Loading...
HomeMy WebLinkAbout2195 FARADAY AVE; A; CB962270; PermitQ,Q... f2-EF1f ;3'-f7~ooo I ALLY/f~q7441(p ' BU IL DING P'E RM IT 12/12/96 15:46 P,:.qe l of 1 ,J,_it, Address: 2195 FARADAY AV Suite: .'4. ?ermit Type: INDUSTRIAL TENANT IMPROVEMENT Permit No: CB96227n Project No: A960J231 I1eve l or:,men t 0! c, : ]?,:;!L-CE'l No: Lot#: Valuation: 16,224 773 ,. Gt Construction Type: VN Occupancy Group: Reference#: Dezcript1on: CONVERT WAREHOUSE TO OFFICE Appl/Ownr : ,.TOHNSOilJ, [JAVE 135 VALLECITOS DE ORO #A SAN MARCOS, CA. 92069 Rt?quired Adjustments: Total F,:tes: Fee d 1:1scription Bu:i.lding P,2rmit Plan Cb.eel: .·' (.,l (! 8~:7. ()() ,,f, •• / 619 471-93E:l3 ',/ Strong :Motion Fee \ . j 1 -., ·,. En ti~r "Y" to Au tocalc 1::. F. F ·. i \ / ,. ;.-;: .: / :·:~:-·/:: I., Enter Traffic Impact· f1='=' ·,. J i.f/ __ \ .,; 1 :·i::J8. pt;)') ;-J · ;,. BUILDING TOTAL :::---,>,; ,,.~: t .. :·,/.,,-· -I • •.-' ',, -~ \II. ~ \-, , ~ f i~ ~~ 1/ Ent,2r "Y' for Electric J..s::1.11:· Fee,;-'.:.,.,;-·_/.". ., .,.,. Enter "Y" for Remodel ,··> '; .. Status: ISSUED Appli 1?d: 11/25/~;r:, Apr/Issue: 12/12/96 Ent<?r•?d By: MDP .00 64.00 773.00 1130.00 117.00 3,tlO 295,(llJ 198. tJ;) 7'33. OU 10,UO 10.00 Dat-3. y Y. y -;; ELECTRICAL rroTAL IN•.'C:'120H,JTE:,i) ,,_ '1~-5~ i 20.00 Enter 'Y' for Mechanica1 Is-su·21 f'c?,:""·. Install Furn/Ducts/Heat P\1.:Y;i:>s .,') 1 ,1' ;;- \ I·lECHANICAL TOTAL / 15.00 y 9 • (j lj 24.0(r ' , J FINAL APPROVAL INSP . .:biJ..L DATE ~ · 7· ff 7 CLEARANCE~---- CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 tl-~r:#-&}6155 /k,t_1ff=lr 3 o 9 l:i 3d PERMIT APPLICATION City of Carlsbad Building Department 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 EST. VAL~#.~~~--t=-bhB 1. Pill.MIT 1YP£ PLANCKD VAIID. BY___,._-1-1i~-------- DATE'---+11--L4+1'1.11.:1.l'----------From Llst 1 (see back) give code of Permit-Type: ____________ _ For Residential Projects Only: From Llst 2 (see back) give , "\ 1..J, __ Code of Structure-Type: ____________________ _ ,•-. ~-:. T Net Loss/Gain of Dwelling Units ___________________ _ 2. PROJECT INFORMATION Address "2-\ ct.s= ~~j Bu1ldmg or Suite No. FOR OFFICE USE ONLY Nearest Cross Street G t(( LEGAL DESCRIPTION Lot No. Subd1v1S1on Name/Number Omt No. Phase No. Energy Cales D 2 Structural Cales D 2 Soils Report D 1 Addressed Envelope EXISTING USE PROPOSED USE ~~Me.ck. aL-t~c::Y"\."5 # OF STORIES # OF BEDROOMS # OF BATHROOMS a~£-V\ ADDRESS STATE ZIP CODE DAY TELEPHONE 0 AGEN'I FOR CON'l'MC'IOR ADDRESS d OWNER d AGEN I FOR OWNER CITY STATE ZIP CODE DAY TELEPHONE s. PROPER.TI oWNRk NAME (last name first) l4~ C.o. ADDRESS k STATE LCt. ZIP CODE q~~ NAME (last name first) C:...s;} T ADDRESS , ~ ~ V°'q,tt-e.c~ ~ on) ~ DAY TELEPHONE 1 "iJ J -'13 8¥ CITY ~ fv\or.to.S STATE ~Cl. ZIP CODE C\~t)~ STATELIC. # LICENSE CLASS CITY BUSINESS LIC. # 1rst STATE ZIP CODE DAY TELEPHONE STATE LIC. # Workers' Compensation Declaration: I hereby affirm that I have a certihcate of consent to self-msure issued by the Director of lndustnal Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. C). eQN\ o ( -EXPIRATION DATE SIGNATURE DATE 8. oWN'ER-BOIWER DECI.ARATION Owner-Builder Declarauon: I hereby afhrm that I am exempt from the ContractoPs License Law for the following reason: D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's Llcense Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale.). D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's Llcense Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). D I am exempt under Section ________ Business and Professions Code for this reason: (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's Llcense Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500]). SIGNATURE DATE COMPLETE 1'H1s SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? DYES D NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? DYES D NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES D NO IF ANY OF TI-IE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY Nar BE ISSUED AFTER JULY 1, 1989 UNLESS TI-IE APPLICANT HAS MET OR IS MEETING TI-IE REQUIREMENTS OF TI-IE OFFICE OF EMERGENCY SERVICES AND TI-IE AIR POILUTION CONTROL DISTRICT. 1s permit 1s issue LENDER'S NAME lo. APPllCAN'I CHR11f1CA110N I cerufy that I have read the application and state that the above mtormat10n 1s correct. I agree to comply with all City ordmances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE 10 SAVE INDEMNIFY AND KEEP HARMLF.SS TI-IE CITY OF CARISBAD AGAINSf ALL LIABIIITIF.S, JUDGMENTS, COSTS AND EXPENSF.S WlllCH MAY IN ANY WAY ACCRUE AGAINSf SAID CITY IN CONSEQUENCE OF TI-IE GRANTING OF TIIlS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. Expiration. Every permit issued by the Building Official under e pr building or work authorized by such permit is no com ce wi such permit is suspended or abandoned at any ti e after APPLICANT'S SIGNATURE S E W E R P E R M I T 12/LU96 15:26 f'ag,E! l of 1 Job Addrecs: 2195 FARADAY AV P,2rr11i t Type: SEWER -OFFICE/WAREHOUSE Par eel I•!o: Desc:c ipth,n: CONVERT WAREHOUSE TO 1:.i:f'FICE 624 SO. WAREHOUSE TO OFFICE P,2rmi t,;-e: JOBi-JSOI.-!, DAVE 135 VALLECITOS DE ORO #A SAr\J ~IAB.COS I Cf~ a $ 10 6 13 f'ees Required ,'. -~ .¾ Suite: A . . Permit No: SE960146 Bldg Pla:nCt#: Statu:::: ISSUED Appli•:<i: 12/12/~:6 Apr/Izsue: l~/12/96 Ezpired: PreparE'd P,y: i"iAl''1 •• j '\ ... ,. ---------~----------------------------------Fees: , ) ,, A<ljustments: ·-' · '-... ,,-,r,+-~ 1 ·("'t; -s'i '-4 • ., .L,<,;;r~ ..... ·;t,~ ... , _ 1:;)··'-t.+:...t .. ~_t 1)t ,:! :t ., £:R,Y,rtteµ ~ " Bitl"-'-'-n\::e-. Dtre : Total fe,::-s: " nu 6:i.B, OtJ , 0 (I 618.00 .oo ~-· "l. ',"-\~ / ·"t ' Fee description . !Jn1ts -. t-E<e/.,.Jn:;, E:-:t fee [)a".:a ---------------------.L-r--"'-·--• -----.::,;,;Ji-,~--.-.:,..''. ---'•,,..._:--,::..~_,, --~---------------- Enter Of fie•::-Squar,:> fc,.:ita·g,: .> ; ; •• 624 . . . 35 ·, i~~=~ ~~~~IT EDUs > • --_:; -~<~L,:.:,:.j;~;f .. ,;;---: ~ ~ Sewer Fee Ent,::-r Sewer Et,us SEWER TOTAL and / -, \. ·.T I ~ .• -;:. J 2 +-----~ f . /: .• _·,·~I: {; ·') ;-, . 'f_,/, r -· I / t,,J( 1)7"1;:·,:;;:,\TLD ',_.,,., / \ -._ \ ', CITY OF CARLSBAD / 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 4.16.00 202.00 F 618.00 PERMIT# CB962270 DESCRIPTION: CONVERT TYPE: ITI CITY OF CARLSBAD INSPECTION REQUEST FOR 02/07/97 WAREHOUSE TO OFFICE INSPECTOR AREA PD PLANCK# CB962270 OCC GRP JOB ADDRESS: 2195 APPLICANT: JOHNSON, CONTRACTOR: FARADAY AV DAVE CONSTR. TYPE VN LOT: STE: A PHONE: 619 471-9388 PHONE: OWNER: PHONE: REMARKS: MW/DAVE/471-9388 SPECIAL INSTRUCT: INSPECTORJ2--'4.----------- TOTAL TIME: --RELATED PERMITS--PERMIT# TYPE SE960146 SWOW STATUS ISSUED CD LVL DESCRIPTION ACT COMMENTS 19 ST Final Structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical -4! fLJJ/~ 3=:-- ------------------- ------------------- ------------------- ***** INSPECTION HISTORY***** DATE 010897 122796 122696 122496 DESCRIPTION Frame/Steel/Bolting/Welding Interior Lath/Drywall Interior Lath/Drywall Frame/Steel/Bolting/Welding ACT INSP AP PD AP DC NR TP AP PD COMMENTS CEIL FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING (FIRE PLANNING U/M WATER PLAN CHECK#: CB962270 PERMIT#: CB962270 PROJECT NAME: CONVERT WAREHOUSE TO OFFICE ADDRESS: 2f95 FARADAY AV SUITE# A CONTACT PERSON/PHONE#: MW/DAVE/471-9388 SEWER DIST: WATER DIST: INSPECTED BY: INSPECTED BY: COMMENTS: DATE INSPECTED: DATE INSPECTED: DATE INSPECTED: 9/t7 j APPROVED APPROVED APPROVED DATE: 02/07/97 PERMIT TYPE: ITI v ij~~~~V/~fn\ ITT FEB 11 1997 ~ By DISAPPROVED DISAPPROVED DISAPPROVED ill:;;if EsGil Corporation Professiona( Pfan ~view 'Engineers ..... ·:.;::::· DATE: 12/9/96 JURISDICTION: Carlsbad ., 0 APPLICANT ------0 JU~~~ 0 FIRE 0 PLAN R . ER I 0 FILE . PLAN CHECK NO.: 96-2270 SET:I PROJECT ADDRESS: 2195 Faraday Ave, Suite A & B PROJECT NAME: Breezecom TI D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's *********** codes. • The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be· corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: • Esgil Corporation staff did not advise the applicant that the plan check has been completed. D Esgil Corporation staff did advise the· applicant that the plan check has been completed. Person contacted: Date contacted: (by: )L,rl ) ' Telephone#: • REMARKS: Building Dept is to field. verify that the existing rest rm access and faciliteis comply with the State disabled access requirements. By: CHUCK MENDENHALL Esgil Corporation O GA O CM O EJ O PC 12/2/96 Enclosures: trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576 JURISDICTION: Carlsbad PREPARED BY: CM VALUATION AND PLAN CHECK FEE PLAN CHECK NO.: 96-2270 DATE: 12/9/96 BUILDING ADDRESS: 2195 Faraday Ave BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VN BUILDING PORTION BUILDING AREA VALUATION VALUE (ft.2) MULTIPLIER ($) Tl 624 26 16224 Air Conditioning Fire Sprinklers TOTAL VALUE 16,224 • 1991 UBC Building Permit Fee D Bldg. Permit Fee by ordinance: $ 180.00 • 1991 UBC Plan Check Fee D Plan Check Fee by ordinance: $ 117.00 Type of Review: . • Complete Review . D Structural Only D Hourly D Repetitive Fee Applicable D Other: Esgil Plan Review Fee: $ 93.60 Comments: Fire Services Review: D Complete Review D Other: D Suppression System D FireAlarm Esgil Fire Services Review Fee: $ Comments: Sheet 1 of 1 macvalue.doc 5196 -· City of Carlsbad Ii ¥1 h· • i 044 4 i h~ I •14 ·iU; I; ,t4 U I BUILDING PLANCHECK CHECKLIST DATE: Jtfl-f/-f~ PLANCHECK NO.: CB 'rbgcX. 7CJ BUILDING ADDRESS: e/ / 9 S ~ ffe--e . PROJECT DE$CRIPTION: ....:::,\\./41==~~=~---.._7.;...:-===------------ ASSESSOR'S PARCEL NUMBER: EST. VALUE: ENGINEERING DEPARTMENT APPROVAL The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build. 0 A Right-of-Way permit is required prior to construction of the following improvements: ATTACHMENTS 0 Dedication Application D Dedication Checklist D Improvement Application D Improvement Checklist D Future lmprov~ment Agreement D Grading Permit Application D Grading Submittal Checklist D Right-of-Way Permit Application D Right-of-Way Permit Submittal Checklist and Information Sheet D Sewer Fee Information Sheet DENIAL Please se attached report of deficiencies marked with . Make necessary corrections to plans or specifi ti s for compliance with applicable codes a · a standards. Submit corrected plans and/or specifications to this office for review. By: Date: -------- By: Date: -------- ENGINEERING DEPT. CONTACT PERSON Name: Michele Masterson City of Carlsbad Address: 2075 Las Palmas Dr., Carlsbad, CA 92009 Phone: (619) 438-1161, ext. 4315 A-4. 111.ASPALMAS\SYS\LIBRARYIENG\WORDIOOCSICHKLST\&lking Planc:heck C1d5I BP0001 Fenn MM.doc Rev. B/21/96 2075 Las Palmas Dr. • Carlsbad; CA 92009-1576 • (619) 438-1161 • FAX (619) 438-0894 D D r BUILDING PLANCHECK CHECKLIST SITE PLAN 1. Provide a fully dimensioned site plan drawn to scale. Show: A. North Arrow D. Property Lines Easements B. Existing & Proposed Structures E. Easements C. Existing Street Improvements F. Right-of-Way Width & Adjacent Streets 2. Show on site plan: A. Drainage Patterns B. Existing & Proposed Slopes C. Existing Topography 3. Include note: "Surface water to be directed away from the building foundation at a 2% gradient for no less than 5' or 2/3 the distance to the property line (whichever is less)." [Per 1985 UBC 2907(d)5] On graded sites, the top of any exterior foundation shall extend above the elevation of the street gutter at point of discharge or the inlet of an approved drainage device a minimum of 12 inches plus two percent." [Per 1990 USC 2907(d)5] 4. Include on title sheet: A. Site address~ B. Assessor's Parcel Numbeiv- C. Legal Description t,,/' For commercial/industrial buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. EXISTING PERMIT NUMBER DESCRIPTION Page 1 of 4 G:ILIBRARYIENGIWORDIDOCS\CHKLST\Bullding Plancheck Cldst BP0001 Fann ""'1.doc Rov. 8/21196 0 0 0 0 0 BUILDING PLANCHECK CHECKLIST DISCRETIONARY APPROVAL COMPLIANCE 5. Project does not comply with the following Engineering Conditions of approval for Project No .. ______________________ _ Conditions were complied with by: ________ _ Date: ---- DEDICATION REQUIREMENTS 6. Dedication for all street Rights-of-Way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ _____ _ pursuant to Code Section 18.40.030. Dedication required as follows: ________________ _ Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8 ½" x 11" plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Provide the completed application form and the requirements on the checklist at the time of resubmittal. Dedication completed by: ___________ _ Date: ---- IMPROVEMENT REQUIREMENTS 7a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds$ _______ , pursuant to Code Section 18.40.040. Public improvements required as follows: _____________ _ Please have a registered Civil Engineer prepare appropriate improvement plans and submit them together with the requirements on the attached checklist for a separate plancheck process through the Engineering Department. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of permit. Attached please find an application form and submittal checklist for the public improvement requirements. Provide the completed application form and the requirements on the checklist at the time of resubmittal. Improvement Plans signed by: _________ _ Date: ---- Page 2 of4 G:ILIBRARY\ENGIWORD\OOCS\CHKLSnBuildmg Ptanchock Cldst BP0001 Form MM.doc Rov. 8121196 .. 2"d,/ 3rd.I Cl Cl Cl Cl Cl 0 0 0 Cl Cl Cl Cl Cl Cl BUILDING PLANCHECK CHECKLIST 7b. Construction of the public improvements may be deferred pursuant to Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $ _______ so we may prepare the necessary Future Improvement Agreement. This agreement must be signed, notarized and approved by the City prior to issuance of a Building permit. Future public improvements required as follows: Improvement Plans signed by: Date: ---------- 7c. Enclosed please find your Future Improvement Agreement. Please return agreement signed and notarized to the Engineering Department. Future Improvement Agreement completed by: Date: 7d. No Public Improvements required. SPECIAL NOTE: Damaged or defective improvements found adjacent to building site must be repaired to the satisfaction of the City Inspector prior to occupancy. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11.06.030 of the Municipal Code. Ba. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill import, export). 8b. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be submitted together with the completed application form attached. NOTE: The Grading Permit must be issued and rough grading approval obtained prior to is.suance of a Building Permit. Grading Inspector sign off by: Date: ---------- 8c. No Grading Permit required. Page 3 of4 G:ILIBRARYIENG\WORDIDOCS\CHKLsn&iklng Planchecl< Cldsl BP0001 Form I.WI.doc Rev. 8121/96 .. a a a a a a a BUILDING PLANCHECK CHECKLIST MISCELLANEOUS PERMITS 9. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or private work adjacent to the public Right-of-Way. Types of work include, but are not limited to: street improvements, trees, driveways, tieing into public storm drain, sewer and water utilities. Right-of-Way permit required for: A separate Right-of-Way permit issued by the Engineering Department is required for the following: 10. A SEWER PERMIT is required concurrent with the building permit issuance. fee is noted in the fees section on the following page. The 11. INDUSTRIAL WASTE PERMIT is required. Applicant must complete Industrial Waste Permit Application Form and submit for City approval prior to issuance of a Permit. Industrial Waste permit accepted by: Date: 12. NPDES PERMIT Complies with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The applicant shall provide best management practices to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved by the City Engineer prior to issuance of grading or building permit, whichever occurs first. Page 4 of4 G:ILIBRARYIENGIWORD\OOCS\CHKLS11&iking Plancheck Cld5I 8P0001 Form MM.doc Rev. 81211116 V ENGINEERING DEPARTMENT ENGINEERING REVIEW SECTION FEE CALCULATION WORKSHEET ~stimate based on unconfirmed information from applicant. /' Calculation based on building plancheck plan submittal. Address:d/ 'S Bldg. Permit No. C.8 96 c:;?_c;,2 7D Prepared by/?l ,4 /'f\.._ Date/2 'I 2 _____ Date: _______ _ EDU CALCULATIONS: List types and square footages for all us~es. ~ {J () 6 11 3 ~ ~~, -~ ' Types of Use_/!,)~ i; Sq. Ft.:AJRits&d~ 5r:;OO EDU's: __ L._•_/~_? __ ~-Total EDU's: ____ ,,_dd/_·~-- ADT CALCULATIONS: List types and square footages for all uses. .,;:>~z,7' Types of usek!.:J..~ i;-Sq. Ft.J,l:J~..tJ; 1 4:tf ;j?t;" c> ADT's: __ ~...;a/_2 ____ ;> __ _ Total ADT's __ C/ ____ _ FEES REQUIRED: PUBLIC FACILITIES FEE REQUIRED O YES O NO (See Building Department for amount) WITHIN CFD: DYES (no bridge & thoroughfare fee, D NO reduced Traffic Impact Fee) 0 1.PARK-IN-LIEU FEE PARK AREA:. ___ _ FEE/UNIT: ____ _ ~FFIC IMPACT FEE ADT's/UNITS: _9 ___ _ X X NO. UNITS: __ _ FEE/ADT: 6l ~ =$ _____ _ =$ ;qg~ 0 3. BRIDGE AND THOROUGHFARE FEE ADT's/UNITS: ____ _ X FEE/ADT: ___ _ =$ _____ _ 0 4. FACILITIES MANAGEMENT FEE ZONE: ___ _ SQ.FT.: __ _ X FEE/SQ.FT.: ___ _ =$ _____ _ 0 5. SEWER FEE PERMIT NoSGc?' 6 0 ~ EDU's: ., c9-,, ,3:: X FEE/EDU: U/ 0 = A I" 1--:.: gr:52..= $_-:t::/.-.;'...€2:..__ . - BENEFIT AREA: F: EDU's: 0 Q(.~ DRAINAGE BASIN:,:,-z9 FEE/EDU: 87/ X . 8qt) =$ o?Oa ·-- 0 6. DRAINAGE FEES PLDA. ____ , HIGH ___ /LOW __ _ ACRES:_____ X FEE/AC: __ _ =$ _ _..;.. ___ _ 0 7, SEWER LATERAL ($2,500 DEPOSIT) =$ _____ _ 0 8. WATER FEE EDU's: ____ _ X FEE/EDU: __ _ =$ ____ _ TOTAL OF ABOVE FEES*:$ g_~ *NOTE: This calculation sheet Is NOT a complete list of all fees which may be due. Dedications and Improvements may also be required with Building Permits. P:\DOCS\MISFORMS\BP0002.FRM REV 01/04/95 .s! "' Cl >, .0 ~ ~ Q) .c: t.) C "' a: >, .0 "' 'It "" () Q) .c: t.) C "' a: PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST Plan Check No. CB <I&-:22""10 Planner J f e. u e_ J 1 ·I',') l'l'7 £ Address ;2 I q S-[arac/a;:; AVf?/lU& Phone (619) 438-1161, extension '-I 3 2 8 APN: 2/")..-070-2100 Type of Project and Use: A/ew 1,,den'o,.,-;24,h'-f/oar, e/ec .1 117ec/2., ailera f,.orzt Zone: C -l'n,.,, Facilities Management Zone: ___ S __________ _ CFD(i~-- ci~~ (If property in, complete SPECIAL TAX CALCULATION WORKSHEET provided by Building Department.) Legend l:8J Item Complete D Item Incomplete -Needs your action Environmental Review Required: YES NO /2YPE ---- DATE OF COMPLETION: ______ _ Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval / Discretionary Action Required: YES NO ;;;..YPE ---- APPROVAL/RESO. NO. _____ DATE ___ _ PROJECT NO. _______ _ OTHER RELATED CASES: __________________ _ Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES NO/ If NO, proceed with checklist; if YES, proceed below. Determine status (Exempt or Coastal Permit Required): If Exempt, proceed with checklist; if Coastal Permit required, hold building permit until Coastal Permit issued. Coastal Permit Determination Form already completed? YES NO If NO, complete Coastal Permit Determination Form now. Coastal Permit Determination Log #: Follow-Up Actions: 1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum Floor Plans). 2) Complete Coastal Permit Determination Log as needed. DD D- lnclusionary Housing Fee required: YES __ NO / (Effective date of lnclusionary Housing Ordinance -May 21, 1993.) Site Plan: 1 . Provide a fully dimensional site plan drawn to scale. Show: North arrow, properw lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width, dimensional setbacks and existing topographical lines. 2. Provide legal description of property and assessor's parcel number. Zoning: 1 . Setbacks: Front: Required ,()A Shown Int. Side: Required Shown Street Side: Required Shown Rear: Required Shown 2. Lot Coverage: Required AJ(_ Shown 3. Height: Required A-IA-Shown 4. Parking: Spaces Required Shown Guest Spaces Required A.Jc.. Shown Additional Comments . 7n+er/oz I/V//.Ji"ouemea.:f..1 j OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER J..:iw..u f t-n1~_; DATE 12-J-?& City of Carlsbad 96367 Fire Department • Bureau of Prevention Plan Review: Requirements Category: Building Plan Check Date of Report: Wednesday, November 27, 1996 Reviewed by: G · i/8&.-e_d._,, Contact Name C.S.I. General Inc Address 145 Vallecitos De Oro #F City, State San Marcos CA 92069 Bldg. Dept. No. CB96-2270 Planning No. Job Name Breezecom ------------------ Job Address _2_1_95_Fa_r_ad_a~y _____________ _ Ste. or Bldg. No. ____ _ ~ Approved -The item you have submitted for review has been approved. The approval is based on plans; information and/or specifications provided in your submittal; therefore any c,hanges to these items after this date, including field modifica- tions, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. D Disapproved -Please see the attached report of deficiencies. Please make corrections to plans or specifications ne9essary to indicate compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. For Fire Department Use Only Review 1st __ _ 2nd. __ _ 3rd __ _ Other Agency ID CFD Job# __ 96_3_6_7 __ File# ___ _ 2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121 City of Carlsbad 96367 Fire Department • Bureau of Prevention General Comments: Date of Report: Wednesday, November 27, 1996 Contact Name C.S.I. General Inc Address 145 Vallecitos De Oro #F City, State San Marcos CA 92069 Bldg. Dept. No. CB96-2270 Planning No. _____ _ Job Name Breezecom Job Address 2195 Faraday ------------------Ste. or Bldg. No. ____ _ All sprinkler work must be approved by the fire department and plans must be submitted prior to doing the work. Fire extinguishers are required. Size 2A 1 0BC currently tagged, hung with top of extinguisher no higher than 5 ft. with the travel distance not to exceed 75 ft. / 2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121 \ ~\ ~.1/20/1996 12: 26 6194806246 HAVNAL&CO TITLE 24 REPORT FOR: 2195 Faraday Ave., Suites A-B 2195 Faraday Ave., suites A-B Carlsbad, CA 92,008 PROJ~C'l' DESIGNER: C.$.I, 135 vallecitos De Oro,: Suite A San Marcos, CA ~1069 {61~)471~9388 REPORT PREPARED BY: Steve Ba14e~r~ma, CEPE Haynal & Co., Iricl. 425 West Fifth stteet Escondido, CA 92025 (619) 743-5408' Jol:i Number: Date: 11/20/1991; PAGE 03 The COMPLY 24 computer program has be$n ueed·to perform the calaulations summarized in this oomplia.noe report. This program has approval and is authorized by the cali~ornia Bnergy Cotnmiaaion for use with both the Residential and Nonresidential auilding Enetj}y Efficiency Standa~da. This program developed by Gabel Dodd Associatea (510) 428-0803. 11/20/1995 12:25 5194805245 HAYNAL&CO PAGE 04 Taole Of Contents for Ti~le 24 Report Cover Page ........................ , .• 4 .......................... , • + • • .. • • • • l 'l'able of Contents ..........••• , • , •.•......•....... , ... , , • • • . . . . . . . • • 2 Nonresiqential Performance Title 24 Forms ........................... 3 ~orm ENV-3 construction As~emblies ................ ,,,, .............. 17 11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 05 ~ERFORMANCE CERTIFICl\.TS OF COMPLIANCE (part l of 3) Run Initiation Time: 9:49:28 PERF-1 page 3 of 20 Runaade: 2875~561270336 ----------------------------------------~----------------~-~--~~--~----M~~-Project Name: 2195 Faraday Ave., Suites A·B Address: 219S Faraday Ave., Suites A-B Carlsbad, CA 92008 Designer: c.s.I. Documentation: Haynal & Co., Inc, STATEMENT OF COMPLIANCE !Date: 11/20/1996 ! _______ _ !Building Permic No '--------!Checked by I Date l !COMPLY 24 User 2875 This Certificate of Compliance list$ the Building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Building using tn@ ~erformance compliance approach. The Principal Designers hereby certify that the pro~osed building design represenceo in the construction documents and mcdelled for this permit appl~~ation are consistent with all other forms and worksheets, specifi- cations, and other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6; Chapter l. A-I he~eby affirm that I am eligible under the provisions of Division 3 of the Business and f~ofeaaions Code to sign this document as the person responsible for its pre~aration; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. 2. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537,2 of the Business and Professions Code to ~ign thiB document Qe·the pe~~on ~esponsible for its preparation; and that I am a licensed contractor ~reparing documents for work that I have contracted to perform. 3. I affirm that I am eligible unde~ the exemption to Division 3 of the Business and Professions Code by Section. cf the ---~-~~-Code to sign this document as the pa~aon re~ponsible for its preparation; and fo~ the following reaeQn; ____________ ~~ SCOPE OF COMPLIANCE (Designers should circl~ applicable paragraph numbers) Princi~al Designer c.s. I. (Ei19) 47lM9388 LIGHTING - Principal Desisner Principal Designer Required Forms: ENV-1, ENV-2 Location of M ndato:ry Meas UC· f-J0- t;)""16~{ Required Forms: LTG•1, LTG-2 l.iocat:i.on of Man u_t.-, eJO{ Lt!\J:\Oct, Required Location \...tC, l\JlY, 1,qtS-lS 1 ~ 3 (Date) (Circle) on I>la:ns 1 ®. 3 (Date) (Circle) M:SCH-4 1® 3 (Circle) 11/20/1995 12:25 5194805245 HAVNAL&CO PAGE 05 PERFORMANCE CERTIFICATE OF COMPLIANCE (part 2 of 3) ~un Initiation Time: 9:49:28 iERF-1 page 4 of 20 Runcode: 2875-561270336 --------------------P•m•P•~--~------~--·-----~~-------~--------------~----- Project Name: 2195 Faraday Ave., Suites A-B Documentation: Haynal & Co.t Inc. ANNUAL SOURCE ENE8.GY' USE SUMMARY {KBtu/sqft-yr) Standard Energy component Ile.l!lign -------------------------------- Space Heating 3.37 $pace Cooling 34.13 Indoor Fans 22.60 Heat Rejection 0.00 Pumps 0,00 Domestic Hot Water 0.00 1,ighting 47.12 Receptacle 25.4B Process 0.00 -------- TOTALS 132.69 GENERAL INFORMATION !Date: 11/20/1996 I jCOMi~Y 24 User 2B75 Proposed Comp1ianca De~ign Margin __ "" _____ ... -........... ..,.,.. --- 2.88 0.48 34.13 0.00 J.4.90 7.G9 0.00 0.00 o.oo 0.00 o.oo 0.00 50.96 -3.85 25.48 o.oo 0.00 0.00 ,,..,.. ........... ---------- 128.37 4.33 Conditioned Floo~ Area: 624 9.0 0.46 1,19 Compliance Method: COMPLY 24 vS.00 Average ceiling Height: Glass ~~ea/ Wall Area: Average Glazing U-Value; Front orientation; Number of Stories: Numl:>er of Zones: Number of Oao1,1pancie1;1: ZONE :tNFORMAT!ON 0 deg-(N) 1 l 1 Floor Display Area Perim. zone Name (sg;ft) (ft) ---------------------·-------------- Loc~tion: Carlsbad Climate Zone: 7 Inst Tailored Process Tailored. I.PD I..ighting Loads Ven.t.. (w/af) {watts) (w/sf) (y/n) ------------"'~"" -.... ~------------ New Office Areas 624 0 J..73 0 0 N ,·: 11/20/1996 12:26 6194806246 HAVNAL&CO PERFORt-U\NCE CERTIFICATE ov COMl?LIANCE (part 3 of 3} Run Initiation Time; 9:49:28 Project Name: 2195 Faraday Ave., Suites A-B Documentation: Haynal & Co,, rnc. PAGE 07 PERF-1 page 5 of 20 Runcode: 2875-561270336 !Date: 11/20/1996 I !COMPLY 24 User 2875 The documentation preparer he~eby ce~tifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR Steve Balderrama, CEPE (619) 743-5408 ~-'(s .. ,o,~ =:;;;;:,A:i:- (Signa.t11re) (Date) EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local ento~cement agency should pay ape~ial attention to the items specified in this checklist. These items ~$quire special written justification and documflltltation, and special verification to be used with the performance approach. The local enforcement ag$ncy detetmines the adequacy of the justification, and may rejeat a building o~ design that otherwise complies based on the adequacy of the special justification and documentation submitted. w~ndow/Wall Ratio value Entered• 0.463 BUILDING DEPARTMENT APPROVAL OF EXC~FT!ONAL 1EATUR.ES JTJSTIF!CA~ION: The exceptional feat~rea liated in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been providea by the applicant. authorized signature o~ ~tamp __________________ _ 11/20/1996 12:26 6194806246 CERTIFICATE OF COMPLIANCE -Envelope Run Initiation Time; 9:49:28 HAYNAL&CO Project Name: 2195 Faraday Ave., Suites A-B Documentation: Haynal & Co., Inc, PAGE 08 ENV-1 page 6 of 20 Runooda: 2875-561270336 !Date: 11/20/1996 I !COMPLY 24 User 2875 ------------------------~---ff·---~··~--~------------------------~---------- Const OPAQUE SURFACES Assembly Name Type LOcation/comm.ent~ R-19 Roof(R-19 on Tile) wood Carpeted Slab On Grade None 6" conc~ete wall None ~ollow Metal Door None FENESTRAT::t:ON Frame Or,ient Panes Type Exterior Shade -------------------~·-----·-~-· Right (W) l. Metal None ,,:,), OH N Glazing Type Note to Field --N~-------------------Single 'I'inted 11/20/1996 12:26 6194806246 CERTIFICATE OF COMPLIANCE -Lighting Run Initiation Time: 9:49:28 HAVNAL&CO PAGE 09 LTG~1 page 7 of 20 Runccde; 287S-SS121O336 -~~----•-•••~---~•-------------------w---------~~----------------~---•--•~• Project Name: 2195 Far~day Ave., Suites A-B Documentation: Haynal & Co., Inc. INSTA:L~ED LIGHTING SCHEDULE NO of Name Lamp Type Lamps -.... -.... .,. _______ ------Fluorescent 3 MANDATORY AUTOMATIC CONTROLS control Watt1:1/ Ballast Lamp Type ---------·-------34 Standard. !Date; ll/20/1996 I !COMPLY 24 User 2875 :Ballasts/ No of Note to Luminaire Fixt, Field ---------------- 1.5 10 Control Location ID Control Type ione Controlled Note to Field CONTROLS FOR ClUilOIT Control control Location ID control Type Zone controlled :-... Note to Field 11/20/1996 12:26 6194806246 HAVNAL&CO CERTIFICATE OF COMPLIANC~ • Mechanical (part l of 2) ~~n Initiation Time; 9:49:28 Project Name: 2195 Faraday Ave., Suites A-B Documentation: Haynal ~ Co., Inc. SYSTEM FEATURES zone Name Time Control Setback Control #of Isolation Zones HP '!'hermostat Elect:dc Heat Fa.n <;:ontrol VAV Min Position Simul. Heat/Cool Heat supply Reset Cool Supply Reset Ventilation OA Damper Control Economizer Type outdoor Air CFM Heat Equip Type Make & Model No, Cool Equip Type Make and Model Code Tables Time Control S:l?;i;-og Switch o:occ Sensor M:Man Timer Existing HVAC _s_ None n/a Yes 0.0 XW Constant Volume n/a n/a Constant 'l'emp constant Temp _B_ _A_ No Eoonomi::er 94 Heat Pump Tie into existing HVAC DX Ventilation B:Air Balanoe C:OA Cert. 1\1: OA Mea.tmre D;Demand Cont N;Natu:i::al OA Damper A:Aut.o G:Gr~vity PAGE 10 MECHAl pages of 20 Runcoda: 2875-561270336 !Date: ll/2O/1996 I !COMPLY 24 User 2875 Note to F.ield I I I I I I I I I l 1 I I I I I I I I I I 11/20/1996 12:26 6194806246 HAYNAL&CO PAGE 11 CE~TlrIC~TE OF COMPLD\NCE ~aohanioal (part ·2 of 2) MECH-1 page 9 of 20 Run Initiation Time: 9:49:28 Runcode: 2875•56l27O33G Project Name: 2195 Faraday Ava., Suites A-B Documentation: Ha-ynal & Co., Inc. DT)CT !NSULl\TION System Name Type Duct Location Tie into existing HVAC Heating Ducts in Attic Cooling Ducts in Attic PIPE INSULATION Insul System Name Pipe Type Required Domestic Hot Water y / N NOTES TO FIELO -For Building Department Use Only !Date: 11/20/1996 I jCOMPLY 24 User 2875 Duct ~ape Insul Note to Allowed R-Val Field y / N y / N 4.2 4.2 Note to Field 11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 12 ENVELOPE COMPLIANCE SUMMARY~ Perfo~ce (p~rt 1 Qf 3)ENV-2 page 10 of 20 Run Initiation Time: 9:49:28 Runcode: 2875-561270336 Project Name: 2195 Fa~aday ~ve,, Suites A-B Documentation: Haynal & co., Inc. GENERAL lNFO~TION BY ZONE :z:one Name New Office Areas Occupancy Office !Date: 11/20/1996 I !COMPLY 24 uaer 2875 Flr Floor Display Perim. No Area Volume 1 5616 0 Total 624 11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 13 ENVELOPE COMPLIANCE SUMMARY p Performance (part 2 of 3)ENV-2 page 11 of 20 Run Initiation Time: 9:49:28 Runcode: 2875-561270336 Project Name: 2195 Faraday Ave., Suites A-B Documentation: Haynal & co., Inc. O~AQUE SURFACES Act Type Area u-Val Azm Tilt Wall 95 0.752 270 90 Roof 624 0.043 0 22 S11;, 624 0.134 0 180 Solar Gains Yes Yes NO Form 3 Reference ----------------~----·ff 611 Concrete wall R-19 Roof(R-19 on Tile) Carpeted slab On Grade ,• ·.,'>., jDate: 11/20/1996 I !COMPLY 24 User 2815 Location/Comments ~·-~·~~-ff~---------- New Office Areas New Office Area~ New Office Areas 11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 14 ENVELOPE COMPLIANCE SOMMAR.Y Performance (pat>.t 3 of 3)ENVft2 page 12 of 20 Run Initiation Time: 9:49:28 Runoode: 2875-561270336 --------------------~-·~---------------------------------------------------Project Name: 2195 Faraday Ave., Suites A-B oocumentation: Haynal & Co., Inc. FENESTRATION SURFACES SC Aat Glass !Pate; ll/20/1996 I !COMPLY 24 User 2875 # Type Area Frame Div U-Val Azm Tilt Only Location/Comments 1 Wow Right (W) 100.0 Metal No 1.19 270 90 0.65 New Office Areas OVERHANGS/SIDE FINS --Window•- # ~ype ~t w~ ··---Overhang---------Left Fin-~- Len Ht LExt RExt Dist Len Ht ~--Right Fin-- Di~t Len Rt 11/20/1996 12:26 6194806246 HAYNAL&CO PAGE 15 LIGETING COMPLIANCE SUMMARY -Pertormance Run Initiation Time; 9:49:28 Project Name: 2195 Faraday Ave., Suitea A-B Documentation: Hayn.al & Co., Inc. ACTUAL LIGHTING POWER N~me Oescription 48" rr-:i.2 I.ow Watt /3 Lamp (Tandem) LTG-2 page 13 of 20 Runcode: 28?5-SG127033G ]Date; 11/20/1996 I jCOMPLY 24 Oser 2875 No of Watts Total Lum!n per Default Wa~ta 10 108.0 _Y_ 1080 SubTotal 1oao Less Control Credits (LTG-3) 0 Total Proposed Watta 1080 * If not c~c Pef~ult value, ple~se provide suppo~ting documentation. MODELLED LIGHTING POWli:R BY ZONE zone Name New Office Area~ Occupancy Offide TOTALS Modelled Flc;>Or ~ea LPD Total Tailored (w/~:f) (watta) (watts) 624 1. 731 624 1.731 1080 1080 0 0 * Note: Tailored Allotment rec.tUires supporting documentation on form LTG-~. 11/20/1996 12:26 6194806246 HAVNAL&CO MECHANICAL EQUIPMENT ZONING $l)?JJMAR.Y -Performance Run Initiation Time; 9149:28 ~roject Name: 2195 Faraday Ave., Suites AMB Documentation: Haynal & Co., Inc. SYSTEM/ZONING SUMMARY system/Zones served central/Zonal System PAGE 16 MECH-2 page 14 of 20 &uneode: 287S-SG1270336 !Date: 11/20/1996 I ]COMPLY 24 User 2875 system Type No Sys Existing HVAC Tie into existing KVAC Packaged Heat Pump 1 New Office Ar~as 11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 17 MECWl.NlCA!. EQUIPMENT SUMMARY -Performance Run Initiation Time: 9149:28 MECH-3 page 15 of 20 Runcode: 2875-561270336 ~roject Name: 2195 Faraday Ave., Suites A-B IDate: 11/20/1996 Documentation: Haynal & co., Inc. CENTRAL SYSTEM SUMMARY Sys I !COMPLY 24 Use~ 2875 No No System Name syaum Type sya Economize~ Type 1 Tie into existing HVAC Packaged geat Pu· 1 No Economizer CENTRA.L SYSTEM RATINGS Sys------~ Heating~---~----··---~--~---·---~--~··---Cooling----------· NO ~ype Outp~t Aux KW EFF Typ~ Output SEm~ihle EER SEER 1 Heat Pump 15000 0.0 S.60 DX J.9000 16500 8.00 9.00 CENTRAL FAN SUMMAR~ ~-··-~-w·---Su~ply Fan---------------Return Fan~-- Sys Mtr Drv Mtr Drv ~o ~~n Type Motor Location CFM Btn' Eff Eff CP'M BHP Eff Eff 1 constant Volume Draw-Through ZONAL FAN SUMMARY Zone Name No CFM None 650 0.13 ss 100 None Zonal li'an w••·---Exhaust Fan-~--- Mtr Drv Mt:r Orv BHP Eff Eff No CFM E:j:f Eff 11/20/1996 12:26 6194806246 MECHANICAL VENTILATION -Performance Run Initiation Time: 9:49:28 HAYNAL&CO Project Name: 2195 Faraday Ave., Suites A-B Documentation: Haynal & Co., Inc. VENTILATION SUMMARY BY ZONE Flocir Zone Name 'l' Occupancy Al:'ea New Office Areas Office 624 sqft /Occ 130 PAGE 18 MECH-4 page 16 of 20 Runoode: 2875-561270336 !Date: 11/20/1996 I ICOM~LY 24 User 2875 Tran CFM Dsg Min sfer /Oco CFM CFM CFM __ ... ___ 15.0 72 94 22 ------ TOTALS 72 ~4 w~RN!NG -Total Design Mechanical ventilation is less than Minimum Required Tailo~ed OA (T=*) req\lires supporting documentation on MECH-5, Tailored Ventilation and Process Loads Workah•et 11/20/1996 12:26 6194806246 HAYNAL&CO PAGE 19 ~~O~OSEP CONSTRUCTION ASSEMBLY Project Name: 2195 Faraday Ave.1 suites A~B Pocumentation: Haynal ~ Co., Inc. ENV-3 page 17 of 20 IOate: 11/20/l996 I jCOMPLY 24 User 2875 COMPONENT DESCRIPTION Sketch of construction Assembly Construction components Outside Air Film l. Rooting, '.Built-Op 2. Membrane, Vapor-PermeaDle Felt 3. Plywood 4. Air Space 5. Insulation, Mineral Fiber, R.~19 6. Acoustical Tile1 Interior Finish 7. 8. 9. I:o.side .Ai~ F;i.lm Assembly Name: R-19 Roof(R-19 on Tile) Assembly Type: Roof Assem))ly Tilt: 22 deg (Tilted Up) Framing Material: Wood Framing-Spacing: " o.c. Framing Percent: 10.0 t Abeorptivity; 0.70 Roughness: Concrete, Asph. Shingles Th Fr (in) 0,375 0.010 o.soo * G.000 6.000 o.soo R.-Value Cavity Fr.i.me 0.17 0.17 0.33 0.33 0.06 O.OG 0.62 0.62 0.80 $.94 19.00 19.00 1.43 1.43 0.61 0.61 unadjusted R-Values 23.02 28.lG APJO'STMENT FOR FB.AMI*G {1 /23.02) X (0.90} • (l /28,16) ~ (0,10) Weight: Heat Capacity; 6.3 ll:,/sqft 2.13 • 0.043 TOTAL TJ-VJU.,TJ'E = 0.043 ===== TOTAL R-V.l\LUE = 23.45 11/20/1996 12:26 6194806246 HAYNAL&CO PAGE 20 PROPOSED CONSTRUCTION ASSEMBLY Project Name: 2195 Far,aday Ave., Suites A-a Documentation! Haynal & Co., Inc. ENV-J page ~8 of 20 !Pate: ll/20/1996 I !COMPLY 24 User 2875 COMPONENT DESCRIPTION Sketch of construction Assembly ASSEMBLY U-VALUE construction Components Outside Air Film 1. Earth 2. Concrete, 140 lb, Not Dried 3. Flooring, Car~et and Fibrous 4. 5. 6. 7. 8. 9. Inside Air Film Pad Aa$embly Name; carpeted Slab on Grade Assembly Type: Floor Assembly Tilt; 180 deg (Ho~izontal Floor) Framing Material: None Framing $pacing: "o.c. Framing ~~~cent; o.o t Absorptivity: 0.70 Roughness; Concrete, Asph. SAingles Th R-Value Fr (in) Cavity Frame 0.17 0.17 24,000 4,00 4.00 3.500 0.28 0.28 0,250 2.08 2.08 0.92 0.92 -MMWVff-~"NftM~-~---------·~-~--~------------~~------------~----------------~ unadjusted R-Values 7.45 ADJUS'n>'I~Nt iOi FRAM!NG (l / 7.45) X (1,00) + (l / 7.45) X (0.00) Weight: Heat. Capacity: 210.9 lb/sgft 42.19 • O.ll4 TO'l'JU., U-VALUE • 7.45 0.134 ...... ~ ===== 11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 21 PROPO$:E!l CONS'tltUCTlON ASSEMBLY ENV-3 page 19 of 20 --------------------~-~------~~----~-----------------~~~~~--~-~-~----------Project Name: 2195 Faraday Ave., Suites A-B Documentation: Haynal & Co,, Ino. !Date: 11/20/1996 I !COMPLY 24 User 2875 COM~O~ENT OESCRiiTION Sketch o! Construction Assembly ASSEMBLY U•VALUE Construction components outside Air Film 1. concrete, 140 lb, NQt Dried ~. 3. 4. 5. 6. 7. 8. !:). :i:ns.idl;! Air Film A.DJUSTMENT FOR FRAMINQ Assembly Name: 6" Concrete Wall Assembly Type: Wall ASaembly Tilt: 61 deg (Tilted Up) Framing Material: None Framing Spacing: 11 O.C. Framing Percent; 0,0 t Absorptivity; 0.70 Roughnaae: concrete, .Asph. Shingles Th Fi-(in) 6.000 Unadjueta4 R-Values R-Value Cavity 0,17 0.48 0.G8 l.33 Frame 0.17 O.'l8 0.6'8 1.33 (1 / 1.33) X (1.00) + (1 / 1.33) X {0.00) • 0.752 Weight: lieat Capac:i.ty: 70.0 lb/sqft 14.00 TOTAL U-VALUE • 0.752 TOTAL R•VALtTE 1.33 ===== 11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 22 PROPOSED CO~STRUCTlON ASSEMBLY Projeot Name: 2195 Faraday Ave,, Suites A·B Documentation~ Haynal ~ Co., Inc. ENV-3 page 20 of 20 1nate: 11/20/1996 I !COMPLY 24 User 2875 COMPONENT PESCRIPTlON Assembly Name: Hollow Metal Door Assembly Type: Door Assembly Tilt: 90 deg (Vertical) Framing t:mterial: None Framing Spacing: 11 o.c. Framing fercent: o.o \ Al::>sorptivity: 0,70 s~ecch of Construction ASsembly RoughneS·J; Smooth Plaster, Metal ASSEMBLY U-VALUE Construction Components Th Fr (in) R-Value Cavity frame -~------------------~·-----------------WW~------~-----------------------~M• Outside Air Film 0.17 0. J, 7 l, Steel 0.001 0.00 0.00 2. Air Space 1.750 0,87 0.87 3. Steel 0.001 o.oo 0.00 4. 5. 6. 7. 8. Sl. Inside Air Film 0.68 0.68 -------------------------··~·------~~-------------------------~~·----------unadjusted R-Values 1,72 1.72 AD.ro'STMENT FOR FRAMING (1 / 1.72) X (1.00) + (1 / l.72) X (0,00) Weight: Heat Cava.city: O.l. lb/sqft 0.01 -0.581 TOTAL tr-VALUE"" 0.581 TOTAL R-VALUE • 1.72 ••ma• ~1/20/1996 12:26 6194806246 HAVNAL&CO PAGE 23 MANDATORY R.EQUI.REMENTS .. ENVELOPE MANDATORY MEASURES (NONRESIDEN'I'IAL) l, £,cterior manufactured doors, windows, and fenestration products shall meet the infiltration and U--value certification requirements of Section l16(a). 2. Site-construced doors, skylights, and windows shall be caulked and weather-stripped. per Section 116(b). 3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to limit infiltration and exfiltration pu Section 117, 4. Certified insulation materials per Section 118(:a). 5. Urea Formaldehyde foam insulation installed per Section t 18(b), 6. Insulation installed to meet flame spread and smoke density requitements pet ~tion t 18(c). LIGHiING MANDATORY MWUIU!S 1. Each enclosed area shall have independent control5 (per Secdo.n 1J1(a) and eJmtptions). 2. Lighting shall be unifonnly reducible by one half in areas which ate greater thu 100 sf, exceed 1.2 watts/sf, and have more than one luminaire (per Section 131(b) and exceptions; exceptions include lights in corridors). 3. Da.ylit a.reas larger than 250 sf shall be separately controlled and uniformly reilucible by one half (per Section 131{c) and exception11). 4. Separately metered spaces 5,000 sf or greater shall have automatic shutoff controls (per Section l31(d) and exceptions). 5, Display lighting shall be separately switched on circuits that are 20 :amps or leu (per Section 131(e). no exceptions). 6, Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131 (0 and exceptions). 7. Pairs of one-lamp and three-lamp fluorC$Cent luminaires shall be tandem-wimJ where reasonilble (per Section 132 and exceptions). SERVICE WATER HEATlNG SYST£MS 1, Tempe.rature controls and recirculating pump controls shall m~et the require.ments of Section 113{a) & (b). 2. Flow rates and temperature controls for publie bv:u.orie, shall nieet the requirements of Section 113(b}3. 3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b)4. MECHANICAL AND PLUMBING MANDATORY MEASURES Equiptnertt and Systems Efficiency 1. HV AC and service water hei:iting equipment shall meet Appliance Efficiency Reguhations, per Sections 111 and 112. 2. Piping, except those conYeying fluids :at temperatures between 60 and 105 degrees F, or within HVAC equil'ment, shall be insulated in accordance with Section 123. 3. Air handling duct systems shall be sealed in accordance with the SMACNA HV AC Ducts Construction Standards, Metal and Flexible, 1985, per Section 124(a) and (b). Ducts shall be installed and insulated as provlded in UMC, Chapter 10, 4. Pilot lights shall not be installed for natural gas central furnace$, an.Ji pool and spa he;iters, per Section 115. Yeotihuian 1. Every space in a building shall be designed to have outdoor air ventilation according to Section 1:Zl(a), (b) and (e). 2. Operation and control of outdoor air shall meet the time-of.occupancy and p.n!"<>Ccupancy requirements of Section 12t(c). 3. Whtm a i:etu.rn plenum js used to distribute outdoor air to a covered. HV AC unit the ducted discharge shall be in accordance with Section 121(d). 4. Systems shall meet the completion and balancing requirements of Section 121(1), Controls 1. Ea.ch space conditioning zone shall be controlled by an individual thermo11tarii; control that responds to temperature within the zone. Heating sh.all be adjustable down to SS degrees or lowert and cooling rhatl be adjustable up to 85 degrees or higher. The control shall provide a dead.band of S degrees between heating iUld oooling. Section 122(a) and (b). 2. Heat pumps whh supplero.enta.ry electri<: r~istance heaters 1Jhru.l have controt. per Sectmn 1l2(b), 3. Each space conditioning system shall be instlllled with an automatfo time switt:h, able to shut off OJ?eration during off-hours of up to four hours, per Section 122(e)l. 4. Thermostat setup and setback controls are required ff the summer design dry bulb temperature iJ more than 99 degrees F, or if the winter design temp¢rat.uri: is }¢ss than 33 degrees, per Seccion 122(e)2t and its exceptions. 5. Outdoor air supply and exhaust equipment shall be inst.lied with dampers that automatically dose during periods of non-use for the areas served by the equipment, per Section 122(£). 6, Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be designed, installed, and controlled to serve isolation are:as, per Section 122(g}.