HomeMy WebLinkAbout2195 FARADAY AVE; A; CB962270; PermitQ,Q... f2-EF1f ;3'-f7~ooo I
ALLY/f~q7441(p
' BU IL DING P'E RM IT
12/12/96 15:46
P,:.qe l of 1
,J,_it, Address: 2195 FARADAY AV Suite: .'4.
?ermit Type: INDUSTRIAL TENANT IMPROVEMENT
Permit No: CB96227n
Project No: A960J231
I1eve l or:,men t 0! c, :
]?,:;!L-CE'l No: Lot#:
Valuation: 16,224
773 ,. Gt
Construction Type: VN
Occupancy Group: Reference#:
Dezcript1on: CONVERT WAREHOUSE TO OFFICE
Appl/Ownr : ,.TOHNSOilJ, [JAVE
135 VALLECITOS DE ORO #A
SAN MARCOS, CA. 92069
Rt?quired
Adjustments:
Total F,:tes:
Fee d 1:1scription
Bu:i.lding P,2rmit
Plan Cb.eel:
.·' (.,l (!
8~:7. ()()
,,f, •• /
619 471-93E:l3
',/ Strong :Motion Fee \ . j 1 -., ·,.
En ti~r "Y" to Au tocalc 1::. F. F ·. i \ / ,. ;.-;: .: / :·:~:-·/:: I.,
Enter Traffic Impact· f1='=' ·,. J i.f/ __ \ .,;
1
:·i::J8. pt;)') ;-J ·
;,. BUILDING TOTAL :::---,>,; ,,.~: t .. :·,/.,,-·
-I • •.-' ',, -~ \II. ~ \-, , ~ f i~ ~~ 1/ Ent,2r "Y' for Electric J..s::1.11:· Fee,;-'.:.,.,;-·_/.". ., .,.,.
Enter "Y" for Remodel ,··> '; ..
Status: ISSUED
Appli 1?d: 11/25/~;r:,
Apr/Issue: 12/12/96
Ent<?r•?d By: MDP
.00
64.00
773.00
1130.00
117.00
3,tlO
295,(llJ
198. tJ;)
7'33. OU
10,UO
10.00
Dat-3.
y
Y.
y
-;; ELECTRICAL rroTAL IN•.'C:'120H,JTE:,i) ,,_ '1~-5~ i 20.00
Enter 'Y' for Mechanica1 Is-su·21 f'c?,:""·.
Install Furn/Ducts/Heat P\1.:Y;i:>s .,') 1 ,1' ;;-
\ I·lECHANICAL TOTAL
/ 15.00 y
9 • (j lj
24.0(r
' , J
FINAL APPROVAL
INSP . .:biJ..L DATE ~ · 7· ff 7
CLEARANCE~----
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
tl-~r:#-&}6155
/k,t_1ff=lr 3 o 9 l:i 3d
PERMIT APPLICATION
City of Carlsbad Building Department
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 EST. VAL~#.~~~--t=-bhB
1. Pill.MIT 1YP£ PLANCKD
VAIID. BY___,._-1-1i~--------
DATE'---+11--L4+1'1.11.:1.l'----------From Llst 1 (see back) give code of Permit-Type: ____________ _
For Residential Projects Only: From Llst 2 (see back) give
, "\ 1..J, __
Code of Structure-Type: ____________________ _ ,•-. ~-:. T
Net Loss/Gain of Dwelling Units ___________________ _
2. PROJECT INFORMATION
Address "2-\ ct.s= ~~j Bu1ldmg or Suite No.
FOR OFFICE USE ONLY
Nearest Cross Street G t((
LEGAL DESCRIPTION Lot No. Subd1v1S1on Name/Number Omt No. Phase No.
Energy Cales D 2 Structural Cales D 2 Soils Report D 1 Addressed Envelope
EXISTING USE PROPOSED USE
~~Me.ck. aL-t~c::Y"\."5 # OF STORIES # OF BEDROOMS # OF BATHROOMS
a~£-V\ ADDRESS
STATE ZIP CODE DAY TELEPHONE
0 AGEN'I FOR CON'l'MC'IOR
ADDRESS
d OWNER d AGEN I FOR OWNER
CITY STATE ZIP CODE DAY TELEPHONE
s. PROPER.TI oWNRk
NAME (last name first) l4~ C.o. ADDRESS
k STATE LCt. ZIP CODE q~~
NAME (last name first) C:...s;} T ADDRESS , ~ ~ V°'q,tt-e.c~ ~ on) ~
DAY TELEPHONE 1 "iJ J -'13 8¥ CITY ~ fv\or.to.S STATE ~Cl. ZIP CODE C\~t)~
STATELIC. # LICENSE CLASS CITY BUSINESS LIC. #
1rst
STATE ZIP CODE DAY TELEPHONE STATE LIC. #
Workers' Compensation Declaration: I hereby affirm that I have a certihcate of consent to self-msure issued by the Director of lndustnal
Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified
by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. C). eQN\ o ( -EXPIRATION DATE
SIGNATURE DATE
8. oWN'ER-BOIWER DECI.ARATION
Owner-Builder Declarauon: I hereby afhrm that I am exempt from the ContractoPs License Law for the following reason:
D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or
offered for sale (Sec. 7044, Business and Professions Code: The Contractor's Llcense Law does not apply to an owner of property who builds
or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended
or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden
of proving that he did not build or improve for the purpose of sale.).
D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions
Code: The Contractor's Llcense Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects
with contractor(s) licensed pursuant to the Contractor's License Law).
D I am exempt under Section ________ Business and Professions Code for this reason:
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the
provisions of the Contractor's Llcense Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code)
or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars [$500]).
SIGNATURE DATE
COMPLETE 1'H1s SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and
prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?
DYES D NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
DYES D NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?
0 YES D NO
IF ANY OF TI-IE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY Nar BE ISSUED AFTER JULY 1, 1989 UNLESS TI-IE APPLICANT
HAS MET OR IS MEETING TI-IE REQUIREMENTS OF TI-IE OFFICE OF EMERGENCY SERVICES AND TI-IE AIR POILUTION CONTROL DISTRICT.
1s permit 1s issue
LENDER'S NAME
lo. APPllCAN'I CHR11f1CA110N
I cerufy that I have read the application and state that the above mtormat10n 1s correct. I agree to comply with all City ordmances and State laws
relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection
purposes. I ALSO AGREE 10 SAVE INDEMNIFY AND KEEP HARMLF.SS TI-IE CITY OF CARISBAD AGAINSf ALL LIABIIITIF.S, JUDGMENTS, COSTS
AND EXPENSF.S WlllCH MAY IN ANY WAY ACCRUE AGAINSf SAID CITY IN CONSEQUENCE OF TI-IE GRANTING OF TIIlS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
Expiration. Every permit issued by the Building Official under e pr
building or work authorized by such permit is no com ce wi
such permit is suspended or abandoned at any ti e after
APPLICANT'S SIGNATURE
S E W E R P E R M I T
12/LU96 15:26
f'ag,E! l of 1
Job Addrecs: 2195 FARADAY AV
P,2rr11i t Type: SEWER -OFFICE/WAREHOUSE
Par eel I•!o:
Desc:c ipth,n: CONVERT WAREHOUSE TO 1:.i:f'FICE
624 SO. WAREHOUSE TO OFFICE
P,2rmi t,;-e: JOBi-JSOI.-!, DAVE
135 VALLECITOS DE ORO #A
SAr\J ~IAB.COS I Cf~ a $ 10 6 13
f'ees Required ,'. -~ .¾
Suite: A
. .
Permit No: SE960146
Bldg Pla:nCt#:
Statu:::: ISSUED
Appli•:<i: 12/12/~:6
Apr/Izsue: l~/12/96
Ezpired:
PreparE'd P,y: i"iAl''1
•• j '\ ... ,. ---------~----------------------------------Fees: , ) ,,
A<ljustments: ·-' · '-... ,,-,r,+-~ 1 ·("'t; -s'i '-4 • ., .L,<,;;r~ ..... ·;t,~ ... , _ 1:;)··'-t.+:...t ..
~_t 1)t ,:! :t ., £:R,Y,rtteµ ~ "
Bitl"-'-'-n\::e-. Dtre :
Total fe,::-s:
" nu
6:i.B, OtJ , 0 (I
618.00
.oo
~-· "l. ',"-\~ / ·"t ' Fee description . !Jn1ts -. t-E<e/.,.Jn:;, E:-:t fee [)a".:a
---------------------.L-r--"'-·--• -----.::,;,;Ji-,~--.-.:,..''. ---'•,,..._:--,::..~_,, --~----------------
Enter Of fie•::-Squar,:> fc,.:ita·g,: .> ; ; •• 624 . . . 35 ·, i~~=~ ~~~~IT EDUs > • --_:; -~<~L,:.:,:.j;~;f .. ,;;---: ~ ~
Sewer Fee
Ent,::-r Sewer Et,us
SEWER TOTAL
and
/ -, \.
·.T
I ~ .• -;:. J 2 +-----~ f . /: .• _·,·~I: {; ·') ;-, . 'f_,/,
r -·
I / t,,J( 1)7"1;:·,:;;:,\TLD
',_.,,.,
/ \ -._ \ ',
CITY OF CARLSBAD
/
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
4.16.00
202.00 F
618.00
PERMIT# CB962270
DESCRIPTION: CONVERT
TYPE: ITI
CITY OF CARLSBAD
INSPECTION REQUEST
FOR 02/07/97
WAREHOUSE TO OFFICE
INSPECTOR AREA PD
PLANCK# CB962270
OCC GRP
JOB ADDRESS: 2195
APPLICANT: JOHNSON,
CONTRACTOR:
FARADAY AV
DAVE
CONSTR. TYPE VN
LOT: STE: A
PHONE: 619 471-9388
PHONE:
OWNER: PHONE:
REMARKS: MW/DAVE/471-9388
SPECIAL INSTRUCT: INSPECTORJ2--'4.-----------
TOTAL TIME:
--RELATED PERMITS--PERMIT# TYPE
SE960146 SWOW
STATUS
ISSUED
CD LVL DESCRIPTION ACT COMMENTS
19 ST Final Structural
29 PL Final Plumbing
39 EL Final Electrical
49 ME Final Mechanical
-4! fLJJ/~ 3=:--
-------------------
-------------------
-------------------
***** INSPECTION HISTORY*****
DATE
010897
122796
122696
122496
DESCRIPTION
Frame/Steel/Bolting/Welding
Interior Lath/Drywall
Interior Lath/Drywall
Frame/Steel/Bolting/Welding
ACT INSP
AP PD
AP DC
NR TP
AP PD
COMMENTS
CEIL
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING (FIRE PLANNING U/M WATER
PLAN CHECK#: CB962270
PERMIT#: CB962270
PROJECT NAME: CONVERT WAREHOUSE TO OFFICE
ADDRESS: 2f95 FARADAY AV SUITE# A
CONTACT PERSON/PHONE#: MW/DAVE/471-9388
SEWER DIST: WATER DIST:
INSPECTED
BY:
INSPECTED
BY:
COMMENTS:
DATE
INSPECTED:
DATE
INSPECTED:
DATE
INSPECTED:
9/t7
j
APPROVED
APPROVED
APPROVED
DATE: 02/07/97
PERMIT TYPE: ITI
v
ij~~~~V/~fn\
ITT FEB 11 1997 ~
By
DISAPPROVED
DISAPPROVED
DISAPPROVED
ill:;;if EsGil Corporation
Professiona( Pfan ~view 'Engineers .....
·:.;::::·
DATE: 12/9/96
JURISDICTION: Carlsbad
., 0 APPLICANT
------0 JU~~~ 0 FIRE
0 PLAN R . ER
I
0 FILE
. PLAN CHECK NO.: 96-2270 SET:I
PROJECT ADDRESS: 2195 Faraday Ave, Suite A & B
PROJECT NAME: Breezecom TI
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's *********** codes.
• The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be· corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
• Esgil Corporation staff did not advise the applicant that the plan check has been completed.
D Esgil Corporation staff did advise the· applicant that the plan check has been completed.
Person contacted:
Date contacted: (by: )L,rl ) ' Telephone#:
• REMARKS: Building Dept is to field. verify that the existing rest rm access and faciliteis
comply with the State disabled access requirements.
By: CHUCK MENDENHALL
Esgil Corporation
O GA O CM O EJ O PC 12/2/96
Enclosures:
trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
JURISDICTION: Carlsbad
PREPARED BY: CM
VALUATION AND PLAN CHECK FEE
PLAN CHECK NO.: 96-2270
DATE: 12/9/96
BUILDING ADDRESS: 2195 Faraday Ave
BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VN
BUILDING PORTION BUILDING AREA VALUATION VALUE
(ft.2) MULTIPLIER ($)
Tl 624 26 16224
Air Conditioning
Fire Sprinklers
TOTAL VALUE 16,224
• 1991 UBC Building Permit Fee D Bldg. Permit Fee by ordinance: $ 180.00
• 1991 UBC Plan Check Fee D Plan Check Fee by ordinance: $ 117.00
Type of Review: . • Complete Review . D Structural Only D Hourly
D Repetitive Fee Applicable D Other:
Esgil Plan Review Fee: $ 93.60
Comments:
Fire Services Review: D Complete Review
D Other:
D Suppression System
D FireAlarm
Esgil Fire Services Review Fee: $
Comments:
Sheet 1 of 1
macvalue.doc 5196
-·
City of Carlsbad
Ii ¥1 h· • i 044 4 i h~ I •14 ·iU; I; ,t4 U I
BUILDING PLANCHECK CHECKLIST
DATE: Jtfl-f/-f~ PLANCHECK NO.: CB 'rbgcX. 7CJ
BUILDING ADDRESS: e/ / 9 S ~ ffe--e .
PROJECT DE$CRIPTION: ....:::,\\./41==~~=~---.._7.;...:-===------------
ASSESSOR'S PARCEL NUMBER: EST. VALUE:
ENGINEERING DEPARTMENT
APPROVAL
The item you have submitted for review has been
approved. The approval is based on plans,
information and/or specifications provided in your
submittal; therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued
conformance with applicable codes. Please review
carefully all comments attached, as failure to comply
with instructions in this report can result in
suspension of permit to build.
0 A Right-of-Way permit is required prior to
construction of the following improvements:
ATTACHMENTS
0 Dedication Application
D Dedication Checklist
D Improvement Application
D Improvement Checklist
D Future lmprov~ment Agreement
D Grading Permit Application
D Grading Submittal Checklist
D Right-of-Way Permit Application
D Right-of-Way Permit Submittal Checklist
and Information Sheet
D Sewer Fee Information Sheet
DENIAL
Please se attached report of deficiencies
marked with . Make necessary corrections to plans
or specifi ti s for compliance with applicable
codes a · a standards. Submit corrected plans and/or
specifications to this office for review.
By: Date: --------
By: Date: --------
ENGINEERING DEPT. CONTACT PERSON
Name: Michele Masterson
City of Carlsbad
Address: 2075 Las Palmas Dr., Carlsbad, CA 92009
Phone: (619) 438-1161, ext. 4315
A-4.
111.ASPALMAS\SYS\LIBRARYIENG\WORDIOOCSICHKLST\&lking Planc:heck C1d5I BP0001 Fenn MM.doc Rev. B/21/96
2075 Las Palmas Dr. • Carlsbad; CA 92009-1576 • (619) 438-1161 • FAX (619) 438-0894
D
D
r
BUILDING PLANCHECK CHECKLIST
SITE PLAN
1. Provide a fully dimensioned site plan drawn to scale. Show:
A. North Arrow D. Property Lines Easements
B. Existing & Proposed Structures E. Easements
C. Existing Street Improvements F. Right-of-Way Width & Adjacent Streets
2. Show on site plan:
A. Drainage Patterns
B. Existing & Proposed Slopes
C. Existing Topography
3. Include note: "Surface water to be directed away from the building foundation at
a 2% gradient for no less than 5' or 2/3 the distance to the property line
(whichever is less)." [Per 1985 UBC 2907(d)5]
On graded sites, the top of any exterior foundation shall extend above the
elevation of the street gutter at point of discharge or the inlet of an approved
drainage device a minimum of 12 inches plus two percent." [Per 1990 USC
2907(d)5]
4. Include on title sheet:
A. Site address~
B. Assessor's Parcel Numbeiv-
C. Legal Description t,,/'
For commercial/industrial buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
Page 1 of 4
G:ILIBRARYIENGIWORDIDOCS\CHKLST\Bullding Plancheck Cldst BP0001 Fann ""'1.doc Rov. 8/21196
0 0
0 0 0
BUILDING PLANCHECK CHECKLIST
DISCRETIONARY APPROVAL COMPLIANCE
5. Project does not comply with the following Engineering Conditions of approval for Project No .. ______________________ _
Conditions were complied with by: ________ _ Date: ----
DEDICATION REQUIREMENTS
6. Dedication for all street Rights-of-Way adjacent to the building site and any
storm drain or utility easements on the building site is required for all new
buildings and for remodels with a value at or exceeding $ _____ _
pursuant to Code Section 18.40.030.
Dedication required as follows: ________________ _
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 ½" x 11" plat map
and submit with a title report. All easement documents must be approved and
signed by owner(s) prior to issuance of Building Permit. Attached please find an
application form and submittal checklist for the dedication process. Provide the
completed application form and the requirements on the checklist at the time of
resubmittal.
Dedication completed by: ___________ _ Date: ----
IMPROVEMENT REQUIREMENTS
7a. All needed public improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the
construction exceeds$ _______ , pursuant to Code Section 18.40.040.
Public improvements required as follows: _____________ _
Please have a registered Civil Engineer prepare appropriate improvement plans
and submit them together with the requirements on the attached checklist for a
separate plancheck process through the Engineering Department. Improvement
plans must be approved, appropriate securities posted and fees paid prior to
issuance of permit.
Attached please find an application form and submittal checklist for the public
improvement requirements. Provide the completed application form and the
requirements on the checklist at the time of resubmittal.
Improvement Plans signed by: _________ _ Date: ----
Page 2 of4
G:ILIBRARY\ENGIWORD\OOCS\CHKLSnBuildmg Ptanchock Cldst BP0001 Form MM.doc Rov. 8121196
..
2"d,/ 3rd.I
Cl Cl
Cl Cl
Cl 0 0
0 Cl
Cl Cl
Cl Cl Cl
BUILDING PLANCHECK CHECKLIST
7b. Construction of the public improvements may be deferred pursuant to Code
Section 18.40. Please submit a recent property title report or current grant deed
on the property and processing fee of $ _______ so we may prepare
the necessary Future Improvement Agreement. This agreement must be signed,
notarized and approved by the City prior to issuance of a Building permit.
Future public improvements required as follows:
Improvement Plans signed by: Date: ----------
7c. Enclosed please find your Future Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Future Improvement Agreement completed by:
Date:
7d. No Public Improvements required. SPECIAL NOTE: Damaged or defective
improvements found adjacent to building site must be repaired to the satisfaction
of the City Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
11.06.030 of the Municipal Code.
Ba. Inadequate information available on Site Plan to make a determination on
grading requirements. Include accurate grading quantities (cut, fill import,
export).
8b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. NOTE: The Grading Permit must be issued and rough grading
approval obtained prior to is.suance of a Building Permit.
Grading Inspector sign off by: Date: ----------
8c. No Grading Permit required.
Page 3 of4
G:ILIBRARYIENG\WORDIDOCS\CHKLsn&iklng Planchecl< Cldsl BP0001 Form I.WI.doc Rev. 8121/96
..
a a
a a
a a a
BUILDING PLANCHECK CHECKLIST
MISCELLANEOUS PERMITS
9. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the public Right-of-Way. Types of work include, but are
not limited to: street improvements, trees, driveways, tieing into public storm
drain, sewer and water utilities.
Right-of-Way permit required for:
A separate Right-of-Way permit issued by the Engineering Department is
required for the following:
10. A SEWER PERMIT is required concurrent with the building permit issuance.
fee is noted in the fees section on the following page.
The
11. INDUSTRIAL WASTE PERMIT is required. Applicant must complete Industrial
Waste Permit Application Form and submit for City approval prior to issuance of
a Permit.
Industrial Waste permit accepted by:
Date:
12. NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior
to discharge to sensitive areas. Plans for such improvements shall be approved
by the City Engineer prior to issuance of grading or building permit, whichever
occurs first.
Page 4 of4
G:ILIBRARYIENGIWORD\OOCS\CHKLS11&iking Plancheck Cld5I 8P0001 Form MM.doc Rev. 81211116
V ENGINEERING DEPARTMENT ENGINEERING REVIEW SECTION
FEE CALCULATION WORKSHEET
~stimate based on unconfirmed information from applicant.
/' Calculation based on building plancheck plan submittal.
Address:d/ 'S Bldg. Permit No. C.8 96 c:;?_c;,2 7D
Prepared by/?l ,4 /'f\.._ Date/2 'I 2 _____ Date: _______ _
EDU CALCULATIONS: List types and square footages for all us~es. ~ {J () 6 11 3 ~ ~~, -~ '
Types of Use_/!,)~ i; Sq. Ft.:AJRits&d~ 5r:;OO EDU's: __ L._•_/~_? __
~-Total EDU's: ____ ,,_dd/_·~--
ADT CALCULATIONS: List types and square footages for all uses. .,;:>~z,7'
Types of usek!.:J..~ i;-Sq. Ft.J,l:J~..tJ;
1
4:tf ;j?t;" c> ADT's: __ ~...;a/_2 ____ ;> __ _
Total ADT's __ C/ ____ _
FEES REQUIRED:
PUBLIC FACILITIES FEE REQUIRED O YES O NO (See Building Department for amount)
WITHIN CFD: DYES (no bridge & thoroughfare fee, D NO
reduced Traffic Impact Fee)
0 1.PARK-IN-LIEU FEE PARK AREA:. ___ _
FEE/UNIT: ____ _
~FFIC IMPACT FEE
ADT's/UNITS: _9 ___ _
X
X
NO. UNITS: __ _
FEE/ADT: 6l ~
=$ _____ _
=$ ;qg~
0 3. BRIDGE AND THOROUGHFARE FEE
ADT's/UNITS: ____ _ X FEE/ADT: ___ _ =$ _____ _
0 4. FACILITIES MANAGEMENT FEE ZONE: ___ _
SQ.FT.: __ _ X FEE/SQ.FT.: ___ _ =$ _____ _
0 5. SEWER FEE
PERMIT NoSGc?' 6 0 ~
EDU's: ., c9-,, ,3:: X FEE/EDU: U/ 0 = A I" 1--:.: gr:52..= $_-:t::/.-.;'...€2:..__ . -
BENEFIT AREA: F:
EDU's: 0 Q(.~
DRAINAGE BASIN:,:,-z9
FEE/EDU: 87/ X
. 8qt)
=$ o?Oa ·--
0 6. DRAINAGE FEES PLDA. ____ , HIGH ___ /LOW __ _
ACRES:_____ X FEE/AC: __ _ =$ _ _..;.. ___ _
0 7, SEWER LATERAL ($2,500 DEPOSIT) =$ _____ _
0 8. WATER FEE
EDU's: ____ _ X FEE/EDU: __ _ =$ ____ _
TOTAL OF ABOVE FEES*:$ g_~
*NOTE: This calculation sheet Is NOT a complete list of all fees which may be due.
Dedications and Improvements may also be required with Building Permits.
P:\DOCS\MISFORMS\BP0002.FRM REV 01/04/95
.s! "' Cl
>, .0
~ ~ Q) .c: t.)
C "' a:
>, .0
"' 'It
"" () Q) .c: t.)
C "' a:
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB <I&-:22""10
Planner J f e. u e_ J 1 ·I',') l'l'7 £
Address ;2 I q S-[arac/a;:; AVf?/lU&
Phone (619) 438-1161, extension '-I 3 2 8
APN: 2/")..-070-2100
Type of Project and Use: A/ew 1,,den'o,.,-;24,h'-f/oar, e/ec .1 117ec/2., ailera f,.orzt
Zone: C -l'n,.,, Facilities Management Zone: ___ S __________ _
CFD(i~--
ci~~ (If property in, complete SPECIAL TAX CALCULATION WORKSHEET provided by Building
Department.)
Legend
l:8J Item Complete
D Item Incomplete -Needs your action
Environmental Review Required: YES NO /2YPE ----
DATE OF COMPLETION: ______ _
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval
/
Discretionary Action Required: YES NO ;;;..YPE ----
APPROVAL/RESO. NO. _____ DATE ___ _
PROJECT NO. _______ _
OTHER RELATED CASES: __________________ _
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES NO/
If NO, proceed with checklist; if YES, proceed below.
Determine status (Exempt or Coastal Permit Required):
If Exempt, proceed with checklist; if Coastal Permit required, hold building permit until Coastal
Permit issued.
Coastal Permit Determination Form already completed? YES NO
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
Follow-Up Actions:
1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum
Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
DD D-
lnclusionary Housing Fee required: YES __ NO /
(Effective date of lnclusionary Housing Ordinance -May 21, 1993.)
Site Plan:
1 . Provide a fully dimensional site plan drawn to scale. Show: North arrow,
properw lines, easements, existing and proposed structures, streets, existing
street improvements, right-of-way width, dimensional setbacks and existing
topographical lines.
2. Provide legal description of property and assessor's parcel number.
Zoning:
1 . Setbacks:
Front: Required ,()A Shown
Int. Side: Required Shown
Street Side: Required Shown
Rear: Required Shown
2. Lot Coverage: Required AJ(_ Shown
3. Height: Required A-IA-Shown
4. Parking: Spaces Required Shown
Guest Spaces Required A.Jc.. Shown
Additional Comments . 7n+er/oz I/V//.Ji"ouemea.:f..1 j
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER J..:iw..u f t-n1~_; DATE 12-J-?&
City of Carlsbad 96367
Fire Department • Bureau of Prevention
Plan Review: Requirements Category: Building Plan Check
Date of Report: Wednesday, November 27, 1996 Reviewed by: G · i/8&.-e_d._,,
Contact Name C.S.I. General Inc
Address 145 Vallecitos De Oro #F
City, State San Marcos CA 92069
Bldg. Dept. No. CB96-2270 Planning No.
Job Name Breezecom ------------------
Job Address _2_1_95_Fa_r_ad_a~y _____________ _ Ste. or Bldg. No. ____ _
~ Approved -The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications provided in your submittal;
therefore any c,hanges to these items after this date, including field modifica-
tions, must be reviewed by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can result in suspension of permit to
construct or install improvements.
D Disapproved -Please see the attached report of deficiencies. Please make corrections to
plans or specifications ne9essary to indicate compliance with applicable
codes and standards. Submit corrected plans and/or specifications to this
office for review.
For Fire Department Use Only
Review 1st __ _ 2nd. __ _ 3rd __ _
Other Agency ID
CFD Job# __ 96_3_6_7 __ File# ___ _
2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121
City of Carlsbad 96367
Fire Department • Bureau of Prevention
General Comments:
Date of Report: Wednesday, November 27, 1996
Contact Name C.S.I. General Inc
Address 145 Vallecitos De Oro #F
City, State San Marcos CA 92069
Bldg. Dept. No. CB96-2270 Planning No. _____ _
Job Name Breezecom
Job Address 2195 Faraday ------------------Ste. or Bldg. No. ____ _
All sprinkler work must be approved by the fire department and plans must be submitted prior to doing the work.
Fire extinguishers are required. Size 2A 1 0BC currently tagged, hung with top of extinguisher no higher than 5 ft. with the
travel distance not to exceed 75 ft.
/
2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121
\ ~\
~.1/20/1996 12: 26 6194806246 HAVNAL&CO
TITLE 24 REPORT FOR:
2195 Faraday Ave., Suites A-B
2195 Faraday Ave., suites A-B
Carlsbad, CA 92,008
PROJ~C'l' DESIGNER:
C.$.I,
135 vallecitos De Oro,: Suite A
San Marcos, CA ~1069
{61~)471~9388
REPORT PREPARED BY:
Steve Ba14e~r~ma, CEPE
Haynal & Co., Iricl.
425 West Fifth stteet
Escondido, CA 92025
(619) 743-5408'
Jol:i Number:
Date: 11/20/1991;
PAGE 03
The COMPLY 24 computer program has be$n ueed·to perform the calaulations
summarized in this oomplia.noe report. This program has approval and is
authorized by the cali~ornia Bnergy Cotnmiaaion for use with both the
Residential and Nonresidential auilding Enetj}y Efficiency Standa~da.
This program developed by Gabel Dodd Associatea (510) 428-0803.
11/20/1995 12:25 5194805245 HAYNAL&CO PAGE 04
Taole Of Contents for Ti~le 24 Report
Cover Page ........................ , .• 4 .......................... , • + • • .. • • • • l
'l'able of Contents ..........••• , • , •.•......•....... , ... , , • • • . . . . . . . • • 2
Nonresiqential Performance Title 24 Forms ........................... 3
~orm ENV-3 construction As~emblies ................ ,,,, .............. 17
11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 05
~ERFORMANCE CERTIFICl\.TS OF COMPLIANCE (part l of 3)
Run Initiation Time: 9:49:28
PERF-1 page 3 of 20
Runaade: 2875~561270336
----------------------------------------~----------------~-~--~~--~----M~~-Project Name: 2195 Faraday Ave., Suites A·B
Address: 219S Faraday Ave., Suites A-B
Carlsbad, CA 92008
Designer: c.s.I.
Documentation: Haynal & Co., Inc,
STATEMENT OF COMPLIANCE
!Date: 11/20/1996 ! _______ _
!Building Permic No '--------!Checked by I Date
l
!COMPLY 24 User 2875
This Certificate of Compliance list$ the Building features and performance
specifications needed to comply with Title 24, Parts 1 and 6, of the State
Building Code. This certificate applies only to a Building using tn@
~erformance compliance approach.
The Principal Designers hereby certify that the pro~osed building design
represenceo in the construction documents and mcdelled for this permit
appl~~ation are consistent with all other forms and worksheets, specifi-
cations, and other calculations submitted with this permit application.
The proposed building as designed meets the energy efficiency requirements
of the State Building Code, Title 24, Part 6; Chapter l.
A-I he~eby affirm that I am eligible under the provisions of Division 3 of
the Business and f~ofeaaions Code to sign this document as the person
responsible for its pre~aration; and that I am licensed as a civil
engineer, mechanical engineer, electrical engineer or architect.
2. I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537,2 of the Business and
Professions Code to ~ign thiB document Qe·the pe~~on ~esponsible for its
preparation; and that I am a licensed contractor ~reparing documents for
work that I have contracted to perform.
3. I affirm that I am eligible unde~ the exemption to Division 3 of the
Business and Professions Code by Section. cf the ---~-~~-Code to sign this document as the pa~aon re~ponsible for its
preparation; and fo~ the following reaeQn; ____________ ~~
SCOPE OF COMPLIANCE (Designers should circl~ applicable paragraph numbers)
Princi~al Designer
c.s. I.
(Ei19) 47lM9388
LIGHTING -
Principal Desisner
Principal Designer
Required Forms: ENV-1, ENV-2
Location of M ndato:ry Meas
UC· f-J0-
t;)""16~{
Required Forms: LTG•1, LTG-2
l.iocat:i.on of Man
u_t.-, eJO{
Lt!\J:\Oct,
Required
Location \...tC, l\JlY,
1,qtS-lS
1 ~ 3
(Date) (Circle)
on I>la:ns
1 ®. 3
(Date) (Circle)
M:SCH-4
1® 3
(Circle)
11/20/1995 12:25 5194805245 HAVNAL&CO PAGE 05
PERFORMANCE CERTIFICATE OF COMPLIANCE (part 2 of 3)
~un Initiation Time: 9:49:28
iERF-1 page 4 of 20
Runcode: 2875-561270336
--------------------P•m•P•~--~------~--·-----~~-------~--------------~-----
Project Name: 2195 Faraday Ave., Suites A-B
Documentation: Haynal & Co.t Inc.
ANNUAL SOURCE ENE8.GY' USE SUMMARY {KBtu/sqft-yr)
Standard
Energy component Ile.l!lign
--------------------------------
Space Heating 3.37
$pace Cooling 34.13
Indoor Fans 22.60
Heat Rejection 0.00
Pumps 0,00
Domestic Hot Water 0.00
1,ighting 47.12
Receptacle 25.4B
Process 0.00 --------
TOTALS 132.69
GENERAL INFORMATION
!Date: 11/20/1996
I
jCOMi~Y 24 User 2B75
Proposed Comp1ianca
De~ign Margin __ "" _____ ... -........... ..,.,.. ---
2.88 0.48
34.13 0.00
J.4.90 7.G9
0.00 0.00
o.oo 0.00
o.oo 0.00
50.96 -3.85
25.48 o.oo
0.00 0.00
,,..,.. ........... ----------
128.37 4.33
Conditioned Floo~ Area: 624
9.0
0.46
1,19
Compliance Method: COMPLY 24 vS.00
Average ceiling Height:
Glass ~~ea/ Wall Area:
Average Glazing U-Value;
Front orientation;
Number of Stories:
Numl:>er of Zones:
Number of Oao1,1pancie1;1:
ZONE :tNFORMAT!ON
0 deg-(N)
1
l
1
Floor Display
Area Perim.
zone Name (sg;ft) (ft)
---------------------·--------------
Loc~tion: Carlsbad
Climate Zone: 7
Inst Tailored Process Tailored.
I.PD I..ighting Loads Ven.t..
(w/af) {watts) (w/sf) (y/n) ------------"'~"" -.... ~------------
New Office Areas 624 0 J..73 0 0 N
,·:
11/20/1996 12:26 6194806246 HAVNAL&CO
PERFORt-U\NCE CERTIFICATE ov COMl?LIANCE (part 3 of 3}
Run Initiation Time; 9:49:28
Project Name: 2195 Faraday Ave., Suites A-B
Documentation: Haynal & Co,, rnc.
PAGE 07
PERF-1 page 5 of 20
Runcode: 2875-561270336
!Date: 11/20/1996
I
!COMPLY 24 User 2875
The documentation preparer he~eby ce~tifies that the documentation is
accurate and complete.
DOCUMENTATION AUTHOR
Steve Balderrama, CEPE
(619) 743-5408
~-'(s .. ,o,~ =:;;;;:,A:i:-
(Signa.t11re) (Date)
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local ento~cement agency should pay ape~ial attention to the items
specified in this checklist. These items ~$quire special written
justification and documflltltation, and special verification to be used with
the performance approach. The local enforcement ag$ncy detetmines the
adequacy of the justification, and may rejeat a building o~ design that
otherwise complies based on the adequacy of the special justification and
documentation submitted.
w~ndow/Wall Ratio value Entered• 0.463
BUILDING DEPARTMENT APPROVAL OF EXC~FT!ONAL 1EATUR.ES JTJSTIF!CA~ION:
The exceptional feat~rea liated in this performance approach application
have specifically been reviewed. Adequate written justification and
documentation for their use have been providea by the applicant.
authorized signature o~ ~tamp __________________ _
11/20/1996 12:26 6194806246
CERTIFICATE OF COMPLIANCE -Envelope
Run Initiation Time; 9:49:28
HAYNAL&CO
Project Name: 2195 Faraday Ave., Suites A-B
Documentation: Haynal & Co., Inc,
PAGE 08
ENV-1 page 6 of 20
Runooda: 2875-561270336
!Date: 11/20/1996
I
!COMPLY 24 User 2875 ------------------------~---ff·---~··~--~------------------------~----------
Const OPAQUE SURFACES
Assembly Name Type LOcation/comm.ent~
R-19 Roof(R-19 on Tile) wood
Carpeted Slab On Grade None
6" conc~ete wall None
~ollow Metal Door None
FENESTRAT::t:ON Frame
Or,ient Panes Type Exterior Shade
-------------------~·-----·-~-·
Right (W) l. Metal None
,,:,),
OH
N
Glazing Type
Note to
Field
--N~-------------------Single 'I'inted
11/20/1996 12:26 6194806246
CERTIFICATE OF COMPLIANCE -Lighting
Run Initiation Time: 9:49:28
HAVNAL&CO PAGE 09
LTG~1 page 7 of 20
Runccde; 287S-SS121O336 -~~----•-•••~---~•-------------------w---------~~----------------~---•--•~•
Project Name: 2195 Far~day Ave., Suites A-B
Documentation: Haynal & Co., Inc.
INSTA:L~ED LIGHTING SCHEDULE
NO of
Name Lamp Type Lamps -.... -.... .,. _______ ------Fluorescent 3
MANDATORY AUTOMATIC CONTROLS
control
Watt1:1/ Ballast
Lamp Type ---------·-------34 Standard.
!Date; ll/20/1996
I
!COMPLY 24 User 2875
:Ballasts/ No of Note to
Luminaire Fixt, Field ----------------
1.5 10
Control Location ID Control Type ione Controlled
Note to
Field
CONTROLS FOR ClUilOIT
Control
control Location ID control Type Zone controlled
:-...
Note to
Field
11/20/1996 12:26 6194806246 HAVNAL&CO
CERTIFICATE OF COMPLIANC~ • Mechanical (part l of 2)
~~n Initiation Time; 9:49:28
Project Name: 2195 Faraday Ave., Suites A-B
Documentation: Haynal ~ Co., Inc.
SYSTEM FEATURES
zone Name
Time Control
Setback Control
#of Isolation Zones
HP '!'hermostat
Elect:dc Heat
Fa.n <;:ontrol
VAV Min Position
Simul. Heat/Cool
Heat supply Reset
Cool Supply Reset
Ventilation
OA Damper Control
Economizer Type
outdoor Air CFM
Heat Equip Type
Make & Model No,
Cool Equip Type
Make and Model
Code Tables
Time Control
S:l?;i;-og Switch
o:occ Sensor
M:Man Timer
Existing HVAC
_s_
None
n/a
Yes
0.0 XW
Constant Volume
n/a
n/a
Constant 'l'emp
constant Temp
_B_
_A_
No Eoonomi::er
94
Heat Pump
Tie into existing HVAC
DX
Ventilation
B:Air Balanoe
C:OA Cert.
1\1: OA Mea.tmre
D;Demand Cont
N;Natu:i::al
OA Damper
A:Aut.o
G:Gr~vity
PAGE 10
MECHAl pages of 20
Runcoda: 2875-561270336
!Date: ll/2O/1996
I
!COMPLY 24 User 2875
Note to
F.ield
I
I
I
I
I I I I I l
1 I
I I I
I I
I I
I
I
11/20/1996 12:26 6194806246 HAYNAL&CO PAGE 11
CE~TlrIC~TE OF COMPLD\NCE ~aohanioal (part ·2 of 2) MECH-1 page 9 of 20
Run Initiation Time: 9:49:28 Runcode: 2875•56l27O33G
Project Name: 2195 Faraday Ava., Suites A-B
Documentation: Ha-ynal & Co., Inc.
DT)CT !NSULl\TION
System Name Type Duct Location
Tie into existing HVAC Heating Ducts in Attic
Cooling Ducts in Attic
PIPE INSULATION Insul
System Name Pipe Type Required
Domestic Hot Water y / N
NOTES TO FIELO -For Building Department Use Only
!Date: 11/20/1996
I
jCOMPLY 24 User 2875
Duct ~ape Insul Note to
Allowed R-Val Field
y / N
y / N
4.2
4.2
Note to
Field
11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 12
ENVELOPE COMPLIANCE SUMMARY~ Perfo~ce (p~rt 1 Qf 3)ENV-2 page 10 of 20
Run Initiation Time: 9:49:28 Runcode: 2875-561270336
Project Name: 2195 Fa~aday ~ve,, Suites A-B
Documentation: Haynal & co., Inc.
GENERAL lNFO~TION BY ZONE
:z:one Name
New Office Areas
Occupancy
Office
!Date: 11/20/1996
I !COMPLY 24 uaer 2875
Flr Floor Display
Perim. No Area Volume
1 5616 0
Total 624
11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 13
ENVELOPE COMPLIANCE SUMMARY p Performance (part 2 of 3)ENV-2 page 11 of 20
Run Initiation Time: 9:49:28 Runcode: 2875-561270336
Project Name: 2195 Faraday Ave., Suites A-B
Documentation: Haynal & co., Inc.
O~AQUE SURFACES Act
Type Area u-Val Azm Tilt
Wall 95 0.752 270 90
Roof 624 0.043 0 22
S11;, 624 0.134 0 180
Solar
Gains
Yes
Yes
NO
Form 3 Reference
----------------~----·ff 611 Concrete wall
R-19 Roof(R-19 on Tile)
Carpeted slab On Grade
,•
·.,'>.,
jDate: 11/20/1996
I
!COMPLY 24 User 2815
Location/Comments ~·-~·~~-ff~----------
New Office Areas
New Office Area~
New Office Areas
11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 14
ENVELOPE COMPLIANCE SOMMAR.Y Performance (pat>.t 3 of 3)ENVft2 page 12 of 20
Run Initiation Time: 9:49:28 Runoode: 2875-561270336
--------------------~-·~---------------------------------------------------Project Name: 2195 Faraday Ave., Suites A-B
oocumentation: Haynal & Co., Inc.
FENESTRATION SURFACES SC
Aat Glass
!Pate; ll/20/1996
I
!COMPLY 24 User 2875
# Type Area Frame Div U-Val Azm Tilt Only Location/Comments
1 Wow Right (W) 100.0 Metal No 1.19 270 90 0.65 New Office Areas
OVERHANGS/SIDE FINS
--Window•-
# ~ype ~t w~ ··---Overhang---------Left Fin-~-
Len Ht LExt RExt Dist Len Ht
~--Right Fin--
Di~t Len Rt
11/20/1996 12:26 6194806246 HAYNAL&CO PAGE 15
LIGETING COMPLIANCE SUMMARY -Pertormance
Run Initiation Time; 9:49:28
Project Name: 2195 Faraday Ave., Suitea A-B
Documentation: Hayn.al & Co., Inc.
ACTUAL LIGHTING POWER
N~me Oescription
48" rr-:i.2 I.ow Watt /3 Lamp (Tandem)
LTG-2 page 13 of 20
Runcode: 28?5-SG127033G
]Date; 11/20/1996
I
jCOMPLY 24 Oser 2875
No of Watts Total
Lum!n per Default Wa~ta
10 108.0 _Y_ 1080
SubTotal 1oao
Less Control Credits (LTG-3) 0
Total Proposed Watta 1080
* If not c~c Pef~ult value, ple~se provide suppo~ting documentation.
MODELLED LIGHTING POWli:R BY ZONE
zone Name
New Office Area~
Occupancy
Offide
TOTALS
Modelled
Flc;>Or
~ea
LPD Total Tailored
(w/~:f) (watta) (watts)
624 1. 731
624 1.731
1080
1080
0
0
* Note: Tailored Allotment rec.tUires supporting documentation on form LTG-~.
11/20/1996 12:26 6194806246 HAVNAL&CO
MECHANICAL EQUIPMENT ZONING $l)?JJMAR.Y -Performance
Run Initiation Time; 9149:28
~roject Name: 2195 Faraday Ave., Suites AMB
Documentation: Haynal & Co., Inc.
SYSTEM/ZONING SUMMARY
system/Zones served central/Zonal System
PAGE 16
MECH-2 page 14 of 20
&uneode: 287S-SG1270336
!Date: 11/20/1996
I
]COMPLY 24 User 2875
system Type
No
Sys
Existing HVAC Tie into existing KVAC Packaged Heat Pump 1
New Office Ar~as
11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 17
MECWl.NlCA!. EQUIPMENT SUMMARY -Performance
Run Initiation Time: 9149:28
MECH-3 page 15 of 20
Runcode: 2875-561270336
~roject Name: 2195 Faraday Ave., Suites A-B IDate: 11/20/1996
Documentation: Haynal & co., Inc.
CENTRAL SYSTEM SUMMARY
Sys
I
!COMPLY 24 Use~ 2875
No
No System Name syaum Type sya Economize~ Type
1 Tie into existing HVAC Packaged geat Pu· 1 No Economizer
CENTRA.L SYSTEM RATINGS
Sys------~ Heating~---~----··---~--~---·---~--~··---Cooling----------·
NO ~ype Outp~t Aux KW EFF Typ~ Output SEm~ihle EER SEER
1 Heat Pump 15000 0.0 S.60 DX J.9000 16500 8.00 9.00
CENTRAL FAN SUMMAR~ ~-··-~-w·---Su~ply Fan---------------Return Fan~--
Sys Mtr Drv Mtr Drv
~o ~~n Type Motor Location CFM Btn' Eff Eff CP'M BHP Eff Eff
1 constant Volume Draw-Through
ZONAL FAN SUMMARY
Zone Name No CFM
None
650 0.13 ss 100 None
Zonal li'an w••·---Exhaust Fan-~---
Mtr Drv Mt:r Orv
BHP Eff Eff No CFM E:j:f Eff
11/20/1996 12:26 6194806246
MECHANICAL VENTILATION -Performance
Run Initiation Time: 9:49:28
HAYNAL&CO
Project Name: 2195 Faraday Ave., Suites A-B
Documentation: Haynal & Co., Inc.
VENTILATION SUMMARY BY ZONE
Flocir
Zone Name 'l' Occupancy Al:'ea
New Office Areas Office 624
sqft
/Occ
130
PAGE 18
MECH-4 page 16 of 20
Runoode: 2875-561270336
!Date: 11/20/1996
I
ICOM~LY 24 User 2875
Tran
CFM Dsg Min sfer
/Oco CFM CFM CFM __ ... ___
15.0 72 94 22
------
TOTALS 72 ~4
w~RN!NG -Total Design Mechanical ventilation is less than Minimum Required
Tailo~ed OA (T=*) req\lires supporting documentation on MECH-5, Tailored
Ventilation and Process Loads Workah•et
11/20/1996 12:26 6194806246 HAYNAL&CO PAGE 19
~~O~OSEP CONSTRUCTION ASSEMBLY
Project Name: 2195 Faraday Ave.1 suites A~B
Pocumentation: Haynal ~ Co., Inc.
ENV-3 page 17 of 20
IOate: 11/20/l996
I
jCOMPLY 24 User 2875
COMPONENT DESCRIPTION
Sketch of construction Assembly
Construction components
Outside Air Film
l. Rooting, '.Built-Op
2. Membrane, Vapor-PermeaDle Felt
3. Plywood
4. Air Space
5. Insulation, Mineral Fiber, R.~19
6. Acoustical Tile1 Interior Finish
7.
8.
9.
I:o.side .Ai~ F;i.lm
Assembly Name: R-19 Roof(R-19 on Tile)
Assembly Type: Roof
Assem))ly Tilt: 22 deg (Tilted Up)
Framing Material: Wood
Framing-Spacing: " o.c.
Framing Percent: 10.0 t
Abeorptivity; 0.70
Roughness: Concrete, Asph. Shingles
Th
Fr (in)
0,375
0.010
o.soo
* G.000
6.000 o.soo
R.-Value
Cavity Fr.i.me
0.17 0.17
0.33 0.33
0.06 O.OG
0.62 0.62
0.80 $.94
19.00 19.00
1.43 1.43
0.61 0.61
unadjusted R-Values 23.02 28.lG
APJO'STMENT FOR FB.AMI*G
{1 /23.02) X (0.90} • (l /28,16) ~ (0,10)
Weight:
Heat Capacity;
6.3 ll:,/sqft
2.13
• 0.043
TOTAL TJ-VJU.,TJ'E = 0.043
=====
TOTAL R-V.l\LUE = 23.45
11/20/1996 12:26 6194806246 HAYNAL&CO PAGE 20
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: 2195 Far,aday Ave., Suites A-a
Documentation! Haynal & Co., Inc.
ENV-J page ~8 of 20
!Pate: ll/20/1996
I
!COMPLY 24 User 2875
COMPONENT DESCRIPTION
Sketch of construction Assembly
ASSEMBLY U-VALUE
construction Components
Outside Air Film
1. Earth
2. Concrete, 140 lb, Not Dried
3. Flooring, Car~et and Fibrous
4.
5.
6.
7.
8.
9.
Inside Air Film
Pad
Aa$embly Name; carpeted Slab on Grade
Assembly Type: Floor
Assembly Tilt; 180 deg (Ho~izontal Floor)
Framing Material: None
Framing $pacing: "o.c.
Framing ~~~cent; o.o t
Absorptivity: 0.70
Roughness; Concrete, Asph. SAingles
Th R-Value
Fr (in) Cavity Frame
0.17 0.17
24,000 4,00 4.00
3.500 0.28 0.28
0,250 2.08 2.08
0.92 0.92
-MMWVff-~"NftM~-~---------·~-~--~------------~~------------~----------------~
unadjusted R-Values 7.45
ADJUS'n>'I~Nt iOi FRAM!NG
(l / 7.45) X (1,00) + (l / 7.45) X (0.00)
Weight:
Heat. Capacity:
210.9 lb/sgft
42.19
• O.ll4
TO'l'JU., U-VALUE •
7.45
0.134 ...... ~
=====
11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 21
PROPO$:E!l CONS'tltUCTlON ASSEMBLY ENV-3 page 19 of 20 --------------------~-~------~~----~-----------------~~~~~--~-~-~----------Project Name: 2195 Faraday Ave., Suites A-B
Documentation: Haynal & Co,, Ino.
!Date: 11/20/1996
I
!COMPLY 24 User 2875
COM~O~ENT OESCRiiTION
Sketch o! Construction Assembly
ASSEMBLY U•VALUE
Construction components
outside Air Film
1. concrete, 140 lb, NQt Dried ~.
3.
4.
5.
6.
7.
8.
!:).
:i:ns.idl;! Air Film
A.DJUSTMENT FOR FRAMINQ
Assembly Name: 6" Concrete Wall
Assembly Type: Wall
ASaembly Tilt: 61 deg (Tilted Up)
Framing Material: None
Framing Spacing: 11 O.C.
Framing Percent; 0,0 t
Absorptivity; 0.70
Roughnaae: concrete, .Asph. Shingles
Th
Fi-(in)
6.000
Unadjueta4 R-Values
R-Value
Cavity
0,17
0.48
0.G8
l.33
Frame
0.17
O.'l8
0.6'8
1.33
(1 / 1.33) X (1.00) + (1 / 1.33) X {0.00) • 0.752
Weight:
lieat Capac:i.ty:
70.0 lb/sqft
14.00
TOTAL U-VALUE • 0.752
TOTAL R•VALtTE 1.33
=====
11/20/1996 12:26 6194806246 HAVNAL&CO PAGE 22
PROPOSED CO~STRUCTlON ASSEMBLY
Projeot Name: 2195 Faraday Ave,, Suites A·B
Documentation~ Haynal ~ Co., Inc.
ENV-3 page 20 of 20
1nate: 11/20/1996
I
!COMPLY 24 User 2875
COMPONENT PESCRIPTlON Assembly Name: Hollow Metal Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
Framing t:mterial: None
Framing Spacing: 11 o.c.
Framing fercent: o.o \
Al::>sorptivity: 0,70
s~ecch of Construction ASsembly RoughneS·J; Smooth Plaster, Metal
ASSEMBLY U-VALUE
Construction Components
Th
Fr (in)
R-Value
Cavity frame
-~------------------~·-----------------WW~------~-----------------------~M•
Outside Air Film 0.17 0. J, 7
l, Steel 0.001 0.00 0.00
2. Air Space 1.750 0,87 0.87
3. Steel 0.001 o.oo 0.00
4.
5.
6.
7.
8.
Sl.
Inside Air Film 0.68 0.68
-------------------------··~·------~~-------------------------~~·----------unadjusted R-Values 1,72 1.72
AD.ro'STMENT FOR FRAMING
(1 / 1.72) X (1.00) + (1 / l.72) X (0,00)
Weight:
Heat Cava.city:
O.l. lb/sqft
0.01
-0.581
TOTAL tr-VALUE"" 0.581
TOTAL R-VALUE • 1.72
••ma•
~1/20/1996 12:26 6194806246 HAVNAL&CO PAGE 23
MANDATORY R.EQUI.REMENTS
..
ENVELOPE MANDATORY MEASURES (NONRESIDEN'I'IAL)
l, £,cterior manufactured doors, windows, and fenestration products shall meet the infiltration and U--value certification requirements
of Section l16(a).
2. Site-construced doors, skylights, and windows shall be caulked and weather-stripped. per Section 116(b).
3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to
limit infiltration and exfiltration pu Section 117,
4. Certified insulation materials per Section 118(:a).
5. Urea Formaldehyde foam insulation installed per Section t 18(b),
6. Insulation installed to meet flame spread and smoke density requitements pet ~tion t 18(c).
LIGHiING MANDATORY MWUIU!S
1. Each enclosed area shall have independent control5 (per Secdo.n 1J1(a) and eJmtptions).
2. Lighting shall be unifonnly reducible by one half in areas which ate greater thu 100 sf, exceed 1.2 watts/sf, and have more than one
luminaire (per Section 131(b) and exceptions; exceptions include lights in corridors).
3. Da.ylit a.reas larger than 250 sf shall be separately controlled and uniformly reilucible by one half (per Section 131{c) and exception11).
4. Separately metered spaces 5,000 sf or greater shall have automatic shutoff controls (per Section l31(d) and exceptions).
5, Display lighting shall be separately switched on circuits that are 20 :amps or leu (per Section 131(e). no exceptions).
6, Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131 (0 and
exceptions).
7. Pairs of one-lamp and three-lamp fluorC$Cent luminaires shall be tandem-wimJ where reasonilble (per Section 132 and exceptions).
SERVICE WATER HEATlNG SYST£MS
1, Tempe.rature controls and recirculating pump controls shall m~et the require.ments of Section 113{a) & (b).
2. Flow rates and temperature controls for publie bv:u.orie, shall nieet the requirements of Section 113(b}3.
3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b)4.
MECHANICAL AND PLUMBING MANDATORY MEASURES
Equiptnertt and Systems Efficiency
1. HV AC and service water hei:iting equipment shall meet Appliance Efficiency Reguhations, per Sections 111 and 112.
2. Piping, except those conYeying fluids :at temperatures between 60 and 105 degrees F, or within HVAC equil'ment, shall be insulated
in accordance with Section 123.
3. Air handling duct systems shall be sealed in accordance with the SMACNA HV AC Ducts Construction Standards, Metal and
Flexible, 1985, per Section 124(a) and (b). Ducts shall be installed and insulated as provlded in UMC, Chapter 10,
4. Pilot lights shall not be installed for natural gas central furnace$, an.Ji pool and spa he;iters, per Section 115.
Yeotihuian
1. Every space in a building shall be designed to have outdoor air ventilation according to Section 1:Zl(a), (b) and (e).
2. Operation and control of outdoor air shall meet the time-of.occupancy and p.n!"<>Ccupancy requirements of Section 12t(c).
3. Whtm a i:etu.rn plenum js used to distribute outdoor air to a covered. HV AC unit the ducted discharge shall be in accordance with
Section 121(d).
4. Systems shall meet the completion and balancing requirements of Section 121(1),
Controls
1. Ea.ch space conditioning zone shall be controlled by an individual thermo11tarii; control that responds to temperature within the
zone. Heating sh.all be adjustable down to SS degrees or lowert and cooling rhatl be adjustable up to 85 degrees or higher. The
control shall provide a dead.band of S degrees between heating iUld oooling. Section 122(a) and (b).
2. Heat pumps whh supplero.enta.ry electri<: r~istance heaters 1Jhru.l have controt. per Sectmn 1l2(b),
3. Each space conditioning system shall be instlllled with an automatfo time switt:h, able to shut off OJ?eration during off-hours of up
to four hours, per Section 122(e)l.
4. Thermostat setup and setback controls are required ff the summer design dry bulb temperature iJ more than 99 degrees F, or if the
winter design temp¢rat.uri: is }¢ss than 33 degrees, per Seccion 122(e)2t and its exceptions.
5. Outdoor air supply and exhaust equipment shall be inst.lied with dampers that automatically dose during periods of non-use for the
areas served by the equipment, per Section 122(£).
6, Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be
designed, installed, and controlled to serve isolation are:as, per Section 122(g}.