Loading...
HomeMy WebLinkAbout2207 CAMINO ROBLEDO; ; CB982775; PermitBUILDING PERMIT 09/22/98 16:55 Page 1 of 1 Job Address Suite Permit No Project No Development No - DETACHED Lot#: 2207 CAMINO ROBLEDO Permit Type: SINGLE FAMILY D.WLNG Parcel No: 255-261-30-00 Valuation: 214,013 Occupancy Group: Description: 2489 SF+421 GAR+32 PORCH,PLN 1 : PHASE 5,VILLAGE H,LA COSTA,STANDARD Appl/Ownr *** STANDARD PACIFIC 9335 CHESAPEAKE DRO SAN DIEGO CA 92123 Plan Check Numbers > Fees Required *** 183 Construction Type Reference*: CT88-03 Status Applied PACI Apr/Issue: Entered By 292-2200 CB982775 A9803629 DEV89110 VN ISSUED 04/17/98 09/23/98 RMA 619 82519 cted Fees: Adjustments: Total Fees: Fee description Number of Bedrooms Number of Bathrooms Building Permit Plan Check Strong Motion Fee Enter Plan Check Disc Enter "Y" to Autocalc Enter "Y" to Autocalc Payoff Fee for CFD Enter LFM Fee (Zones=6,l Enter "Y" for Plumbing Is Each Plumbing Fixture or Tr Each Building Sewer Each Install/Repair Water Line Each Water Heater and/or Vent Gas Piping System Each Vacuum Breaker Enter "Y" for Electric Issue Fee Single Phase Per AMP Enter 'Y' for Mechanical Issue Fee> Install Furn/Ducts/Heat Pumps > Each Install Fireplace > Each Exhaust Fan > Each Install/Reloc Vent > 200 1 1 4 2 & Credits *** 25 00 50 50 .00 W/23/9B Ext fee . 0210975-32Data 4.50 , 4. 2. 1024. 1 666. ' 21. -53. 3895. 550. 4254. 310. 20. 112. 15. 7. 7. 7. 14. 10. 50. 15. 9. 6. 26. 9. 00 50 00 00 00 00 00 00 32 00 00 00 00 00 00 00 00 00 00 00 00 50 00 00 Y Y Y Y Y FINAL APPROVAL DATE CLEARANCE^ Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 nnalBDlldlnglitSDecflan A* •/ APR 2 7 1999 CITY OF CARLSS^T ENGINEERINGiOEPAffTMFNT Dept: Building Plan Check #: Permit #: CB982775 Project Nane: 2489 SF+421 GAR+32 PORCH.PLN 1 Planning CMWD StLtte Fire Date: 4/26/99 8:22:07 Permit Type: SFD Sub Type: PHASE 5.VILLAGE H.LA COSTA.STANDARD PACI 2207 CAMINO ROBIEDO Ufc 183 Contact Person: 3^£P Phone: Sewer Dist Water Dist Inspected /j rfj^ Bv: /" /•/- Inspected Bv: Inspected Bv: Comments: ~) Date Inspected: ^* 2 Date Inspected: Date Inspected: #9? Approved: Approved: Approved: Y Disapproved: Disapproved: Disapproved: VHjP VI VBIBBVim Rnal Building Inspection CMWD StLite FireDept: Building Engineering Plan Check #: Permit #: CB982775 Project Name: 2489 SF+421 GAR+32 PORCH.PLN 1 PHASE 5.VILLAGE H.LA COSTA.STANDARD PACI Address: 2207 CAMINO ROBLEDO Contact Person: 3cCP Phone: Sewer Dist Water Dist: Lot: Permit Type: Sub Type: 183 4/26/99 822:07 SFD Inspected Bv: mW Inspected Bv: Inspected Bv: Comments: Date i Date inspected: Date Inspected: Tf Approved: v Approved: Approved: '7 Disapproved: Disapproved: Disapproved: CttitfCamM Rnal Bonding Inspection Dept: Building Engineering Planning CMWD 9M Plan Check #: Permlt#: CB982775 Project Name: 2489 SF+421 GAR+32 PORCH.PLN 1 PHASE 5.VILLAGE H,LA COSTA.STANDARD PACI Address: 2207 CAMINO ROBLEDO Contact Person: ^ffi Phone: Sewer Dist Water Dist Fire Date: Permit Type: Sid) Type: 4/26/99 8:22:07 SFD Lot: 183 Inspected , rsVV ("^ Bv: ^-A,v Inspected Bv: Inspected Bv: Comments: Date inspected: Date Inspected: Date Inspected: ^~4-Approved:^ Approved: Approved: Disapproved: Disapproved: Disapproved: •* City of Carlsbad Inspection Request Fon 5/3/99 Permit* CB984122 Title: 2275 SF+591 GAR,PLAN 3,PHASE 6 Description: COBBLESTONE^REYSTONE Inspector Assignment: PY Type:SFD Sub Type: Job Address: 6435 OPAL WY Suite: Lot 183 Location: APPLICANT : GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Phone: Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: SHELDON Entered By: CHRISTINE Comments Inspection History Date Description Act insp Comments 4/30/99 89 Final Combo AP PY 4/26/99 39 Final Electrical NR RB 4/21/99 39 Final Electrical PA PY EMR 3/22/99 82 Drywall/Ext Lath/Gas Test AP PY 3/19/99 82 Diywall/Ext Lath/Gas Test NR PY 3/16/99 16 Insulation AP PY 3/12/99 84 Rough Combo AP PY 3/1/99 13 Shear Panels/HD's AP PY 2/26/99 13Shear Panels/HD's NS PY 2/25/09 83 Roof Sheathing/Ext Shear CO PY 2/24/99 13 Shear Panels/HD's CA PY 2/22/99 15 Roof/Reroof AP PY 1/8/99 11Ftg/Foundation/Plers AP PY 12/24/98 21 Underground/Under Floor AP PY