HomeMy WebLinkAbout2210 FARADAY AVE; 120; CBC2018-0386; RecycleDevelopment Services cCity of WASTE MANAGEMENT E C F IV E U1635 Faraday Avenue
Building Division
PLAN
760-602-2719 Carlsbad B-59 JAN 132020
BUILDING DIVISION
Owner: GenMark Dx Contractor: Back's Construction P
1VE 0
Job Address: 2210 Faraday Ave, Suite 120 Phone Number: (619) 713-2566 JUL 17 2018
CITY OF CARL BAD
Permit #: CBC.2.018 _e 5 R& Estimated Cost of Project: $ 1,200,000 _BUILDING DIVISION
Type of Project: 0 New Construction 'Remodel or T.I. 0 Residential 0 Commercial 0 Demolition
(check all that apply) 0 Other
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per OAL.Green Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
0 Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior. to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. = lbs. of allowable waste.
el plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table I - Estimated Waste (To be filled out prior to permit issuance - refer to example on Page 2.)
MATERIALS lbs. of waste to betaken to
LANDFILL
lbs. of waste to be
RE-USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt/ Concrete 0 975 Casper Company
Brick/ Masonry N/A N/A
Cardboard N/A N/A
Drywall 0 600
LandscapeDebris N/A N/A
Lumber/Wood N/A N/A
Metals 75 200
Mixed Waste 0 0
Trash / Garbage 450 0
Other:C&DDebris 630 1470
TOTAL lbs: 1155 . 3245
Estimated Percentage to be Re-Used or Recycled 73
I certify that the information provided herein, to the best of my knowledge, Is true and correct.
7/11/2018
Date
Official Use Only
o Plan Approved 0 Plan Denied 0 Project Valuation Approved
Reviewed / Approved by:____________________________________________
Page 1012 REV.01-2017
C-1
Table 2 - ActualWaste (To be completed after construction.)
MATERIALS lbs. of waste taken to
LANDFILL
lbs. of waste
RE-USED or RECYCLED
Waste Hauling Company or Re-Use Method
(complete only if different than Table 1)
Asphalt /Concrete
Brick / Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash / Garbage ___________ _______________________
Other: e4 Silo I '/20 tJs4-C
TOTAL lbs.: 1 9 410 1 5 ' 1/80
Actual Percentage Re-Used or Recycled _SB
Official Use Only
0 65% Goal Achieved 065% Goal Not Achieved 0 Alternative Compliance Achieved Penalty Paid $
Reviewed / Approved by:__________________________________________
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to
LANDFILL
lbs. of waste to be
RE-USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt / Concrete o 3000 AM— FfQuLLKrA Co.
Brick I Masonry ioo 950 WM / Re-L.4sea rFz ov.-sfte
Cardboard 150 AC 1-fat4L Co.
Drywall o 50 AC lc Co.
Landscape Debris o 120 MuLlcie . e-i.se4 ovt.-s'te
Lumber/ Wood 500 0 waste mcival clemewt
Metals 300 200 WM / A.0 Ftol
Mixed Waste 1500 0 WM
Trash I Garbage 300 0 WM
Other: Pool cufte 0 900 t4secA &s Crt.sIie cse oi&.-sfte
TOTAL lbs.: 2700 51370
Percentage to be Re-Used or Recycled 67- %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
5370 X 100 = 67% Re-Used or Recycled
(2700+ 5370)
Since 67% exceeds the minimum requirement of 65%, this plan complies.
Page 2 of 2
wiao
WASTE MANAGEMENT
DUMPSITE/LANDFILL
Palomar Landfill (PAL)
5960 El Camino Real
Carlsbad, CA, 92008
GENERAL CONTRACTOR:
TYCE CONSTRUCTION ENGINEERING
2210 FARADAY AVE
CARLSBAD, CA. 92008
Construction & Recycling Services
57015. Eastern Ave., STE 300, Commerce, CA 90040
714-480-2317 (Direct) 866-459-3985 (Fax)
C&D SORT & TRANSFER FACILITY Acct: 350-73573
EDCO CDI Recycling & Buy Back Center Sales Rep: Victoria Brown-Delgado
224S Las Posas Rd christooher.marshaIek(aamaiI.com
San Marcos, CA. 92078 Prepared Date: 01/06/2020
frDW
ID(LO WA3rt & II(YcL:J:No 111-7.1'WIMS, INC pp4 POSAS Iil)
3flNM.1RCOS,
(76'i 744—;?,7(j(ej
twiner : I (124 Ticket: 14182
Date:
c;oTwAsTE/T :1: NA LOV1LACI.
;9(0 L-:L. C:AII]:HO FE.fL
t:A c)!t)I4A
- 'rblumcç
In: 13:5t Truck: 3/@@G@
Out,: 14:01 Conta:inern
Route: 0 645
Or i q :L ii ('386 CAIUThAD
- ExtcyucIecI
Ciniiiod i. Ly (Jni ts Ra be Cha'riic
45 C 8 1) IIiX 2.78 Pei TON snow
IGross(in) : 313,380. ibia S1ttJ. Tate 32,)80. 1135 Sci#i Net: Ica@. ibs]
roTcI.. MM"-
Construction & Demolition Diversion Certificate -- Diversion Percentage 88%
This certifies that the company listed ab&e has utilized an EDCO facility to divert construction deeolition materials in accordance -
with LED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
PA
Roo1:(iO rAver ,3rD j3F'7
/L/f- 7 r "
-
EDCO WASTE & RECYCLING SERVICES, INC
224 S. LAS POSAS RD
AN MARCOS, CA 92078 40
(760) 144 /1
Ciitomer: 1024 Ticket: 13595
Date: I0/19/19
COASTWASTE/TINA LOVELACE
5960 EL CAMINO REAL
CARLS3AI) CA 92008
- -
INVOICE
In: 9:49 Truck: 5504/0000
Out: 9:58 Container:
Route: 08645
Origin: 086 CPRLS8PD
Extended
Commodity Units Charge
45 C & D MIX 2.29 per TON snow CC3ross'In) : 37,780. lbs Sc1#1 Tare 3,200. lbs Scl#1 Net: 4,580. ibs]
TOTAL DUE
Construction & Demolition Diversion Certificate -- Diversion
This certifies that the coupany listed above has util ized an EDCO facility to divert construction deuolit:on
with LEED requireaent The diversion tonnage is based on an overall tonnage percentage of the respective EDCO faciUty r.
EVERARDO Driver
13S1)
c
I
EDCOt4ASTE & RECYCLING SERVICES,INC
2124 S. L PO RD---- ----- - - -
SAN I'IARCOS, CA 92078
(760) 744-2700
Customer: 1024 Ticket: 12987
Date: 09/10/19
COSTWflSTE/T I N% LOVELACE
3960 EL CPMINO REAL
CRLSBD CA 92008
INVOICE
In: 12:18 Ti-uck: 3995
Out: 12:28 Container:
Route: 0864
Origin: 086 CPRLSBAD
Extended
Commodity Units Rate Charge
45 C & D MIX 2.67 per TON
CGross(ln): 39,240. lbs Sc14t1 Tare 33,900. lbs Sc1*1 Net: 5,340. lbs'
TOIL DUE - -
Construction & Deoolition Diversion Certificate - Diversion Percentàe 88%
This certifies that the coopany listed above has utilized an EDtO facility to divert construction denolitionoaterials in accordance
with LEED requireaent. The diversion tonnage is based on an overall tonnage percentage of the respective EOCO facility.
3S o353
RODRIGO Driver
2rnUiAW
1 I.:s ri r PNVO PC4 - Page1of2
-' Custo1'D: 22-36876-23005 WASTE iV&ANAGEflIIE1T AIN - Customer Name: TYCE CONSTRUCTION ENGINEERING '1 Service Period: . 07/01/19-07/31/19
U Invoice Date: 08/01/2019
Invoice Ntirnber 4618057-0274-7
0 MY - — J —_ ue
Visit wm.com
Tosetupyoura*iepthile, ,upfapapeiess
swwwft iewbekyarheôks
payyourkiceaschecleapidwp
c: II U
Customer Service:
(800) 596-7444
Due Upon Receipt
If full payolent of ft in4cad atmunt is ixt
u te
receiwd
withn yqir nTs. you may be g dwed a
ntedeof23%ofthaurçaidariuint.vitha
rririmum monthy charge of $5, or such late charge
regulatiaiorccnbct
$417.13
See Reverse for Important Messages
0.00 + 0.00 + 0.00 + 417.13 - 417.13
Details for Service Location: Customer ID: 22-36876-23065.
Tyce Construction Engineering, 2210 Faraday Ave, Carlsbad CA
92008-7225
Descripton Date . Ticket Quantity Amount
Tarp charge flat 07/15/19 105587 1.00 56.35
Del tarp 0.00
Delivery 40-yd demo 1.00 63.43
De: 1-40d 0.00
Ticket Total 119.78
40 Yd demolition 07/15/19 105836 1.00 233.92
Ticket Total 233.92
Delivery 40 yd demo 07/16/19 106138 1.00 63.43
Ticket Total 63.43
Total Current Charges PA s'I -/ 417.13
=E
ii _
---------------------------------Please detach and send the lower poitlon with payment - - - (no cash or staples)
I WN 0 1 \
WASTE MANAGEMENT
WASTE MANAGEMENT
P0 BOX 43530
PHOENIX, AZ 85080
(866) 796-6951 FAX
0274000223687623005046180570000004]713000000417]3 7
003864801 AD 0.409 "AUTO T7 07213 92064.212822 .001-P38686.11 10274008
iliiliilliluulilllllliillailiiltltliuuullliliiulillllliiuuuiliuil
TYCE CONSTRUCTION ENGINEERING
15922 OVERVIEW RD II
P0 WAY CA 92064-2128
THINK GREENEF
lllllilllltiilliillutuillilliliililiilillllliiliiiiliiuilltlliuii
COAST WASTE MANAGEMENT
P0 BOX 541065
LOS ANGELES, CA 90054-1065
C
Piintedon
recycled vaver.
08/01/2019 4618057-0274-7 22-36676-23005
Payment Terms Total Due Amount
Due Upon Receipt $417.13
(800)595-7444 -(Il. (5
VIFVILO
WASTE IVIAWAGEIU1EIUT Customer ID: 22'-36876-230-05-
Customer Name: TYCE CONSTRUCTION ENGINEERING
Service Period:
Jwoj"4B# Invoice Date: 'H ENTERE1T9101119°9130119 10/01/2019
Invoice Number L.) 4619220-0274-0
Visit wm.com
Tosupura-ine profile, sign wpfcrpaperless
statements, marageuracint, viewI'dldaysdiedu!es.
payyaJrinvdcea-scheôieaAckup
*JIe'I U
Customer Service:
(800) 596-7444
Due Upon Receipt
If full panent of the invoiced anount is not received
witHn yair uiltidCWal temis, you may be dw9ed a
rTøldiy late cherge of 25% of the urdanount,witha
nirinRJrn monthly diarge of $5, or such late charge
allowed un&Iicehe law, reaiorwlral
F2F1II!h,i,i-.IPayrnerits
417.13 + (417.13) I + ir.IDiiTil
7
0.00 +595.74
- _____TOM Que,
595.7 = I
Details for Service Location: Customer ID: 22-36876-23005
Tyce Construction Engineering, 2210 Faraday Ave, Carlsbad CA
92008-7225
Description Date Ticket Quantity Amount
40 Yd demolition 09/10/19 123424 1.00 233.92
Disposal per ton demolition 2.67 212.42
Ticket Total 446.34
Container usage charge daily 09/30/19 M97764 1.00 149.40
Through 09/30/2019 0.00
Ticket Total 149.40
Total Current Charges 1595.74
F?r .k1 75"
--------------------------Please detach and send the lower poition with payment - - - (no cash or staples)------------------------------
wwof"'t.
WASTE MANAGEMENT
WASTE MANAGEMENT
P0 BOX 43530
PHOENIX, AZ 85080
(800) 596-7444
(866) 796-6951 FAX
10/01/2019 4619220-0274-0 22-36876-23005
Payment Terms Total Due Amount
Due Upon Receipt $595.74
51r.7y
074000223687623005046192200000005957400000059574 5
003823601 AB 0.409 'AUTO 190727492064-212822.CO1.P3827441 1027.1029 11111111 11111 1111111111111111111 111111111111 111111
I1I11IIlIIt9'1111I11911111'I'II'111r111''IIII'IIPI1'''I,'I'1' COAST WASTE MANAGEMENT
TYCE CONSTRUCTION ENGINEERING P0 BOX 541065
15922 OVERVIEW RD
N
LOS ANGELES, CA 90054-1065
P0 WAY CA 92064-2128
Amk
THINK GREEN Printed on
recycled paper.
0;.
I-
m N In
0
0 U,
.O
WASTE MAfl!AGEfl1IEmT
ENTERED
Customer ID:
Customer Name: j B# Service Period:
'nvoice Date:
Invoice Number:
22-36876-23005
TYCE CONSTRUCTION ENGINEERING
10/01/19-10/31/19
11/01/2019
4619512-0274-0
L_FI YourR_ayrnentjlsjDpe
Visit wm.com Due Upon Receipt $570.49
Tosetiporodine profile, sign upforpaperless
statements,mmegeyiraccwnt.vfewMkysthedules,
payirinvoiceorstheô!eapi±ip
[JjcJ 0
Customer Service:
(800) 596-7444
If M payment of the invciced amount is not received
withn your cixitractual temm you may be dwged a
nuitHy late charge of 2.5% of the urçaidamunt.tvitha
n*irrum rroitliy dwge of $5, or such late charge
dunderaUe law, rejlatiaicrcentract. See Reverse for Important Messags-
59574 + (59574) +
F 0.00 + iijj
570.49
—
— 570.49
Details for Service LOcation: Customer ID: 22-36876-23005
Tyce Construction Engineering, 2210 Faraday Ave, Carlsbad CA
92008-7225
Description Date Ticket Quantity Amount
40 Yd demolition 10/19/19 136326 1.00 233.92
Disposal per ton demolition 2.29 182.19
Ticket Total 416.11
Container usage charge daily 10/31/19 M99421 1.00 154.38
Through 10/31/2019 0.00
Ticket Total 154.38
Total Current Charges 570.49
iD ilk.9
rj itt? LL 571
--------------------------Please detach and send the lower portion with payment - - - (no cash er staples) ------------------------------
-I MN ~
WASTE MANAGEMENT
WASTE MANAGEMENT
P0 BOX 43530
PHOENIX, AZ 85080
(800) 596-7444
(866) 796-6951 FAX
fl r
11/01/2019 4619512-0274-0 22-36876-23005
Payment Terms Total Due Amount
Due Upon Receipt $570.49
02740002236876230050461951200001305704900000057049 I
006860201 AD 0.409 AUTO 1007305 92064.212822.CO1.P68670.I1 10274037 IiIIIlIlIJIIiIIsIlIIIuuIIIlIuIiIIiIuiIilIIIIuiIuiiilii.,IIiJIi.t. IluIiiIii1ttuuliIuIiiIII1IilrIIIItuIIIIiiiltII,,uailuilillllltii COAST WASTE MANAGEMENT
TYCE CONSTRUCTION ENGINEERING P0 BOX 541065
15922 OVERVIEW RD LOS ANGELES, CA 90054-1065
P0 WAY CA 92064-2128
THINK GREEN? Printed on recycled paper.
WASTE MANAGEMENT
INVOICE
Customer ID:
Customer Name:
Service Period:
Invoice Date:
Invoice Number:
Page 1 of 3
22-36876-23005
TYCE CONSTRUCTION ENGINEERING
12/01/19-12/31/19
01/01/2020
4620079-0274-7
Visit wm.com
TosetupurodtnepvfIle, sigiupforpaperless
statements, manage your acccunt. view Fdday schedules,
payycur invoke or scheckile a pickup
W PE U
Customer Service:
(800) 596-7444
Due Upon Receipt
If full paent of the frdced amount is not received
wittán your cavactual ternm you may be clwged a
nuitHyIatediaieof 2.5% of the unpaid amount. wtha
nirimum rrcntliy charge of $5, or such late charge
albwedurxierappkaUe6-w,regiMmorcoritracL
I Previous Balance Payments Adjustments Current Charges Total Due
'Details for Service Location: Customer ID: 22-36876-23005
Tyce Construction Engineering, 2210 Faraday Ave. Carlsbad CA
92008-7225
Description Date Ticket Quantity Amount
Trip nocharge 12/03/19 149166 1.00 0.00
Trip no charge 0.00
Ticket Total 0.00
Container usage charge daily 12/04/19 M02584 1.00 19.92
Through 12/04/2019 0.00
Ticket Total 19.92
4OYddemolition 12/04/19 149494 1.00 233.92
Disposal per ton demolition 2.70 214.81
Ticket Total 448.73
Total Current Charges 468.65
---------------------Please detach and send the lower potfion with payment - - - (no cash or staples) ------------------------------
wj. V, U-11 J-
WA MANAGEMENT
COAST WASTE MANAGEMENT, INC.
P0 BOX 43530
PHOENIX, AZ 85080
(800) 596-7444
(866) 796-6951 FAX
0274000223687623005046200790000004686500000046865 5
009942101 All 0.409 "AUTO 140700292064-212822.0I4'99520.II 10274053 lllllllllliiilliilliiuull,IIsliihl,lllllllllllill,.iu Jill u1llH1lIIlhIIIiluIIlllhhIIlI,llliIUdhIuiuIrIllI WM CORPORATE SERVICES, INC.
TYCE CONSTRUCTION ENGINEERING AS PAYMENT AGENT
15922 OVERVIEW RD P0 BOX 541065
POWAY CA 92064-2128 LOS ANGELES, CA 90054-1065
THINK GREEN Printed on
recycled pape.
cn
N N 0
fn LO
4p.
(City of
Carlsbad
NONRESIDENTIAL GREEN
BUILDING CODE STANDARDS
MANDATORY MEASURES
CERTIFICATION CHECKLIST
B-52
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Thii form, slñdiid completed, and all receipts for recycled materials shall be,
ubmltted to the Building Inspector prior to Final Inspection.
Site Development Mandatory
5.106.1 Storm water pollution prevention plan. For projects of one acre or less, develop a Storm
Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to (X)
the State Storm water NPDES Construction Permit or local ordinance, whichever is stricter, as is
required for projects over one acre. The plan should cover prevention of soil loss by storm water
run-off and/or wind erosion, of sedimentation and/or of dust/particulate matter air pollution.
5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or (x)
meet local ordinance, whichever is stricter.
5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic, provide
permanently anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to (x)
passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two-
bike capacity rack.
5.106.4.2 Long Term bicycle parking. For buildings with over 10 tenant-occupants, provide secure
bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum (x)
of one space.
5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting,
fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.3.1. (x)
5.106.8 Light pollution reduction. Comply with lighting power requirements in the California
Energy Code and design interior lighting such that zero direct-beam illumination leaves the building (x)
site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 14 as defined in
Chapter 10 of the California Administrative Code, using the following strategies:
Shield all exterior luminaries or use cutoff luminaries (x)
Contain interior lighting within each source (X)
Allow no more than .01 horizontal foot candle 15ft. beyond the site (x)
Contain all exterior lighting within property boundaries (x)
Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking
facilities and walkways.
5.106.10 Grading and paving. The site shall be planned and developed to keep surface water
away from buildings. Construction plans shall indicate how site grading or drainage system will (X)
manage all surface water flows.
Water Efficiency and Conservation
Indoor Water Use
5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503.1.1 (x) through 503.1.3.
5303.1.1 Buildings in excess of 50,000 square feet. Separate sub-meters shall be installed as
follows:
For each individual leased, rented, or other tenant space within the building projected to (X)
consume
more than 100 gal/day.
For spaces used for laundry or cleaners, restaurant or food service, medical or dental office,
laboratory or beauty salon or barber shop projected to consume more than 100 gal/day.
B-52 Page 1 of 5 Rev. 5/17
5.303.1.2 Excess consumption. Any building within a project or space within a building that is
projected to consume more than 1,000 gal/day. (X)
5.303 Percent savings. A schedule of plumbing fixtures and fixture fittings that will reduce the
overall use of potable water within the building by 20 percent shall be provided (Calculate (X)
savings by Water Use Worksheets or utilize Table 5.303.2.3).
5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are
served by more than one showerhead, the combined flow rate of all the showerheads shall not (x)
exceed the maximum flow rates specified in the 20 percent reduction column contained in
Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in
dperation at a time.
5303.6 Plumbing fixtures and fittings. Plumbing fixtures (water closets
and urinals) and fittings (faucets and showerheads) shall comply with the requirements listed As applicable
for each type in items listed in Table 5.303.6.
Water closets (toilets) - flushometer type . (X)
Water closets (toilets) - tank type (X)
Urinals (X)
Public lavatory faucets (X)
Public metering self-closing faucets (X)
Residential bathroom lavatory sink faucets (X)
Residential bathroom lavatory sinks (X)
Residential showerheads (X)
Single shower fixtures served by more than one showerhead (x)
Outdoor Water Use
5.304.1 Water Budget. A water budget shall be developed for landscaping irrigation use. (X)
5.304.2 Outdoor potable water use. For new water service, separate meters or submeters
shall be installed for indoor and outdoor potable water use for landscaped areas between
1,000 and 5,000 square feet. (x)
5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500
square feet of landscaped area (the level at which the MLO applies), install irrigation controllers
and sensors which include the following criteria and meet manufacturer's recommendations.
5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of
final inspection shall comply with the following:
Controllers shall be weather- or soil moisture-based controllers that automatically adjust
irrigation in response to changes in plant's needs as weather conditions change. (x) Weather based controllers without integral rain sensors or communication systems that As applicable account for local rainfall shall have separate wired or wireless rain sensors which connects or (x) communicates with the controller(s). Soil moisture-based controllers are not required to have
rain sensor input.
Construction Waste Management Plan
(X) 5.408.1 Construction waste diversion. Establish a construction waste management plan or
meet local ordinance, whichever is more stringent. (x) 5408.2 Construction waste management plan. Submit plan per this section to enforcement
authority within the city.
5.408.1.4 Documentation. Provide documentation of the waste management plan (see form (x) B-59) that meets the requirements listed in Section 5.408.1.1 thru 5.408.1.3 and the plan is
accessible to the enforcement authority.
5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of
nonhazardous construction and demolition debris or meet local ordinance, whichever is more
stringent. (x) Exceptions:
Excavated soil and land-clearing debris
Alternate waste reduction methods, developed by working with local agencies if
diversion or recycle facilities capable of compliance with this item do not exist.
5.408.3 Excavated soil and land clearing debris. 100 percent of trees. Stumps, rocks and
B-52 Page 2 of 5 Rev. 5/17
associated vegetation and soils resulting primarily from land clearing shall be reused or
I Building Maintenance and Operation I I
5.410.1 Recycling by occupants. Provide readily accessible areas that serve the entire
building and are identified for the depositing, storage and collection of nonhazardous materials (X)
for recycling.
5.410.2 Commissioning. For new buildings 10,000 square feet and over, building (X)
commissioning for all building systems covered by T24, Part 6, process systems and
renewable energy systems shall be included in the design and construction processes of the
building project. Commissioning requirements shall include items listed in Section 5.410.2. -
5.410.2.6 (X)
5.410.2.1 Owner's Project Requirements (OPR). Documented before the design phase of
the projeàt begins the OPR shall include items listed in Section 5.410.4. (x)
5.41 0.2.2 Basis of Design (BOD). A written explanation of how the design of the building
systems meets the OPR shall be completed at the design phase of the building project and
updated periodically to cover the systems listed in Section 5.410.2.2. (x)
5.410.2.3 Commissioning plan. A commissioning plan describing how the project will be
commissioned shall be started during the design phase of the building project and shall include
items listed in Section 5.410.2.3. (x)
5.410.2.4 Functional performance testing shall demonstrate the correct installation and
operation of each component, system and system-to-system interface in accordance with the (X)
approved plans and specifications.
5.410.2.5 Documentation and training. A Systems manual and systems operations training
are required. (x)
5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or
representative and facilities operator and shall include the items listed in Section 5.410.2.5.1. (x)
5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff
for each equipment type and/or system shall include items listed in Section 5.410.2.5.2. (x)
5.410.2.6 Commissioning report. A complete report of commissioning process activities
undertaken through the design, construction and reporting recommendations for post
construction phases of the building project shall be completed and provided to the owner or
representative.
5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for (X)
buildings less
than 10,000 square feet.
5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. (X)
Systems to be included for testing and adjusting shall include, as applicable to the project, the
systems listed in Section 5.410.3.2. (x)
5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry
best practices and applicable national standards on each system. (X)
5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or
space is operated for normal use, the system should be balanced in accordance with the
procedures defined by national standards listed in Section 5.410.3.3.1. (x)
5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report (X)
of testing signed by the individual responsible for performing those services.
maintenance instructions and copies of guaranties/warranties for each system prior to final
inspection.
5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed
operating and maintenance manual
5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports
required by the enforcing agency.
B-52 Page 30f5 Rev. 5/17
44
Environmental Quality
Fireplaces
5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a (x)
sealed woodstove and refer to residential requirements in the California Energy Code, Title 24,
Part 6, Subchapter 7, Section 150. As Applicable
5.503.1.1 Woodstoves. Woodstoves shall comply with US EPA Phase II emission limits. (x)
Weather Resistance and Moisture Management
5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope
as required by California Building Code Section 1403.2 and California Energy Code Section 150, (x)
manufacturer's installation instruction instructions or local ordinance, whichever is more stringent.
5.407.2 Moisture control. Employ moisture control measured by the following methods:
5.407.2.1 Sprinklers. Prevent irrigation spray on structures. (X)
5.407.2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion (X)
into buildings.
Pollution Control
5.504.3 Covering of duct openings and protection of mechanical equipment during -
construction. At the time of rough installation or during storage on the construction site and until
final start up of the heating and cooling equipment, all duct and other related air distribution (x)
component openings shall be covered with tape, plastic, sheet metal or other methods to reduce
the amount of debris or duct which the _may _collect _in_ _system.
5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly occupied areas of the
building with outside and return air prior to occupancy that provides at least a MERV of 8.
5.504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1
through 5.504.4.6
5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet
the requirements of the following standards: (X)
Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and
caulks shall comply with local or regional air pollution control or air quality management
district rules where applicable or SCAQMD Rule 1168 VOC limits as shown in Tables
5.504.4.1 and 5.504.4.2.
Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking
compounds (in units of product, less packaging, which do not weigh more than one pound
and do not consist of more than 16 fluid ounces) shall comply with statewide VOC
standards and other requirements, including prohibitions on use of certain toxic
compounds, of California Code of Regulations, Title 17, commencing with Section 94507.
5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3
5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product-
Weighted MIR limits for ROC in Section 94522 (a)(3) and other requirements, including prohibition
on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520
et seq.).
5.504.4 Carpet systems. All carpet installed in the building interior shall meet the testing and
product requirements of one of the standards listed in Section 5.504.4.4.
50504.4.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the
requirements of the Carpet and Rug Institute Green Label Program.
5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 804.4.1.
5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density
fiberboard composite wood products used on the interior or exterior of the building shall meet the
requirements for formaldehyde as specified in Table 5.504.4.
5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as
requested by the enforcing agency. Documentation shall include at least one of the following:
Product certification and specifications
Chain of custody certifications
Other methods acceptable to the enforcing agency
5.504.4.6 Resilient flooring systems. Comply with the VOC emission limits defined in the 2009 (x)
CHPS criteria and listed on its Low-emitting Materials List (or product registry) or certified under
the FloorScore program of the Resilient Floor Covering Institute.
B-52 Page 4 of 5 Rev. 5/17
Indoor Moisture and Radon Control
5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California
Building Code, Title 24 Part 2, Sections 1203 (Ventilation) Chapter 14.1. (x)
Air quality and Exhaust
5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the (x)
minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and
Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent.
5.506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation,
CO2 sensors and ventilation controls shall be specified and installed in accordance with the (x)
requirements of the latest edition of the California Energy Code, Title 24, Part 6, Section 120.1.(C) (4).
Outdoor Air Quality
5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and
fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. As
5.508.1 CFCs. Install HVAC and refrigeration equipment that does not contain CFCs. applicable
5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. (x)
(x)
I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items
listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016
California Green Building Standards. All receipts for recycled materials have been attached to this form.
Project Address: 2.110 Fo rci.cLa, A'c. 5a te. IWO Plan Check Number: e!C2DlS-038L
Print Name: (3hr ibp1*cc ifJ1QA1
LicenseNumber: I084'S2.. Date: fr13 9%Dj..b
B-52 Page 50f5 Rev: 5/17