HomeMy WebLinkAbout2215 CALLE BARCELONA; ; CB052657; Permit07-1*3^006
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Residential Permit Permit No: CB052657
Building Inspection Request Line (760) 602-2725
2215 CALLE BARCELONA CBAD
COMRES
2552730700 Lot #:
$509,958.00 Construction Type:
Reference #:
Structure Type:
VN
0
0 Bathrooms: 0
COASTLINE COMM. CHURCH 6910 SF
MULTI-PURPOSE BLDG.
Applicant:
COASTLINE COMMUNITY CHURCH
511 ENCINITAS BLVD#104
ENCINITAS CA 92024
, Status:
Applied:
Entered By:
Approved:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
07/19/2005
KG
07/13/2006
07/13/2006
Owner:
COASTLINE COMMUNITY CHURCH
511 ENCINITAS BLVD #104
ENCINITAS CA 92024
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
BTD#2Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Meter Size
Add'l Reel. Water Con. Fee
$1,804.66
. $0.00
$1,173.03
$0.00
$0.00
$107.09
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF (31 05540)
PFF (4305540)
License Tax (31 041 93)
License Tax (43041 93)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Redev Parking Fee
Housing Impact Fee
Housing InLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
HMP Fee
TOTAL PERMIT FEES
$0.00
$0.00
$7,324.60,
$0.00
$0.00
$0.00
$0.00
$2,912.00
$0.00
$0.00
$322.00
$1,510.00
$101.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
??
$15,254.38
Total Fees: $15,254.38 Total Payments To Date: $15,254.38 Balance Due: $0.00BUILDING PLANS —
IN STORAGE
ATTACHED
Inspector:
FINAL APPROVAL
Date:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.