HomeMy WebLinkAbout2223 PALOMAR AIRPORT RD; ; CB053337; Permit07-07-2006
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Retaining Wall Permit Permit No CB053337
Building Inspection Request Line (760) 602-2725
Job Address
Permit Type
Parcel No
Valuation
Reference #
Project Title
Applicant
MARY RYAN
949 582-3735
2223 PALOMAR AIRPORT RD CBAD
RETAIN
2130702900 Lot# 0
$36,000 00 Construction Type NEW
HOMEWOOD SUITES-2000 SF RETAIN
WALL
Status
Applied
Entered By
Plan Approved
Issued
Plan Check*
Inspect Area
Owner
AGO HILLS L L C
C/O EDWARD G COSS
620 NEWPORT CENTER DR
NEWPORT BEACH CA 92660
ISSUED
09/22/2005
RMA
02/28/2006
02/28/2006
PC050098
JM
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Strong Motion Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Additional Fees
TOTAL PERMIT FEES
$276 35
$000
$17963
$000
$360
$000
$000
$000
$000
$459 58
Total Fees $459 58 Total Payments To Date $459 58 Balance Due $000
Jnspector
FINAL AP
Date J Clearance
NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications reservations or other exactions hereafter collectively
referred to as fees/exactions ' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired
inspection List
Permit* CB053337 Type RETAIN HOMEWOOD SUITES-2000 SF RETAIN
WALL
Date Inspection Item Inspector Act Comments
07/06/2006 69 Final Masonry JM Fl
04/28/2006 65 Retaining Walls JM PA SOUTH WALL FOOTING
Friday July 07 2006 Page 1 of 1
UNSCHEDULED BUILDING INSPECTION
DATE 6/ INSPECTOR
PERMIT # Qs^yyy PLAN CHECK #
JOB ADDRESS _
DESCRIPTION
CODE DESCRIPTION ACT COMMENTS
FOOTING OBSERVATION SUMMARY
Leighton Consulting, Inc
A LEIGHTON GROUP COMPANY
Project Name |ca$aclu\ n-cU\S Date
Location CeukUad i'A Project No
Plan File No Permit No ^Unit/Phase/Lot(s)
Referenced Geotechnical Report(s)
A3 vack /T&V Aou-'jm-e CS/UXO^VA- Hoi*i%w/o<s<i
oY fa'jKfik Aii/)jvf '4- i^txoiAj i.'3-vl ifeci-O C'!&r£,C\ O" Oo-
'
Observation Summary
Initials A representative of Leighton Consulting observed onsite soil conditions Soil conditions at the
Date Slte are substantially in conformance with those assumed in the geotechnical report
Initials A representative of Leighton Consulting observed and measured footing excavation depth/width
Footing excavations extend to proper depth and bearing strata and are in general conformance
Date with recommendations of the geotechnical report
Initials A representative of Leighton Consulting measured footing setback from slope face The setback
Date was m general accordance with the recommendations of the geotechnical report
Initials ^4s*i«iv4 ^ v^^^-o /"MY2*'uAky iV^u ' <J ky3' •" r>-vL ) f'Cj ^t<.-^ ^T vJ'^u'th ^fc
Date
tt,o ^^ -c;j^;f(<^^ Up_ _\i
Notes to Superintendent/Foreman
1 Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing
concrete
2 Based on expansion potential of underlying soils, presoakmg of soil below slabs may be recommended
Consult the geotechnical report for presoakmg recommendations We note that clayey soils may take an
extended period of time and the contractor should schedule accordingly
3 In the event of a site change subsequent to our footing observation and prior to concrete placement (i e ,
heavy ram, etc ), we should be contacted to perform additional site observations
Note to Building Inspector
1 Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil
expansion index test results are contained in the As-Graded Geotechnical Report provided at the
completion of grading
ForLreightbn Consulting, Inc Date
609 R 1 05
CLIENT/AGENCY COPY
Leighton Consulting, Inc
A LEIGHTON GROUP COMPANY
FOOTING OBSERVATION SUMMARY
Project Name '
Locatlon '
Plan File No
Date
Project No
Permit No CumtumtyPhase/Lot(s)
Referenced Geotechnical Report(s)
O
CU..J )\3
Observation Summary
Y S Initials
Date
A representative of Leighton Consulting observed onsite soil conditions Soil conditions at the
site are substantially in conformance with those assumed in the geotechnical report
Initials
o£ Date
fA Initials
Date
A representative of Leighton Consulting observed and measured footing excavation depth/width
Footing excavations extend to proper depth and bearing strata and are in general conformance
with recommendations of the geotechnical report
A representative of Leighton Consulting measured footing setback from slope face The setback
was in general accordance with the recommendations of the geotechnical report
Initials
Date
4 u ^i ffi. W^ of
'Q^ "^o^ ZwiJ
\i
T>'-x\Cj^r^a
t
Notes to Superintendent/Foreman
1 Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing
concrete
2 Based on expansion potential of underlying soils, presoakmg of soil below slabs may be recommended
Consult the geotechnical report for presoakmg recommendations We note that clayey soils may take an
extended period of time and the contractor should schedule accordingly
3 In the event of a site change subsequent to our footing observation and prior to concrete placement (i e ,
heavy ram, etc ), we should be contacted to perform additional site observations
Note to Building Inspector
1 Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil
expansion index test results are contained in the As-Graded Geotechnical Report provided at the
completion of grading
fcu.il\ u (-/ ——•FoKs^eighton-GonsOltmg, Inc Date
609 R 1 05
CLIENT/AGENCY COPY
DAILY FIELD REPORT
PROJECT DATE
ADDRESS
EQUIPMENT
NAME / QOMPW -CONTACTS feN To? t&fe
DESCRIPTION OF FtBtO OPERATIONS
FIELD DENSITY TESTS TAKEN
Arrive A
Depart D
A
D
A
D
FAILURES -RETESTS
TOTAL DAILY HRS
FAX f79&jr4to?477
E-maB: ENGO<3@aol,corn
DAIIY FIELD REPORT
PROJECT.
ADDRESS
EQUIPMENT <L«w.t*no* •
NAME / COMPANY -CONTACTS N*J
DESCRIPTION OF FIELD OPERATIONS
.DATE
t'
f f<i**-<*a-
or
LJJei.r-1 ur ft f PtLat- /ttJ
*>fi#~t
pg.e -\
fr .
, ** .- t • Si* i , ';
'"- -."&tn>ttff
JUST
..-FAILURES —RETESTS
Arrive
Depart t^..- D
A
D
A
D
TOTAL DAILY HftS
Apr 25 06 0803a ALETHA MARTINEZ 714-524-7596
RM SURVEYING
5651 Casa Loma Avenue
Yorba Linda, California 92886
714-524-0474
Fax 714-524-7596
April 25, 2006
City of Carlsbad
Attention: Building Department
Subject Gravity Retaining Wall
Reference Project Airport Hotels
Ago Hills, LLC
Carlsbad, CA
Gentlemen
This is to certify that we have staked the gravity retaining wall along the property line
per the approved site and grading plan.
Very truly yours,
R.C Statan-PX.S 7415
RM/RCS/alm
ENGINEERING
I DESIGN GROUPm2121 Montiel Road, San Marcos, California 92069 • (760) 839-7302 • Fax (760) 480-7477 • www designgroupca com
Date
To
Re
June 27, 2006)
Tarsadia Hotels \
Attention Rashik Patel/Lon Donald
620 Newport Center Drive - 14th Floor
Newport Beach, CA 92660
Retaining Wall Tarsadia Hotels/Homewood Inn to be Located at 2223
Palomar Airport Road in the City of Carlsbad, California
Subject Summary Letter of Keystone Wall Special Inspection
Reference Wall Permit #CB053337
We have performed part-time site observation during the construction of the above
referenced Keystone wall plans Our site observation included observation of concrete
leveling pad excavations, placement of Keystone block, grid and wall backdrams Soil
observation and compaction testing was performed by the project soils engineer, Leighton
& Associates Based upon our observations of the wall construction, the wall has been
built with the overall design intent of the project retaining wall plans
Please note any work within the reinforced (i.e grid) zone of the project retaining wall
should be reviewed by Engineering Design Group on a case by case basis
If you have any questions regarding this letter, please fee free to contact our office
Sincerely,
ENGINEERING DESIGN GROUP
California RCE 65122
Page No 1
E \LETTERU-ETTER 2\2005\053743-2, TARSADIA HOTEL-HOMEWOOD INN, 2223 PALOMAR AIRPORT RD, CARLSBAD - KEYSTONE INSPEC
SUMM LTR wpd