Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2225 FARADAY AVE; BLDG C; 85-467 C; Permit
,. II) z 0 ~ a: < _, 0 w C a: ~ I hereby affirm that I. am licensed under o [ provisions of Chapter 9 (commencing with I-Section 7000) of Division 3 of the Business ~ and Professions Code, and my license is in a: full force and effec4 ~ \ ~ • _L1c Nn'Sla\7E) Class (.)~ a:' w 0 ... :5 m ii: w z 3 0 z -0 ~·· II) z w Q. :E 0 (.) (/) ix: w ,.: a: 0 ~ 1[ i hereby aff,rm that I am exempt from the Contrac-tor's License Law for the following reason (Sec. 7031.5 Business and Professions Code: Any city or county which re-quires a perm1I to construct, alter, improve, demolish, or repair any structure, pnor to its issuance also requires the ap-plicant for such permit to file a s,gned statement that he 1s licensed pursuant to the provisions of the Contractor s License Law (Chapter 9 commencing with Section 7000 of Division 3 of the Business and Professions Code) or that is ex-empt therefrom and the basis for the alleg~d ixempt1on Any v1olatmn ol Section 7031,5 by an applicant for a permit sub· jects the applicant to a civil penalty of not more than five hun-dred dollars ($500). . 0 I, as owner ol the property, or my employees wilh wage£ as their sole compe~sation, will do·the work, and the struc-ture is not intended·or offered for sale (Sec 7044, Business and Proless1ons Code. The Contractor's License Law does not apply to an owner of property who bwlds or improves thereon and who does such work himself or through his own employees, provided that such improvements are not infend-ed or offered for sate. 11, however, the building or improve-inent is sold within one year of completion, the owner-builder will have the burden of provmg that he did not bwld or 1m· prove for the purpose of sale). 0 I, as owner of the property. am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Pro'fess1ons Code The Contractor's license Law does not apply to an owner of property who builds or im- proves thereon, and who contracts for each proiects wlth a t~~)~ctor(s) license pursuant to the Contractor's License 0 As a homeowner I am improving my home, and the follow-ing cond1t10ns exist: 1. The work is being performed prior to sale. 2. I have lived m my home for twelve months prior to completion of this work. 3. I have not claimed lhJS exemption during the last three years. 0 I am exempt under Sec. ______ _ for this reason vi I hereby affirm that I have a certificate o~onsent to ~I-insure, or a certificate of Workers· Comp nsation In- surance, or a certified copy thereof (Sec. 3~ abor Code) POLICY NO. C~RTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (This section need not be completed if the permit is for one hundred dollars ($100) or less) D I certify that m th; pe(formance of the work for which this permit ls Issued, I shall not employ any person many manlier so as to become subject to the Workers· Compen- sation· Laws of California. NOTiCE TO APPLICANT: lf, after making this Certificate of Exemption. you should Decome subject to the Workers' Compensation provisions of the Labor Code, you must forthwith comply with such provision~ or this permit shall. be deemed re~oked. D I hereby affirm that there is ~ construction lendmg agency for the performance of the work for which this per- mit is issued (Sec. 3097, Civil Code) Lender's Name ____________ _ Lender's Address ____________ _ --.. ... ~ I I USE BALL POINT PEN ONLY & PRESS HARD l CARLSBAP BUILDING DEPARTMENT f Carlsbad, California 92008-1989 (619) 438-5525 I JOBAODRESS,, --------:::r AV.ST.RO. NEARESTCROSSST. i 2:z_ 7-: e:r- 1 LOT ' BLOCK SWBQJ VISION I , I i OWNER'S NAME I ,._ .n OWNER'S PHONE CENSUS TRACT QTY. . -EAC,H FIXTURE TRAP I , EACH BUILDING SEWER f ..,-EACH WATER HEATER ANO/OR VENT I -EACH GAS SYSTEM 1 TO 4 OUTLETS .f i EACH GAS SYSTEM 5 OR MORE EACH INSTAl .. ALTER, REPAIR WATER PIPE EACH VACUUM BREAKER WATER SOFTNER EACH ROOF DRAIN (INSIDE) TOTAL PLUMBING '• QTY.I ElECTRiCAL PERMIT -ISSUE NEW CONST EA AMP/SWT 1BK R 1 PH ~ 1 PH 3 PH REMODEL/ALTER PER CIRCUIT TEMP PO LE 200 AMPS OVER 200 AMPS TEMP O,CCUfANCY (30 DAYSI TOTAL ELECTRICAL -~_,. GRADING PERMIT ISSUED YO N 0 vD ND REDEVELOPMENT AREA vD ND QTY.I MECHANICAL PERMIT -ISSUE INSTALL FURN DUCTS UPTO 100,000 BTU BOILER/COMPRESSOR UP TO 3 HP QTY. I SOLAR -ISSUE COLLECTORS STORAGE TANKS ROCK STORAGE PUMP PLAN CHECK FEE TOTAL SOLAR 3-- OCC LOAD FIRE SPA Y[]J,.ND N WITHIN SHADED AREA AND DECLARATIONS. -zli-J~11.t' ZONE PERMIT NUMBER .,tfb1"~ PLAN 1.0. # BUILDING SQ. FOOTAGE ~~0~1~6l5S6T .979~~913 Not Valid Unless Machine Certified SUMMARY/ACCOUNT NUMBER BUILDING PERMIT 001-810·00-00-8220 SIGN PERMIT 001-810·00-00-8221 PLAN CHECK 001-810-00-00-8806 TOTAL PLUMBING 001-810·00-00-8222 7.-0 - Encinitas San Dieguito San Marcos 001-810-00-00-8162 MFF '() 880-519-92-57 CREDIT DEPOSIT TOTAL FEES PAYABLE I HAVE CAREFULLY EXAMINED THE COMPLETED "APPLICATION AND PERMIT' AND DO HEREBY CERTIFY UNDER PENALTY OF PERJURY THAT ALL INFORMATION HEREON INCLUDING THE DECLARATIONS ARE TRUE AND CORRECT AND I FURTHER CERTIFY AND AGREE IF A PERMIT IS ISSUED: TO COMPLY WITH ALL CITY. COUNTY ANO STATE LAWS GOVERNING BUILDING CON- STRUCTION, WHETHER SPECIFIED HEREIN O'R NOT. I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL UABILITIES, JUDGMENTS, COSTS ANO EXPENSES WHICH MAY lN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. eel by the Building Offic1atw,der the provisions of this * AN OSHA PERMIT IS REQUIRED FOR EXCAVATIONS OVER 5' O'' DEEP AND 01:Mot.lTION OR CONSTRUCTION OF STRUCTURES OVER 3 STORIES IN HEIGHT · · 51'd ff the building or work days from the date of such ·uch permit ls suspended or d for a period of 180 ~ OWNER O CONTAACTbR 0 av PHONE. D Q) u: >, ~ 0 0. E Q) f- l -0 0 0 c Cll () 0. 0. <l'. BP -"' ·c C: 0 Cf) Cf) Q) Cf) Cf) <l'. I 3:: _.Q ai >- Cf)- Cf) Q) () 0 a: Cll <ii 0 & Q) () C Cll C u: C Q) ~ 0 0 0 Q) 0. Cf) C ~ r. 3 l >~ < ; ., _ , . ::, . _ ,\:tvPE_ ·,,_J., ·-·" ·. · ,.,,_ ... · e· .. ·u· .. ,, .. LD-1N'···-G·· ' .'f.:.'-:.:· .·.· ... : .. : ..... ··: ·. . . ..• ·JFOl:JNbAi:io·N :· ) .... 1: 2---".t" !. ···> ... ..-._ ..:.: DA1'?~.-. INSP,~CTQ~-~ . I 1:>:,;__\' .... 4-- -, . -_----c;-.._,. :< ·~: ~--·±i, :• :":·:· :::~~~)/:-·:~::(, ,!' ·; ·\_ . :'·· -: · :~}\r·:,_f;~ , ... ·---~ :-(<_·,;:,~/t<·1. _ · ·_-... · ''-I,.''·.,• . ,,,• .-:· "' ·· .. ·'i/S--C/ii,•fl··· ·E· t-"'• '-i\,i• ,.. ··--., -~ '-.f·,.:,.~v,·. .,_: ''.... ... .:·:'··" .. : .'.~··: -~--~-::'.'!.-'· :-·-. . -·-. \\\·:: ~ .. _·.·._ .··.(, "'; ; .. -. . . t !, i _, " ;.,::~:~-~1~U=:~~6"~0--·s1tiEL ' . ; .. -'M· ASON. R .. y···· . -. '.-r-t::;Go-~,tEO_R:J3Ri50ti . _ ·-:;-~.-.::.' \ ... :, l ' .'~ '· ·-r; ' ·,' -. , '',"' -' ~ :~;.-..... ' . '::~~·~~1.1'1~D $f~-QIA~ IN~P.~X:~TipNS .· . . . . . .,_ ~ . .. . . -~ . ~.:::·-"'.·::·;_ .. 'RECiJF INSPEClfOR'S \ ~~, .. \\,\-~ . " ..... ~~ ,'·,·, ·•1,, ~:: '::; -.;S.VB. -FRAM!;. ~CJ: FJ!'O.OR 1 ,_:>::/{:~::~f~~~JN§ . ~. iijdQf d. G~lijlNG . g:_$fiE,~R. _,;_. __ ,, ~!1fi0 .IN$,Rl;Ci(~QN ·: G.HECKE:b :.):(;pf"!RO\l.;A;L•, .,.,.. ,i. ,' . -. ·.·L"':: .· . .. . . . . ';:-,_}±!~{ '. ~~\ I SOIL_S COMPLIA/'l(:E ';~~N\l~ION lr<JSP .: ~-'-~ J C I •,-....,..,....,,.,-..-,r •,,...·Ao ,~,... , ',,-.. • '•' '• .. • --~~1g:RIQRJ,i\TP:( ,. ·. . . •" , ,·, ·' J . . -~~Y,iR?9Q~:~$t~',':-'nL "· . ::iJJ:sR1,;~ti9tJ ::.( .. :-:~:~ ::. ·->< ·. -· ~: ·_r ·,. · . .. · c· • • · -_:~~~s::t:t0 :: .lt'{fl;R'JOR,!,:.ATH &J>.RYWA,L;L _.; l , . P0ST-t:ENSiONED ~;,' ' ·, : ::/ Y .:... q -~t :'•,;:·:: '.·o£(C9;Nc:-fi_fy;!::t,~:. ~, ~- fl, ,, ,{ r- :) . '. ··.·. 7~ ..... .. ,, :i ...i' ·, ~_;: .. ',,j_,'' r : PLUMBING :r -~-. ""-' "' ' ' -Fi~Co·~iro'iNd i~--·{ , .. -~~~0:~F{,A.Nb :!3.L~~:ov_ ;:'.CJ t~_!QC;f_:. . ::~~~j;~rl~~_GJf . . ,. --~1· ·: J. f' ~ ,,,·,: ! t.JNDJ;:RGRQW,,ND .-P .W.A~TE --~ iWfff.l;R : C ::·: •'.. t. :;. . ,,: 1., 1 ''r'o.P-our ·· .. · o ·wAstE \ ·;o-wA-rER · · . _sP.Ec~~~~?.-'PN,R¥. "·1.., . :· .: · toi3:~A~ I;) ·s,i46w~~·-~Ar-"r' · .. · ;: ·~·-r "-::_ · · ·GAS TEST . , .· . , -~ ~-~.-.=_~~--'--.'-· ._· -,._, ~ ,.._, ' •!. "' ' ,\ ·1 , . · -.j -ErWAi1ER P!E,ATER -o $J)~A~:wl\t~ii( l' . I . _.l' ,,.-, \ · ._PILES ~AISSONS • \ ,I' <I _-f-,'"!-...' 'l'_i,:,... ""1:-,.::t,, +· ·1:: .. k. ·. ,~; ' ,.·.::- ~-.-. ....... ,, -~'.,_ ·t' ,,.:;.1;__ ~-.;. \ .., ------c·~~~ .~ ,g,·· ~ J"'!"· ~-' --~~,; ~,$_~ ... , •' -,e-"'t'><,-;;,,, t-~ ._, :::·,~\,' . ~w:;-~ - ~ :,,:J.,;~ : '";~(-{_-):': I ... t ' ,'.;,·'· ', ~· -··~··. ··:l: .-.~~- --2"-,..·:.,· • .J.1.t,•' :;:t-~~~' ) ~--1~: l') .. , <·,1 ', ~ . ·"--"" _!___:___"_d, :::i, 4 ·,~~ ~, __ / +~. t ____ , ,:.,.._ ."1,~i"LE-. , "1.· "-j -a;:·'" •, .. "''.~,-.. ,,:• s, .. :...,, ....... ,, ;-; r· ·, / : · , , ElEC"FRICAL ' .. ~!,· ..• :!1. ~o~~~~~~:~;::RO;::M~::~R I ·· I · ' I· · I' · r1 · · · ···· ·~· ·· t , v., . "ll ~ " I ; I : -: . / . . . .· .. · ::,~ ~·--:J ·· <-:;, ·.·<'" -'.{'':<'. ... • •... ·1 • · I · ·1 · -·'"··,-:~\ -__ •.\ : .. -:---,~.:.· , ; · / D _1;3PNDl_l'fG~ [J PQQI,. .. ·. ·, L ',' ;+\ ,' .,.-,..'·,·A' . -·, .. ·, . -_---_-L -.:·' ,• •• ,. -, ... ;, .... , .. ,;;r '.·," I' < -. ,,,t -=-.' ',;i.,,..._~_:_ :.:· ~i,1. 1i"J \ ' ,-.·\ • I J. ., ._ _ . MECH . N.1.CAL.. .. I _; .. " . , . .,, . . . . · . .. _ l pl ·:o_. ovct:~ rP;:M:x-:: ·_c;r _REF,. _t:>1P1JN.G: ... · : ;, ..... A: l::),.; __ ; ; :, .. : ~"""; _ ~,:.;.:: .-.. ,-.:,;:... ,,:'f. _: .. ·.: ->::'-. :· ·-:, _ •. _. _.. _ \. ii" :t°" .. {",: ~:_ -\~ 1·'" ~~ -, -~~y:~~~- '!:.: --' _ .. _, _ .. __ ,! _ .. \. _ _,,{,~ ·~.'(u,. • ,t\;.~"."'"7'<° • ,_",_ lt_\!Jr;,,c';.;:; ·.:;~-1 u.ri';...:·:..J,l. -:;:·:t , ~EAT ~"f1R. .. :??N.P-.sv.st~~s. ·; ... :;:~-..... :~---~:·:·:./: ~---,~-: < _ ·,i: .. -~--- 1 • :·-,. '~: ••• l.t~' : .... ;,,.,~---~~·· .::.: .. J .. _ __ _ _ ... · . ___ ·-. \ ''. _ ~/·:·c· .. :l:· \ ;J::VENJI.LAJl~.G,SYSTEM.S -l,.-.::~··ri: "" .. ::·.~\ .... __ ,. ... \\\,A-, i,\,,.,,., 7;~ .. '-1· ~:i:-.).:'1 , • : :::,f/i !·ij,;1·1;;.:,rt/r.t·.Vt,Y-;··:p•,l':::./t . 1 : I :·:: .-·,: . : · · . ::; _ i · .::..t:-::.:_. · . · -""~7'~~--• • · · :o. · -... ~ :.-" ·. '. "'t :.,:': :: · ~.-;/·"':~ ,::,.;:,: · , ....... --~--.!"! -:, '·lf~ . ' _CA_L,L FOR:-FINAL)NSPECf/ON:,'Nf-1 E.N AL.L.APPROP_RIAfE . ,._ 1 . •• '1 _: •• : • .: • I r '•, , ,· ~.~, f'/-r :i r.'~,;-~/ ~ ~ 'H,;'-'· .,,..·· ·:.,:..·1 :,:,:,·.-,:;...:'•..;:.)_,· '1,.,:,-'.1,,,,,,,.,,,·-:c;!,···..:..;T.,'-";_""';;,_1 .. -'-.'i...-+r=:· 'P-:l,_i -'--'-''i'--'---,.--'-'--:,,-'-----'-'--,-'--'-'--'--~'--'--'-'-",----,-;-- ,. 1 ' ......... , !/TEMSAB0V.EHATl,EBE:EN!APP/30VED11~·1t1r,t;_~'ir'"1-,, ... ,,or,,-.. ,,l, 'i"{'·j"',.,ft-·,, .... , ... ,,.,.~ .. ,. ····;,--.,· ... , .. ,, 1..t' \''1 I' ' ii ~Cu;;,~;:' : •FJN~L) . . . . : ·. • " ··. ·.·• . , , ,,_, :; ., '~.:., e1' ' ,,, ; .. , ,· , ';.1·• };,,., ?a.• '.~ ': < ,:-·~ . , .· '. •ri_'. /c'.:' _; ::': _ .·... . , · s ,\i~, , .... r.J;LE;QTRICJXL .,.· _ 1 ,.;, r1f~'" ,,,..(,. .. :,f.o .. ,,:n~, 'f.·1·'·"'·1 ·,Y --1 .. :;.::,;::ttt:_ :' -~ ~:,, ~,,,,>~,}: . .. 1,. : ---,. .. • < :.~r·i . ·~;·,: LL .. ···. :: ~\,.,,~kt_ .. · ··1~10\:, ··: · .·-SPl;QIA~ CO.NO!TJONp . •"'· ·: · ' ·· · ' ' ,~t'' 1--· ,1_,J_ -~ . \:.,_,_ i r::-.: C '· ",} '.~\ p_ SEE 2185 FARADAY AVE FOR MORE INFO ON 85-467 ) r 8S-o/~ 7 -C APPLICATION FOR PERMIT TO CONNECT TO CITY SEWER SYSTEM. CITY OF CARLSBAD ENGINEERING DEPARTMENT 438-5541 FOR APPLICANT TO FILL IN BUILDING ADDRESS OWNER MAILING ADDRESS CONTRACTOR CONTRACTOR'S ADDRESS NEW BUILDING I EXISTING BUILDING I LEGAL DESCRIPTION / I ; , 7 t;/ / REMARKS: Jf.t:it:"j,. _::-,r. ,'I ------------1,/ I~--• C l' ,.I. LATERAL LOCATION i-: I Cl) I i-: Cl) /'I"\ /' I"'\ \... [,./ \.. !/ I ST. I LATERAL NO. _______ INSTAL!-ATION DATE------- /4 .. : ;,. ~ l.-·1 . f ..• -·.:--/ <'!'-,· ' ISSUED BY .. . t.; • -=?· ,-:::~ C ; DATE ISSUED VALIDATION I i LATERAL CHARGE COMPUTATION STANDARD 4" (Max. H. 30', V. 10') _________ _ OVER 30' H. ___ @'---~--FT. _________ _ OVER 10' V. @ FT. _________ _ STANDARD 6" (Max. H. 30', V. 10')~-------- OVER 30' H. ___ @, ____ FT. _________ _ OVER 10'V. @ FT, _________ _ TOTAL CONSTRUCTION COST---------- SERVICE CHARGE (REPAVING ETC.) ________ _ TOTAL LATERAL CHARGE _________ _ LINE COST DATA ASSESSMENT DIST. NO,-------------- FRONTAGE ____ COST PER FT, ___ TOTAL, __ _ OTHER ___________________ _ CONNECTION FEE NO. UNITS t!./C COST PER UNIT fr, ·-TOTAL,.;/',:" PUMP STATION FEES NO. UNITS ___ COST PER UNIT ____ TOTAL--- ,., .t·.-- TOTAL CHARGES (LATERAL ETCJ _~· _ _,'-/_,_(_,._.,<'--.-·_·~-·-· _•~" __ _ W-HITE: Engineering GREEN: Finance YELLOW: Sanit~tion PINK: Building GOLDENROD: Permltter American Engineering ~aboratories, Inc. 7574 Trade Street, San Diego, California 92121 Telephone (619) 695-3730 INSPECTION REPORT Date 7 /2/86 Project No._--c-,-:..P_-=5-'-48=-------------· Report No AEL 6-H032 Client-------K'--'-O_L.._L_C.a_O_N_S_TR_U_C_TI ON COMPANY ClientAddress 7330 Engineer Road san o; ego, CA Project Name (per pl · S) Building Permit No. --"'8""'5_-...,_4""'-6.,_7,,,_C ___ _ Project Address (leg I) Plan File No. __________ _ Architect Govt. Contract No. ________ _ Engineer Census Tract No. ________ _ Contractor Other ____________ _ INSPECTION CODE MAT'L SAMPLING CODE MATERIAL DESCRIPTION __L Reinforced Concrete SIC Concrete Cylinders cc _x__ Reinf.:Rebar A615/60 Steel: _________ _ Prestressed Concrete SIPC Mortar Samples MS Rein!.: W.W.F. _______ _ Metal Decking: ______ _ Reinforced Masonry SIM Grout Samples GS Rein!.: Tendons ______ _ Shear Connectors: ______ _ Struct. Steel Assembly Fireproofing FP _x__ Cone.: Mix #/psi 50-6315G/3000 H.S. Bolts: ________ _ 1. Shop Fabrication SISS-1 Units (block or brick) UB _ Cone.: Mix #/ps,i._· ______ _ Electrodes: _______ _ 2. Field Welding SISS-2 A.C. Concrete ACC Cone.: Mix #/ps,._· ______ _ Electrodes: ________ _ 3. H.S. Bolting SISS-3 Roofing RS Cone.: Mix #/psi ______ _ Cert. Welders: _______ _ Pile Driving SIPD Rein!. Steel RSS Grout: Mix #/psi, ______ _ Fireproofing: _______ _ Nondestructive Testing Steel ss Mortar: Type/psi ______ _ A.C. Concrete: _______ _ 1. Shop SINDT-1 Tendon (PT Strands) TS Units: Block _______ _ Other: _________ _ 2. Field SINDT-2 Other Units: Brick _______ _ Other: _________ _ Fireproofing SIFP Other Roofing IR Other Waterproofing IWP Other Asphalt Paving IAP __ Other ID CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections of the building laws. This report covers the locations of the work inspected. Contact this office if you need more specific information regarding inspection procedures. INSPECTOR INSPECTION DATE Gerad Griffith (C-279) 6/26/86 Special Inspection -Reinforced Concrete Inspected placement of reinforcing steel in wall panels with the following numbers: 1 through 5, 8 through 10 and 13. 6/27/86 Special Inspection -Reinforced Concrete Inspected placement of reinforcing steel 6, 7, 11, 12 and Wl through W8. in wall panels with the following numbers: Inspected placement and consolidation of 13 and Wl through W8. concrete in wall WL A.,,M~ -Yb"-~n~ CITV OF CARLSBAD luifdiog Department 11 ~ Page 2 7/2/86 File P-548 AEL 6-H032 Bldg. Permit #85-467E 6/27/86 Special Inspection -Reinforced Concrete -Bldg. 11 E11 , 2205 Faraday Inspected placement of reinforcing steel and subsequent placement and consolidation of concrete in panels #21 and 24. Consolidation was by mechanical vibration. Obtained concrete cylinders for test. 2-Koll Construction Company I-Conwell-Marshall & Associates/Attn: Harlan Tande 1-Kahn Associates/Attn: Steve Mayoraga I-Construction Surveillance Services/Attn: Jack Hanssel I-Carlsbad Research Center/Attn: Charlie Abdi 1-City of Carlsbad Bldg. Department American Engineering Laboratories. Inc. 7574 Trade Street. San Diego, California 92121 Telephone (619) 695-3730 INSPECTION REPORT Date 7 /22 /86 Project No.~P.,.,.-,-;;5_4..;;.8 __________ Report No AEL 6U-432/3 Clien-t _______ K...,.0-LL______,C~O-NS=T=R,....U..,.CTI ON COMPANY ClientAddress 7330 Engineer Road San Djegg, CA 92111-1464 c Project Name (per plans) =~*l~~t:!~~~~~~~~~~~~~~~..!..:~Building Permit No. __ 8 __ 5_-_4_6_7_/_C ___ _ Project Address (legal Plan File No. __________ _ Architect ___ _::.....,,=~~::¥~~~~~~.::..~:.=.:::.::..:.!:..!::.=.::~-==:::::.---Govt. Contract No. ________ _ Engineer ________ a-'-'n __ s...;s;;..;o_c_i_a-t_e_s _______________ _ Census Tract No. ________ _ Contractor _______ K-o_l_l---C-o_n"""s'""t_r_u_c'""t'""i...;o ... n ___ C;..;o;..;. _____________ _ Other ____________ _ INSPECTION CODE MArL SAMPLING CODE MATERIAL DESCRIPTION Aeinfon:ed Coocrete SIC Concrete Cylinders cc Aeinf ~ Rebar -X Steel: A-36 -----Prestressed Concrete SIPC _ Mortar Samples MS -Aeinf.: W.W.F. -Metal Decking: -Reinfon:ed Masonry SIM -Grout Samples GS --Rein!.: Tendons -Shear Connectors: _x_ Struct. Steel Assembly -Fireproofing FP -Cone~ Mix #/psi -H.S. Bolts: -1. Shop Fabrication SISS·1 -Units (block or brick) us -Cone~ Mix #/psi X Electrodes: 7018 __x_ 2. Field Welding SISS·2 _ A.C. Concrete ACC -Cone~ Mix # /psi -Electrodes: -3. H.S. Bolting SISS-3 -Roofing AS -Cone~ Mix #/psi .L Cert. Welders: _y:es -Pile Driving SIPO -Aeinf. Steel ASS -Grout: Mix #/psr -Fireproofing: --Nondestructive Tes1ing -Steel ss -Mortar: Type/psi _ A.C. Concrete: -1. Shop SINDT·1 _ Tendon (PT Strands) TS -Units: Block -Other: -2. Field SINOT-2 -Other -Units: Brick -Other: --Fireproofing SIFP -Other --Roofing-IA -Other . - __ Waterproofing IWP -Other --Asphalt Paving IAP --Other IQ CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans. specifications and applicable sections of the building laws. This report covers the locations of the work inspected. Contact this office if you need more specific information regarding inspection procedures. INSPECTOR Gerad Griffith (W-279) INSPECTION DATE _ __,_7..,_I ... J ..... S"---/"68.,._6 _________ _ Special Inspection -Field Welding Inspected welding of column-to-panel insert connections at line C (1 and 7) and welding of hold-down T-shapes at line 1 (B.2), line 7 (B.2), 5'-0" north of line 7 (A.3 and A.6). 2-Client 1-Architect 1-Engineer 1-Lender 1-CRC 1-City of Carlsbad . 117 American Engineering Laboratories. Inc. 7574 Trade Street, San Diego, California 92121 Telephone (619) 695-3730 INSPECTION REPORT Date --------=8"-'-/-=2""'8.,_/.,._86~--Project No. _____ P-_5 ___ 4 ..... 8 ____________ Report No AEL 6U-499 Client KOLL CONSTRUCTION COMPANY Client Address 7330 Engineer Road Sao Qjeaa, CA 92111-1464 Project Name (per plans) --::::.,l,(.,li~:!i:!!aii:!a::!:==:::!:2;,....i..f.!aaoj,b, ... I1;_:I~--:B::.::U:.:Ic.!::L,!:::D:.:I.!.!N~G~C------Building Permit No. """""'8=5-_4..,_6.,._7.,_ ___ _ Project Address (legal) -==-~~-:;-~l=i==~;:::::~~==¥:-C~a~r~l s=-b~a~d~-C~A~------Plan File No. __________ _ Architect --------=""-'-'~...:...:.--'-'=-=-'-=-'=-=--'-=-.a.a==.=:.----------Govt. Contract No. ________ _ Engineer Census Tract No. ________ _ Contractor Co. Other ____________ _ INSPECTION CODE MAT'L SAMPLING CODE MATERIAL DESCRIPTION Reinforced Concrete SIC Concrete Cylinders cc Rein!.: Rebar Steel: ______ ;.__ __ _ -Prestressed Concrete SIPC Mortar Samples · MS Reinf.: W.W.F. Metal Decking: ______ _ Reinforced Masonry SIM Grout Samples GS Rein!.: Tendons Shear Connectors: ______ _ Struct. Steel Assembly Fireproofing FP __ Cone.: Mix #/psi H.S. Bolts: ________ _ 1. Shop Fabrication SISS-1 Units (block or brick) UB Cone.: Mix #/psi, Electrodes: ________ _ 2. Field Welding SISS·2 _ A.C. Concrete ACC Cone.: Mix #/~t 3. H.S. Bolting SISS·3 Roofing RS Cone.: Mix #/psh Electrodes: ________ _ _ Cert. Welders: _______ _ Pile Driving SIPD -Rein!. Steel RSS Grout: Mix #/psi _ Fireproofing: _______ _ Nondestructive Testing -Steel ss Mortar: Type/psi A.C. Concrete: _______ _ 1. Shop SINDT·1 _ Tendon (PT Strands) TS Units: Block Other: _________ _ 2. Field SINDT-2 Other . Units: Brick Other: _________ _ x Fireproofing SIFP Other Roofing IR Other --Waterproofing IWP Other __ Asphalt Paving IAP --Other 10 CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections of the building laws. This report covers the locations of the work inspected. Contact this office if you need more specific information regarding inspection procedures. INSPECTOR Jinny L, Garcia (313) INSPECTION DATE _8"""/'--"2_,J ..... /..,..8"""6 _________ _ Roofing Inspection Inspected the in-process application of built-up roofing materials at Building "C" for compliance with specifications, plans and applicable sections of Building Code. Roof level, lines A-C (1-7). 2-Client 1-Architect/Attn: Harlan Tande 1-Engineer/ Attn: Steve Mayorga 1-Lender/ Attn: Jack Hanssel 1-CRC/Attn: Charlie Abdi 1-City of Carlsbad Building Dept. ,' 117 American Engineering Laboratories. Inc. 7574 Trade Street. San Diego, California 92121 Telephone (619) 695-3730 Date _______ ..::.L,-=:..r....:~.,.....,,,,..,,..,..,.,,.,.,,.,,. INSPECTION REPORT Cllent-------!==-=-~=::..!.!=:.:..:~.:....,.:=~~:,__-------------------------- Clleni Address----.:,..::.=.,,..:;:~~;..,;:.;,.....:.:.:;.:;.:;:~__,...,...,,,-,--------------------------- Project Name (per plans~=.:.~..:..:.;::..::..:..:......::.::'--'-~==--=:.:...------=-lb--,---\---:---Building Permit No . ..;8"-'5'--_4.:..;6_7_C _____ _ Project Address (leg .Plan Fife No. __________ _ Architect ____ _:::::!:~~=~~=:!:!:!9::bb='lb~~~~~C..--~~.----- Engineer -----~K~a.!.!h.!,!n_A~s::.s o~c::::..:.;i a~t.:::.:e:::.:s~------..-....,.:1-El:N----l!J-tr,,,_ __ Contractor _____ .:.:K~o..:.1..:.1......::.C.::.o::.;.n.:.s.::.t.:..ru=-c=-t.::.1.:.;· o:.:n.:.....::;..::.:;=.=:..:.:.c.--4-A-,11-+--1-.4/f.Jl--'L--- Govt. Contract No. ________ _ INSPECTION CODE MATL SAMPLING CODE Reinforced Concrete SIC Concrete Cylinders cc Rein!.: Rebar _ Steel: _________ _ -Prestressed Concrete SIPC Mortar Samples MS Rein!.: W.W.F. Metal Decking: ______ _ _ Reinforced Masonry SIM Grout Samples GS Rein!.: Tendons Shear Connectors: ______ _ Struct. Steel Assembly Fireproofing FP _ Cone.: Mix #/ps· H.S. Bolts: ________ _ -1. Shop Fabrication SISS-1 Units (block or brick) UB -Cone.: Mix #/ps· Electrodes: ________ _ 2. Field Welding SISS-2 _ AC. Concrete ACC Cone.: Mix #/psi Electrodes; ____ ~---- 3. H.S. Bolting SISS-3 Roofing RS Cone.: Mix #/psi Cert. Welders: _______ _ Pile Driving SIPD _ Rein!. Steel ASS Grout: Mix #/psi Fireproofing: _______ _ Nondestructive Testing _ Steel ss Mortar: Type/psi A.G. Concrete: _______ _ 1. Shop SINDT-1 _ Tendon (PT Strands) TS Units: Block Other: _________ _ 2. Field SINDT-2 Other Units: Bric Other: _________ _ __ Fireproofing . _ SIFP Other _x_ Roofing JR Other __ Waterproofing IWP Other __ Asphalt Paving IAP --Other 10 CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections of the building laws. This report covers the locations of the work inspected. Contact this office if you need more specific information regarding inspection procedures. INSPECTOR INSPECTION DATE John Mauk 8/19/86 Special Inspection -Roofing (Bldg. C) Conducted pre-roofing inspection of substrate. Plywood appears to be dry, although several gaps exist between sheathing and some delamination of one piece of plywood has occurred at approximately A-1 of building plans. Re-inspection to follow on 8/20/86. 8/20/86 Special Inspection -Roofing (Bldg. C) Plywood substrate discrepancies repaired satisfactorily. De-laminated plywood replaced and gaps filled with strips of plywood. Materials inspected and were noted to be those approved by architect and Koll Company as informed by job site superintendent. RECEHVE SEP l :-1986 CITY OF CARLSBAD · Building Department 117 8/22/86 Special Inspection -Roofing (Bldg. C) Page 2 9/15/86 P-548 AEL 6-Hl84 Performed inspection of in-progress roof-covering application per plans, specifications, at roof grid lines 1 to 7, between 11A11 to 11 C11 • Verified proper sequence application of materials, correct laps at sides and ends, and monitored bitumen temperature. 8/25/86 Special Inspection -Roofing (Bldg. C) Inspected completion of roofing installation at Buildin~ 11 C11 • Application of materials .. are. per:_plans: and spefif-is;atjons-_-anct proper sealing. around all roof penetrations were performed. CC: 2-Koll Construction Company 1-Conwell-Marshall & Associates 1-Kahn Associates 1-Construction Surveillance Services ,l-Carlsbad .Research Center 1-City of Carlsbad R~©EiVED S£Pl 1i 1986 CITY OF CARLSBAD Building Department PLAN CHECK NUMBER: FINAL BUILDING INSPECTION RECEIVED N CV 1 0 1986 DATE: p/ PROJECT NAME: _____ 2 _ 2 _:!_S_F_ 1 ~_'t_U_d_.l_"/-rLe--:.4-!--+-=--H-C----------------- ADDRESS: -------------~~--------------------- PROJECT NO.: _______ UNIT NUMBER: _______ PHASE NO.: ______ _ TYPE OF UNIT: Co,:,,:71,:jrci:11 ____________ NUMBER OF UNITS: Scotti<' CONTACT PERSON: ______________________________ _ CONTACT TELEPHONE: ___ nm©_•_:"<_· _·:_9_l_1_-_9_3_0_fl ___________________ _ IN~PECTEO. h/i~ BY. ~~ INSPECTED BY: _________ _ INSPECTED BY: _________ _ DATE INSPECTED: DATE INSPECTED: DATE INSPECTED: APPROVED L DISAPPROVED --- APPROVED __ _ DISAPPROVED __ _ APPROVED DISAPPROVED __ _ COMMENTS:--------------------------------- Rev. 1186 I' WHITE: Suspense GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire FINAL BUILDING INSPECTION PLAN CHECK NUMBER: 35-467-C DATE: __ 1_1_-6_-_3_6 ___ _ PROJECT NO.: _______ UNIT NUMBER: _______ PHASE NO.: --1,.,__-~~i-/f::Jf'Fff~ TYPE OF UNIT: _____ comm_·_e_r_c._ia_.l ____ NUMBER OF UNITS: CONTACTTELEPHONE: ___ t'f_3_~_&J_{_9_3_1_-_9_30_8 ___________________ _ nll dept:s INSPECTED BY: .· INSPECTED BY: _________ _ INSPECTED BY:-------'------- DATE INSPECTED: DATE //-1/i-lh INSPECTED: -~--- DATE INSPECTED: APPROVED _/ __ DISAPPROVED __ _ APPROVED __ _ DISAPPROVED __ _ APPROVED DISAPPROVED __ COMMENTS: --------------~-------~.[~•_/_. _____ _ Rev. 1/86 WHITE: Suspense GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire FINAL BUILDING INSPECTION ·-····. \ '. PLAN CHECK NUMBER: 11-6-86 ADDRESS: 22~5 Faraday PROJECT NO.: ________ UNIT NUMBER: ----"------PHASE NO.: TYPE OF UNIT: _____ C_om_u..:._,IJ._e_rc_i_a_l ____ NUMBER OF UNITS: Scottie CONTACT PERSON:·---------------,------------------- filDtXX 931-9308 CONTACT TELEPHONE~· ------------------------------ c.J.l clepts INSPECTED/~ _ DATE #K APPROVEOX BY: · -~ INSPECTED: DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED -•-. , ,,,. ~ -,. COMMENTS:---------------------------------- -· Rev. 1/86 WHITE: Suspense GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire t· ' PLAN CHEQJ< NUMl;lER; FINAL BUILDING INSPECTION 85-467-C DATE: 11-6-86 PROJECT NAME:.-,--___,..__,..---,-------------------------- ADDRESS: _____ -_-_2_2_2_5_F_a_r_a_d_a_y ____________________ _ PROJECT NO.:. _______ UNIT NUMBER: _______ PHASE NO.: ______ _ TYPE OF UNIT: _____ co_mm_e_r_c_i_al ____ NUMBER OF UNITS: CONTACT PERSON-· ___ s_c_o_t_t_i_e ______________________ _ CONTACTTELEPHONE: ___ DnX ___ 9_3_1-_9_3_0_8 __________________ _ all depts INSPECTl;D BY: INSPECTED BY: _________ _ DATE INSPECTED: DATE INSPECTED: ____ _ INSPECTED DATE APPROVED __ DISAPPROVED __ APPROVED __ _ DLSAPPROVED _ ___,=· :, BY:__________ INSPECTED: _____ APPROVED ___ DISAPPROVED __ Costa Real Municipal WatPr Distnct A X'i"vi,, COMMENTS: Enoineering Deoartment DEC. 1 7 1986 U {!,lo< A.J<.YL-.._...,,- :::~:;·~· .... ;;-.. , ..... _(E?1 ~) 4'38-~367 Rev. 1/86 WHITE: Suspense GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire American Engineering Laboratories, Inc. 7574 Trade Street. San Diego, California 92121 Telephone (619) 695-3730 INSPECTION REPORT Date ______ ___;7 .. /-=2;L./-=8-=6-,--__ ___,-= Project No._--:-:-c-c'-P_-..;:..5...:...48=-----------Report No AEL 6-H032 Client KOLL CONSTRUCTION COMPANY ClientAddress 7330 Engineer Road San Diego. CA 92111-1464 Project Name (per plans) · CRC MULTI I S, PHASE I I Building Permit No . .....:::8=5_-....:.4..::.6.:..7..::.C ___ _ ProjectAddress(legal) 2225 Faraday Ave., Carlsbad, CA PlanFileNo. _________ _ Architect Conwel 1-Marsha 11 & Associates Govt. contract No. ________ _ Engineer ______ .:..;K.:::a.:.:h.:.:n~A.:::s.:::s.:::o-=c;..:.i..;:;a;..:t..;:;e.:::s __ ..,,..,. __ __,. _ __,, ________ Census Tract No.--------- Contractor Construction Surveillance Services Other ____________ _ INSPECTION CODE MAT'L SAMPLING CODE MATERIAL DESCRIPTION _L Reinforced Concrete SIC Coocrete Cylinders cc _x_ Reinf.:Rebar A615/60 Steel: _________ _ Prestressed Concrete SIPC Mortar Samples MS Rein!.: W.W.F.________ Metal Decking: ______ _ Reinforced Masonry SIM Grout Samples GS Rein!.: Tendons ______ _ Shear Connectors: ______ _ Struct. Steel Assembly Fireproofing FP _x_ Cone.: Mix #/psi50-6315G/3000 H.S. Bolts: ________ _ 1. Shop Fabrication SISS-1 Units (block or brick) UB Cone.: Mix #/psi, ______ _ Electrodes: _______ _ 2. Field Welding SISS·2 A.C. Concrete ACC Cone.: Mix #/psi ______ _ Electrodes: ________ _ 3. H.S. Bolting SISS-3 Roofing RS Cone.: Mix #/psi ______ _ Cert. Welders: _______ _ Pile Driving SIPD Rein!. Steel ASS Grout: Mix #/psi ______ _ Fireproofing: _______ _ Nondestructive Testing Steel ss Mortar: Type/psi ______ _ A.C. Concrete: _______ _ 1. Shop SINDT-1 Tendon (PT Strands) TS Units: Block _______ _ Other: _________ _ 2. Field SINDT-2 Other Units: Brick _______ _ Other: _________ _ Fireproofing SIFP Other Roofing IA Other Waterproofing IWP Other Asphalt Paving IAP Other 10 CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections of the building laws. This report covers the locations of the work inspected. Contact this office if you need more specific information regarding inspection procedures. INSPECTOR 'INSPECTION DATE Geraci Griffith (C-279) 6/26/86 Special Inspection -Reinforced Concrete Inspected placement of reinforcing steel in wall panels with the following numbers: 1 through 5, 8 through 10 and 13. 6/27/86 Special Inspection -Reinforced Concrete Inspected placement of reinforcing steel in wall panels with the following numbers: 6, 1·, 11, 12 and Wl through W8. Inspected placement and consolidation of concrete in wall panels numbered 1 through 13 and WI through W8. 11 ~ Page 2 7/2/86 File P-548 AEL 6-H032 Bldg. Permit #85-467E 6/27/86 Special Inspection -Reinforced Concrete· -Bldg. 11 E11 , 2205 Faraday Inspected placement of reinforcing steel and subsequent placement and consolidation of concrete in panels #21 and 24. Consolidation was by mechanical vibration. Obtained concrete cylinders for test. 2-Koll Construction Company !-Conwell-Marshall & Associates/Attn: Harlan Tande 1-Kahn Associates/Attn: Steve Mayoraga !-Construction Surveillance Services/Attn: Jack Hanssel I-Carlsbad Research Center/Attn: Charlie Abdi 1-City of Carlsbad Bldg. Department American Engineering Laboratories. Inc. 7574 Trade Street. San Diego. California 92121 Telephone (619) 695-3730 INSPECTION REPORT Date 7 /2~ /86 Project No.~P,.,.,-..;.5-'-4.;;;..8 __________ Report No AEL 6U-432/3 Client-_______ K_.O_L __ L __ C_0,,..N'"""S"""T..,..RU__,,.C.TI ON G0MPANY Client Address 7330 Engineer Road Sao Diego, CA 92111-1464 SO! Lb ING c Project Name (per plans) _""'C_A __ R L~S ... B __ A __ D ___ R E __ S __ E __ A..;..R~C .... H_C.;;..;E __ N __ T __ E ..... R-_M_U_L_T_I_' S_,_P_H_A_S_E _I_I __ Building Permit No. __ 8_5-_4_6_7_/_C ___ _ Project Address (legal) --~2;;;;.2;;;;.2 ... s_.,..~F.aa.a-.r_a_,d.a;.a~y_.,..A~v __ e-,;,n.;;.u~e.:... ~C_a_r ___ l .... s .... b_a-d __ • --CA _____ _ Plan Fife No. __________ _ Architect _______ C .... o"-n_w_e-1 ... l_-_M __ a_r_s'-h .... a ... l_l ___ &;;._A_s'""s"""o"""c_i...;a_t_e_s"--______ _ Govt. Contract No. ________ _ Engineer ______ __;,K....;a;;.;,h,;.;,n,;-.;.A....;s:;.;;s;;..;o;;..;ca...i_a_t;;..;e'-'s-----,,,.._-------------Census Tract No. ________ _ Contractor _______ K_o_l_l_C'-o_n_s_t_r_u_c_t_i_o_n_C_o_. ___________ _ Other ____________ _ INSPECTION CODE MArL SAMPLING CODE MATERIAL DESCRIPTION _ Reinforced Concrete SIC _ Concrete Cylinders _ Prestressed Concrete SIPC _ Mortar Samples Rein1orced Masonry SIM _ GIOUt Samples _x._ Struct Steel Assembly _ Fteproofing _ 1. Sholl Fabrication 515S· 1 _ Units (block or brick) .....X.. 2. Field Welding 5155·2 _ A.C. Concrete 3. H.S. Bolting SISS·3 Roofing Pile Driving SIPO -Reinf. Steel Nondestructive Tes ting _ Steel 1. Shop SINOT-1 _ Tendon (PT Strands) 2. Field SINOT-2 -Otner Fireproofing SIFP _ Othef Booting IR Othef Waterproofing IWP Other As0naI1 Pavmg IAP Otner IQ cc __ Reinf~ Rebar _______ _ MS _ Reinf~ W.W.F. _______ _ GS Reinf~ Tendons ______ _ FP _ Cone~ Mix 41:/psi ______ _ us -. ~ Mix #tps·._ _____ _ ACC ~ Mix #/psi ______ _ RS Cone; Mix 41:/psi ______ _ ASS G1011t: Mix #/psi ______ _ ss Mortar: Type/psi ______ _ TS Units: Block Units: Brick _______ _ X Steel: A-36 ---------- Met al Oecl<ino: ------- Shear COMectors: ------- -H.S. Bolts: -=-=-=--=-------X Electrodes: _70_1_8 _____ _ Electrodes: _______ _ X Cert. Welders:_.._Y...;;.e..;.s __ ,_a_ __ _ _ · Fireproofing: _______ _ A.C. Concrete: _______ _ Otner. _________ _ Other: _________ _ CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections of the building laws. This report covers the locations of the work inspected. Contact this ottice if you need more specific information regarding inspection procedures. INSPECTOR Gerad Griffith (W-279) INSPECTION DATE _ __,_7..._/_.J_..5.._/ .... 8..._6 _________ _ Special Inspection -Field Welding Inspected welding of column-to-panel insert connections at line C (1 and 7) and welding of hold-down T-shapes at line 1 (B.2), line 7 (B.2),· 5'-0" north of line 7 (A.3 an~ A.6). 2-Client 1-Architect 1-Engineer 1-Lender 1-CRC 1-City of Carlsbad 117 American Engineering Laboratories, Inc. REC EI INSPECTION -7574 Trade Street, San Diego, California 92121 V £ D Telephone (619) 695-3730 ~EP 2 1986 REPORT KOLL CONSI Q Date _______ ..::8::.i./-=2-=8,_/8=-6:a.-__ Project No. _____ P_-___ 54 __ 8 ____________ Report No AEL 6U-499 Client KOLL CONSTRUCTION COMPANY Client Address 7330 Engineer Road 5ao Qjega, C8 9?JJJ ]464 Project Name (per plans) ~R, MULTI I Ss PHASE II -BUILDING C Building Permit_ No. 85-467 Project Address (legal) 2225 FaradaJ'. Avenue 1 Carlsbad 1 CA Plan File No. Architect Conwell-Marshall & Assoc. Govt. Contract No. Engineer Kahn Associates Census Tract No. Contractor Koll Konstruction Co. Other INSPECTION CODE MArL SAMPLING CODE MATERIAL DESCRIPTION Reinforced Concrete SIC Concrete Cylinders cc Reinf.: Rebar _ Steel: Prestressed Concrete SIPC Mortar Samples MS Rein!.: W.W.F. Metal Decking: Reinforced Masonry SIM Grout Samples GS Reinf.: Tendons Shear Connectors: Struct. Steel Assembly Fireproofing FP _ Cone.: Mix #/psi H.S. Bolts: 1. Shop Fabrication SISS·1 Units (block or brick) us _ Cone.: Mix #/psi Electrodes: 2. Field Welding SISS·2 _ AC. Concrete ACC Cone.: Mix #/psi Electrodes: 3. H.S. Bolting SISS-3 Roofing RS Cone.: Mix #/psi Cert. Welders: Pile Driving SIPD _ Rein!. Steel RSS Grout: Mix #/psi Fireproofing: Nondestructive Testing _ Steel ss Mortar: Type/psi A.C. Concrete: 1. Shop SINDT·1 Tendon (PT Strands) TS Units: Block Other: 2. Field SINDT·2 _ Other Units: Brick Other: -x Fireproofing SIFP Other Roofing IR Other Waterproofing IWP Other Asphalt Paving IAP Other IQ CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections of the building laws. This report covers the locations of the work inspected. Contact this office if you need more specific information regarding inspection procedures. INSPECTOR INSPECTION DATE Jinny l, Garcia (313) 8/21/86 Roofing Inspection Inspected the in-process application of built-up roofing materials at Building 11C11 for compliance with specifications. plans and applicable sections of Building Code. Roof lev~l. lines A-C (1-7). 2-Client 1-Architect/Attn: Harlan Tande 1-Engineer/ Attn: Steve Mayorga 1-Lender/ Attn: Jack Hanssel 1-CRC/Attn: Charlie Abdi 1-City of Carlsbad Building Dept. (' =') '--_, 2 1986 THE KOLL CO 117 American Engineering Laboratories, Inc. 7574 Trade Street. San Diego, California 92121 Telephone (619) 695-3730 INSPECTION REPORT Date 9/15/86 Project No . .......;P_-'""'5 __ 4 ___ 8 __________ Report No AEL 6-H184 Client ------'K~0~L:.:L_C~O~N:.:::S..:..T:.:.;RU~C~T..:.I~0N~C:.::::0:..:.M~PA..:.:.N:..:.Y _____________________ _ Client Address -----....!.7..:::3~3~0~E:.:.ng;;z.1.:.;. n:.:.:e:.:e;.:r,......:.R:.:::o:.::;a~d~-.,,...,,...,._----------------------------------------------San Diego, CA 92111-1464 Project Name (per plans) __ C"-"R"""C'"--M'-U..;;:;L __ T __ I_' .;;;.S..._, __ P .... H __ A __ S;..;Ea......aaI ... I ______ -------=---Building Permit No . ...a8a.a5a...-....:4..;::;6..:..7__.C ___ _ Plan File No. _________ _ ProJect Address (legal) _2=2=2;;.;;5;......;,F..::::a..:..r=a=da=y....,_:..A.:..,:v..;;e;.;;..~·~Ca:;:..ra-l.;..;s'""b;..;;;a;.;;d'""',_..;;.;CA ___ __,,(..;;;B-'-l..;;;.d..,_g =-· _C_.) __ _ Architect -------"'C--o"""nw""-e=-=-1 -=-l -....:Mc:.;a:::..r:..;s:..:h~a=-1=-l:.......;:&::.....a.A""s'-"s;..:o;..:c;..;i..;::;a;..::t:.=e=s_________ Govt. Contract No. _______ _ Engineer _____ ___,;,.;K=a.;.ah""'"n~A.;;;.s.;;;.so.;;;.c.;;;....i a __ t.;;..e;;;;.;s;;;;.;_ _______________ Census Tract No. ________ _ contractor Koll Construction Company Other ____________ _ INSPECTION CODE MATL SAMPLING CODE MATERIAL DESCRIPTION Reinforced Concrete SIC Concrete Cylinders cc -Rein!.: Rebar -Steel: Prestressed Concrete SIPC Mortar Samples MS -Reinf.: W.W.F. -Metal Decking: Reinforced Masonry SIM Groot Samples GS -Rein!.: Tendons Shear Connectors: Struct. Steel Assembly Freproofing FP _ Cone.: Mix #/psi H.S. Bolts: 1. Shop Fabrication SISS·1 Units {block or brick) UB -Cone.: Mix #/psi Electrodes: 2. Field Welding SISS-2 _. AC. Concrete ACC -Cone.: Mix #/psi Electrodes: 3. H.S. Bolting SISS-3 -Roofing RS _ Cone.: Mix #/psi -Cert. Welders: Pile Driving SIPO -Reinf. Steel ASS Grout Mix #/ps" -Fireproofing: Nondestructive Testing -Steel ss Mortar: Type/psi _ A.C. Concrete: 1. Shop SINOT·1 -Tendon (PT Strands) TS Units: Block Other: 2. Field SINOT·2 -Other Units: Brick -Other: Fireproofing . SIFP -Other _x_ Roofing IR Other -Waterproofing IWP -Other _ Asphalt Paving IAP -Other 10 CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections of the building laws. This report covers the locations of the work inspected. Contact this office if you need more specific information regarding inspection procedures. INSPECTOR INSPECTION DATE John Mauk 8/19/86 Special Inspection -Roofing (Bldg. C) Conducted pre-roofing inspection of substrate. Plywood appears to be dry, although several gaps exist between sheathing and some delamination of one piece of plywood has occurred at approximately A-1 of building plans. Re-inspection to follow on 8/20/86. 8/20/86 Special Inspection -Roofing (BJdg. C) Plywood substrate discrepancies repaired satisfactorily. De-laminated plywood replaced and gaps filled with strips of plywood. Materials inspected and were noted to be those approved by architect and Koll Company as informed by job site superintendent. 117 +· 8/22/86 Special Inspection -Roofing (Bldg. C) Page 2 9/15/86 P-548 AEL 6-HI84 Performed inspection of in-progress roof-covering application per plans, specifications, at roof grid lines I to 7, between 11 A11 to 11 C11 • Verified proper sequence application of materials, correct laps at sides and ends, and monitored bitumen temperature. 8/25/86 Special Inspection -Roofing (Bldg. C) CC: Inspected completion of roofing installation at Buildinq 11 C11 • Application of materials . .are_ per. plans. and spefif-i_s:atJons-_-an9 proper sealing around all roof penetrations were performed. 2-Koll Construction Company I-Conwell-Marshall & Associates I-Kahn Associates I-Construction Surveillance Services .I-Carlsbad Research Center I-City of Carlsbad KOLL LETTER OF TRANSMITTAL TO rCity of Carlsbad 1200 Elm Ave. Carlsbad, CA DATE 6/9/86 I JOB NO 5205 RE CRC Multi's, Phase II Permit #85-467 ~ttn.: Building Inspection Department ~l8'51 r,Al~DA--( 2,2,-2,1 J WE ARE SENDING YOU: -[xi Attached D under separate cover via ______ the following items: D Prints D Shop drawings D Plans D Specifications D Samples D Change order D Copy of letter Q9 AITC Certificate of Conformance 't,; . .,,. COPIES DATE NO. 1 6/2/86 22973A Cooy of AITC Certificate of Conformance for alu-lam beams. THESE ARE TRANSMITTED AS CHECKED BELOW: D for approval @ foryouruse 0 As requested D Approved as submitted D Approved as noted D Returned for corrections D Resubmit __ copies for approval D Submit __ copies for distribution D Return __ corrected prints D For review and comment D ___________________________ _ 0 FOR BIDS DUE __________ 19 __ O PRINTS RETURNED AFTER LOAN TO US REMARKS RECEIVED JON 111986 CITY OF CARLSBAD co PY TO __.:C:;..::o=n=w.:...:e::;..:1:..:1=----=M=a=r::...,S,:_:h=a=l=-=l::::.........:&=-....,A=s=s=o=c:::::...:.... L.__, w / enc 1 o siu:Hd i ng Depa rt men t Khan Associates, w/enclosure K-163 1/85 EieJa n File SIGNED /L~ If enclosures are not as noted. kindly notify us at once. Ron S. Brockhoff Project Engineer .----~-.. ~< ~ CER FORMANCE ',; HE UNDERSIGNED-MANUFACTURER. HEREBY CERTIFIES that the products identified below and on attached sheets Nos. __________ are marked with the Collective Mark of the AMERICAN INSTITUTE OF TIMBER CONSTRUCTION (AITC) and were manufactured in conformance with applicable provisions of American National Standard ANSI/ AITC A 190.1-1983, Structural Glued Laminated Timber, and that such manufacture has been at our plant in SPRINGFIELD,, OREGON , which plant has a quality control system approved by the Inspection Bureau of the AMERICAN INSTITUTE OF TIMBER CONSTRUCTION and inspected periodically by such B1,1_reau. The manufacture of these members complies with the manufacturing and fabricating provisions of Chapter 25 of the Uniform Building Code. JOB NAME: 3611-CRC MUL TIS (DUKE PACIFIC) JOB LOCATION: CARLSBAD CA . -,,,. 361iL s a31 CUSTOMER'S ORD~R NO. DATE 3/27 /86 fvlFGR'S,ORDER NO. 6942-G I TITLE QUALI1Y CONTROL ADDRESS __ S0 __ 2_2_N_D_S_T_R_E_E_T ___ DATE __ 6_/_2_/_8_6 ____ _ A/TC HEREBY CERTIFIES that the said company at its said plant is licensed by the AMERICAN INSTITUTE OF TIMBER CONSTRUCTION to use the AITC Collective Mark in respect of products which comply with applicable provisions of said Standard, that the adequacy of the quality control system in effect at said plant is periodically inspected and verified by the Inspection Bureau of the AMERICAN INSTITUTE OF TIMBER CONSTRUCTION, and that, in the judgment of AITC, said company is capable of complying with applicable manufacturing and testing provisions of said Standard in respect of products manufactured at saia plant. Conformance with the Standard in respect of any specific or particular product is the sole responsibility of the manufacturer; AITC's guarantee hereunder being that the said company is qualified to produce a product meeting the said Standard and that its plant is periodically inspected and verifie_d by the AITC Inspection Bureau. AITC FORM IBCA AITC Certificate No. 2 2 9 7 3 A AMERICAN INSTITUTE OF TIMBER CONSTRUCTION © 1983 AMERICAN INSTITUTE OF TIME;IER CONSTRUCTION Ir ? r --· • •• .. 1200 ELM AVENUE CARLSBAD, CA 92008-1989 cititp of <ieadibab FIRE DEPARTMENT PAGE1 OF_ TELEPHONE X (619) 438-5523 APPROVED /, DISAPPROVED PLAN CH ECK REPORT -:t]t't.>b C' PLAttCHECKJt, g')-'-f { I -------i ,,.-,-__ / __ __ PROJECT _._{_/'L_._l_/ )_}_t)_L_Ti_l :_:=·.,_/1-'-1_' &_)=.'5~,C _ _[j~--ADDRESS _______ -,_· ,_,_',c_: _, ·_J ;..)=-· _,-_1 _,_~/~. ____ _ ARCHITECT ADDRESS _________ PHONE _____ _ OWNER -fDDRESS ----,-,,.-=----PHONE OCCUPANCY ./~-2---CONST. V.,,.N TOTALSQ.FT. //t/C/0 STORIES----- -~ SPRINKLERED O TENANT IMP. ______________ / ____________ _ APPROVAL OF PLANS IS PREDICATED ON CONFORMING TO THE FOLLOWING CONDITIONS AND/OR MAKING THE FOLLOWING CORRECTIONS: PLANS, SPECIFICATIONS, AND PERMITS __ 1. Provide one copy of: floor plan(s); site plan; sheets ___________________ _ __ 2. Provide two site plans showing the location of all existing fire hydrants within 200 feet of the project. __ 3. Provide specifications for the following: _______________________ _ V 4. Permits are required for the installation of all fire protection systems (sprinklers, stand pipes, dry chemical, halon, CO2, alarms, hydrants). Plan must be approved by the fire department prior to installation. __ 5. The business owner shall complete a building information letter and return it to the fire department. V _,_. 6. FIRE PROTECTION SYSTEMS AND EQUIPMENT T9e following fire protection systems are required: -/ /. r/, /?:J Automatic fire sprinklers (Design Criteria: , 3~ gcJI__ /SQ ~f.'f Cli..t-L 3 Do o ) 0 Dry Chemical, Halon, CO2 (Location: _____ ,_, __ ._, _________________ ) Q Stand Pipes (Type: . .• -, ) [] FireAlarm(Type/Location: /1/:-/l,11/t,..At.,. .57'A-7J 0 ,J -:J-Wµ,J::?;. v/li-vG 1,Nr .• 1,1,,J 17f.1n~-1 ;,..):, ) r __ 7. Fire Extinguisher Requirements: D One 2A rated ABC extinguisher for each ___ sq. ft. or portion thereof with a travel distance to the nearest extinguisher not to exceed 75 feet of travel. D An extinguisher with a minimum rating of to be located: D Other=-----------------,,-------------------_)j_ 8. Additional fire hydrant(s) shall be provided --'-~"5~F~£J:. __ c;_fr-_'.,J_;:;-._._.,.:.._-··_A_._ ____________ _ l9. \/_ 10. V _L_11. __ 14. -1..15. EXITS Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. A sign stating, " This door to remain unlocked during business hours" shall be placed above the main exit and doors----------------------------------- EXIT signs (6" x ¾" letters) shall !)e placed over all required exists and directional signs located as necessary to clearly indicate the location of exit doors. GENERAL Storage, dispensing or use of any flammable or combustible liquids, flammable liquids, flammable gases and hazardous chemicals shall comply with Uniform Fire Code. Building(s) not approved for high piled combustible stock. Storage in closely packed piles shall not exceed 15 feet in height, 12 feet on pallets or in racks and 6 feet for tires, plastics and some flammable liquids. If high stock pil- ing is to be done, comply with Uniform Fire Code, Article 81. · Additional Requirements. ----------------------------- Comply with regulation~on attached sheet(s). · .. ·, ,'·J. \ ~~ft .. _,,;._,"7,,-vl/f.//,A/ } Plan Examiner-~-'----"-'-'------'-------------- '::l ,:; I // D /· t _) at.,_----,,'---'-------- Report mailed to architect ___ Met with _____________ _ __ Attach to Plans