HomeMy WebLinkAbout2230 FARADAY AVE; BLDG 3; CB051148; Permit09-29-2005
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB051148
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
2230 FARADAY AV CBAD
COMMIND Sub Type: INDUST
2121203900 Lot#: 0
$129,480.00 Construction Type: NEW
Reference #:
FARADAY SPECTRUM BLDG3
4980 SF SHELL BUILDING
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Plan Check#:
ISSUED
03/30/2005
MDP
09/29/2005
09/29/2005
PC05-33
Applicant:
SMITH CONSULTING ARCHITECTS
STE200
12220 EL CAMINO REAL
SAN DIEGO CA 92121
(858) 793-4777
Building Permit
Add'l Building Permit Fed
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFMFee
Bridge Fee
BTD #2 Fee
BTD#3Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$415.32
$0.00
$0.00
$27*19
-Fee
$1,992.00
$0.00
$0.00
$0.00
$0.00
$0.00
' $0.00; $0.00
1 $0.00
$0.00
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
PLUMBING TOTAL
ELECTRICAL f^TAL
MECHANICAL TOTAL
Rddev Parking Fee
Additional Fees
TOTAL PERMIT
$0.00
$0.00
$0.00
$0.00
$2,356.54
$0.00
$0.00
$0.00
$1,992.00
$0.00
$70.00
$310.00
$0.00
$0.00
$3,658.00
$0.00
$0.00
$11,460.01
Total Fees:$11,460.01 $11,460.01 )ue:$0.00
Inspector:
FINAL
Date:Clearance:
NOTICE: Ptease take NOTICE that approval of your project Includes the Imposffloif of fees, declkattons, r^^
referred to as lees/exactions: You have 90 days from the date this permit was issued to protest Imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government CocteSedkm 66020(8), arxlfitetre protest ard
processing In accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIRED that your right to protest the specified fee5/exactfonsDC€S NOT APPLY to
changes, nor planning, zoning, grading or other similar appHcattapiocesslrig or service fees hi com^ NOR DOES IT APPLY to any
fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previouslv otherwise expired.
CttytfCartsftid
Final Bulhlhig Inspactien
Dept: Building Engineering Planning CMWD StLite Fire
Plan Check #:
Permit #:
Project Name:
Address:
Contact Person:
Sewer Dist:
Inspected
Bv:
Inspected
By:
Inspected
Bv:
Consents:
PC05-33 IV
CB051148 *
FARADAY SPECTRUM BLDG 3
4980 SF SHELL BUILDING
2230 FARADAY AV
LUKE Phone: 8584377617
Water Dlst:
Date
Inspected:
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot: 0
Approved:
Approved:
Approved:
05/03/2006
COMMIND
INDUST
Disapproved:
Disapproved:
Disapproved:
o<CA*/
&wM CltvifCirtstatf
nnal BulMlni inspecdon
^K&SaM
Dept: Building Engio^nng Planning CMWD StLite Fire
Plan Check ft PC05-33 Date:
Permit*:
Project Name:
Address:
Contact Person:
Sewer Dlst:
CB051148 . PermttType:
FARADAY SPECTRUM BLDG3 Sub Type:
4980 SF SHELL BUILDING
2230 FARADAY AV Lot 0
LUKE Phone: 8584377617
Water Dlst:
InspedSd Date i / s
Bv.lJ^^t MM& lnsDected:O^(W°^ Approved: *S^ i
Inspected Date
Bv: Insoected: Aooroved:
Inspected
Bv:
Date.
Insoected: AD Droved:
RECEIVEi — -
MAY 3" 2006
05/03/2006
COMMIND
INDUST
Disapproved:
Disapproved:
Disapproved:
Comments:
<-\ •
Projec
Addres
Projeci
Contac
PLANNING DEPARTMENT
FINAL INSPECTION
CHECKLIST
ROUTING
BLDG
A.WEST
PLANNER
PELA
A.WEST
BLDG
t Name:Faradav Spectrum Bide 3 Plan Check No. CB 051 148
is: 2230 Faradav Ave Proiect Number:
t Plannei
;t Person
: Van Lvnch Extension
Phone No. (858) 437-7617 Drawing No. 4279
Inspections
1st
K
J
•
>
2nd Approved
(/. LA—
\
)
/
1
}
(i
/
1
1 -vb
Final Inspection Items
All Items below Conform with Approved Site Plan
1 . Project Planner confirms conditions are met
2. Building elevations
3 . Building materials
4. Building colors
5. Rooftop equipment screens
6. Fence/wall height, location, and materials
7. Size, number and location of parking spaces
compact, regular, handicap
8. Outdoor recreation facilities
9. Employee eating areas
10. Trash enclosure and location
1 1 . Pavement treatment
12. Landscaping installed (under separate contract)
LIST BELOW ANY ADDITIONAL ITEMS REQUIRING
SPECIAL ATTENTION.
13.
14.
15.
16.
17.
Project complies with all conditions, including above-listed items. Final inspection is complete,
f/ . \MW ***" — J^T^^o
PELA Date
(H:\ADMZN\COUNTER\Final Insp Check)05/03/2006
MtytlCartsftrt
nnal Building Inspection
Dept: Building Engineering PlajJhigaoJhi
Plan Check*:
Permit*:
Project Name:
Address:
Contact Person:
Sewer Dlst:
Inspected
Bv:
Inspected
Bv:
Inspected
Bv:
Comments:
PC05-33
CB051148
FARADAY SPECTRUM BLDG3
4980 SF SHELL BUILDING
2230 FARADAY AV
LUKE Phone: 8584377617
Water Dlst:
Date
Inspected:
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot: 0
Aooroved:
Approved:
Approved:
05/03/2006
COMMIND
INDUST
Disapproved:
Disapproved:
Disapproved:
ChiilCartsM
final Building inspeeUra
Dept: Building Engineering Planning CMWD StLlte F^r
Plan Check #:
PermK*:
Project Name:
Address:
Contact Person:
Sewer Dlst:
Inspected
Bv: ^
Inspected
Bv:
Inspected
Bv:
Comments:
PC05-33
CB051148
FARADAY SPECTRUM BLDG3
4980 SF SHELL BUILDING
2230 FARADAY AV
LUKE Phone: 8584377617
Water Olst:
.../2....XZ .,// ffi
/* ffJ^^t Date ^/ /
SI /v/**\. Inspected: ^/2- l&t
/ '
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot 0
^ Approved: f^~
Approved:
Approved:
05/03/2006
COMMIND
INDUST
Disapproved:
Disapproved:
Disapproved:
City of Carlsbad Bldg Inspection Request
For: 05/05/2006
Permit* CB051148
Title: FARADAY SPECTRUM BLDG 3
Description: 4980 SF SHELL BUILDING
Inspector Assignment: JM
Sub Type: INDUST
2230 FARADAY AV
Lot
Type: COMMIND
Job Address:
Suite:
Location:
APPLICANT SMITH CONSULTING ARCHITECTS
Owner:
Remarks:
Phone: 8584377617
Inspector:
Total Time:Requested By: LUKE
Entered By: JANEAN
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Act Comment
Comments/Notices/Holds
Associated PCRs/CVs Original PC# PC05-33
PCR06005 ISSUED FARADAY SPECTRUM-DEFERRED; TRUSS SUBMITTAL-AFFECTS ALL 9 BUILDINGS
Inspection History
Comments
NEED APPROVED ADA PARKING PLAN
ROOF DRAINS
OK TO POUR STRIP
UNDER SLAB ROOF DRAIN
NEED APPROVED TRUSS PACKAGE
NO INSP.
PANELS
ok to pour stab
Date
05/03/2006
02/01/2006
02/01/2006
01/30/2006
01/12/2006
01/05/2006
01/05/2006
01/05/2006
01/05/2006
01/03/2006
12/19/2005
11/21/2005
10/31/2005
Description
89 Final Combo
15 Roof/Reroof
24 Rough/Topout
15 Roof/Reroof
11 Ftg/Foundation/PJers
11 Ftg/Foundation/Piers
12 Steel/Bond Beam
21 Underground/Under Floor
31 Underground/Conduit-Wiring
15 Roof/Reroof
12 Steel/Bond Beam
12 Steel/Bond Beam
11 Ftg/Foundation/Piers
Act
CO
AP
AP
NR
AP
we
we
AP
we
CO
NR
AP
AP
lns|
JM
JM
JM
JM
JM
JM
JM
JM
JM
JM
TP
JM
JM
City of Carlsbad Bldg Inspection Request
For: 11/21/2005
Permit* CB051148
Title: FARADAY SPECTRUM BLDG 3
Description: 4980 SF SHELL BUILDING
Inspector Assignment: JM
2230 FARADAY AV
Lot
TypeiCOMMIND Sub Type: INDUST
Job Address:
Suite:
Location:
APPLICANT SMITH CONSULTING ARCHITECTS
Owner:
Remarks:
Phone: 8584371180
Inspector:
Total Time:
CD Description
12 Steel/Bond Beam
Requested By: ALAN
Entered By: CHRISTINE
Act Comment
Comments/Notices/Hold
Associated PCRs/CVs
Inspection History
Date Description Act Insp Comments
10/31/2005 11 Ftg/Foundation/Piers AP JM ok to pour slab
10/25/2005 11 Ftg/Foundation/Piers
10/03/2005 22 Sewer/Water Service
09/30/2005 22 Sewer/Water Service
PA JM OK TO POUR FOOTING - UFER OK
AP JM ON 9-30-05
AP JM
c T,EONSTRUCTION A EST1NG & 1LNGINEERING, INC.
ESCONDIDO • TRACY • RIVERSIDE • OXNARD • LANCASTER • SACRAMENTO
INSPECTION REPORT PAGE —L OF—L
CTE JOB #
REPORT #
PROJECT NAME:
ADDRESS:
INSPECTION DATE: 11 / 3l ~
PLAN FILE:
BLDG PERMIT:
OTHER:
MATERIAL SAMPLPiG
( ) CONCRETE ( ) MORTAR ( ) GROUT ( ) FIREPROOFING
( ) STRUCTURAL STEEL ( ) BOLTS
( ) MASONRY BLOCK ( ) REBAR
tut friable
AM
f 00-3
ba
n
r \Aec\r
•for
: (PRINT) \^1&V& Ag.(ifK?^TpyNAME
CERTIFICATION NO:
SIGNATURE
0L
GEOTECHNICAL & CONSTRUCTION ENGINEERING TESTING & INSPECTION
1441 MONTIEL ROAD, SUITE 115, ESCONDIDO, CA 92026 (760) 746-4955 FAX (760) 746-9806
LV
c T EONSTRUCTION X ESTING & 1L NGINEERING, INC.
ESCONDIDO • TRACY • RIVERSIDE • OXNARD • LANCASTER • SACRAMENTO
PAGE v OF \INSPECTION REPORT
CTE JOB #
REPORT #
PROJECT NAME:
ADDRESS:
ARCHITECT:
ENGINEER:
CONTRACTOR: TSA
INSPECTION DATE:
PLAN FILE:
\
BLDG PERMIT:
OTHER:
MATERIAL SAMPLING
( ) CONCRETE ( ) MORTAR ( ) GROUT ( ) FIREPROOFING • ( ) MASONRY BLOCK / (
( ) STRUCTURAL STEEL ( ) BOLTS ~ fl /< "
f^WPraV ^ fs " ^ ^ _ aty^n/\
NAME: (PRINT)
CERTIFICATION NO:
GEOTECHNICAL & CONSTRUCTION ENGINEERING TESTING & INSPECTION
1441 MONTIEL ROAD, SUITE 115, ESCONDIDO, CA 92026 (760) 746-4955 FAX (760) 746-9806
CONSTRUCTION TESTING & ENGINEERING, INC.
ENGINEERING, INC.
INSPECTION REPORT PAGE_1 OF 1
CTE JOB* .10-801
REPORT*
PROJECT NAME: Sarazay Spectrum.
ADDRESS:2330 Faraday Ave.
Carlsbad,Ca
ARCHTTECT: Smith Consulting Architects.
ENGINEER: Chung Y. Song.( # 2685)
CONTRACTOR: TSA Contractors.
INSPECTION DATE: 1-30-06
PLAN FILE:
BLDG. PERMIT: (# Bldg.#3) CBO51148
OTHER: SUB-CONTRACTOR
San Diego-Construction Welding/Whitacre
INSPECTION
() CONCRETE
() MASONRY
() P.T.CONC.
(X) FIELD WELD
() SHOP WELDING
() PILEDRIVING
( ) BATCH PLANT
()EXP. ANCHOR
O OTHER
MATERIAL IDENTIFICnON
CONC.MIX#/PSI
GROUTMDC#/PSI
MORTAR TYPE/PSI
REBAR GRADE 50-A706
STR. STEEL: A36
H.S.BOLT:
MAS. BLOCK
ELECTRODE: -NR232 (.072)
MATERIAL SAMPLING
( ) CONCRETE ( ) MORTAR ( ) GROUT ( )FIREPROOF!NG ( ) MASONRY BLOCK ( ) REBAR
(X ) STRUCTURAL STEEL ( ) BOLTS
INSPECTION PERFORMED, JOB PROBLEM, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, AND
1.1 Observed installation of 2 x 2 x( '^")-(3/8") angle iron for horizontal panel to panel splice connections to
#5-#9 rebar.(at the roof level) using (2) 3 "-5 ^"double flare groove welds per side at the following location:
1-2/A & 1-2/B. REF.S-3. DET.17/SD3 & 12/SD1.
1.2 Observed welding of ^"fillet welds for connection/installation of truss's to truss seat at the following loc:l-
2/A & 1-2/B.REF.S-3. DET.2/SD2.
1.3 Observed drag strut installation using '//'all around fillet welds for connection of drag strut to embeds pl.'s
/truss's in the following locations: 1-1.1/A.8 & 1.1-1.2/B. REF.S-3. DET.8,9,10,13/SD4.
1.4 Observed fit-up & installation of (4) W12 by 14 beams using Wfittet welds & bohs for fit-up/connection in
the following locations:l-l.l/B, & 1-1.3/B. REF.S-3. DET.1B/SD5 & 10-10a/SD3),(10,13,14/SD4.
Certification of Compliance: All work, unless otherwise noted, complies with the approved plans and specifications and
the uniform building code.
MAME: (PRINT) _JUSTJN RUNGE SIGNATURE:
CERTIFICATION NO: # 5262291-85
CONSTRUCTION TESTING & ENGINEERING. INC.
ENGINEERING, INC.
INSPECTION REPORT PAGE 1 OF 1
CTEJOB#.10-80T
REPORT* 1
PROJECT NAME: Sarazay Spectrum.
ADDRESS: 23^ Faraday Ave
Carlsbad,Ca
ARCHITECT: Smith Consulting Architects.
ENGINEER: Chung Y. Song.( # 2685)
CONTRACTOR: TSA Contractors.
INSPECTION DATE: 12-14-05
PLAN FILE:
BLDG. PERMIT: (# Bldg.#3) CBO51148
ADDRESS:2230
OTHER: SUB-CONTRACTOR
San Diego-Construction Welding
INSPECTION
() CONCRETE
() MASONRY
() P.TCONC.
(X) FIELD WELD
() SHOP WELDING
( ) PILE DRIVING
OBATCH PLANT
()EXP. ANCHOR
() OTHER
MATERIAL IDENTIFICATION
CONC.MDC#/PSI
GROUTMIX#/PSI
MORTAR TYPE/PSI
REBAR GRADE 50-A706
STR. STEEL: A36
H.S.BOLT:
MAS. BLOCK
ELECTRODE: -NR232 (.072)
MATERIAL SAMPLING
( )CONCRETE ( )MORTAR ( )GROUT ( )FIREPROOFING ( ) MASONRY BLOCK ( )REBAR
(X ) STRUCTURAL STEEL ( ) BOLTS
INSPECTION PERFORMED, JOB PROBLEM, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, AND
1.1 Observed installation of 2 x 2 x Wangle iron for vertical splice tie down connections to #5-rebar & 2 x 2 x
5/16"angle iron for splice connections to #6-rebar using (2) 3 '/^'double flare groove welds per side at the
following locations: 1-2/A, 1-2/B, A-B/1,& A-B/2. REF. DET. 1/SD-l. (NOTE: TYP.rebar welding schedule
det.-1/Sl).
1.2 Observed installation of 2 x 2 x Vi" angle iron for horizontal panel to panel splice connections to #5-rebar
( At roof level) using (2) 3" double flare groove welds per side at the following locations: 1-2/A, 1-2/B, A-B/1,
& A-B/2. REF. DET. 17/SD-3.(NOTE: TYP. Rebar welding schedule det.-1/Sl),
1.3 Observed welding of %' 'by T' long fillet welds for connection of (4) angle iron pl.s to embedded pLs in the
wall panels for a mitered corner wall splice connection at the following location:l/A, 1/B, 2/A & 2/B. REF.
DET.12/SD-1. Work on going.End of report.
Certification of Compliance: All work, unless otherwise noted, complies with the approved plans and specifications and
the uniform building code.
NAME: (PRINT) _JUSTIN RUNGE_SIGNATURE:
CERTIFICATION NO: # 5262291-85
Carl Schmidt Inspection Services. Inc.
P.O. Box 178403
San Diego, CA 92177-8403
(619) 855-9252
SPECIAL INSPECTION REPORT
Protect; FARADAY SPECTRUM
DAY THURSDAY
Addros: 2214 THROUGH 2248 FARADAY AVE.
Cfty: CARLSBAD CA
Permit Number: CBO5-1146 TO CBO5-1154 PUn FOe Nwmben
TYPE Of OBSERVATIONS:
Reinforcing Steel Reinforced Concrete Structural Masonry
Epoxy Prestressed Concrete Shoo Welding X Bolting
Type:
.Field Welding
Fireproofing_
Number of Samples:
Materials/DcsignMix/PsiA 36 STEEL , A500 TUBE STEEL E71T-1
Date: 12/22/05
REPORT
ON SITE AT STRUCT STEEL FOR VISUAL INSPECTION OF WELDING OF MODIFICATION OF WIDE FLANGE BEAMS.
SCOPE OF WORK
FABRICATE, FIT UP AND WELD MODIFICATION TO (4) W12X14 BEAMS TO FACILITATE BEAM SEAT MATCH UP AS PER
APPROVED RFI AND DRAWING DATED 12-lfr-05,02:39PMANDDETAILS9,13,15/SD4. THE FOLLOWING BEAM PC # WERE
MODIFIED:, 6B, SB AND 8A
INSPECTED AND ACCEPTED FIT UP AND SHOP WELDING PERFORMED THIS DATE,
(1) WELDER USING FCAW-G AND E71T-1 ELECTRODE.
WORK INSPECTED CONFORMS WITH APPROVED PLANS AND SPECIFICATIONS UNLESS OTHER WISE NOTED
DUANELORENZ KC3MWM5 sow TIME IN: 1130
Certification #
TIMEOUT: 1500
Signature
General Contractor TSA
Address:
Phone:
Carl Schmidt Inspection Services. Inc.
P.O. Box 178403
San Diego, CA 92177-8403
(619) 855-9252
SPECIAL INSPECTION REPORT
Protect: FARADAY SPECTRUM
DAY WENSDAY
Address: 2214 THROUGH 2248 FARADAY AVE.
Ctty; CARLSBAD CA
Permit Number: CBO5-1146 TO CBO5-1154 Pfcui FOe Nwnber:
TYPE OF OBSERVATIONS:
Reinforcing Steel Reinforced Concrete Structural Masonry Field Welding
Epoxy Prestressed Concrete Shop Welding X Bolting Fireproofing_
Number of Samples:Type:
Materiala/DcsignMix/PsiA 36 STEEL , A500 TUBE STEEL E71T-1
Date: 12/20/05
REPORT
ONSmB AT STRUCTSTEEL FOR VISUAL INSPECTION OF WELDING OF MODIFIHCAT1ON OF WIDE FLANGE BEAMS.
SCOPE OF WORK
FABRICATE, FIT UP AND WELD MODIFICATION TO (4) W12X14 BEAMS TO FACILITATE BEAM SEAT MATCHUP AS PER
APPROVED RFI AND DRAWING DATED 12-16-05,02:39 PM AND DETAILS 9,13,15/SD4. THE FOLLOWING BEAM PC # WERE
MODIFIED: 6A, 6B, 5A^B AND 8A
INSPECTED AND ACCEPTED FIT UP AND SHOP WELDING PERFORMED THIS DATE.
(2) WELDERS USING FCAW-O AND E71T-1 ELECTRODE.
WORK INSPECTED CONFORMS WITH APPROVED P^J^NS AhfDSF«CinCATlONSlJ>a^SSCXrHERWISENCTED
DUANELORENZ KCSMWMS so** TIME IN: 1200 TIMEOUT: 1600
General Contractor TS A
Address:
City:
Phone:
gnature
PLANNING/ENGINEERING APPROVALS
PERMIT NUMBER CB
ADDRESS
RESIDENTIAL
RESIDENTIAL ADDITION MINOR
(<$10,000.00)
OTHER
DATE f
JT
TENANT IMPROVEMENT
PLAZA CAMINO REAL
CARLSBAD COMPANY STORES
VILLAGE FAIRE
COMPLETE OFFICE BUILDING
PLANNER
ENGINEER
DATE
DATE
Doc«/M!sfonns/Planning Enginowing Approval*
D
D
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
Estimate based on unconfirmed information from applicant.
Calculation based on buildinjf plancheck plan submittal.
Address:Bldg. Permit No.
Prepared by:p*ate:Checked by:Date:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: [^(Ju^b*-^ Sq. Ft./Units:
Sq. Ft./Units:Types of Use:
APT CALCULATIONS: List types and square footages for at) uses.
Types of Use: (jJO-*->/t~ Sq. Ft./Units:
Types of Use:Sq. Ft./Units:
EDU's:
EDU's:
ADT's:
ADT's:
FEES REQUIRED:
WITHIN CFD: D YES {no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) D NO
D 1. PARK-IN-LIEU FEE
FEE/UNIT:
PARK AREA & #:
X NO. UNITS:=$
D 2. TRAFFIC IMPACT FEE
ADT's/UNITS:FEE/APT:
D 3. BRIDGE AND THOROUGHFARE FEE (DIST. #1
ADT's/UNITS:__ _ X
D 4. FACILITIES MANAGEMENT FEE
UNIT/SQ.FT.:
D 5. SEWER FEE
EDU's: '
BENEFIT AREA: T
EDU's:
ZONE:
= $~7 /TV .
DIST. #3
X FEE/SQ.FT./UNIT: / ^
^-
U: '* >
=$
FEE/EPU:
D 6. SEWER LATERAL ($2,500)
D 7. DRAINAGE FEES PLDA
ACRES:
= $_
HIGH /LOW_
FEE/AC:= S
D 8. POTABLE WATER FEES
UNITS CODE CONNECTION FEE METER FEE SDCWA FEE IRRIGATION
C*>
n&^\
Word\DocK\Mlifonra\FMCateutetkm Worksheet
Iof2
Rev. 7/14/00
Community Facilities District No. 1
NON-RESIDENTIAL CERTIFICATE: Non-Residential Land Owner,
please read this option carefully and be sure you thoroughly understand the options before
signing. The option you chose will affect your payment of the developed Special Tax
assessed on your property, "this option is available only at the time of the first building
permit issuance. Property owner signature is required before a building permit will be
issued. Your signature is confirming the accuracy of all information shown.
P -n / LLc-
Name of Owner Telephone
8e>0
Address
LA Cg.
Project Address
Carlsbad. California
City, State Zip Code City, State Zip Code
Assessor's Parcel Number or APN and Lot Number if not yet subdivided by County Assessor.
Building Permit Numbers)
As cited by Ordinance No. NS-155 and adopted by the City of Carlsbad, California, the City is authorized
to levy a Special Tax in Community Facilities District No. 1. All non-residential property, upon die
issuance of a building permit, shall have the option to ( 1) pay the SPECIAL DEVELOPMENT TAX ONE-
TIME or (2) assume the ANNUAL SPECIAL TAX - DEVELOPED PROPERTY for a period not to
exceed twenty-five (25) years. Please indicate your choice by initialing the appropriate line below:
OPTION (1):
OPTION (2):
I elect to pay the SPECIAL TAX - OJffi-TIME now, as a one-time payment. Amount of
One-Time Special Tax: $ «j« & /8* " -_ . Owner's Initials
I elect to pay the SPECIAL DEVELOPMENT TAX ANNUALLY for a period not to
exceed Jwenty-five (25) years. • Maximum Aunaal > Special Tax:
$ I I V • . Owner's
I DO HEREBY CERTIFY UNDER PENALTY OF PERJURY THAT THE UNDERSIGNED IS THE
PROPERTY OWNER OF THE SUBJECT PROPERTY AND THAT I UNDERSTAND AND WILL
COMPLY WlTH THE PROVISJONS AS STATED ABOVE.
Title
Print Name Date
The .City of Carlsbad has not independently verified the information shown above. Therefore, we accept no
responsibility as to the accuracy or completeness of mis information.
Land Use, FY,Factor /.X Square Ft.£ ST? g
City of Carlsbad
Building Department
CERTIFICATE OF COMPLIANCE
PAYMENT OF SCHOOL FEES OR OTHER MITIGATION
This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City*
prior to issuing a building permit. The City will not issue any building permit without a completed school fee form.
Project Name:
Building Permit
Plan Check Number:
Project Address:
A.P.N.:
Project Applicant
(Owner Name):
Project Description:
Building Type:
Residential: Number of New Dwelling Units
Square Feet of Living Area in New Dwelling
Second Dwelling Unit: Square Feet of Living Area in SOU '
Residential Additions: Net Square Feet New Area
LL
Commercial/Industrial: Square Feet Floor Area
City Certification of
Applicant Information:
Carlsbad Unified School District
6225 El Camino Real
Carlsbad CA 92009
Q ffft J?/
Date:
THIN THE CITY OF CARLSBAD
San Marcos Unified School District
215MataWay
San Marcos, CA 92069 (290-2649)
Contact: Nancy Dolce (By Appt. Only)
Encinitas Union School District
101 South Rancho Santa Fe Rd
Encinitas, CA 92024 (944-4300 ext 166)
San Dieguito Union High School District
710 Encinitas Blvd.
Encinitas, CA 92024 (753-6491)
Certification of Applicant/Owners. The person executing this declaration ("Owner") certifies under penalty of perjury that (1) the
information provided above is correct and true to the best of the Owner's knowledge, and that the Owner will file an amended
certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square
footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect, and
that (2) the Owner is the owner/developer of the above described projects), or that the person executing this declaration is
authorized to sign on behalf of the Owner.
Signature:Date:
Revised 4/20/00
1635 Faraday Avenue • Carlsbad, CA 92OO8-7314
PtnilHinn l^rti in* or • tffif\\
(760) 602-270O
SCHOOL DISTRICT SCHOOL FEE CERTIFICATION
(To be completed by the school district(s))*************************************************
THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE
PROJECT HAVE BEEN OR WILL BE SATISFIED.
SCHOOL DISTRICT:
The undersigned, being duly authorized by the applicable School District, certifies that the
developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that
the applicant listed on page 1 has paid all amounts or completed other applicable school
mitigation determined by the School District. The City may issue building permits for this project.
SIGNATURE OF AUTHORIZED SCHOOL
DISTRICT OFFICIAL
TITLE
NAME OF SCHOOL DISTRICT
DATE
PHONE NUMBER
6225 ELCMHNO REAL
Revised 4/20/00