Loading...
HomeMy WebLinkAbout2233 FARADAY AVE; K-M; CB951680; Permit12/12/95 17:07 Page 1 of 1 B U I L D I N G PERMI'l, Permit Project Development K-M No: CB951680 No: A9502454 No: Job Address: 2233 FARADAY AV Permit Type: INDUSTRIAL TENANT Parcel No: 212-061-25-00 IMPROVEMENT Suite: Lot#: Valuation: 22,592 Occupancy Group: B2 Reference#: St~etsr: ...., . ~·.t ! £ Vl.\J'2 ISS,URD U· .::. .rmo :1 ,_. l ~ Description: WAREHOUSE TO OFFICE-822 SF Applied: : WALLS, CEILING,ELECT & MECH UPGRADES Apr/Issue: Appl/Ownr : CSI 135 VALLECITOS DE ORO, STE A SAN MARCOS, CA 92069 Entered By: 619-471-9388 11/16/95 12/12/95 RMA *** Fees Required *** *** p"i:fiers~. Collected & Credi ts *** --------------------------,/-/ -,_ Fees: 2, 618-(00 "'(~---_, ,/fl\_ /~;-.-""~ Adjustments: // .Off: . :.>rTb::t,a1l,1C'.t'edfts: .00 ," I / • \ Total Fees: 2,.018,00,__.,, Total:~~y~e1;1ts{ 152.00 / (\ "' ./ //'?:·:,, ... ~a~ahc:e .DLle :\ 2 , 4 6 6 . 0 0 Fee description / : "-:> / .,..?//,---,~1Jil.i t&--.,_ "'·('f-9:e.:/Uri~ t Ext fee Data -------------------! /'-....:__ -'v 7~ ------; .J • ·0~' -----\ _ _j, ~ ~----\------------------ Building Permit / -:,~-. .._:; I"-,·.,. ,,--------------·-::-, -~7 , ·, 234.00 Pl Ch k I ~-:~:--·---. I '~~,,---·;,:;_;;:::;:;.· .. :;:;, -~;.;/ ', 1 1r:;2. 00 an ec , .. ,,,_ : , "'·""".,,;..:.,;, .,,~' __ . -~// ,, . _ .. ~ , .., Strong Motion Fee/ , :·: , , . _f }· ---·/ . J7; "'"l _ 5. 00 Enter Number of EI?U''S:_:-_f/W:ater :s;}'urx --1':::.:: __ /,, :.,,t_Q.(_-j. 720. 00 Enter "Y" to Autoaalc Lic'en;3~ IT'~x >\· ':;-;.:"-' f (·',~ ·\·-/; ;' ,J 411. 00 Y • \,-, C F·, D, '""-,J lff,, r ... r~ ,: < '·,,? 1 '.:)80 00 (Lie ,,.x) . ,\<:. ··\;/~, ·1,, f · :;:;_,':J, / ' -> • \ ('"f'IF----Fu~u. 1 i·;,i; ,,,. · zy:" l i 2.12. 00 \ \ ,, ~J.'i",Jf i.,,_...,, ! ..,:• f \ (TIP CFD F\mcl)..::,, t'.,:;_-,'":---~---...,,.--/ ' 196.00 Enter Bridge Fee \ /"' "-L/ l"~ot:cT-iD64.00/ 264.00 , : /""" ,'-"-.,_ >'l n, 1,.,n,·, -c / / * BUILDING TOTAL \ ~:__ '',.,., ~-1952 ___ ./ · 2574.00 Enter "Y" for Electric,"Iss:"':1-ct;F;e,e-·->. -· _/· 10.00 Y Enter "Y" for Remodel •, ,.,,,__, / 1/ n .>... -, / 1 o. O o Y * ELECTRICAL TOTAL '\,,,_ .. '..._'~ ,-'/ j ~:-:,--,. /-// 20. 00 ' 'f \..., Enter 'Y' for Mechanical Iss·l.l{tFee'> 15.00 Y Install Furn/Ducts/Heat Pumps ··-, ---->.. ----· _ _,,,,.1 9. 00 9. 00 * MECHANICAL TOTAL 24.00 APPROVA~A?k INSP. ,,_,,. fl"'=--DATE-*r-CLEARANCE _____ , CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 PERMIT APPLlCATION PLAN CHECK NO. City of Carlsbad Building Department 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 1. PERMIT 'n'PE ~~0-~ ~~~: _<~~ -b~~~ -~~e-~~~ ~~ ~~~i~-~~ _____ ;f 1 A~ - For Residential Projects Only: From List 2 (see back) give Code of Structure-Type: ____________________ _ 46% 11/16/95 ()001 01 C-PFS1T Net Loss/Gain of Dwelling Units ___________________ _ 2. PRQJECT INFORMATION FOR OFFICE USE ONLY Address t1,?,,.-$3 ~crtta:°3/ Buildmg or Suite No. K-VV\ Nearest Cross Street 'E"C[L LEGAL DESCRIPTION Lot No. Subd1v1S1on Name/Number Umt No. Phase No. D 2 Soils Report # OF BATHROOMS CITI STATE ZIP CODE DAY TELEPHONE s. PROPER1Y oWNM u-' 1 rt <-::;: ~ NAME (last name first) ~--'--.eJ -ADDRESS -Z,?,,,~3 "\""CM et..OtO,y CITI ~~> STATE Ca.. ZIPCODlll-~ DAYTELEPHONE ~-4{l.b3 6 . ~~-(last name first) CS J_ ADDRESS l~S \Jci,U-ee,~s ~ro ~A CITI ~V\ Morao STA '--"''---""' ZIP CODE q~13,1 DAYTELEPHONE 41,t-C-CJCY STATE IJC. # 5'?i IJCENSE CIASS CITI BUSINESS IJC. # i ZIP CODE DAY TELEPHONE STATE IJC. # SIGNATURE DATE s. oWNER-BOlIDER OECI.AltA'tloN D D D Owner-Builder Deciarauon: I hereby affirm that I am exempt from the ContractoPs license Law for the followmg reason: I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale.). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's Llcense Law). I am exempt under Section ________ Business and Professions Code for this reason: (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500)). SIGNATURE DATE COMPLETE THIS SECTION FOR NON-RESIDENTIAL BU!LDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 YES D NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES D NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES D NO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY Nill BE ISSUED AFTER JULY 1, 1989 UNLF..5S THE APPUCANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICFS AND THE AIR POU.UTION CONTROL DISIRICT. ere 1s a construction en mg agen 1s permit 1s issue LENDER'S NAME lo. APPIJ.CANT CRRl1F1CA:l10N I ceruly that I have read the apphcauon and state that the above mformanon 1s correct. I agree to comply with all City ordmances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I AISO AGREE 10 SAVE INDEMNIFY AND KEEP HARMLESS THE CTlY OF CARISBAD AGAINSf All IJABILITIES, JUDGMENTS, CXJSIS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINSf SAID CTlY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. days from the date of such permit or if the building or work authorized by mmenced for a period of 180 days (Section~~) Uniform Building Code). _,, {) ~ DATE: ____ _ YELLOW: Applicant PINK: Finance a/p 1111 S E W E R P E R M I T 12/12/95 11:57 Page 1 of 1 Job Address: 2233 FARADAY AV Permit Type: SEWER -OFFICE/WAREHOUSE Parcel No: 212-061-25-00 Description: CONV WARHS 1,0 OFFICE, SHIP /REC 519 SF WAREHOUSE TO OFFICE Suite: A Permitee: CSI 619-471-9388 135 VALLECITOS DE OSO, #A SAN MARCOS, CA 92069 Fees: Adjustments: Total Fees: / / Permit No: SE950122 Bldg Planck#: CB951615 5127 12/l.2/95" C001 01 02 ! / G-1:·;f\T 3fC .. s:-t Status: ISSUED Applied: 11/16/95 Apr/Issue: 12/11/95 Expired: Prepared By: HE .00 .00 510.00 Ext fee Data FINAL APPROVAL f NSP. --DATE _____ , CLEARANCE _____ , CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 ' .... CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB951680 FOR 05/16/96 DESCRIPTION: WAREHOUSE TO OFFICE-822 SF WALLS, CEILING,ELECT & MECH UPGRADES TYPE: ITI JOB ADDRESS: 2233 APPLICANT: CSI CONTRACTOR: OWNER: FARADAY AV REMARKS: MW/DAVE/471-9388 SPECIAL INSTRUCT: TOTAL TIME: --RELATED PERMITS--PERMIT# SE950126 FA950023 FAD96005 TYPE swow FALARM FADD PHONE: PHONE: PHONE: STATUS ISSUED ISSUED ISSUED INSPECTOR AREA TP PLANCK# CB951680 OCC GRP B2 CONSTR. TYPE VN STE: K-M LOT: 619-4 71-938.8 CD LVL DESCRIPTION ACT COMMENTS 19 ST Final structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical A£_ ________ _ :f= ____ _ --------------------------------------------------------- ***** INSPECTION HISTORY***** DATE 051096 011796 121995 121995 121995 121595 121595 121495 121495 DESCRIPTION Final Combo Final Combo Frame/Steel/Bolting/Welding Rough Electric Rough/Ducts/Dampers Frame/Steel/Bolting/Welding Rough Electric Frame/Steel/Bolting/Welding Rough Electric ACT INSP CO TP CO TP AP TP AP TP AP TP PA PK PA PK CO TP CO TP COMMENTS T-24 ISSUES TITLE 24 ISSUES RM 112,118 CEILING LITES@ 118,112 DUCTS@ 112,115,116,118 SEE JOB CARD SEE JOB CARD NO PLANS OR CARD NO PLANS OR CARD FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING ~_I~J PLANNING U/M WATER PLAN CHECK#: CB951680 PERMIT#: CB951680 PROJECT NAME: WAREHOUSE TO OFFICE-822 SF WALLS, CEILING,ELECT & MECH UPGRADES ADDRESS: (2:2:_3,'3:::FARAO'AY , -~Y -'SUI'PE'.#i~K-..M-7 CONTACT PERSON/PHONE#: MW/DAVE SEWER DIST: CA WATER DIST: CA DATE: 01/17/96 PERMIT TYPE: ITI lij~(C~~\\f ~~ ~ JAN 1 8 1996 ~ By ====================================~=-=============='.i-a-a==:::===imiia----=b~:~===-= INSPECTE~ BY: _'0::d,.(tJ INSPECTE BY: INSPECTED BY: DATE INSPECTED: /-/7'6f,h APPROVED j_ DATE INSPECTED: DATE INSPECTED: APPROVED APPROVED DISAPPROVED DISAPPROVED DISAPPROVED ------------------------------------==-=====----r--==-=-----==--~==•===--•====s COMMENTS: DATE: December 12, 1995 JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1680 EsGil Corporation Professiona{ Pfan ~view 'Engineers SET: II PROJECT ADDRESS: 2233 Faraday, Suites K -M PROJECT NAME: Office T. I. for ALLAR-TIC D APPLICANT . ~) D FIRE ~WER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's*********** codes. • The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: D Esgil Corporation staff did not advise the applicant that the plan check has been completed. • Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Dave Johnson Date contacted: 12/12/95 (by: Abe) Telephone#: Appt. • REMARKS: Compliance with Title 24 Disabled Access Regulations to be verified by the City Building Official. Applicant to carry approved set of plans to the city. Ok'd by Raenette. By: Abe Doliente Esgil Corporation D GA D CM D GP D PC 12/12/95 Enclosures: trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576 :, DATE: November 28, 1995 JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1680 EsGil Corporation Professiona{ Pfan ~view 'Engineers SET:I PROJECT ADDRESS: 2233 Faraday Suites K -M PROJECT NAME: Office T. I. for ALLAR-TIC ~PPb.LCANT (CJ J~ CJ FIRE CJ PLAN REVIEWER CJ FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's*********** codes. D The plans transmitted herewith will substantially comply with the jurisdiction's ********** codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. • The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. • The applicant's copy of the check list has been sent to: Dave Johnson 145 Los Vallecitos De Oro, Suite F, San Marcos, CA 92069 • Esgil Corporation staff did not advise the applicant that the plan check has been completed. D Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: ) Telephone#: D REMARKS: By: Abe Doliente Enclosures: Esgil Corporation • GA DCM D GP D PC 11/20/95 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576 •l Carlsbad 95-1680 November 28, 1995 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 95-1680 OCCUPANCY: B-2 JURISDICTION: Carlsbad USE: Offices TYPE OF CONSTRUCTION: V-N ALLOWABLE FLOOR AREA: Existing ACTUAL AREA: 822 SF (T. I. only) STORIES: ? SPRINKLERS?: Yes REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: November 28, 1995 FOREWORD (PLEASE READ): HEIGHT: OCCUPANT LOAD: DATE PLANS RECEIVED BY ESGIL CORPORATION: 11/20/95 PLAN REVIEWER: Abe Doliente This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 1991 USC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 303 (c), 1991 Uniform Building Code, the approval of the ·plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. LIST NO. 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1991 UBC) tiforw.dot Carlsbad 95-1680 November 28, 1995 1. Please make all corrections on the original tracings and submit two new sets of prints, to: Esgil Corporation, 9320 Chesapeake Drive, Suite #208, San Diego, CA 92123, (619) 560-1468 or to the jurisdiction's building department. 2. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. 3. UBC Section 304 requires the Building Official to determine the total value of all construction work proposed under this permit. The value shall include all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevator, fire extinguishing systems and any other permanent equipment. Please provide a signed copy of the designer's or contractor's construction cost estimate of all work proposed. 4. Provide a fully dimensioned floor plan showing the size and use of all rooms or areas within the space being improved or altered. Draw the plans to scale and indicate the scale on the plan. Section 302(d). 5. Indicate the use of all spaces adjacent to the area being remodeled or improved. 6. Show any existing fire rated area separation walls, occupancy separation walls, demising walls, shafts or rated corridors. Identify and provide construction details for proposed new fire rated walls. 7. The tenant space and new and/or existing facilities serving the remodeled area must be accessible to and functional for the physically disabled. See the attached correction sheet. Title 24, Part 2. Compliance to these requirements will have to be field verified. 8. Exit signs are required whenever two exits are required. Show all required exit sign locations. Section 3314 (a). 9. Show that exits are lighted with at least one foot candle at floor level. Section 3313(a). 10. Corridors must provide continuous protection to the exterior of the building. Interruptions by an intervening room is not permitted. Foyers, lobbies or reception rooms constructed as required for corridors are not considered intervening rooms. Section 3305. 11. Corridors serving 30 or more occupants shall have walls and ceilings of one-hour construction. Show compliance or clearly show on plans which of the following exceptions has been satisfied: Carlsbad 95-1680 November 28, 1995 a) Corridors greater than 30 feet wide when the occupants have an exit independent from the corridor. b) Corridor walls and ceilings need not be of fire-resistive construction within office spaces having an occupant load of 100 or less when the entire story in which the space is located is equipped with an automatic sprinkler system throughout and smoke detectors are installed within the corridor in accordance with their listing. c) Within office spaces occupied by a single tenant, partial height partitions which form corridors and which do not exceed 6 feet in height need not be fire resistive, provided they are constructed in accordance with Section 1705 and are not more than three fourths of the floor-to-ceiling height. Section 3305 (g). 12. If non-rated corridors are used per Section 3305(9), Exe. 5, provide a reference to the corridors on the floor plan, noting: a) Corridors are non-rated per Section 3305(9), Exception 5. b) Smoke detectors shall be maximum 30' on center. c) Power supply shall be dedicated branch circuit. Circuit disconnecting means shall be accessible only to authorized personnel and shall be clearly marked FIRE ALARM CIRCUIT CONTROL, with a lock-on device. 13. If a tenant space utilizes Section 3305(9), Exception 5, then that tenant space shall be separated from adjacent spaces by a demising wall constructed as for a one-hour corridor wall. 14. Clearly show where the non-rated corridor system terminates and a rated corridor system commences. 15. One-hour fire-rated corridors shall have interior door openings protected by tight- fitting smoke and draft control assemblies rated 20 minutes, except openings in interior walls of exterior exit balconies. Doors shall be maintained self-closing or be automatic-closing by action of a smoke detector per Section 4306(b). Doors shall be gasketed to provide a smoke and draft seal where the door meets the stop on sides and top. Section 3305(h). 16. Show rated corridors, lobbies, reception or foyers cross-hatched on the floor plans. 17. Provide a complete architectural section of the corridor showing all fire-resistive materials and details of construction for all floors, walls, ceiling and all penetrations. Section 3305(9) 18. Please see the following mechanical and energy corrections. ·- Carlsbad 95-1680 November 28, 1995 + PLUMBING, MECHANICAL AND ENERGY CORRECTIONS + JURISDICTION: Carlsbad + PLAN REVIEW NUMBER: 95-1680 + PLAN REVIEWER: Glen Adamek DATE: 11/28/95 SET: I • MECHANICAL (UNIFORM MECHANICAL CODE) 19. Show the size, location and type of all heating and cooling appliances or systems. 20. Provide mechanical plans showing existing and proposed HVAC equipment, ducts and access to equipment. 21. Provide mechanical ventilation in all rooms capable of supplying a minimum of 5 cubic feet per minute of outside air with a total circulation of not less than 15 cubic feet per minute per occupant. Section 605 and 705, UBC. • ENERGY CONSERVATION NOTE: Plans submitted after July 1, 1995 must comply with the new energy standards. 22. Provide complete energy designs for the proposed changes in envelope, lighting, and mechanical systems. Provide the completed ENV-, L TG-, and MECH-forms showing Energy compliance. Plans show new conditioned space and envelope changes. 23. On the plans clearly show the wall insulation locations, thickness, and R-values, as per the energy design. 24. Plans show more lighting fixtures than shown on the L TG-forms. Please correct. 25. Complete energy plan check will be done when complete corrected energy designs are provided. 26. The corrected, completed and signed ENV-1, LTG-1, and MECH-1 forms must be imprinted on the plans. Carlsbad 95-1680 November_28, 1995 Note: If you have any questions regarding this plan review list please contact Glen Adamek at (619) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. • MISCELLANEOUS 27. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 28. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. • Have changes been made to the plans not resulting from this correction list? Please indicate: Yes D No D 29. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Abe Doliente at Esgil Corporation. Thank you. DISABLED ACCESS REQUIREMENTS FOR REMODELS' (alterations, structural repairs, additions, tenant improvements and occupancy changes) A GENERAL Full access compliance is required for remodels, including: 1. The specific area being remodeled, (i.e., the "new" work). 2. Existing elements in the path of travel to the remodeled area. (a)Parking, (b)Walks, (c)Hazards, (d)Curb Ramps, (e) Ramps, (f)Elevators, (g) Stairs. 3. Entrance to the remodeled area. (a)Entrance doors, (b)Exit doors. 4. Existing sanitary facilities serving the remodeled area. 5. Existing drinking fountains and telephones serving the remodeled area. B. REMODELS VALUED LESS THAN $80,7102 When remodels are valued at less tha11 $80,710, the total access compliance may be limited to the specific area being remodeled (i.e., "new" work), provided the following conditions are satisfied: Carlsbad 95-1680 November 28, 1995 1. The cost to upgrade the existing elements (described in A.2, A.3, A.4 and A.5 above) exceeds 20% of the cost of the proposed project, and 2. The enforcing agency determines that "an unreasonable hardship" exists (see the attached Form HA-1, to be completed by the applicant), and 3. The plans must still show upgrades to the existing elements, but only to the point where the cost to do so will equal 20% of the cost of the proposed project. In choosing which elements to upgrade, the following priority list should be used: (a) Entrance to the building (b) Route of travel (c) Restrooms (d) Public telephones (e) Drinking fountains (f) Other elements, such as parking, alarms, signage, etc. 2Note: In determining the value of a remodel, the total costs of all improvements over the last 3 years along the same path of travel must be included (even if the previous remodels were done by other tenants). The 20-percent provisions for determining if upgrade costs are disproportionate and for determining the amount to spend on upgrades shall be based on this tota/value. Please complete the attached declaration form (Form HA-1). DATI 11/28/95 Carlsbad 95-1680 November 28, 1995 VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1680 PREPARED BY: Abe Doliente DATE: November 28, 1995 BUILDING ADDRESS: 2233 Faraday Suites K -M BUILDING OCCUPANCY: B-2 BUILDING PORTION BUILDING AREA (sq. ft.) Office T. I. 822 SF Air Conditioning Fire Sprinklers TOTAL VALUE UBC Building Permit Fee: UBC Plan Check Fee: Comments: ESGIL FEE= 0.80 X 184.93 = $ 147.94 TYPE OF CONSTRUCTION: V-N VALUATION MULTIPLIER 36.00 VALUE ($) 29,592 29,592 $ 284.50 $ 184.93 Sheet 1 of 1 valuefee.dot .. , ; City of Carlsbad M ¥i 11~11 1£44 I iii· I •14 ·kl Ii; ,£4 Iii BUILDING PLANCHECK CHECKLIST ~~~~lf ifitii?st" ;/ 3 63 -1-crr;.da ti PLANCHECK NO. cs q5J&, 2 0 PROJECT DESCRIPTION: ~J .;l .SF y:,X. ASSESSOR's·PARCEL NUMBER: _________ EST. VALUE¢~ c.59 d ENGINEERING DEPARTMENT APPROVAL The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal; therefore any changes to these Items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build. DENIAL Please see the attached report of deficiencies marked with D Make necessary corrections to plans or specifications for compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. By: _________ Date: ___ _ D ~ ~ A Right-of-Way permit is required prior to construction ------------- of the following improvements: ATTACHMENTS D Dedication Application D Dedication Checklist D Improvement Application D Improvement Checklist D Future Improvement Agreement D Grading Permit Application D Grading Submittal Checklist D Right of Way Permit Application D Right of Way Permit Submittal Checklist and Information Sheet D Sewer Fee Information Sheet By:,_.""---------Date:, ___ _ ENGINEERING DEPT. CONTACT PERSON NAM~~ City of Carlsbad ADDRESS: 2075 Las Palmas Dr., Carlsbad, CA 92009 PHONE: (619) 438-1161, Ext. 4--3./.S A-4 P:\DOCS\CHKLS1\BP0001.FRM REV 05/11 /94 2075 Las Palmas Dr.• Carlsbad, CA 92009-1576 • (619) 438-1161 • FAX (619) 438-0894 ~ I .. BUILDING PLANCHECK CHECKLIST SITE PLAN 1 J::t) 2ndv' 3rdv' @. D D 1. Provide a fully dimensioned site plan drawn to scale. Show: I ~D D A. North Arrow D. Property Lines Easements B. Existing & Proposed Structures E. Easements C. Existing Street Improvements F. Right-of-Way Width & Adjacent Streets 2 .. Show on site plan: A. Drainage Patterns C. Existing Topography B. Existing & Proposed Slopes 3. Include note: "Surface water to be directed away from the building foundation at a 2% gradient for no less than 5' or 2/3 the distance to the property line (whichever is less)." [Per 1985 UBC 2907(d)5]. On graded sites, the top of any exterior foundation shall extend above the elevation of the street gutter at point of discharge or the inlet of an approved drainage device a minimum of 12 inches plus two percent'' (per 1990 UBC 2907(d)5.). 4. Include on title sheet .. A. Site address B. Assessor's Parcel Number C. Legal Description For commercial/industrial buildings and tenant improvement projects, include: Total building square footage with the square footage for each different use, existing sewer permits showing square footage of. different uses (manufacturing, warehouse, office, etc.) previously approved. EXISTING PERMIT NUMBER DESCRIPTION P:\DOCS\CHKLS1\BP0001.FRM Page 1 of 4 REV OS/11 /94 BUILDING PLANCHECK CHECKLIST DISCRETIONARY APPROVAL COMPLIANCE ~ ~f\gbd./ 3rd./ 1~0 0 D 5. · Project does not comply with the following Engineering Conditions of approval for Project No. _______________________ _ Conditions were complied with by: ______ _ Date: ------- DEDICATION REQUIREMENTS 6. Dedication for all street Rights-of-Way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ ______ -pursuant to Code Section 18.40.030. Dedication required as follows: ________________ _ Attached please find an application form and submittal checklist for the dedication process. Provide the completed application form and the requirements on the checklist at the time of resubmittal. Dedication completed by ___________ _ Date: ___ _ IMPROVEMENT REQUIREMENTS 7a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $ -pursuant to Code Section 18.40.040. . Public improvements required as follows: _____________ _ Please have a registered Civil Engineer prepare appropriate improvement plans and submit them together with the requirements on the attached checklist for a separate plancheck process through the Engineering Department. Improvement plans must be · approved, appropriate securities posted and fees paid prior to issuance of permit. Attached please find an application form and submittal checklist for the public improvements requirements. Provide the completed application form and the requirements on the checklist at the time of resubmittal. Improvement Plans signed by: __________ _ Date: --- P:\DOCS\CHKLS1\BP0001.FRM Page 2 of 4 REV 05/11 /94 BUILDING PLANCHECK CHECKLIST .~~.3rd. ''t"I ~d D 7b. Construction of the public improvements may be deferred pursuant to code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $ ________ so we may prepare the necessary Future Improvement Agreement. This agreement must be signed, notarized and approved by the City prior to issuance of a Building Permit. Future public impro_vements required as follows: ___________ _ Improvement Plans signed by: __________ _ Date: ___ _ D D D 7c. Enclosed please find your Future Improvement Agreement. Please return signed and notarized Agreement to the Engineering Department. D D D D /o D D D Future Improvement Agreement completed by: ____________ _ Date: _______ _ 7d. No Public Improvements required. SPECIAL NOTE: Damaged or defective improvements found adjacent to building site must be repaired to the satisfaction of the City Inspector prior to occupancy. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11.06.030 of the Municipal Code. 8a. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill import, export). 8b. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be Submitted together with the completed application form attached. NOTE: The Grading Permit must be issued and rough grading approval obtained prior to issuance of a Building Permit. Grading Inspector sign off by: Date: 8c. No Grading Permit required. P:\DOCS\CHKLS1\BP0001.FRM Page 3 of 4 REV 05/11 /94 -1:. BUILDING PLANCHECK CHECKLIST MISCELLANEOUS PERMITS 2]~dv' 3rdv' ltlf'\U D 9. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or private work adjacent to the public Right-of-Way. Types of work include, but are not limited to: street improvements, trees, driveways, tieing into public storm drain, sewer and water utilities. D D Right-of-Way permit required for ________________ _ A separate Right-of-Way permit issued by the Engineering Department is required for the following: ______________________ _ 1 o. A SEWER PERMIT is required concurrent with the building permit issuance. The fee is noted in the fees section on the following page. 11. INDUSTRIAL WASTE PERMIT is required. Applicant must complete Industrial Waste Permit Application Form and submit for City approval prior to issuance of a Permit. Industrial waste permit accepted by: ______ _ Date: ___ _ P:\DOCS\CHKLST\BP0001.FRM Page 4 of 4 REV 05/11 /94 .; ' ENGINEERING DEPARTMENT ENGINEERING REVIEW SECTION FEE CALCULATION WORKSHEET D ~mate based on unconfirmed information from applicant. t:EY'calculation based on building plancheck plan submittal. Address: t2 ;1, a 3 For() dujj . Bldgi1~erm/it No. C,B 1 s ,/ lo 8 o Prepared by/2:1J:1f1'---Date: t0g/q5 Checked by:_fr_'t./ ___ Date: 1t/~/4(' , ; I I EDU CALCULATIONS: List types and square footages for all uses. Of '.FI c.--L. jZJ • 1·b Types of Use:C red;+ (1)0 rf A..Oll s.-Sq. Ft.;4::l.r;lits... ~ ~ d-. ; EDU's: ____ 0_/_{o __ Total EDU's: e _3:; 0 -----= o+-'f ,c.,-e_ 1000 l l:, ADT CALCULAJlONS: List types and square footages for all uses. ~ Types of Use:C tecl1± Lt )g re..h-ous-e..Sq. Ft./lslmt& 8 ,;:2. ;),fl ,-i>oo ADT's: -1- Total ADT's __ /_;)._ ___ _ FEES REQUIRED: PUBLIC FACILITIES FEE REQUIRED O YES ~NO (See Building Department for amount) WITHIN CFD: DYES (no bridge & thoroughfare fee, %No reduced Traffic Impact Fee) ~IN-LIEU FEE PARK AREA: ___ _ FEE/UNIT:_____ X NO. UNITS: __ _ ~AFFIC IMPACT FEE ADT'stomi=S! / :)___ [121{ BRIDGE AND THOROUGHFARE FEE X FEE/ADT: ~ j 1: ADT's/t.:115f1$S: / :;2-._ ~ClLITIES MANAGEMENT FEE SQ.FT.: __ _ X ZONE:. ___ _ X FEE/ADT: FEE/SQ.FT.: ___ _ 0 5. SEWER FEE PERMIT No0 £ C/ 5 ()/;? 0 EDU's:~30 __ _ X FEE/EDu:!'3 l){p BENEFIT AREA: _F __ _ DRAINAGE BASIN: 5/3 EDU's: <l>.3Q ~RAINAGE FEES PLDA. ___ _ ACRES: ____ _ /~SEWER LATERAL ($2,500 DEPOSIT) l:Z'.]6A TER FEE X FEE/EDU: 'x] 9 HIGH ___ /LOW __ _ X FEE/AC: __ _ =$ =$ =$_--r __ C)~_ / O'° =$-__ 5±~- ao =$~12; ±-:-' =$_-=-_c9 __ =$_-E)_-=---- EDU's; o~_V. ·· ..... l)O FEE/EDU: ~ 4Q0 =$_, ,7_ci] 0 . X ,60 TOTAL OF ABOVE FEES*: $~) l q g_ ~ *NOTE: This calculation sheet Is NOT a complete list of all fees which may be due. Dedications and Improvements may also be required with Building Permits. ,, P:\DOCS\MISFORMS\BP0002.FRM REV 01/04/95 " " • ... ... -• . , . Q Q " ~, I I 1 1 } .. ~ ; • .. .,. .. ... ~ i " ,C ,C '-' '-' i i i ---• • • .efoo PtNmt'NG OiECCIJ5r Plan Check No. qt;-/ b~O Address .2 A 3 3 FarcJoi,v /}vf-. Planner DAVID RICK Phone 438·1161 ext. 14328 ------ (Name) APN: -------------------------- Type of Project and Use __ T ..... _-i:-_. ______ ~:o---- Zone CM Facilities Management Zone --~------ 0'0 (in/out) *------....-CU'cle (tf property 111, c~mplete SPECIAL TAX CALCULATION WORKSHEET provided by Building Department.) Lmnd [2J [tem Complete (9 [tem [ncomplete -Needs your action 1, 2, 3 Number in circle indicates plancheck number where deficiency was identified / Environmental Rmew Required: YES _ NO ~ TYPE __ _ DATE OF COMPLETION: ____________________ _ Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval _____________________ _ /oo Disaeticmai.y AC1ioa. Required: YES_ NO ~E __ _ APPROVAL/RESO. NO. ___ DATE: _____ _ PROJECT NO. ___ _ OTHER RELATED CASES: __________________ _ Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval _____________________ _ /oo Califomia Coastal Commiaiaa ~t Required= YES _ NO / DATE OP APPROVAL: ____________________ _ San Diego Coast District, 3111 Camino Del Rio North, Suite 200, San Diego, CA. 92108· 1725 (619) 521-8036 Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval _____________________ _ ' ~0, ln!:iusion;,ry Housing l'"~ ~: YES~ NO _/ (Effective date of rndusionary Housing.·Orcllnance -May 21, 1993.) ' r ~ , ' ·~o Site Plan: l. 2. Zoning: 0.00 1.. D :o.·o . . ' . 2. DOD 3. ~o 4. ,Provide a-fully dimensioned. site ,plan drawn to scale. Show: North arrow, property lines, easem~nts, existing and proposed structures, stl'ee~, ~,d.sting· stteet imptovements·, right-of-way width, dimensioned setbacks and: ~xisting topographical lines. ' P'ro.vide legal desc;ription of property, and assessor's parcel number. Setb~cks: Front.: Required Shown tnt. Side: _ Required Shown _ . Street Side: R~~ed Shown Rear: Required Shown tot coverage: Required-Shown Heigh,: .Reqwred · Shown Parkmg:. Spaces Required i. ':J..& I Shown t/tl Guest Spaces Required Shown 0 P O · Additional Co~ents -------....----;,;-;,-------------.-....--......-----__,..----;....._--..:.. ' i 0~ TO [SSUE ANO~ APPROVAL IN1'0 c0MPUTER <j)2c .· I • DATE PLNCI<.FRM City of Carlsbad 95267 Fire Department • Bureau of Prevention Plan Review: Requirements Category: Building Plan Check Date of Report: Monday, December 11, 1995 Reviewed by: ~ Contact Name C.S.I. General Inc Address 145 Vallecitos De Oro #F City, State San Marcos CA 92069 Bldg. Dept. No. 95·1680 Planning No. Jot> Name Unknown K-M ------------------ Job Address _2_2_33_F_a_ra_d_ay~-------------Ste. or Bldg. No. ____ _ 181 Approved -The item you have submitted for review has been approved. The approval is based on plans; information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifica- tions, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attach~d, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. D Disapproved -Please see the attached report of deficiencies. Please make corrections to plans or specifications necessary to indicate compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. For Fire Department Use Only Review 1st~--2nd __ _ 3rd. __ _ Other Agency ID CFD Job# __ 95_2_6_7 __ File# ___ _ 2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121 .. , ..../ TITLE 24 REPORT FOR: 2233 Faraday Ave., Suite K-M 2233 Faraday Ave., Suite K-M Carlsbad, CA 92008 PROJECT DESIGNER: c.s .I. 145 Los Vallecitos De Oro, Suite F San Marcos, CA 92069 (619)471-9388 REPORT PREPARED BY: Steve Balderrama Haynal & Co., Inc. 425 West Fifth Street Escondido, CA 92025 (619) 743-5408 Job Number: ·Date: 12/8/1995 The COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential Building Energy Efficiency Standards. This program developed by Gabel Dodd Associates (510) 428-0803. Table Of Contents for Title 24 Report Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Form ENV-1 Envelope Certificate of Compliance ....................... 3 Form ENV-2 Envelope Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Form ENV-3 Construction Assemblies 9 Form LTG-1 Lighting Certificate of Compliance ....................... 11 Form LTG-2 Lighting Compliance Summary .............................. 13 Form MECH-1 Mechanical Certificate of Compliance .................... 14 Form MECH-2 Mechanical Summary ...................................... 17 Form MECH-3 Mechanical Equipment Summary ............................ 18 Form MECH-4 Mechanical Ventilation .................................. 19 CERTIFICATE OF COMPLIANCE (part 1 of 2) Project Name: 2233 Faraday Ave., Suite K-M Address: 2233 Faraday Ave., Suite K-M Carlsbad, CA 92008 Envelope Designer: C.S.I. Documentation: Haynal & Co., Inc. GENERAL INFORMATION ENV-1 page 3 of 19 Date: 12/8/1995 Building Permit No Checked by/ Date COMPLY 24 User 2875 Date of Plans:---~--Building Conditioned Floor Area: 822 sf Building Type: Nonresidential Climate Zone: 7 Phase of Construction: O New Construction X Addition O Alteration Method of Envelope Compliance: Prescriptive -Overall Envelope STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Part 6, Chapter 1 and Title 20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula- tions. This certificate applies only to building envelope requirements. The Principal Envelope Designer hereby certifies that the proposed build- ing design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the envelope requirements contained in sections 110, 116 through 118, and 143 or 149 of Title 24, Part 6, Chapter 1. Please check one: o I hereby affirm that I am eligible under ~he provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer or architect. Rf' I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing docu- ments for work that I have contracted to perform. o I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section-.---of the Code to sign this document as the responsible for its preparation; and for the following reason:_+-+-++------------ PRINCIPAL ENVELOPE DESIGNER C.S.I. (619)471-9388 ENVELOPE MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures: CERTIFICATE OF COMPLIANCE (part 2 of 2) Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. OPAQUE SURFACES Const ENV-1 page 4 of 19 Date: 12/8/1995 COMPLY 24 User 2875 Assembly Name Type Location/Comments Note to Field R-11 Metal Stud Metal R-19 Roof(R.19 on Tile) Wood FENESTRATION Frame Orient Panes Type Exterior Shade OH Glazing Type OVERALL ENVELOPE METHOD Part 1 of 4 Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. WINDOW AREA TEST A. Display Perimeter 0.0 ft X 6 ft = B. Gross Exterior Wall Area 216.0 sf X 0.40 = C. Gross Exterior Wall Area 216.0 sf X 0.10 = D. Enter Larger of A or B E. Enter Proposed Window Area If Eis greater than Dor less than C, proceed to for window area adjustment. 1. If Eis greater than D: D. Maximum Standard Area N/A 2. If Eis less than C: C. Minimum Standard Area 21.6 SKYLIGHT AREA TEST If not, go to part 2 I I E. Proposed Area N/A E. Proposed Area 0.0 = = ENV-2 page 5 of 19 Date: 12/8/1995 COMPLY 24 User 2875 0.0 sf Display Area 86.4 sf 40%" Area 21. 6 sf Min Std Area 86.4 sf Max Std Area 0.0 sf Proposed Area the next calculation of 4. Window Adjustment Factor N/A Window Adjustment Factor 0.0000 Atrium Height 0.0 ft If Height< 55 ft If Height>= 55 ft Standard= 5% ----------+----------Standard= 10%" I V A. Gross Exterior Roof Area 822.0 sf X 0.05 = 41.1 sf Standard Area B. Enter Proposed Skylight Area 0.0 sf Proposed Area If the Proposed Skylight Area is greater than the Standard Skylight Area, proceed to the next calculation for the skylight area adjustment. If not got to part 2 of 4. 1. If Proposed Skylight Area> Standard Skylight Area: Standard Skylight Area N/A I Proposed Skylight Area N/A = Skylight Adjustment Factor N/A OVERALL ENVELOPE METHOD Part 2 of 4 Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. OVERALL HEAT LOSS Assembly Name R-11 Metal Stud R-19 Roof(R.19 on Tile) No Glazing Area 216.0 822.0 0.0 ** OVERALL HEAT LOSS COMPLIES PROPOSED HC U-Val ----- 1.4 0.189 1.4 0.043 N/A 0.000 Total UxA ------ 40.9 35.7 0.0 ------ 76.6 PROPOSED ENV-2 page 6 of 19 Date: 12/8/1995 COMPLY 24 User 2875 Adj. STANDARD Area U-Val UxA ----------------- 216.0 0.189 40.8 822.0 0.078 64.1 21.6 1.230 26.6 ------ Total 131.5 UA <= STANDARD UA ** OVERALL ENVELOPE METHOD Part 3 of 4 Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. OVERALL HEAT GAIN Glazing North WF 0.34 PROPOSED Area SC H 0.0 0.00 V OHF Total 0.0 ENV-2 page 7 of 19 Date: 12/8/1995 COMPLY 24 User 2875 STANDARD Area RSHG Total Total 0.0 21.6 0.94 Total 6.9 6.9 ** OVERALL HEAT GAIN COMPLIES PROPOSED HG<= STANDARD HG** OVERALL ENVELOPE METHOD Part 4 of 4 Project Name: 2233 Faraday Ave., Suite K-M Documentation: ~aynal & Co., Inc. Window Area Adjustment Calculations Wall Name Demising Wall Gross Dir Area N TOTALS 216.0 216.0 Skylight Area Adjustment Calculations Roof Name R-19 Roof Gross Dir Area H TOTALS 822.0 822.0 Door Area ------ ------ 0.0 Window Area ------ 0.0 ------ 0.0 Skylt Area ------ 0.0 ------ 0.0 ENV-2 page 8 of 19 Date: 12/8/1995 COMPLY 24 User 2875 Adjusted Adjust Window Wall Factor Area Area ------------------ 0.0000 0.0 216.0 ------------ 0.0 216.0 Adjusted Adjust Skylt Roof Factor Area Area ------------------ 0.0000 0.0 822.0 ------------ 0.0 822.0 PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 9 of 19 Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. Date: 12/8/1995 COMPLY 24 User 2875 COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U-VALUE Construction Components Outside Air Film 1. Gypsum or Plaster Board 2. Insulation, Mineral Fiber, R-11 3. Gypsum or Plaster Board 4. 5. 6. 7 . 8 . 9 . Inside Air Film Assembly Name: R-11 Metal Stud Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Framing Material: Metal Framing Spacing: II 0.C. Framing Percent: 15.0 % Absorptivity: 0.70 Roughness: Smooth Plaster, Metal Th R-Value Fr (in) Cavity Frame 0.625 * 3.500 0.625 0.17 0.56 11.00 0.56 0.17 0.56 11. 00 0.56 Unadjusted R-Values 0.68 12.98 0.68 0.00 Weight: Heat Capacity: 5.4 lb/sqft 1.38 TOTAL U-VALUE = 0.189 ===== TOTAL R-VALUE = 5.29 ===== PROPOSED CONSTRUCTION ASSEMBLY Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. ENV-3 page 10 of 19 Date: 12/8/1995 COMPLY 24 User 2875 COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U-VALUE Construction Components Outside Air Film 1. Roofing, Built-Up 2. Membrane, Vapor-Permeable Felt. 3. Plywood 4. Air Space 5. Insulation, Mineral Fiber, R-19 6. Acoustical Tile, Interior Finish 7. 8 . 9 . Inside Air Film Assembly Name: R-19 Roof(R.19 on Tile) Assembly Type: Roof Assembly Tilt: 22 deg (Tilted Up) Framing Material: Wood Framing Spacing: II 0.C. Framing Percent: 10.0 % Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Th R-Value Fr (in) Cavity Frame 0.375 0.010 0.500 12.000 6.000 0.500 0.17 0.33 0.06 0.62 0.80 19.00 1.43 0.17 0.33 0.06 0.62 0.80 19.00 1.43 Unadjusted R-Values 0.61 23.02 0.61 23.02 ADJUSTMENT FOR FRAMING (1 /23.02) X (0.90) + (1 /23.02) X (0.10) = 0.043 Weight: Heat Capacity: 4.6 lb/sqft 1.45 TOTAL U-VALUE = TOTAL R-VALUE = 0.043 ===== 23.02 ===== CERTIFICATE OF COMPLIANCE (part 1 of 2) Project Name: 2233 Faraday Ave., Suite K-M Address: 2233 Faraday Ave., Suite K-M Carlsbad, CA 92008 Lighting Designer: Documentation: Haynal & Co., Inc. GENERAL INFORMATION LTG-1 page 11 of 19 Date: 12/8/1995 Building Permit No Checked by/ Date COMPLY 24 User 2875 Date of Plans: =-----r--=-_,..... Building Conditioned Floor Area: 822 sf Building Type: Nonresidential Climate Zone: 7 Phase of Construction: O New Construction Method of Lighting Compliance: Prescriptive STATEMENT OF COMPLIANCE X Addition O Alteration This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Part 6, Chapter 1 and Title 20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula- tions. This certificate applies only to building lighting requirements. The Principal Lighting Designer hereby certifies that the proposed build- ing design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in sections 110, 119, 130 through 132 and 146 or 149. Please check one: O I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer electrical engineer or architect. ~I affi;m that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing docu- ments for work that I have contracted to perform. O I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section~---of the Code to sign this document as the person responsible for its preparation; and for the following reaso =----=------------- PRINCIPAL LIGHTING DESIGNER Date LIGHTING MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures: CERTIFICATE OF COMPLIANCE (part 2 of 2) Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. INSTALLED LIGHTING SCHEDULE No of Watts/ Ballast Name Lamp Type Lamps Lamp Type LTG-1 page 12 of 19 Date: 12/8/1995 COMPLY 24 User 2875 Ballasts/ No of Note to Luminaire Fixt. Field -------------------------------·----------------------------- Fluorescent 3 34 Standard 1.5 MANDATORY AUTOMATIC CONTROLS Control Control Location ID Control Type CONTROLS FOR CREDIT Control Control Location ID Control Type Space Controlled Space Controlled 12 Note to Field Note to Field LIGHTING COMPLIANCE SUMMARY Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. ACTUAL LIGHTING POWER Name Description 48" T-12 Low Watt /3 Lamp (Tandem) No of Lumin --® LTG-2 page 13 of 19 Date: 12/8/1995 COMPLY 24 User 2875 Watts per ----- 108.0 Default ------- y -- Total Watts 1296.0 SubTotal 1296 Less Control Credits (LTG-3) O Total Proposed Watts 1296 * If not CEC Default value, please provide supporting documentation. ALLOWED LIGHTING POWER BY SPACE Allowed Floor LPD Total Tailored Space Name Occupancy Area (w/sf) (watts) (watts) ------------------------- Office Office 822 1.600 1315 0 ------------------------- TOTALS 822 1.600 1315 0 * Note: Tailored Allotment requires supporting documentation on form LTG-4. CERTIFICATE OF COMPLIANCE (part 1 of 3) Project Name: 2233 Faraday Ave., Suite K-M Address: 2233 Faraday Ave., Suite K-M Carlsbad, CA 92008 Mechanical Designer: Documentation: Haynal & Co., Inc. GENERAL INFORMATION MECH-1 page 14 of 19 Date: 12/8/1995 Building Permit No Checked by/ Date COMPLY 24 User 2875 Date of Plans: '""'"""---r--=-~ Building Conditioned Floor Area: 822 sf Building Type: Nonresidential Climate Zone: 7 Phase of Construction: O New Construction X Addition O Alteration Method of Mechanical Compliance: Prescriptive Proof of Envelope Compliance: O Previous Permit X Compliance Attached STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Part 6, Chapter 1 and Title 20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula- tions. This certificate applies only to building mechanical requirements. The Principal Mechanical Designer hereby certifies that the proposed build- ing design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the mechanical requirements contained in sections 110 through 115, 120 through 124, 140 through 142,144 and 145. Please check one: O I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a civil engineer mechanical engineer or architect. /r affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing docu- ments for work that I have contracted to perform. O I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section-=----of the Code to sign this document as the responsible for its preparation; and for the following r as PRINCIPAL MECHANICAL DESIGNER MECHANICAL MANDATORY MEASURES Indicate location on plans of Note Block for Mandatory Measures: CERTIFICATE OF COMPLIANCE (part 2 of 3) Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. SYSTEM FEATURES Zone Name Office Time Control S Setback Control None-- # of Isolation Zonesn/a HP Thermostat Yes Electric Heat 0.0 KW Fan Control Constant Volume VAV Min Position n/a Simul. Heat/Cool n/a Heat Supply Reset Constant Temp Cool Supply Reset Constant Temp Ventilation B OA Damper Control --A-- Economizer Type No Economizer Outdoor Air CFM 123 Heat Equip Type Heat Pump Make & Model No. Rheem RQKA-A030JK Cool Equip Type DX Make and Model Code Tables Time Control S:Prog Switch O:Occ Sensor M:Man Timer Ventilation B:Air Balance C:OA Cert. M:OA Measure D:Demand Cont N:Natural OA Damper A:Auto G:Gravity MECH-1 page 15 of 19 Date: 12/8/1995 COMPLY 24 User 2875 Note to Field CERTIFICATE OF COMPLIANCE (part 3 of 3) Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. DUCT INSULATION System Name Type Duct Location -------------------------------------------------Rheem RQKA-A030JK Heating Ducts in Attic Cooling Ducts in Attic PIPE INSULATION Insul System Name Pipe Type Required Domestic Hot Water y I N NOTES TO FIELD -For Building Department Use Only MECH-1 page 16 of 19 Date: 12/8/1995 COMPLY 24 User 2875 Duct Tape Allowed ------- y I N y I N Insul R-Val ----- 4.2 4.2 Note to Field ------- Note to Field MECHANICAL SIZING AND FAN POWER MECH-2 page 17 of 19 ---------------------------------------------------------------------------Project Name: 2233 Faraday Ave., Suite K-M Date: 12/8/1995 Documentation: Haynal & Co., Inc. SIZING AND EQUIPMENT SELECTION HVAC Zone Name: Heating System Name: Cooling System Name: System Multiplier: Peak Load Method: Relative Humidity: 1. DESIGN CONDITIONS FOR Carlsbad 2. SIZING SPACES SERVED BY SYSTEM Office Warehouse PEAK (Jan 12am) (Jan 12am) TOTAL SPACE LOAD Duct Gains & Losses: Ventilation: ( 403 CFM) Return Air Lighting Gain TOTAL SYSTEM LOAD 3. SELECTION A. Safety/Warmup Factor B. Maximum Adjusted Load C. Installed Equipment Capacity If Line 3-C > Line 3-B, Explain: FAN POWER CONSUMPTION No. Fan Description Sys BHP -------------------------- Supply Fan 1 X 0.20 I COMPLY 24 User 2875 Office Rheem RQKA-A030JK Btu/hr ------- 4577 0 ------- 4577 458 13910 ------- 18945 1.43 27091 23772 HEATING 38 F PEAK (Aug 3pm) (Aug 3pm) 1 COINCIDENT 50 % COOLING SENSIBLE LATENT 83 F 67 F Btu/hr Btu/hr -------------- 15396 1253 0 0 -------------- 15396 1253 1540 2173 514 0 -------------- 19109 1767 1.21 23122 19557 11220 --------------------- Efficiency Peak Conv Peak Supply Motor Drive HP Fact Watts CFM -------------------------- [O. 60 X 1. 00] = 0.33 X 746 = 249 1000 ---------------- Totals 0.33 249 1000 FAN POWER DEMAND 249 watts/ 1000 cfm = 0.249 watts/cfm MECHANICAL EQUIPMENT SUMMARY Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. CENTRAL SYSTEM SUMMARY Sys No MECH-3 page 18 of 19 Date: 12/8/1995 COMPLY 24 User 2875 No System Name System Type Sys Economizer Type 1 Rheem RQKA-A030JK Packaged Heat Pu 1 No Economizer CENTRAL SYSTEM RATINGS Sys-------Heating----------------------------------Cooling---------- No Type Output Aux KW EFF Type Output Sensible EER SEER 1 Heat Pump 29000 0.0 6.80 DX 29000 CENTRAL FAN SUMMARY------------Supply Fan Sys No Fan Type Motor Location CFM BHP Mtr Drv Eff Eff 1 Constant Volume Draw-Through ZONAL FAN SUMMARY Space Name None No CFM 1000 Zonal Fan Mtr BHP Eff 0.20 60 100 Drv Eff No CFM 19000 9.05 10.00 Return Fan Mtr Drv CFM BHP Eff Eff None Exhaust Fan Mtr BHP Eff Drv Eff MECHANICAL VENTILATION Project Name: 2233 Faraday Ave., Suite K-M Documentation: Haynal & Co., Inc. VENTILATION SUMMARY BY SPACE Floor Space Name T Occupancy Area ------------------------------------------ Office Office 822 sqft /Occ 143 MECH-4 page 19 of 19 Date: 12/8/1995 COMPLY 24 User 2875 Tran CFM Min Design sfer /Occ CFM CFM CFM ------ 21.5 123 123 ------ TOTALS 123 123 Note: If Tailored (T=*), user must document sqft/Occ and/or CFM/Occ values. MANDATORY REQUIREMENTS ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL) 1. Exterior manufactured doors, windows, and fenestration products shall meet the infiltration and U-value certification requirements of Section 116(a). 2. Site-constructed doors, skylights, and windows shall be caulked and weather-stripped per Section 116(b). 3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to limit infiltration and exfiltration per Section 117(a). 4. Certified insulation materials per Section 118(a). 5. Urea Formaldehyde foam insulation installed per Section 118(b). 6. Insulation installed to meet flame spread and smoke density requirements per Section 118(c). LIGHTING MANDATORY MEASURES 1. Each enclosed area shall have independent controls (per Section 131 (a) and exceptions). 2. Lighting shall be uniformly reducible by one half in areas which are greater than 100 sf, exceed 1.2 watts/sf, and have more than one luminaire (per Section 131 (b) and exceptions; exceptions include lights in corridors). 3. Daylit areas larger than 250 sf shall be separately controlled and uniformly_ reducible by one half (per Section 131 (c) and exceptions). 4. Separately metered spaces 5,000 sf or greater shall have automatic shutoff controls (per Section 131 (e), no exceptions). 5. Display lighting shall be separately switched on circuits that are 20 amps or less (per Section 131 (e), no exceptions). 6. Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131 (f) and exceptions). 7. Pairs of one-lamp and three-lamp fluorescent luminaires shall be tandem-wired where reasonable (per Section 132 and exceptions). MECHANICAL AND PLUMBING MANDATORY MEASURES Equipment and Systems Efficiency 1. HVAC and service water heating equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112. 2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HVAC equipment, shall be insulated in accordance with Section 123. 3. Air handling duct systems shall be sealed in accordance with the SMACNA HVAC Ducts Construction Standards, Metal and Flexible, 1985, per Section 124(a) and (b). Ducts shall be installed and insulated as provided in UMC, Chapter 1 O. 4. Pilot lights shall not be installed for natural gas central furnaces, and pool and spa heaters, per Section 115. Ventilation 1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121 (a), (b) and (e). 2. Operation and control of outdoor air shall meet the time-of-occupancy and pre-occupancy requirements of Section 121 (c). 3. When a return plenum is used to distribute outdoor air to a covered HVAC unit, the ducted discharge shall be in accordance with Section 121 (d). 4. Systems shall meet the completion and balancing requirements of Section 121 (f). Controls 1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone. Heating shall be adjustable down to 55 degrees or lower, and cooling shall be adjustable up to 85 degrees or higher. The control shall provide a dead-band of5 degrees between heating and cooling, Section 122(a) and (b). 2. Heat pumps with supplementary electric resistance heaters shall have controls per Section 112(b). 3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours of up to four hours, per Section 122(e)1. 4. Thermostat setup and setback controls are required if the summer design dry bulb temperature is more than 99 degrees F, or if the winter design temperature is less than 33 degrees, per Section 122(e) 2, and its exceptions. 5. Outdoor air supply and exhaust equipment shall be installed with dampers that automatically close during periods of non-use for the areas served by the equipment, per Section 122(f). 6. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be designed, installed, and controlled to serve isolation areas, per Section 122(g). SERVICE WATER HEATING SYSTEMS 1. Temperature controls and recirculating pump controls shall meet the requirements of Section 113(a) and (b). 2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113(b}3. 3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b}4.