HomeMy WebLinkAbout2233 FARADAY AVE; B | C; CB951681; Permit12/12/95 17:11
Page 1 of 1
B U I L D I N G P E R M I T Permit
Project
Development
B-C
No: CB951681
No: A9502455
No:
Job Address: 2233 FARADAY AV
Permit Type: INDUSTRIAL TENANT IMPROVEMENT
Parcel No: 212-061-25-00
Suite:
Lot#:
Valuation: 18!720
Occupancy Group: B2 Reference#:
Description: WAREHOUSE TO OFFICE-WALLS, ELC
: NEW HVAC UNIT,CEILING UPGRADE
5127 12/l.2/"95 0001 !)1
Construction tr-y~ter:
Status:
Applied:
Apr/Issue:
Entered By:
619-471-9388
VN .:i.7l; ~· ""
ISSUED
11/16/95
12/12/95
RMA
Appl/Ownr: CSI
135 VALLECITOS DE ORO, #A
SAN MARCOS, CA 92069
*** Fees Required *** .. / -;;;~·::---.. Fee·s---,Collected & Credits ---------------------------,-,,.---~-' ',// ,· ~,~:> ,, / _;· -~ ' /'~,, '· 1 , 8 7 )3'. 0 0 , , · ) ·" , '· 1 : :. : · , ·.,
/ . oo,>" 1 ·'J:o::ta1>ftredi~s: . oo
1,1878. oo\ ... _.) Total· (;I?,ay-ine:nt~,: 12 9. O O
Fees:
Adjustments:
Total Fees:
***
/ "'-. -Ba'1,aiic~: .,D~e :\ 1 , 7 4 9 . 0 0
Fee description / '') ¾ ...... / /:.· ,,,:-~Uiiit~,. (f~~e/Un~t Ext fee Data -;~ii~i~~-~~~~i~---~-t:::;-~-7-----------~--------\~~~~~~-~-------~;~~~~-----
p lan Check '· .... ,., ·~-,-0• ,, 12 9 . 0 0
Strong Motion Fee; 0 . ,, 4.00
Enter Number ·of Ef?U'\i ::_; Water 9;$,e\,> \" · 456. 00
Enter "Y" to Au!od:lc Lic·~~Jet./-5{
1
.f \ ~41. 00 Y
(Lie trx) C.F._t>'\ .,;,.~....._, \ , 314.00
\ (T:J:F ,E'JJXtp,,\· \ I) 12 4. 0 0
1 {TIF CPD Fund)-' ::·: ... ·, ./' ,, 114. 00 \ . ' . . \ .. · Enter Bridge Fee , ',; : liJc-~r ~·9 ... 4~54 00 / .. * BUILDING 'l'OTAL \\ .. <: '"' '· .,_,,..;;,~2 .. , _,_, ,..:-. , / ·
Enter "Y" for Electric......,Ii~:Y.~·,F'.ee_-···>· · :·:,,
Enter "Y" for Temporary"-pertr_.iq~ /,/ ,?:·. ·.,· \ :·:..:-__<··'·
* ELECTRICAL TOTAL ""·· ,.;: .! J ; 1·. \ > ,..
Enter 'Y' for Mechanical I;~ue Pei>
Install Furn/Ducts/Heat Pumps · ·-. ->
* MECHANICAL TOTAL
1 9.00
154.00
1834,00
10.00 Y
10.00 Y
20.00
15.00 Y
9.00
24.00
APPROVAL
iNSP. -----DATE -¢,fit CLEARANCE _____ ,
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
I
)1
I iPPllCATION
.farlsbad Building Department
Palmas Dr., Carlsbad, CA 92009 (61.9-Y.438-1161
/ f
jrI'1YPE
/t 1 (see back) give code of Permit-Type: ___ :J;._..] ____ 'I,.~------
idential Pro'ects Onl : From Llst 2 (see back) give
/of Structure-Type: _____________________ _
kiss/Gain of Dwelling Units
, RQJECf INFORMATION
~V~DJ!, 7 i-9:m; ()p
VAIID.BY_--l'f'-r'~--c:---c-----
DATE:.__ _____ -1-ll-l-.U,.-,.,,.;;...,.,.,!::...._
4696 11/16/95 0001 01
129-00
FOR OFFICE USE ONLY
/1-'iddress --z,,z...~ ~ ~ttd.Gty Bmldmg or Suite No.
'Nearest Cross Street ~ ey!
hGAL DESCRIPTION Lot No. Subd1vis10n Name/Number Umt No . Phase No.
/
I 2 Energy Cales D 2 Structural Cales D 2 Soils Report D 1 Addressed Envelope . ~-----=-----'-------ASSESSOR'S PARCEL EXISTING USE PROPOSED USE
DEscruPTION oF woRK JiJ N se ·w Of:-c IV r:.,w H vA-c.. ,.h,_ , r / ~L-'-rS 1 (CJ" L-1 /;t
I
I # OF BEDROOMS # OF]A~
ADDRESS
DAYTELEPHONE 1-1 f-:--'l'3g'r
STATE ZIP CODE DAY TELEPHONE
ADDRESS <2,.'2-,-'33 fcv-euJ..~ 4ve..
ZIP CODE ~oor DAY TELEPHONE g-.,,, :lb 3
CITY~O'v" ~ STATE a. ADDRESS \~ V-0\,L-~\tc, s ~Q.,-o ~ A
ZIP CODE'1,%>~CC DAY TELEPHONE + 71 -°1,~&f
STATE UC.# -71)/o UCENSE CLASS 12 CITY BUSINESS UC. #
ast name 1rst
CITY ~ STATE ZIP CODE DAY TELEPHONE STATE UC.#
1. WORKERS' COMPENSATION
Workers' Compensation Declaration: I hereby atfirm that I have a cert1hcate of consent to self-msure issued by the DJrector of lndustnal
Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified
by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. C).
INSURANCE COMPANY ~..{-e, --$RATION DATE /-" f-q h
SIGNATURE DATE
8. oWNER-BOIIJJER DEC1ARA'rlON
D
D
D
Owner-Builder Declaration: I hereby athrm that I am exempt from the Contractors Llcense Law for the followmg reason:
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or
offered for sale (Sec. 7044, Business and Professions Code: The Contractor's Llcense Law does not apply to an owner of property who builds
or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended
or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden
of proving that he did not build or improve for the purpose of sale.).
I, as owner of the property, am exclusively contracting with li!:ensed contractors to construct the project (Sec. 7044, Business and Professions
Code: The Contractor's Llcense Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects
with contractor(s) licensed pursuant to the Contractor's Llcense Law).
I am exempt under Section _______ Business and Professions Code for this reason:
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the
provisions of the Contractor's Llcense Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code)
or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars [$500]).
SIGNATURE DATE
COMPLETt: THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and
prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?
0 YES D NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
DYES ONO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?
0 YES D NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE~ AFTER JULY 1, 1989 UNLESS THE APPUCANT
HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POILUTION OON1ROL DISfRICT.
1s permit 1s issue
I cert1ty that 1 nave react the apphcatton and state that the at>ove mformat1on 1s correct. I agree to comply with all City ordmances and State laws
relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection
purposes. I ALSO AGREE 10 SAVE INDEMNIFY AND KEEP HARMLESS THE Cl'IY OF CARISBAD AGAINSf AIL UABILITIES, JUDGMENTS, COSI'S
AND EXPENSF.S WHICH MAY IN ANY WAY ACCRUE AGAINSf SAID Cl'IY IN OONSEQUENCE OF THE GRANTING OF TIIlS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the
building or work authorized by such permit is not c menced within 365 days from the date of such permit or if the building or work authorized by
such permit is suspended or aban n a tim a ter the work is co ed for a period of 180 days (Section ~~ Uniform Building Code).
APPUCANTS SIGNATURE . {.,,, lb _,,,_{{_) DATE: ___ _
ile YELLOW: Applicant PINK: Finance
S E W E R P E R M I T
12/12/95 17:09
Page 1 of 1
Job Address: 2233 FARADAY AV
Permit Type: SEWER -OFFICE/WAREHOUSE
Parcel No: 212-061-25-00
Description: WAREHOUSE TO OFFICE-822 SF
Suite: K-M
WALLS, CEILING,ELECT & MECH UPGRADES
Permitee: CSI
135 VALLECITOS DE ORO, STE A
SAN MARCOS, CA 92069
619-471-9388
Permit No: SE950126
Bldg Planck#: CB951680
Status: ISSUED
Applied: 11/28/95
Apr/Issue: 12/12/95
Expired:
Prepared By: MAM
*** Fees Required *** **;fe.--., --1:_~es Collected & Credi ts
-··' _.,.,,. ------------.",JL,--.. ----------------------------
***
Fees:
Adjustments:
Total Fees:
' \
/
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
,. CITY OF CARLSBAD
INSPECTION REQUEST
PERMIT# CB951681 FOR 05/10/96
DESCRIPTION: WAREHOUSE TO OFFICE-WALLS, ELC
NEW HVAC UNIT,CEILING UPGRADE
TYPE: ITI
JOB ADDRESS: 2233
APPLICANT: CSI
CONTRACTOR:
OWNER:
FARADAY AV
REMARKS: MW/DAVE/471-9388
SPECIAL INSTRUCT:
TOTAL TIME: ----
--RELATED PERMITS--PERMIT# TYPE
SE950127 SWOW
PHONE:
PHONE:
PHONE:
STATUS
ISSUED
INSPECTOR AREA TP
PLANCK# CB951681
OCC GRP B2
CONSTR. TYPE VN
STE: B-C LOT:
619-471-938
CD LVL DESCRIPTION ACT COMMENTS
# 19 ST Final Structural
29 PL Final Plumbing
39 EL Final Electrical
49 ME Final Mechanical
~---
----------------------·-----,.-------------------------------
***** INSPECTION HISTORY*****
DATE
011796
121995
121995
121995
121595
121495
121495
DESCRIPTION
Final Combo
Frame/Steel/Bolting/Welding
Rough Electric
Rough/Ducts/Dampers
Frame/Steel/Bolting/Welding
Frame/Steel/Bolting/Welding
Rough Electric
ACT INSP
CO TP
AP TP
AP TP
AP TP
PA PK
CO TP
CO TP
COMMENTS
TITLE 24 ISS.ROOF ACCESS EQPT
T=BAR@ 102
CEIL LITES@ 102
DUCTS@ 102 & 103
WALLS
NO PLANS OR CARD
NO PLANS OR CARD
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING cf1lm.' PLANNING · U/M WATER
PLAN CHECK#: CB951681
PERMIT#: CB951681
PROJECT NAME: WAREHOUSE TO OFFICE-WALLS, ELC
NEW HVAC UNIT,CEILING UPGRADE
ADDRESS: 2-fi£1t.iaioA~-·Av-~tr1:f1t~-cs--e-:~ ----11'
CONTACT PERSON/PHONE#: MW/DAVE
SEWER DIST: CA WATER DIST: CA
DATE: 01/17/96
PERMIT TYPE: ITI
=.-==========================.============:rn=-=====~~,:::::---------==-= -=-=-
INSPECTED . ...-\ DATE ,/) b BY: ~.&. INSPECTED: APPROVED
6 ( DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
=======================~=-===============-=-==========:...:..======-====== COMMENTS:
EsGil Corporation
Professiona{ P{an !R.§.view 'Engineers
DATE: December 12, 1995
JURISDICTION: Carlsbad
PLAN CHECK NO.: 95-1681
PROJECT ADDRESS: 2233 Faraday, Suites B-C
PROJECT NAME: Office T. I. ALLAR-TIC
SET: II
~NT
~) CJ FIRE
CJ PLAN REVIEWER
CJ FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's *********** codes.
• The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
• Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Dave Johnson
Date contacted: 12/12/95 (by: Abe) Telephone #: Appt.
• REMARKS: Compliance with Title 24 Disabled Access Regulations to be verified bv the
City Building Official. Applicant to carry approved set of plans to the city. Ok'd by Raenette.
By: Abe Doliente
Esgil Corporation
D GA D CM D GP D PC 12/12/95
Enclosures:
trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
EsGil Corporation
Professiona{ Pfan !R.f,view 'Engineers
DATE: November 28, 1995
JURISDICTION: Carlsbad
PLAN CHECK NO.: 95-1681
PROJECT ADDRESS: 2233 Faraday Suites B-C
PROJECT NAME: Office T. I. ALLAR-TIC
SET:I
Cl FIRE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's*********** codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's ********** codes
when minor deficiencies identified below are. resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
• The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
• The applicant's copy of the check list has been sent to:
Dave Johnson
145 Los Vallecitos De Oro, Suite F, San Marcos, CA 92069
• Esgil Corporation staff did not advise the applicant that the plan check has been completed.
D Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted:
Date contacted:
D REMARKS:
By: Abe Doliente
Esgil Corporation
(by:
• GA D CM D GP D PC
) Telephone #:
Enclosures:
11/20/95 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 95-1681
November 28, 1995
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: 95-1681
OCCUPANCY: B-2
JURISDICTION: Carlsbad
USE: Offices
TYPE OF CONSTRUCTION: V-N
ALLOWABLE FLOOR AREA: Existing
ACTUAL AREA: 520 SF (T. I. only)
STORIES: ?
SPRINKLERS?: Yes
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: November 28, 1995
FOREWORD (PLEASE READ):
HEIGHT:
OCCUPANT LOAD:
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 11/20/95
PLAN REVIEWER: Abe Doliente
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department,
Fire Department or other departments. Clearance from those departments may be required
prior to the issuance of a building permit.
Code sections cited are based on the 1991 UBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 303 (c),
1991 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process, ple~se note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
LIST NO. 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1991UBC) tiforw.dot
Carlsbad 95-1681
November 28, 1995
1. Please make all corrections on the original tracings and submit two new sets of
prints, to:
2.
3.
4.
5.
6.
7.
8.
Esgil Corporation, 9320 Chesapeake Drive, Suite #208, San Diego, CA 92123,
(619) 560-1468 or to the jurisdiction's building department.
Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes. Business and
Professions Code.
UBC Section 304 requires the Building Official to determine the total value of all
construction work proposed under this permit. The value shall include all finish
work, painting, roofing, electrical, plumbing, heating, air conditioning, elevator,
fire extinguishing systems and any other permanent equipment. Please provide a
signed copy of the designer's or contractor's construction cost estimate of all
work proposed.
Indicate the use of all spaces adjacent to the area being remodeled or improved.
Show any ·existing fire rated area separation walls, occupancy separation walls,
demising walls, shafts or rated corridors. Identify and provide construction details
for proposed new fire rated walls.
The tenant space and new and/or existing facilities serving the remodeled area
must be accessible to and functional for the physically disabled. See the
attached correction sheet. Title 24, Part 2.
The width of the required level area on the side into which doors swing shall
extend 24 inches past the strike edge for exterior doors, 18 inches past the strike
edge for interior doors and extend 12" past the strike edge on the push side
if door has latch and closer. Section 2-3304, Title 24. Check door 1.
Please see the following mechanical and energy corrections.
+ PLUMBING, MECHANICAL AND ENERGY CORRECTIONS
+ JURISDICTION: Carlsbad DATE: 11/28/95
SET: I + PLAN REVIEW NUMBER: 95-1681
+ PLAN REVIEWER: Glen Adamek
• MECHANICAL (UNIFORM MECHANICAL CODE)
9. Provide mechanical plans showing existing and proposed HVAC equipment,
ducts and access to equipment.
Carlsbad 95-1681
November 28, 1995
10. Detail ladder access to roof mounted HVAC equipment.
11. Detail disposal of main c.ondensate drainage from air conditioning units. (UMC
Section 510)
• ENERGY CONSERVATION
NOTE: Plans submitted after July 1, 1995 must comply with the new energy
standards.
12. Provide complete lighting energy designs for the proposed changes in lighting
systems in the existing conditioned space. Provide the completed L TG-forms
showing lighting energy compliance.
13. On the plans clearly show the wall insulation locations, thickness, and R-values,
as per the energy design. The plans and the energy design do not show the
construction of the closing of.the existing roll-up door. .
14. Complete energy plan check will be done when complete corrected energy
designs are provided.
Note: If you have any questions regarding this plan review list please contact
Glen Adamek at (619) 560-1468. To speed the review process, note on this list
(or a copy) where the corrected items have been addressed on the plans.
• MISCELLANEOUS
15. To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
16. Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
• Have changes been made to the plans not resulting from this correction list? Please
indicate:
Yes D No D
Carlsbad 95-1681
November 28, 1995
17. The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
619/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Abe Doliente at
Esgil Corporation. Thank you.
DISABLED ACCESS REQUIREMENTS FOR REMODELS1
(alterations, structural repairs, additions, tenant improvements and occupancy changes)
A GENERAL
Full access compliance is required for remodels, including:
1. The specific area being remodeled, (i.e., the "new" work).
2. Existing elements in the path of travel to the remodeled area.
(a)Parking, (b)Walks, (c)Hazards, (d)Curb Ramps, (e) Ramps, (f)Elevators, (g) Stairs.
3. Entrance to the remodeled area.
(a)Entrance doors, (b)Exit doors.
4. Existing sanitary facilities serving the remodeled area.
5. Existing drinking fountains and telephones serving the remodeled area.
B. REMODELS VALUED LESS THAN $80,7102
When remodels are valued at less than $80,710, the total access compliance may be limited to the
specific area being remodeled (i.e., "new" work), provided the following conditions are satisfied:
1. The cost to upgrade the existing elements (described in A.2, A.3, A.4 and A.5 above)
exceeds 20% of the cost of the proposed project, and
2. The enforcing agency determines that "an unreasonable hardship" exists (see the attached
Form HA-1, to be completed by the applicant), and
3. The plans must still show upgrades to the existing elements, but only to the point where the
cost to do so will equal 20% of the cost of the proposed project. In choosing which elements to upgrade, the
following priority list should be used: (a) Entrance to the building (b) Route of travel (c) Restrooms
(d) Public telephones (e) Drinking fountains (f) Other elements, such as parking, alarms, signage, etc.
2Note: In determining the value of a remodel, the total costs of all improvements over the last 3 years along the same
path of travel must be included (even if the previous remodels were done by other tenants). The 20-percent provisions
for determining if upgrade costs are disproportionate and for determining the amount to spend on upgrades shall be
based on this tota/value. Please complete the attached declaration form (Form HA-1).
DAT!
11/29/95
Carlsbad 95-1681
November 28, 1995
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1681
PREPARED BY: Abe Doliente DATE: November 28, 1995
BUILDING ADDRESS: 2233 Faraday Suites B-C BUILDING OCCUPANCY: B-2
TYPE OF CONSTRUCTION: V-N
BUILDING PORTION BUILDING AREA
(sq. ft.)
Office T. I. 520 SF
Air Conditioning
Fire Sprinklers
TOTAL VALUE
UBC Building Permit Fee:
UBC Plan Check Fee:
Comments: ESGIL FEE= 0.80 X 128.70 = $ 102.96
VALUATION
MULTIPLIER
36.00
VALUE
($)
18,720
18,720
$ 198.00
$ 128.70
Sheet 1 of 1
valuefee.dot
.,
City of Carlsbad
· M#i•t•i ilt44ii•t·I •24·Sliii,t4•ii
BUILDING PLANCHECK CHECKLIST
DATE: //-Ji. 1~ 9 5 =1---PLANCHECK NO . ....,a:;C-=-8 ___ _
BUILDING ADDRESS: ;? ~ d 3 ~-4£~ ·
PROJECT DESCRIPTION: __,!,_I --=.r~------v _______ ...,..,,...---=-=--:::---"9.e-
ASSESSOR's PARCEL NUMBER: _________ EST. VALUE /gJ 2r!l0-
ENGINEERING DEPARTMENT
APPROVAL
The item you have submitted for review has been
approved. The approval Is based on plans, information
and/or specifications provided in your submittal; therefore
any changes to these items after this date, including field
modifications, must be reviewed by this office to insure
continued conformance with applicable codes. Please
review carefully all comments attached, as failure to
comply with Instructions in this report can result in
suspension of permit to build.
DENIAL
Please see the attached report of deficiencies marked
with D Make necessary corrections to plans or
specifications for compliance with applicable codes and
standards. Submit corrected plans and/or specifications
to this office for review.
By: __________ Date: ___ _
D ~ ~ .A Right-of-Way permit is required prior to construction --------------
of the following improvements:
ATTACHMENTS
D Dedication Application
D Dedication Checklist
D Improvement Application
D Improvement Checklist
D Future Improvement Agreement
D Grading Permit Application
D Grading Submittal Checklist
D Right of Way Permit Application
D Right of Way Permit Submittal Checklist
and Information Sheet
D Sewer Fee Information Sheet
By: _________ Date: ___ _
ENGINEERING DEPT. CONTACT PERSON
NAM~'72;2~
City of Carlsbad
ADDRESS: 2075 Las Palmas Dr .• Carlsbad, CA 92009
PHONE: (619) 438-1161, Ext. =re?/ 5
A-4
P:\DOCS\CHKLST\BP0001.FRM REV 05/11 /94
2075 Las Palmas Dr.• Carlsbad, CA 92009-1576 • (619) 438-1161 • FAX (619) 438-0894
• ;.
BUILDING PLANCHECK CHECKLIST
SITE PLAN
1 sV2ndv' 3rdv'
10 D D 1. Provide a fully dimensioned site plan drawn to scale. Show:
~D D
D D D
D
A. North Arrow D. Property Lines Easements
B. Existing & Proposed Structures E. Easements
C. Existing Street Improvements F. Right-of-Way Width & Adjacent Streets
2. Show on site plan:
A. Drainage Patterns C. Existing Topography
B. Existing & Proposed Slopes
3. Include note: "Surface water to be directed away from the building foundation at a 2%
gradient for no less than 5' or 2/3 the distance to the property line (whichever is less)."
[Per 1985 UBC 2907(d)5].
On graded sites, the top of any exterior foundation shall extend above the elevation
of the street gutter at point of discharge or the inlet of an approved drainage device
a minimum of 12 inches plus two percent'' (per 1990 UBC 2907(d)5.).
4. Include on title sheet
•'
A. Site address
B. Assessor's Parcel Number
C. Legal Description
For commercial/industrial buildings and tenant improvement projects, include: Total
building square footage with the square footage for each different use, existing sewer
permits showing square footage of different uses (manufacturing, warehouse, office,
etc.) previously approved.
EXISTING PERMIT NUMBER -DESCRIPTION
P:\DOCS\CHKLS1\BP0001.FRM Page 1 of 4 REV 05/11 /94
7
I'
BUILDING PLANCHECK CHECKLIST
DISCRETIONARY APPROVAL COMPLIANCE
1 ndv' 03rdv' s.
Project does not comply with the following Engineering Conditions of approval for Project No. _______________________ _
Conditions were complied with by: ______ _ Date: -------
DEDICATION REQUIREMENTS
6. Dedication for all street Rights-of-Way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and for
remodels with a value at or exceeding $ ______ -pursuant to Code Section
18.40.030. .
Dedication required as follows: ________________ _
Attached please find an application form and submittal checklist for the dedication
process. Provide the completed application form and the requirements on the
checklist at the time of resubmittal.
Dedication completed by ___________ _ Date: ----
IMPROVEMENT REQUIREMENTS
7a. All needed public improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the construction
exceeds $ -pursuant to Code Section 18.40.040.
Public improvements required as follows: _____________ _
Please have a registered Civil Engineer prepare appropriate improvement plans and
submit them togetherirwith the requirements on the attached checklist for a separate
plancheck process through the Engineering Department. Improvement plans must be
approved, appropriate securities posted and fees paid prior to issuance of permit.
Attached please find an application form and submittal checklist for the public
improvements requirements. Provide the completed application form and the
requirements -on the checklist at the time of resubmittal.
Improvement Plans signed by: __________ _ Date: ___ _
P:\DOCS\CHKLST\BP0001.FRM Page 2 of 4 REV 05/11 /94
BUILDING PLANCHECK CHECKLIST
1 stv' 2ndv' 3rdv' D D D 7b. Construction of the public improvements may be deferred pursuant to code Section
18.40. Please submit a recent property title report or current grant deed on the
property and processing fee of $ ________ so we may prepare the
necessary Future Improvement Agreement. This agreement must be signed, notarized
and approved by the City prior to issuance of a Building Permit.
Future public improvements required as follows:. ___________ _
Improvement Plans signed by: __________ _ Date: ___ _
D D D 7c. Enclosed please find your Future Improvement Agreement. Please return signed and
notarized Agreement to the Engineering Department.
D
Future Improvement Agreement completed by:. ____________ _
Date: ·--------
7d. No Public Improvements required. SPECIAL NOTE: Damaged or defective
improvements found adjacent to building site must be repaired to the satisfaction of
the City Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section 11.06.030
of the Municipal Code.
D D D 8a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities (cut, fill import, export).
D D D Sb. Grading Permit required. A separate grading plan prepared by a registered Civil·
Engineer must be Submitted together with the completed ap.plication form attached.
NOTE: The Grading Permit must be issued and rough grading approval obtained prior
to issuance of a Building Permit.
Grading Inspector sign off by: ________ _ Date: ___ _
8c. No Grading Permit required.
P:\DOCS\CHKLS1\BP0001.FRM Page 3 of 4 REV 05/11 /94
-,
BUILDING PLANCHECK CHECKLIST
MISCELLANEOUS PERMITS
1~~nd./ 3rd./ 'li]r~ D D 9. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the public Right-of-Way. Types of work include, but are not
limited to: street improvements, trees, driveways, tieing· into public storm drain, sewer
and water utilities.
D
D
Right-of-Way permit required for ________________ _
A separate Right-of-Way permit issued by the Engineering Department is required for
the following: ______________________ _
1 o. A SEWER PERM IT is required concurrent with the building permit issuance. The fee
is noted in the fees section on the following page.
11. INDUSTRIAL WASTE PERMIT is required. Applicant must complete Industrial
Waste Permit Application Form and submit for City approval prior to issuance of a
Permit.
Industrial waste permit accepted by:, ______ _ Date: ----
P:\DOCS\CHKLST\BP0001,FRM Page 4 of 4 REV 05/11 /94
ENGINEERING DEPARTMENT ENGINEERING REVIEW SECTION
FEE CALCULATION WORKSHEET
D Estimate based on unconfirmed information from applicant.
~lculation based on building plancheck plan submittal.
Address:i?< a 3--3 --f~ Bldg. PermitNo.C,l3 9S /ft;,?/
Prepared by/1JA J,11._ Date://-,;) f-Z 5 Checked by: ,.& Date: /:~s"
EDU CALCULATIONS: List types and square footages for all uses. ,../" ,1 fcD o ;3 C/ o+-F,-c-e_ ~~ {) j,Q_ {l O (!, / 0
Types of Use:C ted,· + (.( le: t£ 6, ow:Sf' _ Sq. Ft./tttrits!. a-;J.O &I 5 ifrru•s:_-_____ _
e, ., q
Total EDU's: ___ ___,a,_...,__ { __
ADT CALCULATIONS: List types and square footages for all uses. ,-,,r ");,-,./ c, ID
C9 + Fr c e.. 5 ;;..oi-A/ o<'-7?00
Types of Use:(! 1-ed ,· ± U ,X) rdouse.. Sq. Ft.I~: .5~0 A#oo~DT's: ___ -_-3 ____ _
Total ADT's. __ J.-7 ___ _
FEES REQUIRED:
PUBLIC FACJUTIES FEE REQUIRED O YES ~See B~d~ Department fo, amount)
WITHIN CFO: DYES (no bridge & thoroughfare fee, lf:f NO
reduced Traffic lmpad Fee)
~ARKSN-i.JEU FEE PARK AREA: __ _
FEE/UNIT: ____ _
~RAFFIC IMPACT FEE
/ ADT's/elrsnm&: 7
[!a 3. BRIDGE AND THOROUGHFARE FEE
ADT's/~;. 7 vq ~IUTJES MANAGEMENT FEE
SQ.FT.: __ _
~SEWER FEE
X
X
X
NO. UNITS: __ _
O'°
FEE/ADT: 3 + -
~
FEE/ADT: ~d
ZONE: ___ _
X FEE/SQ.FT.: ___ _
PERMIT No.SE CZ 5CJ/ J.7 00
EDU's: ,. l ':]_ X FEE/EDU. /, ~Qf, -
BENEFIT AREA: F DRAINAGE BASIN: 5.J
Q 00
EDU's: ' J J X FEE/EDU; S' 7 2-.:f Jll;;AINAGE FEES PLDA___ HIGH ___ /LOW __ _
. ACRES: ---e-:-: X FEE/AC: ::0::
,rd~EWER LATERAL ($2,500 DEPOSll)
~ATER FEE c::r:?
=$ c9-.
DO
=$ ;?3$>__.
C>'O
=$ 1s+
=$ -a
-{3-=$ _____ _
=$_-"""'-{J_-_
EDU's: _...;11>'-'/...____i.___ X FEE/EDU: ;J, 1eo-=$
c:P
TOTAL OF ABOVE FEES*: $ } 13 53-
*NOTE: This calculation sheet Is NOT a complete 11st of all feea which may be due.
Dedications and Improvements may also be required with Building Permits.
P:\DOCS\MISFORMS\BP0002.FRM REV 01/04/95
" " . .. .. .. • • • c::11 c::11 c::11
~II
1 1 1
; ~ ;
"" all all ~ ~ a
i i i ---"' "' "'
PINOONG CHECl(L[Sf
Plan Check No .. 95; /G3/ Address ~<A3, furctdcAk
J Planner DAVID RICK Phone 438-1161 ext, _4_3_2a ____ _
(Name)
APN: --------------------------
T «-Type of Project and Use __ >-__ . ------=----
Zone Cl\/\, Facilities Management Zone __ S" __ _
CPD (in/out) # ______ _
cU'cle (If property in, c~mplete SPECIAL TAX CALCULATION
WORKSHEET provided by Building Department.)
[fflnd.
rtem Complete
Item [ncomplete -Needs your action
1, 2, 3 Number in circle indicates plancheck number where deficiency was
identified 15b D EnW'CIIIIIM!IUa Review Rajlmd: YES_ NOL 'li'PE __ _
DATE OF COMPLETION: ____________________ _
Compliance with conditions of approval? [f not, state conditions which require action.
Conditions of Approval _____________________ _
ci'o D Discretionary Action Required: YES -NO L 1'YPE ---
APPROVAL/RESO. NO. ___ DATE: _____ _
PROJE.C! NO. ___ _
OTHER RELATED CASES: ___________________ _
Compliance with conditions of approval? [f not,. state conditions w~ch require action.
Conditions of Approval--=----------------------
~ D California Coastal c.ommission Permit Rajlmd: YES -NO L
DATE OF APPROVAL: ____________________ _
San Diego Coast District, 3111 Camino Del Rio North, Suite 200, San Diego, CA. 92108-172S
(619) 521-8036
Compliance with· conditions of approval? [f not, state conditions which require action. Conditions of Approval ____________________ _
efD D !n!'iusiotiary HOusi!,g ,Fee ~: YES _ NO L
. {Ef:fe<:tive dat~ ofrn~lusionary:_Housing. Ordln,ance -May ·21,, 1993.)
. ~Dd
GYDo
. '~0
1efoo
Si_te Phm:
i.
2. (
2 .
3.
4.
Provid~ a .fiilly dimensioned site plan. drawn co scale. Show: North
arrow, property lin~s, eas~~~nts, existing and proposed structur-=s,
streets,-existing stteet,imptovexnents, right-of-way wid~ dimensioned
~~-tbacks and. existjng. tOJ.?0$?'aphical lines .
Provide legal desctiptic;,n of p_roperty, and assessor's parcel number ..
Setbacks;
Front:
:rnt .. Side:
Street Side:
Rear:
R~quired
· Required
R Uired ~
. Required
I.et coverage: Required
H 'gh R uired e1t: eq.
par~g: Spa~es Required
Guest :Spa~e$ Required
__ Shown-__ . __
__ Shown __
__ Shown __
__ Shown ____ _
__ Shown ____
___ shown ____
L '-I b I Shown ~
__ Shown __
·o D D Additional Comments ....... --------...----.------------------
'.· -~-' ' ' . ' ' (
QK TO ISSUE ANO ENFERE0 APPROVAL INTO COMPl,J"l!U . ·. ·. ··. c__j
PLNCic.FRM
' i
~ity of Carlsbad 95268
Fire Department 0 Bureau of Prevention
Plan Review: Requirements Category: Building Plan Check
Date of Report: Monday, November 27, 1995 Reviewed by: Mo-1::_ AP
Contact Name C.S.I. General Inc
Address 145 Vallecitos De Oro #F
City, State San Marcos CA 92069
Bldg. Dept. No. 95-1681 Planning No.' _____ _
Job Name Unknown B-C -----------------
Job Address _2_23..;...3_F_a_ra_da_.y _____________ _ Ste. or Bldg. No. _B_-C ___ _
jg! Approved -The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications. provided in your submittal;
therefore any changes to these items after this date, including field modifica-
tions, must be reviewed by this office to insure co,ntinued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can result in suspension of permit to
construct or install improvements.
D Disapproved -Please see the attached report of deficiencies. Please make corrections to
plans or specifications necessary to indicate complfance with applicable
codes and standards. Submit corrected plans and/or specifications to this
office for review.
For Fire Department Use Only
Review 1st. __ _ 2nd. __ _ 3rd. __ _
Other Agency ID
CFO Job# __ 95_2_6_8 __ File# ___ _
2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121
~,ity of Carlsbad
Fire Department
General Comments:
Date of Report: Monday, November 27, 1995
Contact Name
Address
City, State
C.S.I. General Inc
145 Vallecitos De Oro #F
San Marcos CA 92069
95268
Bureau of Prevention
Bldg. Dept. No. _9_5-_1_68_1 ___ _ Planning No. _____ _
Job Name Unknown B-C ----------------
Job Address 2233 Faraday -----------------Ste. or Bldg. No. _B_-c ___ _
Wall changes may effect sprinkler coverage. Will be checked on site.
2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121
)
TITLE 24 REPORT FOR:
2233 Faraday Ave., Suite B-C
2233 Faraday Ave., Suite B-C
Carlsbad, CA 92008
PROJECT DESIGNER:
c.s. I.
145 Los Vallecitos De Oro, Suite F
San Marcos, CA 92069
(619)471-9388
REPORT PREPARED BY:
Steve Balderrama
Haynal & Co., Inc.
425 West Fifth Street
Escondido, CA 92025
(619) 743-5408
Job Number:
Date: 11/14/1995
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance repor~. This program has approval and is
authorized by the California Energy Commission for use with both the
Residential and Nonresidential Building Energy Efficiency Standards.
This program developed by Gabel Dodd Associates (510) 428-0803.
Table Of Contents for Title 24 Report
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Form ENV-1 Envelope Certificate of Compliance ....................... 3
Form PERF-1 Building Energy Performance Summary ..................... 5
Form ENV-2 Envelope Summary
Form ENV-3 Construction Assemblies
6
9
Form LTG-1 Lighting Certificate of Compliance ....................... 12
Form LTG-2 Lighting Compliance Summary .............................. 14
Form MECH-1 Mechanical Certificate of Compliance .................... 15
Form MECH-2 Mechanical Summary ...................................... 18
Form MECH-3 Mechanical Equipment Summary ............................ 19
Form MECH-4 Mechanical Ventilation .................................. 20
CERTIFICATE OF COMPLIANCE (part 1 of 2)
Project Name: 2233 Faraday Ave., Suite B-C
Address: 2233 Faraday Ave., Suite B-C
Carlsbad, CA 92008
Envelope
Designer: C.S.I.
Documentation: Haynal & Co., Inc.
GENERAL INFORMATION
ENV-1 page 3 of 20
Date: 11/14/1995
Building Permit No
Checked by/ Date
COMPLY 24 User 2875
Date of Plans:,........-----.--=--Building Conditioned Floor Area: 520 sf
Building Type: Nonresidential Climate Zone: 7
Phase of Construction: O New Construction X Addition O Alteration
Method of Envelope Compliance: Performance -COMPLY 24 v 4.11
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Part 6, Chapter 1 and Title
20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula-
tions. This certificate applies only to building envelope requirements.
The Principal Envelope Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compliance forms and worksheets, with the specifications,
and with any other calculations submitted with this permit application.
The proposed building has been designed to meet the envelope requirements
contained in sections 110, 116 through 118, and 143 or 149 of Title 24,
Part 6, Chapter 1.
Please check one:
O I hereby affirm that I am eligible under the provisions of Division 3
of the Business and Professions Code to sign this document as the
person responsible for its preparation; and that I am a civil engineer
or architect.
~ I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its preparation; and that I am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
0 I affirm that I am eligible under the exemption to Division 3 of the
of e
esponsible for its
Business and Professions Code by Section
Code to sign this document as the
preparation; and for the following rea on: ........ ::----1t--t--t-----;f----------
PRINCIPAL ENVELOPE DESIGNER c.s .I.
(619)471-9388
ENVELOPE MANDATORY MEASURES
(Lie.
Indicate location on plans of Note Block for Mandatory Measures:
CERTIFICATE OF COMPLIANCE (part 2 of 2)
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
Const
ENV-1 page 4 of 20
Date: 11/14/1995
COMPLY 24 User 2875
OPAQUE SURFACES
Assembly Name Type Location/Comments
Note to
Field
6 11 Concrete Wall
R-19 Roof(R.19 on Tile)
Hollow Metal Door
FENESTRATION Frame
None
Wood
None
Orient Panes Type Exterior Shade
Back (8) 1 Metal None
OH Glazing Type
N Single Tinted
PERFORMANCE COMPLIANCE SUMMARY
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
ANNUAL SOURCE ENERGY USE (KBtu/sqft-yr)
Energy Component
Space Heating
Space Cooling
HVAC Fans & Pumps
Domestic Hot Water
Lighting
Receptacle
Process
TOTALS
Cale:
Standard
Design --------
8.31
25.50
17.54
0.00
47.25
25.50
0.00 --------
124.10
*** BUILDING COMPLIES***
DOE-24
PERF-1 page 5 of 20
Date: 11/15/1995
COMPLY 24 User 2875
(COMPLIANCE)
Proposed Compliance
Design Margin ------------------
7.38 0.92
26.31 -0.81
17.13 0.40
0.00 0.00
42.92 4.33
25.50 0.00
0.00 0.00 ------------------119.25 4.85
OPTIONAL CAPABILITES AND SPECIAL COMPLIANCE INFORMATION
Window/Wall Ratio Value Entered= 0.500
PERFORMANCE ENVELOPE SUMMARY Part 1 of 3
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
GENERAL INFORMATION BY SPACE
Space Name
Office
Occupancy
Office
ENV-2 page 6 of 20
Date: 11/14/1995
COMPLY 24 User 2875
Flr Floor Display
No Area Volume Perim.
1 520 4680 0
Total 520
PERFORMANCE ENVELOPE SUMMARY Part 2 of 3 ENV-2 page 7 of 20 ---------------------------------------------------------------------------Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
Date: 11/14/1995
COMPLY 24 User 2875 ---------------------------------------------------------------------------
OPAQUE SURFACES Act Solar
Type Area U-Val Azm Tilt Gains Form 3 Reference Location/Comments
-----------------------------------------------------
Wall 70 0.752 180 90 Yes 6" Concrete Wall Office
Roof 520 0.043 0 22 Yes R-19 Roof(R.19 on Tile) Office
PERFORMANCE ENVELOPE SUMMARY Part 3 of 3
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
FENESTRATION SURFACES
Act
# Type Area Frame Div U-Val Azm ----------------------------
1 Wdw Back (S) 90.0 Metal No 1.10 180
OVERHANGS/SIDE FINS
SC
Glass
Tilt Only
-----
90 0.65
ENV-2 page 8 of 20
Date: 11/14/1995
COMPLY 24 User 2875
Location/Comments ---------------------
Office
--Window-------Overhang---------Left Fin------Right Fin--
# Type Ht Wd Len Ht LExt RExt Dist Len Ht Dist Len Ht
NONE
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 9 of 20
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
Date: ll/14/1995
COMPLY 24 User 2875
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Concrete, 140 lb, Not Dried
2.
3.
4.
5.
6.
7 .
8.
9 .
Inside Air Film
ADJUSTMENT FOR FRAMING
Assembly Name: 6 11 Concrete Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Framing Material: None
Framing Spacing: "O.C.
Framing Percent: 0.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame
6.000
Unadjusted R-Values
0.17
0.48
0.68
l. 33
0.17
0.48
0.68
l.33
(l / 1.33) X (1.00) + (l / 1.33) X (0.00) = 0.752
Weight:
Heat Capacity:
70.0 lb/sqft
15.40
TOTAL U-VALUE = 0.752
=====
TOTAL R-VALUE = 1.33
=====
..
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
ENV-3 page 10 of 20
Date: 11/14/1995
COMPLY 24 User 2875
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Roofing, Built-Up
2. Membrane, Vapor-Permeable Felt
3. Plywood
4. Air Space
5. Insulation, Mineral Fiber, R-19
6. Acoustical Tile, Interior Finish
7 .
8 .
9 .
Inside Air Film
Assembly Name: R-19 Roof(R.19 on Tile)
Assembly Type: Roof
Assembly Tilt: 22 deg (Tilted Up)
Framing Material: Wood
Framing Spacing: II 0.C.
Framing Percent: 10.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame
0.375
0.010
0.500
12.000
6.000
0.500
0.17
0.33
0.06
0.62
0.80
19.00
1.43
0.17
0.33
0.06
0.62
0.80
19.00
1.43
Unadjusted R-Values
0.61
23.02
0.61
23.02
ADJUSTMENT FOR FRAMING
(1 /23.02) X (0.90) + (1 /23.02) X (0.10) = 0.043
Weight:
Heat Capacity:
4.6 lb/sgft
1.45
TOTAL U-VALUE = 0.043
=====
TOTAL R-VALUE = 23.02
=====
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 11 of 20 ---------------------------------------------------------------------------Project Name: 2233 Faraday Ave., Suite B-C Date: 11/14/1995
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Steel
2. Air Space
3. Steel
4.
5.
6 .
7.
8.
9.
Inside Air Film
ADJUSTMENT FOR FRAMING
COMPLY 24 User 2875
Assembly Name: Hollow Metal Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
Framing Material: None
Framing Spacing: "O.C.
Framing Percent: 0.0 %
Absorptivity: 0.70
Roughness: Smooth Plaster, Metal
Th R-Value
Fr (in) Cavity Frame
0.001
1.750
0.001
Unadjusted R-Values
0.17
0.00
0.87
0.00
0.68
1.72
0.17
0.00
0.87
0.00
0.68
1. 72
(1 / 1.72) X (1.00) + (1 / 1.72) X (0.00) = 0.581
Weight:
Heat Capacity:
0.1 lb/sqft
0.01
TOTAL U-VALUE = 0.581
=====
TOTAL R-VALUE = 1.72
=====
CERTIFICATE OF COMPLIANCE (part 1 of 2)
Project Name: 2233 Faraday Ave., Suite B-C
Address: 2233 Faraday Ave., Suite B-C
Carlsbad, CA 92008
Lighting
Designer:
Documentation: Haynal & Co., Inc.
LTG-1 page 12 of 20
Date: 11/14/1995
Building Permit No
Checked by/ Date
COMPLY 24 User 2875
GENERAL INFORMATION
Date of Plans: Building Conditioned Floor Area: 520 sf
Building Type: Nonresidential Climate Zone: 7
Phase of Construction: O New Construction X Addition O Alteration
Method of Lighting Compliance: Performance -COMPLY 24 v 4.11
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Part 6, Chapter 1 and Title
20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula-
tions. This certificate applies only to building lighting requirements.
The Principal Lighting Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compliance forms and worksheets, with the specifications,
and with any other calculations submitted with this permit application.
The proposed building has been designed to meet the lighting requirements
contained in sections 110, 119, 130 through 132 and 146 or 149.
Please check one:
0 I hereby affirm that I am eligible under ~he provisions of Division 3
of the Business and Professions Code to sign this document as the
person responsible for its preparation; and that I am a civil engineer
electrical engineer or architect.
I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its preparation; and that I am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
O I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section~---of the
Code to sign this document as the person responsible for its preparation; and for the following reaso : _______________ _
PRINCIPAL LIGHTING DESIGNER
LIGHTING MANDATORY MEASURES
Indicate location on plans of Note Block for Mandatory Measures:
CERTIFICATE OF COMPLIANCE (part 2 of 2)
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
INSTALLED LIGHTING SCHEDULE
No of
Name Lamp Type Lamps -----------------------
Fluorescent 3
MANDATORY AUTOMATIC CONTROLS
Control
Watts/ Ballast
Lamp Type ----------------34 Standard
LTG-1 page 13 of 20
Date: 11/14/1995
COMPLY 24 User 2875
Ballasts/ No of Note to
Luminaire Fixt. Field ---------------------
1.5 7
Control Location ID Control Type Space Controlled
Note to
Field
CONTROLS FOR CREDIT
Control
Control Location ID Control Type Space Controlled
Note to
Field
LIGHTING COMPLIANCE SUMMARY LTG-2 page 14 of 20 ---------------------------------------------------------------------------Project Name: 2233 Faraday Ave., Suite B-C Date: 11/14/1995
Documentation: Haynal & Co., Inc. COMPLY 24 User 2875
ACTUAL LIGHTING POWER
No of Watts Total
Name Description Lumin per Default Watts
48" T-12 Low Watt / 3 Lamp ( Tandem) 7 108.0 Y 756
SubTotal 756
Less Control Credits (LTG-3) O
Total Proposed Watts 756
* If not CEC Default value, please provide supporting documentation.
MODELLED LIGHTING POWER BY SPACE
Space Name Occupancy
Modelled
Floor LPD
Area (w/sf)
Total Tailored
(watts) (watts)
Office Office 520 1.454 756 O
TOTALS 520 1.454 756 0
* Note: Tailored Allotment requires supporting documentation on form LTG-4.
CERTIFICATE OF COMPLIANCE (part 1 of 3)
Project Name: 2233 Faraday Ave., Suite B-C
Address: 2233 Faraday Ave., Suite B-C
Carlsbad, CA 92008
Mechanical
Designer:
Documentation: Haynal & Co., Inc.
GENERAL INFORMATION
MECH-1 page 15 of 20
Date: 11/14/1995
Building Permit No
Checked by/ Date
COMPLY 24 User 2875
Date of Plans:=,-----,--=--Building Conditioned Floor Area: 520 sf
Building Type: Nonresidential Climate Zone: 7
Phase of Construction: 0 New Construction X Addition O Alteration
Method of Mechanical Compliance: Performance -COMPLY 24 v 4.11
Proof of Envelope Compliance: O Previous Permit X Compliance Attached
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Part 6, Chapter 1 and Title
20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula-
tions. This certificate applies only to building mechanical requirements.
The Principal Mechanical Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compliance forms and worksheets, with the specifications,
and with any other calculations submitted with this permit application.
The proposed building has been designed to meet the mechanical requirements
contained in sections 110 through 115, 120 through 124, 140 through 142,144
and 145.
Please check one:
O I hereby affirm that I am eligible under ~he provisions of Division 3
of the Business and Professions Code to sign this document as the
person responsible for its preparation; and that I am a civil engineer
mechanical engineer or architect.
~ I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its preparation; and that I am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
o I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section ____ of the
Code to sign this document as the person responsible for its
preparation; and for the following r
PRINCIPAL MECHANICAL DESIGNER
MECHANICAL MANDATORY MEASURES
Indicate location on plans of Note Block for Mandatory Measures:
CERTIFICATE OF COMPLIANCE (part 2 of 3)
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
SYSTEM FEATURES
Zone Name Office
Time Control S Setback Control None--
# of Isolation Zonesn/a
HP Thermostat Yes
Electric Heat 0.0 KW
Fan Control Constant Volume
VAV Min Position n/a
Simul. Heat/Cool n/a
Heat Supply Reset Constant Temp
Cool Supply Reset Constant Temp
Ventilation B
OA Damper Control --A--
Economizer Type No Economizer
Outdoor Air CFM 78
Heat Equip Type Heat Pump
Make & Model No. Rheem RQKA-A024JK
Cool Equip Type DX
Make and Model
Code Tables
Time Control
S:Prog Switch
O:Occ Sensor
M:Man Timer
Ventilation
B:Air Balance
C:OA Cert.
M:OA Measure
D:Demand Cont
N:Natural
OA Damper
A:Auto
G:Gravity
MECH-1 page 16 of 20
Date: 11/15/1995
COMPLY 24 User 2875
Note to
Field
CERTIFICATE OF COMPLIANCE (part 3 of 3)
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
DUCT INSULATION
System Name -----------------------Rheem RQKA-A024JK
PIPE INSULATION
System Name
Domestic Hot Water
Type Duct Location --------------------------Heating Ducts in Attic
Cooling Ducts in Attic
Insul
Pipe Type Required
y I N
NOTES TO FIELD -For Building Department Use Only
MECH-1 page 17 of 20
Date: 11/15/1995
COMPLY 24 User 2875
Duct Tape
Allowed
-------
y I N
y I N
Insul
R-Val -----
4.2
4.2
Note to
Field -------
Note to
Field
MECHANICAL EQUIPMENT ZONING SUMMARY
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
SYSTEM/ZONING SUMMARY
Zone/Spaces Served Central/Zonal System
MECH-2 page 18 of 20
Date: 11/15/1995
COMPLY 24 User 2875
System Type
No
Sys
Office Rheem RQKA-A024JK Packaged Heat Pump 1
Office
MECHANICAL EQUIPMENT SUMMARY
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
No
MECH-3 page 19 of 20
Date: 11/15/1995
COMPLY 24 User 2875
CENTRAL SYSTEM SUMMARY
Sys
No System Name System Type Sys Economizer Type
1 Rheem RQKA-A024JK Packaged Heat Pu 1 No Economizer
CENTRAL SYSTEM RATINGS
Sys-------Heating----------------------------------Cooling----------
No Type Output Aux KW EFF Type Output Sensible EER SEER
1 Heat Pump 23000 0.0 6.80 DX 22600
CENTRAL FAN SUMMARY------------Supply Fan-----------
Sys Mtr Drv
No Fan Type Motor Location CFM BHP Eff Eff
1 Constant Volume Draw-Through
ZONAL FAN SUMMARY
Space Name
None
No CFM
800
Zonal Fan
Mtr
BHP Eff
0.16 55 100
Drv
Eff No CFM
16500 9.05 10.00
Return Fan
Mtr Drv
CFM BHP Eff Eff
None
Exhaust Fan
Mtr
BHP Eff
Drv
Eff
MECHANICAL VENTILATION
Project Name: 2233 Faraday Ave., Suite B-C
Documentation: Haynal & Co., Inc.
VENTILATION SUMMARY BY SPACE
Floor
Space Name T Occupancy Area ------------------------------------------
Office Office 520
sqft
/Occ
143
MECH-4 page 20 of 20
Date: 11/15/1995
COMPLY 24 User 2875
Tran
CFM Min Design sfer
/Occ CFM CFM CFM ------
21.5 78 78 ------
TOTALS 78 78
Note: If Tailored (T=*), user must document sqft/Occ and/or CFM/Occ values.
MANDATORY REQUIREMENTS
ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL)
1. Exterior manufactured doors, windows, and fenestration products shall meet the infiltration and U-value certification requirements of Section
116(a).
2. Site-constructed doors, skylights, and windows shall be caulked and weather-stripped per Section 116(b).
3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to limit
infiltration and exfiltration per Section 117(a).
4. Certified insulation materials per Section 118(a).
5. Urea Formaldehyde foam insulation installed per Section 118(b).
6. Insulation installed to meet flame spread and smoke density requirements per Section 118(c).
LIGHTING MANDATORY MEASURES
1. Each enclosed area shall have independent controls (per Section 131 (a) and exceptions).
2. Lighting shall be uniformly reducible by one half in areas which are greater than 100 sf, exceed 1.2 watts/sf, and have more than one luminaire
(per Section 131 (b) and exceptions; exceptions include lights in corridors).
3. Daylit areas larger than 250 sf shall be separately controlled and uniformly reducible by one half (per Section 131 (c) and exceptions).
4. Separately metered spaces 5,000 sf or greater shall have automatic shutoff controls (per Section 131 (e), no exceptions).
5. Display lighting shall be seperately switched on circuits that are 20 amps or less (per Section 131 (e), no exceptions).
6. Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131 (f) and exceptions).
7. Pairs of one-lamp and three-lamp fluorescent luminaires shall be tandem-wired where reasonable (per Section 132 and exceptions).
MECHANICAL AND PLUMBING MANDATORY MEASURES
Equipment and Systems Efficiency
1. HVAC and service water heating equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112.
2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HVAC equipment, shall be insulated in
accordance with Section 123.
3. Air handling duct systems shall be sealed in accordance with the SMACNA HVAC Ducts Construction Standards, Metal and Flexible, 1985,
per Section 124(a) and (b). Ducts shall be installed and insulated as provided in UMC, Chapter 1 O.
4. Pilot lights shall not be installed for natural gas central furnaces, and pool and spa heaters, per Section 115.
Ventilation
1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121 (a), (b) and (e).
2. Operation and control of outdoor air shall meet the time-of-occupancy and pre-occupancy requirements of Section 121 (c).
3. When a return plenum is used to distribute outdoor air to a covered HVAC unit, the ducted discharge shall be in accordance with Section
121 (d).
4. Systems shall meet the completion and balancing requirements of Section 121 (f).
Controls
1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone. Heating
shall be adjustable down to 55 degrees or lower, and cooling shall be adjustable up to 85 degrees or higher. The control shall provide a
dead-band of 5 degrees between heating and cooling, Section 122(a) and (b).
2. Heat pumps with supplementary electric resistance heaters shall have controls per Section 112(b}.
3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours of up to four
hours, per Section 122(e)1.
4. Thermostat setup and setback controls are required if the summer design dry bulb temperature is more than 99 degrees F, or if the winter
design temperature is less than 33 degrees, per Section 122(e) 2, and its exceptions.
5. Outdoor air supply and exhaust equipment shall be installed with dampers that automatically close during periods of non-use for the areas
served by the equipment, per Section 122(f).
6. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be
designed, installed, and controlled to serve isolation areas, per Section 122(g).
SERVICE WATER HEATING SYSTEMS
1. Temperatu~e controls and recirculating pump controls shall meet the requirements of Section 113(a) and (b).
2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113(b)3.
3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b)4.