HomeMy WebLinkAbout2234 FARADAY AVE; BLDG 4; CB051149; Permit09-29-2005
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB051U9
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
2234 FARADAY AV CBAD
COMMIND Sub Type: INDUST
2121203900 Lot#: 0
$104,520.00 Construction Type: NEW
Reference #:
FARADAY SPECTRUM BLDG4
4020 SF SHELL BUILDING
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Plan Check*:
ISSUED
03/30/2005
MDP
09/29/2005
09/29/2005
PC05-33
Applicant:
SMITH CONSULTING ARCHITECTS
STE200
12220 EL CAMINO REAL
SAN DIEGO CA 92121
(858) 793-4777
Owner:
Buildftg Permit
Add1! Building Permit Fee
Plan Check
Add1! Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$0.00
$365.27
$0.00
$0.00
$21.95
$0.00
$1,608.00
$0.00
$0.00
$0.00
$0.00
$0.00
/ $0.00
$0.00
$0.00
Traffic Impact Fee (3105J541)
Traffic Impact Fee (4305541)
fiedev Parking Fee
Additional Fees
TOTAL PERMIT FE1
$0.00
$0.00
$0.00
$0.00
$1,902.26
$0.00
$0.00
$0.00
$560.00
$0.00
$70.00
$310.00
$0.00
$0.00
$2,926.40
$0.00
$0.00
$8,325.84
Total Fees:$8,325.84 )ue:$0.00
Inspector:
FINAL
Date:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedcatkxts, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
foflow the protest procedures set forth in Government Code Section 66Q20(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure Witt bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to pro^ the spectfWfees/exacttons DOES NOT APPLY to w^
changes, nor planning, zoning, grading or other staiilarappllcaticflprc<»sslngwservto NOR DOES IT APPLY to any
fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of KmHatlons has previously otherwise expired.
Final Building Inspection
Dept: Building En
Plan Check ft PC05-33
Permit*:
Project Name:
«ring Planning CMWD StLite Fire
Date:
CB051149
FARADAY SPECTRUM BLDG4
4020 SF SHELL BUILDING
MAY 3 2006
05/03/2006
Permit Type: COMMIND
Sub Type: INDUS!
Address:
Contact Person:
Sewer Dlst:
Inspected
Inspected
Bv:
Inspected
Bv:
2234 FARADAY AV
LUKE Phone: 8584377617
Water Dist:
t Date , i
t4-^/\c* Inspected: o^fTo/D
Date
Inspected:
Date
Inspected:
Lot: 0
(0 Approved: •/
Approved:
Approved:
Disapproved:
Disapproved:
Disapproved:
Comments:
CltytfCtflsftatf
nnal Building Inspection
Dept: Building Engineering Planning CMWD StLite
Plan Check*: PC05-33
Permit*: CB051149
Project Name: FARADAY SPECTRUM BLDG 4
4020 SF SHELL BUILDING
Address: 2234 FARADAY AV Lot:
Contact Person: LUKE Phone: 8584377617
Sewer Dlst: M * Water Ditt:
Date: 05/03/2006
Permit Type: COMMIND
Sub Type: INDUST
Inspected
By:
Inspected
By:
Inspected
By:
Date
Inspected:
Date
Inspected:
Date
Inspected:
Approved:1
.Approved:
. Approved:
Disapproved:
Disapproved:
Disapproved:
Comments:
x PLANNING DEPARTMENT
FINAL INSPECTION
CHECKLIST
Projec
Addre
Projec
Contac
t NamerFaradav Spectrum Bide 4 Plan Check No. CB 051 149
ss: 2234 Faradav Ave Proiect Number:
t Planner
:t Person
Ins
1st
&
t_b
2nd
: Van Lvnch Extension
ROUTING
BLDG
A.WEST
PLANNER___
PELA
A. WEST
BLDG
Phone No. (858) 437-7617 Drawing No. 427 9
pections
Approved
t/^A--
/
)r
}
I
\>
Final Inspection Items
All Items below Conform with Approved Site Plan
1 . Project Planner confirms conditions are met
2. Building elevations
3. Building materials
4. Building colors
5. Rooftop equipment screens
6. Fence/wall height, location, and materials
7. Size, number and location of parking spaces
compact, regular, handicap
8. Outdoor recreation facilities
9. Employee eating areas
10. Trash enclosure and location
1 1 . Pavement treatment
12. Landscaping installed (under separate contract)
UST BELOW ANY ADDITIONAL ITEMS REQUIRING
SPECIAL ATTENTION.
13.
14.
15.
16.
17.
Project complies with all conditions, including above-listed items. Final inspection is complete.
Ly ipL^ s^os
PELA r Date
(H:\ADMIN\COUNTER\Final Insp Check)05/03/2006
CHvtftllttMl
Final Bunding Inspection
Dept: Building Engineering PlaanMg CMWD StLite Fire
Plan Check #:
Permit ft
Project Name:
Address:
Contact Person:
Sewer Diet:
Inspected
Bv:
Inspected
Bv:
Inspected
Bv:
Comments:
PC05-33 ^
CB051149
FARADAY SPECTRUM BLDG4
4020 SF SHELL BUILDING
2234 FARADAY AV
LUKE Phone: 8584377617
Water Dist:
Date
Inspected:
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot: 0
Aooroved: S
AD Droved:
Aooroved:
05/03/2006
COMMIND
INDUST
Disapproved:
Disapproved:
Disapproved:
CONSTRUCTION TESTING & ENGINEERING. INC.
ENGINEERING, INC.
INSPECTION REPORT PAGE 1
REPORT#3
.OF 1
CTEJOB# .10-801
PROJECT NAME: Faraday Spectrum.
ADDRESS: 2234 Faraday Ave.
Carisbad,Ca
ARCHITECT: Smith Consulting Architects.
ENGINEER: Chung Y. Song.( # 2685)
CONTRACTOR: TSA Contractors.
INSPECTION DATE: 12-16-05
PLAN FILE:
BLDG. PERMIT: (# Bldg.#4) CBO51149
OTHER: SUB-CONTRACTOR
San Diego-Construction Welding/Whitacre
INSPECTION
OCONCRETE
OMASONRY
O P.T.CONC.
(X) FIELD WELD
() SHOP WELDING
() PILE DRIVING
OBATCH PLANT
()EXP. ANCHOR
() OTHER
MATERIAL IDENTIFICTION
CONCJrfDW/PSI
GROUTMK#/PSI
MORTAR TYPE/PSI
REBAR GRADE 50-A706
STR. STEEL: A36
H.S. BOLT:
MAS. BLOCK
BU3CTRODE: -NR232 (.072)
MATERIAL SAMPLING
( )CONCRETE ( ) MORTAR ( )GROUT ( )FIREPROOFING ( ) MASONRY BLOCK ( )REBAR
(X) STRUCTURAL STEEL () BOLTS
INSPECTION PERFORMED, JOB PROBLEM, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, AND
1.1 Observed installation of 2 x 2 x %' "angle iron for vertical splice tie down connections to #5-rcbar & 2 x 2 x
5/16" angle iron for splice connections to #6-rebar using (2) 3 ^"double flare groove welds per side at the
following locations: 1-2/A, 1-2/B, A-Bft, & A-B/2. REF. DET. 9/Sr>l. (NOTE: TYP. rebar welding schedule
det-l/Sl).
1.2 Observed installation of 2 x 2 x Vi" angle iron for horizontal panel to panel splice connections to #5-rebar
(At roof level) using (2) 3" double flare groove welds per side at tiie following locations: 1-2/A, 1-2/B, A-B/1,
& A-B/2. REF. DET. 17/SD-3.(NOTE: TYP. Rebar welding schedule det-l/Sl).
1.3 Observed welding of %"by 2" long fillet welds for connection of (4) angle iron pl.s to embedded pl.s in the
wall panels for a mitered corner wall splice connection at the following location:l/A, 1/B, 2/A & 2/B. REF.
DET.12/SD-1. Work on going.Eod of report
Certification of Compliance: All work, unless otherwise noted, complies with the approved plans and specifications and
the uniform building code.
NAME: (PRINT) _JUSTIN KUNQE,SIGNATURE:
CERTIFICATION NO: # 5262291-85
CONSTRUCTION TESTING & ENGINEERING, INC.
F.SrONDflKVTRArY-TOllONA-OXNARn-l.ANrASTKR-SArRMKNTO
ENGINEERING, INC.
INSPECTION REPORT PAGE 1 OF 1
CTEJOB# .10-801
REPORT #
PROJECT NAME: Sarazay Spectrum.
ADDRESS: 2234 Faraday Ave.
Carlsbad,Ca
ARCHITECT: Smith Consulting Architects.
ENGINEER: Chung Y. Song.( # 2685)
CONTRACTOR: TSA Contractors.
INSPECTION DATE: 1-30-06
PLAN FILE:
BLDG. PERMIT: (# Bldg.#4) CBO51149
OTHER: SUB-CONTRACTOR
San Diego-Construction Welding/Whitacre
INSPECTION
() CONCRETE
()MASONRY
( ) P.T.CONC.
(X) FIELD WELD
() SHOP WELDING
() PILE DRIVING
() BATCH PLANT
()EXP. ANCHOR
() OTHER
MATERIAL DOENTIFICnON
CONC.MDC#/PSI
GROUTMDCWPSI
MORTAR TYPE/PSI
REBAR GRADE 50-A706
STR. STEEL: A36
H.S.BOLT:
MAS. BLOCK
ELECTRODE: -NR232 (.072)
MATERIAL SAMPLING
( ) CONCRETE ( ) MORTAR ( ) GROUT ( )FIREPROOFING ( ) MASONRY BLOCK ( ) REBAR
(X ) STRUCTURAL STEEL ( ) BOLTS
INSPECTION PERFORMED, JOB PROBLEM, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, AND
1.1 Observed installation of 2 x 2 x( %"H3/8") angle iron for horizontal panel to panel splice connections to
#5-#9 rebar.(at the roof level) using (2) 3"-5 ^"double flare groove welds per side at the following location:
1-2/A & 1-2/B. REF.S-4. DET.17/SD3 & 12/SD1.
1.2 Observed welding of Wfillet welds for connection/installation of truss's to truss seat at the following locrl-
2/A & 1-2/B.REF.S-4. DET.2/SDZ
1.3 Observed drag strut installation using '//'all around fillet welds for connection of drag strut to embeds pl.'s
/truss's in the following locations:l-l.l/A.8 & U-1.2/B. REF.S-4. DET.8,9,10,13/SD4.
1.4 Observed fit-up & installation of (4) W12 by 14 beams using VV'fiuet welds & bohs for fit-up/connection in
the following locations: 1-1.1/B, & 1-I.3/B. REF.S-4. DET.1B/SD5 & 10-10a/SD3),(10,13,14/SD4.
Certification of Compliance: All work, unless otherwise noted, complies with the approved plans and specifications and
the uniform building code.
MAME: (PRINT) __JUSTIN RUNGE_SIGNATURE:
CERTIFICATION NO: # 5262291-85
City of Carlsbad Bldg Inspection Request
For: 05/05/2006
Permit* CB051149
Title: FARADAY SPECTRUM BLDG 4
Description: 4020 SF SHELL BUILDING
Inspector Assignment: JM
Sub Type: INDUST
2234 FARADAY AV
Lot
Type:COMMlND
Job Address:
Suite:
Location:
APPLICANT SMITH CONSULTING ARCHITECTS
Owner:
Remarks:
Phone: 8584377617
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: LUKE
Entered By: JANEAN
Comments/Notices/Holds
Associated PCRs/CVs Original PC# PC05-33
PCR06005 ISSUED FARADAY SPECTRUM-DEFERRED; TRUSS SUBMITTAL-AFFECTS ALL 9 BUILDINGS
Inspection History
Comments
NEED APPROVED ADA PARKING PLAN
NAIL OFF ROOF SHEATING - INSTALL HARDWARE @ TOWER
OK TO POUR STRAP
NO INSP/
STEEL/BEAM PANELS
OK TO POUR SLAB
OK TO POUR FOOTING - UFER OK
Date
05/03/2006
01/27/2006
01/24/2006
01/17/2006
12/23/2005
12/23/2005
12/19/2005
11/21/2005
10/31/2005
10/25/2005
10/24/2005
09/30/2005
Description
89 Final Combo
15 Roof/Reroof
15 Roof/Reroof
11 Ftg/Foundation/Piers
11 Ftg/Foundation/Piers
31 Underground/Conduit-Wiring
12 Steel/Bond Beam
14 Frame/Steel/Bolting/Welding
11 Ftg/Foundation/Piers
11 Ftg/Foundation/Piers
11 Ftg/Foundation/Piers
22 Sewer/Water Service
Act
CO
AP
CO
AP
CO
CO
NR
AP
AP
PA
NR
AP
Ins;
JM
JM
JM
PD
TP
TP
TP
JM
JM
JM
JM
JM
c T EONSTRUCTION 1ESTING & JLNGINEERING, INC.
ESCONDIDO • TRACY • RIVERSIDE • OXNARD • LANCASTER • SACRAMENTO
INSPECTION REPORT PAGE
CTE JOB #
REPORT #
PROJECT NAME:
ADDRESs(^l\\
ARCHITECT:
VMP VC*\
CONTRACTOR:
INSPECTION DATE
PLAN FILE:
: \\ I
BLDG PERMIT:
OTHER:
MATERIAL SAMPLING
( ) CONCRETE ( ) MORTAR ( ) GROUT ( ) FIREPROOFING ( ) MASONRY BLOCK ( )REBAR
( ) STRUCTURAL STEEL ( ) BOLTS
<, 7 ? frfa to If
\o-.Q
C, •-'-* .id
l*P . I \ > dome /
rs
/
NAME: (PRINT)
CERTIFICATION NO:
SIGNATURE \| s£fr&g7<?
/
GEOTECHNICAL & CONSTRUCTION ENGINEERING TESTING & INSPECTION
1441 MONTffiL ROAD, SUITE 115, ESCONDIDO, CA 92026 (760) 746-4955 FAX (760) 746-9806
c T EONSTRUCTION X ESTING & JLrf NGINEER1NG, INC.
ESCONDIDO • TRACY • RIVERSIDE • OXNARD • LANCASTER • SACRAMENTO
PAGE V OF \INSPECTION REPORT
CTE JOB #
REPORT # \\
PROJECT NAME:
ADDRESS:
ARCHITECT:
ENGINEER:^
CONTRACTOR:
INSPECTION DATE: _
PLAN FILE: K/A
BLDG PERMIT:
OTHER:
MATERIAL SAMPLING
( ) CONCRETE ( ) MORTAR ( ) GROUT ( ) FIREPR.OOFING
( ) STRUCTURAL STEEL ( ) BOLTS
( ) MASONRY BLOCK ( )REBAR
NAME: (PRINT)
CERTIFICATION NO:
SIGNATURE
GEOTECHNICAL & CONSTRUCTION ENGINEERING TESTING & INSPECTION
1441 MONTIEL ROAD, SUITE 115, ESCONDIDO, CA 92026 (760) 746-4955 FAX (760) 746-9806
SOIL ft TESTING. INC
SOUTHERN CALIFORNIA SOIL & TESTING, INC.
6280 RIVERDALE STREET, POST OFFICE BOX 600627, SAN ifffiGO, CA 92160-0627
Phone (619) 280-4321, FAX (619) 280-47l|
FT6- S^-D 3,^SC&T FILE NO.
J R O. NO.:
C PL NC FIX ' PAGE / OF /-
SOILS ENGINEERING & GEOLOGY FIELD REPORT: D SITE OBSERVATION D GRADING OBSERVATION D PR-GRADE
^FOOTING OBSERVATION D PIER OBSERVATION D
PROJECT TITLE: x *y / -C4*i$t£4£> ftoF&afwfi- / sZAtiyry 2f&
PROJECT ADDRESS: f' ^^ * -»^
ARCHITECT: /• y x*
GENERAL CONTRACTOR: -TV *
LOCATION OF WORK INSPECTED: *r . . . , 5—t>t-&4 * j */ mm*
DSA FILE NO.: DSA APP. NO.:
PERMIT NO.: If US* J PLAN FILE NO.:
ENGINEER:
SUB CONTRACTOR:
**5 KZmwrrfj1*!*
DATE:
dr
fir
^
&
D
DESCRIPTION OF WORK INSPECTED:TIME ARRIVED: /^i*< TIME DEPARTED: /^iT
MINIMUM CHARGE: ?**,<,
SOIL CONDITIONS ARE SUBSTANTIALLY IN CONFORMANCE WITH THOSE ASSUMED IN THE SOIL
INVESTIGATION REPORT.
FOUNDATION EXCAVATIONS EXTEND TO THE PROPER DEPTH AND BEARING STRATA.
FOUNDATION EXCAVATIONS DEMONSTRATE AN ADEQUATE AMOUNT OF COMPACTION FOR THE PROPOSED
BEARING PRESSURE.
FOUNDATION EXCAVATIONS SHOULD BE CLEARED OF ALL LOOSE SOILS PRIOR TO CONCRETE
Dl &OPUPMT ^ _—** > *c-** —
T <f
COMMENTS:
s~\
4->
&
'•Igratur*
P.E. REVIEW
-7 s* — ?***r*/
I - tNSPECjflfafesiGHATURE // REGISTRATION Mo.
•SUPERINTENDENT S SIGNATURE DATH
auttXHizM ttw Ibov* WoHe
SCST 200 (02AM)
Carl Schmidt Inspection Services. Inc. DAY THURSDAY
P.O.Box 178403
San Diego, CA 92177-8403
(619) 855-9252
SPECIAL INSPECTION REPORT
Project; FARADAY SPECTRUM
Addren; 2214 THROUGH 2248 FARADAY AVE.
Cftyg CARLSBAD CA
Permit Number: CBO5-1146 TO CBO5-1154 Pbui File Nvmber:
TYPE OF OBSERVATIONS:
Reinforcing Steel Reinforced Concrete Structural Masonry Field Welding
Epoxy Prestressed Concrete Shop Welding X Bolting Fireproofing_
Number of Samples: Ttype:
Materials/PcsitmMixyPsiA 36 STEEL , A500 TUBE STEEL E71T-1
Date: 12/22/05
REPORT
ON SITE AT STRUCT STEEL FOR VISUAL INSPECTION OF WELDING OF MODIFICATION OF WIDE FLANGE BEAMS.
SCOPE OF WORK
FABRICATE, FIT UP AND WELD MODIFICATION TO (4) W12X14 BEAMS TO FACILITATE BEAM SEAT MATCH UP AS PER
APPROVED RFI AND DRAWING DATED 12-16-05,02-39 PM AND DETAILS 9,13,15/SD4, THE FOLLOWING BEAM PC # WERE
MODIFIED:, 6B, 8B AND 8A
INSPECTED AND ACCEPTED FIT UP AND SHOP WELDING PERFORMED THIS DATE.
(1) WELDER USING FCAW-G AND E71T-1 ELECTRODE
WORK INSPECTED CONFORMS WITH APPROVED PLANS A>TO SPECIFICATIONS UNLESS OTHER WISE NOTED
DUANELORENZ ran**** SD» TIME IN: 1130 TIME OUT: 1500
Certification**
General Contractor: TSA
ttxme:
Signature
Carl Schmidt Inspection Services. Inc. DAY WENSDAY
P.O. Box 178403
Sm Diego, CA 92177-8403
(619) 855-9252
SPECIAL INSPECTION REPORT
Protect; FARADAY SPECTRUM
Address: 2214 THROUGH 2248 FARADAY AVE.
Ctty; CARLSBAD CA
Permit Number: CBO5-1146 TO CBO5-1154 nan Ffle Nuber: __________
TYPE OF OBSERVATIONS:
Reinforcing Steel Reinforced Concrete Structural Masonry Field Welding
Epoxy Presteesaed Concrete Shop Welding J>£_ Bolting Fiicproofing_
Number of Samples: "type:
Materiala/DeagnMix/PsiA 36 STEEL , A500 TUBE STEEL E71T-1
Date: 12/20/05
REPORT
ONSITE AT STRUCT STEEL FOR VISUAL INSPECTION OF WELDING OF MODIFICATION OF WIDE FLANGE BEAMS.
SCOPE OF WORK
FABRICATE, FIT UP AND WELD MODIFICATION TO (4) W12X14 BEAMS TO FACILITATE BEAM SEAT MATCHUP AS PER
APPROVED RFI AND DRAWING DATED 12-16-05,0239 PM AND DETAILS 9,13,15/SD4. THE FOLLOWING BEAM PC # WERE
MODIFIED: 6A, 6B, 5A.5B AND 8A
INSPECTED AND ACCEPTED FIT UP AND SHOP WELDING PERFORMED THIS DATE.
(2) WELDERS USING FCAW-G AND E71T-1 ELECTRODE
WORK INSPECTED CONFORMS WITH APPROVED Pl^WS AND SPECIHCAT1ONS U>OJESS OTHER WISE NOim)
DUANELORENZ tccn**** SDM TIME IN: 1200 TIMEOUT: 1600
Certification*
General Contractor TSA
Phone:
Signature
PLANNING/ENGINEERING APPROVALS
PERMIT NUMBER CB
ADDRESS
DATE
RESIDENTIAL TENANT IMPROVEMENT
RESIDENTIAL ADDITION MINOR
(<$10,000.00)
PLAZA CAMINO REAL
CARLSBAD COMPANY STORES
VILLAGE FAIRE
OTHER
PLANNER
ENGINEER
COMPLETE OFFICE BUILDING
DATE
DATE
Docs/Mfsfbrms/Ptonnin0 EnginMring Approval!
D Estimate based on unconfirmecLinformation from applicant.
D Calculation based on building prancheck plan submittal.
Address:
Prepared by:Date:
Bldg. Permit No.
Checked by:Date:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: ^ Q^Xs—- Sq. Ft./Units: V D VQ EDU's:
Types of Use: Sq. Ft./Units: EDU's:
APT CALCULATIONS: List tvpes and square footages for all uses.
Types of Use: VO t^*-£=— Sq. Ft./Units: H D ^ O ADT's:
Types of Use: Sq. Ft./Units: __ ADT's:
FEES REQUIRED:
WITHIN CFD: D YES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) D NO
D 1. PARK-IN-LIEU FEE
FEE/UNIT:
PARK AREA & #:
X NO. UNITS:
2. TRAFFIC IMPACT FEE
ADT's/UNITS:X FEE/ADT: /> Q = S
D 3. BRIDGE AND THOROUGHFARE FEE {DIST.
ADT's/UNITS: X
D 4. FACILITIES MANAGEMENT BEE
UNIT/SQ.FT.:
D 5. SEWER FEE
EDU's: l
ZONE:
X
BENEFIT AflEA: .
EDU's: .fl FEE/EDU:
D 6. SEWER LATERAL ($2,500)
D 7. DRAINAGE FEES PLDA_
ACRES:
= $
HIGH /LOW
FEE/AC:= $
D 8. POTABLE WATER FEES
UNITS CODE CONNECTION FEE METER FEE
NP->-^
SDCWA FEE IRRIGATION
Iof2
Community Facilities District No. 1
NON-RESIDENTIAL CERTIFICATE: Non-Residential Land Owner,
please read this option carefully and be sure you thoroughly understand the options before
signing. The option you chose will affect your payment of the developed Special Tax
assessed on your property, this option is available only at the time of the first building
permit issuance. Property owner signature is required before a building permit will be
issued. Your signature is confirming the accuracy of all information shown.
Name of Owner Telephone
Address
LA 1.1L.
City, State
^l
Cc. <?toi-7
Zip Code
Project Address
Carlsbad, California
City, State
9200 6
Zip Code
Assessor's Parcel Number or APN and Lot Number if not yet subdivided by County Assessor.
Building Permit Number(s)
As cited by Ordinance No. NS-155 and adopted by die City of Carlsbad, California, the City is authorized
to levy a Special Tax in Community Facilities District No. 1. All non-residential property, upon the
issuance of a building permit, shall have the option to ( 1) pay the SPECIAL DEVELOPMENT TAX ONE-
TIME or (2) assume the ANNUAL SPECIAL TAX - DEVELOPED PROPERTY for a period not to
exceed twenty-five (25) years. Please indicate your choice by initialing die appropriate line below:
OPTION (I):
OPTION (2):
I elect to pay flic SPECIAL TAX -J?N
One-Time Special Tax: $
>wf as^a. oqr-£»« payment. Amount of
Q fc • . Owner's Initials
I elect to pay the SPECIAL DEVELOPMENT TAX ANNUALLY for a period not to
exceed twenty-five (2i) ,vear>> • Maximum Arnnjal^ JJpecial Tax:
$ ^.IfatfjJft! "" OLL. . Owner's Iritis
I DO HEREBY CERTIFY UNDER PENALTY OF PERJURY THAT THE UNDERSIGNED IS THE
PROPERTY OWNER OF THE SUBJECT PROPERTY AND THAT I UNDERSTAND AND WILL
COMPLYJWTTH THE PROVISIONS AS STATED ABOVE.
Title
Print Name Date
The .City of Carlsbad has not independently verified the information shown above. Therefore, we accept no
responsibility as to the accuracy or completeness of this information.
Land Use, FY .Factor (.(2. X Square Ft V, fl2,0 = H(
City of Carlsbad
Building Department
CERTIFICATE OF COMPLIANCE
PAYMENT OF SCHOOL FEES OR OTHER MITIGATION
This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City
prior to issuing a building permit. The City wilt not issue any building permit without a completed school fee form.
Project Name:
Building Permit
Plan Check Number:
Project Address:
A.P.N.:
Project Applicant
(Owner Name):
Project Description:
Building Type:
Residential:
r •ru
Number of New Dwelling Units
Square Feet of Living Area in New Dwelling
Second Dwelling Unit: Square Feet of Living Area in SDU
Residential Additions: Net Square Feet New Area
Commercial/Industrial: Square Feet Flopr Area
City Certification of
Applicant Information:
SCHOOL PlSTRlCTfr^OTHIN THE CITY OF CARLSBAD
Carlsbad Unified School District
6225 El Camino Real
rarlshaq- CA 92QQ9 (311 -5000)
San Marcos Unified School District
215MataWay
San Marcos, CA 92069 (290-2649)
Contact: Nancy Dolce (By Appt. Only)
Encinitas Union School District
101 South Rancho Santa Fe Rd
Encinitas, CA 92024 (944-4300 ext 166)
San Dieguito Union High School District
710 Encinitas Blvd.
Encinitas, CA 92024 (753-6491)
Certification of Applicant/Owners. The person executing this declaration ("Owner") certifies under penalty of perjury that (1) the
information provided above is correct and true to the best of the Owner's knowledge, and that the Owner will file an amended
certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square
footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect, and
that (2) the Owner is the owner/developer of the above described project(s), or that the person executing this declaration is
authorized to sign on behalf of the Owner.
Signature:Date:
Revised 4/20/00 1635 Faraday Avenue • Carlsbad, CA 92008-7314» /-7Rn\ Rno.o-7-iQ « FAV
(760) 602-270O
SCHOOL DISTRICT SCHOOL FEE CERTIFICATION
(To be completed by the school district(s))*************************************************
THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE
PROJECT HAVE BEEN OR WILL BE SATISFIED.
SCHOOL DISTRICT:
The undersigned, being duly authorized by the applicable School District, certifies that the
developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that
the applicant listed on page 1 has paid all amounts or completed other applicable school
mitigation determined by the School District. The City may issue building permits for this project.
SIGNATURE OF AUTHORIZED SCHOOL
DISTRICT OFFICIAL
TITLE
CARLSBAD UNIFIED SCHOOL 1
NAME OF SCHOOL DISTRICT 6225 EL CAMINO REAL
CARLSBAD. CA 92009
DATE
PHONE NUMBER
Revised 4/20/00