Loading...
HomeMy WebLinkAbout2235 CAMINO ROBLEDO; ; CB973745; Permit\J UILDIN G PERMIT 01/14/9$ 16= Pacre i of Job Address: Permit Type Parcel No: Valuation: 32 Permit Project Development No No No 2235 CAMINO ROBLEDO nFTarHFD ; SINGLE FAMILY DWLNG - DETACHED 255-261-50-00 Reference*: Suite Lot* CT 442 3002 01/14/98 0001 01 Construction 88-03 CB973745 A9704834 DEV89110 02 ISSUED 10/01/97 01/14/98 RMA Appl/Ownr * * * SHEA HOMES 10721 TREENA ST SAN DIEGO CA Plan Check Numbers Fees Required STE 200 *** 619 549-3156 Collected & Credits * ** ,.„_*-—*-*-«• Fees : Adjustments: Total Fees: 12,470.83 .00 12,470.83 Fee description Uni ,00 350.00 12,120,83 Ext fee Data ^-Fee Number of Bedrooms . . • • Number of Bathrooms . Building Permit Plan Check Strong Motion Fee Enter" "Y" to Autocalc ,P . F. F Enter "V" to Autocalc t. I .F Payoff Fee for CFD '••'.. Enter LFM Fee f Zones*6, 11, Enter "Y" for Plumbing Ms S Each Plumbing Fixture Or .Trap Each Building Sewer _• _ Each install/Repair Water V ,' Each Water Heater and/or Vent Gas Piping System * Each Vacuum Breaker Enter "Y" for Electric Issue Fee Sinale Phase Per AMP Enter 'Y' for Mechanical Issue Fee> Install Furn/Ducts/Heat Pumps > Each Install Fireplace > Each Exhaust Fan Each Install/Reloc Vent 3.60 5 3 1182 768 25 00 00 .00 , 00 >310. 4637.00 Y 83 00 00 . 00 4698 310 20 133 1 2 100 1 2 4 2 '15 7 7 7 7 00 00 00 , 00 .00 .25 7. 00 7. 00 9. 00 6. 50 6. 50 4. 50 10, 25 15 9 13 26 9 00 00 00 00 ,00 .00 .00 CLE; L CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 City of Carlsbad Bldg Inspection Request For: 8/24/2000 Permit# CB973745 Title: MODEL.PLN 4,3080+592 GAR+136 Description: DECK,LA COSTA VALLEY-VILLAGE G-SHEA HOME Inspector Assignment: PY 2235 CAMINO ROBLEDO Lot 442 Type:SFD Sub Type: Job Address: Suite: Location: APPLICANT SHEA HOMES Owner: SHEA HOMES LTD PARTNERSHIP Remarks: Phone: 7606329922 Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: SCOTT Entered By: CHRISTINE Act Comments Associated PCRs Date 4/22/1998 4/21/1998 4/17/1998 4/1/1998 3/18/1998 3/16/1998 3/16/1998 3/13/1998 3/13/1998 3/12/1998 3/12/1998 3/11/1998 3/10/1998 3/10/1998 3/9/1998 3/6/1998 Inspection History Description 89 Final Combo 89 Final Combo 89 Final Combo 39 Final Elec 23 Gas/Test/ 18 Exterior L 23 GasH"est/ 17 Interior l_£ 23 Gas/Testy 17 Interior LE 23 Gas/Test/ 17 Interior LE 16 Insulation Act .bo AP .bo NR bo PA trical PA Repairs AP ath/Drywall WC Repairs NS ,th/Drywall AP Repairs NR th/Drywall NR Repairs NR th/Drywall PA AP ath/Drywall AP mbo AP jel/Bolting/Welding PI Insp PY PY PY PY PS PY PY PY PY PY PY PY PY PY PY PY Comments EMR 1ST LAYER LID Inspection List Permit*: Date 4/22/98 4/21/98 4/17/98 4/1/98 3/18/98 3/16/98 3/16/98 3/13/98 3/13/98 3/12/98 3/12/98 3/11/98 3/10/98 3/10/98 3/9/98 3/6/98 3/6/98 3/6/98 3/6/98 3/5/98 3/2/98 2/24/98 2/24/98 2/18/98 2/18/98 2/2/98 1/30/98 1/29/98 1/26/98 1/26/98 CB973745 Type: SFD Inspection Item 89 89 89 39 23 18 23 17 23 17 23 17 16 18 84 14 24 34 44 84 83 13 13 13 15 11 11 11 21 22 Final Combo Final Combo Final Combo Final Electrical Gas/Test/Repairs Exterior Lath/Drywall Gas/Test/Repairs Interior Lath/Drywall Gas/Test/Repairs Interior Lath/Drywall GasfTest/Repairs Interior Lath/Drywall Insulation Exterior Lath/Drywall Rough Combo Frame/Steel/Bolting/Weldin Rough/Topout Rough Electric Rough/Ducts/Dampers Rough Combo Roof Sheathing/Ext Shear Shear Panels/HD's Shear Panels/HD's Shear Panels/HD's Roof/Reroof Ftg/Foundation/Piers Ftg/Foundation/Piers Ftg/Foundation/Piers Underground/Under Floor Sewer/Water Service MODEL.PLN 4,3080+592 GAR+136 Inspector Act Comments PY PY PY PY PS PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY AP NR PA PA EMR AP we NS AP NR NR NR PA 1ST LAYER LID AP AP AP PI AP PI PI NR AP NR MISSING WINDOWS NS NR AP AP AP REVISE PLAN NR AP we Saturday, October 23, 1999 Page 1 of 1 FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD Q® LITE PLAN CHECKtf: CB973745 DATE: 04/17/98 PERMIT#: CB973745 PERMIT TYPE: SFD PROJECT NAME: MODEL,PLN 4,3080+592 GAR+136 DECK,LA COSTA VALLEY-VILLAGE G-SHEA HOME ADDRESS: 2235 CAMINO ROBLEDO LOT# 442 CONTACT PERSON/PHONE#: C/MARK/632-9922 SEWER DIST: LC WATER DIST: O INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED COMMENTS: A- A FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD ST LITE PLAN CHECK#: CB973745 PERMIT#: CB973745 PROJECT NAME: MODEL,PLN 4,3080+592 GAR+136 DECK,LA COSTA VALLEY-VILLAGE G-SHEA HOME ADDRESS: 2235 CAMINO ROBLEDO LOT* 442 CONTACT PERSON/PHONE#: C/MARK/632-9922 SEWER DIST: LC WATER DIST: 0 DATE: 04/17/98 PERMIT TYPE: SFD INSPECTED BY: INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: DATE INSPECTED: APPROVED APPROVED APPROVED DISAPPROVED DISAPPROVED DISAPPROVED COMMENTS: DEPT: BUILDING FINAL BUILDING INSPECTION ENGINEERING FIRE PLANNING CMWD ST LITE PLAN CHECK#: CB973745 PERMIT*: CB973745 PROJECT NAME: MODEL,PLN 4,3080+592 GAR+136 DECK,LA COSTA VALLEY-VILLAGE G-SHEA HOME ADDRESS: 2235 CAMINO ROBLEDO LOT# 442 CONTACT PERSON/PHONE#: C/MARK/632-9922 SEWER DIST: LC WATER DIST: 0 DATE: 04/17/98 PERMIT TYPE: SFD APR 2i 1998 INSPECTE BY i INSPEC BY: INSPECTED BY: DATE INSPECTED; DATE INSPECTED; DATE INSPECTED; APPROVED' APPROVED DISAPPROVED APPROVED X DISAPPROVED DISAPPROVED COMMENTS: dU>*- PREFERRED CONSTRUCTION INSPECTIONS, INC. *frO- 4888 RONSON COURT "Q" ' SAN DIEGO, CA 92111 TELEPHONE (619) 676-9110 CERTIFIED INSPECTOR'S WEEKLY REPORT COVERING WORK PERFORMED WHICH REQUIRED APPROVAL BY THE SPECIAL INSPECTOR OF JOB ADDRESS S} / f %^C-J*>$ £~S?sl4*s2Q J\OG&* OWNER OR PROJECT NAME CONSTfl. MAT!. (TYPE. GRADE. ETC.) DESIC STflE JOB NO. , g_7 5j"7 Jy D REINFORCED CONCRETE D STRUCT. STEEL ASSEMBLY Ds D PHE-STRESSED CONCRETE D REINFORCED GYPSUM 29 c Q REINFORCED MASONRY DoEEP FOUNDATtON . , I BUtLDWO PERMIT NUMBER ARCHITECT ^/^CTV^XV^ IN SOURCE OF MFGR. *3TH DESCRIBE MAT'L (MIX DESIGN. RE-BAR GRADE & MFGR.. WELD-ROD. ETC.) ^^x»*^5*r) si -3i* 2> sZjd&X.tf / s /• ENGINEER , XT^XT^^*^1^^^" x^ai GENERAL CONTRACTOR -" ' J>*/S£s? CONTR. DOING REPORTED WORK £sWL&<#£'SS ^C )R WEEK / / DING ? /y../ ^-. «.^-/wyyf PRAY-APPLtED FIREPROOFING THER I?jQ QXy S f PLAN FILE NUMBER y -^" <*/£. LAB. RECEIVING I TESTING CONSTfl. UATL. SAMPLES INSPEC- ARRIVAL TON TIME. DATE DEPARTURETIME tfit- s-Zo/ ~T**f i*jAc"' DETAILEDREPORT OF LOCATION OF WORK INSPECTED. TEST SAMPLES TAKEN. WORK REJECTED, JOB PROBLEMS. PROGRESS. REMARKS, ETC.WORK *CLUDeSNFO«IATK»AaOyT— MKMJNTBOflWTeflULPUeeDOflW INSPECTED COMfCTKM (WELMUADC. H.T. MLTB TORQUCDt CHKKED: ETC. ^~*rSAt*./ '.. 49ra^;S«* ^***Je£& *,^ . ^^V «y^ Jxx^(-"^t> / a- o/ 7^*-^ >^x^y <L?^> ^^CT^ £ - f&**^ A*/o«J <: £ szyp &+>? T-&HS '/<* X^ c^jT^ /- r-rT^oy^y ^^^ .^ >0^a^^ J^/sttr y4> <3&*^cLf0& • - fAt(<f ' *•" < / _, //• o ^ ^?^ 7^ ' r f s INSPECTOR imMTOHTvre $ '$-£-& ^&G>^~ ' SIGNATURE i^X^Enf^ X^!^X DATE SIGNED 2 1 /£ 1 ?ft CERTflCATE NO. &£5^& NOT* Hi MMC1KM MWm UMT M MCOVU §Y FMMV Of THI WI0C KUOWHQ TWfHWKTIONMTO. CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved pi, specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering 01 ion or project control. PREFERRED CONSTRUCTION INSPECTIONS, INC. 4888 Ronson Court "G" San Diego, Ca. 92111 (619) 576-9110 Fax (619) 576-7028 TEST RREQRT...30B-NQ-2374 JOB.MONTEREY COLLECTIONS ADDRESS 2"5 CAMINO ROBLEDO OWNER SHEA HOMES CL.ENT SHEA HOMES ARCHITECT CHILDRESS CONCRETEf*f*\ KIT D A f^T/^ Q PNB1NEEB J-L. DAVIDSON m nR AUTH CITY OF CARLSBAD INSPECTOR DALE REGLI PERMIT MO 973745 PLAN FILE FIELD SAMPLE OF: CONCRETE LOCATION OF SPECIMEN IN JOB OR STRUCTURE: LOT #442 MIX NO. PROPORTIONS ADMIXTURE 3475P 4.75 SACK POZZOLAN MADE BY SLUMP DATE MADE DALE REGLI 3 1/2" 2/02/98 TYPE OF CEMENT CONG. SUPPLIER . TICKET NO. II DATE RECEIVED 2/03/98 ESCONDIDO READY MIX 226737 SOURCE OF ROCK INSPECTOR SIGN _ AGE TESTED LABORATORY TEST DATA DAYS 10=? DAYS 28 DAYS 28 DAYS H DAYS SPECIMEN MARKINGS DATE TESTED AREA -SO. IN. ULTIMATE LOAD - LBS. UNIT STRESS - PSI SPECIFIED STRENGTH AT 28 DAYS - PSI 27598 2/12 28.28 61000 2160 27599 3/02 28.28 27600 3/02 28.28 2500 27601 HOLD DISTRIBUTION: SHEA HOMES CHILDRESS CONCRETE CITY OF CARLSBAD TEST METHODS -ASTM C39 C172 C173: C143: C231: C138: C1231: ENGINEER PREFERRED CONSTRUCTION INSPECTIONS, INC. 4888 Ronson Court "G" San Diego, Ca. 92111 (619) 576-9110 Fax (619) 576-7028 .JOB-NO.2374 JOB MONTEREY COLLECTIONS 2235ADDRESS SHEA CLIENT SHEA ARCHITECT INSPECTOR DALE CAMINO ROBLEDO HOMES HOMES REGLI PHONE roNTBAr™« CHILDRESS CONCRETE FNRINEER CITYBIDG. AUTH. PF.RMIT MO 973745 DAVIDSON OF CARLSBAD PI AM Fit F FIELD „«„„„,,,„„ LOCATION OF SPECIMENSAMPLE OF: CONCRETE [N JOB OR STRUCTURE: LOT #442 MIX NO. PROPORTIONS ADMIXTURE A TYPE OF CEMENT CONG. SUPPLIER TICKET NO. 3475P 4.75 SACK POZZOLAN II & V ESCONDIDO READY MIX 226737 MADE BY SLUMP DATE MADE DATE RECEIVED SOURCE OF ROCK INSPECTOR SIGN DALE REGLI 3 1/2" 2/02/98 2/03/98 LABORATORY TEST DATA AGE TESTED 28 DAYS H DAYS SPECIMEN MARKINGS DATE TESTED AREA - SQ. IN. ULTIMATE LOAD - LBS. UNIT STRESS - PSI SPECIFIED STRENGTH AT 28 DAYS - PSI 27598 2/12 28.28 61000 2160 27599 3/02 28.28 93000 3290 -^ 27600 3/02 28.28 91500 '//r 3240 2500 27601 HOLD DISTRIBUTION: SHEA HOMES CHILDRESS CONCRETE CITY OF CARLSBAD TEST METHODS - ASTM C39: C173: C231: C172: C143: C138: C1231: ENGINEER