HomeMy WebLinkAbout2235 CAMINO ROBLEDO; ; CB973745; Permit\J UILDIN G PERMIT
01/14/9$ 16=
Pacre i of
Job Address:
Permit Type
Parcel No:
Valuation:
32
Permit
Project
Development
No
No
No
2235 CAMINO ROBLEDO nFTarHFD
; SINGLE FAMILY DWLNG - DETACHED
255-261-50-00
Reference*:
Suite
Lot*
CT
442 3002 01/14/98 0001 01
Construction
88-03
CB973745
A9704834
DEV89110
02
ISSUED
10/01/97
01/14/98
RMA
Appl/Ownr
* * *
SHEA HOMES
10721 TREENA ST
SAN DIEGO CA
Plan Check Numbers
Fees Required
STE 200
***
619 549-3156
Collected & Credits * **
,.„_*-—*-*-«•
Fees :
Adjustments:
Total Fees:
12,470.83
.00
12,470.83
Fee description Uni
,00
350.00
12,120,83
Ext fee Data
^-Fee
Number of Bedrooms . . • •
Number of Bathrooms .
Building Permit
Plan Check
Strong Motion Fee
Enter" "Y" to Autocalc ,P . F. F
Enter "V" to Autocalc t. I .F
Payoff Fee for CFD '••'..
Enter LFM Fee f Zones*6, 11,
Enter "Y" for Plumbing Ms S
Each Plumbing Fixture Or .Trap
Each Building Sewer _• _
Each install/Repair Water V ,'
Each Water Heater and/or Vent
Gas Piping System *
Each Vacuum Breaker
Enter "Y" for Electric Issue Fee
Sinale Phase Per AMP
Enter 'Y' for Mechanical Issue Fee>
Install Furn/Ducts/Heat Pumps >
Each Install Fireplace >
Each Exhaust Fan
Each Install/Reloc Vent
3.60
5
3
1182
768
25
00
00
.00
, 00
>310.
4637.00 Y
83
00
00
. 00
4698
310
20
133
1
2
100
1
2
4
2
'15
7
7
7
7
00
00
00
, 00
.00
.25
7. 00
7. 00
9. 00
6. 50
6. 50
4. 50
10,
25
15
9
13
26
9
00
00
00
00
,00
.00
.00
CLE;
L
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
City of Carlsbad Bldg Inspection Request
For: 8/24/2000
Permit# CB973745
Title: MODEL.PLN 4,3080+592 GAR+136
Description: DECK,LA COSTA VALLEY-VILLAGE G-SHEA HOME
Inspector Assignment: PY
2235 CAMINO ROBLEDO
Lot 442
Type:SFD Sub Type:
Job Address:
Suite:
Location:
APPLICANT SHEA HOMES
Owner: SHEA HOMES LTD PARTNERSHIP
Remarks:
Phone: 7606329922
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: SCOTT
Entered By: CHRISTINE
Act Comments
Associated PCRs
Date
4/22/1998
4/21/1998
4/17/1998
4/1/1998
3/18/1998
3/16/1998
3/16/1998
3/13/1998
3/13/1998
3/12/1998
3/12/1998
3/11/1998
3/10/1998
3/10/1998
3/9/1998
3/6/1998
Inspection History
Description
89 Final Combo
89 Final Combo
89 Final Combo
39 Final Elec
23 Gas/Test/
18 Exterior L
23 GasH"est/
17 Interior l_£
23 Gas/Testy
17 Interior LE
23 Gas/Test/
17 Interior LE
16 Insulation
Act
.bo AP
.bo NR
bo PA
trical PA
Repairs AP
ath/Drywall WC
Repairs NS
,th/Drywall AP
Repairs NR
th/Drywall NR
Repairs NR
th/Drywall PA
AP
ath/Drywall AP
mbo AP
jel/Bolting/Welding PI
Insp
PY
PY
PY
PY
PS
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
Comments
EMR
1ST LAYER LID
Inspection List
Permit*:
Date
4/22/98
4/21/98
4/17/98
4/1/98
3/18/98
3/16/98
3/16/98
3/13/98
3/13/98
3/12/98
3/12/98
3/11/98
3/10/98
3/10/98
3/9/98
3/6/98
3/6/98
3/6/98
3/6/98
3/5/98
3/2/98
2/24/98
2/24/98
2/18/98
2/18/98
2/2/98
1/30/98
1/29/98
1/26/98
1/26/98
CB973745 Type: SFD
Inspection Item
89
89
89
39
23
18
23
17
23
17
23
17
16
18
84
14
24
34
44
84
83
13
13
13
15
11
11
11
21
22
Final Combo
Final Combo
Final Combo
Final Electrical
Gas/Test/Repairs
Exterior Lath/Drywall
Gas/Test/Repairs
Interior Lath/Drywall
Gas/Test/Repairs
Interior Lath/Drywall
GasfTest/Repairs
Interior Lath/Drywall
Insulation
Exterior Lath/Drywall
Rough Combo
Frame/Steel/Bolting/Weldin
Rough/Topout
Rough Electric
Rough/Ducts/Dampers
Rough Combo
Roof Sheathing/Ext Shear
Shear Panels/HD's
Shear Panels/HD's
Shear Panels/HD's
Roof/Reroof
Ftg/Foundation/Piers
Ftg/Foundation/Piers
Ftg/Foundation/Piers
Underground/Under Floor
Sewer/Water Service
MODEL.PLN 4,3080+592 GAR+136
Inspector Act Comments
PY
PY
PY
PY
PS
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
AP
NR
PA
PA EMR
AP
we
NS
AP
NR
NR
NR
PA 1ST LAYER LID
AP
AP
AP
PI
AP
PI
PI
NR
AP
NR MISSING WINDOWS
NS
NR
AP
AP
AP REVISE PLAN
NR
AP
we
Saturday, October 23, 1999 Page 1 of 1
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD Q® LITE
PLAN CHECKtf: CB973745 DATE: 04/17/98
PERMIT#: CB973745 PERMIT TYPE: SFD
PROJECT NAME: MODEL,PLN 4,3080+592 GAR+136
DECK,LA COSTA VALLEY-VILLAGE G-SHEA HOME
ADDRESS: 2235 CAMINO ROBLEDO LOT# 442
CONTACT PERSON/PHONE#: C/MARK/632-9922
SEWER DIST: LC WATER DIST: O
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
COMMENTS:
A-
A
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING CMWD ST LITE
PLAN CHECK#: CB973745
PERMIT#: CB973745
PROJECT NAME: MODEL,PLN 4,3080+592 GAR+136
DECK,LA COSTA VALLEY-VILLAGE G-SHEA HOME
ADDRESS: 2235 CAMINO ROBLEDO LOT* 442
CONTACT PERSON/PHONE#: C/MARK/632-9922
SEWER DIST: LC WATER DIST: 0
DATE: 04/17/98
PERMIT TYPE: SFD
INSPECTED
BY:
INSPECTED
BY:
INSPECTED
BY:
DATE
INSPECTED:
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
COMMENTS:
DEPT: BUILDING
FINAL BUILDING INSPECTION
ENGINEERING FIRE PLANNING CMWD ST LITE
PLAN CHECK#: CB973745
PERMIT*: CB973745
PROJECT NAME: MODEL,PLN 4,3080+592 GAR+136
DECK,LA COSTA VALLEY-VILLAGE G-SHEA HOME
ADDRESS: 2235 CAMINO ROBLEDO LOT# 442
CONTACT PERSON/PHONE#: C/MARK/632-9922
SEWER DIST: LC WATER DIST: 0
DATE: 04/17/98
PERMIT TYPE: SFD
APR 2i 1998
INSPECTE
BY i
INSPEC
BY:
INSPECTED
BY:
DATE
INSPECTED;
DATE
INSPECTED;
DATE
INSPECTED;
APPROVED'
APPROVED
DISAPPROVED
APPROVED X DISAPPROVED
DISAPPROVED
COMMENTS:
dU>*-
PREFERRED CONSTRUCTION INSPECTIONS, INC. *frO-
4888 RONSON COURT "Q" '
SAN DIEGO, CA 92111 TELEPHONE (619) 676-9110
CERTIFIED INSPECTOR'S WEEKLY REPORT
COVERING WORK PERFORMED
WHICH REQUIRED APPROVAL BY
THE SPECIAL INSPECTOR OF
JOB ADDRESS S} / f
%^C-J*>$ £~S?sl4*s2Q J\OG&*
OWNER OR PROJECT NAME
CONSTfl. MAT!. (TYPE. GRADE. ETC.) DESIC
STflE
JOB NO. , g_7 5j"7 Jy
D REINFORCED CONCRETE D STRUCT. STEEL ASSEMBLY Ds
D PHE-STRESSED CONCRETE D REINFORCED GYPSUM 29 c
Q REINFORCED MASONRY DoEEP FOUNDATtON
. , I BUtLDWO PERMIT NUMBER
ARCHITECT
^/^CTV^XV^
IN SOURCE OF MFGR.
*3TH
DESCRIBE MAT'L (MIX DESIGN. RE-BAR GRADE & MFGR.. WELD-ROD. ETC.)
^^x»*^5*r) si -3i* 2> sZjd&X.tf
/ s /•
ENGINEER ,
XT^XT^^*^1^^^" x^ai
GENERAL CONTRACTOR -" '
J>*/S£s?
CONTR. DOING REPORTED WORK
£sWL&<#£'SS ^C
)R WEEK / /
DING ? /y../ ^-. «.^-/wyyf
PRAY-APPLtED FIREPROOFING
THER I?jQ QXy
S f
PLAN FILE NUMBER
y -^"
<*/£.
LAB. RECEIVING I TESTING CONSTfl. UATL. SAMPLES
INSPEC- ARRIVAL
TON TIME.
DATE DEPARTURETIME
tfit- s-Zo/
~T**f
i*jAc"'
DETAILEDREPORT OF LOCATION OF WORK INSPECTED. TEST SAMPLES TAKEN. WORK REJECTED, JOB PROBLEMS. PROGRESS. REMARKS, ETC.WORK *CLUDeSNFO«IATK»AaOyT— MKMJNTBOflWTeflULPUeeDOflW
INSPECTED COMfCTKM (WELMUADC. H.T. MLTB TORQUCDt CHKKED: ETC.
^~*rSAt*./ '..
49ra^;S«*
^***Je£&
*,^ .
^^V «y^ Jxx^(-"^t> /
a- o/ 7^*-^ >^x^y
<L?^> ^^CT^ £ -
f&**^ A*/o«J <:
£ szyp &+>? T-&HS
'/<* X^ c^jT^ /-
r-rT^oy^y ^^^
.^
>0^a^^ J^/sttr
y4> <3&*^cLf0& •
- fAt(<f
' *•" <
/ _, //•
o ^ ^?^ 7^
' r f s
INSPECTOR imMTOHTvre $ '$-£-& ^&G>^~ '
SIGNATURE i^X^Enf^ X^!^X
DATE SIGNED 2 1 /£ 1 ?ft CERTflCATE NO. &£5^&
NOT* Hi MMC1KM MWm UMT M MCOVU §Y FMMV Of THI WI0C KUOWHQ TWfHWKTIONMTO.
CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved pi,
specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering 01
ion or project control.
PREFERRED CONSTRUCTION INSPECTIONS, INC.
4888 Ronson Court "G"
San Diego, Ca. 92111
(619) 576-9110
Fax (619) 576-7028
TEST RREQRT...30B-NQ-2374
JOB.MONTEREY COLLECTIONS
ADDRESS 2"5 CAMINO ROBLEDO
OWNER SHEA HOMES
CL.ENT SHEA HOMES
ARCHITECT
CHILDRESS CONCRETEf*f*\ KIT D A f^T/^ Q
PNB1NEEB J-L. DAVIDSON
m nR AUTH CITY OF CARLSBAD
INSPECTOR DALE REGLI PERMIT MO 973745 PLAN FILE
FIELD
SAMPLE OF: CONCRETE LOCATION OF SPECIMEN
IN JOB OR STRUCTURE: LOT #442
MIX NO.
PROPORTIONS
ADMIXTURE
3475P
4.75 SACK
POZZOLAN
MADE BY
SLUMP
DATE MADE
DALE REGLI
3 1/2"
2/02/98
TYPE OF CEMENT
CONG. SUPPLIER .
TICKET NO.
II DATE RECEIVED 2/03/98
ESCONDIDO READY MIX
226737
SOURCE OF ROCK
INSPECTOR SIGN _
AGE TESTED
LABORATORY TEST DATA
DAYS 10=? DAYS 28 DAYS 28 DAYS H DAYS
SPECIMEN MARKINGS
DATE TESTED
AREA -SO. IN.
ULTIMATE LOAD - LBS.
UNIT STRESS - PSI
SPECIFIED STRENGTH
AT 28 DAYS - PSI
27598
2/12
28.28
61000
2160
27599
3/02
28.28
27600
3/02
28.28
2500
27601
HOLD
DISTRIBUTION: SHEA HOMES
CHILDRESS CONCRETE
CITY OF CARLSBAD
TEST METHODS -ASTM C39
C172
C173:
C143:
C231:
C138:
C1231:
ENGINEER
PREFERRED CONSTRUCTION INSPECTIONS, INC.
4888 Ronson Court "G"
San Diego, Ca. 92111
(619) 576-9110
Fax (619) 576-7028
.JOB-NO.2374
JOB MONTEREY COLLECTIONS
2235ADDRESS
SHEA
CLIENT SHEA
ARCHITECT
INSPECTOR DALE
CAMINO ROBLEDO
HOMES
HOMES
REGLI
PHONE
roNTBAr™« CHILDRESS CONCRETE
FNRINEER
CITYBIDG. AUTH.
PF.RMIT MO 973745
DAVIDSON
OF CARLSBAD
PI AM Fit F
FIELD „«„„„,,,„„ LOCATION OF SPECIMENSAMPLE OF: CONCRETE [N JOB OR STRUCTURE: LOT #442
MIX NO.
PROPORTIONS
ADMIXTURE
A
TYPE OF CEMENT
CONG. SUPPLIER
TICKET NO.
3475P
4.75 SACK
POZZOLAN
II & V
ESCONDIDO READY MIX
226737
MADE BY
SLUMP
DATE MADE
DATE RECEIVED
SOURCE OF ROCK
INSPECTOR SIGN
DALE REGLI
3 1/2"
2/02/98
2/03/98
LABORATORY TEST DATA
AGE TESTED 28 DAYS H DAYS
SPECIMEN MARKINGS
DATE TESTED
AREA - SQ. IN.
ULTIMATE LOAD - LBS.
UNIT STRESS - PSI
SPECIFIED STRENGTH
AT 28 DAYS - PSI
27598
2/12
28.28
61000
2160
27599
3/02
28.28
93000
3290 -^
27600
3/02
28.28
91500
'//r 3240
2500
27601
HOLD
DISTRIBUTION: SHEA HOMES
CHILDRESS CONCRETE
CITY OF CARLSBAD
TEST METHODS - ASTM C39: C173: C231:
C172: C143: C138:
C1231:
ENGINEER