HomeMy WebLinkAbout2248 FARADAY AVE; BLDG 9; CB051154; Permit09*29-2005
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB051154
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
2248 FARADAY AV CBAD
COMMIND Sub Type: INDUST
2121204000 Lot#: 0
$129,480.00 Construction Type: NEW
Reference #:
FARADAY SPECTRUM BLDG9
4980 SF SHELL BUILDING
Status;
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Plan Check#:
ISSUED
03/30/2005
MDP
09/29/2005
09/29/2005
PC05-33
Applicant:
SMITH CONSULTING ARCHITECTS
STE200
12220 EL CAMINO REAL
SAN DIEGO CA 92121
(858) 793-4777
Building Permit
Add! Building Permit Fee
Plan Check
Add'1 Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$415.32
$0.00
$0.00
$27.19
$0.00
1,992.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
PFF14305540)
License Tax (3104193)
License Tax (4304193) .
Traffic Impact Fee (3105541}
Traffic Impact Fee (4305541)
PLUMBING TOTAL
ECECTRICALTSfTAL
MECHANICAL TOTAL
Master Drainage Fee
oowor i so
Rettev Parking Fee '.'•''•
Actditional Fees
TOTAL PERMIT,
$0.00
$0.00
$0.00
$0.00
$2,356.54
$0.00
$0.00
$0.00
$700.00
$0.00
$70.00
$310.00
$0.00
$0.00
$3,658.00
$0.00
$0.00
$10,168.01
Total Fees:$10,168.01 $10,168.01 Balance Due:$0.00
Inspector:
FINAL
Date:
AL
Clearance:
NOTICE Please take NOTICE that approval of your project includes the Imposition* of fees, detfcations, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Cote Section 66Q20(a), art ^
processing in accc^irowlm&ulsbadMui^ Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their Imposition.
You are hereby FURTHER NOTIRED that your right to protest the specified fees/exactions K)£Sr^ APPLY tow
changes, nor ptennfng, zoning, grading or otrw similar appticatton processing crsento fees in c^ NOR DOES IT APPLY to any
tees/exactions of which vou have previously been oiven a NOTICE similar to this, or as to which the rfahJte of Hmitattons has previous^
eitytfCirtsfeai
Final Building inspecdra
Dept: Building Engb^Ring Planning CMWD StLite Fire
R
E
ECEIVED
MAY 3 2006
NcSii$i$rE*rr
Plan Check*:
Permit ft
PC05-33
CB051154
Project Name: FARADAY SPECTRUM. BLDG 9
Date: 05/03/2006
Permit Type: COMMIND
Sub Type: INDUS!
Address:
4980 SF SHELL BUILDING
2248 FARADAY AV Lot:
Contact Person: LUKE
Sewer Dist:
Inspi
Inspected
By:
Inspected
By:
Phone: 8584377617
Water Dlst:
Date / i
Inspected: OU to [$& Approved:
Date
Inspected: Approved:
Date
Inspected: Approved:
: \s DiDisapproved:
Disapproved:
Disapproved:
Comments:
Final Building Inspeetlen
Dept: Building Engineering Planning CMWD St Lite EK
Plan Check*:
Permit*:
Project Name:
Address:
Contact Person:
Sewer Dlst:
Inspected ,
Bv: *
Inspected
Bv:
Inspected
Bv:
Comments:
PC06-33
CB051154
FARADAY SPECTRUM . BLDG 9
4980 SF SHELL BUILDING
2248 FARADAY AV
LUKE Phone: 8584377617
Water Dist:
"ff""ff '
h ftJA*A Date / /
tf AT**!, Inspected: S/zY^f / "7^*
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot: 0
p Approved: *%L~
Approved:
Approved:
05/03/2006
COMMIND
INDUST
Disapproved:
Disapproved:
Disapproved:
PLANNING DEPARTMENT
FINAL INSPECTION
CHECKLIST
Projeci
Addre
Projec
Contac
t Name:Faradav Spectrum Bide 9 Plan Check No. CB 051 154
ss; 224fcFaradav Ave Project Number:
t Planner
* Person
Ins
1st
X
' I
\
/
f\
\\
IJL
2nd
: Van Lvnch Extension
ROUTING
BLDG
A.WEST
PLANNER
PELA
A.WEST
BLDG
Phone No. (858) 437-7617 DrawineNo. 4279
pections
Approved
\J*L/is'r
\
,/Lt>
Final Inspection Items
All Items below Conform with Approved Site Plan
1 . Project Planner confirms conditions are met
2. Building elevations
3. Building materials
4. Building colors
5. Rooftop equipment screens
6. Fence/wall height, location, and materials
7. Size, number and location of parking spaces
compact, regular, handicap
8. Outdoor recreation facilities
9. Employee eating areas
10. Trash enclosure and location
1 1 . Pavement treatment
12. Landscaping installed (under separate contract)
LIST BELOW ANY ADDITIONAL ITEMS REQUIRING
SPECIAL ATTENTION.
13.
14.
15.
16.
17.
Project complies with all conditions, including above-listed items. Final inspection is complete.
1 / ( (J^/^^ -4~ii®'&
PELA Date
(H:\ADMIN\COUNTER\Final Insp Check)05/03/2006
CltyffCirtrtU
Hnal Building Insnoctlan
Dept: Building Engineering Pla CMWD StLlte Fire
Plan Check*:
Permit*:
Project Name:
Address:
Contact Person:
Sewer Dlst:
Inspected
Bv:
Inspected
Bv:
Inspected
Bv:
Comments:
PC05-33 ^
CB051154
FARADAY SPECTRUM . BLDG 9
4980 SF SHELL BUILDING
2248 FARADAY AV
LUKE Phone: 8584377617
Water Dist:
Date
Inspected:
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot: 0
ADDroved:
Approved:
Approved:
05/03/2006
COMMIND
INDU8T
Disapproved:
Disapproved:
Disapproved:
City of Carlsbad Bldg Inspection Request
For: 05/05/2006
Permit* CBOS 1154
Title: FARADAY SPECTRUM BLDG 9
Description: 4980 SF SHELL BUILDING
Inspector Assignment: JM
2248 FARADAY AV
Lot
Type: COMMIND Sub Type: INDUST
Job Address:
Suite:
Location:
APPLICANT SMITH CONSULTING ARCHITECTS
Owner:
Remarks:
Phone: 8584377617
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: LUKE
Entered By: JANEAN
Act Comment
Com ments/Notices/Holds
Associated PCRs/CVs Original PC# PC05-33
PCR06005 ISSUED FARADAY SPECTRUM-DEFERRED; TRUSS SUBMITTAL-AFFECTS ALL 9 BUILDINGS
Inspection History
Comments
NEED APPROVED ADA PARKING PLAN
ELEC ROOM
ROOF DRAINS
AL
OK TO POUR STRIP
UNDERSLAB ROOF DRAIN
Date
05/03/2006
02/28/2006
02/10/2006
02/10/2006
02/10/2006
02/10/2006
02/09/2006
01/31/2006
01/30/2006
01/20/2006
01/20/2006
01/18/2006
01/18/2006
Description
89 Final Combo
17 Interior Lath/Drywall
15 Roof/Reroof
24 Rough/Topout
24 Rough/Topout
24 Rough/Topout
15 Roof/Reroof
15 Roof/Reroof
15 Roof/Reroof
11 Ftg/Foundation/Piers
21 Underground/Under Floor
11 FtgVFoundation/Piers
21 Underground/Under Floor
Act
CO
AP
AP
AP
AP
AP
CA
NR
NR
AP
AP
NR
NR
Insj
JM
JM
JM
JM
JM
JM
JM
JM
JM
JM
JM
JM
JM
17 05 02:32p Alan Dundon
act 17 OS 02!55p 7604310847
856-483-6056
P-1
p-e
AccuLiNE SURVEY, INC.1919 Grind Avc., Sic 1C, San Diego. CA 92109
(858)483-6665 • Fax (858) 48^6056
E-mail; accuUnesurvey@sbcslobal.Det
AFFIDAVIT OF BUILDING LOCATION
October 6,2005
TSA Contracting, Inc.
4350 Executive Dr., Suite 301
SAn Diego, CA 92121
Attn: Brian Mansell
Job No. 863-05
Faraday Spectmra
Dear Sirs,
This "Letter of Affidavit" is to affirm that all of the buildings, (I thru 9), on the above site
have been calculated and surveyed on the ground in the locations as shown on the approved Civil
Drawings.
Respectfully,
Rudy P. Pacbeco, LS
cc Partners Planning & Engineering
Via 6x (858-376-3555)
Attn: Andrew Kann
c T EONSTRUCTION A ESTING & EJ NGINEERING, INC.
ESCONDIDO • TRACY • RIVERSIDE • OXNARD • LANCASTER • SACRAMENTO
INSPECTION REPORT PAGE jl OF
CTEJOB#
REPORT #
PROJECT NAME:
ADDRESS:<xd
ARCHITECT:
ENGINEER:
CONTRACTOR:
INSPECTION DATE: \\l 3^ -
PLAN FILE:
JO
BLDG PERMIT:
OTHER:
MATERIAL SAMPLING
( ) MASONRY BLOCK ( )REBAR
of
°\ba
dnec^c -fnr
NAME: (PRINT)
CERTIFICATION NO:
SIGNATURE,
GEOTECHNICAL& CONSTRUCTION ENGINEERING TESTING & INSPECTION
1441 MONTIEL ROAD, SUITE 115, ESCONDIDO, CA 92026 (760) 746-4955 FAX (760) 746-9806
CONSTRUCTION TESTING & ENGINEERING. INC.
ENGINEERING, INC.
INSPECTION REPORT PAGE 1 OF 1
CTEJOB#.10-80T
REPORT #
PROJECT NAME: Sarazay Spectrum.
ADDRESS: 2226 Faraday Ave.
Carlsbad,Ca
ARCHITECT: Smith Consulting Architects.
ENGINEER: Chung Y. Song.( # 2685)
CONTRACTOR: TSA Contractors.
INSPECTION DATE: 2-9-06
PLAN FILE:
BLDG. PERMIT: (# Bldg.#7) CBO51152
OTHER: SUB-CONTRACTOR
San Diego-Construction Welding/Whitacre
INSPECTION
() CONCRETE
( ) MASONRY
( ) P.T.CONC.
( X) FIELD WELD
() SHOP WELDING
() PILE DRIVING
() BATCH PLANT
()EXP. ANCHOR
() OTHER
MATERIAL IDENTIFICTION
CONC.MK#/PSI
GROUTMDC#/PSI
MORTAR TYPE/PSI
REBAR GRADE 50-A706
STR. STEEL: A36
H.S. BOLT:
MAS. BLOCK
ELECTRODE: -NR232 (.072)
MATERIAL SAMPLING
( ) CONCRETE ( ) MORTAR ( ) GROUT ( )FffiEPROOFING ( ) MASONRY BLOCK ( ) REBAR
(X ) STRUCTURAL STEEL ( ) BOLTS
INSPECTION PERFORMED, JOB PROBLEM, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, AND
niriur A n vc<
1.1 Observed installation of 2 x 2 x( Vi"X^8") angle iron for horizontal panel to panel splice connections to
#5-#9 rebar,(at the roof level) using (2) 3"-5 ^''double flare groove welds per side at the following location:
1-3/A, A-C/1,1-2/C, A-B/3 & 2-3/B-C. REF.S-7.2. DET.17/SD3 & 12/SD1.
.,2 Observed welding of W fillet welds for connection/installation of truss's to truss seat at the following loc:l-
3/A & 1-2.6/B-C. REF.S-7.2. DET.2/SD2.
1.3 Observed drag strut installation using %"all around fillet welds for connection of drag strut to embeds pl.'s
/truss's in the following locations:l-l.l/B.7 & 1.M.2/B.9. REF.S-7.2. DET.8,9,10,13/SD4.
1.4 Observed fit-up & installation of (4) W12 by 14 beams using Vfillet welds & bolts for fit-up/connection in
the following locations:!-! .2/8,7,1-1.1/C & B.8-C/1.REF.S-7.2. DET.1B/SD5 & 10-10a/SD3),(8,
9,10,13,14/SD4.(Note wooded ledge pending bolted installation at the following loc:l.l-1.2/C.)
RFI's for building #7 ( #29, #31, #33-completed.)
Condensed Report of roof inspection.
Certification of Compliance: All work, unless otherwise noted, complies with the approved plans and specifications and
the uniform building code.
SAME: (PRINT) _JUSTIN RUNGE.SIGNATURE:
CERTIFICATION NO: # 5262291-85
CONSTRUCTION TESTING & ENGINEERING. INC.
KSTONniDO-TRArY-rORONA-OXNARn-I.ANrASTKR-SArRMF.NTO
ENGINEERING, INC.
INSPECTION REPORT PAGE 1 OF 1
CTEJOM.10-80T
REPORT*
PROJECT NAME: Sarazay Spectrum.
ADDRESS: 2248 Faraday Ave.
Carlsbad,Ca
ARCHITECT: Smith Consulting Architects.
ENGINEER: Chung Y. Song.( # 2685)
CONTRACTOR: TSA Contractors.
INSPECTION DATE: 1-30-06
PLAN FILE:
BLDG. PERMIT: (# BIdg.#9) CBO51154
OTHER: SUB-CONTRACTOR
San Diego-Construction Welding/Whitacre
INSPECTION
() CONCRETE
OMASONRY
() P.T.CONC.
(X) FIELD WELD
() SHOP WELDING
() PILEDRIVING
() BATCH PLANT
()EXP. ANCHOR
O OTHER
MATERIAL IDENTIFICriON
CONC.MDC#/PSI
GROUTMDC#/PSI
MORTAR TYPE/PSI
REBAR GRADE SO-A706
STR. STEEL: A36
H.S.BOLT:
MAS. BLOCK
ELECTRODE: -NR232 (.072)
( )CONCRETE ( )MORTAR ( )GROUT ( )FIREPROOFING ( ) MASONRY BLOCK ( )REBAR
(X ) STRUCTURAL STEEL ( ) BOLTS
INSPECTION PERFORMED, JOB PROBLEM, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, AND
T»W»* A It VC
1.1 Observed installation of 2 x 2 x( W)-(3/8") angle iron for horizontal panel to panel splice connections to
#5-#9 rebar.(at the roof level) using (2) 3"-5 %"double flare groove welds per side at the following location:
1-2/A & 1-2/B. REF.S-5. DET.17/SD3 & 12/SD1.
1.2 Observed welding of %' 'fillet welds for connection/installation of truss's to truss seat at the following loc:l-
2/A & 1-2/B.REF.S-5. DET.2/SD2.
1.3 Observed drag strut installation using Wall around fillet welds for connection of drag strut to embeds pl.'s
/truss's in the following loc:1.8-1.9/A & 1.9-2/A.2. REF.S-5. DET.8,9,10,13/SD4.
1.4 Observed fit-up & installation of (4) W12 by 14 beams using Wfillet welds & bolts for fit-up/connection in
the following locations:l-l.l/B, & 1-1.3/B. REF.S-5. DET.1B/SD5 & 10-10a/SD3),(10,13,14/SD4.
Certification of Compliance: All work, unless otherwise noted, complies with the approved plans and specifications and
the uniform building code.
VAME: (PRINT) JUSTIN RUNGE_SIGNATURE:
^ERTTFICATION NO: # 5262291-85
CONSTRUCTION TESTING & ENGINEERING. INC.
ENGINEERING, INC.
INSPECTION REPORT PAGE 1 OF 2
CTEJOB#.10-80T
REPORT*5
PROJECT NAME: Faraday Spectrum.
ADDRESS: 2244 & 2248 Faraday Ave.
CarIsbad,Ca
ARCHITECT: Smith Consulting Architects.
ENGINEER: Chung Y.Song.(# 2685)
CONTRACTOR: TSA Contractors.
INSPECTION DATE: 12-20-05
PLAN FILE:
BLDG. PERMIT: (# Bldg.#8) CBOSI153
BLDG.(#9)CBOSn54
OTHER: SUB-CONTRACTOR
San Diego-Construction Wekting/Whitacre
INSPECTION
OCONGRETE
() MASONRY
C) P.T.CONC.
(X) FIELD WELD
(> SHOP WELDING
() PILE DRIVING
() BATCH PLANT
(^XP. ANCHOR
OOTHER
MATERIAL IDENTIFICnON
coNC.Mrx#/psi
GROUTMTXWPSI
MORTAR TYPE/PSI
REBAR GRADE 50-A706
STR. STEEL: A36
as. BOLT:
MAS. BLOCK
ELECTRODE: -NR232 (.072)
MATERIAL SAMHJNC
( ) CONCRETE ( ) MORTAR ( ) GROUT ( )FIREPROOFING ( ) MASONRY BLOCK ( ) REBAR
(X) STRUCTURAL STEEL ( )BOLTS
INSPECTION PERFORMED, JOB PROBLEM, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, AND
1.1 Observed installation of 2 x 2 x Wangle inm for vertical splice tie down connections to #5-rebar & 2 x 2 x
5/16**angleiitm for spUce connections to #6-r^ar using (2) 3 ^"double flare groove welds per side at the
foflowing locations: 1-2/A, 1-2/B, A-B/1, & A-B/2. REF. S-4A S-5. DET. 9/SD-l. (NOTE: TYP. tebar
welding schedule det-l/Sl).
1.2 Observed installation of 2 x 2 x %" angle iron for horizontal panel to panel splice connections to #5-*ebar
( At roof level) using (2) 3" doable flare groove welds per side at the fo!k>wmglocations:l-2/A, l-2/B,A-B/l,
& A-B/2. REF.S-4 & S-5. DET. 17/SD-3.(NOTE: TYP. Rebar welding schedule det-l/Sl).
13 Observed welding of %"by 2?* long fillet welds for connection of (4) aaagle iron pd.s to embedded pl^ in tiM
wall panels fiar a inhered comer wall splice cramection at tbe fbUowing locatioml/A, 1/B.2/A&2/B. REF.S-4.
& S-5. DET.12/SD-1. Work on going.End of report
Certification of Compliance: All work, unless otherwise noted, complies with the approved plans and specifications and
the uniform buikting code.
NAME: (PRINT) JUSTIN RUNGE.SIGNATURE:
CERTIFICATION NO: # 5262291-85
24967
< SOIL * TESTING, IN'
SOUTHERN CALIFORNIA SOIL & TESTING, INC.
6280 RIVERDALE STREET, POST OFFICE BOX 600627, SAN DIEGO, CA 92160-0627
Phone (619) 280-4321, FAX (619) 280-4717
SCS&T FILE NO.
P.O. NO.:
PL NC FIX PAGE OF
LOCATION OF WORK INSPECTED:
MATERIAL CLASSIFICATION:
FIELD INSPECTION REPORT FOR: .JBWJEINFORCED CONCRETE n REINFORCED MASONRY n WELDING n FIREPROOFING
D Q.C. CONCRETE D ROOFING/WATERPROOFING D P.T. CONCRETE/STRESS D EPOXY ANCHORS D H.S. BOLTING
DESCRIPTION OF WORK INSPECTED: TIME ARRIVED:TIME DEPARTED:
cwr&t a<>
i/v?s /?
^/ferr^g
UBC I hereby certify that I have inspected the above reported work. Unless noted otherwij
the work inspected is to the beaKpf jfly knowledge in compliance with the approved^ptans,
specifications and applicajjle^wrtqpp'fif the governing building laws.
Inspector Initials I//' /
DSA I hereby certify that I haUevtffspe'cted the above reported work in accordance with the
requirements of DSA approved documents. Sampling and testing were conducted in
accordance with the requirements of the DSA approved documents. The work inspected
complies with the DSA approved documents.
Yes: No: Inspector Initials ,___._
ENDENTS SIGNATURE
signature authoriz** the above work.
SCST205 (REV 8/04)
SOUTHERN CALIFORNIA SOIL & TESTING, INC.
6280 R1VERDALE STREET, POST OFFICE BOX 600627, SAN DIEGO, CA 92160-0627
Phone (619) 2804321. FAX (619) 280-4717
CS&T FILE NO.
P. O. NO.:
PL NC FIX PAGE OF
SOILS ENGINEERING & GEOLOGY FIELD REPORT:
gT FOOTING OBSERVATION D PIER OBSERVATION D
n SITE OBSERVATION D GRADING OBSERVATION D PR-GRADE
PROJECT TITLE:DSA FILE NO.:DSA APR NO.:
PROJECT ADDRESS:PERMIT NO.:PLAN FILE NO.
ARCHITECT:ENGINEER:
GENERAL CONTRACTOR:SUB CONTRACTOR:
LOCATION OF WORK INSPECTED:
DATE:DESCRIPTION OF WORK INSPECTED: TIME ARRIVED:
MINIMUM CHARGE:
TIME DEPARTED:
SOIL CONDITIONS ARE SUBSTANTIALLY IN CONFORMANCE WITH THOSE ASSUMED IN THE SOIL
INVESTIGATION REPORT.
FOUNDATION EXCAVATIONS EXTEND TO THE PROPER DEPTH AND BEARING STRATA.
FOUNDATION EXCAVATIONS DEMONSTRATE AN ADEQUATE AMOUNT OF COMPACTION FOR THE PROPOSED
BEARING PRESSURE.
FOUNDATION EXCAVATIONS SHOULD BE CLEARED OF ALL LOOSE SOILS PRIOR TO CONCRETE
PLACEMENT,$&**&**»
a COMMENTS:
RE. REVIEW
' 'iff ,
ReGtSTRMION No.
DATE
'•tonaftirt juftortieM tt» «bovi work.
OUKVKY, INC.1919 Grand Ave., Ste 1G, San Diego, CA 92109
(858)483-6665 • Fax (858) 483-<S056
E-mail: acculinesurvey@sbcglobal.nct
AFFIDAVIT OF BUILDING LOCATION
October 6, 2005
TSA Contracting, Inc.
4350 Executive Dr., Suite 301
SAn Diego, CA 92121
Attn: Brian Mansell
Job No. 863-05
Faraday Spectrum
Dear Sirs,
This "Letter of Affidavit" is to affirm that all of the buildings, (1 thru 9), on the above site
have been calculated and surveyed on the ground in the locations as shown on the approved Civil
Drawings.
Respectfully,
Rudy P. Pacheco, LS
cc Partners Planning & Engineering
Via fex (858-376-3555)
Attn: Andrew Kann
Dot 06 OS O3:53p Ruda Pacheco
e v
858-483-6056 P.I
AccuLine Survey, Inc.1919 GRAND AVE. SUITE 1C. SAN DIEGO.CA WI09
DATE:
TO:
FAX
ATTN
FROM:
NAME:
(858)483-6665 FAX(838) 483-6056
FAX COVER SHEET
THIS FAX CONTAINS - SHEETS INCLUDING COVER SHEET. IF YOU DO NOT
RECDEVE ALL SHEETS, PLEASE CALL. THANK YOU
ORIGINAL TO FOLLOW VIA MAIL YES NO
Carl Schmidt Inspection Services. Inc. DAY THURSDAY
P.O. Box 178403
San Diego, CA 92177-8403
(619) 855-9252
SPECIAL INSPECTION REPORT
Project: FARADAY SPECTRUM
Addreia; 2214 THROUGH 2248 FARADAY AVE.
Citvt CARLSBADCA ,
Permit Number: CBO5-1146 TO CBO5-1154 pta Fife Number:
TYPE OF OBSERVATIONS:
Reinforcing Steel Reinforced Concrete Structural Masonry Field Welding
Epoxy Prestressed Concrete Shop Welding X Bolting Fireproofing __
Number of Samples: Type:
Materials/DcsignMix/PsiA 36 STEEL , A500 TUBE STEEL E71T-1
Date: 12/22/05
REPORT
ON SITE AT STRUCT STEEL FOR VISUAL INSPECTION OF WELDING OF MODIFICATION OF WIDE FLANGE BEAMS.
SCOPE OF WORK
FABRICATE, FIT UP AND WELD MODIFICATION TO (4) W12X14 BEAMS TO FACILITATE BEAM SEAT MATCH UP AS PER
APPROVED RFI AND DRAWING DATED 12-16-05,02:39 PM AND DETAILS 9,13,15/SD4. THE FOLLOWING BEAM PC # WERE
MODIFIED:. 6B, 8B AND 8A
INSPECTED AND ACCEPTED FIT UP AND SHOP WELDING PERFORMED THIS DATE.
(1) WELDER USING FCAW-G AND E71T-I ELECTRODE.
WORK INSPECTED CONFORMS WTTH APPROVED PLANS AND SPECIHCAT1ONSUNLBS5 OTHER WISE NOTED
DUANELORENZ KC»#«MS SDW TIME IN: 1130 TIMEOUT: 1500
Certification #
General Contractor: TSA
Phone:
Signature
Carl Schmidt Inspection Services. Inc.
P.O. Box 178403
San Diego, CA 92177-8403
(619) 855-9252
SPECIAL INSPECTION REPORT
Project; FARADAY SPECTRUM
DAY WBNSDAY
Addma; 2214 THROUGH 2248 FARADAY AVE.
Ctty; CARLSBAD CA
Permit Number. CBO5-1146TOCBO5-1154 Plan File Number:
TYPE OF OBSERVATIONS:
Reinforcing Steel _ Reinforced Concrete _ Structural Masonry _ Field Welding
Epoxy _ Prestressed Concrete _ Shop Welding X Boiling _ Fireproofing_
Number of Samples:Type:
Materiais/DesignMix/PsiA 36 STEEL , A500 TUBE STEEL E71T-1
Date: 12/20/05
REPORT
ONSITE AT STRUCTSTEEL FOR VISUAL INSPECTION OF WELDING OF MODfflFICATION OF WIDE FLANGE BEAMS.
SCOPE OF WORK
FABRICATE, FIT UP AND WELD MODIFICATION TO (4) W12X14 BEAMS TO FACILITATE BEAM SEAT MATCHUP AS PER
APPROVED RFI AND DRAWING DATED 12-16-05,0239PM AND DETAILS 9,13,15/SD4. THE FOLLOWING BEAM PC # WERE
MODIFIED; 6A, 68,5A^B AND 8A
INSPECTED AND ACCEPTED FTP UP AND SHOP WELDING PERFORMED THIS DATE.
(2) WELDERS USING FCAW-G AND E71T-1 ELECTRODE.
WORK INSPECTS) CONFORMS WTTH APPROVED PLANS AND SPECIFICATIONS UNLESS OTHER WISE NOTED
DUANELORENZ SD»» TIME IN: 1200 TIME OUT: 1600
General Contractor: TSA
Address:
City:
Phone:
igoature
PLANNING/ENGINEERING APPROVALS
PERMIT NUMBER CB
ADDRESS
DATE
RESIDENTIAL TENANT IMPROVEMENT
RESIDENTIAL ADDITION MINOR
(<$10,000.00)
OTHER
PLAZA CAMINO REAL
CARLSBAD COMPANY STORES
VILLAGE FAIRE
COMPLETE OFFICE BUILDING
PLANNER
ENGINEER
DATE
DocsMMbmsff>lannlno Engkiwrfno Approval
D
D
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
Estimate based on unconfirmed information from applicant.
Calculation based on-building plancheck plan submittal.
Address:
Prepared by:
Btdg. Permit No.
Date:Checked by:Date:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: <-/C&rd Sq. Ft./Units:
Sq. Ft./Units:Types of Use: •
APT CALCULATIONS: List types and square footages for all uses.
Types of Use: T^H^ Sq. Ft./Units:
. Sq. Ft./Units:Types of Use:
EDU's:
EDU's:
ADT's:
ADT's:
FEES REQUIRED:
WITHIN CFD: D YES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) D NO
PARK AREA & #:D 1. PARK-IN-LIEU FEE
FEE/UNIT:NO. UNITS:
D 2. TRAFFIC IMPACT FEE
ADT's/UNtTS:
D 3. BRIDGE AND THOROUGHFARE FEE (DIST. #1
ADT's/UNITS: X FEE/ADT:
D
D 4. FACILITIES MANAGEMENT FEE
UNIT/SQ.FT.:_
5. SEWER FEE
EDU's: L-
BENEFIT AflEA:
EDU's: /
ZONE:
X
D 6. SEWER LATERAL ($2,500)
D 7. DRAINAGE FEES PLDA_
ACRES:
D 8. POTABLE WATER FEES
UNITS CODE CONNECTION FEE METER FEE SDCWA FEE IRRIGATION
Iof2
Community Facilities District No. 1
NON-RESIDENTIAL CERTIFICATE: Non-Residential Land Owner,
please read this option carefully and be sure you thoroughly understand the options before
signing. The option you chose will affect your payment of the developed Special Tax
assessed on your property. This option is available only at the time of the first building
permit issuance. Property owner signature is required before a building permit will be
issued. Your signature is confirming the accuracy of all information shown.
£"o - 1 Lie.
Name of Owner Telephone
L
Address
*
Project Address
Carlsbad, California 92001
City, State Zip Code City, State
fLo Ho eo
Zip Code
Assessor's Parcel Number or APN and Lot Number if not yet subdivided by County Assessor.
"' M
Building Permit Numbers)
As cited by Ordinance No. NS-155 and adopted by the City of Carlsbad, California, the City is authorized
to levy a Special Tax in Community Facilities District No. 1. All non-residential property, upon the
issuance of a building permit shall have the option to (I) pay the SPECIAL DEVELOPMENT TAX ONE-
TIME or (2) assume the ANNUAL SPECIAL TAX - DEVELOPED PROPERTY for a period not to
exceed twenty-five (25) years. Please indicate your choice by initialing flic appropriate line below:
OPTION (I):
OPTION (2):
I elect to pay the SPECIAL TAX -
One-Time Special Tax: $
now, as a one-time payment. Amount of
"* . Owner's Initials
I elect to pay the SPECIAL DEVELOPMENT TAX ANNUALLY for a period not to
exceed twerty^lve (25) years. • Maximum ABIW&- ,/Snecial Tax:
$ | 11* . Owner's Initu
I DO HEREBY CERTIFY UNDER PENALTY OF PERJURY THAT THE UNDERSIGNED IS THE
PROPERTY OWNER OF THE SUBJECT PROPERTY AND THAT I UNDERSTAND AND WILL
COMPLY^WITH THE PROVISIONS AS STATED ABOVE.
ignature of Property Owner Title
Print Name Date
The City of Carlsbad has not independently verified the information shown above. Therefore, we accept no
responsibility as to the accuracy or completeness of mis information.
Land Use, FY, Factor f^s. -/. /2- X Square Ft
City of Carlsbad, _ — _ ,,. _ ^, ^j^^^g^^^^_^^^^^^^^^^^^^^^^^^^
Building Department
CERTIFICATE OF COMPLIANCE
PAYMENT OF SCHOOL FEES OR OTHER MITIGATION
This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City
prior to issuing a building permit ft)e City will not issue any building permit without a completed school fee form.
Project Name:
Building Permit
Plan Check Number-
Project Address:
A.P.N.:
Project Applicant
(Owner Name):
Project Description:
Building Type:
Residential:
£j
osr-
-1.7- <•( g>
Number of New Dwelling Units
Square Feet of Living Area in New Dwelling
Second Dwelling Unit: Square Feet of Living Area in SDU
Residential Additions: Net Square Feet New Area
Commercial/Industrial
City Certification of
Applicant Information:
ial: Square Feet Floor Area cJ O CJQ \/]
Pate.
SCHOOL DISTRICTS WITHIN THE CITY OF CARLSBAD
Tsbad Unified School District
6225 El Camino Real
Carlsbad CA 92009 (331-5000J
San Marcos Unified School District
215MataWay
San Marcos, CA 92069 (290-2649)
Contact: Nancy Dolce (By Appt. Only)
Encinitas Union School District
101 South Rancho Santa Fe Rd
Encinitas, CA 92024 (944-4300 ext 166)
San Dieguito Union High School District
710 Encinitas Blvd.
Encinitas, CA 92024 (753-6491)
Certification of Applicant/Owners. The person executing this declaration ("Owner") certifies under penalty of perjury that (1) the
information provided above is correct and true to the best of the Owner's knowledge, and that the Owner will file an amended
certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square
footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect, and
that (2) the Owner is the owner/developer of the above described project(s), or that the person executing this declaration is
authorized to sign on behalf of the Owner,
Signature:Date:
Revised 4/20/00
1635 Faraday Avenue
Building Counter
Carlsbad, CA 92OO8-7314 • (760) 602-27OO
(76O) 602-2719 • FAX (76O) 602-8558
SCHOOL DISTRICT SCHOOL FEE CERTIFICATION
(To be completed by the school district(s))*************************************************
THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE
PROJECT HAVE BEEN OR WILL BE SATISFIED.
SCHOOL DISTRICT:
The undersigned, being duly authorized by the applicable School District, certifies that the
developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that
the applicant listed on page 1 has paid all amounts or completed other applicable school
mitigation determined by the School District. The City may issue building permits for this project.
SIGNATURE OF AUTHORIZED SCHOOL
DISTRICT OFFICIAL LLLva^n^
TITLE GAYLEN FREEMAN
DEPUTY SUPERINTENDENT
CARLSBAD UNIFIED SCHOOL DISTRICT
NAME OF SCHOOL DISTRICT 6225 EL CAMINO REAL
- CAnLGDAD,CA02QOQ
DATE
Revised 4/20/00