HomeMy WebLinkAbout2261 COSMOS CT; ; 82-70; PermitDECLARATIONS
LENDER
s IFa L*. -
* -c£VI IT **Z »*»
058< n 3
~ 4 —O o c2 ? "
Sol
WORKER S COMPENSATION OWNER/BUILDER CONTRACTOR
I I
"I" 8sSs!£ii!i**M*
SSgCSS;iifiss!
8 *
>SVr- =
ji-^sis! 55_qg5 3 tio" ~ ^% ~-5 ^~ ~^=%-0-*
in-s*?^;?i l!SSi?N5s:ils---"°--—r ~"s |§|Sa|^£B9Sa?3
lill^i£||ll||
g»->5aJ8o»"|_piE|a-nS»5aa3»opnS
3l-S5l"?»§or
— Inspector Green — (1) Finance (2) Data Process, Yellow — Assessor Pink — Applicant Gold — Temporary File
II APPLICANT COPY
j ic i^y ,rfii^iY^'"^
l~] PLAN CHECKER COPY
dtp of Cartebab
TC
eck PLAN CORRECTION SHEFT
PI an Chfck No.
1 »»• [ilans received by junsdiction_
• Mf plan* received by plan checker_
*)a:c initial plan check completed
PLEASE READ
Plan check is limited to technical requirements
contained in the Uniform Building Code, Uniform
Plumbing Coda, Uniforn Mechanical Code, National
Electrical Code and state laws regulating energy
conservation, noise attenuation and access for
the hardicapped. The plan check is based on
regulations enforced by the Building Inspection
Department. You may have other corrections
based on laws and ordinances enforced by the
Planning Department, Engineering Department
or other departments.
T*\e items circled below need clarification,
modification or change All circled items have
tc be satisfied before the plans will be in
conformance with the cited codes and regulations
Per Sec 303 (c), 1979 Uniform Building Code,
the approval of the plans does not permit th«
violation of any state, county or city law
PI ASS
Please make all corrections on the original
tracings and submit two new sets of prints,
and any original plan sets that may have
been returned to you by the jurisdiction,
to
To facilitate rechecking, please identify,
next to each circled item, the sheet of
the plans upon which each correction on
this sheet has been made and return this
check sheet with the revised plans
//-
/s
v '
rt-
ESOII. CORPORATION
SAN DIKC.O. <'A in^lXJM
(Tl-t) oOO-l KIM
PLAN CHECK NO. ___ Q at ~7O
OWNLR
DATE REC'D
DATE CHECKED 5V/-
CHECKED BY
"B".
T7CSY1
*<</?
./f
DISTRIBUTION:APPLICANT CITY PLAN CHECXE?
Datei Jurisdiction/ /
Prepared by«
VALUATION AND PLAN CHECK FEE
PLAN CHECK NO.
BUILDING ADDRESS __
APPLICANT/CONTACT .
BUILDING OCCUPANCY
n
TYPE OF CONSTRUCTION
PHONE N0._
DESIGNER PHONE^&& £/A
CONTRACTOR PHONE
BUILDING PORTION
cc/
<d-
fa
-fa
d^lJt;rr?~Y7 •=* —
i-Ofi- ft cv?
Air Conditioning
Commercial
Residential
Fire Sprinklers
Total Value
BUILDING AREA
A/
VALUATION
MULTIPLIER
tie
OT"
VALUE
Building Permit Fee
Plan Check
f,
i^ate!
Prepared byt
FLAN CHECK NO.
BUILDING ADDRESS
APPLICANT/CONTACT
BUILDING OCCUPANCY
TYPE OF CONSTRUCTION /£/_'- /I/
Jurisdiction/<3^^c^U-^£-
VALUATION AND PLAN CHECK FEE
£><*
PHONE NO.
DESIGNER PHONE
CONTRACTOR PHONE
BUILDING PORTION BUILDING AREA VALUATION
MULTIPLIER
VALUE
-fo ^91
"VT-?
&<M
tse. . ,
r
te a/fr^sl^Tj
. 3? << C?
Air Conditioning
Commercial
Residential
Fire Sprinklers
Total Value
/27 -^" 97
Building Permit Fee*
Plan Check pee
ot>/
C 0 V.V. EN TS
Datei
Prepared byt
CARLSBAD
VALUATION AND PLAN CHECK
PLAN CHECK NO. _8
BUILDING ADDRESS ___
APPLICANT/CONTACT P^JDidP . QfcV £a,c7\ PHONE NO. 7. \ $ - <*+S O -
BUILDING OCCUPANCY ?; - 2. C?S) DESIGNER PHONE Z I B - ^ 3Z
TYPE OF CONSTRUCTION HT- >V)CONTRACTOR PHONE rh4-2.£U 5S
BUILDING PORTION BUILDING AREA VALUATION
MULTIPLIER
VALUE W<*
Buy,14--2
>^Lua
00
Air Conditioning;
Commercial 2.85
Residential 2.^0
Fire Sprinklers 1.30
Total Value
•4-^4
Building Permit Fee
Plan Check Fee
Account No. 65-638-0519 (80fl of plan check fee) \B^>C1 »
Account No. 01-000-U80? (20^ of plan check fee) *f S J
C OMM ENTS : . ^ttA 4/(f? ^ t ) O.M 1;.'-^ q, f, < 3 y> > f (- > \ \ (. ' >•
r; .c
\ v
cfl..0,j ^'\
• •'
nvrvf-'/-, v -,
J v
-,
vj
,
'
l^b^t^ cl
J3 .4 -<•><) .
ESQIL, CORPORATION
BH20 CIIKHAPKAKK DR.. Hl'ITE ISiSi
SAN r>IKC;0, CA 0212:*
(T14)
June 5. 1981
Kowalski, Harding and Associates
201? So. Avalon Boulevard, Suite 310
Carson, California 907^6
Subjecti Recheck of Andrex Project, Yarrow Road,
Carlsbad, California (Carlsbad Plan
Check No. 81-138)
Your response to the itemized corrections listed in our
April 19. 1981 initial correction list, did not resolve the
items due to the shell nature of the project.
My telephone conversation to you on June 5 confirmed that
you prefer to go forward with the "shell" construction and
resolve the interior details as tenant improvements are
planned. In view of that aspect, the plans will be acceptable
if the following items are addressedi
1. Have the responsible design professionals legibly sign
the plan and imprint their seal and license number.
Structural should specifically sign and seal the "S"
sheets unless a licensed architect desires to sign and
seal.
2. Place the following information on the Cover sheet, in
the space beneath "Development Co." and have the note
signed.
Notei APPROVED AS "SHELL" BUILDING ONLY
a. The applicant hereby acknowledges that the plans
do not reflect the presently unknown ultimate
detailed configuration of the interior of the
buildings regarding use, corridor location and
construction, corridor exit facilities, light
and ventilation for the occupants, other light-
ing, mechanical, HVAC, electrical and plumbing
systems, State energy conservation calculations
and design items, interior accessibility to
second floor offices by the physically hand-
icapped, compliance with City of Carlsbad
1.
Policy No. 80-6 and other pertinent regulations.
No use or occupancy of the buildings shall occur
prior to obtaining all required plan checks,
approvals and permits for tenant improvements.
Applicant or Applicant's Agent
We have transmitted all the plans and documents to the
Carlsbad Building Department, in the event you wish to take
care of the two items by inking the two sets of plans. You
can contact Mr. Carter Darnell at (?1*O 438-5525.
If you have any questions, please call Jim Gilshian at
(714) 560-1468.
Thank you,
Esgil Corporation (
jth Gilshian
Vi4e-PresidWt
Encli Carlsbad Policy 80-6 "Roof Mounted EQuipment"
cct City of Carlsbad (Mr. Darnell)
JJG/jms
2.
ESGIL CORPORATION
9a2O CHESAPEAKE DR., SriTE IVSt!
iowalski, Hardi/if HA.N DIEOO. CA 9tn:i:i
(Til) 500-14.<1N Ar>ril201? South Avalon Mvd., Suite 310 April
: arson, Ca. 907^16 COMMERCIAL PLAN CORRECTION SKEZT
Jurisdiction of _ Carlsbad _
Plan Check No. 81-136 Stories
Owner Andrex Development Site Yarrow Dr
Area(s) See remarks
Occupancy To bc clarified
Type Const. m"N Sprinklorcd
Allowable Floor Area 9.000
Basis for Area Increase Unlimited; Sprinklers £ 60' yards
Occupant Load To be clarified _
R emarks Areas: A a 19. ^?6 * 7.3fX> mozz.; 3 'a 6 3,632^+
21,533 mezz.; C G> 29,618.
Date plans picked up/received by ESGIL Tu • ^y by R 'E •
Date first plan check completed by ESGIL v'J':^/2%y JtG'
Corrections checked below are to be made on plans before
permit is issued. The approval of plans and specification
does not permit the violation of any section of the Build-
ing Code, or other City Ordinance or State Law. The follow-
ing list does not necessarily include all errors and
ommissions. See Sec. 303(c) of the 1976 Uniform BuiDding
Code. Plans require correction as indicated by listed
items below, before a building permit can be issued.
Return this correction sheet with corrected plans.
TO FACILITATE RECHECKING PLEASE IDENTIFY. NEXT TO EACH
ITEM LISTED BELOW. THE SHEET OF THE PLANS UPON WHICH THE
CORRECTION HAS BEEN MADE.
1. Return two sets of any plans or documents needed to
•
clarify the listed item-;, r-nd return, -my ;;c ti> of oririnal
- plans that may have bc><. n n-turnoi' to vc u by the City
These corrections i elate only to Building Department require-
ments and other departments, such as Planning or Engineering,
may have additional corrections. If you are not advised of
the status of the Planning or Engineering corrections, please
call Kr. Carter Darnell at (?1*O *O8-5525 •
The responsible design professional should sign the approp-
riate sheets of the plans. . - < ^ r-iM<i
Per Table No. 5-A, U.B.C., please clarify on Sheet 1 of the
plans the type of material to be stored in the warehouse to
allow classifying occupancy as either H-2, H-3 or B-2 or
B-4 (Sec. 501, U.B.C. ). S*r. MB AW»B 5
;iOte on Sheet 1 of the plans, under u;:e, I':,M Iding Use and
Occupancy is restricted to warchouro use only" -sefi /*&OQ*
Plans and General ..otos refer to "'Jrdustri °1 and Office
'Complex" and "Office Warehouse". !'!(ru:u modify to warehouse
i
only or provide complete details and plans for offices.
Otherwide plan check is predicated on no u;,e except ware-
house use. ••• *«^0* Ft**&
\ Assuming use is warehouse only (b-2, conburtible storage),
'show calculations for light and ventilation to comply with
''Section 1105 and 605. Occupant load for warehouse'use is
i
. ft. per occupant (Table 33-A, U.B.C.). A is -94-;
is jg&) C is •9&r'^iGZ2
Provide notes to show compliance with Section 3303(a)(c)j
Section 3306 specify :;lope of handicapped r.unps; Section
] •
'/3312(b) where over 100 occupan ts . »BH #«MP f»cPA/9
A mezzanine cannot exceed 33 1/3 jTtcc-nt o* the total
2.
18
floor area in the room below or it becomes a story (Sec.
414, U.B.C.). Building A and B appear to have stories,
rather than mezzanines.
•>
The stories (see above) have an occupant load greater
han 10 and require two complying exits (Sec. 3302, par.MBZZ r * i *
2). Show compliance as the mezzanines have occupant
100
sq.-- ft. per occupantloads in excess of 10, when usingi .
for warehouse use.
VlO.; Provide toilets for both sexes and handicapped. Show '
(a)(b)(c)(d) and 3oc. 1205, U.B.C.).details. (Sec.QMT. 48 *QT8 A
Provide details of the water service and drain, waste and
•;
jvent piping (Sec. 20.6; U.P.C.) rnd any heating or cool-
!
ng equipment, v/ater hcatern, otc. (.'Jec. "J0?(b) U.M.C.).Mr. 43 /W7B 4
12. I.C.B.O. Research Report for Bristol Skylight-Smoke Vent-
ouver (Ko. 2469) may have expired. Plofiso clarify. •***•
I.ote on plans that smoke vents arc to be tested prior to
pproval for occupancy (I.C.B 0. Research Report 2469).ewr. AS AA0/8 2
Sheet A-3 notes on floor plan "Shop-'Jarehouso". Please
larify word "Shop". *fp ^COOH /H^wvs
5. Show on Sections the Curtain Boards, and installation
details, in Building B. (Sec. 3?0^(f) 'J.B.C.).9MT. A9 Nom 8
16. Show location and details, and structural adequacy, for
guardrails on mezzanine edges. (Sec. 1716, U.E.C.).
1?. Show a complying exit for the mozzaninpn (if you decrease
their size to qualify). (Sec. 330?(a), par. l).aECMfiZ2.
Please submit revised plans and structur.il calculations
as th'e storage mezzanine requires PI the r a 125 Ibs. per
sq. ft. or 250 Ibs. per sq. ft. live load (Table 23-A;
U.B.C.). The submitted design used office loading of
only 50 Ibs. per sq. ft.
'19- Iiote on each foundation plan "Prjoi to th" contractor
requesting a foundation inspection by the City the
geotechnical consultant shall advise the building Official,
in writing, that the consultant has reviewed the site
grading, subgrade preparation, foundation excavations and
foundation plans and confirms that those items conform to
the intent of the consultant's recommendations contained in
the December 16, 1980 report from Woodward-Clyde Consult-
Andrex Development Company for Project iJo. 50332W-
UD01". 8*r. Sa
i/20. Clarify the roof framing to be used in the north offset.
<••-"
Roofing, Plan A. •*!* •!»
Sheet 7 of Plan A calculations shows 2U1 - unsupported wall
height. SEAOC suggests ^2 maximum h/t. '/hat and where is
'your maximum h/t with the 6" wall^BM *TTHCHSO C*LCB (PC*
Show on 1/3-5; 7/--5: 12/S-5 connections betw^n plywood.
V 21
trus - joists and related into lodgerf.
** «?3\ Provide the approved I.C.B.O. "Trus-Joist:-" data referred
on plans. 7&C/8-
You mentioned you designed Plan A walls using "the latest
method developed by 3£AGC" lor til tup .vails and said you
enclosed the article. Apparently it was not enclosed.
Please enclose. M* nTTRCH&Q
'5. Calculations by "CRG" for Plan A were received, as v/ell as
calculations for Plan C by Victor Abe nnd Associates.
i,o calculations were received for Plan B. Please submit,•M #rr*CHao CPLCS-
26. No check was made, at this time, for Plan B, pending
receiving calculations.
If you have any questions please call Jim Gilshian at
560-1U68.
Thank you,
Esgil Corporation
J/v-v_t t^p- ^.-H '^ >l^<^^
James Joseph Gilshian
Vice President
ESGII. CORPORATION
e:i£OCIIKSAPKAKK 1>H.. SI'ITI-: ISitJSAN niFXiO, c\\ »^i^:»
(714) r>(lO-l KVW
PLAN CHECK NO. Jo?
OWNER
DATE REC'D
DATE CHECKED
CHECKED BY \J (s*
O'~r
2
/r?"&".
-p**
X3-12.
It
its
^'
.DISTRIBUTION;APPLICANT CITY PLAN CHECKS?
Date;Jurisdiction-
Prepared by«Dept.
PLAN CHECK NO .
BUILDING ADDRESS
APPLICANT/CONTACT fcoLL. £t> .C ?
BUILDING OCCUPANCY
VALUATION AND PLAN CHECK FEE
£>&.
PHONE NO.
DESIGNER PHONE
TYPE OF CONSTRUCTION #LT- t\J CONTRACTOR PHONE
Building Permit
Plan Check
C OMT.1 EN TS
T A
V-
Date i
Prepared by:
CARLSBAD
VALUATION AND PLAN CHECK FEE
Bid p. Dept
inance
PLAN CHECK NO.
BUILDING ADDRESS
APPLICANT/CONTACT
BUILDING OCCUPANCY "6 - 2.
N),2. (T
PHONE NO. Z-13 -
DESIGNER PHONE Z|
TYPE OF CONSTRUCTION HE- >V)CONTRACTOR PHONE
BUILDING PORTION BUILDING AREA VALUATION
MULTIPLIER
VALUE £a?c*'
Cki
'X'1 14- ^5
oo
Air Conditioning
Commercial 2.85
Residential 2.^0
Fire Sprinklers 1.30
Total Value
-»-~^
Building Permit Fee
Plan Check Fee
Account No. 65-638-0519 (80# of plan check fee)
Account No. 01-000-480? (20$ of plan check fee)
C OMM EN TS i - •V'tt\ l/? "T)1 (^M h? 0, S Q 9
°f ^ '<o'
p./ J rfio,j f /\ i • c
'-- /!j£L*< \ > * J
*,X ft - ..L.-
8/Uj?JLi> i
L/i-i^. <iXLUx>uL.*-o ,-,LC-!>
it* ^ ~J J'VA_f>»V-^f -V {ClrCL^V^^-V.-^\ - 'I,
'J V\ v)
ESOIJ. CORPORATION
CIIKSA1>KAKK I>H , Sl'ITK 1S>S£
NAN I)IK(.0. CA
(Ti4)
June 5, 1981
Kowalski, Harding and Associates
201? So. Avalon Boulevard, Suite 310
Carson, California 90?46
Subjecti Recheck of Andrex Project, Yarrow Road,
Carlsbad, California (Carlsbad Plan
Check No. 81-138)
Your response to the itemized corrections listed in our
April 19* 1981 initial correction list, did not resolve the
items due to the shell nature of the project.
My telephone conversation to you on June 5 confirmed that
you prefer to go forward with the "shell" construction and
resolve the interior details as tenant improvements are
planned. In view of that aspect, the plans will be acceptable
if the following items are addressedi
1. Have the responsible design professionals legibly sign
the plan and imprint their seal and license number.
Structural should specifically sign and seal the "S"
sheets unless a licensed architect desires to sign and
seal.
2. Place the following information on the Cover sheet, in
the space beneath "Development Co." and have the note
signed.
Notei APPROVED AS "SHELL" BUILDING ONLY
a. The applicant hereby acknowledges that the plans
do not reflect the presently unknown ultimate
detailed configuration of the interior of the
buildings regarding use, corridor location and
construction, corridor exit facilities, light
and ventilation for the occupants, other light-
ing, mechanical, HVAC, electrical and plumbing
systems, State energy conservation calculations
and design items, interior accessibility to
second floor offices by the physically hand-
icapped, compliance with City of Carlsbad
1.
Policy No. 80-6 and other pertinent regulations.
b. No use or occupancy of the buildings shall occur
prior to obtaining all required plan checks,
approvals and permits for tenant improvements.
Applicant or Applicant's Agent
We have transmitted all the plans and documents to the
Carlsbad Building Department, in the event you wish to take
care of the two items by inking the two sets of plans. You
can contact Mr. Carter Darnell at (714) 438-5525.
If you have any questions, please call Jim Gilshian at
560-1468.
Thank you,
Esgil Corp9ration
•V
jh Gilshian
ViAe-President
Encli Carlsbad Policy 80-6 "Roof Mounted EQuipment"
cct City of Carlsbad (Mr. Darnell)
JJG/jms
2.
ESGIL CORPORATION
9320 CHESAPEAKE DR , SI ITE llT-i
CowalsKi, Hardly SAN DIPZOO CA 9'-ii-»:i
*. ASSOC (Tit) o«0-14.«JH
'017 South vvalon blvd , Suite 310
:arson, Ca 90?46
COMMERCIAL PLAN CORRECTION SHEET
Jurisdiction of Carlsbad
Plan Check No. 81-136 Stories
Owner Andrex Development Site Yarrow Dr
Area(s) See remarks
Occupancy To bo clarified
Type Const. m"N Spnnklcrcd
Allowable Floor Area 9.000
Basis for Area Increase Unlimited, Sprinklers & 60' yards
Occupant Load To be clarified
Remarks Areas: A a> 19. W> + 7.3S>6 mrtz ; B a 63,632^+
21,533 mezz.; C 0> 29,6l8
Date plans picked up/received by ESGIL_Tu VI'»/>«, R
Date first plan check completed by ESGIL '^ ^>/2%y J>G
Corrections checked below are to be made on plans before
permit is issued. The approval of plans and specification
does not permit the violation of any section of the Build-
ing Code, or other City Ordinance or State Law. The follow-
ing list does not necessarily include all errors and
ommissions. See Sec. 303(c) of the 1976 Unifcr-n BuiDding
Code. Plans require correction as indicated by listed
items below, before a building permit can be issued.
Return this correction sheet with corrected plans.
TO FACILITATE RECHECKING PLEASE IDENTIFY. NEXT TO EACH
ITEM LISTED BELOW. THE SHEET OF THE PLANS UPON WHICH THE
CORRECTION HAS BEEN MADE.
1. Return two oets of any plans or clor'^ionti needed to
•
clarify the listed item-j, .-nd rrt'irn my r,et:. of original
- plans that may have bt-c M n turnci' to \cu by the City
These corrections i elate only to building Department require-
ments and other departments, such as Planning or Engineering,
may have additional corrections If you arc not advised of
the status of the Planning or Engineering corrections, please
call Kr. Carter Darnell at (?1*O *O8-5525
V 2. The responsible design professional should sign the approp-
riate sheets of the plans. - ««•* MM£
Per Table No. 5-A, U.B.C., please clarify on Sheet 1 of the
plans the type of material to be stored in the warehouse to
allow classifying occupancy as either H-2, H-3 or B-2 or
B-4 (Sec 501, U.E C ) 9tfr. ft/B A/a»B *
,iOte on Sheet 1 of the plans, under u':e, '':,.aiding Use and
Occupancy is restricted to warehouse use or ly" Sfi6 ^*JO<
Plans and General oter, retcr to "Ldustri'l rnd Office
_G, /Complex" and "Office Warehouse" T lea o .norlily to warehouse
only or provide complete details .ind plans for offices
Otherwide plan check is predicated on no u ,o except ware-
house use •*• PtJjOA, ^it^A/S
Assuming use is warehouse only (b-2, gonbuc-tible storage),
show calculations for light and ventilation to comply with
Section 1105 and 605. Occupant load for warehouse^use is
. ft. per occupant (Table 33~A, U B C ) A is -^
is 2&& C is •W*~^ieg?
Provide notes to show compliance with Section 3303(a)(c)j
vSection 3306 specify :,lope ol handicapped i.unps; Section
^ /~\ ! *< et ^l'0\/3312(b) where over 100 occupants OEB A«MP ^»*>W3
S, A mezzanine canrot exceed 33 1/3 percent o' the total
2.
. i
floor area in the room below or it becomcr a story (bee
414, U.B C.) Building A and B appear to have stories,
rather than mezzanines
•
The stories (see above) have an occupant load greater
han 10 and require two complying exits> (Sec. 3302, par
085 MmXif ^t^fi/9
f 11 \
) Show compliance as the mezzanines have occupant
100 —r- ?)
loads in excess of 10, when using %&Q sq-.—ft. per occupant
i
for warehouse use.
VlO ,' Provide toilets for both sexes and handicapped. Show V <
details (Sec. 1?11(a)(b)(c)(d) ind 3oc 1205, U.B C.).
Provide details of the water service and drain, waste and
jvent piping (Sec. 20.6; U PC.) pnd any heating or cooi-
ng equipment, water heatern, etc (jec. JQ?(b) U.M.C.).MT. *3 A/078 4-
12. I.C.B.O. Research Report for Bristol Skylight-Smoke Vent-
ouver (i<o. 2469) may have expired Plo.iso clarify. •***
i.ote on plans that smoke \cnts arc to be tested prior to
pproval for occupancy (I C B 0. Research Report 2469)ewr. *a *e/s s
Sheet A-3 notes on floor plan "Lhop-'Jarehouoo" Please
*slariiy word "Shop" ACS fUjoo*. ^t«^/8
5. Show on Sections the Curtain Boards, and installation
details, in Building B (Sec 3?0/>(f) „ E C )SMT. A& Atom a
16. Show location and details, and structural adequacy, for
guardrails on mezzanine edges. (^cc. I?l6, U E.G.)
PVU. HOI&HT bVfftL //V UGU OP QiM*Q*tHC
17 Show a complying exit for the mozzaninen (if you decrease
their size to qualify) (Sec. 330?(a), par. l).aEftMfiZ2.
18. Please submit revised plans and fitructur.il calculations
,as the storage mezzanine require0, oithct a 1?5 Ibs per
sq ft or 250 Ibs per t,q. Jt live load (Table 23-A;
U.B C.). The submitted dcsifn used office loading of
only 50 Ibs per s,<i ft.
'19 r»ote on each foundation pljin "nrjoi to th° contractor
requesting a foundation inspection by the City the
geotechnical consultant shall advise the building Official,
in writing, that the consults it lias revie-ved the site
grading, subgrade preparation, foundation excavations and
foundation plans and confirms that those items conform to
the intent of the consultant's recommendations contained in
the December 16, 1980 report from Woodward-Clyde Consult-
Andrex Development Company for Project iJo. 50332W-
UD01" Bur. &a
Clarify the roof framing to be used in the north offset.*-^-
Roofing, Plan A. •M* •!»
%/ 21. Sheet 7 of Plan A calculations shows 2V - unsupported wall
height. SEAOC suggests k2 maximum h/t /hat and where is
your maximum h/t with the 6" wall^BM BTTftCHBD CPLCS
Show on 1/3-5? 7/"-5» 12/S-5 connections between plyuood,
trus - joists and related into ledger! 9ffT. *fi
>" Vthe approved I C B.O "Trus-Joist'" data referred
on pi ins. 7W/&-JQ/3TB TQ
PA./OA TO
You mentioned you desigred Plan A walls uTing "the latest
method developed by o'?ACC" lor til tup .vails and said you
enclosed the article. Apparently it was not enclosed
Please enclose Bf* 6TT&CHBO GATtCLB
Calcu'lations by "CRG" for Plan A were received, as well as
calculations for Pliri C by Victor Abe nnd Associates
i«o calculations were received for Plan B Please submit•as wrrfiCHmo CALCS>
26. Ko check was made, at this time, for Pl«m B, pending
»
receiving calculations
If you have any questions please call Jim Gilshian at
560-1468.
Thank you,
Esgil Corporation
I / • '
V_Jv-v_t t^-T- U.H •^-' »^^^
James Jqseph Gilshian
Vice President
INTERDEPARTMENTAL INFORMATION SHEET
BUILDING DEPARTMENT
BUILDING ADDRESS
PLANNING DEPARTMENT
70NE LOT SIZE LOT WIDTH
UNITS ALLOWED UNITS PROVIDED
PARKING SPACES REQUIRED
% COVERAGE ALLOWED
BUILDING HEIGHT ALLOWED
FRONT SETBACK
ALLOWED
PROVIDED
_PROVIDED_
_PROVIDED
PROVIDED
SIDE SETBACK
INTRUSIONS
LANDSCAPE & IRRIGATION PLAN COMMENTS
\.TL PIENVIRONMENTAL PROT/ECTION RED NelV^of""r& ,t?\
ADDITIONAL COMMENTS
ENGINEERING DEPARTMENT
ROW
SEWER CONNECTION ^,
GRADING PERMIT
LEGAL DESCRIPTION
ADDITIONAL COMMENTS'
DRIVEWAY LOCATIONS
FIRE DEPARTMENT
SPPINKLING SYSTEM
FIRE ALARMS
_FIRE PROTECTION EQJIP
EXITS
FIRE HYDRANTS LOCATION
ADDITIONAL COMMENTS
OK TO ISSUE DATE OK TO FINAL DATE
WATER DEPARTMENT
REQUIREMENTS OF APPROPRIATE DISTRICTS MET_DATE