Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2270 COSMOS CT; ; CB911541; Permit
12/18/91 11 41 BUILDING PERMIT Page 1 of l Job Address 2270 COSMOS CT str Permit Type INDUSTRIAL TENANT IMPROVEMFNT Parcel No 213-050-42-00 Valuation 19,152 Construction Type IIIN Occupancy Group B2/H2 Class Code Description 1050 SF TI/LUNCH ROOM 12/17 REDUCED SF TO 912 Permit No CB911541 Project No A9101953 Development No Fl ste 5650 12/18/91 0001 01 02 C-PRHT 909-00 Appl/Ownr CONTRACTOR PALOMAR 12 PARTNERS 20101 HAMILTON AVE STE 3000 TORRANCE, CA 9050? " Status ISSUED Applied 11/14/91 Apr/Issue 12/18/91 Validated By SBB 213 515-0015 * * * INGOLDT CONSTRUCTION 1511 CONWAY,DRIVE ESCONDIDO,'CA ^2027' Fees Required / *** .,*. • ''• \ /L;ic C NO •''.'.••.• .. \ " ' ''• :''••'"•• \ Fees, Collected, & Credits 619 737-7633 * * * Fees Adjustments Total Fees 1,0-6.1 crd / ''7 ••\j--'-V% °9 N';-^,. -,:::.:;-;..;--Total...-->- Fee description ! \ -', i .\ O ^lance^jue- ,! I [ _!~"' ! /^V \. 4v> ...^nits.../ - Fee/Un-lti ~^:*~ **" "•""" j""~ """" — "~~ "~* *" ~""i~~ ~*~ "~ ~~ ~- —* *••• -^-1— -^.t^._'l_ _„„ ] Building Permit Plan Check ,; -. '; Strong Motion Fee -. 'AN ",;;•'''!• Enter "Y" to Autocalq License\Tax ^^/^ * BUILDING TOTAL V Enter "Y" for Plumbing Issue Fee > Enter "Y" tor Electric Issue Fee '> Enter "Y" for Remodel • > ' ' * ELECTRICAL TOTAL Enter 'Y' for Mechanical Issue Fee> Install Fum/Ducts > * MECHANICAL TOTAL 9 00 00 152 00 909 00 Ext fee Data 207 00 135 00 4 00 349 00 Y 322 00 1017 00 N 10 00 Y 10 00 Y 20 00 15 00 Y 9 00 24 00 CITY OF CARLSBAD 2075 Las Palmas Dr , Carlsbad, CA 92009 (619) 438-1161 PERMIT APPLICATION City of Carlsbad Building Department 2075 Las PaI mas Dr , Carlsbad. CA 92009 (619) 438-1161 1 PERMIT ~A U Commercial U New Building 13 Tenant Improvement B B Industrial O New Building D T< nant Improvement C D Residential D Apartment D Condo D Single Family Dwelling D Addition/Alteration D Duplex O Demolition D Relocation D Mobile Home D Electncal D Plumbing D Mechanical D Pool D Spa D Retaining Wall D Solar D Other 2 PROJECT INFORMATION PLAN CHECK NO C-PRMT 152.00 FOR OFFICE USE ONLY Address building or suite NO Nearest Cross Street LEGAL. DESCRIPTION Lot No Subdivision Name/Number Unit No Phase No CHECK BUiaW IV iJUBMlTI'E'D D 2 Energy Gales D 2 Structural Gales [] 2 Soils Report D 1 Addressed Envejope CITY ff STATE ZIP CODE DAY TELEPHONE 4 ArPlJUtNl M CAJJN 1 KAC, 1 UK LJAtiLNl rUK CAJ1N 1KAC.1UK LJUWNhR rJACjhlSI rUK UWNL.K /£}._, -I- Uo~w ADDRESS " CITY O I w STATE CODE DAY TELEP1 :1ONE -? A— IT ' ~7 5 PHlJPhR I NAME / CITY STATE ZIP CODE I *O C-o ¥*£_ CT ' L / o i^^ci L ^ C— Cj DAY TELEPHONE 313 ~ 5~/ 5~OO / 6 CJON1KAL.UJR _i_A>->oi T^T--^ I ~. JC UI^A ( > - IITY J^Jl JJ~4-<rr-7 STA DDRESS ZIP CODE STATE LIC #'0-3 Y»>-*-f LICENSE CLASS DAY TELEPHONE ' C I1Y BUSINESS LIC # DESIGNER NAME CITY STATE ADDRESS ZIP CODE DAY TELEPHONE STATE LIC # WOHKERiT COMPENSATION Workers Compensation Declaration I hereby airirm that I have a certificate or consent to self insure issued uy the Director ot Industrial Relations, or a certificate of Workers Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab C) INSURANCE COMPANY POLICY NO EXPIRATION DATE Certificate of Exemption I certiry that in the performance of tne work tor which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers Compensation laws of California SIGNATU DATE AT '* 8 OWNER-BUILDER DECLARATH Owner Builder Declaration I hereby attirm that I am exempt from the Contractors Lie ense Law for the tollowing reason D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec 7044, Business and Professions Code The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, prowded that such improvements are not intended or offered for sale If, however, the building or improvement is sold within one year of completion, the owner builder will have the burden of proving that he did not build or improve for the purpose of sale ) D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044, Business and Professions Code The Contractor's License Law do< s not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's Ucense Law) D I am exempt under Section Business and Professions Code for this reason (Sec 7031 5 Business and Professions Code Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's I jcense Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption Any violation of Section 7031 5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [SSOOJ) SIGNATURE DATE COMPLETE THIS SECTION FOR NON RESIDENTIAL BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley Tanner Hazardous Substance Account Act? D YES ffl NO Is the applicant or future building occupant required to obtain a permit from the air pollution control distnct or air quality management district? P YES H NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? Q YES B NO IF ANY OF THE ANSWFJIS ARE YES, A FINAL CERTIF1CATF. OF OCCUPANCY MAY NOT BE ISSUED AFTER JULY 1, 1989 UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF FJXERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT 9 CIJNSTKUCJTION LENDING ACJHNCY ~ I hereby attirm that there is a construction l< nding agency lor the perlormance ot the work tor which this permit is issued (Sec 3097(0 Civil CcxleJ LENDER S NAME LENDER'S ADDRESS APPLICANT CERTIFICATION I certiry that I have read the application and state that the above inlormation is correct Iagree to comply with all City ordinances and State laws relating to building construction I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes I ALSO AGREE TO SAVE INDEMNIFY AND KEEP IIARMLESS THE CITY OF CARLSBAD AGAINST AIL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT OSIIA. An OSHA permit is required for excavations over 5 0" deep and demolition or construction of structures over 3 stories in height Expiration Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 365 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 303(d) Uniform Building Code) APPLICANTS SIGNATURE DATE" tffTTE_5Jile YELLOW Applicant PIMK. Finance cEoNj-'-*- ut<=- 5~3*5??/ FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING U/M PLAN CHECK*: CB911541_ PERMIT*: CB911541 PROJECT NAME: 1050 SF TI/LUNCH ROOM 12/17 REDUCED SF TO 912 ADDRESS: 2270 COSMOS CT CONTACT PERSON/PHONE*: MHJOHN/737-7633 SEWER DIST: CA WATER DIST: CA RECEIVED JAN 2 7 1992 WATER DATE: 01/21/92 PERMIT TYPE: ITI INSPECTED BY: INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED. DATE INSPECTED: APPROVED APPROVED APPROVED U^^^DISAPPROVED DISAPPROVED DISAPPROVED COMMENTS: *- " * CITY OF CARLSBAD INSPECTION REQUEST PERMIT* CB911541 FOR 01/24/92 DESCRIPTION: 1050 SF TI/LUNCH ROOM 12/17 REDUCED SF TO 912 TYPE: ITI JOB ADDRESS: APPLICANT: CONTRACTOR: OWNER: 2270 PALOMAR INGOLDT COSMOS CT 12 PARTNERS CONSTRUCTION REMARKS: MH/JOHN/737-7633 SPECIAL INSTRUCT: STR: INSPECTOR AREA MC PLANCK* CB911541 OCC GRP CONSTR. TYPE NEW FL: STE: PHONE: PHONE: PHONE: 619 737-7633 INSPECTOR 7 TOTAL TIME: —RELATED PERMITS—PERMIT* TYPE CB920025 ELEC C0920014 COFO STATUS ISSUE!) ISSUED CD 19 29 39 49 LVL DESCRIPTION ST Final Structural PL Final Plumbing EL Final Electrical ME Final Mechanical ACT COMMENTS "To ***** INSPECTION HISTORY ***** DATE DESCRIPTION 012292 Final Combo 012192 Final Combo 010892 Frame/Steel/Bolting/Welding 010892 Rough Electric 010892 Rough/Ducts/Dampers 010892 Service Change/Upgrade 122691 Interior Lath/Drywall 122391 Frame/Steel/Bolting/Welding 122391 Rough Electric ACT CO CA AP PA CO CO AP AP AP INSP MFC MPC MFC MPC MPC MPC MPC MPC MPC COMMENTS SEE INSP NOTES RESCHEDULE SUSPENDED CEILING GRIDS LIGHT FIXTURES SEE INSP NOTES DTD 1/8/92 SEE INSP NOTES DTD 1/8/92 WALLS IN WALLS UNSCHEDULED INSPECTTOM DATE /INSPECTOR /V PERMIT I 9//5"y/PLANCK #. ADDRESS TIME ARRIVE:TIME LEAVE: CD LVL DESCRIPTION ACT COMMENTS PERMITS 6/15/89 CITY OF CARLSBAD INSPECTION REQUEST PERMIT* CB911541 FOR 01/21/92 DESCRIPTION: 1050 SF TI/LUNCH ROOM 12/17 REDUCED SF TO 912 TYPE: ITI JOB ADDRESS: 2270 COSMOS CT APPLICANT: PALOMAR 12 PARTNERS PHONE: CONTRACTOR: INGOLDT CONSTRUCTION PHONE: OWNER: PHONE: REMARKS: MHJOHN/737-7633 SPECIAL INSTRUCT: PM IF POSSIBLE STR: INSPECTOR AREA MC PLANCK* CB911541 OCC GRP CONSTR. TYPE NEW FL: STE: 619 737-7633 INSPECTOR 1 TOTAL TIME: —RELATED PERMITS—PERMIT* TYPE CB920025 ELEC STATUS ISSUED CD 19 29 39 49 LVL DESCRIPTION ST Final Structural PL Final Plumbing EL Final Electrical ME Final Mechanical ACT COMMENTS ***** INSPECTION HISTORY ***** DATE DESCRIPTION 010892 Frame/Steel/Bolting/Welding 010892 Rough Electric 010892 Rough/Ducts/Dampers 010892 Service Change/Upgrade 122691 Interior Lath/Drywall 122391 Frame/Steel/Bolting/Welding 122391 Rough Electric ACT INSP AP MFC MFC MFC MFC MFC MFC MFC PA CO CO AP AP AP COMMENTS SUSPENDED CEILING GRIDS LIGHT FIXTURES SEE INSP NOTES DTD 1/8/92 SEE INSP NOTES DTD 1/8/92 WALLS IN WALLS CITY OF CARLSBAD INSPECTION REQUEST PERMIT* CB911541 FOR 01/08/92 DESCRIPTION. 1050 SF TI/LUNCH ROOM 12/17 REDUCED SF TO 912 TYPE: ITI JOB ADDRESS: 2270 COSMOS CT APPLICANT: PALOMAR 12 PARTNERS PHONE: CONTRACTOR: INGOLDT CONSTRUCTION PHONE: OWNER: PHONE: REMARKS: RS/JOHN SPECIAL INSTRUCT: STR: ISPECTOR AREA MC PLANCK* CB911541 OCC GRP CONSTR. TYPE NEW FL: STE: 619 737-7633 INSPECTOR TOTAL TIME: CD LVL DESCRIPTION 14 24 34 44 ACT COMMENTS ST Frame/Steel/Bolting/Welding PL Rough/Topout EL Rough Electric ME Rough/Ducts/Dampers AP' ***** INSPECTION HISTORY ***** DATE DESCRIPTION ACT INSP COMMENTS 122691 Interior Lath/Drywall AP MPC 122391 Frame/Steel/Bolting/Welding AP MPC WALLS 122391 Rough Electric AP MPC IN WALLS ESGIL CORPORATION 9320 CHESAPEAKE DR , SUITE 2O8 SAN DIEGO, CA 92123 (619) 56O-1468 DATE -j-^ r - I A. -<\ \ MAPPLICANT JURISDICTION ( i U .-T\ r^Slo^cl ^^FLAM CHECKER O T [JFILE COPY PLAN CHECK NO C i"b ^ \ - 1 5 Ml SET IT [~ups '^DESIGNER PROJECT ADDRESS ^ 1 Q ^a^wa-b C-T PROJECT NAME T \. (>v^cUv>v> r^AA. The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. -, The plans transmitted herewith will substantially comply J with the jurisdiction's building codes when minor deficien- cies identified are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and snould be corrected and resubmitted for a complete recheck D The check list transmitted herewith is for your information. The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. The applicant's copy of the check list has been sent to HH Esgil staff did not advise the applicant contact person that plan check has been completed [j Esgil staff did advise applicant that the plan check has —' been completed. Person contacted: Date contacted: Telephone #_ REMARKS: By LA. M O /\ c* > e. Enclosures: ESGIL CORPORATION V QGA UCM ESGIL CORPORATION 9320 CHESAPEAKE DR , SUITE ?08 SAN DIEGO, CA 92123 (619) 56O-1468 DATE. JURISDICTION PLAN CHECK NO PROJECT ADDRESS PROJECT NAME- K A. V ~ V5H\SET C , (vL)t cu Y Q APPLICANT PLAN CHECKER QFILE COPY QUPS PDESIGNER D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficien- cies identified __ are resolved and checked by building department staff The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck The check lisr. transmitted herewith is for your information. The plans are being held at Esgil Corp until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person The applicant's copy of the check list has been sent to: H /.k* y ||i Esgil staff did not advise the applicant contact person that plan check has been completed. j | Esgil staff did advise applicant that the plan check has — been completed. Person contacted- __ Date contacted: REMARKS: Telephone #_ By: ESGIL CORPORATION u, DGA DAA D RN QDM Enclosures v-> c PLAN CORRECTION SHEET TENANT IMPROVEMENT PLAH CHECK *0-: JURISDICTION : C \ i r ( TO:A f » M PROJECT DATA OCCUPANCY; &- 2- H - 2- BUILDING USE;t A. TYPE OF CONSTKDCTION:_•gr- ACTUAL AREA; ALLOWABLE AREA:o STORIES: HEIGHT:O SPRINKLERS : OCCDPANT LOAD: A! REMARKS; Date plans received by jurisdiction III l& I* I Date plans received by Esgil Corporation Date initial plan check completed I' /^o|^ I By Applicant contact person Tel 75 g> FOREWORD: PLEASE READ Plan check is limited to technical requirements contained in 1-he Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the handicapped The plan check is based on regulations enforced by the Building Inspection Department You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments Code sections cited are based on the 1988 UBC The circled items listed need clarification, modification or change All items must be satisfied before the plans will be in conformance with the cited codes and regulations Per Sec 303(c), 1988 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law To speed up the recheck process, note on this list (or a copy) where each correction item has been addressed, i e . plan sheet, specification, etc Be sure to enclose the marked up list when you submit the revised plans NOTE: PAGE NUMBERS ARE NOT IN SEQUENCE AS PAGES HAVING NO ITEMS NEEDING CORRECTIONS WERE DELETED. LIST NO 58 TENANT IMPROVEMENT WITHOUT SPECIFIC ENERGY ZONE DATA OR POLICY SUPPLEMENTS, 1988 UBC Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction, to Esgil Corporation, 9320 Chesapeake Drive, Suite #208, San Diego, CA 92123, (619) 560-1468 Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction, to The jurisdiction's building department Indicate on the Title Sheet of the plans, the name of the legal owner and name of person responsible for the preparation of the plans Section 302(d) Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes Business and Professions Code Plans and calculations shall be signed by the California state licensed engineer or architect where there are structural changes to existing buildings or structural additions Please include the California license number, seal, date of license expiration and date plans are signed Business and Professions Code Provide the correct address and suite number of tenant space on the plans Section 302(d) Provide a note on the site plan indicating the previous use of the tenant space or building being remodeled Section 302 When the character of the occupancy or use changes within a building, the building must be made to comply with current Building Code requirements for the new occupancy Please provide complete details to show the building with comply Section 502 UBC Section 304 requires the Building Official to determine the total value of all construction work proposed under this permit The value shall include all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevator, fire extinguishing systems and any other permanent equipment Please provide a signed copy of the designer's or contractor's construction cost estimate of all work proposed Provide a plot plan showing the distance from the building to the property lines and the location of tenant space (or remodel) within the building On the first sheet of the plans indicate Type of construction of the existing building, present and proposed occupancy classifications of the remodel area and the occupant load of the remodel areas and the floor where the tenant improvement is located Provide a note on the plans indicating if any hazardous materials will be stored and/or used within the building which exceed the quantities listed in UBC Tables 9-A and 9-B A complete description of the activities and processes that will occur in this tenant space should be provided A listing of all hazardous materials should be included The materials listing should be stated in a form that would make classification in Tables 9-A and 9-B possible The building official may require a technical report to identify and develop methods of protection from hazardous materials Section 901(f) If control areas are used for exceeding the exempt amounts of hazardous materials from Tables 9-A and 9-B, they shall be constructed of not less that required for a one-hour occupancy separation Section 404 The number of control areas within a building used for retail/wholesale stores shall not exceed two, the number of control areas in buildings with other uses shall not exceed four Footnote 1, Tables 9-A and 9-B The aggregate quantity of any hazardous materials "in use" and "in storage" shall not exceed the quantity listed in Tables 9-A and 9-B for "storage" Footnotes 2 and 3, Tables 9-A and 9-B 17 I Provide a statement on the Title Sheet of the V x plans that this project shall comply with Title 24 and 1988 UBC, UMC and UPC and 1990 NEC Provide a fully dimensioned floor plan showing the size and use of all rooms or areas within the space being improved or altered Draw the plans to scale and indicate the scale on the plan Section 302(d) Indicate the use of all spaces adjacent to the area being remodeled or improved Show any existing fire rated area separation walls, occupancy separation walls, demising walls, shafts or rated corridors Identify and provide construction details for proposed new fire rated walls Specify on the plans the fire ratings of assemblies to protect proposed openings in existing or new fire walls 7/10/91 23 25 Identify existing walls to be removed, existing walls to remain and proposed new walls Identify bearing walls, non-bearing walls, and shear walls Provide a section view of all new interior partitions Show A H n e.-J P» «"^ &~ s T^s WI Type, size and spacing of studs Indicate gauge for metal studs Specify manufacturer and approval number or indicate "to be ICBO approved" Method of attaching top and bottom plates to structure(NOTETopof partition must be secured to roof or floor framing, unless suspended ceiling has been designed for partition lateral load) :\lic&» st *%., -j Wall sheathing material and details of attachment (size and spacing of fasteners) Show height of partition and suspended ceiling, and height from floor to roof framing or floor framing Provide notes and/or details to show that the floor and wall finish in toilet rooms are surfaced with a smooth hard non-absorbent material extending five inches up the wall Similar surfacing shall be provided on the walls from the floor to a height of 4 feet around urinals and within water closet compartments Section 510(b) Note on the plans "All interior finishes must comply witlu-^hapter 42 of the UBC" Specify "Class JO— flame spread rating (minimum) for A-3 " Lateral bracing for suspended ceiling must be provided (UBC Table 23-P) Where ceiling is not supporting interior partitions, ceiling bracing shall be provided by four No 12 gauge wires secured to the main runner within 2 inches of the cross runner intersection and splayed 90 degrees from each other at an angle not exceeding 45 degrees from the plane of the ceiling A strut (adequate to resist the vertical component from lateral loads) fastened to the main runner shall be extended to and fastened to the structural members of the roof or floor above These horizontal restraint points shall be placed 12 feet o c in both directions with the first point within 6 feet of each wall Attachment of restraint wires to the structure above shall be adequate for the load imposed UBC Standard 47-18 -^Wj-cJ> £?mr\r 29/ 3/ 1 1 In buildings having floors and roofs of wood frame construction, other than dwelling or hotel occupancies, draft stop the area between the ceiling and floor above so that no concealed space exceeds 1,000 s f and no horizontal dimension exceeds 60 L F (if space has sprinklers, then 3,000 s f and 100 L F ) Section 2516 (f ) In buildings having floors and roofs of wood frame construction, other than dwelling or hotel occupancies, draft stop the area between the ceiling and roof above so that no concealed space exceeds 3,000 s f and no horizontal dimension exceeds 60 L F (if space has sprinklers, then 9,000 s f and 100 L F ) Section 2516(f) Storage areas exceeding 1000 sq ft in connection with wholesale or retail sales shall be separated from the public area by a one-hour occupancy separation If the entire building has an automatic sprinkler system, then the occupancy separation need not be provided An automatic sprinkler system shall be installed in rooms used by the occupants for the consumption of alcohol and in accessory uses where the total area of such unseparated rooms and assembly uses exceeds 5000 square feet Section 3802(c) The tenant space and new , and/or existing facilities serving the remodeled area must be accessible to and functional for the physically disabled See the attached correction sheet Title 24, Part 2 The width of the required level area on the side into which doors swing shall extend 24 inches past the strike edge for exterior doors and 18 inches past the strike edge for interior doors Section 2-3304, Title 24 Specify lever-type hardware for passage doors on floors accessible to the disabled Section 2-3304, Title 24 If both sexes will be employed and the number of employees exceeds four, provide separate toilet facilities for men and women If "both sexes will be employed and the total number of employees will not exceed four", and only one restroom is provided, note the words in quotation above on the floor plan Section 705 In areas where the occupant load exceeds / two exits are required See Table 33-A 2/15/90 Provide an exit analysis plan (may be 8 1/2" x 11" or any convenient size) • 37 M Exits should have a minimum separation of one- V ) half the maximum overall diagonal dimension of — the building or ar.ea served Section 3303(c) 38 ] The maximum number of required exits and their V.y' required separation must be maintained until egress is provided from the structure 3303(a) <^UL-. -»••,<> Section Rooms with more than 10 occupants may have one exit through one adjoining room Revise exits to comply Section 3303(e) Exit signs are required for exits serving an occupant load exceeding 49 Show all required exit sign locations Section 3314(a) Show that exits are lighted with at least one foot candle at floor level Section 3313(a) Show the locations of existing exits from the building and show the path of travel from the remodel area to the existing exits Note on the plans "All exits are to be openable from inside without the use of a key or special knowledge" In lieu of the above, in a Group B occupancy, you may note "Provide a sign on or near the exit doors reading THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS" This signage is only allowed at the main exit Section 3304(c) Exit doors should be a minimum size of 3 feet by 6 feet 8 inches with a minimum door swing of 90 degrees Maximum leaf width is 4 feet Section 3304(f) Exit doors should swing in the direction of egress when serving an occupant load of 50 or more or when serving any hazardous area Section 3303(b) Applies to door(s)_ iRegardless or occupant load, "a floor or landing not more than 1/2 inch below the threshold is required on each side of an exit door used for disabled access (may be 1" maximum where not used for disabled access) Section 3304(i) Doors should not project more than 7 inches into the required corridor width when fully opened, nor more than one-half of the required corridor width when in any pos Ltion Section 3305(d) Revolving, sliding and overhead doors are not permitted as exit doors if the occupant load exceeds 9 or the exit door serves a hazardous area Section 3304(h) 49 ] Exit doors from assembly rooms with 50 or more occupants shall not be provided with a latch or lock unless it is panic hardware Section 3318 k\\ <U^, oj\c?i 1 r / r.-i .^. ~•! i .Double a'bting dooi"5areno t alluwtid wlieji serving a tributary occupant load of more than 100, or when part of a fire assembly, or part of smoke and draft control assemblies or when equipped with panic hardware Section 3304(b) Corridors must provide continuous protection to the exterior of the building Interruptions by an intervening room is not permitted Foyers, lobbies or reception rooms constructed as required for corridors are not considered intervening rooms Section 3305 Corridors and exterior exit balconies serving 10 or more occupants must be a minimum 44 inches wide and 7 feet high to the lowest projection Corridors serving less than 10 occupants must be a minimum of 36 inches in width Section 3305(b) When two exits are required, dead end corridors and exit balconies are limited to 20 feet Section 3305(e) Corridors serving 30 or more occupants shall have walls and ceilings of one-hour construction except a Corridors greater than JO feet wide when the occupants have an exit independent from the corridor Exterior sides of balconies exterior exit c Corridor walls and ceilings need not be of fire-resistive construction within office spaces having an occupant load of 100 or less when the entire story in which the space is located is equipped with an automatic sprinkler system throughout and smoke detectors are installed within the corridor in accordance with their listing Section 3305 (g) Section 3305(g), Exception 5, cannot be used for non-rated corridors in a fully sprinklered office space if the occupant load in the space exceeds 100 Section 3305(g), Exception 5 does not apply to common corridors where the corridor serves as an exit for non-office areas (manufacturing, warehouse, etc ) 2/14/90 1 ELECTRICAL Submit plan showing location of all panels Submit panels schedules Submit electrical load calculations Indicate existing main service size Indicate existing total main service load Indicate new additional loads Indicate wiring method, i e EMT, metal flex Show exit signs on the electrical lighting plan(s) As per Section 3313 and 3314 of the 1988 UBC, provide two sources of power to exit signs and exit illumination Provide receptacle(s) within 25' of HVAC units UMC Section 509 Provide multiple Title 24, 5319 switch lighting controls per Provide an electrical plan for the alarm system showing compliance with criteria described under earlier correction number 58 MECHANICAL Provide mechanical ventilation in all rooms capable of supplying a minimum of 5 cubic feet per minute of outside air with a total circulation of not less than 15 cubic feet per minute per occupant Section 605 and 705, UBC Provide mechanical plans showing existing and proposed HVAC equipment, ducts and access to equipment Detail access equipment and working clearances to HVAC Cooling coils or cooling units located in attic or furred space, where damage may result from condensate overflow, shall be provided with an additional water tight pan of corrosion resistant material to catch overflow if primary condensate drain becomes clogged Section 1205, UMC One-hour corridors shall not be used as an integral part of a duct system This includes the space above a dropped ceiling within the one-hour corridor UMC Section 706(b) PUMBIBG Provide gas line plans and calculations, showing pipe lengths and gas demands UPC Section 1219 90* 7* Provide drain, waste and vent plans Provide water line sizing calculations UPC Section 3009 Detail how floor drain trap seal is to be maintained UPC Section 707 (floor drain trap priming) Show P & T valve on water heater and detail drain line route from P & T valve to the exterior UPC Section 1007(e) Show 1/4" per 12" slope on drain lines UPC Section 407 and waste Provide a drinking fountain at each floor level in assembly occupancies (except drinking and dining establishments) UBC Section 605 ENERGY Provide complete energy design calculations, including all existing design and new energy design for this building See attached non- residential energy design checklist For remodels in an existing conditioned space, show that the remodeled space will not use more energy than the existing space or show the remodeled space will conform to latest energy design standards KISCELLANBOOS Please see additional that follow corrections or remarks ©To speed up the recheck process, note on this list (or a copy) whee each correction item has been addressed, i e , plan sheet, note or detail number, calculation page, etc 98 )Please indicate here if any changes have been \ _/ made to the plans that are not a result of corrections from this list If there are other changes, please briefly describe them and where they are located in the plans Have changes been made to the plans not resulting from this correction list' Please check Yes No 7/8/91 TITLE 24 HANDICAPPED ACCESS CORRECTION LIST Jurisdiction _ C_^>-^VPA A, __ Plan Check No . ( ^ <\\ - References to section numbers with prefix "2" are (California Building Code) Prefix "3" is for Part 3 Part 5 (California Plumbing Code) to Title 24, California Code of Regulations, Part 2 (California Electrical Code) Prefix "5" is for Exemptions claimed for any item shall be requested in writing and shall include all data needed to determine "unreasonable hardship" as described in Section 2-422 SITE DEVELOPMENT- iHANDICAPPED PARKING SPACES I If no landing is provided, the slope of flared sides shall not exceed 1 in 12 -H 2-7103(d) Provide 2-7102(b) _hand-capped spaces b Space shall be so located that handicapped persons are not compelled to wheel or walk behind parked cars other than his/her own 2-7102(c) c Parking space shall be a minimum of 9 ft x!8 ft with adjacent marked 5 ft loading zone Double space shall be 23 ft. wide Where a single space is provided, the loading/unloading zone shall be on the passenger side of the vehicle 2-7102(c) d Maximum slope of parking surface in any is to -contrasting sidewalk 2-7103(f) slip resistant and a from adjacent direction shall foot 2-7102(e) not exceed 1/4" per e Parking space(s) shall be identified with the International Symbol of Accessibility on reflectorized sign affixed to post or wall, and also duplicated on parking surface (symbol to be 36"x36" and painted at the back of the parking stall) 2-7102(f) f Entrance to parking area (or at each stall) shall have a sign stating that unauthorized vehicle(s) parking in handicapped space(s) may be subject to tow-away 2-7102(f) g If covered parking is provided, then a reasonable portion of the total number of stalls reserved for the disabled shall also be covered 2-7102(a) h Entrances to and vertical clearances within accessible levels of parking structures shall be 8 ft 2 in to any structural member, duct or pipe 2-7102(g) CURB RAMPS a. Curb ramps shall be located wherever pedestrian path crosses curb (2- 7103(a)) b Curb ramp shall be 48" mm. width (2- 7103(b)) with maximum slope of 1 in 12 2-7103(d) c A level 48" min depth landing is required at top of curb ramps over entire curb ramp width. 2-7103(d) V f Border markings shall be 12" wide of l/4"xl/4" grooves, 3/4" apart, located at top and sides 2-7103(h) WALKS a Site development and grading shall be designed to provide access to primary entrances and access to normal paths of travel and where necessary to provide access shall incorporate pedestrian ramps, curb ramps, etc 2-7101(a) b Walks sloping greater than 5% (1 in 20) must comply with ramp requirements of Sec 2-3307 2-3325(c) c Walk width shall be 48" minimum, and shall have slip-resistant surfaces 2-3325(a) d The maximum cross slope shall not exceed 1/4" per foot 2-3325(a)3 Gratings possible are not 2-3325(b) allowed whenever f At each gate or door a 60"x60" level area is required when the gate swings toward the walk 2-3325(e) g A 48"x44" deep level area is required when the gate swings away from the walk. 2-3325(e) h A 24" clear space is required at strike side of gate or door 2-3325(e) PEDESTRIAN RAMPS a A path of travel with a slope greater than 1 in 20 shall be considered a ramp 2-3307(a) b The maximum slope shall be 1 in 12 2-3307(c 1) c The width shall be 48" minimum A minumim width of 60" is required where a ramp serves as a primary entrance to buildings having an occupant load of 300 or more Group R Occupancies may be 36" when the occupant load is 50 or less 2- 3307(b 1) d The surface of ramps shall be slip- resistant 2-3307(g) e A 60" intermediate landing is required at maximum elevation change of 30" and 72" landing at each change of direction (over 30 degrees) 2-3307(d 1) f Landings are required at top and bottom of ramps 2-3307(d 1) g Bottom landing shall be minimum of 72" in the direction of travel Fig 2-33- 11A Top landing 2-3307(d 1) shall be 60" x 60" minimum i When door swings onto top landing, minimum depth of landing required is door width plus 42" 2-3307(d 1 ) j Top landing shall have 60" mm width when door swings onto the landing, with 24" on strike side of door at exterior ramp, or 18" at interior ramp 2-3307(d 1) k Ramp handrails are required on each side of ramp, when slope exceeds 1 in 15 2- 3307(e 1) 1 Ramp handrails shall be continuous, located 30"-34" in height above ramp surface, with 12" extensions beyond top and bottom, and the ends returned 2-3307(e 1) m Handrails shall be 1-1/4" to 2" cross section, spaced minimum of 1-1/2" from wall 2-3307(e 1) n A 2" high curb or wheel guide rail centered 3" + 1" above ramp surface is required on both sides where not otherwise bounded by walls when the ramp exceeds 10 feet in length 2-3307(h 1) SPECIAL ACCESS LIFTS a Lifts may be provided between levels, in lieu of elevator, when the vertical distance between landings, structural elevator, structural design and safeguards are as allowed by the State of California, Department of Industrial Relations, Division of Occupational Safety and Health 2-5107(a) b The lift platform shall be of sufficient size to accommodate a wheelchair (30"x48") 2-5107(a) c There shall be a level and clear floor area or landing (60"x60") at each level for access to the lift 2-5107(a) HAZARDS a Provide 80" headroom from walkway surface to any overhanging obstruction 2-3326(b) b Headroom of 80" minunum shall be maintained for walks, corridors, aisles, etc 2-522(f) c Protruding objects with leading edges between 27" and 80" above finished floor shal 1 not protrude more than 4" into vails, corridors, etc 2-522(f) d Free standing objects mounted on posts between 27" and 80" above the floor may project a maximum of 12" 2-522(f) e Abrupt changes in level exceeding 4" adjacent to walks, except between walks and adjacent streets or drives, shall be identified by 6" high warning curbs above walk surface 2-3326(a) ENTRANCES AND CIRCULATION ( 7 ) ENTRANCES, DOORS, VESTIBULES AND CORRIDORS riJTZa* A-\e«" Tr^V' All primary entrances to buildings shall " be accessible to the handicapped 2-3301(f) r © All required passage doors shall have 32" clear opening at 90 degrees (36" door) 2-3304(f) At least one of a pair of doors shall meet the minimum 32" clear entrance width requirement 2-3304(f) Threshold shall be no higher than 1/2" above the floor Edge to be beveled with a slope no greater than 1 in 2, if more than 1/4" 3304(i 1) Exterior level landing may slope up to 1/4" per foot in any direction for surface drainage 2-413 f) Door hardware shall be of the lever or push type, mounted 30" to 44" above the floor and be operable with a maximum effort of 8 5 Ibs for exterior doors and 5 Ibs for interior doors 2-3304(c), 2- 3304(i 2) The lower 10" of the door shall be of smooth, plane surface (no recess or trap) except at automatic and sliding doors 2-3304(i 3) Building entrance(s) shall be identified by sign with the International Symbol of Accessibility Show location on plan The symbol shall be a white figure on blue background 2-522(b) At turnstile, provide an access gate, 32" clear width opening, within 30 feet of turnstile 2-3304(i 4) There shall be a clear area on each side of door, 60" deep in direction of door swing and 44" deep in opposite direction of door swing 2-3304(i 1) Date i Jurisdiction \J Prepared byi D Bldg. Dept. VALUATTON AND PLAN CHECK FEE PT.AN CHECK NO. (Lfe^V-l5<-\\ CT.^ BUILDING ADDRESS $^~lrt r^vwos CT APPLICANT/CONTACT Ha<\c Qv^TT,,^ PHONE NO. TS*"- It HJL BUILDING OCCUPANCY •£=-•2. 1 H-2. TYPE OF CONSTRUCTION 17T~- ^ \S(Vu_. BUILDING PORTION V-AJV^ £-V-\ O v f ./^ i"7n iW esiL L ^ |J- (J- / ^3>-C)T~#VTjs farr^rzis^r^ (p f&JT *30T- P^-^ />JA-£*^-J*--'^-£> IP Air Conditionine Commercial Residential Res. or Comm. Fire ST3rinklers BUILDING AREA lo<5£?^~ j jf^^1^^^ cA^^ *&— -FTi ^i "Z- ?SH2Wz i.-r^/er^ e. ^^ uo ^^SO , - 1 Total Value DKSTO-NER PHONE CONTRACTOR VALUATION MULTIPLIER ^\~ ^ ^ @ @ e PHONE VALUE C^ ^tft^^ /J3 ' t / ^f / «Tz--^ ^050 - Building Permit Fee $ Plan Check Fee $ COM M E N T 5 SHEET OF 12/87 V UJ i £> 01 <cis T BUILDING PLANCHECK ENGINEERING CHECKLIST DATE: H- Z£>- PLANCHECK NO.- 1541 2 3 N R D D 2*210 ITEM COMPLETE ITEM INCOMPLETE NEEDS YOUR ACTION ITEM SELECTED C C C PROJECT ID- H H H E E E LEGAL REQUIREMENTS K K Site Plan ' — ' 1. DD DDD Provide a fully dimensioned site plan drawn to scale. Show: north arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width and dimension setbacks. 2. Show on site plan: Finish floor elevations, pad elevations, elevations of finish grade adjacent to building, existing topographical lines, existing and proposed slopes, driveway with percent (%) grade and drainage patterns. 3 Provide legal description and Assessors Parcel Number. Discretionary Approval Compliance ^-' '—' '—' 4. '—' '—' '—' 5 No Discretionary approvals were required. Project complies with all Engineering Conditions of Approval for Project No. Project does not comply with the following Engineering Conditions of Approval for Project No. Conditions complied with by: Field Review ' — ' ' — ' ' — ' 7. Field review completed. No issues raised. ' — ' ' — ' ' — ' Date: 8. ' — ' ' — ' ' — ' Field review completed. The following issues or discrepancies with the site plan were found: ' — ' ' — ' ' — ' A. ' — ' ' — ' ' — ' B. Site lacks adequate public improvements Existing drainage improvements not shown or in conflict with site plan. C. Site is served by overhead power lines. P \DOCS\MISFORMS\FRM0010 DH REV 02/27/91 1—' '—' D. Grading is required to access site, create pad or provide for ultimate street improvement. '—' '—' E. Site access visibility problems exist. Provide onsite turnaround or engineered solution to problem. nn F. Other: Dedication Requirements 9. No dedication required. '—' '—' '—' 10. Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8V x 11" plat map and submit with a title report and the required processing fee. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. The description of the dedication is as follows: Dedication completed, Date By:. Improvement Requirements '—' '—' 11. No public improvements required. SPECIAL NOTE; Damaged or defective improvements found adiac€>nt to building site must be repaired to the satisfaction of the City inspector prior to occupancy. I II II I1—M—M—'12. Public improvements required. This project requires construction of public improvements pursuant to Section 18.40 of the City Code. Please have a registered Civil Engineer prepare appropriate improvement plans and submit for separate plancheck process through the Engineering Department. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of permit. The required improvements are: Improvement plans signed, Date: by:. P \DOCS\MISFORMS\FRM0010 DH REV 02/27/91 '—''—''—' 13. Improvements are required. Construction of the public improvements may be deferred in accordance with Section 18.40 of the City Code. Please submit a letter requesting deferral of the required improvements together with a recent title report on the property and the appropriate processing fee so we may prepare the necessary Future Improvement Agreement. The Future Improvement Agreement must be signed, notarized and approved by the City prior to issuance of a Building Permit. Future Improvement Agreement completed, Date: By: DDE J 13a. Inadequate information available on site plan to make a determination on grading requirements. Please provide more detailed proposed and existing elevations and contours. Include accurate estimates of the grading quantities (cut, fill, import, export). '—' I—^ 14. No grading required as determined by the information I, provided on the site plan. i. '—' '—' '—' 15. Grading Permit required. A separate grading plan prepared ; by a registered Civil Engineer must be submitted for separate plan check and approval through the Engineering 1 Department. NOTE; The Grading Permit must be issued and grading substantially complete and found acceptable to the City Inspector prior to issuance of Building Permits.i Grading Inspector sign off. Date. by: Miscellaneous Permits 16. Right-of-Way Permit not required. 17. Right-of-Way Permit required. A separate Right-of-Way Permit issued by the Engineering Department is required for the following: '—' '—' 18. Sewer Permit is not required. '—' '—' '—' 19. Sewer Permit is required. A sewer Permit is required concurrent with Building Permit issuance. The fee required is noted below in the fees section. 20. Industrial Waste Permit is not required. P \DOCS\MISFORMS\FRM0010 DM REV 02/27/91 n 21. Industrial Waste Permit is required. Applicant mus,t complete Industrial Waste Permit Application Form and submit for City approval prior to issuance of a Building Permits. Permits must be issued prior to occupancy. Industrial Waster Permit accepted - Date: By: T Fees Required 27. D D D D D 23, 24, 25, 26. 27. Park-in-Lieu Fee Quadrant: Fee per Unit:. Total Fees:. Traffic Impact Fee Fee Per Unit- Bridge and Thorough fare Fee Fee Per Unit: JTotal Fee:. Total Fee: Public Facilities Fee required. Facilities Management Fee Zone:. Sewer Fees Permit No. Fee: EDU's Benefit Area:Fee: 28. Sewer Lateral Required:. Fee: 29. REMARKS: ENGINEERING AUTHORIZATION TO ISSUE PERMIT BY: P \DOCS\MISFORMS\FRM0010 DH REV 02/27/91 Plan Check No *?/' Planner <?l ftfc^ PLANNING CHECKLIST Address 22.1 0 Co*>nof Ci, Phone 438-1161 ext (Name) APN 2.1 ? ~ \'£- —Type of Project and Use _ Zone PAP Facilities Management Zone i*i Legend 5 si e -^ -^ -^ HI (U <D c c coj <g a a. a. a. Item Complete Item Incomplete - Needs your action 1, 2, 3 Number in circle indicates plancheck number where deficiency was identified CH Environmental Review Required YES DATE OF COMPLETION NO TYPE erne Compliance with conditions of approval7 If not, state conditions which require action Conditions of Approval Discretionary Action Required YES NO APPROVAL/RESO NO PROJECT NO DATE OTHER RELATED CASES Compliance with conditions of approval7 If not, state conditions which require action Conditions of Approval D D California Coastal Commission Permit Required YES N DATE OF APPROVAL San Diego Coast Distnct, 3111 Cammo Del Rio North, Suite 200, San Diego, CA 92108-1725 (619) 521-8036 Compliance with conditions of approval7 If not, state conditions which require action Conditions of Approval n EnD D Landscape Plan Required YES NO See attached subrmttal requirements for landscape plans Site Plan QDD D Zoning 3 4 Provide a fully dimensioned site plan drawn to scale Show North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width and dimensioned setbacks Show on Site Plan Finish floor elevations, elevations of finish grade adjacent to building, existing topographical lines, existing and proposed slopes and dnveway Provide legal descnption of property Provide assessor's parcel number Setbacks BTinyrt 3 o'nn/Hfr 4 Lj D D Additional Comments Front Int Side Street Side Rear Lot coverage Height Parking ^JL^ IS Required Required Required Required Required Required Spaces Required Guest Spaces Required Shown Shown Shown Shown Shown Shown Shown Shown OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE PLNCK FRM \ <. ^ o 3 S IS !?* > 71 </> o 1§ \3 35 Sl J V ?? a t> 30 'Sffil 1 0Q i OQ 3