HomeMy WebLinkAbout2280 Faraday Ave; ; CB162084; Recycle(City of
Carlsoad
Owner:
WASTE MANAGEMENT
PLAN
8-59
Contractor:
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Phone Number: ____ 'b=Boc.....,,c._1.._:I~1z-""-"""'~"""@...=..,~I--------
Permit#: Estimated Cost of Project: $_4~,_o_o~o~,~o~o_o~-------
Type of Project: D New Construction .)@!jemodel or T.I. D Residential D Commercial D Demolition
~heckallfu~appM OffihITT _____________________________ _
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 50% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 50% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tab.les 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. = lbs. of allowable waste.
~ plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to finai.
Table 1-Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete
Brick/ Masonry
cardboard
Drywall
Landscape Debris
L.umber / Wood
Metals
Mixed Waste
Trash I Garbai:s:e
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled. ______ %
Official Use Only
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: _________________ _
Page 1 of 2
Table 2 -Actual Waste (To be completed after construction.)
MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method
LANDFILL RE-USED or RECYCLED (complete only if different than Table 1)
Asphalt/ Concrete 'l.o.10 Tt>N~
Brick/ Masonry
cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash I Garbae:e 4~¥.7 ~
Other: !
TOTAL lbs.: 'l~"3colb> Yl,'4oolk.~
,,-'
Actual Percentage Re-Used or Recycled ___ .3~1~ __ %
Official Use Only
D 50% Goal Achieved D 50% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $_--------
Reviewed/ Approved by:. ____________________ _
EXAMPLE: Us~ the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE~USED or RECYCLED
Asphalt I Concrete 0 -:woo
Brick I Masonry iOO -450·
Cardboard 0 -156
Drywall 0 50
Landscape Debris 0 120
Lumber I Wood 500 0
Metals 300 200
Mixed Waste 1500 0
Trash I Garbage 300 0
Other: Pool c;L,(_111.,Lte 0 ~00
TOTAL lbs.: 27-00 3'2J-O
Percentage to be Re-Used or Recycled 59 %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
Waste Hauling Company or Re-Use Method
AlsC H-C!fA.tLvi,OI Co.
WM I Re-l,\_sed lsrLcR. 0111,-s[te
AlsC H-C!l,(,LLvi,IA Co.
A"B,C H-ctl,(,LLvi,c:i Co.
Ml,(,Le,vieo! _c; Re-useDI OV\--SLte
waste Mv1111,acie11vtell\,t
WM I A"B,C H-C!L-<.LL111,g
WM
WM
l,\_SeDI as c.rnsvieDI lslilse 0111,-sLte
3870 X 100 = 59% Re-Used or Recycled
(2700 + 3870)
Since 59% exceeds the minimum requirement of 50%, this plan complies.
Page 2 of 2
T\.le: TOU~i,e \ i.ll-1..M~ iE.AC;:iH
1l\ll'tr 1"E OWfJE.£. f'~\.IO iltAr
~,.io .._,or Lot-'1= f~ THE: (.0~1llJ.4Vfl~.
t\L;,O ntE: 0t>.1L~"1t:r '1'1.C,"2.-~ru.w
~ \tJ oue... ~~-P~
DUMPSITE/LANDFILL
Palomar Landfill (PAL)
5960 El Camino Real
Carlsbad, CA, 92008
DATE OF SERVICE SVC TICKET#
10/20/2016 793274
11/1/2016 796862
11/9/2016 798893
11/29/2016 804310
12/15/2016 808711
1/6/2017 815585
1/26/2017 820587
2/8/2017 824331
2/21/2017 828290
3/6/2017 832032
3/16/2017 834954
3/24/2017 838243
4/6/2017 841485
4/19/2017 845541
Total Tons
Total Tons Diverted
Total Tons Landfilled
Total Diversion
BIN SIZE
40yd
40yd
40yd
40yd
40yd
40yd
40yd
40yd
40yd
40yd
40yd
40yd
40yd
40yd
46.15
0.00
46.15
0.00%
GENERAL CONTRACTOR:
BN BUILDERS
2280 FARADAY AVE
CARLSBAD, CA. 92008
Construction & Recycling Services
5701 S. Eastern Ave., STE 300, Commerce, CA 90040
714-480-2317 (Direct) 866-459-3985 (Fax)
Total Tons
MATERIAL TYPE Tons RCY
MSW /TRASH 5.08 0.00
MSW /TRASH 2.95 0.00
MSW /TRASH 5.61 0.00
MSW /TRASH 4.01 0.00
MSW /TRASH 2.24 0.00
MSW /TRASH 5.58 0.00
MSW /TRASH 4.58 0.00
MSW /TRASH 2.63 0.00
MSW /TRASH 3.29 0.00
MSW /TRASH 3.25 0.00
MSW /TRASH 0.93 0.00
MSW /TRASH 1.64 0.00
MSW /TRASH 2.17 0.00
MSW /TRASH 2.19 0.00
RECY
RATE%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Acct: 350-71541
Sales Rep: Karrie Crawford
Bruce.Clegg@bnbuilders.com
Prepared Date: 4/26/2017
FACILITY
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
PALOMAR LANDFILL (PAL)
12:50 PM Roll Off Dispatch Closed Ticket Display 4/26/2017
350-71541 BN BUILDERS
Opened by KCRAWF02
Closed by TLOVELAl
2280 FARADAY AVE CARLSBAD CA 92008-7208
Ticket 793274 Driver code KMORD Requested by 6193097691 BOBBY
Dump Info: Site PAL Tkt# 030:XXXXCB Qty 5.08
Load type S/0 Equipment code 274 -575 Points O
Status Code * Additional comments exist for this ticket*
Date Time Time
Dispatched: 10/20/2016 13:54 Arrived at customer: 14:03
Loaded I Drop off: 14:27 Stop Ticket:
Restart Ticket: Arrived at landfill: 14:32
Finished at landfill: 14:48 Ticket completed: 14:48
Svc Quantity Price
45.15
217.20
Special Description Job#
waste
Type
DTN 5.08
400 1. 00 PO# GS0716004 MSW
Tax T/P
T
T
Bottom
P3=Exit Pll=View Dates P12=Prev F13=Additional Comments Fl7=Top PlB•Bottom
12:50 PM Roll Off Dispatch Closed Ticket Display 4/26/2017
350-71541 BN BUILDERS
Opened by MMORA2
Closed by TLOVELAl
2280 FARADAY AVE CARLSBAD CA 92008-7208
Ticket 796862 Driver code KAARG Requested by AFTER HOURS 2ND ATTEMPT TICKT
Dump Info: Site PAL Tkt# 145XXXXCB Qty 2.95
Load type E/R Equipment code 274 -575 Points O
Status Code * Additional comments exist for this ticket*
Date Time Time
Dispatched: 11/01/2016 11:52 Arrived at customer: 12:14
Loaded I Drop off: 13:48 Stop Ticket: 12:17
Restart Ticket: 13:31 Arrived at landfill: 13:54
Finished at landfill: 14:28 Ticket completed: 14~37
Svc Quantity Price
45.15
217.20
Special Description Job#
Waste
Type
DTN 2.95
400 1.00 LONIS MSW
Tax T/P
T
T
Bottom
F3=Exit Fll=View Dates F12=Prev F13=Additional Comments Fl7=Top Fl8=Bottom
12:50 PM Roll Off Dispatch Closed Ticket Display 4/26/2017
350-71541 BN BUILDERS
Opened by HBERMUDl
Closed by LBELTRAN
2280 FARADAY AVE CARLSBAD CA 92008-7208
Ticket 798893 Driver code KJMAL Requested by KC-BEN 619 933 0403
Dump Info: Site PAL Tkt# 700XX.XXCB Qty 5.61
Load type E/R Equipment code 274 -584 Points o
Status Code * Additional comments exist for this ticket*
Date Time Time
Dispatched: 11/09/2016 13:06 Arrived at customer: 13:14
Loaded I Drop off: 13:30 Stop Ticket:
Restart Ticket: Arrived at landfill: 13:32
Finished at landfill: 14:01 Ticket completed: 14:10
Svc Quantity Price
45.15
217.20
Special Description Job#
Waste
Type
DTN 5.61
400 1.00 LON IS MSW
Tax T/P
T
T
Bottom
F3=Bxit Fll=View Dates Fl2=Prev F13=Additional Comments F17=Top F18=Bottom
12:50 PM Roll Off Dispatch Closed Ticket Display 4/26/2017
350-71541 BN BUILDERS
Opened by MMORA2
Closed by LBELTRAN
2280 FARADAY AVE CARLSBAD CA 92008-7208
Ticket 804310 Driver code KJMOR Requested
Dump Info: Site PAL Tkt# 278XXXXCB Qty
by AFTERHOURS DUIPLICATE TICKET
4.01
Load type E/R Equipment code
Status Code * Additional
Date Time
Dispatched: 11/29/2016 7:58
Loaded I Drop off: 8:11
Restart Ticket:
Finished at landfill: 8:33
Points O
comments exist for this ticket*
Arrived at customer:
Stop Ticket:
Arrived at landfill:
Ticket completed:
Time
8:06
Svc Quantity Price
45.15
217.20
Special Description Job#
8:17
8:44
Waste
Type
DTN 4.01
400 1. 00 LON IS MSW
Tax T/P
T
T
Bottom
F3=Exit Fll=View Dates F12=Prev F13=Additional Comments F17=Top F18=Bottom
12:50 PM Roll Off Dispatch Closed Ticket Display 4/26/2017
350-71541 BN BUILDERS
Opened by KLUJANl
Closed by LBELTRAN
2280 FARADAY AVE CARLSBAD CA 92008-7208
Ticket 808711 Driver code KJMAL Requested
Dump Info: Site PAL Tkt# 098:XXXXCB Qty
by BEN/Javier 619.805.5506
2.24
Load type E/R Equipment code Points o
Status Code * Additional comments exist for this ticket*
Date Time
Dispatched: 12/15/2016 8:51
Loaded I Drop off: 9:03
Arrived at customer:
Stop Ticket:
Restart Ticket: Arrived at landfill:
Finished at landfill: 9:18 Ticket completed:
Svc Quantity Price
45.15
217.20
Special Description Job#
DTN 2.24
400 1. 00 am please IONIS
Time
8:56
9:06
9:26
waste
Type
MSW
Tax T/P
T
T
Bottom
F3=Exit Fll=View Dates F12=Prev Fl3=Additional Comments Fl7=Top F18=Bottom
12:50 PM Roll Off Dispatch Closed Ticket Display 4/26/201'/
350-71541 BN BUILDERS
Opened by KCRAWF02
Closed by TLOVELAl
2280 FARADAY AVE CARLSBAD CA 92008-7208
Ticket 815585 Driver code KJMOR Requested
Dump Info: Site PAL Tkt# 669XXXXCB Qty
by BEN 619.933.0403
5.58
Load type S/0 Equipment code
Status Code * Additional
Date Time
Dispatched: 1/06/2017 7:15
Loaded I Drop off: 7:45
Restart Ticket:
Finished at landfill: 8:07
Points O
comments exist for this ticket*
Arrived at customer:
Stop Ticket:
Arrived at landfill:
Ticket completed:
Time
7:44
Svc Quantity Price
45.15
217.20
special Description Job#
7:47
8:08
Waste
Type
DTN 5.58
400 1. 00 LONIS MSW
Tax T/P
T
T
Bottom
F3=Exit Fll=View Dates F12=Prev Fl3=Additional Comments F17=Top F18=Bottom
12:50 PM Roll Off Dispatch Closed Ticket Display 4/26/201'/
350-71541 BN BUILDERS
Opened by KCRAWF02
Closed by LBELTRAN
2280 FARADAY AVE CARLSBAD CA 92008-7208
Ticket 820587 Driver code KAARG Requested
Dump Info: Site PAL Tkt# 313:XXXXCB Qty
by BEN 619.q33.0403
4.58
Load type E/R Equipment code
Status Code * Additional
Date Time
Dispatched: 1/26/2017 11:05
Loaded I Drop off: 11:22
Restart Ticket:
Finished at landfill: 11:56
Points O
comments exist for this ticket*
Arrived at customer:
Stop Ticket:
Arrived at landfill:
Ticket completed:
Time
11:10
11:25
12:09
Svc Quantity Price
45.15
217.20
Special Description Job#
waste
Type
DTN 4.58
400 1.00 LON IS MSW
Tax T/P
T
T
Bottom
F3=Bxit Pll=View Dates Fl2=Prev Fl3=Additional Comments Fl7=Top PlB=Bottom
12:50 PM Roll Off Dispatch Closed Ticket Display 4/26/2Ul'/
350-71541 BN BUILDERS
Opened by KLUJANl
Closed by LBELTRAN
2280.FARADAY AVE CARLSBAD CA 92008-7208
Ticket 824331 Driver code KJMOR Requested
Dump Info: Site PAL Tkt# 829XXX.XCB Qty
Load type E/R Equipment code
Status Code * Additional
by KB-BEN
2.63
Points
comments exist for this
0
ticket*
Date Time
Dispatched: 2/08/2017 7:46 Arrived at customer:
Loaded I Drop off: 8:02 Stop Ticket:
Restart Ticket: Arrived at landfill:
Finished at landfill: 8:15 Ticket completed:
Svc Quantity Price
45.15
217.20
Special Description Job#
DTN 2.63
400 1. 00 LON IS
Time
7:53
8:07
8:28
waste
Type
MSW
Tax T/P
T
T
Bottom
F3=Exit Fll=View Dates F12=Prev Fl3=Additional Comments Fl7=Top F18=Bottom
12:50 PM Roll Off Dispatch Closed Ticket Display 4/26/2017
350-71541 BN BUILDERS
Opened by KCRAWF02
Closed by LBELTRAN
2280 FARADAY AVE CARLSBAD CA 92008-7208
Ticket 828290 Driver code KJMOR Requested
Dump Info: Site PAL Tkt# 356XXXXCB Qty
by BEN 619.933.0403
3.29
Load type E/R Equipment code
Status Code * Additional
Date Time
Dispatched: 2/21/2011 13:35
Loaded I Drop off: 13:54
Restart Ticket:
Finished at landfill: 14: 13
Points o
comments exist for this ticket*
Arrived at customer:
Stop Ticket:
Arrived at landfill:
Ticket completed:
Time
13:46
13:57
14:21
Svc
DTN
LIN
40D
Quantity
3.29
1. 00
1. 00
Price
45.15
54.71
217.20
Special Description Job#
waste
Type
LON IS
DEMO
DEMO
Tax T/P
T
T
T
Bottom
F3=Bxit Fll=View Dates Fl2=Prev Fl3=Additional Comments Fl7=Top Fl8=Bottom
12:50 PM Roll Off Dispatch Closed Ticket Display 4/26/2017
350-71541 BN BUILDERS
Opened by KLUJANl
Closed by LBELTRAN
2280 FARADAY AVE CARLSBAD CA 92008-7208
Ticket 832032 Driver code KJMOR Requested
Dump Info: Site PAL Tkt# 930XXXXCB Qty
by KC BEN 619.933.0403
3.25
Load type E/R Equipment code
status Code * Additional
Date Time
Dispatched: 3/06/2017 12:27
Loaded I Drop off: 12:39
Restart Ticket:
Finished at landfill: 13:35
Points O
comments exist for this ticket*
Arrived at customer:
Stop Ticket:
Arrived at landfill:
Ticket completed:
Time
12:33
12:44
13:45
Svc Quantity Price
45.15
217.20
Special Description Job#
Waste
Type
DTN 3.25
40D 1. 00 LONIS MSW
Tax T/P
T
T
Bottom
F3=Exit Fll=View Dates Fl2=Prev F13=Additional Comments Fl7=Top FlB=Bottom
~'"'!'."\"-' 'l'tlt·~'ll: ·1. it.~..,-.r"II 11~.-!> ·~<tJ.111(~\I:" • • t • • ., I •• ·• • ..... ~ ... 'f't ~ '._,._l,: • .• •• •, ~ .. 'L~
~41 ~. '!J..L~ Pf)~~~~ 'F.l)
~~ ~'.\}J(.~r,s... ~\ ~D?'lt
t"fff~) 74~-V(l(~
1]]11~lt: jl~f(}I
i~tt,~::: ~'11P'11~;
~ <CVJlff[~::
~J)li} ~.llff!))X ~
~?if.!} [ll[lffilll tt:'A '.nn. n..<~
«J .. B!lhtwiit:v lf.!\!Q.i.:tt$ ~~-
]~:: l~)):]~
((\)iolt:: 1()):3.t!
"5 ~~[ft M~[M: --~'1 ~i$ ... !lJrQI 11~9!" ·,:rmmr
?~d: ~ll91
f J1;m\~1'.ti,re,,.r;
~t~Olt~: ~l~t
(l})rtfurttra:: i(l1,t} ~ ~)!Ji
'l~1<' ['!!I!·~: n..e) ... ~l'i!Jl} .. u~ ~~n.tn.. ·~l!'it:' nm> ... ·.1$q1... ~lht.,: ~ \Wtt IV'~!lt..:-
1P:,rtbf.'ro'~~
<<:tao:~~-. 'tn.,·:r.a:
~':}/i'». r lh~!!··l'
l O · ~ '2... it)"-!!>
~i,a & OP.9,)lit:iaa ~ ~i.f:~ -Oi~nw ~'l'"r.'P.rrf.a~· ff?!'
t\ia 'Jt!UU'J.lS 'Al\ tk ,., .... l~'Jf ._ 111& I\Uu,A • ID utility tat mm~--litualldltWai bl wt'll"-t··
a.1u. mt ~tt ... t • fi11.tt\ltl ,_. u ~ • • ~u t--,e ~ c,f, ~ J'P~~m.· m ~ilr.r~:re,.
i-:-nr:() r 1·;,,n :. t',.~,-q ,._.,,, .,, ... ,
···:(;,:;,:') ()::, "f. I.'• •1 ··,:.1 I .-., ' : l ,.
'.· :·,n r,·j ;:.,c.1r ·, ., 1,(1 <·· 'I • . . ..
I ,'·):f <:' 0J ~-•• '.l! ., ....... . ...
I ·11:;, 1 . .-:·,o,,· .... · :: . · .. ·I
Cc1mmnr:! .i. ·I· , ·
'", '." C t:J.> l"'lt." fl:}' . ."[ ,·;1
l,.11 TO~
'Jn . t·:
I, u t_',!l
.l.l·-11/1 I.I.CE
T1···1.1.c:I : :: 00:1.4/0000
Cont.,,-._ :i: n (·:·:· 1·· ::
1 ; , .. J. • :i :1 n :: (t?O ~;,::-r1,1 J:t J 1...G(i
I· '1.r.•1v.f~.,d
/ 'h,,, 1•·1.:.1,sa
I :I. I " r. ,:.":'
,,,ij I. ·1.:.-:i,y ,;··,
1 rq hi N JI :. :1 l '.'·, .. l_;;?
Construction & Demol i tion Diversion Certificate --DiveFsion Percentage 65%
·1h1,; cer-llf1e-::-. that the 1:nm!)ill'ly listed rJt"()Ve h-lS util:t:r.f!d an EIUJ +acillt)' to dl\lert cmstruch on demlition 01<:Ytenals in .:.crnrd.1nr'"'
q,t h LEJll r-equrn~t1li-'l1t. lhe t11versi0"1 tomage ic, based oo an cr-;era:t! tnnnaoe perceot.:iqi: Q'f the rtiSpecti YP. DU! -fii.cilitv.
................. . ......... .. .. . ······.. ... .. . .. ······ .............. ····-···•"''''''""' ············· ........ . ///. -.. -. ··-················"······························ .. ··--···· .. // _.,..... •.•• ~ !)1···, .... , ... .-, ..
/ ~-·-----·· ~_... .... --
r
91.. ESCONDIDO
RESOURCE
EC OVERY
AND WASTE TRANSFER SERVICE
"We'll Take Care of It''
Construction & Demolition Diversion Certificate
Received at :Escondido Resource Recovery Date: Cf· Zfif-ZQ lb
5502
Processed At : SRR Lemon Grove, CAD CDI San Marcos, CA D
Customer:(J/lt~~ C!v~ INC Ticket# 1 o/ 6 L.
Project: Number/Description __ __....,.{!_;...-,;A/-~6,,,__ ____ f:_A_A..;..;,A.....;...:..,,IJA __ y,,_
Total Tons Received: ~ .]O Tons Diversion Percentage:
Scale house Operators Signature~~/iiiz° ~ 6S o/o
This certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.