HomeMy WebLinkAbout2285 HIGHLAND DR; ; CB140529; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
04-14-2014 Cogeneration Permit Permit No:CB140529
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
2285 HIGHLAND DR CBAD
COGEN Sub Type: PHOTO
Lot#: 0
Constuction Type: NEW
Reference #:
1560511300
$12,000.00
PATE RES-PHOTOVOLTAIC SYSTEM
Status: ISSUED
Applied: 03/10/2014
Entered By: RMA
Plan Approved: 04/14/2014
Issued: 04/14/2014
Inspect Area:
Plan Check #:
30 ROOF MOUNTED MODULES-UPGRADE ELECTRIC PANEL TO 200 AMPS
Applicant:
GREEN TECH SOLUTIONS GROUP INC
STE 422
20335 VENTURA BLVD
WOODLAND HILLS CA 91364
888 272-6868
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Green Bldg Stands (SB1473) Fee
$146.47
$0.00
$102.53
$47.47
$0.00
$1.20
$1.00
Owner:
PATE ALVIN A&MARGARET E
2285 HIGHLAND DR
CARLSBAD CA 92008
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Additional Fees
TOTAL PERMIT FEES
Total Fees: $298.67 Total Payments To Date: $298.67 Balance Due:
Inspector: Clearance:
$0.00
$0.00
$0.00
$0.00
$298.67
$0.00
NOTICE: Please take NOTICE at approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.' au have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020{a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
f Tl' hih fiiinh hi
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: PLANNING ENGINEERING BUILDING FIRE
JOBADORESS '7,.1,>o~
CT/PROJECT #
EXISTING USE
PHONE
~-~•?--,.i=-,\
EMAIL
Y'\
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-271 9 Fax: 760-602-8558
email: building@carlsbadca.gov
www.carlsbadca.gov
SUITEf/SPACEt/UNIT
PHASE# # OF UNITS # BEOROOMS #BATHR M
PROPOSED USE GARAGE (SF) PATI0S(SF) DECKS (SF)
ZIP CC)--\\
FAX
PROPERTY OWNER NAME
ADDRESS
'").. '7-~ Ir\,
PHONE 7CJ0•7?-9· \~')....\ FAX
EMAIL
~'2:v ,-----.1\ _,...._ ' ' _i: l STATE ~·~ ,,.,\ ~ ,C'A
HEALTH HAZMAT/APCD
SWPPP
CON TR. TYPE OCC. R UP
~ "&~p
AIR CONDITIONING
YES□No□
ZIP
~\~
FIRE SPRINKLERS
vEsO NoO
(Seo. 7031.5 Business 11nd Professions Code: Any City or County which requires a permit to construct. alter. improve, demolish or repair any structure, prior to its issua , iso requires the
applicant for such permit to file a signed statement that he is lioensed pursuant to the provisions of the Contractor's Uoense Law {Chapter 9, oommendlng with Section of Division 3 of the Business and Professions Code) or that he is exempt therefrom. and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)).
Worllers' Compensation Declaration: I hereby affirm under penally of (l(lrjury one of the following declal'1llions: D I !JJ,le'1ndwlll maintain a certificate of consent to self-Insure for wori(ers' compensation as provided by Section 3700 of the labor Code, for the performance of the WOf1( for which this permit is Issued.
~have and will maintain worlltrs' compen11~on. as required bv Sectio(l 3700 of the labor Code, for lhe performance of the WOf1( for wh~it is Issued. My WOfkers' compensalion Insurance earner pnd policy
number are: Insurance Co. <;1 l c:::~ 1 e' ~--0 Policy No. \ 97<o\ ~ Expiralion Date V · ?-I · \ '-\
Jw.section need not bt completed W the permit is for one hundred dollars ($100) or less. LJ Certificate of Exemption: I certify that in the performance of the WOik for which this permit is issued, I shall not employ any person in any manner so as IO become subject ID the Worl(ers' Compensation Laws of
California. WARNING: Fallure to secure worllffl' compen.~~~ ~~~.~ unlawful, and shall subject an employer to cltmlnal penaltltt end civil flllff up to one hundred thousand dollars (& 100,000}, In
addition to the cost of compensation, da'7-• ~ed ~"'(06 of the Labor code, Interest and attorney's lffl. ~
LS CONTRACTOR SIGNATURE ~ -" 0AGENT DATE
I
~ I
I hereby affirm that I 8111 exempt from Contractor's License law for the following reason: 0 I, as owner of the property or my employees with wages as their sole compensation, wih do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Conlracto(s
license law does not apply to an owner of property who builds or improves thereon. and who does such WOf1( himself or ttvough his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or ~tis sold within one year of completion, the OWl18(-00ider w,11 have the burden of proving that he did not build or improve for the purpose of sale).
□
□
I, as owner of the property, am exclusively contracting with licensed contractors to construct !he project (Sec. 7044, Business and Professions Code: The Conlracto(s License Law does not apply to an owner of
property who builds or improves thereon, end contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section ____ .Business and Professions Code for this reason:
1. I personally plan to provide lhe major labor and materials for construction of the proposed property improvement. O ves Do
2. I (have / have not) signed an application for a building permit for the proposed WOik.
3. I have conlracted with lhe following person (finn) to proYide the proposed conslrudion (include name address/ phone / contractors' license nul008r):
4. I plan to proYide portions of lhe work, but I have hired lhe following person to coordmate, supervise and provide lhe major work (indude name I address / phone/ contractors' bnse number):
5. I will provide some of the work. but I have contracted (hired) the following persons lo provide the work indicated (include name I address/ phone / lype of work):
LS PROPERTY OWNER SIGNATURE □AGENT DATE
,.;
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Spbstance Account Act? □Yes □No
Is the applicant or Mure building occupant required to obtain a pennit from the air pollution control disbict or air quality management disbict? □Yes □No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? □Yes □No
IF ANY OF THE ANSWERS ARE YES, A ANAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES ANO THE AIR POLLUTION CONTROL DISTRICT.
I hereby affinn that there is a construction lending agency for the perfonnance of the work this pennit is issued (Sec. 3097 (i) Civil Code).
Lender's Name Lender's Address
I certify that I have read the application and state that the aboYe lnfonnatlon Is correct and that the lnfonnatlon on the plans Is accurate. I agreetooomplyl'Ath all Cltyordlnanoes and State laws relatlngto bulldlng oons1JUdton.
I hereby aulhooze representative of the City of Car1sbad to enter upon the above mentiooed property for nspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST A1.1 LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: AA OSHA permit is requi'ed for excavations over 5'0' deep and demolition or construction of structJJres CNer 3 stories n helwJl
EXPIRATION: Every permit issued by the Buikling Olfdal under lhe provisions of lhis Code shall expie by mtaoon and become nul and void W the buiklng or v.oi1< authorized by such permit is not commenced 'Mlt1i1
180 days from the dale of such permit or ff the buidng orv.oil< authorized by such ~ii is suspended or abandoned atanytme after the v.oi1< is conmenced for a period of 180 days (Section 106.4.4 Unifoml Buildilg Code).
~ APPLICANT'S SIGNATURE ~ ~ DATE -
lnspectio·n List
Permit#: CB140529 Type: COGEN PHOTO PATE RES-PHOTOVOLTAIC SYSTEM
30 ROOF MOUNTED MODULES-UPGRAD
Date Inspection Item Inspector Act Comments ---------------
05/07/2014 35 Photo Voltaic (PV) RI
05/07/2014 35 Photo Voltaic (PV) PY AP
05/07/2014 39 Final Electrical RI
05/07/2014 39 Final Electrical PY AP
05/06/2014 33 Service Change/Upgrade PY AP
05/06/2014 35 Photo Voltaic (PV) RI
05/06/2014 39 Final Electrical RI
Friday, May 09, 2014 Page 1 of 1
EsGil Corporation
In <Partnersnip witn (]o~ernment for (}Jui(aing Safety
DATE: 03/28/2014
JURISDICTION: Carlsbad
PLAN CHECK NO.: 14-0529
5 PROJECT ADDRESS: 228J Highland Dr.
SET: II
PROJECT NAME: Pate (2) 5000 watt Rooftop Solar PV System
□ APPLICANT
□ JURIS.
□ PLAN REVIEWER
□ FILE
~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
~ Esgil Corporation staff did not advise the applicant that the plan check has been completed.
D Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Aldo Mantellassi Telephone#: 562.455.6734
Date contacted: (by: )
Mail Telephone Fax In Person
0 REMARKS:
By: Eric Jensen
EsGil Corporation
□GA 0EJ □PC
Fax #:
E-mail: gothamite80@gmail.com
Enclosures:
3/27/e-mail
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
DATE: 03/12/2014
JURISDICTION: Carlsbad
PLAN CHECK NO.: 14-0529
EsGil Corporation
In (]'artnersnip witn <,overnment for (}Jui[aing Safety
SET: I
PROJECT ADDRESS: 2283 Highland Dr.
PROJECT NAME: Pate (2) 5000 watt Rooftop Solar PV System
~PPLICANT
~ JURIS.
□ PLAN REVIEWER
□ FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
~ Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Aldo Mantellassi Telephone#: 562.455.6734
Date co9-tacted: 3-j \-1'"" (bYlA--) Fax #:
J"fiMail ✓Telephone Fax In Person E-mail: gothamite80@gmail.com
0 REMARKS:
By: Morteza Beheshti
EsGil Corporation
□GA □EJ □PC
Enclosures:
3/11
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
Carlsbad 14-0529
03/12./2014
GENERAL PLAN CORRECTION LIST
JURISDICTION: Carlsbad
PROJECT ADDRESS: 2283 Highland Dr.
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 3/11
REVIEWED BY: Morteza Beheshti
FOREWORD (PLEASE READ):
PLAN CHECK NO.: 14-0529
DATE REVIEW COMPLETED:
03/12/2014
This plan review is limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and disabled access. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. The approval of
the plans does not permit the violation of any state, county or city law.
• Please make all corrections and submit two new complete sets of prints to:
ESGIL CORPORATION.
• To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
• Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
D Yes D No
Carlsbad 14-0529
03/12/2014 ·
ELECTRICAL and ENERGY COMMENTS
PLAN REVIEWER: Morteza Beheshti
ELECTRICAL (2013 CALIFORNIA ELECTRICAL CODE)
1. "Arc-fault protection is required for DC circuits per CEC 690.11. Document how this protection
is provided with your photovoltaic design."
2. Please provide a statement on the Title Sheet of the plans to show compliance with the
current Codes. The following are the correct current Codes:
a. The 2013 edition of the California Building Code (CBC) adopts the 2012 International
Building Code (IBC) and the 2012 International Residential Code (IRC).
b. The 2013 edition of the California Electrical Code (CEC) adopts the 2011 National
Electrical Code (NEC) and the 2012 California Amendments.
c. The 2013 edition of the California Mechanical Code (CMC) adopts the 2012 Uniform
Mechanical Code (UMC) and the 2012 California Amendments.
d. The 2013 edition of the California Plumbing Code (CPC) adopts the 2012 Uniform
Plumbing Code (UPC) and the 2012 California Amendments.
e. The 2010 edition of the California Energy Efficiency Standards
3. Please revise the section numbers and notes on the plans to match the 2013 CBC and 2010
CEC, as adopted by California.
4. Pis. clarify single line service size as it indicates 30A service.
5. Provide the required separate ground electrode for the "photovoltaic rack assembly" per
690.47 (D) or connect to the building electrode system. If the electrode conductor is routed
through electrical equipment (disconnects, panels, meter enclosures, etc) then provide a detail
on the plans describing compliance with CEC 250.64(C). (Conductor splices only allowed with
compression connectors or exothermic welding.) Size the ground electrode conductor per
250.166, not smaller than #8. Pis. clarify the single line to show this.
*Note: The rack electrode system is described in the 2010 CEC 690.47(D) and the
upcoming 2016 CEC 690.47(D). It was mistakenly deleted from the 2013 CEC.
Note: If you have any questions regarding this Electrical and Energy plan review list please
contact Morteza Beheshti at (858) 560-1468. To speed the review process, note on this list (or
a copy) where the corrected items have been addressed on the plans.
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 14-0529
PREPARED BY: Morteza Beheshti
BUILDING ADDRESS: 2283 Highland Dr.
DATE: 03/12/2014
BUILDING OCCUPANCY: TYPE OF CONSTRUCTION:
BUILDING AREA Valuation
PORTION (Sq.Ft.) Multiplier
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
--
Bldg. Permit Fee by Ordinance ...
Plan Check Fee by Ordinance -----
Type of Review: □ Complete Review
D Repetitive Fee _ -~ j Repeats
* Based on hourly rate
D Other
0 Hourly
EsGil Fee
Comments: 1.5 hour PV plan review.
Reg. VALUE
Mod.
D Structural Only
1---__ 1_.--151 Hrs. @ •
$100 oo_
($)
$187.501
$150.001
Sheet 1 of 1
macvalue.doc +
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
/f~ ~•.: ~ CITY Of
CARLSBAD
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
P-29
DATE: 3-11-14 PROJECT NAME: PROJECT ID:
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.eov
PLAN CHECK NO: CB 14-0529 SET#: 1 ADDRESS: 2285 Highland Dr APN: 156-051-13-00
IZ] This plan check review is complete and has been APPROVED by the Planning
Division.
By: Chris Sexton
A Final Inspection by the Planning Division is required □ Yes cgJ No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: gotham1te80@gmail.com
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING ENGINEERING FIRE PREVENTION
760-602-4610 760-602-2750 760-602-4665
~ Chris Sexton □ Kathleen Lawrence □ Greg Ryan
760-602-4624 760-602-27 41 760-602-4663
Qhris.s~xtQn~carlsbgQ~i].gov Kt'!tl.Jl~ga.Lawren,~®carl~QaQ,~.gov Gr~gQr1-B)'.en@,arl~bgdca.gQv
□ Gina Ruiz □ Linda Ontiveros □ Cindy Wong
760-602-4675 760-602-2773 760-602-4662
(llna.Ryiz@carls!1m!~a.gov Lini;!a.Qn!iv~,Q~@carl~!li'!d~il-gov !;yo!hia.Wong@carl~bag~a.gQv
□ □ □ Dominic Fieri
760-602-4664
Dominic. Fieri~~arls!1adca.gov
Remarks: