HomeMy WebLinkAbout2290 COSMOS CT; ; CB150199; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
03-02-2016 Commercial/Industrial Permit Permit No: CB150199
Building Inspection Request Line (760) 602-2725
Job Address:
2290 COSMOS CT CBAD
Permit Type:
TI Sub Type:
INDUST. Status: ISSUED
Parcel No:
2130504400 Lot #:
0 Applied: 01/21/2015
Valuation:
$96,864.00 Construction Type:
5B Entered By: RMA
Occupancy Group:
Reference #
AFP13001 Plan Approved: 03/02/2016
Issued: 03/02/2016
Inspect Area PD
Plan Check #:p
Project Title:
VIASAT-COMPILATION RECORD
' 21iA'd3
DRAWINGS FOR ANNUAL PERMIT (AFP13001)-
2236 SF OFFICE TO CL l3U125
OFFICE
C l3 / 30 ?y3 --i 5YlR!
Applicant:
Owner:
SMITH CONSULTING
ARCHITECTS
GRANDONA INVESTMENT ASSOCIATES L P
STE 125
13280 EVENING CREEK DR SOUTH
2177 LASSEN CT
SAN DIEGO CA 92128
GRAND JUNCTION CO 81507
858 793-4777
Building Permit
$612.83
Meter Size
Add'I Building Permit Fee
$0.00
Add'I Recl. Water Con. Fee
$0.00
Plan Check
$428.98
Meter Fee
$0.00
Add1 Building Permit Fee
$0.00
SDCWA Fee
$0.00
Plan Check Discount
$0.00
CFD Payoff Fee
$0.00
Strong Motion Fee
$27.12
PFF (3105540)
$0.00
Park Fee
$0.00
PFF (4305540)
$0.00
LFM Fee
$0.00
License Tax (3104193)
$0.00
Bridge Fee
$0.00
License Tax (4304193)
$0.00
BTD #2 Fee
$0.00
Traffic Impact Fee (3105541)
$0.00
BTD #3 Fee
$0.00
Traffic Impact Fee (4305541)
$0.00
Renewal Fee
$0.00
PLUMBING TOTAL
$49.00
Add'I Renewal Fee
$0.00
ELECTRICAL TOTAL
$816.75
Other Building Fee
$0.00
MECHANICAL TOTAL
$151.15
Pot. Water Con. Fee
$0.00
Master Drainage Fee
$0.00
Meter Size
Sewer Fee
$0.00
Add'I Pot. Water Con. Fee
$0.00
Redev Parking Fee
$0.00
Recl. Water Con. Fee
$0.00
Additional Fees
$0.00
Green Bldg Stands (SB1473) Fee
$4.00
HMP Fee
??
Fire Expedidted Plan Review
$0.00
Green Bldg Standards Plan Chk
??
TOTAL PERMIT FEES
$2,089.83
Total Fees: $2,089.83
Totall Payments To Date:
$2,089.83 Balance Due:
$0.00
FINAL APPROVAL
Insnertnr• Date: J- -sue IClearance:
NONCE Please take NONCE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as ' fees/exactions." You have 90 days from the date the pemit was issued to protest imposition of these fees/exactions. If you protest them, ym mist
follow the protest procedures set forth in Govemnrerd Cade Section 66020(a), and file the protest and any other required infarration with the CQty Manager for
processing in accordance with Carlsbad Wryciped Code Section 3.32.030. Failure to fimeiy follow that procedure will bar- any subsequent legal action to attack,
review, set aside, void, or annol their imposition.
You are hereby F-IRTd ER NOT R ED that your right to protest the specified feestexactiaris DOES NOT APPLY to water and seiner- connection fees and capacity
charges, nor planning, wring, grading or other siin ilar application processing or service fees in connection with this project. NOR DOES ITAPPLY to any
Zacc4% Hvrfnow -* tc5g-21T-3774-
f,P, `'. Building Permit Application
City ®f 163,15 Faraday Ave., Carlsbad, CA 92008
Plan Check No.
Est. Value _
1�AJ rn: �fsu-au"l-'L(1y r25 aX: /bU-bUZ-bb25
u1— s ernail: building@carisbadca.gov
f �
Plan Ck. Deposit
ate `
sWPP
www.Carlsbadca.Cv
JOB ADDRESS
/}
2
SUITE#/SPACE#/UNIT
AP
-1.4 -
6
CT/PROJECT # LOT
# PHASE # # OF UNITS
#-BEDROOMS
# BATHROOMS
TENANT I INE S NAME
CONSTR. TYPE
OCC. GROUP
DESCRIPTION OF WORK: Include Square Feet ofAffectedi4rea(s)
r
J , J"
(STING USE
��i
PRO SED USE
GARAGE (SF)
PATIOS (SF)
DECKS (SF)
FIREPLACE
YES ❑ #_ NO ❑
AIR CONDITIONING
YES ❑ NO ❑
IFIRESPRINKLERS
YES ❑ NO ❑
b
APPLICANT NAME
� ^�r ��c�
4/1
PROPERTY OWNER NAME
Primary Contact
ADPDRE�SS
43 G® 0 IJ L �
ii _
V .—If — '4 1 L -Z�
ADDRESS
CITY
STATES� Z�gr /ry,
�
CITY
STATE ZIP
P�NE
FAX i
� )
PHONE
FAX
RMAIL I k—
+
`.
EMAIL
DESIGN PROFESSIONAL NAME
CO CT R US. E
ADDRESS
`
A D R SS
�71
�C Y l // C
CITY
STATE ZIP
CyT.I' t
STATE
PHONE
FAX
PHONE
EMAIL
EMAIL
coWUV
STA�9 LIG# ,. 0 1
STATELIC.# 5-ZG�
CLAS \
Cl a -/� 1 -0
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, pprior to its issuance, also requires the
applicantfor such permit to file a signed statement that he is licensed pursuant to the provisions ofthe Contractor's License Law (Chapter 9, commendingwith Section 7000 of Division 3 of the
Business and Professions Code) dr that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section (03 p5 by any applicant for a permit subjects the applicant to a
civil penalty of not more than five hundred dollars ($500)).
/ 7 ` 7V 1 RV(l .�. r � /® 321MMIS S,1NV31lddVX
(apo0 6u!plm8 uuqNn b'b'90l uo!loaS) sAep pgl to pound a col paouawwoo si poM a41 rage awg Aue le pauopuege jo papuadsns s! liuuad ypns Aq pa .Vf�j�p!!nq aylll jo l!uuad yonslo alep all, wog sAep Og1.
u!ylnn paouawwoo lqu s! 1!uuad yens Aq pazuoylne >u i0 6u!pl!nq ayl}! p!on pue pnu awooaq pue uoilel!wg Aq andxa lleys apo0 s!yllo suo!s! 6u!plin8ay}Aqpanss!1!uuadUan3 NOIlVHIdX3-Iy6iaq u! sauols E nano samlowlslo uopongsuoo jo uog!Iowa , esuogeneoxe jol pannbai s! liuuad VHSO uVVHSO
llWb3d SIH1 d0 ONIlNVHE) 3H1 d0 30N3no3SNOO NI lllO 01HS 1SNIdOH 3n1 ]OOb AVM ANV NI AdW H01HM S3SN3dX3 0NV S1S00'S1N3WOOf1P'S3111-IISVfl llHlSNIVSV
OV8S-NV0d0 A110 3H1 SS3lW2iVH d3311 ONV AdINWMINI '3AVS 01332i0V OSIv I -sasodmd uopadsu! jol 4adwd pauoiluaw anoge ayl uodn ialue of pegspe0lo Alp ayl to eA!leluesaidai ezuoglne Agejay I
•uogon.gsuoo; u!ppq mflugelaa sMel a;elS pue saoueu!paoAl!3lle qg mn clwoo ojm0e I •alean33e s! sueld ayl uo uogeuuolu! a glegl puepwoo s! uogewu(lul anoge otpeylalels pue uopo!ldde ayl peal aney ljeylAjgjaa I
ssaippy s,iapual
aweN s)apual
•(9p001!n10 (!) L60£ 'oeS) pans! s! 1!wjed s!ql lions egl;o eouewjo}lad ay} jol Aoua6e 6uwpual uoipnjlsuoo a si aiagl leyl wip Agejeq I
131USIO IOH1NO3 NOI1nl1Od HIV 31-11 ONV S331AZIIS AON39H3W3
30 331330 31-11 JO S1N3 RM038 31-ll 9NI133114 SI 8013W SVH 1NV311ddV 31-11 S 3u+ fl 03nSS138 ION AVW AONVdno30 AO 31VDIAIlZI331VN13 V'S3A 3HV SH3MSNV 3H1 JO ANV A[
p ON saA ial!s loops a to Ajepunoq jalno ayl to laa1000' 6 u!yl!m palowlsuoo aq of Aj!jpel ayl sl
o saA p 6louls!p luawa6euew Al!jnb �, jo louls!p jaluoo uogn1lod i!e ayl wal l!uued a ulelgo of pannbai luedn000 6ulppq ajnlnl jo lueolldde ayl sl
o�fyt< saA O 613V lun000V eouelsgnS snoplezeH Jauuel-AalsaJd
ayl to b£99Z to E£99Z '9099Z suogooS japun wei6ad uoguanajd pue luawa6euew Hsu jo wol uogejls!6aj sleualew snopiezey Alalnae^ueldsseu!snq a liwgns of paimbei luedn000 builopq aminl jo lupIdde eLg sl
Inspection List
Permit#: CB150199 Type: TI INDUST VIASAT-COMPILATION RECORD
DRAWINGS FOR ANNUAL PERMIT (AFP1
Date Inspection Item Inspector Act Comments
05/05/2016 89 Final Combo - RI TALK TO MARIA ABOUT THIS!!
05/05/2016 89 Final Combo PD AP
Thursday, May 05, 2016 Page 1 of 1
CB150199 2290 COSMOS CT
C'TY Of
CARLSBAD INSPECTION RECORD
Building Division
0 INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
VIASAT-COMPILATION RECORD
DRAWINGS FOR ANNUAL PERMIT (AFP13001)- 2236 SF
OFFICE TO OFFICE
TI INDUST
Lot#: SMITH CONSULTING ARCHITECTS
0 CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION
0 FOR BUILDING INSPECTION CALL: 760-602-2725
1 b d a ov/Buildina AND CLICK ON RECORD
OR GO TO• www Car s a c .g
T e —fins ection
Type of Inspection
Yp p
BUILDING Date
Inspector
•• ECTRICAL
Date
Inspector
#31 ❑ ELECTRIC UNDERGROUND ❑ UFER
CODE #
#11 FOUNDATION
#34 ROUGH ELECTRIC
#12 REINFORCED STEEL
#33 ❑ ELECTRIC SERVICE ❑ TEMPORARY
#66 MASONRY PRE GROUT
❑ GROUT ❑WALL DRAINS
#35 PHOTO VOLTAIC
#39 FINAL
#10 TILT PANELS
CODE # MECHANICAL
#11 POUR STRIPS
#41 UNDERGROUND DUCTS & PIPING
#11 COLUMN FOOTINGS
#44 ❑ DUCT & PLENUM ❑ REF. PIPING
#14 SUBFRAME ❑ FLOOR ❑ CEILING
#43 HEAT -AIR COND. SYSTEMS
#15 ROOF SHEATHING
#13 EXT. SHEAR PANELS
#49 FINAL
#16 INSULATION
#81 UNDERGROUND (11,12,21,31)
#18 EXTERIOR LATH
#82 DRYWALL, EXT LATH, GAS TES (17,18,23)
#1INTERIOR LATH &DRYWALL
#83 ROOF SHEATING, EXT SHEAR (13,15)
#51 POOL EXCA/STEEL/BOND/FENCE
#84 FRAME ROUGH COMBO (14,24,34,44)
#55 PREPLASTER/FINAL
#85 T-Bar (14,24,34,44)
#19 FINAL
Inspector
#89 FINAL OCCUPANCY(19,29,39,49)
PLUMBINGDate
CODE #
Date
Inspector
#22 ❑ SEWER & BL/CO ❑ PL/CO
#21 UNDERGROUND ❑WASTE ❑ WIR
#24 TOP OUT ❑WASTE ❑ WTR
A/S UNDERGROUND VISUAL
A/S UNDERGROUND HYDRO
#27 TUB & SHOWER PAN
A/S UNDERGROUND FLUSH
#23 ❑ GASTEST ❑ GAS PIPING
A/S OVERHEAD VISUAL
#25 WATER HEATER
A/S OVERHEAD HYDROSTATIC
#28 SOLAR WATER
#29 FINAL
A/S FINAL
F/A ROUGH -IN
CODE* STORM WATER
#600 PRE -CONSTRUCTION MEETING
FL
FIXED XED EEXTINGUISHING SYSTEM ROUGH -IN
#603 FOLLOW UP INSPECTION
FIXED EXTING SYSTEM HYDROSTATIC TEST
#605 NOTICE TO CLEAN
FIXED EXTINGUISHING SYSTEM FINAL
#607 WRITTEN WARNING
MEDICAL GAS PRESSURE TEST
#609 NOTICE OF VIOLATION
#610 VERBALWARNING
M ED [CAL GAS FINAL
SEE BACK FOR SPECIAL NOTES
REV 10/2012
EsGil Corporation
In (Partnership with ('Government for ouiffing Safety
DATE: 2/4/2016 ❑ APPLICANT
Ifj/JURIS.
JURISDICTION: City of Carlsbad ❑ PLAN REVIEWER
❑ FILE
PLAN CHECK NO.: 15-0199 SET: III
PROJECT ADDRESS: 2290 Cosmos Court
PROJECT NAME: ViaSat T. 11.
® The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's buildling codes.
❑ The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
❑ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
❑ The applicant's copy of the check list has been sent to:
® EsGil Corporation staff did not advise the applicant that the plan check has been completed.
❑ EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: —
Date contacted:
Mail Telephone Fax
Telephone #:
(by,,)_S)
In Person
Email:
® REMARKS: Please slip revised City III set (at building department -mechanical and electrical
sheets) into City II set. (at building department)
By: David Yao Enclosures:
EsGil Corporation
❑ GA ® EJ ❑ MEI ❑ PC 1/28
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
u EsGil Corporation
In Tartnership with Government for (Building Safety
DATE: 1/5/2016
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: B15-0199 SET: II
PROJECT ADDRESS: 2290 (`.osmos Court
PROJECT NAME: ViaSat T. 11.
❑ APPLICANT
JURIS.
❑ PLAN REVIEWER
❑ FILE
❑ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
❑ The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
® The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
® The applicant's copy of the check list has been sent to:
Mark Langan
❑ EsGil Corporation staff did not advise the applicant that the plan check has been completed.
® EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Mark Langan
ate contacted: t (bW \�)
11t)Mail leph e Fax In Person
❑ REMA .
By: David Yao
EsGil Corporation
❑GA ®EJ ❑ME3 ❑PC
Telephone #: 858-793-4777
Email: markl@sca-sd.com
Enclosures:
12/24
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
City of Carlsbad B:15-0199
1/5/2016
NOTE: The items listed below are from the previous correction list. These
remaining items have not been adequately addressed. The numbers of the items
are from the previous check list and may not necessarily be in sequence. The
notes in bold font are current.
Please make all corrections, as requested in the correction list. Submit FOUR new
complete sets of plans for commercial/industrial projects (THREE sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted
in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
PLUMBING, MECHANICAL, ELECTRICAL, and ENERGY COMMENTS
PLAN REVIEWER: Eric Jensen
01/05/2016: Plan check response was to "See attached electrical and mechanical
response letter". No letter received.
MECHANICAL (2013 CALIFORNIA MECHANICAL CODE)
1. If compliance with CEC Article 645 is part of the electrical design be sure to
include the mechanical requirements found in 645.4 (equipment shut-off and
rated separation) are shown.
2. Provide smoke detection in the supply air duct of an "air -moving system" for
required shut-off of equipment for smoke control. CMC Section 608.1 Check the
floorplan layout, some units are shown with SD, others are not. Due to the
rearrangement of the floorplan additional units may require SD's.
♦ An "air -moving system" is a system designed to provide heating, cooling, or
ventilation in which one or more air -handling units are used to supply air to a
common space or to draw air from a common plenum or space.
3. There are assembly, development and lab labs shown on the floorplans with no
exhaust systems, just standard recirculation systems with a small amount of
outside air added. Please explain the use of these labs so as to warrant no
exhaust systems.
City of Carlsbad B 15-0199
1/5/2016
4. Likewise no exhaust at the lunchroom? Is this correct?
ELECTRICAL and ENERGY COMMENTS
PLAN REVIEWER: Eric Jensen
ELECTRICAL (2013 CALIFORNIA ELECTRICAL CODE)
5. Fully describe the UPS battery system on the plans. It may need to be installed
in a rated room per CBC 509 Table specifications. (Sheet 1-E3.1.)
6. Does Article 645 (Information Technology Equipment) apply to any of these
rooms? If so, detail all requirements: Rated separation, disconnect switches, etc
for the appropriate rooms.
7. Panelboard 1 PK will require a main disconnect. As an aside, interesting to only
a very few people, a service panel may now revert to the six handle rule.
Previous Code cycles allow a maximum of two main disconnects to protect a
service panelboard.
ENERGY COMMENTS
8. Provide an updated (current energy design) for the changes to the mechanical
equipment.
Note: If you have any questions regarding this Electrical, Plumbing, Mechanical, and
Energy plan review list please contact Eric Jensen at (858) 560-1468. To speed the
review process, note on this list (or a copy) where the corrected items have been
addressed on the plans.
END OF DOCUMENT
EsGil Corporation
In (Partnership with Government for Building Safety
DATE: 2/2/2015 ❑ APPLICANT
X JURIs.
JURISDICTION: City of Carlsbad ❑ PLAN REVIEWER
❑ FILE
PLAN CHECK NO.: 5(15-0199 SET: I
PROJECT ADDRESS: 2290 Cosmos Court
PROJECT NAME: ViaSat T. I.
❑ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
❑ The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
® The check list transmitted) herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
® The applicant's copy of the check list has been sent to:
Mark Langan
❑ EsGil Corporation staff did not advise the applicant that the plan check has been completed.
® EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Mark Langan Telephone #: 858-793-4777
/Date contacted: 7-13 (by. Email: markl@sca-sd.com
JI&Mail i phoneFax In Person
❑ REMARW-
By: David Yao Enclosures:
EsGil Corporation
❑ GA ® EJ ❑ MB ❑ PC 1/23
9320 Chesapeake Drive, Suite; 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
City of Carlsbad B 15-0199
2/2/2015
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: B15-0199
OCCUPANCY: B
TYPE OF CONSTRUCTION: VB
ALLOWABLE FLOOR AREA:
SPRINKLERS?: Y
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: 2/2/2015
FOREWORD (PLEASE READ):
JURISDICTION: City of Carlsbad
USE: office
ACTUAL AREA: T. I. 2236
STORIES: 2
HEIGHT:
OCCUPANT LOAD:
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 1/23
PLAN REVIEWER: David Yao
This plan review is limited to the technical requirements contained in the California version of
the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National
Electrical Code and state 'laws regulating energy conservation, noise attenuation and access for
the disabled. This plan review is based on regulations enforced by the Building Department.
You may have other corrections based on laws and ordinances enforced by the Planning
Department, Engineering Department, Fire Department or other departments. Clearance from
those departments may be required prior to the issuance of a building permit.
Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2012 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
City of Carlsbad B 15-0199
2/2/2015
Please make all corrections, as requested in the correction list. Submit FOUR new
complete sets of plans for commercial/industrial projects (THREE sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted
in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
Provide a statement on the Title Sheet of the plans, stating that this project shall
comply with the 2013 California Building Code, which adopts the 2012 IBC, 2012
UMC, 2012 UPC and the 2011 NEC.
2. Provide a note on the plans indicating if any hazardous materials will be stored
and/or used within the building which exceed the quantities listed in IBC Tables
307.1(1) and 307.1(2).
3. Provide a fully, dimensioned site plan drawn to scale. Sec. 107.2. Include the
following:
a) Clearly dimension building setbacks from property lines, street centerlines,
and from all adjacent buildings and structures on the site plan.
b) North arrow.
c) Property lines/easements.
d) Streets/alleys.
e) Existing and proposed buildings and structures.
4. Provide a statement on the site plan stating: "All property lines, easements and
buildings, both existing and proposed, are shown on this site plan."
5. Clearly designate any side yards used to justify increases in allowable area
based on Section 506.2.(60 feet all sides?)
6. Note on the plans: "All egress doors shall be readily openable from the egress
side without the use of a key or special knowledge or effort." Section 1008.1.9.
In lieu of the above, in a Group B, F, M or S occupancies (or places of religious
assembly or Group A occupancies having an occupant load of 300 or less), you
may note on the plans "Provide a sign on or near the exit door, reading THIS
City of Carlsbad E3 15-0199
2/2/2015
DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED." This
signage is only allowed at the main exit. Section 1008.1.9.3.
7. Each door in a means of egress from an occupancy of Group A having an
occupant load of 50 or more (and any occupancy of Group H) shall not be
provided with a latch or lock unless it is panic hardware. Section 1008.1.10.(door
9033A, 9033B,)
8. Provide notes and details on the plans to show compliance with the enclosed
"Disabled Access" Review List.
9. Please refer to the following corrections for mechanical, electrical and energy
items.
10. To speed up the review process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
11. Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changers been made to the plans not resulting from this correction
list? Please indicate: ❑ Yes ❑ No
12. The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact David Yao at Esgil
Corporation. Thank you.
PLUMBING, MECHANICAL, ELECTRICAL, and ENERGY COMMENTS
PLAN REVIEWER: Eric Jensen
PLUMBING (2013 CALIFORNIA PLUMBING CODE)
♦ Plumbing is okay as submitted.
MECHANICAL (2013 CALIFORNIA MECHANICAL CODE)
1. If compliance with CEC Article 645 is part of the electrical design be sure to
include the mechanical requirements found in 645.4 (equipment shut-off and
rated separation) are shown.
2. Provide smoke detection in the supply air duct of an "air -moving system" for
required shut-off of equipment for smoke control. CIVIC Section 608.1 Check the
City of Carlsbad B,15-0199
2/2/2015
floorplan layout, some units are shown with SD, others are not. Due to the
rearrangement of the floorplan additional units may require SD's.
♦ An "air -moving system" is a system designed to provide heating, cooling, or
ventilation in which one or more air -handling units are used to supply air to a
common space or to draw air from a common plenum or space.
3. There are assembly, development and lab labs shown on the floorplans with no
exhaust systerns, just standard recirculation systems with a small amount of
outside air added. Please explain the use of these labs so as to warrant no
exhaust systems.
4. Likewise no exhaust at the lunchroom? Is this correct?
ELECTRICAL and ENERGY COMMENTS
PLAN REVIEWER: Eric Jensen
ELECTRICAL (2013 CALIFORNIA ELECTRICAL CODE)
5. Fully describe the UPS battery system on the plans. It may need to be installed
in a rated room per CBC 509 Table specifications. (Sheet 1-E3.1.)
6. Does Article 645 (Information Technology Equipment) apply to any of these
rooms? If so, detail all requirements: Rated separation, disconnect switches, etc
for the appropriate rooms.
7. Panelboard 1 PK will require a main disconnect. As an aside, interesting to only
a very few people, a service panel may now revert to the six handle rule.
Previous Code cycles allow a maximum of two main disconnects to protect a
service panelboard.
ENERGY COMMENTS
8. Provide an updated (current energy design) for the changes to the mechanical
equipment.
Note: If you have any questions regarding this Electrical, Plumbing, Mechanical, and
Energy plan review list please contact Eric Jensen at (858) 560-1468. To speed the
review process, note on this list (or a copy) where the corrected items have been
addressed on the plans.
City of Carlsbad B: 15-0199
2/2/2015
DISABLED ACCESS REVIEW LIST
DEPARTMENT OF STATE ARCHITECT
TITLE 24
REMODELS, ADDITIONS AND REPAIRS
When alterations, structural repairs or additions are made to an existing building,
that building, or portion of the building affected, is required to comply with all of the
following requirements, per Section 11 B-202.4:
The area of specific alteration, repair or addition must comply as "new"
construction.
• A primary entrance to the building and the primary path of travel to the
altered area. must be shown to comply with all accessibility features.
• The path of travel shall include the existing parking.
END OF DOCUMENT
City of Carlsbad B 15-0199
2/2/2015
(DO NOT PAY— THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad PLAN CHECK NO.: B15-0199
PREPARED BY: David Y'ao DATE: 2/2/2015
BUILDING ADDRESS: 2*12190 Cosmos Court
BUILDING OCCUPANCY: B
BUILDING
PORTION
ARE,A7
( Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
office t. I.
2236
43.32
96,864
Air Conditioning
Fire Sprinklers
TOTAL VALUE
96,864
Jurisdiction Code Icb IBy Ordinance
Bldg. Permit Fee by Ordinance"
Plan Check Fee by Ordinance
Type of Review: F�] Complete Review
❑ Repetitive Fee
Repeats
❑ Other
❑ Hourly
EsGil Fee
❑ Structural Only
Hr.@*
$609.31
$396.05
Comments:
Sheet 1 of 1
maevalue.doc +
CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE:01/27/2015 PROJECT NAME: VIA SATAFP13001 PROJECT ID: CB150199
PLAN CHECK NO: I SET#: I ADDRESS: 2290 COSMOS CT APN: 213-050-44-00
VALUATION: $582,741
This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
A Final Inspection by the
Division is required Yes V No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: MARKLE@SCA- SD.COM
"You may also havc, corrections frorn one or nnore of the divisions listed below. Approval
from these divisions gnu ,T,y be required prior to the issuance of a building permit.
Piesubmitted,"-dans shoifid include corrections from all divisiorlis.
For questions or clarifications, on the attached checklist please contact the following reviewer as marked:
Chris Sexton
Kathleen Lawrence
Greg Ryan
760-602-4624
760-602-2741
760-602-4663
Chris.Sexton@carisbadca.gov
Kathleen.Lawrence@carisbadca.gov
Gregory. Ryan@carisbadca.gov
Gina Ruiz
Linda Ontiveros
Cindy Wong
760-602-4675
760-602-2773
760-602-4662
Gina.Ruiz@carlsbadca.�ov
Linda.0nflveros@carlsbadcg.g_oy
Cvnthia.Won@carisbadca.gov
ov ValRay Marshall
Dominic Fieri
760-602-2773
760-602-4664
VaiRay.Marshail@carisbadca.gov
Dorninic.Fieri@carj,sb .,.?Ldca.g 9,v
Remarks:
Development Services
BUILDING PLANCHECK Land Development Engineering
I0 CHECKLIST 1635 Faraday Avenue
C TY F
760-602-2750
QUICK-CHECK/APPROVAL
CARLSBAD www.carisbadca.gov
ENGINEERING Plan Check for CIB1 50199
Project Address: 2290 COSMOS CT
Project Description: COMPILATION OF DRAWINGS FOR THE AFP13001
PERMIT -ALL TI OFFICE TO OFFICE
ENGINEERING Contact: VALRAY MARSHALL
Phone: 760-602-2773
RESIDENTIAL INTERIOR
RESIDENTIAL ADDITION MINOR
(<$,'?0,000.00)
I CARLSBAD PREMIER OUTLETS
OTHER: GYM
Date: 01/27/2015
APN: 213-050-44-00
Valuation: $582,741
Email: VALRAY, MARS HALL@CARLS BA DCA. GOV
Fax: 760-602-1052
yVJENANTIMPROVEMENT
1� PLAZA CAMINO REAL
COMPLETE OFFICE BUILDING
r- - -- - -- - -- - -- - -- - -- - - -- - -- - -- - -- - - - -- - --
OFFICIAL USE ONLY
ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT
BY: VALRAY MARSHALL DATE:01/27/2015
REMARKS:
Fee Calculation Worksheet
ENGINEERING DIVISION
Prepared by: Date: 01/27/2015 GEO DATA: LFIVIZ: / B&T:
Address: 2290 COSMOS CT Bldg. Permit#: CB150199
Fees Update by: Date: 01/27/2015 Fees Update by: Date: 01127/2011
EDU CALCULATIONS: List types and square footages for all uses,
Types of Use:
Sq,Ft./Units
EDU's:
Types of Use:
Sq,Ft./Units
EDU's:
Types of Use:
Sq,Ft./Units
EDU's:
Types of Use:
Sq,Ft./Units
EDU's:
ADT CALCULATIONS: List types and square footages for all uses.
Types of Use:
Sq.Ft,/Units
ADT's:
Types of Use:
Sq.Ft./Units
ADT's:
Types of Use:
Sq.Ft./Units
ADT's:
Types of Use:
Sq.Ft./Units
ADT's:
FEES REQUIRED:
Within CFD:, YES (no bridge & thoroughfare fee in District #1, reduces
Traffic Impact Fee)
NO
1. PARK -IN -LIEU FEE:NW QUADRANT NE QUADRANT
-SE QUADARANT '---SW
QUADRANT
ADT'S/UNITS: X FEE/ADT:
i =$
2.TRAFFIC IMPACT FEE:
ADT'S/UN7S: I X FEE/ADT:
=$
3, BRIDGE & THOROUGHFARE FEE: DIST. #1
DIST.#2
DIST.#3
ADT'S/UNITS: FEE/ADT:
W1
4. FACILITIES MANAGEMENT FEE ZONE:
ADT'S/UNITS: I X FEE/SQ,FT./UNIT:
77
5. SEWER FEE
EDU's X FEE/EDU:
BENEFIT AREA:
EDU's
I x
6. DRAINAGE FEES:
PLDA:
ACRES:
I x
7. POTABLE WATER FEES:
UNITS I CODE
FEE/EDU:
HIGH
FEE/AC:
=$
MEDIUM
1 =$
CONN. FEE I METER FEE I SDCWA FEE I TOTAL
M
PLANNING DIVISION
BUILDING PLAN CHECK
Planning Division
CITY OF APPROVAL 1635 Faraday Avenue
(760) 602-4610
CARLSBAD P-29 www.carlsbadcaxov
DATE: 1-22-15 PROJECT NAME: PROJECT ID:
PLAN CHECK NO: CB 11.5-0199 SET#: I ADDRESS: 2290 Cosmos Ct APN: 213-050-44-00
This plan check review is complete and has been APPROVED by the Planning
Division.
By: Chris Sexton
A Final Inspection by the Planning Division is required [-] Yes M No
You may also have corrections from one or more of the divisions listed below. Approv]
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from a// divisions.
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: markl@sca-sd.com
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
Z
Chris Sexton
Kathleen Lawrence
❑
Greg Ryan
760-602-4624
760-602-2741
760-602-4663
Chris.Sexton@carlsbadca.gov
Kathleen.Lawrence@carlsbadca.gov
Gregory.Ryan@carisbadca.gov
Ej
Gina Ruiz
F]
Linda Ontiveros
El
Cindy Wong
760-602-4675
760-602-2773
760-602-4662
Gina.Ruiz@carisbadca.gov
Linda.Ontiveros@carisbadca.gov
Cynthia.Wong@carlsbadca.gov
El
Dominic Fieri
760-602-4664
Dominic.Fieri@carisbadca.gov
Remarks:
CITY OF
CARLSD/-%D
PLAN CHECK
REVIEW
TRANSMITTAL
COMCOWYEconomic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE: 02/12/2015 PROJECT NAME: VIASAT - COSMOS CT PROJECT ID: CB150199
PLAN CHECK NO: 1 SET#:1 ADDRESS: 2290 COSMOS CT APN: 213-050-44-00
® This plan check review is complete and has been APPROVED by the FIRE Division.
By: G R
A Final Inspection by the FIRE Division is required ® Yes ❑ No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: M. LANGAN -SCA
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may, be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
❑
Chris Sexton
❑
Kathleen Lawrence
❑
Greg Ryan
760-602-4624
760-602-2741
760-602-4663
Chris.Sexton@carlsbadca. ov
Kathleen.Lawrence@carlsbadca.eov
Gregory.Ryan@carlsbadca.gov
❑
Gina Ruiz
❑
Linda Ontiveros
❑
Cindy Wong
760-602-4675
Gina.Ruiz@carlsbadca.gov
760-602-2773
Linda.Ontiveros@carlsbadca.gov
760-602-4662
Cynthia.Wong@carlsbadca.gov
❑
❑
❑
Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
Carlsbad Fire Department
Plan Review Requirements Category: TI , INDUST
Date of Report: 02-12-2015
Name: SMITH CONSULTING ARCHITECTS
Address: 13280 EVENING CREEK DR SOUTH STE 125
SAN DIEGO, CA 92128
ATTN: MARK LANGAN
Permit #: CB150199
Job Name: VIASAT-COMPILATION RECORD
Job Address: 2290 COSMOS CT CBAD
Please review carefully all comments attached.
Conditions:
CITY OF CARLSBAD FIRE DEPARTMENT - APPROVED:
Reviewed by: , A Q�r
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN
CORRESPONDENCE AND CONFORMANCE WITH ALL. APPLICABLE REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW.
At or prior to Final Fire and Building; inspection an Emergency lighting facilities test shall be conducted by CFD
personnel during pre -dawn or dusk hours when ambient light is at 0.00 Lux or 0.0 Foot-candle.
This test shall be conducted to test the initial loss of power reading of illumination that is at least an average of 1
foot candle (11 lux) and a minimum of 0.1 foot-candle (1 lux) measured along the path of egress at the floor level.
And tested after 60-minutes to 0.6 fc (6 lux). Failure to provide sufficient lighting in egress aisles, corridors, exit
enclosures, exit passageways and stair enclosures is the AOR's responsibility. CFC Ch. 10, Sec. 1006.
** Please note that the incorrect code citations were made and the title sheets for each area indicate the wrong
address. I will not require revision and will defer these items to the building plan checker in the interest of
conservation. However, as the architect of record it is your responsibility to ensure that the plans have the correct
information.
Entry: 02/12/2015 By: GR Action: AP
Z
C C Q
cu
�
LO
M
�
�
'
N
C
r
V
C;)=
n
'E Q O
W
c
`
c0-7
4
Y
0
W
Z
E
J
O c
U
N: O
C
H
O
O= 0
O
(� Coe)
>
>
cn
J
>
Y
xx E
Q
m U
f�6
W
O
2
~
W
O N
`� C >, cL
C
N O Q U
O
NU)
LO
U
Q
—
C C
°) O E
a)' g U
LO
co
LO
UN
CDO
LO
m
LO
LO
M
LO
0)
O
M
N
m Lp
C
r
a
o o�
W
2
U' Q x `
O
co
�
N
11O
lon'
n
M
ti
N
T
LU
LLJ
> C
N
C9
CL
O x
LOO
V
O
M
LCn
M�
v
c
O
Q
LL U W
r
N
�.
U
U
Z
r
C-4m
OU
ZO
LL
U o E2
LO
Ln
LO
LO
�
L2
Ln
L2
Z
�I
a
OU
'..�
Z
0
0 N
a
W
W
CL
E O
M
V
N
0
6�
°o
CO
v
a
zW
J
L
r
Z
z
N
Z
Q
x
o
c� nzU
x
aomNOLO�Mrn
M2
0
W
W
��Qm
J
a
m
Ci
LE `
N
�
�
r
a
LE
U Q
o
06
0
0
0
0
0
V
ca
Q
c
Z
m
o o N
0
�
0
LO
LO
Ln
l!i
O
lf�
M
O
M
a
� Q
COO
N
CO
a,
O
U
mE
r
N
M
'7
Ln
COT
W
Q
C
m
°U
N c
a-
a�
a�
a�
a�
a�
a-
1
c
3
G
�E
O
7 7
O
a) U
c
a)a
U
o
o
U
c
U
U)
E
O
Q
C �G
Q
m
E C
o
U
En
z
U aa)
a)
a
Q
a)
E
E cm
c
00
`
O
c
U)
Z
0) E
t6
°'
Q
U
U O
c
m
a
a) O
m U
o
w
=
a)
m
Q
U
U
c
E
0 Q
m o
U
C
O
c
C m
N
N
c
°
C
o
a)
�
``'
U
c
o
a
a)
a
a)
a
-
°
°
>
m
a)
E
0)-0
o
U
a
m
U
.�
C
U
()
3
-C
=
cu
.`L
O
+
C a)
U)
U)m
°'
E
t
co
0
E of
° a)
C
a3
O
0
°
j
0 0
n
O
U
c
O
�'
Z
O
°
a)
U c
�_ a)
O
—
C
O
`
°
a)
Q G
o
a)
c
o
N
>
O
O
-C
+�
co a)
Q
p
E
a)
N
_ U
N
C
O
U
aci
°
m
`
a)
-
.°
U
C
O
C
(a
•� a)
H
Q
~
°
C7 +�
°
r
c'
aa)i
N
7
0
t
c
�=
CO)
-C
U
—
L
O
U
0
o
Q°
LO
x
0
O
U°
a)
U
m
0
�
O
N
C
`)
a)
0)
W
E
Y
O
C
° L
°
a
a -a)
C
c0
U
a)
N
d=
O
O m
cu
a
Q
O
E
C>
y
C
Q0
c0
N
c
O
C
M
U
x
c
E
r
a)
a) �
Co
�
w
co
�
a
:3
CO
-0
C
70
a)
C
L
a)O_
O
o
U
E O
>
x
c
>
a)
o
�
E E
E
=mom
n
co
C
E
m
Q'm2
O
° U
.a)
a) c
�_
��o
�n'°)�x
,
rmE
c —
mEW
°
�
U�
Imo—
I` U
U
W=—
Y
J
z
2'
�cf)
a
LLo Z
0
C) Im
Ii1
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1 C
Project Name
Date
Viasat- Building 9
21112013
Project Address
Climate Zone
Total Cond. Floor Area
Addition Floor Area
2290 Cosmos Court Carlsbad
CA Climate Zone 07
26,929
n/a
GENERAL INFORMATION
Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Relocatable - indicate ❑ specific climate zone ❑ all climates
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alta ratty
STATEMENT OF COMPLIANCE
_.
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
i f
certificate applies only to a Building using the performance compliance approach.
The documentation author herebycertifies that the documentation is accurate and complete.
Documentation Author
Name Javier R. Ares
Signature w=
Company McPARLANE & ASSOCIATES, INC.
Date 21112013
Address 4830 Viewridge Ave San Diego CA 92123
Phone 858 277 9721
City/State/Zip
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV. LTG. MECH.
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
❑ ❑ ® sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name SCA
Signature zzK.40'1
Company
Date /
Address 0 S
License # C%7 61
City/State/Zip QtEdd
Phone 20-- 2 -V77
Principal Mechanical Designelr
Name Doug Isaaks
Signature
Company McParlane & Associates
Date 01-19-14
Address 4830 Viewridge Ave
License # 30090
City/State/Zip San Diego, CA
Phone 858 277 9721
Principal Lighting Designer
Name
Signature
Company Lighting Compliance Not In The Scope Of This Submittal
Date
Address
License #
City/State/Zip
Phone
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
m ENV-1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans.
❑ LTG-1 C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements.
❑ LTG-2C Lighting Controls Credit Worksheet. ® MECH-3C Mechanical Ventilation and Reheat.
❑ LTG-3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details.
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 1 of 41
PERFORMANCE CERTIFICATE OF COMPLIANCE
Wasat- Building 9
ANNUAL TDV ENERGY USE SUMMARY (kBtu/sqft-yr)
Standard Proposed Compliance
Energy Component Design Design Margin
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Process Lighting
TOTALS
0.05
0.05
0.00
163.86
157.30
6.56
70.54
69.86
0.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.55
50.55
0.00
74.01
74.01
0.00
397.92
397.92
0.00
0.00
0.00
0.00
756.94
749.69
7.24
Percent better than Standard 1.0 % ( 2.0 % excludi
GENERAL INFORMATION
Part 2 of 3
Heating
Cooling
Fans
Heat Rej
Pumps
DHW
Lighting
Receptacle
Process
Process Ltg
PERF-1 C
Date
21112013
BUILDING COMPLIES I
Building Orientation (N) 0 deg Conditioned Floor Area 26,929 sqft.
Number of Stories 1 Unconditioned Floor Area 0 sqft.
Number of Systems 26 Conditioned Footprint Area 0 sqft.
Number of Zones 26 Natural Gas Available On Site Yes
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Total
Roof
Orientation Gross Area
(N)
Z 900
(E)
2,220
(s)
2,690
(W)
1,300
9,110
17,895
Prescriptive Lighting Power Density
Prescriptive Envelope TDV Energy
Remarks:
Standard
_ __ 0.8'93 W/sgft.
438,786
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
G127inn Area
585
585
831
475
2,476
0
Proposed
0.8913 W/sgft.
764,
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazina Ratio
20.2 %
26.4 %
30.9 %
36.5 %
27.2 %
0.0 %
Prescriptive Values for
Comparison only. See
LTG-1 C for allowed LPD.
5.1
PERFORMANCE CERTIFICATE OF COMPLIANCE
(Part 3 of 3) PERF-1 C
Project Name
Viasat- Building 9
Date
21112013
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
s ft.
Inst.
LPD
W/sf'
Ctrl.
Credits
W/sf 2
Allowed LPD
Proc.
Loads
W/sf
Area
W/sf 3
Tailored
W/sf a
CBD-B9-R-HP9
HP-9
Office > 250 sgft
1,100
*0.900
CBD-B9-R-HP10
HP-10
Office > 250 sgft
1,935
*0.900
CBD-B9-R-HP11
HP-11
Office > 250 sgft
1,260
*0.900
CBD-B9-R-HP12
HP-12
Office > 250 sgft
859
*0.900
CBD-B9-R-HP13
HP-13
Office > 250 sgft
1,600
*0.900
CBD-B9-R-HP14
HP-14
Office > 250 sgft
690
*0.900
CBD-B9-R-HP15
HP-15
Office > 250 sgft
625
*0.900
CBD-B9-R-HP16
HP-16
Office > 250 sgft
1,400
*0.900
CBD-B9-R-HP17
HP-17
Office > 250 sgft
Z 100
*0.900
CBD-B9-R-HP18
HP-18
Office > 250 sgft
815
*0.900
25.000
CBD-B9-R-HP19
HP-19
Office > 250 sgft
1,475
*0.900
25.000
CBD-B9-R-HP20
HP-20
Office > 250 sgft
685
*0.900
CBD-B9-R-HP21
HP-21
Office > 250 sgft
1,500
*0.900
CBD-B9-R-HP22
HP-22
Office > 250 sgft
1,680
*0.900
CBD-B9-R-HP23
HP-23
Office > 250 sqft
590
*0.900
CBD-B9-R-HP24
HP-24
Office > 250 sgft
1,415
*0.900
CBD-B9-R-HP25
HP-25
Office > 250 sgft
1,100
*0.900
50.000
CBD-B9-R-HP26
HP-26
Office > 250 sgft
660
*0.900
10.000
CBD-B9-R-HP27
HP-27
Office > 250 sgft
395
*0.900
CBD-B9-R-HP28
HP-28
Office > 250 sgft
1,315
*0.900
25.000
Notes: 1. See LTG-1 C 2. See LTG-2C 3. See LTG-3C 4. See LTG-4C
items marked with asterisk, see LTG-1 -C b others) b others)
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The HVAC System TRANE WSC 072 includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
EnergyPro 5.1 by EnergySoft User Number. 2445
RunCode: 2013-02-01T14:17:35 ID: 3813 Page 3 of 41
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1 C
Project Name
Wasat- Building 9
Date
2/1/2013
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
s ft.
Inst.
LPD
W/sf'
Ctrl.
Credits
W/sf 2
Allowed LPD
Proc.
Loads
W/sf
Area
W/sf 3
Tailored
W/sf a
CBD-B9-R-HP29
HP-29
Office > 250 sgft
1,300
*0.900
CBD-B9-R-HP30
HP-30
Office > 250 sgft
390
*0.900
CBD-B9-R-HP31
HP-31
Office > 250 sgft
475
*0.900
CBD-B9-R-HP32
HP-32
Office > 250 sgft
150
*0.900
15.000
LIEBERT CBD-B9-F/R-FC11
SERVER ROOM
Electrical, Mechanical Room
1,000
*0.700
50.000
CBD-B9-R-HP33
HP-33
Office > 250 sgft
415
*0.900
15.000
Notes: 1. See LTG -IC 2. See LTG-2C 3. See LTG-3C 4. See LTG-4C
items marked with asterisk, see LTG-1-C b others b others
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pall special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01T14:17.35 ID: 3813 Page 4 of 41
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
1 21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces
Bldg.
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV-4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Tag/ID
AssemblyType
a
fA
O z
V
U.
7
t6
c� cc
r- O
X R
w>
O C
X O
w u.
O O
"O' R
5>
O r
r
u
C
'p Q
a
N
O
U
a
u
1
Wall
305
(lM
0.110
R-11
4.3.1-A2
Existing
❑
❑
2
Wall
225
(N)
0.110
R-11
4.3.1-A2
Existing
❑
❑
3
Wall
680
(S)
0.110
R-11
4.3.1-A2
Existing
❑
❑
4
Wall
420
(S)
0.110
R-11
4.3.1-A2
Existing
❑
❑
5
Wall
624
(S)
0.110
R-11
4.3.1-A2
Existing
❑
❑
6
Wall
135
(S)
0.110
R-11
4.3.1-A2
Existing
❑
❑
7
Wall
495
(E)
0.110
R-11
4.3.1-A2
Existing
❑
❑
8
Wall
840
(E)
0.110
R-11
4.3.1-A2
Existing
❑
❑
9
Roof
1,400
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
10
Roof
2,100
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
w
"
a
O
•C N
w
O Z
O
�
C.1
LL
2>
a
5 i
ca
4 o
> N
V
S
R ^�
M °�
V i
1:o
N N
r
i
>
O
C
'+0
•a 7
o
U 6
a
u_
1
Window
475
(W) 1
1.190
Defaultl
0.830
Default
❑
Existing
❑
❑
2
Window
831
(S)
1.190
Default
0.830
Default
❑
Existing
❑
❑
3
Window
585
(E)
1.190
Default
0.830
Default
❑
Existing
❑
❑
4
Window
585
(N)
1.190
Default
0.830
Default
❑
Existing
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 5 of 41
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: EI Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces
Bldg.
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV-4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Tag/ID /ID
Assembly Type
Y-
y
a
C N
N W
O z
V
LL
�
Y
j R
0 of
CE
.O 7
w>
C
N d
w L
0 0
7
>
0=
.O
v_
X
a
O
C R
0 v)
W
a
LL
11
Wall
285
(N)
0.110
R-11
4.3.1-A2
Existing
❑
❑
12
Roof
815
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
13
Roof
1,475
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
14
Wall
545
(N)
0.110
R-11
4.3.1-A2
Existing
❑
❑
15
Roof
685
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
16
Roof
1,500
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
17
Roof
1,680
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
18
Wall
215
(N)
0.110
R-11
4.3.1-A2
Existing
❑
❑
19
Roof
590
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
20
Wall
450
(N)
0.110
R-11
4.3.1-A2
Existing
1 ❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
y
a
C
' Z
o
0
R LL
M>
0
LL o
> N
w E
n
T oo
N N
>
O
w
o ,
06
m
a
m
v_
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. if Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by Energ Soft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 6 of 41
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Wasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School ® Conditioned Spaces ❑ Unconditioned Spaces
I3ld .
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV-4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Tag/ID
AssemblyType
i1
B
C N
N U
i
O z
V
V.
D
Z 3
.5 >
l0
0 cc
V y
d 7
X 1C
w>
c
.O L
X 7
w a
cc
O O
•Gf O
lC
�>
OT
•G7 •r-
7
c U-
X
O Q.
p =
-, a
i=
O R
U rn
N
lC
a.
tC
LL
21
Roof
1,415
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
22
Wall
385
(lM
0.110
R-11
4.3.1-A2
Existing
❑
❑
23
Roof
1,100
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
24
Wall
135
(M
0.110
R-11
4.3.1-A2
Existing
❑
❑
25
Roof
660
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
26
Wall
195
(N)
0.110
R-11
4.3.1-A2
Existing
❑
❑
27
Wall
300
(E)
0.110
R-11
4.3.1-A2
Existing
❑
❑
28
Roof
395
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
29
Wall
400
(N)
0.110
R-11
4.3.1-A2
Existing
❑
❑
30
Roof
1,315
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Tye
_
yr..
a
_
O
•y ui
c
gZ
O
r;
>
0
"- o'
> cn
/U/��
2
R�
M
0 0
s o
O N
>
O
O
o ;°
U w
a
a
a_
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 7 of 41
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Wasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: EI Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces
Bldg.
❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV-4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: IN, E, S, W or in Degrees:
o deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS
INSULATION
Tag/ID
Assembly Type
10
¢
0
_
dw
O z
p
D
y
to
0 Cr
C
d
w>
m
w LL
5>
i
i
5 LL
K
$
Q
-, a
c
O
L) cn
y
a
LL
31
Roof
1,300
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
32
Roof
390
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
33
Roof
475
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
34
Roof
150
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
35
Roof
450
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Tye
N
O
W
O
i
LL
L
LL oX
V
^r
Lc>
n o
0)
.2V
>L
C
7?
o
G :
Q.
R
LL
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 8 of 41
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
AND FIELD INSPECTION ENERGY CHECKLIST
ENV-1 C
Project Name
Viasat- Building 9
Date
21112013
ROOFING PRODUCT (COOL ROOFS)
(Note if the roofing product is not CRFiC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or
Performance Approach.
CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS:
Pass
Fail'
N/A
❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less.
❑
❑
❑
❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch.
❑
❑
❑
Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or
❑ SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV-2C.
El
❑
❑
❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI
that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assemblybelow, Column H of ENV-2C.
❑
[3 The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are
ted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www.ener .ca. ov/title24/
❑exem
❑Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from❑the Cool Roof criteria below.❑
EE313
High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are
exempted from the low -sloped roofing criteria.
❑
1. If Fail then describe on this page of the (Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
CRRC Product ID
Number'
Roof Slope
< 2:12 > 2:12
Product Weight
< 51b/ft2 >_ 5lb/ft2
Product
Type 2
Aged Solar
Reflectance3
Thermal
Emmitance
SRI'
Pass
Fai16
❑
❑
❑
❑
❑4
❑
❑
❑
❑
❑
❑
❑ 4
❑
❑
❑
❑
❑
❑
❑ 4
❑
❑
❑
❑
❑
❑
❑4
❑
❑
❑
❑
❑
❑
❑4
❑
❑
❑
1 ❑
❑
❑
❑ 4
❑
❑
1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
www.coolroofs.org/products/search.iohp
2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc.
3. If the Aged Reflectance is not available !in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the
same directory and use the equation (0.2+0.7(p;n;f;ai — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool
Roof Rating Council's Rated Product Directory.
4. Check box if the Aged Reflectance is a calculated value using the equation above.
5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.energV.ca.aoy/title24/
6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage
recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating:
❑ Aluminum -Pigmented Asphalt Roof Coating
❑ Cement -Based Roof Coating
❑ Other
Discrepancies:
EnergyPro 5.1 by EnerqySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813
Page 9 of 41
CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV-1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Wasat- Building 9
Date
21112013
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope
Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that
require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration
products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices
Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new
fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the
enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled
out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different
fenestration product line must be provided to the owner of the building for their records.
Test Description
ENV-2A
Test Performed By:
Fenestration Products Name or ID
Requiring Testing or Verification
Area of like
Products
Building Envelope
Acceptance Test
13
13
13
13
13
11
13
13
11
11
13
11
EnergyPro 5.1 by EnergySoft User Number.- 2445 RunCode: 2013-02-01 T14:17.35 1D: 3813 Page 10 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-9 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Wasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. ® Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: IN, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
Equipment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP9
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
28,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'.
46,000 Btu/hr
❑
❑
.Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
Equipment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP10
❑
❑
-Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'-
35,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
58,800 Btu/hr
❑
❑
-Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro5.1byEnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 11 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-9 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
Equipment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP11
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'.
28,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
46,000 Btu/hr
❑
❑
.Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
Equipment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP12
❑
❑
-Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
16,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
29,100 Btu/hr
❑
❑
-Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 12 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
Equipment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP13
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
35,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'-
58,800 Btu/hr
❑
❑
-Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP14
❑
❑
Equipment Type 3 :
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
28,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
46,000 Btu/hr
❑
❑
-Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 13 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad'
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E uipment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP15
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
16,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
29,100 Btu/hr
❑
❑
.Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP16
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
35,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'-
58,800 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
1EnergyPro5.1byEnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Pa e 14 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
Equipment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP17
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
83,210 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 COP
❑
❑
Max Allowed Cooling Capacity'
94,000 Btu/hr
❑
❑
-Cooling Efficiency'
11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
Equi ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP18
❑
❑
Equipment Type 3 :
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
83,210 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 COP
❑
❑
Max Allowed Cooling Capacity'
94,000 Btu/hr
❑
❑
-Cooling Efficiency'
11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 15 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad'
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV
Ener ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
o deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E uipment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP19
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
83,210 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 COP
❑
❑
Max Allowed Cooling Capacity'
94,000 Btu/hr
❑
❑
.Cooling Efficiency'
11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E uipment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
AC-1, RTU-1, HP-1
CBD-B9-R-HP20
❑
Eli.e.
-Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity-'
16,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
29,100 Btu/hr
❑
❑
-Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party :shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
1EnergyPro5.1byEnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 16 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU 1, HP-1
CBD-B9-R-HP21
❑
❑
Equipment Type 3 :
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
35,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
58,800 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP22
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
35,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
58,800 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 17 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. ® Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
10 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP23
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'.
16,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
29,100 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP24
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
28,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
46,000 Btu/hr
❑
❑
-Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, :iplit), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 18 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. ® Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP25
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'-
28,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
46,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
Equi ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason2
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP26
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
19,900 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
35,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, ;iplit), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Pa e 19 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
o deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
Equipment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP27
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
12,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
23,700 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.4 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E uipment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP28
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
83,210 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 COP
❑
❑
Max Allowed Cooling Capacity'
94,000 Btu/hr
❑
❑
Cooling Efficiency'
11.7 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use (Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 20 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. ® Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
Equipment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP29
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'.
68,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 COP
❑
❑
Max Allowed Cooling Capacity'
77,000 Btu/hr
❑
❑
Cooling Efficiency'
11.7 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E uipment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason2
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP30
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
12,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
23,700 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.4 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 217774171
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Decfrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP31
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'.
12,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
23,700 Btu/hr
❑
❑
.Cooling Efficiency'
13.0 SEER/ 11.4 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP32
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
12,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
23,700 Btu/hr
❑
❑
-Cooling Efficiency'
13.0 SEER / 11.4 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 22 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
Equipment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
LIEBERT CBD-B9-F/R-FC1/CU1
❑
❑
Equipment T e3:
Split DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
39,400 Btu/hr
❑
❑
Minimum Heating Efficiency'
n/a
❑
❑
Max Allowed Cooling Capacity'
185,700 Btu/hr
❑
❑
Cooling Efficiency'
12.0 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP33
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
12,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
23,700 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.4 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyProElbyEnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 23 of 41
CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Viasat- Building 9
Wrozoltel
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 24 of 41
V
T
m -0 o
CE5 O ^O c
¢
U
C O O
•-
"
M
v C—_ m aU)cz i vim
=
o E�
0
0
0
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
'o
V
O
a� 3 �Ero m
w
OQ�U
¢
ro
N
co E CL c3a0
W
mo8 O Gov)
a
o
-E m
\
p
c) E
O a
>=���U
O am-m
a
cr
d
( � C"
uC m C
iE5
O
a)
a'�m
m
M �O"Cr
0 CZ
>�
L
^ m OT a) -0
W
cl)
min- C E yU)0)m
U 3 C
Q_
Cf) � F-
a)
m cmi U O C
a) CZ mam ro
v
1> 1Z
❑❑
❑
❑
El
❑
❑
❑
❑
El
El
O
OO X
>
V!
CU O
Em a10 aam
CC)
¢
o
o >1 QE
Vm>
0.)
El
El
❑
El
❑
❑
El
❑
❑
❑
❑
❑
❑
Elo
U m -O = ro
w
�LL
jr
Cl)O
W
n (D�:a)
mc�mm mEM �-0-0
g
=
U
a ..r U m C C— Ch
O a.T ur O
N Q 7 T
0
Q Q
m O � C U
E
<
a
_�
C a) cnO
O E C a p-
U
E CO 0
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
11) !A
u1 Z� m �� � N QO O
N
Q�>
al � N Z o m m O m
m
h
N
N
W
Z
� 3 C fd m co m
U C � E
W
U ,�
Q U � 7
U
1 -E:
0
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
Z
Q y Q
m O U m C C U 1
O Q Q
W
O U
O
O
U m N ai �-
m�Cm C- W �m°a)
��
W
o
V
m co O C
Paz ��'°�' °�°'
M
o
W
tCO �oaa -
v
g
a°
❑❑❑❑❑❑❑❑❑❑❑❑❑❑d
a
CO6E_
2
�Q
o
cn
�0C)
-xQ 2W'-0 Q���C
o `� °-
_
N c� m m C
O
Q c
2
S O N `m
"E
a)N co >, a)
W
���m m )I o°c� "_
w
U0-0
ja'�
«� C C a)U '
-°
LL
° 0ca
ca _
C >
m 0 0 0 -C Q .v) C E .0 U
Q,E" a N O m
L.
a�
,fl N� � m'� E 2
¢
=
o y U
m� ! 0-� m� U
v
-.R pus
0
0
®
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
o a�i EQ
C)L
N O N a
> >
N
Z.m
O �.� '�
C + m (SS V) 7
EaE a)COS: -m
a�
Q
i�=.-= �'� ac >,am
� a� a EU 3 °
CJ
J
Q
J
a
.
C (0-0 o >,m > o¢ m� �
� � >�co
�-
J
z
�j
�'m U m co mSJ
C Q0 N Q"�Q N
C
O
ti
8
`
0
NJ Na)
o�
ci
cz,ajUaE
Zo
o
:o
LL
�C,
Nz
E C)�
a
>
C)
m a) >> m s C
im�mm 0Umog)
cc
U
c
o
W
a)
U °ovia t� y-y �mm. v�
w
Q
Q C O U Q: O- � N cC0
N
N
V
m m o
v c ®yvy �EE.S0
�
C
:�
w
U 0 f6 ca V O V U O p 0-0
CF
o
cv
O
Q)
Co
-Q
N
E
m
¢ aroma �aa) =`moo=
N
U
U
(Vj
u-i
LLL
r
co m
C) 0) E S .Q .gym- $ W j 0 U fl-'O >,
.y E e E E W m
N
E
�+
O
a
o N
3 �vn:o (>m4) 2p1._N
W
W
W
W
UO
°'
>
G�.�X�' �E� mE2a°ia°ia
c C a)O m N i, O >+ ,_C a
Hm a m N f-
W
Q
z
Q
z
Q
a>
G
CN ao to a
w
U
r
a
M
N
w
N
a
C
C
N
a�
m
p
m
ro
O
`O
d'
D
�
N
co
p
M
cn
M
M
O
`'
i
w
2
U
T
LO
r
m w ,
=t
LO
C�
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
w
m
•`
Z
o
w
o
Z
�
2 oU65 < E
❑
o
U
� �,X in
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
L®
r
LU.Tp
p N
O
w
w
a
v�
Qroxiom
COLL�wE-
r
O O '.-0-� O
_Z
=
iU U NON
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
®
U
EO
w
Q p
LL
v
(w%
Q
N
06 N w
C.O-. C
co
�x
El®
El
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
•V
w
C)
2
LL
p p o
U
N
Z
N
Q
CL
U
o
LL
a
O
0
F
w
Cl)
Q
Cl)
cr
a
w
a
w
I--
c
a)o
o
o
co
LL
m
U
cEu
z
c
s
�s
o
w
a
w
o
w
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 21112013
Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...)
i.e. AC-1, RTLI-1, HP-1 CBD-B9-R-HP9 CBD-B9-R-HP10 CBD-B9-R-HP11
Number of Systems 1 1 1
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
Indicate Page Reference on Plans or Schedule and indicate the
T-24 Sectio
112 a
112 a
112(b), 112
112(c), 115
121(b)
121(b)
12!1 c
12!1 c
122(e)
122(e)
122(f)
122(g)
1213
124
144a&
144a&
144a&
144a&
144(c)
1444�
1444(c)
1444(d)_
1444(e)
1444(f)
1444(f
1444(g)
144i)
144(k)
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
165 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
290 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
189 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0
n/a
21,573 Btu/hr
n/a
33,401 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
n/a
26,928 Btu/hr
n/a
41,007 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
Wrd
n/a
21,573 Btu/hr
n/a
39,289 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 27 of 41
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 21112013
Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...)
i.e. AC-1, RTU-1, HP-1) CBD-B9-R-HP12 CBD-B9-R-HP13 CBD-B9-R-HP14
Number of Systems 1 1 1
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T-24 Sections
112(a)
112(a)
112(b), 112(c)
112(c), 115(a)
121(b)
121(b)
121(c)
12I1(c)
1212(e)
1212(e)
122(f)
r122(g)
3
4
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
129 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
240 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
104 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0 lAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0
144(a & b
n/a
n/a
n/a
144(a & b
12,316 Btu/hr
26,928 Btu/hr
21,573 Btu/hr
144(a & b
n/a
n/a
n/a
144(a & b
24,376 Btu/hr
40,818 Btu/hr
35,662 Btu/hr
144(c)
Constant Volume
Constant Volume
Constant Volume
144(c)
144
144
144
14.4
144
Yes
No
No Economizer
Constant Temp
Constant Temp
Yes
No
No Economizer
Constant Temp
Constant Temp
Yes
No
No Economizer
Constant Temp
Constant Temp
144(k) I No I No I No
1. Total installed capacity (MBtu/hr) of all! electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 28 of 41
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 21112013
Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...)
i.e. AC-1, RTU-1, HP-1) CBD-B9-R-HP15 CBD-B9-R-HP16 CBD-B9-R-HP17
Number of Systems 1 1 1
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T-24 Sections
112(a)
112(a)
112(b), 112(c)
112(c), 115(a)
121(b)
12.1(b_
1211(c)
12'.1(c)
12'2(e)
1212(e)
12'2(f)
'2(g)
3
ril
4
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
1
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
94 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
210 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 COP
11.7 EER
Yes
n/a
No
315 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0 (Attic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0
n/a
I Z 316 Btu/hr
n/a
22,554 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
26,928 Btu/hr
n/a
41,444 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
63,655 Btu/hr
n/a
65,566 Btu/hr
Constant Volume
Yes
No
Diff. Enth (Integrated)
Constant Temp
Constant Temp
r14
4
4i
4(k)No No No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number 2445 Run Code: 2013-02-01T14:17:35 ID: 3813 Page 29 of 41
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 1 21112013
Item or System Tags Indicate Air S stems Type (Central, Single Zone, Package, VAV, or etc...)
i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP18 CBD-B9-R-HP19 CBD-B9-R-HP20
Number of Systems 1 1 1
Indicate Page Reference on Plans or Schedule and indicate the applicable exceotion(sl
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
T-24 Sections
112(a)
112(a)
112(b), 112
112 c,115
121(b)
12!1(b)
12!1
122
122
12!2
12:3
12:4
1
8.00 COP
11.7 EER
Yes
n/a
No
122 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 COP
11.7 EER
Yes
n/a
No
221 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
103 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0 lAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0
n/a
63,655 Btu/hr
n/a
67,181 Btu/hr
Constant Volume
Yes
No
Diff. Enth (Integrated)
Constant Temp
Constant Temp
mo
n/a
63,655 Btu/hr
n/a
68,539 Btu/hr
Constant Volume
Yes
No
Diff. Enth (Integrated)
Constant Temp
Constant Temp
No
n/a
12,316 Btu/hr
n/a
22,044 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
I EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01T14:17:35 ID: 3813 Page 30 of 41
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 21112013
Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...)
i.e. AC-1, RTU-1, HP-1) CBD-B9-R-HP21 CBD-B9-R-HP22 CBD-B9-R-HP23
Number of Systems 1 1 1
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T-24 Sections
112(a)
112(a)
112(b), 112(c)
112(c), 115(a)
121(b)
121(b)
121(c)
121(c)
122(e)
122(e)
122(f)
2(g)
3
rl
4
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144
144
144
144
144
144
144
144
0
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
225 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
630 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
89 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0
n/a
26,928 Btu/hr
n/a
40,844 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
26,928 Btu/hr
n/a
41,961 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
12,316 Btu/hr
n/a
22,082 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
144 i
144(k) I No No I No
1. Total installed capacity (MBtu/hr) of alll electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01T14:17r35 ID: 3813 Page 31 of 41
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 1 2/1/2013
Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...)
i.e. AC-1, RTU-1, HP-1) CBD-B9-R-HP24 CBD-B9-R-HP25 CBD-B9-R-HP26
Number of Systems 1 1 1
Indicate Page Reference on Plans or Schedule and indicate the armlicable excention(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T••24 Sections
112(a)
112(a)
112(b), 112(c)
112(c), 115(a)
121(b)
121(b)
121(c)
121(c)
122(e)
122(e)
122(f)
122(g)
123
124
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144
144
1214
1114
144
144
144
1414
14-4
144
14.4
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
212 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
165 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
99 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.01 Attic, Ceiling Ins, vented / 8.0 1
n/a
21,573 Btu/hr
n/a
32,529 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
21,573 Btu/hr
n/a
33,779 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
15,223 Btu/hr
n/a
24,987 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
� 144(i)
144(k) No No No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01T14:17.35 ID: 3813 Page 32 of 41
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 21112013
Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...)
i.e. AC-1, RTLI-1, HP-1) CBD-B9-R-HP27 CBD-B9-R-HP28 CBD-B9-R-HP29
Number of Systems 1 1 1
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T-24 Sections
112(a)
112(a)
112(b), 112(c)
112(c), 115(a)
121(b)
121(b)
121(c)
121(c)
122(e)
122(e)
122(f)
122(g)
123
124
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144a&
144a&
144(a &
144a&
144(c)
144(c)
144 c
144(d)
144(e)
144(ff)_
144(f)
8.00 HSPF
13.0 SEER / 11.4 EER
Yes
n/a
No
59 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 COP
11.7 EER
Yes
n/a
No
197 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0 1 Conditioned / 8.0
n/a
9,256 Btu/hr
n/a
18,687 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
63,655 Btu/hr
n/a
68,554 Btu/hr
Constant Volume
Yes
No
Diff. Enth (Integrated)
Constant Temp
Constant Temp
8.00 COP
11.7 EER
Yes
n/a
No
1,219 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
n/a
52,019 Btu/hr
n/a
58,209 Btu/hr
Constant Volume
Yes
No
Diff. Enth (Integrated)
Constant Temp
Constant Temp
144(i)
144(k) I No No No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01T14:17.35 ID: 3813 Page 33 of 41
11
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 21112013
Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...)
i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP30 CBD-B9-R-HP31 CBD-B9-R-HP32
Number of Systems 1 1 1
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T-24 Sections
112(a)
112 a
112(b), 112(c)
112(c), 115 a
121(b)
121(b)
121 c
121(c)
122(e)
122 e
122(f)
122(g)
123
124
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144a&
144a&
144a&
144a&
144 c
144(c)
1
8.00 HSPF
13.0 SEER / 11.4 EER
Yes
n/a
No
234 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
n/a
9,256 Btu/hr
n/a
18,385 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
8.00 HSPF
13.0 SEER / 11.4 EER
Yes
n/a
No
285 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
n/a
9,256 Btu/hr
n/a
18,533 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
8.00 HSPF
13.0 SEER / 11.4 EER
Yes
n/a
No
90 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
n/a
9,256 Btu/hr
n/a
18,323 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
IAA/L1 I No I No I No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01T14:17.35 ID: 3813 Page 34 of 41
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 21112013
Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...)
i.e. AC-1, RTLI-1, HP-1 -IEBERTCBD-B9-F/R-FC1/CU CBD-B9-R-HP33
Number of Systems 1 1 1
Indicate Paqe Reference on Plans or Schedule and indicate the applicable exceptions)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T-24 Sections
112(a)
112(a)
112(b), 112(c)
112(c), 115(a)
121(b)
121(b)
121(c)
121(c)
122(e)
122(e)
122(f)
122(g)
123
12:4
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144a&
144a&
144a&
144a&
144(c)
144 c
144(c)
1
n/a
12.0 EER
n/a
n/a
No
50 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
n/a
0 Btu/hr
n/a
179,682 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
8.00 HSPF
13.0 SEER / 11.4 EER
Yes
n/a
No
415 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
n/a
9,256 Btu/hr
n/a
19,357 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
I1AAILN I No I No I
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 35 of 41
U
U
M
M
z
c<
¢
o
ro
H
o
M
U
O
N
as
cr.
LLI
C
E
O
�,
76
a
E
'
U
CD
a
°
Cc:
Z
o=o
o
`m
O
U ch
U)
a
m
F-
v
°
>
-
gC)
a
Y
x�
0
s
LL
o-
a
N
W
is
o
a)x
LU
_�
°
CL
N
0
N L
—
m
n
\° C QLL
o
C
O
3
M
0) O
�
LO�UU
a)
U)E
M
U
U
O
m
E=
c
O
O
CLU
}
p E
O
Lo
Lo
O
O
m
O
m
O
O
O
<t
�t
"t
O
O
CO
�-
CO
O
N
m
N
m
�-
co
�-
N
�-
N
�-
<t
N
N
O
O
m
m
N
w
Z
U 7
En Q
of U
a)
U
E�
o
U
O
c
LO
CO
LO
CO
o
m
O
m
m
co
m
co
m
m
N
o
Q)
't
O
v
O)
";t
m
O
�-
;
E-
_
Q O C7
N
N
O
U
2
2 0
7
E>
Q
m
—o
Q
�
E
ti
w
@
@
w0
w0
w
O
W
=
E
O
LL a3 LL
!�
f�
!�
U
Q
m
O
-
c
N
O
Q x
U
N
N
O
fn
C°
O W
(D
(Z
,--
O
O
O
Q
O
O
O'
U
O
N
00
o
m
o
a)
a
c
o
is
Y
O
E
8) N
O
a
CL
3
in
E �
§
CZ
�
U
N
°
E
.�
_�
M_
��a
r
r
U
I_-�s
as
c
`o
0
°UE
oc
EvJ
W
O 0
Z
O
i p
Z
Z d
o
-
c
°
o
Q U
0
F-
L
2
LO
O
m
O
O
<t
r!'
O
TW
co
m
N
cw
N
v
N
Q.
m
.-
°
N
O
N
_
i
W
J
H
O
LLLL N U
U Q x
°
F-
N
M
�O-•
�_
Q
in
O
C :J
m (�
c m m
O
O
W
>
ca
aci
Q
J
N
�
a)
N
N
H
°
O'er
O
h
Cn
Cn
Lo
Cn
O
(O
(O
V
Q
N
O
O
O
O
O
O
O
O
N
N
N
o
-(
N
O
aZ
Z
m
U
U Q�
r
X
._
3
LO
LL
U
E
7
m°
L N
4
N
z
=
W
a
o¢
°
x
°
o
U
°� °
O
(�
Q
U
8
>
_
C7
YO
L Y
E
O
O
m
O
O
h
O
W
c
Cl
N
w
coo
Coo
(No
U
co
V
o
3
o
z
o
.
.=
�=
C7
c°
Y
m
i
a
J
m�
0
��
CF
I
6
0
0)
o
Q
o
o
N
Z
o
0o
CU
U
x
_
W
(n
°
�3�
>
X
aa))
(1)
J
>
co
>
Y
coc
E
y
a Y
E
E
0
°
c
o
E
E
o
n
d)
m
to
cr
to
w
°
C
X
(n
co c
m
Z
Q
(n
O
e-
N
co
tl
LO
�
m
m
W
i
i0
(Ea m
z
N
rY
K
LO
o
V
v�
m
m
m
m
m
m
dl
U
W
2
_
'�
Y
J
�
Z
Q,
°)
m
`�
`?
`�
`o
C
O
d
Z
U
T
o�
U
Z
m
U=
m
0
m
U
Z
m
0
1
m
U=
I
a)
W
V
�
�
C?z
CY)
C<
as Q
o
V
H
o
coO
C:
y
c
W
C
C c
. 'o
Q) ; ¢ ,_.
a)
..
0 Cf)
V
.Q
C
O Y
j
U
Q
C
�USrY)
N
O
m
N
a_
Z
-
H
�r
>
r�
Q
Y
o
X�
0
s
O
>
3
O
a
�
U
a
O
U
C:
_
ON a�
~
(n
U
m
O
��C)
�o
caw
o
'0)
(n U
E
io
cn
co
,o Fn
E
co
U
C)O
m
2
C
O
}
U
O
O
C:�-
O
LO
LO
N
N
e-
F
CO
Cl)LO
LO
O
Q)m
m
C o
N
�-
coC)
N
N
N
N
O
O
N
N
M
M
co
co
m
co
Z
O
U D
�m•`LL
ai
d
`U
Q U
Q
0
m
U
E�
>
o
U
O
c
'O E
O
<-
LO
LO
N
N
Cl)
co
LO
N
Lo
N
N
Lo
N
Lo
@
N
O
WCZ
a
O
y
O C7
N
co
Cl)
<-
N
N
�-
N
N
N
N
O
co
O
U
M
=
Ow j CO o
cn
Z
0)
[C �0
Q
�Q
U
Q
CIO
E
a
w0B00
w0
wa
O
W
2
N 3
r
LL O
u <u tL
O
ti
O
ti
O
O
ti
O
ti
O
H-
O
I-
O
I�
U
Q
CDO
O
C c
N
CS'
C)
C:C
N
E
O
ca
M
C� a'X
U w
N
N
r
p
C
p
Q
O
o
o
U
N
00
0
a
o
0
ai
C
U
o
iu
Y
N
E
0)m
C
z
LL
:E O
w `m cn
o
�
o
ro
3
O
w
o�
'_ •
U
e
N
Q
a
aro
U a
-0
Co
o
�
a)
°
�
Y
o
z
C
U
m
Y
`cu
o
E
-0 a>
T
p
m
�
E
o
o
�
0 2
W
EO0
Z
o
a''
V_ E
Z
Z a
o
c
O
o
Q C)O
a
W
o
o=Ea)
m
O
Q
2 (z
Cl)eN
-
C14
N
C)
N
N
to
Q
m
C
E
C
W
J
W2U
U Q X
o
i-
c�
E
O
o
Q
.N
mho
O
d d
C m
r
c
�>
cc
W
04
a)
a�i
a)
CY.
m
Q
J
S2
F-
U
a)
C
y
O
C`>
N
O
l(J
O
O
Z
a
a
U
�o
Q
Uv-
�
LLC =-
1
O
1
C)
1
C)
1
O
N
x
()
a)
..�.
E-
a)
J
=
E
oc 's
Lo
z
m
r
a)
O
$
w
w
N
Z
=
Q
W
C-)Q"-
Y
O
Lo
x
U
OspC
°�
i
0
U
o
o
Q
o
o
U
ro
Q
W
Q
o
L
ti
L
o
�
C)
a)
iu
U
o
3
o
c
�-
of
v
co
uo
co
Lo
Y
m
W
3
LL
I.L
C)
cr
O
L N
N
coJ
oav
�,
Y
:
M
o'o
C)iu
o¢
o
LL
o
x
N
c
Qm
Z
o
iu
o
U
m
W
m
w
-
cu
o
=
>
x
m
ca
N
L'
C)O
E�
J
C
c
E
Q 47
a
E
o
o
o
o
o
U)
ZQ
�
O
Co
C)
O
NC")
m
0
U
I-
I- a)
a
i
E m
=
N
�
O
U
t
m
m
m
Q
m
m
m
m
U
W
2—
Y
J
Z
n
W
O co
Q
m
m
m
N
m
N
m
N
m
N
m
0-
U=
U=
U
Z
U=
U=
U=
U=
U
W
C?
Cl)
�¢
o
M
U
Cl
a)
uJ
� E
�(DQ
o
o
cn
v
•-
z
0
° 2 O
c0
a)
N
O
C)L�
N
Q
z
c
x
_
>
C)\
C
O
s
C7
C)0
3
o
Q
�
s
N
=
_
0
OLU
L6
c
o >.
~
c
N
o
p
_
O
U
m
L
�jM
��caL
Lo oUU
�
o
E
N
U
U
o
mCL
�S
c
O
3
}
p E
c
N
N
LO
LO
m
O
O
c 0
�-
N
N
to
�-
co
a)
O)
LO
LO
O)
)-
O)
)-
�-
N
N
a)
N
a)
N
coU
N
co
Z
U 7
� ca .. �
i=
r"
u)
Q
—o
C)-N-QLL
C)m
i
d
Q .,
0 aa)i
U
E 2
>
o
U
O
c
3
N
N
LO
O
Ln
m
o)
m
o)
m
m
Lo
LO
m
r�
m
Lo
O
LO
m
O
LO
m
LO
N
-o
o
°
C
O
_
p O U
`o
N
N
)-
�-
�-
e-
_o
c
cn
Z
O
U
M
t;
'n
=31-
W
6
0
0
B
0
w6
E
o
S(D
O
LL ca LL
--
N
0U
a :5 Xcn
U
c
o
c�
E
ciso
r�
U W
m
cz
'
r
o
O
a
O
Y
o
U(D
y
N
m
O
N
o
a)O
c
O
U
o
o
a)(Da)
o
E
p
o) a)
co �
o
V
Q
LL
LL Q N
U
'6
U
3
cn
N
"E "6
j
N
=
d
N
Y
t=
m
-Q
(�
co
o
E
'ns
°
E S
°
a)�a
c
°cr
°UE
LV
C- 0 a)
o
o
z
a)
o
aI
Z
z d
o
`—°
c°
E
o
oQU
c
W
o>
°
c
�¢
rn
rn
rn
LO
�:
W
J
o
ax
°
N
`
L
���
M
z
c �m
o¢
Li
LIJ
m
Q
7cts
J
fn
U
a)
c
°
c
>
LO
LO
LO
Lo
LO
LO
LO
Lo
Z
V
Q
O
O
O
O
O
O
O
O
N
x
m
N
f-
N
o
p
Q
z
m
y
U O_"-
T
._
7
m
LL
U
p
CF
p
N
Z
=
w
oc
o
Q
°
x
°
o
U
o
o
C.)
Q
.0
N
>
_
�
�
M
o
L �
2
Lo
O
O
LO
l0
O
O
LO
W
c
<h
o
�-
Lo
O
m
co
co
o
co
m
a�')
N
Nt
°
p
o
LL
U
0
m
3 c
N
Q
O O
.=
.=
�=
UW
LLL
Y
O
c:r
3
"o
J
t-- <
a)
a)
LL
U
N
`p
N
.o 4
N
U
m
`o
i
¢
`o
L
LL
d.
o
x
_
N
N
a(D
Z
o
is
o
La
U
E
Y
c
°
W
_
m
o
aNNi
3 m
x
aa))
of
°
E o
J
>
co
>
-p
c
co
c
o
E
N
°
Q
o
cn
V
E
E
o
E
a)
m
c
o
E
E
o
N_
i
a)
En
'c
m
N
U
N
N
c
x
L'a
j
cr
w
Z
a
Q
c
N
N
N
N
N
N
�
m
CC
�
�
U
�c15
I-
1- m
CL
10
Q
m m
Z
Z
Z
LO
N
1�
o
U
Z
&_
6
m
m
m
m
m
m
m
U
W
S
'�
Y
J
Z
uj
co
N
O
N
O
N
O
N
O
N
O
N
O
O
M
o
C
a j
U
Z
U
T
m=
m
Z
U=
W
U
Q
M
M
z
_
N Q
LO
T1
r
M
i
U
N
C
to
Q)
LU
�
�,
12
En c
CD
En
J
�En
EYU
3
Q
E
nT O.CO
�U=m
�
O
8
N
F-
a
z
:
m
x
ro
>
a
Y
C)
x�
E
0_
mLL
U
3
O
Q
o
N
a
m
N
=
o
0
m
c
m
_ �
�
-3
o c Cl LL
��
c
=5
c
`� FnUU
:
�
E
co
U
U
o
m
=
c
O_
3
}
U
3
c
LO
U O
coo
N
M
M
LO
LO
.`�-
V)
Z
j
`LL
m
d
`U
_
Q
of U
Q
CD
U
E�
o
U
Q
c
0 O C7
N
N
Lo
L"
CNO
CNO
Q
O
0
O
m
M
C1Q x
co
cU
ra
aNiQ
U
o
Q
Lu
=
3
r
o
LL CZ LL
I�
ti
U
Q
a)
c
O E-_
N
O
C3
=X
U
c
_
N
E
.
F
N
C U W
U
°�'
r
C
Q
O
o
N
U`m-Ey
(N
00
0
a
o
`0)
a
co
E
ro
O
Z
LL
O
LL N
o
U
CL
(n
m
U
N
=
d
�
N
O W
U
(n
a)
E
ro
_
E
,-
r
U
m
o
�U_E
o c
`07
W
a
U�
c
o
Z
�
-
Q
z
Z d
O
Rs
c
8
p
Q U
O
-
N
E
7
O
O
(ii
O i
p
N
LO
Uo
W
_
F
a
y
a)
>
O
O
N
-
Q
O
2
LL a) U
Q
i
C-
O
W
0
V Q x
F
N
:3
0
Q
U)
� N
W
_C m m
N
O
N
m
-6
a0i
®
>
J
N
~
U
m
Cam..,
c6
C
ca
O O
a
LO
Z
V
Q
V
41 Y
O
O
O
_
N
x
m
H
N
°
E
a> �_
3
h
d'
LL
Cl)
m
LL
a)
Z
=
W
x
c
®
v
a
o
o
Q
_
4
o
CO")
U
a)
o
o
LO
LLI
o
'O
J
oQ=
���
a)
M
LL
U
-i
a)
o
N
CIS
O
Q
O
LL
aoo��
O
x
O
CZO.
O
Z
o
-
m
O
-
CO
U
E
y
s c
m
W
CL
co
U
ro
v a)
U
c
a1)
c
M
E a
�
a)
,max-.,
c
-O
N
alO
c
E
Q
N
N
Q
p
E
c
E
E
U
aE)
a)
E
C
o
N
N
N
x
c6
N
7
zQ
CO
�-
N
Cl)mC)0]
ca
o
U
F-
F- a)
W
i
co
N
CC
M
m
m
W
W
m
U
W
2
-
Y
-j
2E
Z
CIL
uj
CC
N (q
o
d
U
N
`)
cp
U��
W
cM
Cl)
U
G
T
=
W
U
LO
o
m
y
R
co
co
Z
m
m
V
W
W
W
W
W
W
Z
ao
U-
C
I
Z
W
W
W
z
W
cc
W
0_
W
W
c
o
c
0
c
0
c
0
c
0
c
0
c
0
a
Q
cc
:3
m
w
W
W
W
W
W
W
W
w
o
o
o
~�
ti
LL
U
CV
N
crci�
Q�
cr
Q
00
W
W
W
O
=
w
co
cn
cn
cn
p.
M
o
CO
N
O
N
M
1-
M
N
-
N
X-
o
N
T
J O
d
(S
of
of
co
Cl)
Cl)
Q d
y
y
J
0
0
0
0
0
0
0
cz
L
r_
m
�
v
ai
O
O
a
Cl)p
U
m
O
O
O
o
O
0
O
0
O
0
O
0
O
o
O
a
(s
=
Z
Q
L
O
Cp
—
O
O
1.-
O
LL
7
h
N
M
N
Obi
>•
0
0
O-
0
0
O
0
N
0
Q.
O
T7
CO
O
a
cOO
OOp
0
C
M
�=
CV
M
1=
M
W
—
lL
U
a
a
a
a
U
o
EL
cQ
o
T
T
U
O
U
T
T
U
o
C
>
d
0
0
0
0
O
0
0
0
W
�
V
OCi
CO
W
co
CO
h
w
W
M
7
�
•�
Z
0
0
0
0
0
C.
0
y
y
F
O
N
v
W_
7
Q
N
Cl)
N
E
N
C,
O)_
O
O
0
0
0
0
O
N
O
N
�-
-N
OA
0
N
NN
NNL
+OO
•
N
M
W
cv
_
E
_
E
_
Ua
CL
O
O
O
O
O
G
O
O
O
O
W
O
O
zu
r
cr
W
W
W
W
W
T
o
CJ
�
n
O
O
't
M
—
—
—
_y
�
N
U)
E
CL
F—
E
E
E
E
E
E
E
J
per.
2
c
3
3
J
L
L
0
LL
a
Lu
W
�
,�'�
w
w
..gym.
,2m,
d
a
d
CL
0
CO
N
h
0
0
h
O
Z_
k
k
k
IQ,
X
X
o
U
0
818
0
0
U
0
U
0
U
0
U
N
O
�
�
I
O
O
O
Q
F'
a
a
a
a
a
a
a
m
CCL D
m
m
m
m
ro
m
m
m
am
m
o
m
o
m
E
Z
~
W
=
Y
m
Y
m
Y
m
Y
m
-IT,
Y
Y
3
LLIa
a
a
a
a
a
a
oC
LU
co
m
LIJ
W
o
E
Z
o
J
d
d
LL
E
Co
Q
Z
E
W
V
U
W
Z
W
U
N
N
N
z
>'
U)
co
c00
M
O
N
U)
co
CO0
c�
O
N
W
Z
a
Z
E
Q
W
J
E
J
i•
U)
�!
O
M
O
Cl)
O
M
N
co
N
O
CO
N
N
O
Cl)
O
M
O
M
N
M
M
O
co
N
-O
a
m
co m
a
a
Q
d
in
>
a
J
N
U
U
U
U
U
o
U
U
U
U
U
o
U
J
U
U
U
U
U
o
U
U
U
U
U
o
U
-
ui
co
W
m
Cl)
LL
a
�s
a
s�
�s
o
z v�
J
WU
(3
a) v>
J
�'"
-�
�"
Z
W
W
W
W
W
W
W
Z
W
W
W
W
W
W
W
PI
W
I,
J
Z
¢
Z
¢
Z
¢
Z
¢
Z
¢
Z
¢
Z
¢
W
Z
¢
Z
¢
Z
¢
Z
¢
Z
¢
Z
¢
Z
¢
I
I
I
I
I
I
LO
§
j
\
CL
)
§
u
Ec
f
o
O
u
°
J
7
%
0LL
-3
\
§
\
\
cc§
(
o,
/
).
[
§
-1 p
{
®
¥
{
cc
k�
c�
§
N
±§
§
\
§
O
a.
§
=
_
$
co C,4
\
\
\0a.
2
co
§
o
o
$
§ °
)
§
R
a
«
aR
°
m
=
§
o
0
0
E%\
2�
a
%
Q
o
0
o
\
)
m
Q
@
/
m
'
$
®
6
8
20
2
o
`
-,IIIb
/
\
0
@R/
c
>o
)4g
co
w
§
�
5
-
0
0
fo
a
2cc
»
t
§
k
/
°
N
e
)
cl
k
{
§
§
2
&
G
§
w
3
5\\
w
0
{
(
\
s
o
(
A
§
u
$
$
§
B
$
.
13
m
E
IL
>
o
o
e
Cl)
a.
J
/
§
\
\
\
d)
O
■
co
co
LU
Z
\
\
\
L
&
&
k
\
z
ƒ
]
]
2
k
W
&
LLI
\
�
�
CL
■
�
\
cc
�
x
m
\
k
2
\
E
z
LU
§
E
®ca
$
E
k
�
w
t121
a)
?
O
Z
2
&
U)
&
-j
CL
§
®
/
2
cn
\
2
°
E
2
2
�
o
\
«
¥
m
o
?
/
$
/
-j
m
o
?
/
$
%
/
-
�
/
2
W2M
ƒ
\\§
z
$\E
�
/ »
Q
❑
�
Q
F
/
w
w
K
m
§
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1 C
Project Name
Date
Wasat- Building 9
2/1/2013
Project Address
Climate Zone
Total Cond. Floor Area
Addition Floor Area
2290 Cosmos Court Carlsbad
CA Climate Zone 07
26,929
n/a
GENERAL INFORMATION
Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Relocatable - indicate ❑ specific climate zone ❑ all climates
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
certificate applies only to a Building using the performance compliance approach.
The documentation author hereby certifies that the documentation is accurate and complete.
Documentation Author
---
Name
Signature _
Company McPARLANE & ASSOCIATES, INC.
Date 21112013
Address
Phone 858 277 9721
City/State/Zip
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV. LTG. MECH.
hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
❑ ❑ 0 sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or 1 am a licensed architect.
affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name SCA
[Signature
Company
Date
Address LJ
<
License #
City/State/Zip coPhone
Principal Mechanical Designer a
Name Doug Isaaks <
Signature
Company McParlane & Associates LL _z
Date
01-19-14
Address 4830 Viewridge Ave W -1p _g
License # 30090
City/StatelZip San Diego, CA Z)
Phone 858 277 9721
Principal Lighting Designer
Name
Signature
Company Lighting Compliance Not In The Scope Of This Submittal
Date
Address
License #
City/State/Zip
Phone
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
0 ENV-1C Certificate of Compliance. Required on plans. 0 MECH-1C Certificate of Compliance. Required on plans.
❑ LTG-1 C Certificate of Compliance. Required on plans. 0 MECH-2C Air/Water Side/Service Hot Water & Pool Requirements.
❑ LTG-2C Lighting Controls Credit Worksheet. 0 MECH-3C Mechanical Ventilation and Reheat.
❑ LTG-3C Indoor Lighting Power Allowance. 0 MECH-5C Mechanical Equipment Details.
Ener yPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 1 of 41
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1C
I Wasat- Building 9 1 21112013
ANNUAL TDV ENERGY USE SU161MARY (kBtu/soft-vrl
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
Process Lighting
TOTALS
;tandard Proposed Compliance
Design Design Marain
0.05
0.05
0.00
163.86
157.30
6.56
70.54
69.86
0.69
0.00
0.00
0.00
o.o0
0.00
0.00
0.00
0.00
0.00
50.55
50.55
0.00
74.01
74.01
0.00
397.92
397.92
0.00
0.00
0.001
0.00
756.94
749.69
7.24
Heating
Cooling
Fans
Heat Rej
Pumps
DHW
Lighting
Receptacle
Process
Process Ltg
Percent better than Standard 1.0 % 2.0 % excluding process)
BUILDING COMPLIES
INFORMATION
Building Orientation (A9 0 deg Conditioned Floor Area 26,929 sqft.
Number of Stories 1 Unconditioned Floor Area 0 sqft.
Number of Systems 26 Conditioned Footprint Area 0 sqft.
Number of Zones 26 Natural Gas Available On Site Yes
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Total
Roof
Orientation Gross Area
(N)
Z 900
(E)
Z220
(s)
2,690
(VV)
1,300
9,110
17, 895
Prescriptive Lighting Power Density
Prescriptive Envelope TDV Energy
Remarks:
Standard
0.893 W/sgft.
438,786
sqft.
sqft.
sqft.
sqft.
sqft'
sqft.
Glazing Area
585
585
831
475
Z476
90
Proposed
0.893 W/sgft.
764,475
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazina Ratio
20.2 %
26.4 %
30.9 %
36.5 %
27.2
0.0
Prescriptive Values for
Comparison only. See
LTG-1 C for allowed LPD.
PERFORMANCE CERTIFICATE OF COMPLIANCE
(Part 3 of 3) PERF-1C
Project Name
Wasat- Building 9
e
71/2013
ZONE INFORMATION
S stem Name
Zone Name
Occu anc T e
FloorTLP
Area
s ft.
t
Ctrl.
Credits
/sf 2
Allowed LPD
Proc.
Loads
W/sfCBD-B9-R-HP9
Area
W/sf a
Tailored
/sf a
HP-9
Office > 250 sgft
1,10000
CBD-B9-R-HP10
HP-10
Office > 250 sgft
1,935
*0.900
CBD-B9-R-HP11
HP-11
Office > 250 sgft
1,260
*0.900
CBD-B9-R-HP12
HP-12
Office > 250 sgft
859
*0.900
CBD-B9-R-HP13
HP-13
Office > 250 sgft
1,600
*0.900
CBD-B9-R-HP14
HP-14
Office > 250 sgft
690
*0.900
CBD-B9-R-HP15
HP-15
Office > 250 sgft
625
*0.900
CBD-B9-R-HP16
HP-16
Office > 250 sgft
1,400
*0.900
CBD-B9-R-HP17
HP-17
Office > 250 sgft
2,100
*0.900
CBD-B9-R-HP18
HP-18
Office > 250 sgft
815
*0.900
25.000
CBD-B9-R-HP19
HP-19
Office > 250 sgft
1,475
*0.900
25.000
CBD-B9-R-HP20
HP-20
Office > 250 sgft
685
*0.900
CBD-B9-R-HP21
HP-21
Office > 250 sgft
1,500
*0.900
CBD-B9-R-HP22
HP-22
Office > 250 sgft
1,680
*0.900
CBD-B9-R-HP23
HP-23
Office > 250 sgft
590
*0.900
CBD-B9-R-HP24
HP-24
Office > 250 sgft
1,415
*0.900
CBD-B9-R-HP25
HP-25
Office > 250 sgft
1,100
*0.900
50.000
CBD-B9-R-HP26
HP-26
Office > 250 sgft
660
*0.900
10.000
CBD-B9-R-HP27
HP-27
Office > 250 sgft
395
*0.900
C8D-B9-R-HP28
HP-28
Office > 250 sgft
1,315
*0.900
25.000
Notes: 1. See LTG -IC 2. See LTG-2C 3. See LTG-3C 4. See LTG-4C
items marked with asterisk, see LTG-1-C b others b others
Hems above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation :submitted.
The HVAC System TRANE WSC 072 includes an Economizer. This system has a cooling output < 75,000 Btuh ore supply cfm < 2500.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
EnergyPro 5.1 by EnergySoft User Number. • 2445
RunCode: 2013-02-01T14:17:35 ID: 3813 Page 3 of 41
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1C
Project Name
Viasat- Building 9
Date
21112013
ZONE INFORMATION
S stem Name
Zone (Name
Occu anc T e
Floor;LPD
Area
s ft.
.
1
Ctrl.
Credits
/sf 2
Allowed LPD
Proc.
toads
W/sfCBD-B9-R-HP29
Area
W/sf 3
Tailored
/sf n
HP-29
Office > 250 sgft
1,300900
CBD-B9-R-HP30
HP-30
Office > 250 sgft
390
*0.900
CBD-B9-R-HP31
HP-31
Office > 250 sgft
475
*0.900
CBD-B9-R-HP32
HP-32
Office > 250 sgft
150
*0.900
15.000
LIEBERT CBD-B9-F1R-FC11
SERVER ROOM
Electrical, Mechanical Room
1,000
*0.700
50.000
CBD-B9-R-HP33
HP-33
Office > 250 sgft
415
*0.900
15.000
Notes: 1. See LTG-1C 2. See LTG-2C 3. See LTG-3C 4. See LTG-4C
items marked with asterisk, see LTG-1-C b others b others
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation :submitted.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 4 of 41
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Wasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
Public School 0 Conditioned Spaces ❑ Unconditioned Spaces
❑ Schools (Public School) ❑ Bldg.
❑ Skylight Area for Large Enclosed Space a 8000 ftz (If checked include the ENV-4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component 0 Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, IN or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE
SURFACE DETAILS
INSULATION
Tag/ID
AssemblyType
¢
4 y
mw
O z
v
li
0
�.
>>
R
0 cc
O
do
V a
w>
O C
;%t
x o
LU LL
2 0
�3
�,
__ >
G C
d;=
o
C LL
x
C
co6
o a
-2 a
c
'.o--, H
0
V N
o.
N
LL
1
Wall
305
(W)
0.110
R-11
4.3.1-A2
Existing
❑
❑
2
Wall
225
(N)
0.110
R-11
4.3.1-A2
Existing
❑
❑
3
Wall
680
(S)
0.110
R-11
4.3.1 A2
Existing
❑
❑
4
Wall
420
(S)
0.110
R-11
4.3.1 A2
Existing
❑
❑
5
Wall
624
(S)
0.110
R-11
4.3.1 A2
Existing
❑
❑
6
Wall
135
(S)
0.110
R-11
4.3.1 A2
Existing
❑
❑
7
Wall
495
(E)
0.110
R-11
4.3.1 A2
Existing
❑
❑
8
Wall
840
(E)
0.110
R-11
4.3.1 A2
Existing
❑
❑
9
Roof
1,400
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
10
Roof
2,100
(N)
0.048
R-19
4.2.1 A16
Existing
❑
L ❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
0
2)
a
c
03
4
e ui
O Z
c
R LL
2>
c
LL o
> U)
, N
z e
= o
rn N
C
>
O
_
o
o
U m
w
a
01
LL
1
Window
475
(IM
1.190
Default
0.830
Default
❑
Existing
❑
❑
2
Window
831
(S)
1.190
Default
0.830
Default
❑
Existing
❑
❑
3
Window
585
(E)
1.190
Default
0.830
Default
❑
Existing
❑
❑
4
Window
585
(N)
1.190
Default
0.830
Default
❑
Existing
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 5 of 41
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Wasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: M Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Bedlocatable g. Public School M Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space z 8000 fe (If checked include the ENV-4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
1 0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE
SURFACE DETAILS
INSULATION
Ta /ID
AssemblyType
Q
N
C
OZ
C
_
4
UoE
'C
wa
>
'O
w3
s
�
=
'
v
x
C
a
"o
on
o"
'd M
v to
y
a
a
11
Walt
285
(N)
0.110
R-11
4.3.1 A2
Existing
❑
❑
12
Roof
815
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
13
Roof
1,475
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
14
Walt
545
(N)
0.110
R-11
4.3.1-A2
Existing
❑
❑
15
Roof
685
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
16
Roof
1,500
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
17
Roof
1,680
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
18
Wall
215
(N)
0.110
R-11
4.3.1 A2
Existing
❑
❑
19
Roof
590
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
20
Walt
450
(N)
0.110
R-111
4.3.1-A2
Existing
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
m
d
a
C�
4c
= ui
d
O Z>
ro
KLL
m
a a
5
>
LLo
> vs
v
O
X0
R^
d
:$ 7
x o
0 m
m
a
>
O
c
0 y
o
c� cn
a
u.
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary-
EnergyPro 5.1 by EnergySoft User Number. • 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 6 of 41
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Wasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ BRledlocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space z 8000 fe (If checked include the ENV-4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component 0 Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
0 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE
SURFACE DETAILS
INSULATION
Tag/ID
AssemblyType
N
..
a
=
3:
C N
O
v,
7
.0 C
O d
E>
O C
LL
et
K
G
_
=+ N
ti
21
Roof
1,415
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
22
Wall
385
(WJ
0.110
R-11
4.3.1 A2
Existing
❑
❑
23
Roof
1,100
(N)
0.048
R-19
4.2.1-A16
Existing
❑
❑
24
Wall
135
(W)
0.110
R-11
4.3.1 A2
Existing
❑
❑
25
Roof
660
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
26
Wall
195
(N)
0.110
R-11
4.3.1 A2
Existing
❑
❑
27
Wall
300
(E)
0.110
R-11
4.3.1 A2
Existing
❑
❑
28
Roof
395
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
29
Wall
400
(N)
0.110
R-11
4.3.1-A2
Existing
❑
❑
30
Roof
1,315
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
2
a
o
=
:.' z
O>
v
a LL
ri o
> w
2
w
..
V
= o
rn rn
>
O
a
u
U m
o-
LL
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑ 1
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary-
EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 7 of 41
CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Wasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ RRlellocatable Public School 0 Conditioned Spaces ❑ Unconditioned Spaces
❑ Skylight Area for Large Enclosed Space z 8000 ftz (If checked include the ENV-4C with submittal)
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component 0 Overall Envelope ❑ Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:
10 deg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE
SURFACE DETAILS
INSULATION
Tag/ID
I Assembly Type
yd
¢
C
u
O z
j
tL
:5
O
9 0
U¢
.d.
w>
2 C
•+d.
w U.
O
5>
O C
5 U.
C
R
" H
06
a
U.
31
Roof
1,300
(N)
0.048
R-191
4.2.1 A16
Existing
❑
❑
32
Roof
390
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
33
Roof
475
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
34
Roof
150
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
35
Roof
450
(N)
0.048
R-19
4.2.1 A16
Existing
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
$
d
R
c
gO>
d W
C 2
�
tL
v
I
v
K
d
n
°
n
m
0
o
c
C
CL Nawte-'
O
a
U.
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number. • 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 8 of 41
CERTIFICATE OF COMPLIANCE (Part 2 of 3)
AND FIELD INSPECTION ENERGY CHECKLIST
ENV-1C
Project Name
Wasat- Building 9
Date
21112013
ROOFING PRODUCT (COOL ROOFS)
(Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or
Performance Approach.
CHECK APPLICABLE BOX BELOW IF (EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS:
Pass
Fail'
N/A
❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less.
❑
❑
❑
❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch.
❑
❑
❑
❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or
SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV-2C.
❑
❑
❑
❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI
that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assemblybelow, Column H of ENV-2C.
❑
❑
❑
roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are
[3 exempted.
exem ted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.ener .ca. ov/title24/
❑
❑
❑
❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 lb /ft are exempt from
the Cool Roof criteria below.
❑
❑
❑
❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are
from the low -sloped roofingcriteria.
❑
❑
Elexempted
1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
CRRC Product ID
Number'
Roof Slope
s 2:12 > 2:12
Product Weight
< 5116/ft2 z 5lb/ft2
Product
Typ82
Aged Solar
Reflectance
Thermal
Emmitance
SRI5
Pass
Fail6
❑
❑
❑
❑
❑ 4
❑
❑
❑
❑
❑
❑
❑ 4
❑
❑
❑
❑
❑
❑
❑ 4
❑
❑
❑
❑
❑
❑
❑ 4
❑
❑
❑
❑
❑
❑
❑ 4
❑
❑
❑ 1
❑
1❑
❑
❑ 4
❑
❑
1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
www.coolroofs.orq/products/Search.r)hp
2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc.
3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the
same directory and use the equation (0.2,-0.7(p;n;i;J — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool
Roof Rating Council's Rated Product Directory.
4. Check box if the Aged Reflectance is a calculated value using the equation above.
5. The SRI value needs to be calculated from a spreadsheet calculator at htto://www.enemv.ca.gov/title24/
6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage
recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating:
❑ Aluminum -Pigmented Asphalt Roof Coating
❑ Cement -Based Roof Coating
❑ Other
Discrepancies;
EnergyPro 5.1 by Ene Soft User Number, 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813
Page 9 of 41
CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV-1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope
Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that
require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration
products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices
Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new
fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the
enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled
out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different
fenestration product line must be provided to the owner of the building for their records.
Test Description
ENV-2A
Test Performed By:
Fenestration Products Name or ID
Requiring Testing or Verification
Area of like
Products
Building Envelope
Acceptance Test
13
13
13
13
11
11
13
13
11
13
13
13
13
11
13
13
13
11
13
13
13
EnergyPro 5.1 by Ener Soft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 PaFa 10 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION E14ERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
I o deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ul ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP9
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
28,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
46,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit.
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP10
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
35,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
58,800 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
1EnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Pa a 11 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C
FIELD INSPECTION E14ERGY CHECKLIST
Project Name
Wasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces p Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP11
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
28,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
46,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit:
MECH-4A & MECH-4-HERS
NO
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP12
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
16,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
29,100 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
lEnergyProElbyEnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 12 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
I 0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP13
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
35,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
58,800 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason 2_
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP14
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
28,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
46,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Nurnber.• 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Pa - a 13 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
o deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP15
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
16,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
29,100 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit:
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP16
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
35,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
58,800 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01 T14:17.35 ID: 3813 Page 14 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Ds grees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP17
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
83,210 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 COP
❑
❑
Max Allowed Cooling Capacity'
94,000 Btu/hr
❑
❑
Cooling Efficiency'
11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit:
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP18
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
83,210 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 COP
❑
❑
Max Allowed Cooling Capacity'
94,000 Btu/hr
❑
❑
Cooling Efficiency'
11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Nurnber. 2445 Run Code: 2013-02-01 T14:17:35 ID: 3813 Page 15 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
2/1/2013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-89-R-HP19
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
83,210 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 COP
❑
❑
Max Allowed Cooling Capacity'
94,000 Btu/hr
❑
❑
Cooling Efficiency'
11.7 EER
❑
❑
Duct Location/ R-value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP20
❑
❑
Equipment Type 3 :
Packaged DX
❑
❑
Number of Systems
1
0
0
Max Allowed Heating Capacity'
16,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
29,100 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number., 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 16 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION E14ERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
I 0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP21
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
35,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
58,800 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP22
❑
❑
Equipment Type 3 :
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
35,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
58,800 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 17 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
I 0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fall — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP23
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
16,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
29,100 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER/ 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP24
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
Max Allowed Heating Capacity'
28,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
46,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER/ 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or:, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number. • 2445 RunCode: 2013-02-01T14:17.35 ID: 3813 Page 18 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP25
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
28,200 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
46,000 Btu/hr
❑
❑
Coolinq Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP26
❑
❑
Equipment Type 3 :
Packaged DX
❑
❑
Number of Systems
1
❑
0
Max Allowed Heating Capacity'
19,900 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
35,000 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.7 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible parry shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyPro5.1byEnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 19 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-IC
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
I 0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP27
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
12,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
23,700 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.4 EER
❑
❑
Duct Location/ R-Value
Attic, Ceiling Ins, vented / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP28
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
83,210 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 COP
❑
❑
Max Allowed Cooling Capacity'
94,000 Btu/hr
❑
❑
Cooling Efficiency'
11.7 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyPro5.1byEnergySoft User Nwmber. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 20 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces p Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP29
❑
❑
Equipment T e3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
68,000 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 COP
❑
❑
Max Allowed Cooling Capacity'
77,000 Btu/hr
❑
❑
Cooling Efficiency'
11.7 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
Diff. Enth (Integrated)
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
1 ❑
E ui ment2
Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP30
❑
❑
Equipment Type 3:
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
12,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
23,700 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.4 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible parry shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
JEnergyPro5.1byEnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 21 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Project Address Climate Zone Total Cond. Floor Area
2290 Cosmos Court Carlsbad 7 26,929
Date
21112013
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
I 0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fall — Describe Reason2
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP31
❑
❑
Equipment Type 3 :
Packaged DX
❑
❑
Number of Systems
1
❑
❑
Max Allowed Heating Capacity'
12,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
23,700 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.4 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
Equipment 2
Inspection Criteria
FIELD INSPECTION
ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP32
❑
❑
Equipment lype3:
Packaged DX
❑
❑
Number of Systems
1
❑
13
Max Allowed Heating Capacity'
12,100 Btu/hr
❑
❑
Minimum Heating Efficiency'
8.00 HSPF
❑
❑
Max Allowed Cooling Capacity'
23,700 Btu/hr
❑
❑
Cooling Efficiency'
13.0 SEER / 11.4 EER
❑
❑
Duct Location/ R-Value
Conditioned / 8.0
❑
❑
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
❑
Economizer
No Economizer
❑
❑
Thermostat
Setback Required
❑
❑
Fan Control
Constant Volume
❑
❑
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnerqySoft User Number. 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 22 of 41
CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C
FIELD INSPECTION ENERGY CHECKLIST
Project Name
Viasat- Building 9
Date
21112013
Project Address
2290 Cosmos Court Carlsbad
Climate Zone
7
Total Cond. Floor Area
26,929
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room
❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces
affidavit
Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration
Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit)
Energy
Front Orientation: N, E, S, W or in Degrees:
0 deg
HVAC SYSTEM DETAILS
FIELD INSPECTION ENERGY CHECKLIST
E ui ment2
Inspection Criteria
Meets Criteria
or Requirements
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
LIEBERT CBD-B9-F/R-FC1/CU1
0
0
Equipment T e3:
Split DX
0
0
Number of Systems
1
0
0
Max Allowed Heating Capacity'
39,400 Btu/hr
0
Minimum Heating Efficiency'
n/a
0
0
Max Allowed Cooling Capacity'
185,700 Btu/hr
Cooling Efficiency'
12.0 EER
❑
0
Duct Location/ R-Value
Conditioned / 8.0
0
0
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
0
0
Economizer
No Economizer
❑
0
Thermostat
Setback Required
0
0
Fan Control
Constant Volume
0
0
E ui ment2
Inspection Criteria
FIELD INSPECTION
ENERGY CHECKLIST
Pass
Fail — Describe Reason
Item or System Tags
i.e. AC-1, RTU-1, HP-1
CBD-B9-R-HP33
0
0
Equipment T e3.
Packaged DX
00
Number of Systems
1
❑
0
Max Allowed Heating Capacity'
12,100 Btu/hr
0
0
Minimum Heating Efficiency'
8.00 HSPF
0
❑
Max Allowed Cooling Capacity'
23,700 Btu/hr
0
0
Cooling Efficiency'
13.0 SEER / 11.4 EER
❑
0
Duct Location/ R-Value
Conditioned / 8.0
0
0
When duct testing is required, submit
MECH-4A & MECH-4-HERS
No
❑
0
Economizer
No Economizer
0
0
Thermostat
Setback Required
0
1 0
Fan Control
Constant Volume
0
0
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or-, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
1EnergyPro5.1byEnerg,ySoft User Number: 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 23 of 41
CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECHA C
FIELD INSPECTION ENERGY CHECKLIST
Viasat-
21112013
EnergyPro 5.1 by Ener<1ySoft UserNumber.• 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 24 of 41 1
CERTIFICATE OF COMPLIANCE° and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C
Project Name
Date
Wasat- Building 9
2/1/2013
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be
part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.
The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the
properly filled out and signed forms before the building can receive final occupancy.
TEST DESCRIPTION
MECH-2A
MECH-3A
MECH-4A
MECH-5A
MECH-6A
MECH-7A
MECH-8A
MECH-9A
MECH-10A
MECH-11A
Hydronic
Outdoor
Constant
Demand
Supply
System
Automatic
Ventilation
Volume &
Air
Control
Supply
Valve
Water
Variable
Demand
For
Single -Zone
Distribution
Economizer
Ventilation
Fan
Leakage
Temp.
Flow
Shed
Equipment Requiring Testing or Verification
Qty.
VAV & CAV
Unitary
Ducts
Controls
DCV
VAV
Test
Reset
Control
Control
TRANE WSCO90
1
0
0
❑
0
❑
❑
❑
❑
❑
0
TRANE WSC 072
1
0
0
❑
0
❑ 1
❑
❑
❑
❑
0
TRANE 4WCC 3024
4
0
0
❑
❑
❑
❑
❑
❑
❑
0
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
EnemvPro5.1 by EnemySoft User Number., 2445 RunCode: 2013-02-01T14:17:35
ID: 3813
Pa a 25 of 41
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1 C
Project Name
Wasat- Building 9
Date
1 21112013
TEST DESCRIPTION
AAECH-12A
MECH-13A
MECH-14A
MECH-15A
Equipment Requiring Testin
Qty.
Fault
Detection &
Diagnostics
for DX Units
Automatic Fault
Detection &
Diagnostics for
Air & Zone
Distributed
Energy Storage
DX AC
Systems
Thermal Energy
Storage (TES)
Systems
Test Performed By:
TRANE WSCO90
1
0
❑
❑
❑
TRANE WSC 072
1
❑
❑
❑
TRANE 4WCC 3024
4
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
1 ❑
1 ❑
1 ❑
❑
❑1
❑
1 ❑
EnemvPro 5.1 by EnemySoff User Number 2445
RunCode: 2013-02-01T14:17:35 ID: 3813 Page 26 of 41
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Viasat- Building 9 2/1/2013
Indicate Air Systems Type (Central, Single Zone, Packa e, VAV, or etc...)
Item or System Tags
i.e. AC 1, RTU 1, HP 1 CBD-89-R-HP9 CBD-89-R-HP10 CBD-89-R-HP11
Number of Systems 1 1 1
Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. It Yes, a
MECH-4-A must be submitted
112
112
112
112
121
121
121
122
122
122
122
123
1E
I
8.00 HSPF
13.0 SEER/ 11.7 EER
Yes
n/a
No
165 oft
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER/ 11.7 EER
Yes
n/a
No
290 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
189 oft
No
No
Programmable Switch
Setback Required
Auto
n/a
1124 1 Attic, Ceiling Ins, vented / 8.0 (Attic, Ceiling Ins, vented / 8.O I Attic, Ceiling Ins, vented / 8.0
144 a & b
n/a
n/a
n/a
144 a & b
21,573 Btu/hr
26,928 Btu/hr
21,573 Btu/hr
144 a & b
n/a
n/a
n/a
144 a & b
33,401 Btu/hr
41,007 Btu/hr
39,289 Btu/hr
144 c
Constant Volume
Constant Volume
Constant Volume
11 44c
11 44c
Yes
Yes
Yes
1144 d
No
No
No
1144 a
No Economizer
No Economizer
No Economizer
.1 44f
Constant Temp
Constant Temp
Constant Temp
.144(f)
Constant Temp
Constant Temp
Constant Temp
I ....,,_. I No I No I No
11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
1
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Viasat- Building 9 1 21112013
Item or System Tags
(i.e. AC-1. RTLI-1. HP-1)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. It Yes, a
MECH-4-A must be submitted
Indicate Air Systems Typi
CBD-B9-R-HP12
71
Indicate Paae Reference on Plar
T-24 Sectio
112 a
112 a
112(b), 1121
112(c), 115(
121(b)
121(b)
121 c
121 c
122 e
122 e
122(f)
122
123
'Central, Single Zone, Packag
CBD-B9-R-HP13
1
or Schedule and indicate the
8.00 HSPF
13.0 SEER/ 11.7 EER
Yes
n/a
No
129 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER/ 11.7 EER
Yes
n/a
No
240 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
VAV, or etc...)
CBD-B9-R-HP14
1
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
104 oft
No
No
Programmable Switch
Setback Required
Auto
n/a
1 124 1 Attic, Ceiling Ins, vented / 8.0 I Attic, Ceiling Ins, vented / 8.0 I Attic, Ceiling Ins, vented / 8.0
144a&
144a&
144a&
144(a &
144 c
144(c)
1144(c)
11 44d
11 44e
11 44f
'144 f
144(g)
'I 44(i)
n/a
12,316 Btu/hr
n/a
24,376 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
n/a
26,928 Btu/hr
21,573 Btu/hr
n/a
n/a
40,818 Btu/hr
35,662 Btu/hr
Constant Volume
Constant Volume
Yes Yes
No No
No Economizer No Economizer
Constant Temp Constant Temp
Constant Temp Constant Temp
•IAA /I-\ I No I No I No
11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode. 2013-02-01T14:17:35 ID: 3813 Page 28 of 41
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 1 21112013
Indicate Air Systems Type (Central, Single Zone, Packa e, VAV, or etc...)
Item or System Tags
i.e. AC 1, RTU 1, HP-1 CBD-B9-R-HP15 CBD-B9-R-HP16 CBD-B9-R-HP17
Number of Systems 1 1 1
Indicate Paae Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
T-24 Sectio
112 a
112 a
112(b), 112(
112(c), 115
121(b)
121(b)
121 c
121 C
122 e
122 e
122(f)
122(g)
123
124
144a&
144a&
144a&
144(a &
144 c
144 c
144(c)
144 d
144 e
144 f
1i 44(f)
8.00 HSPF
13.0 SEER/ 11.7 EER
Yes
n1a
No
94 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER/ 11.7 EER
Yes
n/a
No
210 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 COP
11.7 EER
Yes
n/a
No
315 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0
n/a
1Z316 Btu/hr
n/a
22,554 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
n/a
26,928 Btu/hr
n/a
41,444 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Tamp
Constant Temp
n/a
63,655 Btu/hr
We
65,566 Btu/hr
Constant Volume
Yes
No
Diff. Enth (Integrated)
Constant Temp
Constant Temp
1144 i
1144(k) I No I No No
11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
1
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 21112013
Indicate Air Systems Type (Central, Single Zone, Packa e, VAV, or etc...)
Item or System Tags
i.e. AC-1, RTLI-1, HP-1 CBD-89-R-HP18 CBD-89-R-HP19 CBD-69-R-HP20
Number of Systems 1 1 1
Indicate pane Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T-24 Sectio
112 a
112 a
1'12 b , 1121
112(c), 115
121 b
121(b)
121 c
121 c
122 e
122 e
122(f)
122(g)
123
124
PRESCRIPTIVE MEASURES
Calculated Design Heating Load L44 a &
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a &
144(a &
144(a &
144(c)
144(c)
144(c)
144 d
144 e
144 f
144 f
144(g)
144(i)
144(kL
8.00 COP
11.7 EER
Yes
n/a
No
122 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0
n/a
63,655 Btu/hr
n/a
67,181 Btu/hr
Constant Volume
Yes
No
Diff. Enth (Integrated)
Constant Temp
Constant Temp
No
8.00 COP
11.7 EER
Yes
n/a
No
221 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
We
No
103 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0 1
n/a
63,655 Btu/hr
n/a
68,539 Btu/hr
Constant Volume
Yes
No
Diff. Enth (Integrated)
Constant Temp
Constant Temp
No
n/a
I Z 316 Btu/hr
We
22,044 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 30 of 41
AIR SYSTEM REQUIREMENTS
Project Name
Wasat- Building 9
Item or System Tags
(i.e. AC-1, RTLI-1, HP-1)
Number of Svstems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
_ Indicat
T-24 Secth
1 -I 2 a
112 a
1-12b,11,
112(c), 11!
121(b)
121
121
1222
122
12s
123
Indicate Air Systems Type (Q
CBD-B9-R-HP21
1
e Paoe Reference on Plans or
8.00 HSPF
13.0 SEER/ 11.7 EER
Yes
n/a
No
225 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Part 1 of
CBD-89-R-HP22
1
ule and indicate the
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
630 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
MECH-2C
72/1/2013
VAV, or etc...)
CBD-B9-R-HP23
1
8.00 HSPF
13.0 SEER/ 11.7 EER
Yes
We
No
89 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
1 1 P4 1 Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0
144 a & b
n/a
n/a
n/a
144 a & b
26,928 Btu/hr
26,928 Btu/hr
12,316 Btu/hr
144 a & b
n/a
n/a
n/a
144 a & b
40,844 Btu/hr
41,961 Btu/hr
22,082 Btu/hr
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
Yes
Yes
Yes
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144 f
Constant Temp
Constant Temp
Constant Temp
r144(f)
Constant Temp
Constant Temp
Constant Temp
r1144 i
44(k) I No No No
11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number. • 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 31 of 41 I
AIR SYSTEM REQUIREMENTS
Project Name
Wasat- Buildinq 9
Item or System Tags
(i.e. AC-1, RTU-1, HP-1)
Number of Systems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
Indicate Air Systems Typ
Indicate
T-24 Sectioi
1 -I 2 a
1 '12 a
112(b), 112
112(c), 115
121(b)
121
121
122
122'
122
123
124
Part 1 of 2
CBD-B9-R-HP24 CBD-B9-R-HP25
1 1
Reference on Plans or Schedule and indicate
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
212 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
B.00 HSPF
13.0 SEER / 11.7 EER
Yes
n/a
No
165 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
MECH-2C
1 21112013
VAV, or etc...)
CBD-B9-R-HP26
1
8.00 HSPF
13.0 SEER / 11.7 EER
Yes
We
No
99 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented /
144 a & b
n/a
n/a
n/a
144 a & b
21,573 Btu/hr
21,573 Btu/hr
15,223 Btu/hr
144 a & b
We
n/a
n/a
144 a & b
32,529 Btu/hr
33,779 Btu/hr
24,987 Btu/hr
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
Yes
Yes
Yes
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144 f
Constant Temp
Constant Temp
Constant Temp
144 f
Constant Temp
Constant Temp
Constant Temp
144
144 i
144(k)
No
No
No
11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Buildinq 9 21112013
Indicate Air Systems Type (Central, Single Zone, Packa e, VAV, or etc...)
Item or System Tags
i.e. AC-1, RTLI-1, HP-1 CBD-89-R-HP27 CBD-89-R-HP28 CBD-B9-R-HP29
Number of Systems 1 1 1
Indicate Paae Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
T-24 Sectio
112 a
11 2 a
1112(b), 1121
1112(c), 1151
12-1(b)
121(b)
121 c
121(c)
1221
1221
1221
123
124
8.00 HSPF
13.0 SEER/ 11.4 EER
Yes
n/a
No
59 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Attic, Ceiling Ins, vented / 8.0
n/a
9,256 Btu/hr
We
18,687 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
8.00 COP
11.7 EER
Yes
n/a
No
197 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
n/a
63,655 Btu/hr
n/a
68,554 Btu/hr
Constant Volume
Yes
No
Diff. Enth (Integrated)
Constant Temp
Constant Temp
8.00 COP
11.7 EER
Yes
We
No
1, 219 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
n/a
52,019 Btu/hr
n/a
58,209 Btu/hr
Constant Volume
Yes
No
Diff. Enth (Integrated)
Constant Temp
Constant Temp
1 — 1 No I No I No
11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
1
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Viasat- Building 9 1 2/1/2013
Indicate Air Systems Type (Central, Single Zone, Packa e, VAV, or etc...)
Item or System Tags
i.e. AC-1, RTLI-1, HP-1 CBD-B9-R-HP30 CBD-B9-R-HP31 CBD-B9-R-HP32
Number of Systems 1 1 1
Indicate Pace Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
T-24 Sectio
1112 a
1'12 a
1-12(b), 112(
112 c , 115
121(b)
121(b)
121 c
1121 c
122 e
1 22e
122(f)
122(g)
123
124
8.00 HSPF
13.0 SEER / 11.4 EER
Yes
n/a
No
234 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
B.00 HSPF
13.0 SEER/ 11.4 EER
Yes
n/a
No
285 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
8.00 HSPF
13.0 SEER/ 11.4 EER
Yes
n/a
No
90 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
144 a & b
n/a
n/a
n/a
144 a & b
9,256 Btu/hr
9,256 Btu/hr
9,256 Btu/hr
144 a & b
n/a
n/a
We
144 a & b
18,385 Btu/hr
18,533 Btu/hr
18,323 Btu/hr
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
Yes
Yes
Yes
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144 f
Constant Temp
Constant Temp
Constant Temp
144 f
Constant Temp
Constant Temp
Constant Temp
144
144(i)
I ...,, . I No I No I No I
11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C
Project Name Date
Wasat- Building 9 2/1/2013
Indicate Air Systems T e (Central, Single Zone, Packa e, VAV, or etc...)
Item or System Tags
i.e. AC 1, RTU 1, HP 1)IEBERT CBD-B9-F/R-FC1/CU CBD-B9-R-HP33
Number of Systems 1 1
Indicate Paae Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T-24 Sectic
112 a
112 a
112(b), 112
112(c), 115
121(b)
12.1 b
121 c
121 c
122 e
122 e
122(f)
1•22(g)
123
124
PRESCRIPTIVE MEASURES
Calculated Design Heating Load C44 a &
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144 a &
144 a &
144(a &
144(c)
144(c)
144(c)
144 d
144 e
144 f
144 f
144
144 i
144(k)
n/a
12.0 EER
n/a
n/a
No
50 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
n/a
0 Btu/hr
We
179,682 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
8.00 HSPF
13.0 SEER/ 11.4 EER
Yes
n/a
No
415 cfm
No
No
Programmable Switch
Setback Required
Auto
n/a
Conditioned / 8.0
n/a
9,256 Btu/hr
n/a
19,357 Btu/hr
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 35 or 4 7 I
MECHANICAL VENTILATION AND REHEAT
MECH-3C
Project Name
Wasat- Building 9
Date
21112013
MECHANICAL VENTILATION (§121(b)2)
REHEAT LIMITATION (§144(d))
AREA BASIS
OCCUPANCY BASIS
VAV MINIMUM
A
Zone/System stem
B
Condition
Area
ft2
C
CFM
per
fe
D
Min CFM
By Area
B X C
E
Number
Of
Peo le
F
CFM
per
Person
G
Min CFM
by
Occupant
E X F
H
REQ'D
V.A.
Max of
D or G
1
Design
Ventilation
Air
CFM
J
50 % of
Design Zone
Supply
CFM
K
B X 0.42
CFM / ft
L
Max. of
Columns
H, J, K,
300 CFM
M
Design
Minimum
Air
Set oint
N
Transfer
Air
HP-9
1,100
0.15
165
165
165
CBD-B9-R-HP9
I
Total
165
165
HP-10
1,935
0.15
290
290
290
CBD-B9-R-HP10
Total
290
290
HP-11
1,260
0.15
189
189
189
CBD-B9-R-HP11
Total
189
189
HP-12
859
0.15
129
129
129
CBD-B9-R-HP12
Total
129
129
HP-13
1,600
0.15
240
240
240
CBD-B9-R-HP13
Total
240
240
HP-14
690
0.15
104
104
104
CBD-B9-R-HP14
Total
104
104
HP-15
625
0.15
94
94
94
CBD-B9-R-HP15
Total
94
94
HP-16
1,400
0.151
210
2101
210
Totals I
Column I Total Design Ventilation Air
C
Minimum ventilation rate par Section §1211, Table 121-A.
E
Based on fixed seat or the greater of the expected number of occupants and 50 % of the CBC occupant load foregress purposes fors aces without fixed seating.
H
Required Ventilation Air REQ'D V.A. is ttie larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G .
I
Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J
Design fan supply CFM Fan CFM x 50 % ; or the design zone outdoor airflow rate per 121.
K
Condition area fex 0.4 CFM / ft2; or
L
Maximum of Columns H, J, K, or 300 CFMI
M
N
I This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N.
Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
EnergyPro 5.1 by Ene Soft User Number., 2445 RunCode: 2013-02-01T14:17:35
ID: 3813
Pa a 36 of 41
MECHANICAL VENTILATION AND REHEAT
MECH-3C
Project Name
Wasat- Building 9
Date
2/1/2013
MECHANICAL VENTILATION (§121(b)2)
REHEAT LIMITATION (§144(d))
AREA BASIS
OCCUPANCY BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
Zone/System stem
Condition
Area
ft2
CFM
per
flx
Min CFM
By Area
B X C
Number
Of
Peo le
CFM
per
Person
Min CFM
by
Occupant
E X F
REQ'D
V.A.
Max of
D or G
Design
Ventilation
Air
CFM
50 % of
Design Zone
Supply
CFM
B X 0.4
CFM / tt2
Max. of
Columns
H, J, K,
300 CFM
Design
Minimum
Air
Setpoint
Transfer
Air
CBD-B9-R-HP16
Total
210
210
HP-17
2,100
0.15
315
315
315
CBD-B9-R-HP17
Total
315
315
HP-18
815
0.15
122
122
122
CBD-B9-R-HP18
Total
122
122
HP-19
1,475
0.15
221
221
221
CBD-B9-R-HP19
Totall
221
221
HP-20
685
0.15103
103
103
CBD-B9-R-HP20
Total
103
103
HP-21
1,500
0.15
225
225
225
CBD-B9-R-HP21
Total
225
225
HP-22
1,6801
0.15
252
1
252
630
CBD-B9-R-HP22
Total
252
630
HP-23
590
0.15
89
89
89
CBD-B9-R-HP23
Total
89
89
Totals
Column I Total Design Ventilation Air
C
Minimum ventilation rate per Section 121, Table 121-A.
E
Based on fixed seat or the greater of the ex ected number of occupants and 50 % of the CBC occupant load foregress purposes fors aces without fixed seating.
H
Required Ventilation Air REQ'D V.A. is tfis larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G .
I
Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J
Design fan supply CFM Fan CFM x 50 % ; or the design zone outdoor airflow rate per 121.
K
Condition area ft2 x 0.4 CFM / fe; or
L
Maximum of Columns H, J, K, or 300 CFNI
M
I This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N.
N
Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
EnefgyPro 5.1 by EnergySoft User Number:2445 RunCoder 2013-02-01T14:17:35
ID: 3813
Page 37 &41
MECHANICAL VENTILATION AND REHEAT
MECH-3C
Project Name
Wasat- Building 9
Date
21112013
MECHANICAL VENTILATION (§121(b)2)
REHEAT LIMITATION (§144(d))
AREA BASIS
OCCUPANCY BASIS
VAV MINIMUM
A
Zone/System
B
Condition
Area
ft2
C
CFM
per
ftZ
D
Min CFM
By Area
B X C
E
Number
Of
People
F
CFM
per
Person
G
Min CFM
by
Occupant
E X F
H
REQ'D
V.A.
Max of
D or G
Design
Ventilation
Air
CFMCFM
IKGFM
K
B X 0.4
/ ftz
L
Max. of
Columns
H, J, K,
300 CFM
M
Design
Minimum
Air
Setpoint
N
Transfer
Air
HP-24
1,415
0.15
212
212
212
CBD-B9-R-HP24
Total
212
212
HP-25
1,100
0.15
165
165
165
CBD-B9-R-HP25
Total
165
165
HP-26
660
0.15
99
99
99
CBD-B9-R-HP26
Total
99
99
HP-27
395
0.15
59
59
59
CBD-B9-R-HP27
Totall
59
59
HP-28
1,315
0.15
197
197
197
CBD-B9-R-HP28
Total
197
197
HP-29
1,300
0.15
195
195
1,219
CBD-B9-R-HP29
Total
195
1,219
HP-30
390
0.15
59
59
234
CBD-B9-R-HP30
Total
59
234
HP-31
475
0.15
71
711
285
Totals
Column I Total Design Ventilation Air
C
Minimum ventilation rate per Section §121, Table 121-A.
E
Based on fixed seat or the greater of the expected number of occupants and 500% of the CBC Occupant load foregress purposes fors aces without fixed seating.
H
Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G).
I
Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J
Desi n fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121.
K
Condition area ftz x 0.4 CFM / fe; or
L
Maximum of Columns H, J, K, or 300 CFM
M
N
EnergjPro 5.1
This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N.
Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
by EnergKSoft User Number. 2445 Run Code: 2013-02-01T14r17:35 ID: 3813 Pa a 38 of 41
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name
Wasat- Building 9
Date
2/1/2013
MECHANICAL VENTILATION (§121(b)2)
REHEAT LIMITATION (§144(d))
AREA BASIS
=OCCUPANCY BASIS
VAV MINIMUM
A
Zone/System
B
Condition
Area
ft2
C
CFM
per
ft2
D
Min CFM
By Area
B X C
E
Number
Of
People
F
CFM
per
Person
G
Min CFM
by
Occupant
E X F
H
REQ'D
V.A.
Max of
D or G
I
Design
Ventilation
Air
CFM
J
50% of
Design Zone
Supply
CFM
K
B X 0.4
CFM / ft2
L
Max. of
Columns
H, J, K,
300 CFM
M
Design
Minimum
Air
—Setpoint
N
Transfer
Air
CBD-B9-R-HP31
Total
71
285
HP-32
150
0.151
23
23
90
CBD-B9-R-HP32
Total
23
90
SERVER ROOM
1,000
0.15
150
150
50
100
LIEBERT CBD-B9-F/R-FC1/CU1
Total
150
50
HP-33
415
0.15
62
62
415
CBD-B9-R-HP33
Total
62
415
Totals Column I Total Design Ventilation Air
C
Minimum ventilation rate per Section §12'I, Table 121-A.
E
Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load forogress purposes fors aces without fixed seating.
H
Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G .
I
Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J
Design fan supply CFM Fan CFM x 50 % ;or the design zone outdoor airflow rate per 121.
K
Condition area ft2 x 0.4 CFM / it; or
L
Maximum of Columns H, J, K, or 300 CFM
M
N
I This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N.
Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M.
Energypro 5.1 by EnergySoft User Number.' 24,I5 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 39 of 41
MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C
Project Name
Wasaf- Building 9
Date
2/1/2013
CHILLER AND TOWER SUMMARY
PUMPS
Equipment Name
T e
City,
Efficiency
Tons
Ot .
GPM
BHP
Pump
Control
DHW / BOILER SUMMARY
Vol. Energy Factor Standby Loss Tank Ext.
System Name Type Distribution City. Rated Input Gals. or RE or Pilot R-Value Status
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pum Hot Water PI In Len th ft
Control
HP
T
In Plenum
Outside
Buried
Add �/' Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name
Type
city.
Output
Aux. kW
Efficiency
Out ut
Efficienc
Status
TRANE4144VC3048
Packaged DX
5
28,200
0.0
8.00 HSPF
46,000
13. 0 SEER / 11, 7 EER
Existing
TRANE 4 WCC3060
Packaged DX
5
35,2001
0.0
8.00 HSPF
58,800
13.0 SEER / 11.7 EER
Existing
TRANE 4WCC 3030
Packaged DX
4
16,100
0.0
8.00 HSPF
29,100
13.0 SEER/ 11.7 EER
Existing
TRANE WSC090
Packaged DX
3
83,2101
0.0
8.00 COP
94,000
11.7 EER
Existing
TRANS 4 WCC3036
Packa ed OX
1
19, 900
0.0
8.00 HSPF
35,000
13.0 SEER/ 11.7 EER
adsti
TRANE 4WCC 3024
Packaged DX
1
12,100
0.0
8.00 HSPF
23,7001
13.0 SEER! 11.4 EER
Existing
TRANEWSCO90
Packaged DX
1
83,2101
0.01
8.00
COP 94,000
11.7EERF
New
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN RETURN FAN
System Name
Fan Type
Economizer T a I
CFM
BHP
CFM
BHP
TRANE 4WWC3048
Constant Volume
No Economizer
1,600
0.23
none
TRANE4WCC3060
Constant Volume
No Economizer
2,000
0.25
none
TRANE 4WCC 3030
Constant Volume
No Economizer
100
0.19
none
TRANE WSC090
Constant Volume
Diff. Enth (integrated)
3,000
0.29
none
TRANE 4WCC3036
Constant Volume
No Economizer
1,200
0.21
none
TRANE 4WCC 3024
Constant Volume
No Economizer
800
0.17
none
TRANE WSC090
Constant Volume
Difi. Enth (integrated)
3,000
0.291
none
EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode., 2013-02-01T14:17:35 ID: 3813 Page 40 of 41
MECHANICAL EQUIPMENT DETAILS Part 1 of 2 Date MECH-5C
Project Name
2/1/2013
Wasat- Building 9
CHILLER AND TOWER SUMMARY
PUMPS
Equipment Name
T e
Oty,
Efficiency
Tons
Oty,
GPM
BHP
Pump
Control
DHW / BOILER SUMMARY
Vol. Energy Factor Standby Loss Tank Ext.
System Name Type Distribution City. Rated Input (Gals). or RE or Pilot R-Value Status
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pum Hot Water PI in Len th ft
Control
HP
Type
In Plenum
Outside
Buried
Add'Fi" Insulation
CENTRAL SYSTEM RATINGS
COOLING
System Name
TRANEWSC 072
T e
Packaged DX
Efficient
8.00 COP
Out ut
77,00011.7
Efficient
EER
Status
New
TRANE 4WCC 3024
Packaged DX
jW
8.00 HSPF
23,70013.0
SEER/ 11.4 EER
New
LIEBERT DS053
S lit DX
n/a 185,700
12.0 EER
Existing
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN I RETURN FAN
System Name
Fan Type
Economizer Type
CFM
BHP
I CFM
BHP
TRANE WSC 072
Constant Volume
Diff. Enth (integrated)
2,400
0.28
none
TRANE 4WCC 3024
Constant Volume
No Economizer
800
0.171
none
LIEBERT DS053
Constant Volume
No Economizer
7,500
1.90
none
�P,41
EnergyPro 5.1 by EnergySoff User Number: 2445 RunCods: 2013-02-01T14:17:35 ID: 3813 of 41
+ ��Project Address: Permit Na.:5
Information provided below refers to worla,bOW done cm the above mentioned pe only.
This `form must be cosnolete�d and returned to the 8uildin}l Division before the aermit can be issued.
Hullding Dept Fax: (760) 602-8558
Number of new or relocated %ctu s, Ira , or floor drains ............. .... I
l
New building sewer line? ...... ..: .... ., »» .......» . : G ........ ..:_.»,.». Yes No
Number of new roof drains?` M ..... .
Install/after water line? ...... ...... ........ ,..., ...._._...»........,...;...,»»»�.».....
Number of new water heaters? .
Number of new, relocated or replaced gas outlets? ....»
Number of new hose bibs? .� .
Tenant Im rovenlen l emadelu.
Number of Panels Onvolved in this proNd) Amps per panel (1r OWGd inthis Ate) -
Remodel only - (re:locatetadd outlets/switches) . . Yes No
New Construction: Number of new panels or subpanels?.»».»»»..... » •»
Amps per Panel,
Single Phase
---� . b neVomperes
Three Phase ............ . .. �....»�..»,... ».�.,� .. . ,. ........ NuUeZ new ampere s
Three Phase 460.. � .Number of new amperes_
Number of new furnaces. A1C, or heat pumps?. ..,... i......,. ». ............. ........
New or relocated duct warp? ............. Yes No
Number of new fireplaces?
Number of new exhaust fans7.. ..........
Relocate/install vent?,........ ,..
Number of new exhaust hoods? .......... .... . �.
a
Number of new boilers or compressors?....... :.-r.,. .»....» ..:...,... »,.... ,...». Number of IIP
6-iS Page 1 of 1 Rev. 03109