Loading...
HomeMy WebLinkAbout2290 COSMOS CT; ; CB150199; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 03-02-2016 Commercial/Industrial Permit Permit No: CB150199 Building Inspection Request Line (760) 602-2725 Job Address: 2290 COSMOS CT CBAD Permit Type: TI Sub Type: INDUST. Status: ISSUED Parcel No: 2130504400 Lot #: 0 Applied: 01/21/2015 Valuation: $96,864.00 Construction Type: 5B Entered By: RMA Occupancy Group: Reference # AFP13001 Plan Approved: 03/02/2016 Issued: 03/02/2016 Inspect Area PD Plan Check #:p Project Title: VIASAT-COMPILATION RECORD ' 21iA'd3 DRAWINGS FOR ANNUAL PERMIT (AFP13001)- 2236 SF OFFICE TO CL l3U125 OFFICE C l3 / 30 ?y3 --i 5YlR! Applicant: Owner: SMITH CONSULTING ARCHITECTS GRANDONA INVESTMENT ASSOCIATES L P STE 125 13280 EVENING CREEK DR SOUTH 2177 LASSEN CT SAN DIEGO CA 92128 GRAND JUNCTION CO 81507 858 793-4777 Building Permit $612.83 Meter Size Add'I Building Permit Fee $0.00 Add'I Recl. Water Con. Fee $0.00 Plan Check $428.98 Meter Fee $0.00 Add1 Building Permit Fee $0.00 SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $27.12 PFF (3105540) $0.00 Park Fee $0.00 PFF (4305540) $0.00 LFM Fee $0.00 License Tax (3104193) $0.00 Bridge Fee $0.00 License Tax (4304193) $0.00 BTD #2 Fee $0.00 Traffic Impact Fee (3105541) $0.00 BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00 Renewal Fee $0.00 PLUMBING TOTAL $49.00 Add'I Renewal Fee $0.00 ELECTRICAL TOTAL $816.75 Other Building Fee $0.00 MECHANICAL TOTAL $151.15 Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Meter Size Sewer Fee $0.00 Add'I Pot. Water Con. Fee $0.00 Redev Parking Fee $0.00 Recl. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (SB1473) Fee $4.00 HMP Fee ?? Fire Expedidted Plan Review $0.00 Green Bldg Standards Plan Chk ?? TOTAL PERMIT FEES $2,089.83 Total Fees: $2,089.83 Totall Payments To Date: $2,089.83 Balance Due: $0.00 FINAL APPROVAL Insnertnr• Date: J- -sue IClearance: NONCE Please take NONCE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as ' fees/exactions." You have 90 days from the date the pemit was issued to protest imposition of these fees/exactions. If you protest them, ym mist follow the protest procedures set forth in Govemnrerd Cade Section 66020(a), and file the protest and any other required infarration with the CQty Manager for processing in accordance with Carlsbad Wryciped Code Section 3.32.030. Failure to fimeiy follow that procedure will bar- any subsequent legal action to attack, review, set aside, void, or annol their imposition. You are hereby F-IRTd ER NOT R ED that your right to protest the specified feestexactiaris DOES NOT APPLY to water and seiner- connection fees and capacity charges, nor planning, wring, grading or other siin ilar application processing or service fees in connection with this project. NOR DOES ITAPPLY to any Zacc4% Hvrfnow -* tc5g-21T-3774- f,P, `'. Building Permit Application City ®f 163,15 Faraday Ave., Carlsbad, CA 92008 Plan Check No. Est. Value _ 1�AJ rn: �fsu-au"l-'L(1y r25 aX: /bU-bUZ-bb25 u1— s ernail: building@carisbadca.gov f � Plan Ck. Deposit ate ` sWPP www.Carlsbadca.Cv JOB ADDRESS /} 2 SUITE#/SPACE#/UNIT AP -1.4 - 6 CT/PROJECT # LOT # PHASE # # OF UNITS #-BEDROOMS # BATHROOMS TENANT I INE S NAME CONSTR. TYPE OCC. GROUP DESCRIPTION OF WORK: Include Square Feet ofAffectedi4rea(s) r J , J" (STING USE ��i PRO SED USE GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE YES ❑ #_ NO ❑ AIR CONDITIONING YES ❑ NO ❑ IFIRESPRINKLERS YES ❑ NO ❑ b APPLICANT NAME � ^�r ��c� 4/1 PROPERTY OWNER NAME Primary Contact ADPDRE�SS 43 G® 0 IJ L � ii _ V .—If — '4 1 L -Z� ADDRESS CITY STATES� Z�gr /ry, � CITY STATE ZIP P�NE FAX i � ) PHONE FAX RMAIL I k— + `. EMAIL DESIGN PROFESSIONAL NAME CO CT R US. E ADDRESS ` A D R SS �71 �C Y l // C CITY STATE ZIP CyT.I' t STATE PHONE FAX PHONE EMAIL EMAIL coWUV STA�9 LIG# ,. 0 1 STATELIC.# 5-ZG� CLAS \ Cl a -/� 1 -0 (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, pprior to its issuance, also requires the applicantfor such permit to file a signed statement that he is licensed pursuant to the provisions ofthe Contractor's License Law (Chapter 9, commendingwith Section 7000 of Division 3 of the Business and Professions Code) dr that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section (03 p5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). / 7 ` 7V 1 RV(l .�. r � /® 321MMIS S,1NV31lddVX (apo0 6u!plm8 uuqNn b'b'90l uo!loaS) sAep pgl to pound a col paouawwoo si poM a41 rage awg Aue le pauopuege jo papuadsns s! liuuad ypns Aq pa .Vf�j�p!!nq aylll jo l!uuad yonslo alep all, wog sAep Og1. u!ylnn paouawwoo lqu s! 1!uuad yens Aq pazuoylne >u i0 6u!pl!nq ayl}! p!on pue pnu awooaq pue uoilel!wg Aq andxa lleys apo0 s!yllo suo!s! 6u!plin8ay}Aqpanss!1!uuadUan3 NOIlVHIdX3-Iy6iaq u! sauols E nano samlowlslo uopongsuoo jo uog!Iowa , esuogeneoxe jol pannbai s! liuuad VHSO uVVHSO llWb3d SIH1 d0 ONIlNVHE) 3H1 d0 30N3no3SNOO NI lllO 01HS 1SNIdOH 3n1 ]OOb AVM ANV NI AdW H01HM S3SN3dX3 0NV S1S00'S1N3WOOf1P'S3111-IISVfl llHlSNIVSV OV8S-NV0d0 A110 3H1 SS3lW2iVH d3311 ONV AdINWMINI '3AVS 01332i0V OSIv I -sasodmd uopadsu! jol 4adwd pauoiluaw anoge ayl uodn ialue of pegspe0lo Alp ayl to eA!leluesaidai ezuoglne Agejay I •uogon.gsuoo; u!ppq mflugelaa sMel a;elS pue saoueu!paoAl!3lle qg mn clwoo ojm0e I •alean33e s! sueld ayl uo uogeuuolu! a glegl puepwoo s! uogewu(lul anoge otpeylalels pue uopo!ldde ayl peal aney ljeylAjgjaa I ssaippy s,iapual aweN s)apual •(9p001!n10 (!) L60£ 'oeS) pans! s! 1!wjed s!ql lions egl;o eouewjo}lad ay} jol Aoua6e 6uwpual uoipnjlsuoo a si aiagl leyl wip Agejeq I 131USIO IOH1NO3 NOI1nl1Od HIV 31-11 ONV S331AZIIS AON39H3W3 30 331330 31-11 JO S1N3 RM038 31-ll 9NI133114 SI 8013W SVH 1NV311ddV 31-11 S 3u+ fl 03nSS138 ION AVW AONVdno30 AO 31VDIAIlZI331VN13 V'S3A 3HV SH3MSNV 3H1 JO ANV A[ p ON saA ial!s loops a to Ajepunoq jalno ayl to laa1000' 6 u!yl!m palowlsuoo aq of Aj!jpel ayl sl o saA p 6louls!p luawa6euew Al!jnb �, jo louls!p jaluoo uogn1lod i!e ayl wal l!uued a ulelgo of pannbai luedn000 6ulppq ajnlnl jo lueolldde ayl sl o�fyt< saA O 613V lun000V eouelsgnS snoplezeH Jauuel-AalsaJd ayl to b£99Z to E£99Z '9099Z suogooS japun wei6ad uoguanajd pue luawa6euew Hsu jo wol uogejls!6aj sleualew snopiezey Alalnae^ueldsseu!snq a liwgns of paimbei luedn000 builopq aminl jo lupIdde eLg sl Inspection List Permit#: CB150199 Type: TI INDUST VIASAT-COMPILATION RECORD DRAWINGS FOR ANNUAL PERMIT (AFP1 Date Inspection Item Inspector Act Comments 05/05/2016 89 Final Combo - RI TALK TO MARIA ABOUT THIS!! 05/05/2016 89 Final Combo PD AP Thursday, May 05, 2016 Page 1 of 1 CB150199 2290 COSMOS CT C'TY Of CARLSBAD INSPECTION RECORD Building Division 0 INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB VIASAT-COMPILATION RECORD DRAWINGS FOR ANNUAL PERMIT (AFP13001)- 2236 SF OFFICE TO OFFICE TI INDUST Lot#: SMITH CONSULTING ARCHITECTS 0 CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION 0 FOR BUILDING INSPECTION CALL: 760-602-2725 1 b d a ov/Buildina AND CLICK ON RECORD OR GO TO• www Car s a c .g T e —fins ection Type of Inspection Yp p BUILDING Date Inspector •• ECTRICAL Date Inspector #31 ❑ ELECTRIC UNDERGROUND ❑ UFER CODE # #11 FOUNDATION #34 ROUGH ELECTRIC #12 REINFORCED STEEL #33 ❑ ELECTRIC SERVICE ❑ TEMPORARY #66 MASONRY PRE GROUT ❑ GROUT ❑WALL DRAINS #35 PHOTO VOLTAIC #39 FINAL #10 TILT PANELS CODE # MECHANICAL #11 POUR STRIPS #41 UNDERGROUND DUCTS & PIPING #11 COLUMN FOOTINGS #44 ❑ DUCT & PLENUM ❑ REF. PIPING #14 SUBFRAME ❑ FLOOR ❑ CEILING #43 HEAT -AIR COND. SYSTEMS #15 ROOF SHEATHING #13 EXT. SHEAR PANELS #49 FINAL #16 INSULATION #81 UNDERGROUND (11,12,21,31) #18 EXTERIOR LATH #82 DRYWALL, EXT LATH, GAS TES (17,18,23) #1INTERIOR LATH &DRYWALL #83 ROOF SHEATING, EXT SHEAR (13,15) #51 POOL EXCA/STEEL/BOND/FENCE #84 FRAME ROUGH COMBO (14,24,34,44) #55 PREPLASTER/FINAL #85 T-Bar (14,24,34,44) #19 FINAL Inspector #89 FINAL OCCUPANCY(19,29,39,49) PLUMBINGDate CODE # Date Inspector #22 ❑ SEWER & BL/CO ❑ PL/CO #21 UNDERGROUND ❑WASTE ❑ WIR #24 TOP OUT ❑WASTE ❑ WTR A/S UNDERGROUND VISUAL A/S UNDERGROUND HYDRO #27 TUB & SHOWER PAN A/S UNDERGROUND FLUSH #23 ❑ GASTEST ❑ GAS PIPING A/S OVERHEAD VISUAL #25 WATER HEATER A/S OVERHEAD HYDROSTATIC #28 SOLAR WATER #29 FINAL A/S FINAL F/A ROUGH -IN CODE* STORM WATER #600 PRE -CONSTRUCTION MEETING FL FIXED XED EEXTINGUISHING SYSTEM ROUGH -IN #603 FOLLOW UP INSPECTION FIXED EXTING SYSTEM HYDROSTATIC TEST #605 NOTICE TO CLEAN FIXED EXTINGUISHING SYSTEM FINAL #607 WRITTEN WARNING MEDICAL GAS PRESSURE TEST #609 NOTICE OF VIOLATION #610 VERBALWARNING M ED [CAL GAS FINAL SEE BACK FOR SPECIAL NOTES REV 10/2012 EsGil Corporation In (Partnership with ('Government for ouiffing Safety DATE: 2/4/2016 ❑ APPLICANT Ifj/JURIS. JURISDICTION: City of Carlsbad ❑ PLAN REVIEWER ❑ FILE PLAN CHECK NO.: 15-0199 SET: III PROJECT ADDRESS: 2290 Cosmos Court PROJECT NAME: ViaSat T. 11. ® The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's buildling codes. ❑ The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ❑ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ❑ The applicant's copy of the check list has been sent to: ® EsGil Corporation staff did not advise the applicant that the plan check has been completed. ❑ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: — Date contacted: Mail Telephone Fax Telephone #: (by,,)_S) In Person Email: ® REMARKS: Please slip revised City III set (at building department -mechanical and electrical sheets) into City II set. (at building department) By: David Yao Enclosures: EsGil Corporation ❑ GA ® EJ ❑ MEI ❑ PC 1/28 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 u EsGil Corporation In Tartnership with Government for (Building Safety DATE: 1/5/2016 JURISDICTION: City of Carlsbad PLAN CHECK NO.: B15-0199 SET: II PROJECT ADDRESS: 2290 (`.osmos Court PROJECT NAME: ViaSat T. 11. ❑ APPLICANT JURIS. ❑ PLAN REVIEWER ❑ FILE ❑ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. ❑ The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ® The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ® The applicant's copy of the check list has been sent to: Mark Langan ❑ EsGil Corporation staff did not advise the applicant that the plan check has been completed. ® EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Mark Langan ate contacted: t (bW \�) 11t)Mail leph e Fax In Person ❑ REMA . By: David Yao EsGil Corporation ❑GA ®EJ ❑ME3 ❑PC Telephone #: 858-793-4777 Email: markl@sca-sd.com Enclosures: 12/24 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 City of Carlsbad B:15-0199 1/5/2016 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in bold font are current. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. PLUMBING, MECHANICAL, ELECTRICAL, and ENERGY COMMENTS PLAN REVIEWER: Eric Jensen 01/05/2016: Plan check response was to "See attached electrical and mechanical response letter". No letter received. MECHANICAL (2013 CALIFORNIA MECHANICAL CODE) 1. If compliance with CEC Article 645 is part of the electrical design be sure to include the mechanical requirements found in 645.4 (equipment shut-off and rated separation) are shown. 2. Provide smoke detection in the supply air duct of an "air -moving system" for required shut-off of equipment for smoke control. CMC Section 608.1 Check the floorplan layout, some units are shown with SD, others are not. Due to the rearrangement of the floorplan additional units may require SD's. ♦ An "air -moving system" is a system designed to provide heating, cooling, or ventilation in which one or more air -handling units are used to supply air to a common space or to draw air from a common plenum or space. 3. There are assembly, development and lab labs shown on the floorplans with no exhaust systems, just standard recirculation systems with a small amount of outside air added. Please explain the use of these labs so as to warrant no exhaust systems. City of Carlsbad B 15-0199 1/5/2016 4. Likewise no exhaust at the lunchroom? Is this correct? ELECTRICAL and ENERGY COMMENTS PLAN REVIEWER: Eric Jensen ELECTRICAL (2013 CALIFORNIA ELECTRICAL CODE) 5. Fully describe the UPS battery system on the plans. It may need to be installed in a rated room per CBC 509 Table specifications. (Sheet 1-E3.1.) 6. Does Article 645 (Information Technology Equipment) apply to any of these rooms? If so, detail all requirements: Rated separation, disconnect switches, etc for the appropriate rooms. 7. Panelboard 1 PK will require a main disconnect. As an aside, interesting to only a very few people, a service panel may now revert to the six handle rule. Previous Code cycles allow a maximum of two main disconnects to protect a service panelboard. ENERGY COMMENTS 8. Provide an updated (current energy design) for the changes to the mechanical equipment. Note: If you have any questions regarding this Electrical, Plumbing, Mechanical, and Energy plan review list please contact Eric Jensen at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. END OF DOCUMENT EsGil Corporation In (Partnership with Government for Building Safety DATE: 2/2/2015 ❑ APPLICANT X JURIs. JURISDICTION: City of Carlsbad ❑ PLAN REVIEWER ❑ FILE PLAN CHECK NO.: 5(15-0199 SET: I PROJECT ADDRESS: 2290 Cosmos Court PROJECT NAME: ViaSat T. I. ❑ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. ❑ The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ® The check list transmitted) herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ® The applicant's copy of the check list has been sent to: Mark Langan ❑ EsGil Corporation staff did not advise the applicant that the plan check has been completed. ® EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Mark Langan Telephone #: 858-793-4777 /Date contacted: 7-13 (by. Email: markl@sca-sd.com JI&Mail i phoneFax In Person ❑ REMARW- By: David Yao Enclosures: EsGil Corporation ❑ GA ® EJ ❑ MB ❑ PC 1/23 9320 Chesapeake Drive, Suite; 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 City of Carlsbad B 15-0199 2/2/2015 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: B15-0199 OCCUPANCY: B TYPE OF CONSTRUCTION: VB ALLOWABLE FLOOR AREA: SPRINKLERS?: Y REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 2/2/2015 FOREWORD (PLEASE READ): JURISDICTION: City of Carlsbad USE: office ACTUAL AREA: T. I. 2236 STORIES: 2 HEIGHT: OCCUPANT LOAD: DATE PLANS RECEIVED BY ESGIL CORPORATION: 1/23 PLAN REVIEWER: David Yao This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state 'laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. City of Carlsbad B 15-0199 2/2/2015 Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. Provide a statement on the Title Sheet of the plans, stating that this project shall comply with the 2013 California Building Code, which adopts the 2012 IBC, 2012 UMC, 2012 UPC and the 2011 NEC. 2. Provide a note on the plans indicating if any hazardous materials will be stored and/or used within the building which exceed the quantities listed in IBC Tables 307.1(1) and 307.1(2). 3. Provide a fully, dimensioned site plan drawn to scale. Sec. 107.2. Include the following: a) Clearly dimension building setbacks from property lines, street centerlines, and from all adjacent buildings and structures on the site plan. b) North arrow. c) Property lines/easements. d) Streets/alleys. e) Existing and proposed buildings and structures. 4. Provide a statement on the site plan stating: "All property lines, easements and buildings, both existing and proposed, are shown on this site plan." 5. Clearly designate any side yards used to justify increases in allowable area based on Section 506.2.(60 feet all sides?) 6. Note on the plans: "All egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort." Section 1008.1.9. In lieu of the above, in a Group B, F, M or S occupancies (or places of religious assembly or Group A occupancies having an occupant load of 300 or less), you may note on the plans "Provide a sign on or near the exit door, reading THIS City of Carlsbad E3 15-0199 2/2/2015 DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED." This signage is only allowed at the main exit. Section 1008.1.9.3. 7. Each door in a means of egress from an occupancy of Group A having an occupant load of 50 or more (and any occupancy of Group H) shall not be provided with a latch or lock unless it is panic hardware. Section 1008.1.10.(door 9033A, 9033B,) 8. Provide notes and details on the plans to show compliance with the enclosed "Disabled Access" Review List. 9. Please refer to the following corrections for mechanical, electrical and energy items. 10. To speed up the review process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 11. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changers been made to the plans not resulting from this correction list? Please indicate: ❑ Yes ❑ No 12. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact David Yao at Esgil Corporation. Thank you. PLUMBING, MECHANICAL, ELECTRICAL, and ENERGY COMMENTS PLAN REVIEWER: Eric Jensen PLUMBING (2013 CALIFORNIA PLUMBING CODE) ♦ Plumbing is okay as submitted. MECHANICAL (2013 CALIFORNIA MECHANICAL CODE) 1. If compliance with CEC Article 645 is part of the electrical design be sure to include the mechanical requirements found in 645.4 (equipment shut-off and rated separation) are shown. 2. Provide smoke detection in the supply air duct of an "air -moving system" for required shut-off of equipment for smoke control. CIVIC Section 608.1 Check the City of Carlsbad B,15-0199 2/2/2015 floorplan layout, some units are shown with SD, others are not. Due to the rearrangement of the floorplan additional units may require SD's. ♦ An "air -moving system" is a system designed to provide heating, cooling, or ventilation in which one or more air -handling units are used to supply air to a common space or to draw air from a common plenum or space. 3. There are assembly, development and lab labs shown on the floorplans with no exhaust systerns, just standard recirculation systems with a small amount of outside air added. Please explain the use of these labs so as to warrant no exhaust systems. 4. Likewise no exhaust at the lunchroom? Is this correct? ELECTRICAL and ENERGY COMMENTS PLAN REVIEWER: Eric Jensen ELECTRICAL (2013 CALIFORNIA ELECTRICAL CODE) 5. Fully describe the UPS battery system on the plans. It may need to be installed in a rated room per CBC 509 Table specifications. (Sheet 1-E3.1.) 6. Does Article 645 (Information Technology Equipment) apply to any of these rooms? If so, detail all requirements: Rated separation, disconnect switches, etc for the appropriate rooms. 7. Panelboard 1 PK will require a main disconnect. As an aside, interesting to only a very few people, a service panel may now revert to the six handle rule. Previous Code cycles allow a maximum of two main disconnects to protect a service panelboard. ENERGY COMMENTS 8. Provide an updated (current energy design) for the changes to the mechanical equipment. Note: If you have any questions regarding this Electrical, Plumbing, Mechanical, and Energy plan review list please contact Eric Jensen at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. City of Carlsbad B: 15-0199 2/2/2015 DISABLED ACCESS REVIEW LIST DEPARTMENT OF STATE ARCHITECT TITLE 24 REMODELS, ADDITIONS AND REPAIRS When alterations, structural repairs or additions are made to an existing building, that building, or portion of the building affected, is required to comply with all of the following requirements, per Section 11 B-202.4: The area of specific alteration, repair or addition must comply as "new" construction. • A primary entrance to the building and the primary path of travel to the altered area. must be shown to comply with all accessibility features. • The path of travel shall include the existing parking. END OF DOCUMENT City of Carlsbad B 15-0199 2/2/2015 (DO NOT PAY— THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK NO.: B15-0199 PREPARED BY: David Y'ao DATE: 2/2/2015 BUILDING ADDRESS: 2*12190 Cosmos Court BUILDING OCCUPANCY: B BUILDING PORTION ARE,A7 ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) office t. I. 2236 43.32 96,864 Air Conditioning Fire Sprinklers TOTAL VALUE 96,864 Jurisdiction Code Icb IBy Ordinance Bldg. Permit Fee by Ordinance" Plan Check Fee by Ordinance Type of Review: F�] Complete Review ❑ Repetitive Fee Repeats ❑ Other ❑ Hourly EsGil Fee ❑ Structural Only Hr.@* $609.31 $396.05 Comments: Sheet 1 of 1 maevalue.doc + CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE:01/27/2015 PROJECT NAME: VIA SATAFP13001 PROJECT ID: CB150199 PLAN CHECK NO: I SET#: I ADDRESS: 2290 COSMOS CT APN: 213-050-44-00 VALUATION: $582,741 This plan check review is complete and has been APPROVED by the ENGINEERING Division. A Final Inspection by the Division is required Yes V No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: MARKLE@SCA- SD.COM "You may also havc, corrections frorn one or nnore of the divisions listed below. Approval from these divisions gnu ,T,y be required prior to the issuance of a building permit. Piesubmitted,"-dans shoifid include corrections from all divisiorlis. For questions or clarifications, on the attached checklist please contact the following reviewer as marked: Chris Sexton Kathleen Lawrence Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Chris.Sexton@carisbadca.gov Kathleen.Lawrence@carisbadca.gov Gregory. Ryan@carisbadca.gov Gina Ruiz Linda Ontiveros Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.�ov Linda.0nflveros@carlsbadcg.g_oy Cvnthia.Won@carisbadca.gov ov ValRay Marshall Dominic Fieri 760-602-2773 760-602-4664 VaiRay.Marshail@carisbadca.gov Dorninic.Fieri@carj,sb .,.?Ldca.g 9,v Remarks: Development Services BUILDING PLANCHECK Land Development Engineering I0 CHECKLIST 1635 Faraday Avenue C TY F 760-602-2750 QUICK-CHECK/APPROVAL CARLSBAD www.carisbadca.gov ENGINEERING Plan Check for CIB1 50199 Project Address: 2290 COSMOS CT Project Description: COMPILATION OF DRAWINGS FOR THE AFP13001 PERMIT -ALL TI OFFICE TO OFFICE ENGINEERING Contact: VALRAY MARSHALL Phone: 760-602-2773 RESIDENTIAL INTERIOR RESIDENTIAL ADDITION MINOR (<$,'?0,000.00) I CARLSBAD PREMIER OUTLETS OTHER: GYM Date: 01/27/2015 APN: 213-050-44-00 Valuation: $582,741 Email: VALRAY, MARS HALL@CARLS BA DCA. GOV Fax: 760-602-1052 yVJENANTIMPROVEMENT 1� PLAZA CAMINO REAL COMPLETE OFFICE BUILDING r- - -- - -- - -- - -- - -- - -- - - -- - -- - -- - -- - - - -- - -- OFFICIAL USE ONLY ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT BY: VALRAY MARSHALL DATE:01/27/2015 REMARKS: Fee Calculation Worksheet ENGINEERING DIVISION Prepared by: Date: 01/27/2015 GEO DATA: LFIVIZ: / B&T: Address: 2290 COSMOS CT Bldg. Permit#: CB150199 Fees Update by: Date: 01/27/2015 Fees Update by: Date: 01127/2011 EDU CALCULATIONS: List types and square footages for all uses, Types of Use: Sq,Ft./Units EDU's: Types of Use: Sq,Ft./Units EDU's: Types of Use: Sq,Ft./Units EDU's: Types of Use: Sq,Ft./Units EDU's: ADT CALCULATIONS: List types and square footages for all uses. Types of Use: Sq.Ft,/Units ADT's: Types of Use: Sq.Ft./Units ADT's: Types of Use: Sq.Ft./Units ADT's: Types of Use: Sq.Ft./Units ADT's: FEES REQUIRED: Within CFD:, YES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) NO 1. PARK -IN -LIEU FEE:NW QUADRANT NE QUADRANT -SE QUADARANT '---SW QUADRANT ADT'S/UNITS: X FEE/ADT: i =$ 2.TRAFFIC IMPACT FEE: ADT'S/UN7S: I X FEE/ADT: =$ 3, BRIDGE & THOROUGHFARE FEE: DIST. #1 DIST.#2 DIST.#3 ADT'S/UNITS: FEE/ADT: W1 4. FACILITIES MANAGEMENT FEE ZONE: ADT'S/UNITS: I X FEE/SQ,FT./UNIT: 77 5. SEWER FEE EDU's X FEE/EDU: BENEFIT AREA: EDU's I x 6. DRAINAGE FEES: PLDA: ACRES: I x 7. POTABLE WATER FEES: UNITS I CODE FEE/EDU: HIGH FEE/AC: =$ MEDIUM 1 =$ CONN. FEE I METER FEE I SDCWA FEE I TOTAL M PLANNING DIVISION BUILDING PLAN CHECK Planning Division CITY OF APPROVAL 1635 Faraday Avenue (760) 602-4610 CARLSBAD P-29 www.carlsbadcaxov DATE: 1-22-15 PROJECT NAME: PROJECT ID: PLAN CHECK NO: CB 11.5-0199 SET#: I ADDRESS: 2290 Cosmos Ct APN: 213-050-44-00 This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required [-] Yes M No You may also have corrections from one or more of the divisions listed below. Approv] from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from a// divisions. This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: markl@sca-sd.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: Z Chris Sexton Kathleen Lawrence ❑ Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carisbadca.gov Ej Gina Ruiz F] Linda Ontiveros El Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carisbadca.gov Linda.Ontiveros@carisbadca.gov Cynthia.Wong@carlsbadca.gov El Dominic Fieri 760-602-4664 Dominic.Fieri@carisbadca.gov Remarks: CITY OF CARLSD/-%D PLAN CHECK REVIEW TRANSMITTAL COMCOWYEconomic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 02/12/2015 PROJECT NAME: VIASAT - COSMOS CT PROJECT ID: CB150199 PLAN CHECK NO: 1 SET#:1 ADDRESS: 2290 COSMOS CT APN: 213-050-44-00 ® This plan check review is complete and has been APPROVED by the FIRE Division. By: G R A Final Inspection by the FIRE Division is required ® Yes ❑ No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: M. LANGAN -SCA You may also have corrections from one or more of the divisions listed below. Approval from these divisions may, be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: ❑ Chris Sexton ❑ Kathleen Lawrence ❑ Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Chris.Sexton@carlsbadca. ov Kathleen.Lawrence@carlsbadca.eov Gregory.Ryan@carlsbadca.gov ❑ Gina Ruiz ❑ Linda Ontiveros ❑ Cindy Wong 760-602-4675 Gina.Ruiz@carlsbadca.gov 760-602-2773 Linda.Ontiveros@carlsbadca.gov 760-602-4662 Cynthia.Wong@carlsbadca.gov ❑ ❑ ❑ Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Carlsbad Fire Department Plan Review Requirements Category: TI , INDUST Date of Report: 02-12-2015 Name: SMITH CONSULTING ARCHITECTS Address: 13280 EVENING CREEK DR SOUTH STE 125 SAN DIEGO, CA 92128 ATTN: MARK LANGAN Permit #: CB150199 Job Name: VIASAT-COMPILATION RECORD Job Address: 2290 COSMOS CT CBAD Please review carefully all comments attached. Conditions: CITY OF CARLSBAD FIRE DEPARTMENT - APPROVED: Reviewed by: , A Q�r THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL. APPLICABLE REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. At or prior to Final Fire and Building; inspection an Emergency lighting facilities test shall be conducted by CFD personnel during pre -dawn or dusk hours when ambient light is at 0.00 Lux or 0.0 Foot-candle. This test shall be conducted to test the initial loss of power reading of illumination that is at least an average of 1 foot candle (11 lux) and a minimum of 0.1 foot-candle (1 lux) measured along the path of egress at the floor level. And tested after 60-minutes to 0.6 fc (6 lux). Failure to provide sufficient lighting in egress aisles, corridors, exit enclosures, exit passageways and stair enclosures is the AOR's responsibility. CFC Ch. 10, Sec. 1006. ** Please note that the incorrect code citations were made and the title sheets for each area indicate the wrong address. I will not require revision and will defer these items to the building plan checker in the interest of conservation. However, as the architect of record it is your responsibility to ensure that the plans have the correct information. Entry: 02/12/2015 By: GR Action: AP Z C C Q cu � LO M � � ' N C r V C;)= n 'E Q O W c ` c0-7 4 Y 0 W Z E J O c U N: O C H O O= 0 O (� Coe) > > cn J > Y xx E Q m U f�6 W O 2 ~ W O N `� C >, cL C N O Q U O NU) LO U Q — C C °) O E a)' g U LO co LO UN CDO LO m LO LO M LO 0) O M N m Lp C r a o o� W 2 U' Q x ` O co � N 11O lon' n M ti N T LU LLJ > C N C9 CL O x LOO V O M LCn M� v c O Q LL U W r N �. U U Z r C-4m OU ZO LL U o E2 LO Ln LO LO � L2 Ln L2 Z �I a OU '..� Z 0 0 N a W W CL E O M V N 0 6� °o CO v a zW J L r Z z N Z Q x o c� nzU x aomNOLO�Mrn M2 0 W W ��Qm J a m Ci LE ` N � � r a LE U Q o 06 0 0 0 0 0 V ca Q c Z m o o N 0 � 0 LO LO Ln l!i O lf� M O M a � Q COO N CO a, O U mE r N M '7 Ln COT W Q C m °U N c a- a� a� a� a� a� a- 1 c 3 G �E O 7 7 O a) U c a)a U o o U c U U) E O Q C �G Q m E C o U En z U aa) a) a Q a) E E cm c 00 ` O c U) Z 0) E t6 °' Q U U O c m a a) O m U o w = a) m Q U U c E 0 Q m o U C O c C m N N c ° C o a) � ``' U c o a a) a a) a - ° ° > m a) E 0)-0 o U a m U .� C U () 3 -C = cu .`L O + C a) U) U)m °' E t co 0 E of ° a) C a3 O 0 ° j 0 0 n O U c O �' Z O ° a) U c �_ a) O — C O ` ° a) Q G o a) c o N > O O -C +� co a) Q p E a) N _ U N C O U aci ° m ` a) - .° U C O C (a •� a) H Q ~ ° C7 +� ° r c' aa)i N 7 0 t c �= CO) -C U — L O U 0 o Q° LO x 0 O U° a) U m 0 � O N C `) a) 0) W E Y O C ° L ° a a -a) C c0 U a) N d= O O m cu a Q O E C> y C Q0 c0 N c O C M U x c E r a) a) � Co � w co � a :3 CO -0 C 70 a) C L a)O_ O o U E O > x c > a) o � E E E =mom n co C E m Q'm2 O ° U .a) a) c �_ ��o �n'°)�x , rmE c — mEW ° � U� Imo— I` U U W=— Y J z 2' �cf) a LLo Z 0 C) Im Ii1 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1 C Project Name Date Viasat- Building 9 21112013 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 2290 Cosmos Court Carlsbad CA Climate Zone 07 26,929 n/a GENERAL INFORMATION Building Type: m Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ❑ New Construction ❑ Addition ❑ Alta ratty STATEMENT OF COMPLIANCE _. This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This i f certificate applies only to a Building using the performance compliance approach. The documentation author herebycertifies that the documentation is accurate and complete. Documentation Author Name Javier R. Ares Signature w= Company McPARLANE & ASSOCIATES, INC. Date 21112013 Address 4830 Viewridge Ave San Diego CA 92123 Phone 858 277 9721 City/State/Zip The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ® sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name SCA Signature zzK.40'1 Company Date / Address 0 S License # C%7 61 City/State/Zip QtEdd Phone 20-- 2 -V77 Principal Mechanical Designelr Name Doug Isaaks Signature Company McParlane & Associates Date 01-19-14 Address 4830 Viewridge Ave License # 30090 City/State/Zip San Diego, CA Phone 858 277 9721 Principal Lighting Designer Name Signature Company Lighting Compliance Not In The Scope Of This Submittal Date Address License # City/State/Zip Phone INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) m ENV-1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans. ❑ LTG-1 C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. ❑ LTG-2C Lighting Controls Credit Worksheet. ® MECH-3C Mechanical Ventilation and Reheat. ❑ LTG-3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details. EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 1 of 41 PERFORMANCE CERTIFICATE OF COMPLIANCE Wasat- Building 9 ANNUAL TDV ENERGY USE SUMMARY (kBtu/sqft-yr) Standard Proposed Compliance Energy Component Design Design Margin Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS 0.05 0.05 0.00 163.86 157.30 6.56 70.54 69.86 0.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.55 50.55 0.00 74.01 74.01 0.00 397.92 397.92 0.00 0.00 0.00 0.00 756.94 749.69 7.24 Percent better than Standard 1.0 % ( 2.0 % excludi GENERAL INFORMATION Part 2 of 3 Heating Cooling Fans Heat Rej Pumps DHW Lighting Receptacle Process Process Ltg PERF-1 C Date 21112013 BUILDING COMPLIES I Building Orientation (N) 0 deg Conditioned Floor Area 26,929 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 26 Conditioned Footprint Area 0 sqft. Number of Zones 26 Natural Gas Available On Site Yes Front Elevation Left Elevation Rear Elevation Right Elevation Total Roof Orientation Gross Area (N) Z 900 (E) 2,220 (s) 2,690 (W) 1,300 9,110 17,895 Prescriptive Lighting Power Density Prescriptive Envelope TDV Energy Remarks: Standard _ __ 0.8'93 W/sgft. 438,786 sqft. sqft. sqft. sqft. sqft. sqft. G127inn Area 585 585 831 475 2,476 0 Proposed 0.8913 W/sgft. 764, sqft. sqft. sqft. sqft. sqft. sqft. Glazina Ratio 20.2 % 26.4 % 30.9 % 36.5 % 27.2 % 0.0 % Prescriptive Values for Comparison only. See LTG-1 C for allowed LPD. 5.1 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1 C Project Name Viasat- Building 9 Date 21112013 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area s ft. Inst. LPD W/sf' Ctrl. Credits W/sf 2 Allowed LPD Proc. Loads W/sf Area W/sf 3 Tailored W/sf a CBD-B9-R-HP9 HP-9 Office > 250 sgft 1,100 *0.900 CBD-B9-R-HP10 HP-10 Office > 250 sgft 1,935 *0.900 CBD-B9-R-HP11 HP-11 Office > 250 sgft 1,260 *0.900 CBD-B9-R-HP12 HP-12 Office > 250 sgft 859 *0.900 CBD-B9-R-HP13 HP-13 Office > 250 sgft 1,600 *0.900 CBD-B9-R-HP14 HP-14 Office > 250 sgft 690 *0.900 CBD-B9-R-HP15 HP-15 Office > 250 sgft 625 *0.900 CBD-B9-R-HP16 HP-16 Office > 250 sgft 1,400 *0.900 CBD-B9-R-HP17 HP-17 Office > 250 sgft Z 100 *0.900 CBD-B9-R-HP18 HP-18 Office > 250 sgft 815 *0.900 25.000 CBD-B9-R-HP19 HP-19 Office > 250 sgft 1,475 *0.900 25.000 CBD-B9-R-HP20 HP-20 Office > 250 sgft 685 *0.900 CBD-B9-R-HP21 HP-21 Office > 250 sgft 1,500 *0.900 CBD-B9-R-HP22 HP-22 Office > 250 sgft 1,680 *0.900 CBD-B9-R-HP23 HP-23 Office > 250 sqft 590 *0.900 CBD-B9-R-HP24 HP-24 Office > 250 sgft 1,415 *0.900 CBD-B9-R-HP25 HP-25 Office > 250 sgft 1,100 *0.900 50.000 CBD-B9-R-HP26 HP-26 Office > 250 sgft 660 *0.900 10.000 CBD-B9-R-HP27 HP-27 Office > 250 sgft 395 *0.900 CBD-B9-R-HP28 HP-28 Office > 250 sgft 1,315 *0.900 25.000 Notes: 1. See LTG-1 C 2. See LTG-2C 3. See LTG-3C 4. See LTG-4C items marked with asterisk, see LTG-1 -C b others) b others) Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System TRANE WSC 072 includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 3 of 41 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1 C Project Name Wasat- Building 9 Date 2/1/2013 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area s ft. Inst. LPD W/sf' Ctrl. Credits W/sf 2 Allowed LPD Proc. Loads W/sf Area W/sf 3 Tailored W/sf a CBD-B9-R-HP29 HP-29 Office > 250 sgft 1,300 *0.900 CBD-B9-R-HP30 HP-30 Office > 250 sgft 390 *0.900 CBD-B9-R-HP31 HP-31 Office > 250 sgft 475 *0.900 CBD-B9-R-HP32 HP-32 Office > 250 sgft 150 *0.900 15.000 LIEBERT CBD-B9-F/R-FC11 SERVER ROOM Electrical, Mechanical Room 1,000 *0.700 50.000 CBD-B9-R-HP33 HP-33 Office > 250 sgft 415 *0.900 15.000 Notes: 1. See LTG -IC 2. See LTG-2C 3. See LTG-3C 4. See LTG-4C items marked with asterisk, see LTG-1-C b others b others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pall special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01T14:17.35 ID: 3813 Page 4 of 41 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 1 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces Bldg. ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID AssemblyType a fA O z V U. 7 t6 c� cc r- O X R w> O C X O w u. O O "O' R 5> O r r u C 'p Q a N O U a u 1 Wall 305 (lM 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 2 Wall 225 (N) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 3 Wall 680 (S) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 4 Wall 420 (S) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 5 Wall 624 (S) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 6 Wall 135 (S) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 7 Wall 495 (E) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 8 Wall 840 (E) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 9 Roof 1,400 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 10 Roof 2,100 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type w " a O •C N w O Z O � C.1 LL 2> a 5 i ca 4 o > N V S R ^� M °� V i 1:o N N r i > O C '+0 •a 7 o U 6 a u_ 1 Window 475 (W) 1 1.190 Defaultl 0.830 Default ❑ Existing ❑ ❑ 2 Window 831 (S) 1.190 Default 0.830 Default ❑ Existing ❑ ❑ 3 Window 585 (E) 1.190 Default 0.830 Default ❑ Existing ❑ ❑ 4 Window 585 (N) 1.190 Default 0.830 Default ❑ Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 5 of 41 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: EI Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces Bldg. ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID /ID Assembly Type Y- y a C N N W O z V LL � Y j R 0 of CE .O 7 w> C N d w L 0 0 7 > 0= .O v_ X a O C R 0 v) W a LL 11 Wall 285 (N) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 12 Roof 815 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 13 Roof 1,475 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 14 Wall 545 (N) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 15 Roof 685 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 16 Roof 1,500 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 17 Roof 1,680 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 18 Wall 215 (N) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 19 Roof 590 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 20 Wall 450 (N) 0.110 R-11 4.3.1-A2 Existing 1 ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type y a C ' Z o 0 R LL M> 0 LL o > N w E n T oo N N > O w o , 06 m a m v_ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. if Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by Energ Soft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 6 of 41 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Wasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School ® Conditioned Spaces ❑ Unconditioned Spaces I3ld . ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID AssemblyType i1 B C N N U i O z V V. D Z 3 .5 > l0 0 cc V y d 7 X 1C w> c .O L X 7 w a cc O O •Gf O lC �> OT •G7 •r- 7 c U- X O Q. p = -, a i= O R U rn N lC a. tC LL 21 Roof 1,415 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 22 Wall 385 (lM 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 23 Roof 1,100 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 24 Wall 135 (M 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 25 Roof 660 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 26 Wall 195 (N) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 27 Wall 300 (E) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 28 Roof 395 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 29 Wall 400 (N) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 30 Roof 1,315 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Tye _ yr.. a _ O •y ui c gZ O r; > 0 "- o' > cn /U/�� 2 R� M 0 0 s o O N > O O o ;° U w a a a_ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 7 of 41 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Wasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: EI Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces Bldg. ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: IN, E, S, W or in Degrees: o deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly Type 10 ¢ 0 _ dw O z p D y to 0 Cr C d w> m w LL 5> i i 5 LL K $ Q -, a c O L) cn y a LL 31 Roof 1,300 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 32 Roof 390 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 33 Roof 475 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 34 Roof 150 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 35 Roof 450 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Tye N O W O i LL L LL oX V ^r Lc> n o 0) .2V >L C 7? o G : Q. R LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 8 of 41 CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV-1 C Project Name Viasat- Building 9 Date 21112013 ROOFING PRODUCT (COOL ROOFS) (Note if the roofing product is not CRFiC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or ❑ SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV-2C. El ❑ ❑ ❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assemblybelow, Column H of ENV-2C. ❑ [3 The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are ted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www.ener .ca. ov/title24/ ❑exem ❑Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from❑the Cool Roof criteria below.❑ EE313 High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low -sloped roofing criteria. ❑ 1. If Fail then describe on this page of the (Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope < 2:12 > 2:12 Product Weight < 51b/ft2 >_ 5lb/ft2 Product Type 2 Aged Solar Reflectance3 Thermal Emmitance SRI' Pass Fai16 ❑ ❑ ❑ ❑ ❑4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑4 ❑ ❑ ❑ ❑ ❑ ❑ ❑4 ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ 4 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.org/products/search.iohp 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available !in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(p;n;f;ai — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.energV.ca.aoy/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies: EnergyPro 5.1 by EnerqySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 9 of 41 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Wasat- Building 9 Date 21112013 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV-2A Test Performed By: Fenestration Products Name or ID Requiring Testing or Verification Area of like Products Building Envelope Acceptance Test 13 13 13 13 13 11 13 13 11 11 13 11 EnergyPro 5.1 by EnergySoft User Number.- 2445 RunCode: 2013-02-01 T14:17.35 1D: 3813 Page 10 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-9 C FIELD INSPECTION ENERGY CHECKLIST Project Name Wasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. ® Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: IN, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP9 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 28,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity'. 46,000 Btu/hr ❑ ❑ .Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ Equipment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP10 ❑ ❑ -Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity'- 35,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 58,800 Btu/hr ❑ ❑ -Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro5.1byEnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 11 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-9 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP11 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity'. 28,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 46,000 Btu/hr ❑ ❑ .Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ Equipment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP12 ❑ ❑ -Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 16,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 29,100 Btu/hr ❑ ❑ -Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 12 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP13 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 35,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity'- 58,800 Btu/hr ❑ ❑ -Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP14 ❑ ❑ Equipment Type 3 : Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 28,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 46,000 Btu/hr ❑ ❑ -Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 13 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad' Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E uipment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP15 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 16,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 29,100 Btu/hr ❑ ❑ .Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP16 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 35,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity'- 58,800 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. 1EnergyPro5.1byEnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Pa e 14 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP17 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 83,210 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 COP ❑ ❑ Max Allowed Cooling Capacity' 94,000 Btu/hr ❑ ❑ -Cooling Efficiency' 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ Equi ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP18 ❑ ❑ Equipment Type 3 : Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 83,210 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 COP ❑ ❑ Max Allowed Cooling Capacity' 94,000 Btu/hr ❑ ❑ -Cooling Efficiency' 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 15 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad' Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV Ener ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: o deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E uipment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP19 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 83,210 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 COP ❑ ❑ Max Allowed Cooling Capacity' 94,000 Btu/hr ❑ ❑ .Cooling Efficiency' 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E uipment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags AC-1, RTU-1, HP-1 CBD-B9-R-HP20 ❑ Eli.e. -Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity-' 16,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 29,100 Btu/hr ❑ ❑ -Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party :shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. 1EnergyPro5.1byEnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 16 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU 1, HP-1 CBD-B9-R-HP21 ❑ ❑ Equipment Type 3 : Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 35,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 58,800 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP22 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 35,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 58,800 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 17 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. ® Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 10 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP23 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity'. 16,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 29,100 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP24 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 28,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 46,000 Btu/hr ❑ ❑ -Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, :iplit), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 18 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. ® Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP25 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity'- 28,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 46,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ Equi ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason2 Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP26 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 19,900 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 35,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, ;iplit), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Pa e 19 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: o deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP27 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 12,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 23,700 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.4 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E uipment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP28 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 83,210 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 COP ❑ ❑ Max Allowed Cooling Capacity' 94,000 Btu/hr ❑ ❑ Cooling Efficiency' 11.7 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use (Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 20 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. ® Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP29 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity'. 68,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 COP ❑ ❑ Max Allowed Cooling Capacity' 77,000 Btu/hr ❑ ❑ Cooling Efficiency' 11.7 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E uipment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason2 Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP30 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 12,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 23,700 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.4 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 217774171 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Decfrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP31 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity'. 12,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 23,700 Btu/hr ❑ ❑ .Cooling Efficiency' 13.0 SEER/ 11.4 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP32 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 12,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 23,700 Btu/hr ❑ ❑ -Cooling Efficiency' 13.0 SEER / 11.4 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 22 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 LIEBERT CBD-B9-F/R-FC1/CU1 ❑ ❑ Equipment T e3: Split DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 39,400 Btu/hr ❑ ❑ Minimum Heating Efficiency' n/a ❑ ❑ Max Allowed Cooling Capacity' 185,700 Btu/hr ❑ ❑ Cooling Efficiency' 12.0 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP33 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 12,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 23,700 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.4 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyProElbyEnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 23 of 41 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Viasat- Building 9 Wrozoltel EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 24 of 41 V T m -0 o CE5 O ^O c ¢ U C O O •- " M v C—_ m aU)cz i vim = o E� 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 'o V O a� 3 �Ero m w OQ�U ¢ ro N co E CL c3a0 W mo8 O Gov) a o -E m \ p c) E O a >=���U O am-m a cr d ( � C" uC m C iE5 O a) a'�m m M �O"Cr 0 CZ >� L ^ m OT a) -0 W cl) min- C E yU)0)m U 3 C Q_ Cf) � F- a) m cmi U O C a) CZ mam ro v 1> 1Z ❑❑ ❑ ❑ El ❑ ❑ ❑ ❑ El El O OO X > V! CU O Em a10 aam CC) ¢ o o >1 QE Vm> 0.) El El ❑ El ❑ ❑ El ❑ ❑ ❑ ❑ ❑ ❑ Elo U m -O = ro w �LL jr Cl)O W n (D�:a) mc�mm mEM �-0-0 g = U a ..r U m C C— Ch O a.T ur O N Q 7 T 0 Q Q m O � C U E < a _� C a) cnO O E C a p- U E CO 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 11) !A u1 Z� m �� � N QO O N Q�> al � N Z o m m O m m h N N W Z � 3 C fd m co m U C � E W U ,� Q U � 7 U 1 -E: 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Z Q y Q m O U m C C U 1 O Q Q W O U O O U m N ai �- m�Cm C- W �m°a) �� W o V m co O C Paz ��'°�' °�°' M o W tCO �oaa - v g a° ❑❑❑❑❑❑❑❑❑❑❑❑❑❑d a CO6E_ 2 �Q o cn �0C) -xQ 2W'-0 Q���C o `� °- _ N c� m m C O Q c 2 S O N `m "E a)N co >, a) W ���m m )I o°c� "_ w U0-0 ja'� «� C C a)U ' -° LL ° 0ca ca _ C > m 0 0 0 -C Q .v) C E .0 U Q,E" a N O m L. a� ,fl N� � m'� E 2 ¢ = o y U m� ! 0-� m� U v -.R pus 0 0 ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ o a�i EQ C)L N O N a > > N Z.m O �.� '� C + m (SS V) 7 EaE a)COS: -m a� Q i�=.-= �'� ac >,am � a� a EU 3 ° CJ J Q J a . C (0-0 o >,m > o¢ m� � � � >�co �- J z �j �'m U m co mSJ C Q0 N Q"�Q N C O ti 8 ` 0 NJ Na) o� ci cz,ajUaE Zo o :o LL �C, Nz E C)� a > C) m a) >> m s C im�mm 0Umog) cc U c o W a) U °ovia t� y-y �mm. v� w Q Q C O U Q: O- � N cC0 N N V m m o v c ®yvy �EE.S0 � C :� w U 0 f6 ca V O V U O p 0-0 CF o cv O Q) Co -Q N E m ¢ aroma �aa) =`moo= N U U (Vj u-i LLL r co m C) 0) E S .Q .gym- $ W j 0 U fl-'O >, .y E e E E W m N E �+ O a o N 3 �vn:o (>m4) 2p1._N W W W W UO °' > G�.�X�' �E� mE2a°ia°ia c C a)O m N i, O >+ ,_C a Hm a m N f- W Q z Q z Q a> G CN ao to a w U r a M N w N a C C N a� m p m ro O `O d' D � N co p M cn M M O `' i w 2 U T LO r m w , =t LO C� ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ w m •` Z o w o Z � 2 oU65 < E ❑ o U � �,X in ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ L® r LU.Tp p N O w w a v� Qroxiom COLL�wE- r O O '.-0-� O _Z = iU U NON ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ® U EO w Q p LL v (w% Q N 06 N w C.O-. C co �x El® El ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ •V w C) 2 LL p p o U N Z N Q CL U o LL a O 0 F w Cl) Q Cl) cr a w a w I-- c a)o o o co LL m U cEu z c s �s o w a w o w AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 21112013 Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...) i.e. AC-1, RTLI-1, HP-1 CBD-B9-R-HP9 CBD-B9-R-HP10 CBD-B9-R-HP11 Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted Indicate Page Reference on Plans or Schedule and indicate the T-24 Sectio 112 a 112 a 112(b), 112 112(c), 115 121(b) 121(b) 12!1 c 12!1 c 122(e) 122(e) 122(f) 122(g) 1213 124 144a& 144a& 144a& 144a& 144(c) 1444� 1444(c) 1444(d)_ 1444(e) 1444(f) 1444(f 1444(g) 144i) 144(k) 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 165 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 290 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 189 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0 n/a 21,573 Btu/hr n/a 33,401 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No n/a 26,928 Btu/hr n/a 41,007 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp Wrd n/a 21,573 Btu/hr n/a 39,289 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 27 of 41 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 21112013 Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...) i.e. AC-1, RTU-1, HP-1) CBD-B9-R-HP12 CBD-B9-R-HP13 CBD-B9-R-HP14 Number of Systems 1 1 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections 112(a) 112(a) 112(b), 112(c) 112(c), 115(a) 121(b) 121(b) 121(c) 12I1(c) 1212(e) 1212(e) 122(f) r122(g) 3 4 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 129 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 240 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 104 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 lAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0 144(a & b n/a n/a n/a 144(a & b 12,316 Btu/hr 26,928 Btu/hr 21,573 Btu/hr 144(a & b n/a n/a n/a 144(a & b 24,376 Btu/hr 40,818 Btu/hr 35,662 Btu/hr 144(c) Constant Volume Constant Volume Constant Volume 144(c) 144 144 144 14.4 144 Yes No No Economizer Constant Temp Constant Temp Yes No No Economizer Constant Temp Constant Temp Yes No No Economizer Constant Temp Constant Temp 144(k) I No I No I No 1. Total installed capacity (MBtu/hr) of all! electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 28 of 41 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 21112013 Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...) i.e. AC-1, RTU-1, HP-1) CBD-B9-R-HP15 CBD-B9-R-HP16 CBD-B9-R-HP17 Number of Systems 1 1 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections 112(a) 112(a) 112(b), 112(c) 112(c), 115(a) 121(b) 12.1(b_ 1211(c) 12'.1(c) 12'2(e) 1212(e) 12'2(f) '2(g) 3 ril 4 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 1 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 94 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 210 cfm No No Programmable Switch Setback Required Auto n/a 8.00 COP 11.7 EER Yes n/a No 315 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 (Attic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0 n/a I Z 316 Btu/hr n/a 22,554 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a 26,928 Btu/hr n/a 41,444 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a 63,655 Btu/hr n/a 65,566 Btu/hr Constant Volume Yes No Diff. Enth (Integrated) Constant Temp Constant Temp r14 4 4i 4(k)No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number 2445 Run Code: 2013-02-01T14:17:35 ID: 3813 Page 29 of 41 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 1 21112013 Item or System Tags Indicate Air S stems Type (Central, Single Zone, Package, VAV, or etc...) i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP18 CBD-B9-R-HP19 CBD-B9-R-HP20 Number of Systems 1 1 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exceotion(sl MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted T-24 Sections 112(a) 112(a) 112(b), 112 112 c,115 121(b) 12!1(b) 12!1 122 122 12!2 12:3 12:4 1 8.00 COP 11.7 EER Yes n/a No 122 cfm No No Programmable Switch Setback Required Auto n/a 8.00 COP 11.7 EER Yes n/a No 221 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 103 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 lAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0 n/a 63,655 Btu/hr n/a 67,181 Btu/hr Constant Volume Yes No Diff. Enth (Integrated) Constant Temp Constant Temp mo n/a 63,655 Btu/hr n/a 68,539 Btu/hr Constant Volume Yes No Diff. Enth (Integrated) Constant Temp Constant Temp No n/a 12,316 Btu/hr n/a 22,044 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. I EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01T14:17:35 ID: 3813 Page 30 of 41 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 21112013 Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...) i.e. AC-1, RTU-1, HP-1) CBD-B9-R-HP21 CBD-B9-R-HP22 CBD-B9-R-HP23 Number of Systems 1 1 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections 112(a) 112(a) 112(b), 112(c) 112(c), 115(a) 121(b) 121(b) 121(c) 121(c) 122(e) 122(e) 122(f) 2(g) 3 rl 4 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144 144 144 144 144 144 144 144 0 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 225 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 630 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 89 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0 n/a 26,928 Btu/hr n/a 40,844 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a 26,928 Btu/hr n/a 41,961 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a 12,316 Btu/hr n/a 22,082 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp 144 i 144(k) I No No I No 1. Total installed capacity (MBtu/hr) of alll electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01T14:17r35 ID: 3813 Page 31 of 41 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 1 2/1/2013 Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...) i.e. AC-1, RTU-1, HP-1) CBD-B9-R-HP24 CBD-B9-R-HP25 CBD-B9-R-HP26 Number of Systems 1 1 1 Indicate Page Reference on Plans or Schedule and indicate the armlicable excention(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T••24 Sections 112(a) 112(a) 112(b), 112(c) 112(c), 115(a) 121(b) 121(b) 121(c) 121(c) 122(e) 122(e) 122(f) 122(g) 123 124 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144 144 1214 1114 144 144 144 1414 14-4 144 14.4 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 212 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 165 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 99 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.01 Attic, Ceiling Ins, vented / 8.0 1 n/a 21,573 Btu/hr n/a 32,529 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a 21,573 Btu/hr n/a 33,779 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a 15,223 Btu/hr n/a 24,987 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp � 144(i) 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01T14:17.35 ID: 3813 Page 32 of 41 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 21112013 Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...) i.e. AC-1, RTLI-1, HP-1) CBD-B9-R-HP27 CBD-B9-R-HP28 CBD-B9-R-HP29 Number of Systems 1 1 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections 112(a) 112(a) 112(b), 112(c) 112(c), 115(a) 121(b) 121(b) 121(c) 121(c) 122(e) 122(e) 122(f) 122(g) 123 124 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144a& 144a& 144(a & 144a& 144(c) 144(c) 144 c 144(d) 144(e) 144(ff)_ 144(f) 8.00 HSPF 13.0 SEER / 11.4 EER Yes n/a No 59 cfm No No Programmable Switch Setback Required Auto n/a 8.00 COP 11.7 EER Yes n/a No 197 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 1 Conditioned / 8.0 n/a 9,256 Btu/hr n/a 18,687 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a 63,655 Btu/hr n/a 68,554 Btu/hr Constant Volume Yes No Diff. Enth (Integrated) Constant Temp Constant Temp 8.00 COP 11.7 EER Yes n/a No 1,219 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 n/a 52,019 Btu/hr n/a 58,209 Btu/hr Constant Volume Yes No Diff. Enth (Integrated) Constant Temp Constant Temp 144(i) 144(k) I No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01T14:17.35 ID: 3813 Page 33 of 41 11 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 21112013 Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...) i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP30 CBD-B9-R-HP31 CBD-B9-R-HP32 Number of Systems 1 1 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections 112(a) 112 a 112(b), 112(c) 112(c), 115 a 121(b) 121(b) 121 c 121(c) 122(e) 122 e 122(f) 122(g) 123 124 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144a& 144a& 144a& 144a& 144 c 144(c) 1 8.00 HSPF 13.0 SEER / 11.4 EER Yes n/a No 234 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 n/a 9,256 Btu/hr n/a 18,385 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp 8.00 HSPF 13.0 SEER / 11.4 EER Yes n/a No 285 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 n/a 9,256 Btu/hr n/a 18,533 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp 8.00 HSPF 13.0 SEER / 11.4 EER Yes n/a No 90 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 n/a 9,256 Btu/hr n/a 18,323 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp IAA/L1 I No I No I No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01T14:17.35 ID: 3813 Page 34 of 41 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 21112013 Item or System Tags Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc...) i.e. AC-1, RTLI-1, HP-1 -IEBERTCBD-B9-F/R-FC1/CU CBD-B9-R-HP33 Number of Systems 1 1 1 Indicate Paqe Reference on Plans or Schedule and indicate the applicable exceptions) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections 112(a) 112(a) 112(b), 112(c) 112(c), 115(a) 121(b) 121(b) 121(c) 121(c) 122(e) 122(e) 122(f) 122(g) 123 12:4 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144a& 144a& 144a& 144a& 144(c) 144 c 144(c) 1 n/a 12.0 EER n/a n/a No 50 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 n/a 0 Btu/hr n/a 179,682 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp 8.00 HSPF 13.0 SEER / 11.4 EER Yes n/a No 415 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 n/a 9,256 Btu/hr n/a 19,357 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp I1AAILN I No I No I 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 35 of 41 U U M M z c< ¢ o ro H o M U O N as cr. LLI C E O �, 76 a E ' U CD a ° Cc: Z o=o o `m O U ch U) a m F- v ° > - gC) a Y x� 0 s LL o- a N W is o a)x LU _� ° CL N 0 N L — m n \° C QLL o C O 3 M 0) O � LO�UU a) U)E M U U O m E= c O O CLU } p E O Lo Lo O O m O m O O O <t �t "t O O CO �- CO O N m N m �- co �- N �- N �- <t N N O O m m N w Z U 7 En Q of U a) U E� o U O c LO CO LO CO o m O m m co m co m m N o Q) 't O v O) ";t m O �- ; E- _ Q O C7 N N O U 2 2 0 7 E> Q m —o Q � E ti w @ @ w0 w0 w O W = E O LL a3 LL !� f� !� U Q m O - c N O Q x U N N O fn C° O W (D (Z ,-- O O O Q O O O' U O N 00 o m o a) a c o is Y O E 8) N O a CL 3 in E � § CZ � U N ° E .� _� M_ ��a r r U I_-�s as c `o 0 °UE oc EvJ W O 0 Z O i p Z Z d o - c ° o Q U 0 F- L 2 LO O m O O <t r!' O TW co m N cw N v N Q. m .- ° N O N _ i W J H O LLLL N U U Q x ° F- N M �O-• �_ Q in O C :J m (� c m m O O W > ca aci Q J N � a) N N H ° O'er O h Cn Cn Lo Cn O (O (O V Q N O O O O O O O O N N N o -( N O aZ Z m U U Q� r X ._ 3 LO LL U E 7 m° L N 4 N z = W a o¢ ° x ° o U °� ° O (� Q U 8 > _ C7 YO L Y E O O m O O h O W c Cl N w coo Coo (No U co V o 3 o z o . .= �= C7 c° Y m i a J m� 0 �� CF I 6 0 0) o Q o o N Z o 0o CU U x _ W (n ° �3� > X aa)) (1) J > co > Y coc E y a Y E E 0 ° c o E E o n d) m to cr to w ° C X (n co c m Z Q (n O e- N co tl LO � m m W i i0 (Ea m z N rY K LO o V v� m m m m m m dl U W 2 _ '� Y J � Z Q, °) m `� `? `� `o C O d Z U T o� U Z m U= m 0 m U Z m 0 1 m U= I a) W V � � C?z CY) C< as Q o V H o coO C: y c W C C c . 'o Q) ; ¢ ,_. a) .. 0 Cf) V .Q C O Y j U Q C �USrY) N O m N a_ Z - H �r > r� Q Y o X� 0 s O > 3 O a � U a O U C: _ ON a� ~ (n U m O ��C) �o caw o '0) (n U E io cn co ,o Fn E co U C)O m 2 C O } U O O C:�- O LO LO N N e- F CO Cl)LO LO O Q)m m C o N �- coC) N N N N O O N N M M co co m co Z O U D �m•`LL ai d `U Q U Q 0 m U E� > o U O c 'O E O <- LO LO N N Cl) co LO N Lo N N Lo N Lo @ N O WCZ a O y O C7 N co Cl) <- N N �- N N N N O co O U M = Ow j CO o cn Z 0) [C �0 Q �Q U Q CIO E a w0B00 w0 wa O W 2 N 3 r LL O u <u tL O ti O ti O O ti O ti O H- O I- O I� U Q CDO O C c N CS' C) C:C N E O ca M C� a'X U w N N r p C p Q O o o U N 00 0 a o 0 ai C U o iu Y N E 0)m C z LL :E O w `m cn o � o ro 3 O w o� '_ • U e N Q a aro U a -0 Co o � a) ° � Y o z C U m Y `cu o E -0 a> T p m � E o o � 0 2 W EO0 Z o a'' V_ E Z Z a o c O o Q C)O a W o o=Ea) m O Q 2 (z Cl)eN - C14 N C) N N to Q m C E C W J W2U U Q X o i- c� E O o Q .N mho O d d C m r c �> cc W 04 a) a�i a) CY. m Q J S2 F- U a) C y O C`> N O l(J O O Z a a U �o Q Uv- � LLC =- 1 O 1 C) 1 C) 1 O N x () a) ..�. E- a) J = E oc 's Lo z m r a) O $ w w N Z = Q W C-)Q"- Y O Lo x U OspC °� i 0 U o o Q o o U ro Q W Q o L ti L o � C) a) iu U o 3 o c �- of v co uo co Lo Y m W 3 LL I.L C) cr O L N N coJ oav �, Y : M o'o C)iu o¢ o LL o x N c Qm Z o iu o U m W m w - cu o = > x m ca N L' C)O E� J C c E Q 47 a E o o o o o U) ZQ � O Co C) O NC") m 0 U I- I- a) a i E m = N � O U t m m m Q m m m m U W 2— Y J Z n W O co Q m m m N m N m N m N m 0- U= U= U Z U= U= U= U= U W C? Cl) �¢ o M U Cl a) uJ � E �(DQ o o cn v •- z 0 ° 2 O c0 a) N O C)L� N Q z c x _ > C)\ C O s C7 C)0 3 o Q � s N = _ 0 OLU L6 c o >. ~ c N o p _ O U m L �jM ��caL Lo oUU � o E N U U o mCL �S c O 3 } p E c N N LO LO m O O c 0 �- N N to �- co a) O) LO LO O) )- O) )- �- N N a) N a) N coU N co Z U 7 � ca .. � i= r" u) Q —o C)-N-QLL C)m i d Q ., 0 aa)i U E 2 > o U O c 3 N N LO O Ln m o) m o) m m Lo LO m r� m Lo O LO m O LO m LO N -o o ° C O _ p O U `o N N )- �- �- e- _o c cn Z O U M t; 'n =31- W 6 0 0 B 0 w6 E o S(D O LL ca LL -- N 0U a :5 Xcn U c o c� E ciso r� U W m cz ' r o O a O Y o U(D y N m O N o a)O c O U o o a)(Da) o E p o) a) co � o V Q LL LL Q N U '6 U 3 cn N "E "6 j N = d N Y t= m -Q (� co o E 'ns ° E S ° a)�a c °cr °UE LV C- 0 a) o o z a) o aI Z z d o `—° c° E o oQU c W o> ° c �¢ rn rn rn LO �: W J o ax ° N ` L ��� M z c �m o¢ Li LIJ m Q 7cts J fn U a) c ° c > LO LO LO Lo LO LO LO Lo Z V Q O O O O O O O O N x m N f- N o p Q z m y U O_"- T ._ 7 m LL U p CF p N Z = w oc o Q ° x ° o U o o C.) Q .0 N > _ � � M o L � 2 Lo O O LO l0 O O LO W c <h o �- Lo O m co co o co m a�') N Nt ° p o LL U 0 m 3 c N Q O O .= .= �= UW LLL Y O c:r 3 "o J t-- < a) a) LL U N `p N .o 4 N U m `o i ¢ `o L LL d. o x _ N N a(D Z o is o La U E Y c ° W _ m o aNNi 3 m x aa)) of ° E o J > co > -p c co c o E N ° Q o cn V E E o E a) m c o E E o N_ i a) En 'c m N U N N c x L'a j cr w Z a Q c N N N N N N � m CC � � U �c15 I- 1- m CL 10 Q m m Z Z Z LO N 1� o U Z &_ 6 m m m m m m m U W S '� Y J Z uj co N O N O N O N O N O N O O M o C a j U Z U T m= m Z U= W U Q M M z _ N Q LO T1 r M i U N C to Q) LU � �, 12 En c CD En J �En EYU 3 Q E nT O.CO �U=m � O 8 N F- a z : m x ro > a Y C) x� E 0_ mLL U 3 O Q o N a m N = o 0 m c m _ � � -3 o c Cl LL �� c =5 c `� FnUU : � E co U U o m = c O_ 3 } U 3 c LO U O coo N M M LO LO .`�- V) Z j `LL m d `U _ Q of U Q CD U E� o U Q c 0 O C7 N N Lo L" CNO CNO Q O 0 O m M C1Q x co cU ra aNiQ U o Q Lu = 3 r o LL CZ LL I� ti U Q a) c O E-_ N O C3 =X U c _ N E . F N C U W U °�' r C Q O o N U`m-Ey (N 00 0 a o `0) a co E ro O Z LL O LL N o U CL (n m U N = d � N O W U (n a) E ro _ E ,- r U m o �U_E o c `07 W a U� c o Z � - Q z Z d O Rs c 8 p Q U O - N E 7 O O (ii O i p N LO Uo W _ F a y a) > O O N - Q O 2 LL a) U Q i C- O W 0 V Q x F N :3 0 Q U) � N W _C m m N O N m -6 a0i ® > J N ~ U m Cam.., c6 C ca O O a LO Z V Q V 41 Y O O O _ N x m H N ° E a> �_ 3 h d' LL Cl) m LL a) Z = W x c ® v a o o Q _ 4 o CO") U a) o o LO LLI o 'O J oQ= ��� a) M LL U -i a) o N CIS O Q O LL aoo�� O x O CZO. O Z o - m O - CO U E y s c m W CL co U ro v a) U c a1) c M E a � a) ,max-., c -O N alO c E Q N N Q p E c E E U aE) a) E C o N N N x c6 N 7 zQ CO �- N Cl)mC)0] ca o U F- F- a) W i co N CC M m m W W m U W 2 - Y -j 2E Z CIL uj CC N (q o d U N `) cp U�� W cM Cl) U G T = W U LO o m y R co co Z m m V W W W W W W Z ao U- C I Z W W W z W cc W 0_ W W c o c 0 c 0 c 0 c 0 c 0 c 0 a Q cc :3 m w W W W W W W W w o o o ~� ti LL U CV N crci� Q� cr Q 00 W W W O = w co cn cn cn p. M o CO N O N M 1- M N - N X- o N T J O d (S of of co Cl) Cl) Q d y y J 0 0 0 0 0 0 0 cz L r_ m � v ai O O a Cl)p U m O O O o O 0 O 0 O 0 O 0 O o O a (s = Z Q L O Cp — O O 1.- O LL 7 h N M N Obi >• 0 0 O- 0 0 O 0 N 0 Q. O T7 CO O a cOO OOp 0 C M �= CV M 1= M W — lL U a a a a U o EL cQ o T T U O U T T U o C > d 0 0 0 0 O 0 0 0 W � V OCi CO W co CO h w W M 7 � •� Z 0 0 0 0 0 C. 0 y y F O N v W_ 7 Q N Cl) N E N C, O)_ O O 0 0 0 0 O N O N �- -N OA 0 N NN NNL +OO • N M W cv _ E _ E _ Ua CL O O O O O G O O O O W O O zu r cr W W W W W T o CJ � n O O 't M — — — _y � N U) E CL F— E E E E E E E J per. 2 c 3 3 J L L 0 LL a Lu W � ,�'� w w ..gym. ,2m, d a d CL 0 CO N h 0 0 h O Z_ k k k IQ, X X o U 0 818 0 0 U 0 U 0 U 0 U N O � � I O O O Q F' a a a a a a a m CCL D m m m m ro m m m am m o m o m E Z ~ W = Y m Y m Y m Y m -IT, Y Y 3 LLIa a a a a a a oC LU co m LIJ W o E Z o J d d LL E Co Q Z E W V U W Z W U N N N z >' U) co c00 M O N U) co CO0 c� O N W Z a Z E Q W J E J i• U) �! O M O Cl) O M N co N O CO N N O Cl) O M O M N M M O co N -O a m co m a a Q d in > a J N U U U U U o U U U U U o U J U U U U U o U U U U U o U - ui co W m Cl) LL a �s a s� �s o z v� J WU (3 a) v> J �'" -� �" Z W W W W W W W Z W W W W W W W PI W I, J Z ¢ Z ¢ Z ¢ Z ¢ Z ¢ Z ¢ Z ¢ W Z ¢ Z ¢ Z ¢ Z ¢ Z ¢ Z ¢ Z ¢ I I I I I I LO § j \ CL ) § u Ec f o O u ° J 7 % 0LL -3 \ § \ \ cc§ ( o, / ). [ § -1 p { ® ¥ { cc k� c� § N ±§ § \ § O a. § = _ $ co C,4 \ \ \0a. 2 co § o o $ § ° ) § R a « aR ° m = § o 0 0 E%\ 2� a % Q o 0 o \ ) m Q @ / m ' $ ® 6 8 20 2 o ` -,IIIb / \ 0 @R/ c >o )4g co w § � 5 - 0 0 fo a 2cc » t § k / ° N e ) cl k { § § 2 & G § w 3 5\\ w 0 { ( \ s o ( A § u $ $ § B $ . 13 m E IL > o o e Cl) a. J / § \ \ \ d) O ■ co co LU Z \ \ \ L & & k \ z ƒ ] ] 2 k W & LLI \ � � CL ■ � \ cc � x m \ k 2 \ E z LU § E ®ca $ E k � w t121 a) ? O Z 2 & U) & -j CL § ® / 2 cn \ 2 ° E 2 2 � o \ « ¥ m o ? / $ / -j m o ? / $ % / - � / 2 W2M ƒ \\§ z $\E � / » Q ❑ � Q F / w w K m § PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1 C Project Name Date Wasat- Building 9 2/1/2013 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 2290 Cosmos Court Carlsbad CA Climate Zone 07 26,929 n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author --- Name Signature _ Company McPARLANE & ASSOCIATES, INC. Date 21112013 Address Phone 858 277 9721 City/State/Zip The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ 0 sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or 1 am a licensed architect. affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name SCA [Signature Company Date Address LJ < License # City/State/Zip coPhone Principal Mechanical Designer a Name Doug Isaaks < Signature Company McParlane & Associates LL _z Date 01-19-14 Address 4830 Viewridge Ave W -1p _g License # 30090 City/StatelZip San Diego, CA Z) Phone 858 277 9721 Principal Lighting Designer Name Signature Company Lighting Compliance Not In The Scope Of This Submittal Date Address License # City/State/Zip Phone INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) 0 ENV-1C Certificate of Compliance. Required on plans. 0 MECH-1C Certificate of Compliance. Required on plans. ❑ LTG-1 C Certificate of Compliance. Required on plans. 0 MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. ❑ LTG-2C Lighting Controls Credit Worksheet. 0 MECH-3C Mechanical Ventilation and Reheat. ❑ LTG-3C Indoor Lighting Power Allowance. 0 MECH-5C Mechanical Equipment Details. Ener yPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 1 of 41 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1C I Wasat- Building 9 1 21112013 ANNUAL TDV ENERGY USE SU161MARY (kBtu/soft-vrl Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS ;tandard Proposed Compliance Design Design Marain 0.05 0.05 0.00 163.86 157.30 6.56 70.54 69.86 0.69 0.00 0.00 0.00 o.o0 0.00 0.00 0.00 0.00 0.00 50.55 50.55 0.00 74.01 74.01 0.00 397.92 397.92 0.00 0.00 0.001 0.00 756.94 749.69 7.24 Heating Cooling Fans Heat Rej Pumps DHW Lighting Receptacle Process Process Ltg Percent better than Standard 1.0 % 2.0 % excluding process) BUILDING COMPLIES INFORMATION Building Orientation (A9 0 deg Conditioned Floor Area 26,929 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 26 Conditioned Footprint Area 0 sqft. Number of Zones 26 Natural Gas Available On Site Yes Front Elevation Left Elevation Rear Elevation Right Elevation Total Roof Orientation Gross Area (N) Z 900 (E) Z220 (s) 2,690 (VV) 1,300 9,110 17, 895 Prescriptive Lighting Power Density Prescriptive Envelope TDV Energy Remarks: Standard 0.893 W/sgft. 438,786 sqft. sqft. sqft. sqft. sqft' sqft. Glazing Area 585 585 831 475 Z476 90 Proposed 0.893 W/sgft. 764,475 sqft. sqft. sqft. sqft. sqft. sqft. Glazina Ratio 20.2 % 26.4 % 30.9 % 36.5 % 27.2 0.0 Prescriptive Values for Comparison only. See LTG-1 C for allowed LPD. PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1C Project Name Wasat- Building 9 e 71/2013 ZONE INFORMATION S stem Name Zone Name Occu anc T e FloorTLP Area s ft. t Ctrl. Credits /sf 2 Allowed LPD Proc. Loads W/sfCBD-B9-R-HP9 Area W/sf a Tailored /sf a HP-9 Office > 250 sgft 1,10000 CBD-B9-R-HP10 HP-10 Office > 250 sgft 1,935 *0.900 CBD-B9-R-HP11 HP-11 Office > 250 sgft 1,260 *0.900 CBD-B9-R-HP12 HP-12 Office > 250 sgft 859 *0.900 CBD-B9-R-HP13 HP-13 Office > 250 sgft 1,600 *0.900 CBD-B9-R-HP14 HP-14 Office > 250 sgft 690 *0.900 CBD-B9-R-HP15 HP-15 Office > 250 sgft 625 *0.900 CBD-B9-R-HP16 HP-16 Office > 250 sgft 1,400 *0.900 CBD-B9-R-HP17 HP-17 Office > 250 sgft 2,100 *0.900 CBD-B9-R-HP18 HP-18 Office > 250 sgft 815 *0.900 25.000 CBD-B9-R-HP19 HP-19 Office > 250 sgft 1,475 *0.900 25.000 CBD-B9-R-HP20 HP-20 Office > 250 sgft 685 *0.900 CBD-B9-R-HP21 HP-21 Office > 250 sgft 1,500 *0.900 CBD-B9-R-HP22 HP-22 Office > 250 sgft 1,680 *0.900 CBD-B9-R-HP23 HP-23 Office > 250 sgft 590 *0.900 CBD-B9-R-HP24 HP-24 Office > 250 sgft 1,415 *0.900 CBD-B9-R-HP25 HP-25 Office > 250 sgft 1,100 *0.900 50.000 CBD-B9-R-HP26 HP-26 Office > 250 sgft 660 *0.900 10.000 CBD-B9-R-HP27 HP-27 Office > 250 sgft 395 *0.900 C8D-B9-R-HP28 HP-28 Office > 250 sgft 1,315 *0.900 25.000 Notes: 1. See LTG -IC 2. See LTG-2C 3. See LTG-3C 4. See LTG-4C items marked with asterisk, see LTG-1-C b others b others Hems above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation :submitted. The HVAC System TRANE WSC 072 includes an Economizer. This system has a cooling output < 75,000 Btuh ore supply cfm < 2500. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySoft User Number. • 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 3 of 41 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1C Project Name Viasat- Building 9 Date 21112013 ZONE INFORMATION S stem Name Zone (Name Occu anc T e Floor;LPD Area s ft. . 1 Ctrl. Credits /sf 2 Allowed LPD Proc. toads W/sfCBD-B9-R-HP29 Area W/sf 3 Tailored /sf n HP-29 Office > 250 sgft 1,300900 CBD-B9-R-HP30 HP-30 Office > 250 sgft 390 *0.900 CBD-B9-R-HP31 HP-31 Office > 250 sgft 475 *0.900 CBD-B9-R-HP32 HP-32 Office > 250 sgft 150 *0.900 15.000 LIEBERT CBD-B9-F1R-FC11 SERVER ROOM Electrical, Mechanical Room 1,000 *0.700 50.000 CBD-B9-R-HP33 HP-33 Office > 250 sgft 415 *0.900 15.000 Notes: 1. See LTG-1C 2. See LTG-2C 3. See LTG-3C 4. See LTG-4C items marked with asterisk, see LTG-1-C b others b others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation :submitted. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 4 of 41 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Wasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room Public School 0 Conditioned Spaces ❑ Unconditioned Spaces ❑ Schools (Public School) ❑ Bldg. ❑ Skylight Area for Large Enclosed Space a 8000 ftz (If checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component 0 Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, IN or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID AssemblyType ¢ 4 y mw O z v li 0 �. >> R 0 cc O do V a w> O C ;%t x o LU LL 2 0 �3 �, __ > G C d;= o C LL x C co6 o a -2 a c '.o--, H 0 V N o. N LL 1 Wall 305 (W) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 2 Wall 225 (N) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 3 Wall 680 (S) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 4 Wall 420 (S) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 5 Wall 624 (S) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 6 Wall 135 (S) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 7 Wall 495 (E) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 8 Wall 840 (E) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 9 Roof 1,400 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 10 Roof 2,100 (N) 0.048 R-19 4.2.1 A16 Existing ❑ L ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type 0 2) a c 03 4 e ui O Z c R LL 2> c LL o > U) , N z e = o rn N C > O _ o o U m w a 01 LL 1 Window 475 (IM 1.190 Default 0.830 Default ❑ Existing ❑ ❑ 2 Window 831 (S) 1.190 Default 0.830 Default ❑ Existing ❑ ❑ 3 Window 585 (E) 1.190 Default 0.830 Default ❑ Existing ❑ ❑ 4 Window 585 (N) 1.190 Default 0.830 Default ❑ Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 5 of 41 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Wasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: M Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bedlocatable g. Public School M Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 fe (If checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 1 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID AssemblyType Q N C OZ C _ 4 UoE 'C wa > 'O w3 s � = ' v x C a "o on o" 'd M v to y a a 11 Walt 285 (N) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 12 Roof 815 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 13 Roof 1,475 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 14 Walt 545 (N) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 15 Roof 685 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 16 Roof 1,500 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 17 Roof 1,680 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 18 Wall 215 (N) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 19 Roof 590 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 20 Walt 450 (N) 0.110 R-111 4.3.1-A2 Existing ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type m d a C� 4c = ui d O Z> ro KLL m a a 5 > LLo > vs v O X0 R^ d :$ 7 x o 0 m m a > O c 0 y o c� cn a u. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary- EnergyPro 5.1 by EnergySoft User Number. • 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 6 of 41 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Wasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ BRledlocatable Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 fe (If checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component 0 Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID AssemblyType N .. a = 3: C N O v, 7 .0 C O d E> O C LL et K G _ =+ N ti 21 Roof 1,415 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 22 Wall 385 (WJ 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 23 Roof 1,100 (N) 0.048 R-19 4.2.1-A16 Existing ❑ ❑ 24 Wall 135 (W) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 25 Roof 660 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 26 Wall 195 (N) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 27 Wall 300 (E) 0.110 R-11 4.3.1 A2 Existing ❑ ❑ 28 Roof 395 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 29 Wall 400 (N) 0.110 R-11 4.3.1-A2 Existing ❑ ❑ 30 Roof 1,315 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type 2 a o = :.' z O> v a LL ri o > w 2 w .. V = o rn rn > O a u U m o- LL ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary- EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 7 of 41 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Wasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ RRlellocatable Public School 0 Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space z 8000 ftz (If checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component 0 Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 10 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID I Assembly Type yd ¢ C u O z j tL :5 O 9 0 U¢ .d. w> 2 C •+d. w U. O 5> O C 5 U. C R " H 06 a U. 31 Roof 1,300 (N) 0.048 R-191 4.2.1 A16 Existing ❑ ❑ 32 Roof 390 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 33 Roof 475 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 34 Roof 150 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ 35 Roof 450 (N) 0.048 R-19 4.2.1 A16 Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID Fenestration Type $ d R c gO> d W C 2 � tL v I v K d n ° n m 0 o c C CL Nawte-' O a U. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number. • 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 8 of 41 CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV-1C Project Name Wasat- Building 9 Date 21112013 ROOFING PRODUCT (COOL ROOFS) (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF (EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ Roofing compliance not required in Climate Zones 1 andl6 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ft2. Greater than 2:12 pitch. ❑ ❑ ❑ ❑ Low -sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV-2C. ❑ ❑ ❑ ❑ Low -sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assemblybelow, Column H of ENV-2C. ❑ ❑ ❑ roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are [3 exempted. exem ted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.ener .ca. ov/title24/ ❑ ❑ ❑ ❑ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 lb /ft are exempt from the Cool Roof criteria below. ❑ ❑ ❑ ❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are from the low -sloped roofingcriteria. ❑ ❑ Elexempted 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope s 2:12 > 2:12 Product Weight < 5116/ft2 z 5lb/ft2 Product Typ82 Aged Solar Reflectance Thermal Emmitance SRI5 Pass Fail6 ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ 1 ❑ 1❑ ❑ ❑ 4 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.orq/products/Search.r)hp 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2,-0.7(p;n;i;J — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at htto://www.enemv.ca.gov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies; EnergyPro 5.1 by Ene Soft User Number, 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 9 of 41 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV-2A Test Performed By: Fenestration Products Name or ID Requiring Testing or Verification Area of like Products Building Envelope Acceptance Test 13 13 13 13 11 11 13 13 11 13 13 13 13 11 13 13 13 11 13 13 13 EnergyPro 5.1 by Ener Soft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 PaFa 10 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION E14ERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: I o deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ul ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP9 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 28,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 46,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit. MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP10 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 35,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 58,800 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. 1EnergyPro5.1byEnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Pa a 11 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C FIELD INSPECTION E14ERGY CHECKLIST Project Name Wasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces p Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP11 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 28,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 46,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit: MECH-4A & MECH-4-HERS NO ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP12 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 16,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 29,100 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. lEnergyProElbyEnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 12 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: I 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP13 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 35,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 58,800 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason 2_ Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP14 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 28,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 46,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Nurnber.• 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Pa - a 13 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: o deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP15 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 16,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 29,100 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit: MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP16 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 35,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 58,800 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number. 2445 Run Code: 2013-02-01 T14:17.35 ID: 3813 Page 14 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Ds grees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP17 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 83,210 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 COP ❑ ❑ Max Allowed Cooling Capacity' 94,000 Btu/hr ❑ ❑ Cooling Efficiency' 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit: MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP18 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 83,210 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 COP ❑ ❑ Max Allowed Cooling Capacity' 94,000 Btu/hr ❑ ❑ Cooling Efficiency' 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Nurnber. 2445 Run Code: 2013-02-01 T14:17:35 ID: 3813 Page 15 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 2/1/2013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-89-R-HP19 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 83,210 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 COP ❑ ❑ Max Allowed Cooling Capacity' 94,000 Btu/hr ❑ ❑ Cooling Efficiency' 11.7 EER ❑ ❑ Duct Location/ R-value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP20 ❑ ❑ Equipment Type 3 : Packaged DX ❑ ❑ Number of Systems 1 0 0 Max Allowed Heating Capacity' 16,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 29,100 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number., 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 16 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION E14ERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: I 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP21 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 35,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 58,800 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP22 ❑ ❑ Equipment Type 3 : Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 35,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 58,800 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 17 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: I 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fall — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP23 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 16,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 29,100 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER/ 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP24 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ Max Allowed Heating Capacity' 28,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 46,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER/ 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or:, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number. • 2445 RunCode: 2013-02-01T14:17.35 ID: 3813 Page 18 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP25 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 28,200 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 46,000 Btu/hr ❑ ❑ Coolinq Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP26 ❑ ❑ Equipment Type 3 : Packaged DX ❑ ❑ Number of Systems 1 ❑ 0 Max Allowed Heating Capacity' 19,900 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 35,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.7 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible parry shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro5.1byEnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 19 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-IC FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: I 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP27 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 12,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 23,700 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.4 EER ❑ ❑ Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP28 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 83,210 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 COP ❑ ❑ Max Allowed Cooling Capacity' 94,000 Btu/hr ❑ ❑ Cooling Efficiency' 11.7 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro5.1byEnergySoft User Nwmber. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 20 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces p Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP29 ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 68,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 COP ❑ ❑ Max Allowed Cooling Capacity' 77,000 Btu/hr ❑ ❑ Cooling Efficiency' 11.7 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Diff. Enth (Integrated) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ 1 ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP30 ❑ ❑ Equipment Type 3: Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 12,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 23,700 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.4 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible parry shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. JEnergyPro5.1byEnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 21 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Project Address Climate Zone Total Cond. Floor Area 2290 Cosmos Court Carlsbad 7 26,929 Date 21112013 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: I 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fall — Describe Reason2 Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP31 ❑ ❑ Equipment Type 3 : Packaged DX ❑ ❑ Number of Systems 1 ❑ ❑ Max Allowed Heating Capacity' 12,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 23,700 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.4 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ Equipment 2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP32 ❑ ❑ Equipment lype3: Packaged DX ❑ ❑ Number of Systems 1 ❑ 13 Max Allowed Heating Capacity' 12,100 Btu/hr ❑ ❑ Minimum Heating Efficiency' 8.00 HSPF ❑ ❑ Max Allowed Cooling Capacity' 23,700 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER / 11.4 EER ❑ ❑ Duct Location/ R-Value Conditioned / 8.0 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer No Economizer ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnerqySoft User Number. 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 22 of 41 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Viasat- Building 9 Date 21112013 Project Address 2290 Cosmos Court Carlsbad Climate Zone 7 Total Cond. Floor Area 26,929 Addition Floor Area n/a GENERAL INFORMATION Building Type: 0 Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 LIEBERT CBD-B9-F/R-FC1/CU1 0 0 Equipment T e3: Split DX 0 0 Number of Systems 1 0 0 Max Allowed Heating Capacity' 39,400 Btu/hr 0 Minimum Heating Efficiency' n/a 0 0 Max Allowed Cooling Capacity' 185,700 Btu/hr Cooling Efficiency' 12.0 EER ❑ 0 Duct Location/ R-Value Conditioned / 8.0 0 0 When duct testing is required, submit MECH-4A & MECH-4-HERS No 0 0 Economizer No Economizer ❑ 0 Thermostat Setback Required 0 0 Fan Control Constant Volume 0 0 E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 CBD-B9-R-HP33 0 0 Equipment T e3. Packaged DX 00 Number of Systems 1 ❑ 0 Max Allowed Heating Capacity' 12,100 Btu/hr 0 0 Minimum Heating Efficiency' 8.00 HSPF 0 ❑ Max Allowed Cooling Capacity' 23,700 Btu/hr 0 0 Cooling Efficiency' 13.0 SEER / 11.4 EER ❑ 0 Duct Location/ R-Value Conditioned / 8.0 0 0 When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ 0 Economizer No Economizer 0 0 Thermostat Setback Required 0 1 0 Fan Control Constant Volume 0 0 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or-, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. 1EnergyPro5.1byEnerg,ySoft User Number: 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 23 of 41 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECHA C FIELD INSPECTION ENERGY CHECKLIST Viasat- 21112013 EnergyPro 5.1 by Ener<1ySoft UserNumber.• 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 24 of 41 1 CERTIFICATE OF COMPLIANCE° and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C Project Name Date Wasat- Building 9 2/1/2013 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume & Air Control Supply Valve Water Variable Demand For Single -Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Equipment Requiring Testing or Verification Qty. VAV & CAV Unitary Ducts Controls DCV VAV Test Reset Control Control TRANE WSCO90 1 0 0 ❑ 0 ❑ ❑ ❑ ❑ ❑ 0 TRANE WSC 072 1 0 0 ❑ 0 ❑ 1 ❑ ❑ ❑ ❑ 0 TRANE 4WCC 3024 4 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnemvPro5.1 by EnemySoft User Number., 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Pa a 25 of 41 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1 C Project Name Wasat- Building 9 Date 1 21112013 TEST DESCRIPTION AAECH-12A MECH-13A MECH-14A MECH-15A Equipment Requiring Testin Qty. Fault Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed By: TRANE WSCO90 1 0 ❑ ❑ ❑ TRANE WSC 072 1 ❑ ❑ ❑ TRANE 4WCC 3024 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ 1 ❑ 1 ❑ ❑ ❑1 ❑ 1 ❑ EnemvPro 5.1 by EnemySoff User Number 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 26 of 41 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Viasat- Building 9 2/1/2013 Indicate Air Systems Type (Central, Single Zone, Packa e, VAV, or etc...) Item or System Tags i.e. AC 1, RTU 1, HP 1 CBD-89-R-HP9 CBD-89-R-HP10 CBD-89-R-HP11 Number of Systems 1 1 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. It Yes, a MECH-4-A must be submitted 112 112 112 112 121 121 121 122 122 122 122 123 1E I 8.00 HSPF 13.0 SEER/ 11.7 EER Yes n/a No 165 oft No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER/ 11.7 EER Yes n/a No 290 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 189 oft No No Programmable Switch Setback Required Auto n/a 1124 1 Attic, Ceiling Ins, vented / 8.0 (Attic, Ceiling Ins, vented / 8.O I Attic, Ceiling Ins, vented / 8.0 144 a & b n/a n/a n/a 144 a & b 21,573 Btu/hr 26,928 Btu/hr 21,573 Btu/hr 144 a & b n/a n/a n/a 144 a & b 33,401 Btu/hr 41,007 Btu/hr 39,289 Btu/hr 144 c Constant Volume Constant Volume Constant Volume 11 44c 11 44c Yes Yes Yes 1144 d No No No 1144 a No Economizer No Economizer No Economizer .1 44f Constant Temp Constant Temp Constant Temp .144(f) Constant Temp Constant Temp Constant Temp I ....,,_. I No I No I No 11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. 1 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Viasat- Building 9 1 21112013 Item or System Tags (i.e. AC-1. RTLI-1. HP-1) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. It Yes, a MECH-4-A must be submitted Indicate Air Systems Typi CBD-B9-R-HP12 71 Indicate Paae Reference on Plar T-24 Sectio 112 a 112 a 112(b), 1121 112(c), 115( 121(b) 121(b) 121 c 121 c 122 e 122 e 122(f) 122 123 'Central, Single Zone, Packag CBD-B9-R-HP13 1 or Schedule and indicate the 8.00 HSPF 13.0 SEER/ 11.7 EER Yes n/a No 129 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER/ 11.7 EER Yes n/a No 240 cfm No No Programmable Switch Setback Required Auto n/a VAV, or etc...) CBD-B9-R-HP14 1 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 104 oft No No Programmable Switch Setback Required Auto n/a 1 124 1 Attic, Ceiling Ins, vented / 8.0 I Attic, Ceiling Ins, vented / 8.0 I Attic, Ceiling Ins, vented / 8.0 144a& 144a& 144a& 144(a & 144 c 144(c) 1144(c) 11 44d 11 44e 11 44f '144 f 144(g) 'I 44(i) n/a 12,316 Btu/hr n/a 24,376 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a n/a 26,928 Btu/hr 21,573 Btu/hr n/a n/a 40,818 Btu/hr 35,662 Btu/hr Constant Volume Constant Volume Yes Yes No No No Economizer No Economizer Constant Temp Constant Temp Constant Temp Constant Temp •IAA /I-\ I No I No I No 11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode. 2013-02-01T14:17:35 ID: 3813 Page 28 of 41 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 1 21112013 Indicate Air Systems Type (Central, Single Zone, Packa e, VAV, or etc...) Item or System Tags i.e. AC 1, RTU 1, HP-1 CBD-B9-R-HP15 CBD-B9-R-HP16 CBD-B9-R-HP17 Number of Systems 1 1 1 Indicate Paae Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted T-24 Sectio 112 a 112 a 112(b), 112( 112(c), 115 121(b) 121(b) 121 c 121 C 122 e 122 e 122(f) 122(g) 123 124 144a& 144a& 144a& 144(a & 144 c 144 c 144(c) 144 d 144 e 144 f 1i 44(f) 8.00 HSPF 13.0 SEER/ 11.7 EER Yes n1a No 94 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER/ 11.7 EER Yes n/a No 210 cfm No No Programmable Switch Setback Required Auto n/a 8.00 COP 11.7 EER Yes n/a No 315 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0 n/a 1Z316 Btu/hr n/a 22,554 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp n/a 26,928 Btu/hr n/a 41,444 Btu/hr Constant Volume Yes No No Economizer Constant Tamp Constant Temp n/a 63,655 Btu/hr We 65,566 Btu/hr Constant Volume Yes No Diff. Enth (Integrated) Constant Temp Constant Temp 1144 i 1144(k) I No I No No 11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. 1 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 21112013 Indicate Air Systems Type (Central, Single Zone, Packa e, VAV, or etc...) Item or System Tags i.e. AC-1, RTLI-1, HP-1 CBD-89-R-HP18 CBD-89-R-HP19 CBD-69-R-HP20 Number of Systems 1 1 1 Indicate pane Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sectio 112 a 112 a 1'12 b , 1121 112(c), 115 121 b 121(b) 121 c 121 c 122 e 122 e 122(f) 122(g) 123 124 PRESCRIPTIVE MEASURES Calculated Design Heating Load L44 a & Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & 144(a & 144(a & 144(c) 144(c) 144(c) 144 d 144 e 144 f 144 f 144(g) 144(i) 144(kL 8.00 COP 11.7 EER Yes n/a No 122 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 n/a 63,655 Btu/hr n/a 67,181 Btu/hr Constant Volume Yes No Diff. Enth (Integrated) Constant Temp Constant Temp No 8.00 COP 11.7 EER Yes n/a No 221 cfm No No Programmable Switch Setback Required Auto n/a 8.00 HSPF 13.0 SEER / 11.7 EER Yes We No 103 cfm No No Programmable Switch Setback Required Auto n/a Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0 1 n/a 63,655 Btu/hr n/a 68,539 Btu/hr Constant Volume Yes No Diff. Enth (Integrated) Constant Temp Constant Temp No n/a I Z 316 Btu/hr We 22,044 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 30 of 41 AIR SYSTEM REQUIREMENTS Project Name Wasat- Building 9 Item or System Tags (i.e. AC-1, RTLI-1, HP-1) Number of Svstems MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted _ Indicat T-24 Secth 1 -I 2 a 112 a 1-12b,11, 112(c), 11! 121(b) 121 121 1222 122 12s 123 Indicate Air Systems Type (Q CBD-B9-R-HP21 1 e Paoe Reference on Plans or 8.00 HSPF 13.0 SEER/ 11.7 EER Yes n/a No 225 cfm No No Programmable Switch Setback Required Auto n/a Part 1 of CBD-89-R-HP22 1 ule and indicate the 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 630 cfm No No Programmable Switch Setback Required Auto n/a MECH-2C 72/1/2013 VAV, or etc...) CBD-B9-R-HP23 1 8.00 HSPF 13.0 SEER/ 11.7 EER Yes We No 89 cfm No No Programmable Switch Setback Required Auto n/a 1 1 P4 1 Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 8.0 144 a & b n/a n/a n/a 144 a & b 26,928 Btu/hr 26,928 Btu/hr 12,316 Btu/hr 144 a & b n/a n/a n/a 144 a & b 40,844 Btu/hr 41,961 Btu/hr 22,082 Btu/hr 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 f Constant Temp Constant Temp Constant Temp r144(f) Constant Temp Constant Temp Constant Temp r1144 i 44(k) I No No No 11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number. • 2445 RunCode: 2013-02-01 T14:17.35 ID: 3813 Page 31 of 41 I AIR SYSTEM REQUIREMENTS Project Name Wasat- Buildinq 9 Item or System Tags (i.e. AC-1, RTU-1, HP-1) Number of Systems MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted Indicate Air Systems Typ Indicate T-24 Sectioi 1 -I 2 a 1 '12 a 112(b), 112 112(c), 115 121(b) 121 121 122 122' 122 123 124 Part 1 of 2 CBD-B9-R-HP24 CBD-B9-R-HP25 1 1 Reference on Plans or Schedule and indicate 8.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 212 cfm No No Programmable Switch Setback Required Auto n/a B.00 HSPF 13.0 SEER / 11.7 EER Yes n/a No 165 cfm No No Programmable Switch Setback Required Auto n/a MECH-2C 1 21112013 VAV, or etc...) CBD-B9-R-HP26 1 8.00 HSPF 13.0 SEER / 11.7 EER Yes We No 99 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 JAttic, Ceiling Ins, vented / 8.0 1 Attic, Ceiling Ins, vented / 144 a & b n/a n/a n/a 144 a & b 21,573 Btu/hr 21,573 Btu/hr 15,223 Btu/hr 144 a & b We n/a n/a 144 a & b 32,529 Btu/hr 33,779 Btu/hr 24,987 Btu/hr 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 f Constant Temp Constant Temp Constant Temp 144 f Constant Temp Constant Temp Constant Temp 144 144 i 144(k) No No No 11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Buildinq 9 21112013 Indicate Air Systems Type (Central, Single Zone, Packa e, VAV, or etc...) Item or System Tags i.e. AC-1, RTLI-1, HP-1 CBD-89-R-HP27 CBD-89-R-HP28 CBD-B9-R-HP29 Number of Systems 1 1 1 Indicate Paae Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted T-24 Sectio 112 a 11 2 a 1112(b), 1121 1112(c), 1151 12-1(b) 121(b) 121 c 121(c) 1221 1221 1221 123 124 8.00 HSPF 13.0 SEER/ 11.4 EER Yes n/a No 59 cfm No No Programmable Switch Setback Required Auto n/a Attic, Ceiling Ins, vented / 8.0 n/a 9,256 Btu/hr We 18,687 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp 8.00 COP 11.7 EER Yes n/a No 197 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 n/a 63,655 Btu/hr n/a 68,554 Btu/hr Constant Volume Yes No Diff. Enth (Integrated) Constant Temp Constant Temp 8.00 COP 11.7 EER Yes We No 1, 219 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 n/a 52,019 Btu/hr n/a 58,209 Btu/hr Constant Volume Yes No Diff. Enth (Integrated) Constant Temp Constant Temp 1 — 1 No I No I No 11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. 1 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Viasat- Building 9 1 2/1/2013 Indicate Air Systems Type (Central, Single Zone, Packa e, VAV, or etc...) Item or System Tags i.e. AC-1, RTLI-1, HP-1 CBD-B9-R-HP30 CBD-B9-R-HP31 CBD-B9-R-HP32 Number of Systems 1 1 1 Indicate Pace Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted T-24 Sectio 1112 a 1'12 a 1-12(b), 112( 112 c , 115 121(b) 121(b) 121 c 1121 c 122 e 1 22e 122(f) 122(g) 123 124 8.00 HSPF 13.0 SEER / 11.4 EER Yes n/a No 234 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 B.00 HSPF 13.0 SEER/ 11.4 EER Yes n/a No 285 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 8.00 HSPF 13.0 SEER/ 11.4 EER Yes n/a No 90 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 144 a & b n/a n/a n/a 144 a & b 9,256 Btu/hr 9,256 Btu/hr 9,256 Btu/hr 144 a & b n/a n/a We 144 a & b 18,385 Btu/hr 18,533 Btu/hr 18,323 Btu/hr 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 f Constant Temp Constant Temp Constant Temp 144 f Constant Temp Constant Temp Constant Temp 144 144(i) I ...,, . I No I No I No I 11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Wasat- Building 9 2/1/2013 Indicate Air Systems T e (Central, Single Zone, Packa e, VAV, or etc...) Item or System Tags i.e. AC 1, RTU 1, HP 1)IEBERT CBD-B9-F/R-FC1/CU CBD-B9-R-HP33 Number of Systems 1 1 Indicate Paae Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sectic 112 a 112 a 112(b), 112 112(c), 115 121(b) 12.1 b 121 c 121 c 122 e 122 e 122(f) 1•22(g) 123 124 PRESCRIPTIVE MEASURES Calculated Design Heating Load C44 a & Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144 a & 144 a & 144(a & 144(c) 144(c) 144(c) 144 d 144 e 144 f 144 f 144 144 i 144(k) n/a 12.0 EER n/a n/a No 50 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 n/a 0 Btu/hr We 179,682 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No 8.00 HSPF 13.0 SEER/ 11.4 EER Yes n/a No 415 cfm No No Programmable Switch Setback Required Auto n/a Conditioned / 8.0 n/a 9,256 Btu/hr n/a 19,357 Btu/hr Constant Volume Yes No No Economizer Constant Temp Constant Temp No 11. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode: 2013-02-01 T14:17:35 ID: 3813 Page 35 or 4 7 I MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Wasat- Building 9 Date 21112013 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A Zone/System stem B Condition Area ft2 C CFM per fe D Min CFM By Area B X C E Number Of Peo le F CFM per Person G Min CFM by Occupant E X F H REQ'D V.A. Max of D or G 1 Design Ventilation Air CFM J 50 % of Design Zone Supply CFM K B X 0.42 CFM / ft L Max. of Columns H, J, K, 300 CFM M Design Minimum Air Set oint N Transfer Air HP-9 1,100 0.15 165 165 165 CBD-B9-R-HP9 I Total 165 165 HP-10 1,935 0.15 290 290 290 CBD-B9-R-HP10 Total 290 290 HP-11 1,260 0.15 189 189 189 CBD-B9-R-HP11 Total 189 189 HP-12 859 0.15 129 129 129 CBD-B9-R-HP12 Total 129 129 HP-13 1,600 0.15 240 240 240 CBD-B9-R-HP13 Total 240 240 HP-14 690 0.15 104 104 104 CBD-B9-R-HP14 Total 104 104 HP-15 625 0.15 94 94 94 CBD-B9-R-HP15 Total 94 94 HP-16 1,400 0.151 210 2101 210 Totals I Column I Total Design Ventilation Air C Minimum ventilation rate par Section §1211, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50 % of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is ttie larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G . I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50 % ; or the design zone outdoor airflow rate per 121. K Condition area fex 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFMI M N I This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. EnergyPro 5.1 by Ene Soft User Number., 2445 RunCode: 2013-02-01T14:17:35 ID: 3813 Pa a 36 of 41 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Wasat- Building 9 Date 2/1/2013 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N Zone/System stem Condition Area ft2 CFM per flx Min CFM By Area B X C Number Of Peo le CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50 % of Design Zone Supply CFM B X 0.4 CFM / tt2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air CBD-B9-R-HP16 Total 210 210 HP-17 2,100 0.15 315 315 315 CBD-B9-R-HP17 Total 315 315 HP-18 815 0.15 122 122 122 CBD-B9-R-HP18 Total 122 122 HP-19 1,475 0.15 221 221 221 CBD-B9-R-HP19 Totall 221 221 HP-20 685 0.15103 103 103 CBD-B9-R-HP20 Total 103 103 HP-21 1,500 0.15 225 225 225 CBD-B9-R-HP21 Total 225 225 HP-22 1,6801 0.15 252 1 252 630 CBD-B9-R-HP22 Total 252 630 HP-23 590 0.15 89 89 89 CBD-B9-R-HP23 Total 89 89 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the ex ected number of occupants and 50 % of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is tfis larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G . I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50 % ; or the design zone outdoor airflow rate per 121. K Condition area ft2 x 0.4 CFM / fe; or L Maximum of Columns H, J, K, or 300 CFNI M I This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. EnefgyPro 5.1 by EnergySoft User Number:2445 RunCoder 2013-02-01T14:17:35 ID: 3813 Page 37 &41 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Wasat- Building 9 Date 21112013 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A Zone/System B Condition Area ft2 C CFM per ftZ D Min CFM By Area B X C E Number Of People F CFM per Person G Min CFM by Occupant E X F H REQ'D V.A. Max of D or G Design Ventilation Air CFMCFM IKGFM K B X 0.4 / ftz L Max. of Columns H, J, K, 300 CFM M Design Minimum Air Setpoint N Transfer Air HP-24 1,415 0.15 212 212 212 CBD-B9-R-HP24 Total 212 212 HP-25 1,100 0.15 165 165 165 CBD-B9-R-HP25 Total 165 165 HP-26 660 0.15 99 99 99 CBD-B9-R-HP26 Total 99 99 HP-27 395 0.15 59 59 59 CBD-B9-R-HP27 Totall 59 59 HP-28 1,315 0.15 197 197 197 CBD-B9-R-HP28 Total 197 197 HP-29 1,300 0.15 195 195 1,219 CBD-B9-R-HP29 Total 195 1,219 HP-30 390 0.15 59 59 234 CBD-B9-R-HP30 Total 59 234 HP-31 475 0.15 71 711 285 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 500% of the CBC Occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Desi n fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121. K Condition area ftz x 0.4 CFM / fe; or L Maximum of Columns H, J, K, or 300 CFM M N EnergjPro 5.1 This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. by EnergKSoft User Number. 2445 Run Code: 2013-02-01T14r17:35 ID: 3813 Pa a 38 of 41 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Wasat- Building 9 Date 2/1/2013 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS =OCCUPANCY BASIS VAV MINIMUM A Zone/System B Condition Area ft2 C CFM per ft2 D Min CFM By Area B X C E Number Of People F CFM per Person G Min CFM by Occupant E X F H REQ'D V.A. Max of D or G I Design Ventilation Air CFM J 50% of Design Zone Supply CFM K B X 0.4 CFM / ft2 L Max. of Columns H, J, K, 300 CFM M Design Minimum Air —Setpoint N Transfer Air CBD-B9-R-HP31 Total 71 285 HP-32 150 0.151 23 23 90 CBD-B9-R-HP32 Total 23 90 SERVER ROOM 1,000 0.15 150 150 50 100 LIEBERT CBD-B9-F/R-FC1/CU1 Total 150 50 HP-33 415 0.15 62 62 415 CBD-B9-R-HP33 Total 62 415 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section §12'I, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load forogress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G . I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFM x 50 % ;or the design zone outdoor airflow rate per 121. K Condition area ft2 x 0.4 CFM / it; or L Maximum of Columns H, J, K, or 300 CFM M N I This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. Energypro 5.1 by EnergySoft User Number.' 24,I5 RunCode: 2013-02-01T14:17:35 ID: 3813 Page 39 of 41 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name Wasaf- Building 9 Date 2/1/2013 CHILLER AND TOWER SUMMARY PUMPS Equipment Name T e City, Efficiency Tons Ot . GPM BHP Pump Control DHW / BOILER SUMMARY Vol. Energy Factor Standby Loss Tank Ext. System Name Type Distribution City. Rated Input Gals. or RE or Pilot R-Value Status MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pum Hot Water PI In Len th ft Control HP T In Plenum Outside Buried Add �/' Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type city. Output Aux. kW Efficiency Out ut Efficienc Status TRANE4144VC3048 Packaged DX 5 28,200 0.0 8.00 HSPF 46,000 13. 0 SEER / 11, 7 EER Existing TRANE 4 WCC3060 Packaged DX 5 35,2001 0.0 8.00 HSPF 58,800 13.0 SEER / 11.7 EER Existing TRANE 4WCC 3030 Packaged DX 4 16,100 0.0 8.00 HSPF 29,100 13.0 SEER/ 11.7 EER Existing TRANE WSC090 Packaged DX 3 83,2101 0.0 8.00 COP 94,000 11.7 EER Existing TRANS 4 WCC3036 Packa ed OX 1 19, 900 0.0 8.00 HSPF 35,000 13.0 SEER/ 11.7 EER adsti TRANE 4WCC 3024 Packaged DX 1 12,100 0.0 8.00 HSPF 23,7001 13.0 SEER! 11.4 EER Existing TRANEWSCO90 Packaged DX 1 83,2101 0.01 8.00 COP 94,000 11.7EERF New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer T a I CFM BHP CFM BHP TRANE 4WWC3048 Constant Volume No Economizer 1,600 0.23 none TRANE4WCC3060 Constant Volume No Economizer 2,000 0.25 none TRANE 4WCC 3030 Constant Volume No Economizer 100 0.19 none TRANE WSC090 Constant Volume Diff. Enth (integrated) 3,000 0.29 none TRANE 4WCC3036 Constant Volume No Economizer 1,200 0.21 none TRANE 4WCC 3024 Constant Volume No Economizer 800 0.17 none TRANE WSC090 Constant Volume Difi. Enth (integrated) 3,000 0.291 none EnergyPro 5.1 by EnergySoft User Number. 2445 RunCode., 2013-02-01T14:17:35 ID: 3813 Page 40 of 41 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 Date MECH-5C Project Name 2/1/2013 Wasat- Building 9 CHILLER AND TOWER SUMMARY PUMPS Equipment Name T e Oty, Efficiency Tons Oty, GPM BHP Pump Control DHW / BOILER SUMMARY Vol. Energy Factor Standby Loss Tank Ext. System Name Type Distribution City. Rated Input (Gals). or RE or Pilot R-Value Status MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pum Hot Water PI in Len th ft Control HP Type In Plenum Outside Buried Add'Fi" Insulation CENTRAL SYSTEM RATINGS COOLING System Name TRANEWSC 072 T e Packaged DX Efficient 8.00 COP Out ut 77,00011.7 Efficient EER Status New TRANE 4WCC 3024 Packaged DX jW 8.00 HSPF 23,70013.0 SEER/ 11.4 EER New LIEBERT DS053 S lit DX n/a 185,700 12.0 EER Existing CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN I RETURN FAN System Name Fan Type Economizer Type CFM BHP I CFM BHP TRANE WSC 072 Constant Volume Diff. Enth (integrated) 2,400 0.28 none TRANE 4WCC 3024 Constant Volume No Economizer 800 0.171 none LIEBERT DS053 Constant Volume No Economizer 7,500 1.90 none �P,41 EnergyPro 5.1 by EnergySoff User Number: 2445 RunCods: 2013-02-01T14:17:35 ID: 3813 of 41 + ��Project Address: Permit Na.:5 Information provided below refers to worla,bOW done cm the above mentioned pe only. This `form must be cosnolete�d and returned to the 8uildin}l Division before the aermit can be issued. Hullding Dept Fax: (760) 602-8558 Number of new or relocated %ctu s, Ira , or floor drains ............. .... I l New building sewer line? ...... ..: .... ., »» .......» . : G ........ ..:_.»,.». Yes No Number of new roof drains?` M ..... . Install/after water line? ...... ...... ........ ,..., ...._._...»........,...;...,»»»�.»..... Number of new water heaters? . Number of new, relocated or replaced gas outlets? ....» Number of new hose bibs? .� . Tenant Im rovenlen l emadelu. Number of Panels Onvolved in this proNd) Amps per panel (1r OWGd inthis Ate) - Remodel only - (re:locatetadd outlets/switches) . . Yes No New Construction: Number of new panels or subpanels?.»».»»»..... » •» Amps per Panel, Single Phase ---� . b neVomperes Three Phase ............ . .. �....»�..»,... ».�.,� .. . ,. ........ NuUeZ new ampere s Three Phase 460.. � .Number of new amperes_ Number of new furnaces. A1C, or heat pumps?. ..,... i......,. ». ............. ........ New or relocated duct warp? ............. Yes No Number of new fireplaces? Number of new exhaust fans7.. .......... Relocate/install vent?,........ ,.. Number of new exhaust hoods? .......... .... . �. a Number of new boilers or compressors?....... :.-r.,. .»....» ..:...,... »,.... ,...». Number of IIP 6-iS Page 1 of 1 Rev. 03109