Loading...
HomeMy WebLinkAbout2303 OCEAN ST; ; CB141322; Permit• City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 09-26-2014 Pool Permit Permit No: CB141322 Building Inspection Request Line (760) 602-2725. Job Address: 2303 OCEAN ST CBAD Permit Type: POOL Status: ISSUED Parcel No: 2030102200 Lot #: 0 Applied: 06/12/2014 Valuation: $31,924.00 Construction Type: NEW Entered By: RMA Reference #: Plan Approved: 09/26/2014 PC #: Issued: 09/26/2014 Project Title: OCEAN STREET CONDOS- POOL & Inspect Area: SPA-7845F Applicant: Owner: MISSION POOLS OF ESCONDIDO INC OCEAN STREET 8 OWNER LLC AUN:GENERAL COUNSEL 755 W GRANDAV 3300 P G A BLVD #820 ESCONDIDO CA 92025 PALM BCH GDNS FL 33410 619-743-2605 Building Permit . $323.36 AddI Building Permit Fee $0.00 Plan Check . $226.35 Add'l Plan Check Fee $0.00 Electrical Fee $33.00 Plumbing Fee $33.00 Strong Motion Fee $3.19 Green Bldg Standards (5B1473) Fee $1.00 Renewal Fee $0.00 AddI Renewal Fee $0.00 Other Building Fee $0.00 Additional Fees $0.00 TOTAL PERMIT FEES $619.90 Total Fees: $619.90 Total Payments To Date: $619.90 Balance Due: $0.00 InsDector: FINAL APR)AL IADAS .._ Clearance: ZI _________ Date: NOTICE: Please take F%6110E that approval of your project includes the "Imposition" of lees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any • City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit 09-26-2014 Permit No:SW140196 Job Address: 2303 OCEAN ST CBAD Permit Type: SWPPP Status: ISSUED Parcel No: 2030102200 Lot #: 0 Applied: 06/12/2014 Reference #: Entered By: .RMA CB#: CB141322 Issued: 09/26/2014 Inspect Area: Project Title: OCEAN STREET CONDOS-POOL & SPA Tier: 1 Priority: L Applicant: MISSION POOLS OF ESCONDIDO INC 755W GRAND AV ESCONDIDO CA 92025 619-743-2605 Emergency Contact: JACK TONE Owner: OCEAN STREET 8 OWNER LLC ATTN:GENERAL COUNSEL 3300 P G A BLVD #820 PALM BCH GDNS FL. 33410 760-801-6049 SWPPP Plan Check $48.00 SWPPP Inspections $57.00 Additional Fees $0.00 TOTAL PERMIT FEES $105.00 Total Fees: $105.00 Total Payments To Date: $105.00 Balance Due: $0.00 FIIALAPLF DATE/ SGNATUR <<4' CITY OF Plan Check No. /C/ IJI.Z. Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value ,7 760-602-2717/2718/2719 . . "o —' .# Fax 760-602-8558 1a11 pUIL Q( o(4'J) CARLSD/-%D www.carlsbadca.gov A4,Dateihhu/ / I (/ jsw /c'c, i JOB ADDRESS I SUITE#/SPACE#/UNIT# PN - - - 5e)cc(Af)t, I Ed St SI PHASE St OF UNITS BEDROOMS BATHROOMS I TENANT BUSINESS NAME I CONSTR. TYPE 0CC. GROUP (LOT (St ::1:&t,i .s"?j'- 114.Li)i2 ..J I DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) poo - c, c,tdes 719//I EXISTING USE USE GARAGE (SF) PATIOS (SF) DECKS (SF) I FIREPLACE l AIR CONDITIONING I FIRE SPRINKLERS (PROPOSED I s NOE ki:i't YES DNO U I YESD NOU (U NAME (Primary APPLICA Con tact) .. tat4! s,rw- ee'eeeee APPLICANTNAME (Secondary Contact) ADDRESS ADDRESS CITY STATE ZIP CITY STATE ZIP PHONE FAX PHONE FAX EMAIL PROPERTY OWN a~l ER N 3 CONTRACTOR BUS. NAME 6(n aaallcoxl- ADDRESS z%Itca,C(. ADDRESS CITY j) .5zn (d/_ceJ'O STATE / CITY STATE ZIP PHONE FAX PHONE FAX EMAILEMAIL EMAIL ARC WOESIGNER NAME & ADDRESS STATE LIC. St STATE UC.# I ClAss IC?-53I,71OO I CM BUS. LIC.# 'Ouu ,U.,J..0 ouuineus OUU rrutessions Uuoe: wily ity or bounty wnicn requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). 'z'j 1 lCO M PENS A T ION Workers' Compensation Declaration: thereby affirm under penalty of pe4uiy one of the following declarations. I have and will maintain a certificate of consent to self-insure for workers' compensation as-provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation, as required by Section 3700 of the Lor Code. for the performance of the work for which this permit is issued. My workers' compensation insu nce rTier and policy number are:Insurance Co ( VC"/'CS 7 A/&7,'O/'t i21 Policy N/(1lf3/ /'J 1 Expiration Date _g/y1'j 5 This section need not be completed if the permit is for one hundred dollars ($100) or less. C] Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (116100,000), In addition to the cost of compensation, d mages as rovlded for In Sec 3706 of the Labor code, interest and attorney's fees. £ CONTRACTOR SIGNATURE LGENT DATE - thereby affirm that lam exempt from Contractor's License Law for the following reason: [] I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply loan owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). [] I am exempt under Section Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement IIYes UNo 2.l(have I have not) signed an application for a building permit for the proposed work. I have contracted with the following person (firm) to provide the proposed construction (include name address! phone! contractors' license number): I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name! address! phone! contractors' license number): 5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address! phone! type of work): ..PROPERTY OWNER SIGNATURE []AGENT DATE @0DO17I oa O®IJ 900 G90G900000a)(mmaaQ(!)O()O)® G)WEIMOV0 ®1SY Is the applicant or future building occupant required to submit a business_, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? j Yes LA No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or ajality management district? —]Yes (AJ,No Is the facility lobe constructed within 1,000 feet of the outer boundary of a school site? [:lYes ILjto IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. C®!)(?O®() &3000690 &()€S7 I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lenders Name . Lender's Address DO?O®i IcertIfythatt have read the application and state' thattheabove infOrTnaUon iscoriectand thatthe infomiatlonon the plans tsaccurate. IagreetocompIywith all Cltyordinances and State laws relatlngto buildlngconstruction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANYWAY ACCRUE AGAINST SAID CITY INCONSEQUENCE OF THE GRANTING OF THIS PERMIT.- OSHA. An OSHA permit is required for excavations over 69 deep and demolition or construction of structures over 3 stories in height EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or;build*9 or work aulho ysudi permit is suspended or abandoned at anytime after the work is commenced fora period of days (Section 106.4.4 Uniform Building Code). ..APPLICANFS SIGNATURE DATE W\ L/ Inspection List Permit#: CB141322 Type: POOL OCEAN STREET CONDOS- POOL & SPA -784SF. Date Inspection Item Inspector Act Comments 11/02/2015 59 Final Pool - PY AP 09/29/2015 39 Final Electrical PY PA 09/25/2015 59 Final Pool PD AP 08/31/2015 59 Final Pool PY NR 08/06/2015 55 Fence/Pre-Plaster PY AP 06/30/2015 51 Excav/Steel/Bonding/Fence PY PA 11/05/2014 51 Excav/Steel/Bonding/Fence PY AP 11/05/2014 52 Underground Plumbing PY PA 10/31/2014 12 Steel/Bond Beam SP AP 10/31/2014 31 Underground/Conduit-Wirin SP AP 10/29/2014 11 Ftg/Foundation/Piers PY NR Wednesday, November 04, 2015 Page 1 of 1 N$P;ECTION R.16-CO-4 'BuftnOh fl IHNSFECTION. RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB 0 CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION 0 FOR BUILDING INSPECTION CALL: 760-602-2725 OR GO TO: www.CarIsbdca.uv/8u1IdIn9 AND CLICK ON Request Inspection" DATE: JL)L., lit-I !F 5L?' POOL Lot#: MISSION POOLS OF ESCONDDO)NC RD COPY IF YES" L, CHECKED BELOW THAT DIVISION'S APPROVAL IS REQUIRED PRIOR TO REQUESTING A F I N A L B U I L D I N G I N S P E C T I O N . IF YOU HAVE ANY QUESTIONS PLEASE CALL THE APPLICABLE DIVISIONS A T T H E P H O N E N U M B E R S P R O V I D E D B E L O W . A F T E R ALL REQUIRED APPROVALS ARE SIGNED OFF— FAX TO 760-602-8560. EMAIL TO BLOGINSPECTIONS@CARLSBADCA,GOV OR BRING IN A COPY OF THIS CARD To: 1635 FARADAY AVE., CARLSBAD, CA 92008. BUILDING INSPECTORS CAN BE REACHED AT 760-602-2700 BETWEEN 7:30 AM - 8:00 AM THE DAY OF YOUR INSPECTION. 4IRequired IPrior L1Requesting Notes1 FTT1ITA!.I.I 760-944-8463 Aflow 48 hours CM&I fEnginecring Inspections) 760-43 B-38 91 Call IIbefore .i. 41 - Fire Prevention 760-602-4660 I;Ihours - Allow type UT inspection Tve of Inseection UJII]IIi.. #11 FOUNDATION Date Inspector Date inspector #31 0 ELECTRIC UNDERGROUND 0 UFER #12 REINFORCED STEEL ITj #34 ROUGH ELECTRIC '- #66 MASONRY PRE GROUT " #33 U ELECTRIC SERVICE 0 TEMPORARY " 0 GROUT C) WALL DRAINS #35 PHOTOVOLTAIC 10 TILT PANELS #39 FINAL 11 COLUMN FOOTINGS )ii POUR STRIPS #41 UNDERGROUND DUCTS & PIPING #14 SUBFRAME 0 FLOOR 0 CEILING - #44 0 DUCT& PLENUM 0 REF. PIPING #16 ROOF SHEATHING #43 HEAT-AIR COND. SYSTEMS #33 EXT. SHEAR PANELS #49 FINAL #16INSULATION CoDE# 'COMBO INSPECTION #31 UNDERGROUND (11,12,21,31) #18 EXTERIOR LATH #17 INTERIOR LATH & DRYWALL #82 DRYWALL,EXT LATH, GAS TES (17,18,23) #51 POOL EXCA/STEEL/BOND/FENCE (0/3//I It .r?" _!!.. ROOF SHEATING, EXT SHEAR (13,15) #55 PREPLASTER/FINAL 1 #84 FRAME ROUGH COMBO (14,24,34,44) #19 FINAL #85 T-Bar(14,24,34,44) #22 OSEWER&BL/CO DPL/CO - Date Inspector ______ FIRE #89 FINAL OCCUPANCY (19,29,39,49) jor #21 UNDERGROUND OWASTE 0 WTR #24TOPOUT OWASTEOWTR A/S UNDERGROUND VISUAL #27 TUB & SHOWER PAN __________ A/S UNDERGROUND HYDRO #230 GAS TEST 0 GAS P!PING _______ ____________ 'A/$ UNDERGROUND FLUSH I #25 WATER HEATER _________ A/S OVERHEAD VISUAL #28 SOLAR WATER ____________ A/S OVERHEAD HYDROSTATIC #29 FINAL ________ A/S FINAL ip.1t']1&W.I #600 PRE-CONSTRUCTION MEETING - _______ F/AROUGHIN ____________ F/AFINAL #603 FOLLOW UP INSPECTION ____________ FIXED EXTINGUISHING SYSTEM ROUGH IN #60 7(#CE1O.CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST 6Oi RPTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL MEDICAL GAS PRESSURE TEST am i OW — MEDICAL GAS FINAL CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 6/24/14 PROJECT NAME: Ocean St residences pool construction PROJECT 1DCT 05-12 PLAN CHECK NO:CB141322 SET#:I ADDRESS: 2303 Ocean St APN: 20301012 VALUATION: $31,924 APPLICANT CONTACT: barbaras@missionpools.com IX-1 TI-is plan check review transmittal is to notify you of clearance by: LAND DEVELOPMENT ENGINEERING DIVISION Final Inspe ction by the Construction & Inspection Division is required: Yes L No X GM For status from a division not marked below, please call 760-602-2719 F-1 This plan check review is NI'COMPLETE Items missing or incorrect are listed on the attached checklist. Please resubmit ame nded plans as required. DEVELOPMENT ENG. rAND 760-602-2750 Chris Sexton {1 Kathleen Lawrence fl Greg Ryan 760-602-4624 LJ 760-602-2741 -- 760-602-4663 ChrisSexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov Gina Ruiz Linda Ontiveros fl Cindy Wong 760-602-4675 Z 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Qfliveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov Dominic Fieri L._ 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: - Mission Pools 760 871-0285 p.1 --4- CITY OF CARLSEl BAD STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov I am applying to the City of Carlsbad for the following type(s) of construction permit U. Building Permit U Right-of-Way Permit 0 My project is categorically EXEMPT from Electrical PatiolDeck Fire the requirement to prepare a storm water Additional Photo Voltaic pollution prevention plan (SWPPP) because it Fire Alarm Fixed Systems Re-Roofing Sign only requires issuance of one or more of the . Mechanical Spa-Factory following permit types: Mobile Home Sprinkler Plumbing Water Discharge Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria 0 My project qualifies as NO THREAT and Is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) become it meets the Ino threat assessment criteria on the City's Project Threat A smetWorksheetforpetemdnation of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. hen - Low Threat Assessment Criteria My project does not meet any of the Signiflonat or Moderate Threat criteria, is not an exempt permit We (See list above) and the project meets one or more of the following criteria: Results in some sell disturbance and!or Includes outdoor construction activities (such as saw cutting. equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2- Moderate Threat Assessment Criteria O My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, Proiect will result In 2.500 square feet or more of soils disturbance including any associated construction staging, stodmpil.ng, pavement removel, equipment storage, refueling and maintenance areas and project meets one or more of the additional foltowing anterior Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, andlor Disturbed area is located on a slope with a grade atorexceedmg 5 horizontal to 1 vertical, andlor Disturbed area is located along orwithin 30 feel of a storm drain Inlet, an open drainage channel or watercourse, andlor Construction will be initiated during the rainy season or w3 extend into the rainy season (Oct. t through April 30). Tier 3 - Significant mreatAssessment Criteria 0 My project includes clearing, grading or oilier disturbances to the ground resulting in suit disturbance totaling one or more asses including any associated onnstruclion staging, equipment storage, stockpiling, pavement removal., refueling and maintenance areas: andlor O My project is part ala phased development plan that will cumulatively result in soil disturbance totaling one or more acres Including any associated construction staging, equipment storage, refueling and maintenance areas: or. 0 My project is located inside or within 200 feet of an environmentally sensitive area (sea City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters byway of storm water runoff or non-storm water discharge(s). I ceitlfjte the best of my knowledge that the above checked statements are true and correct I understand and acknowledge that even though this project does not require preparation of a construction SWPP, Imrsst stilt adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management pra cdces pursuant to Thle 15 of Me Carlsbad Municipal Code and to City Standards. 'The City Engineer may authorize mirarvatoices frcm the Storm Water1heaIAmessmnern Qitaria in spacial ciminatanoesatrereit can be owrtl'at a baser or Ngher constniclien SWPPP Tier Level is warmnlat B-24 PieAddmss: Assessor Pacot No. ?3O Ocriii O#rorwnet'sA,r.helzed Agent Name: Thiec 0snmts0wAutho&a:I Pgent - Oat; rnece: na 11 NO rym 17 Z'/,1'66 cJ* lay I Page 1 of I Rev.03109 BE Mission Pools 760 871-0285 p.3 CITY OF CAR LSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760.602-2750 www.carlsbadca.goi To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SIJSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.aov!standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdMsion, discretionary permits and!or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Storrnwater Requirements' or be subject to additional criteria called Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project, conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of The development application as incomplete. In This case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project Please start by completing Step I and follow the instructions. When completed, sign the foni, at the end and submit this with your application to the city. Mp ME 1-IN MON. 11 To determine if your project is a priority development project, please answer the following questions: YES NO Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trils that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? Is your project LIMITED TO retrofitting or redeveloping easting paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? If you answered 'yes' to one or more of the above questions, then your project is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet POP requirements" and complete applicant information. If you answered 'no' to both questions, then go to Step 2. E-34 Page 1 of 3 Effective 6127113 Mission Pools 760 871-0285 p.4 CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov 1To determine if your project is a priority development project, please answer the following questions: YES NO Is your project a new development that creates 10000 square feet or more of impervious surfaces collectively over the entire project site? This includes commerciai industrial, residential, mued-use, and public development projects on public or private land. Is your project creating or replacing 5.000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on-public or private land. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption. Is your project a new or redevelopment project that creates 5,000 square.feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater.. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the .entire project site and supports a parking lot A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. Is your project a new or redevelopment project that creates 5.000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, mad, highway, freeway or driveway is any paved impervious surface used for the transposfation of automobiles, trucks, motomycles— and other vehiries. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)?'Discharging Directly to includes Now that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated Now from the project to the ESA (ie. not commingles with flows from adjacent lands)' S. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. Is your project a new development that supports a retail gasoline outlet (RGO)? This calago,y inriiudes RGO's Mat meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 100/6? To—you answered 'yes to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets POP requirements" box and complete applicant information. If you answered 'no' to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all [development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development Go to step I at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant [I nformation. E-34 Page 2 of 3 Efleelve 27l13 Mission Pools 760 871-0285 p.5 c CITY OF CAR LS12 BAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov SIE Complete the questions below regarding your redevelopment project YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? If you answered 'yes,' the structural BMP's required for Priority Development Prqects apply only to the creation or replacement of impervious surface and not the entire development. Go to step 4, check the 'my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 46 check the 'y project meets PDP requirements" box and complete applicant Information. I] My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SIJSMP for details. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSIVIP. As part of these requirements, I will incorporate low impact development strategies throughout my project Applicant Information and Signature Box Accessor's Parcel Number(s): liPI!-ll1.I_. Applicant Title: - - - Date.,/jJ,g This Box for City Use Onfy MIA 'MI No FA * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6127)13 CITY OF CARLSBAD STORM WATER COMPLIANCE FORM TIER I CONSTRUCTION SWPPP E-29 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STORM WATERPOLLUTION PREVENTION NOTES I. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL THE OWNERICONTRACTOR SHALL INSTALL ADDITIONAL. EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4, ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (6) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPE-CIAL NOTES STORM WATER COMPUANCE CERTIFICATE / My project Is not In a category of permit types exempt from the Construction SWPPP requirements I My project Is not located inside or withIn 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). / My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) I My project will not result in 2,500 square feet or more of soils disturbance Including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: located within 200 Feet of an environmentally sensitive area or the Pacific Ocean; and/or, disturbed area is located on a slope with a grade at or exceeding 5 horizontal to I vertical; and/or disturbed area is located along or Within 30 feel of a storm drain Inlet an open drainage channel or watercourse; and/or construction will be Initiated during the rainy season or will extend Into the rainy season (Oct. 1 through AprIl 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER I CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (I) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES; COMPLY WITH THIS CITY APPROVED TIER I CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. 7f& 2Y. OWNER(S)IOWNER'S AGENT NAME (PRINT) _________ t,/, // OWNER(S)IOWNER'S GENT NAME (SIGNATURE) DATE PROJECT INFORMATION Site Address: =5 &69111 1:5 Assessors Parcel Number: Project ID: (jJ/(40 Construction Permit N0A26 I4 Estimated ConstructIon Start Date Project Duration ___________Months Emergency Contact: NamJLfr__12/ e-- 24 hour Phone. -7w - go/ d9'7 Perceived Threat to Storm Water Quality D Medium di Low If medium box Is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only C CARLSBAD ST TIER TIER 1 SWPPP VDApproved By: Date: E-29 Page 1 of 3 REV 4/30/10 Erosion Control I(.1LI Sediment -,BMPs Tracking - Best Management Praciice BMI t.Y Designation Construction Activity UUBI I UIAUUUIUUUUU MMMM u!1Illllr cutting LLV. 0r1iJnT= ____.____ ____.__.____•_______ IF, RIM, -- SMENIMENEENEE WNEENNIN NONNI azardous Substance U5 IIt! I.r!T1tiI — — __._ _______.___ ____.________ • • • ____.________•__•____• _______• • ____•________•_______• ----- __• • ______ Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrrlbed. pick one or more best management practices (BMPs) from the list located along the top of the form. Than place an X In the box at the place where the activity row Intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example -if the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction lngresslEgress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction ingresslEgress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row Intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the I3MP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4130110 PLANNING DIVISION BUILDING PLAN CHECK Development Services leow:h> Planning Division CITY OF APPROVAL 1635 Faraday Avenue CARLSBAD P-29 (760) 602-4610 www.carIsbdca.2ov DATE: 6-12-14 PROJECT NAME: PROJECT ID: PLAN CHECK NO: CB 14-1322 SET#: I ADDRESS: 2303 Ocean St APN: This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton/Shannon Werneke A Final Inspection by the Planning Division is required El Yes 00 You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: barbaras@missionpools.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton Kathleen Lawrence Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Chrjs.sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carIsbadca.gov Gina Ruiz Linda Ontiveros Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.0ntiveros@carIsbadca.ov Cynthia.Wong@carlsbadca.gov Dominic Fier! 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: AN CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL COPY Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 06.21.2014 PROJECT NAME: OCEAN STREET RESIDENCES PROJECT ID: CB141322 PLAN CHECK NO: I SET#: I ADDRESS: 2303 OCEAN ST APN: This plan check review is complete and has been APPROVED by the FIRE Division. By: G. RYAN A Final Inspection by the FIRE Division is required Z Yes J No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: You may also have corrections, from one or more of the divisions listed below. Approval from these divisions may berequired prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-6024610 760-60:12750 760.602-4665 Chris Sexton Kathleen Lawrence Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Greeory.Rvan@carlsbadca.gov . Gina Ruiz • Linda Ontiveros • Cindy Wong 760-602-4615 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cvnthia.WoM@carlsbadca.gov Dominic Fieri • 760-602-4664 Dominic.Fieri@carlsbadca.gov Conditions for CB141322 Sec Item Id Description Approved Recr Date Items Action Inheritable Item Origin * C0N000739 SHALL PROVIDE MAN GATE No R 06/21/2014 1 CO No 0 ALONG NORTH WALL FACING EMERGENCY ACCESS AISLE. SHALL PROVIDE A RECESSED KNOX KEY BOX (3200 SERIES) AT EACH ACCESS GATE Total Rows: I 16:05 06/21/2014 oz m Page 1 49 1/2. -11 3/4- t.rça1 Of J jc(4 Pf 01. 1014S. nO ThE ,I IRE-SPEC %t - I 22 "—MAXIMLJM -391/4 NOTE: . SETBACK Li\ DIMENSIONS VERY WITH SPECIFIC APPLICATIONS. SPECIFICATIONS ARE NOMINAL AND ARE SUBJECT TO CHANGE, PLEASE CONTACT, SPECTUM PRODUCTS FOR CUSTOM APPLICATIONS. 7100 Spectrum Lane Missoula, Montana 59808 406.542.9781 * 800.791.8056 PROD Fax: 406.542.1158 www.spectrumproducts.com I1A1 ADJUSTABLE FOOTREST ENGINEERING DATA