HomeMy WebLinkAbout2306 Altisma Way; ; CBR2018-1884; PermitResidential Permit
Print Date: 01/13/2020
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
Description:
FEE
2306 Altisma Way
BLDG-Residential
2152402812
$ 19,174.98
LA COSTA VIEW HOA: REROOF
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
SB1473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-RESIDENTIAL
Work Class: Reroof
Lot#:
Reference#:
Construction Type
Bathrooms:
Orig. Plan Check#:
Plan Check#:
Total Fees: $ 349.71 Total Payments To Date : $ 349.71
Ccityof
Carlsbad
Permit No: CBR2018-1884
Status:
Applied:
Issued:
Closed -Expired
08/02/2018
08/02/2018
Permit
Finaled:
Inspector: TFraz
Final
Inspection:
Contractor:
ALTA ROOFING AND WATERPROOFING INC
5665 Kearny Villa Rd
San Diego, CA 92123-1123
858-256-7663
Balance Due:
AMOUNT
$203.66
$142.56
$1.00
$2.49
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees /exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
EXPIRED PERMIT
PERMIT HAS EXPIRED IN 1,r.rnRDANCE WITH C.B.C.
SECTION 106.4.4 AS AMEtf.,tD BY C.M.C.18.04.030
DATE!:-1 ~-7'?_ SIGNATURE ff1' M,'t'a '&kr.C'OY'I
Building Division
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
C:4111 c Pen aa,ipl ll1n
1635 fllldllr Ave., CIIIINd. CA82CI08
Plr 7IIIMI02-Z719 FU 78CMI02-115511
MIiii: .,.,......,.,..,..... p
,,..,_ ... ,_...,, ___ i.111' .. ...,_
u--
□ L•-d ............... _ ... _, __ ._ .. ., ..... _. .. ________ ,._ _ _., ; ; ---:=-=-=----,, ~.:.=~-=-.~•t:-:.::--.:.====.:.-:.._..:..-----□ L-d•-•--...... •---•----(&ll.-,..__.,.__._'1111_..U...1.9-•-••-lf ,,_ .............. -. .. --....... ---··---□ ,_..,. __ , __ _; _______ _
1 .................. _ _._lllr_dM.......,__.,._1111. 0,.. C)I. ,,,.., ....................... ,... ......... ....
llla h.•~17 ; 6 ............. ,,.... 7 I ..,. __ ,,._, __ _... •••• ., ... .,.,,.._ .. ....,._ ....... _... ................ _,_,..,..i __ _,,
ll "'I -•••111111 __ ,....,......,_.,... ... _.....,_, __ ,.,.,_,...,_,. -
~-:,, __ ....,._...., _____ ..., ____ ., ___ _
T-----OV.. Ollt
......... _.....,._,..... __ ,_._ ... ,_ __ ••----•-DYa D• .............. I d-\•i.e1 .. --,.,•--DYii ONo •-o,---l'El,A-CB1111J:A11Clf-.:yMJ-•--111E-INErCll ■-t/.lllm -------·
PERMIT INSPECTION HISTORY REPORT (CBR2018-1884)
Permit Type: BLDG-Residential Application Date: 08/02/2018 Owner:
Work Class: Reroof Issue Date: 08/02/2018 Subdivision:
Status: Closed -Expired Expiration Date: 04/16/2019 Address:
IVR Number: 12965
Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector
08/06/2018 08/06/2018 BLDG-15 066105-2018
Roof/ReRoof (Patio)
Checklist Item
BLDG-Building Deficiency
09/19/2018 09/19/2018 BLDG-15 070409-2018
Roof/ReRoof (Patio)
Checklist Item
BLDG-Building Deficiency
10/18/2018 10/18/2018 BLDG-15 073440-2018
Roof/ReRoof (Patio)
Checklist Item
BLDG-Building Deficiency
January 13, 2020
Failed Tim Frazee
COMMENTS
Not Ready
Partial Pass Tim Frazee
COMMENTS
Not Ready
Tear Off/ Demo on 2 east biogs OK
Replaced 5 sheets of plywood on eastern
most bldg
Replaced 2 sheets on middle/ little bldg
Partial Pass Tim Frazee
COMMENTS
Not Ready
Tear Off/ Demo on 2 east biogs OK
Replaced 5 sheets of plywood on eastern
most bldg
Replaced 2 sheets on middle/ little bldg
Replaced 4 sheets of plywood on west bldg
10/18/18
LA COSTA VALLEY #5
2306 Altisma Way
Carlsbad, CA 92009
Reinspection Complete
Reinspection Complete
Passed
No
Reinspectlon Incomplete
Passed
Yes
Reinspection Incomplete
Passed
Yes
Page 1 of 1
8-10
REROOFING SUPPLEMENTAL BUILDING PERMIT APPLICATION
1. JOBAooRess:2,3O2, ?3C>Y~ 23a1o12 3Q:l, 2.31D A\+is~~
2. TYPE OF BUILDING: RESIDENTIAL ~ COMMERCIAL. __ _
3. ROOF SLOPE: RISE y INCHES IN 12 INCHES
4. NUMBER OF EXISTING ROOF COVERIN_G (CIRCLE ONE) d) 2 3
Bu1\ct \JP
5. TYPE OF EXISTING ROOF COVERING Eu:Cl\Je.\ /-£ \:f SHEATHING f )yi,,oud
S<Av-na. h I f>v c 1
*6. NEW ROOF MATERIALt Eo5\~ ::t·, I€ CLASS A WEIGHT PER SQ. Sri
7. NUMBER OF SQUARES \0 \ 0 (j:p--\-a \)
8. TRADE NAM~pD m·,, wh\\e MANUFACTURER
P\IG 3,~\7 1.-C\ SO-.\\o \_\Q..('.d
9. ROOF SYST M LISTING: ..., v
UL NO. _____ I.C.C.E.S. Report# _____ _
ASTM ____ _
10. IS THE EXISTING STRUC~ DESIGN SUFFICIENT TO SUSTAIN THE WEIGHT OF THE
PROPOSED ROOF? ~ NO
All roof coverings are required to be CLASS A Combustible roof COWlfings of any type or
classification are prohibited.
I understand the following inspections are required:
1. Tear Off/Pre-Inspection prior to install new roof covering
2. Final Inspection
I agree to provide a ladder extending at least 2 rungs above the roof for inspection_
Signature Co,4 ~ ChAJ..riA ••.
Contractor Owner Contractor
Date 13' r 1 1 i~ r I
A~en+ ✓
Name Caro\\~ C bx\ <;;-\i 0-..(°"'\
"6. Rolled Roofing, Standardll.i1e Tile, Asphalt/Comp fiberglass, Built Up, Other
Re-,_ 04/14