Loading...
HomeMy WebLinkAbout2306 Altisma Way; ; CBR2018-1884; PermitResidential Permit Print Date: 01/13/2020 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: Description: FEE 2306 Altisma Way BLDG-Residential 2152402812 $ 19,174.98 LA COSTA VIEW HOA: REROOF BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) SB1473 GREEN BUILDING STATE STANDARDS FEE STRONG MOTION-RESIDENTIAL Work Class: Reroof Lot#: Reference#: Construction Type Bathrooms: Orig. Plan Check#: Plan Check#: Total Fees: $ 349.71 Total Payments To Date : $ 349.71 Ccityof Carlsbad Permit No: CBR2018-1884 Status: Applied: Issued: Closed -Expired 08/02/2018 08/02/2018 Permit Finaled: Inspector: TFraz Final Inspection: Contractor: ALTA ROOFING AND WATERPROOFING INC 5665 Kearny Villa Rd San Diego, CA 92123-1123 858-256-7663 Balance Due: AMOUNT $203.66 $142.56 $1.00 $2.49 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees /exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. EXPIRED PERMIT PERMIT HAS EXPIRED IN 1,r.rnRDANCE WITH C.B.C. SECTION 106.4.4 AS AMEtf.,tD BY C.M.C.18.04.030 DATE!:-1 ~-7'?_ SIGNATURE ff1' M,'t'a '&kr.C'OY'I Building Division 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov C:4111 c Pen aa,ipl ll1n 1635 fllldllr Ave., CIIIINd. CA82CI08 Plr 7IIIMI02-Z719 FU 78CMI02-115511 MIiii: .,.,......,.,..,..... p ,,..,_ ... ,_...,, ___ i.111' .. ...,_ u-- □ L•-d ............... _ ... _, __ ._ .. ., ..... _. .. ________ ,._ _ _., ; ; ---:=-=-=----,, ~.:.=~-=-.~•t:-:.::--.:.====.:.-:.._..:..-----□ L-d•-•--...... •---•----(&ll.-,..__.,.__._'1111_..U...1.9-•-••-lf ,,_ .............. -. .. --....... ---··---□ ,_..,. __ , __ _; _______ _ 1 .................. _ _._lllr_dM.......,__.,._1111. 0,.. C)I. ,,,.., ....................... ,... ......... .... llla h.•~17 ; 6 ............. ,,.... 7 I ..,. __ ,,._, __ _... •••• ., ... .,.,,.._ .. ....,._ ....... _... ................ _,_,..,..i __ _,, ll "'I -•••111111 __ ,....,......,_.,... ... _.....,_, __ ,.,.,_,...,_,. - ~-:,, __ ....,._...., _____ ..., ____ ., ___ _ T-----OV.. Ollt ......... _.....,._,..... __ ,_._ ... ,_ __ ••----•-DYa D• .............. I d-\•i.e1 .. --,.,•--DYii ONo •-o,---l'El,A-CB1111J:A11Clf-.:yMJ-•--111E-INErCll ■-t/.lllm -------· PERMIT INSPECTION HISTORY REPORT (CBR2018-1884) Permit Type: BLDG-Residential Application Date: 08/02/2018 Owner: Work Class: Reroof Issue Date: 08/02/2018 Subdivision: Status: Closed -Expired Expiration Date: 04/16/2019 Address: IVR Number: 12965 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector 08/06/2018 08/06/2018 BLDG-15 066105-2018 Roof/ReRoof (Patio) Checklist Item BLDG-Building Deficiency 09/19/2018 09/19/2018 BLDG-15 070409-2018 Roof/ReRoof (Patio) Checklist Item BLDG-Building Deficiency 10/18/2018 10/18/2018 BLDG-15 073440-2018 Roof/ReRoof (Patio) Checklist Item BLDG-Building Deficiency January 13, 2020 Failed Tim Frazee COMMENTS Not Ready Partial Pass Tim Frazee COMMENTS Not Ready Tear Off/ Demo on 2 east biogs OK Replaced 5 sheets of plywood on eastern most bldg Replaced 2 sheets on middle/ little bldg Partial Pass Tim Frazee COMMENTS Not Ready Tear Off/ Demo on 2 east biogs OK Replaced 5 sheets of plywood on eastern most bldg Replaced 2 sheets on middle/ little bldg Replaced 4 sheets of plywood on west bldg 10/18/18 LA COSTA VALLEY #5 2306 Altisma Way Carlsbad, CA 92009 Reinspection Complete Reinspection Complete Passed No Reinspectlon Incomplete Passed Yes Reinspection Incomplete Passed Yes Page 1 of 1 8-10 REROOFING SUPPLEMENTAL BUILDING PERMIT APPLICATION 1. JOBAooRess:2,3O2, ?3C>Y~ 23a1o12 3Q:l, 2.31D A\+is~~ 2. TYPE OF BUILDING: RESIDENTIAL ~ COMMERCIAL. __ _ 3. ROOF SLOPE: RISE y INCHES IN 12 INCHES 4. NUMBER OF EXISTING ROOF COVERIN_G (CIRCLE ONE) d) 2 3 Bu1\ct \JP 5. TYPE OF EXISTING ROOF COVERING Eu:Cl\Je.\ /-£ \:f SHEATHING f )yi,,oud S<Av-na. h I f>v c 1 *6. NEW ROOF MATERIALt Eo5\~ ::t·, I€ CLASS A WEIGHT PER SQ. Sri 7. NUMBER OF SQUARES \0 \ 0 (j:p--\-a \) 8. TRADE NAM~pD m·,, wh\\e MANUFACTURER P\IG 3,~\7 1.-C\ SO-.\\o \_\Q..('.d 9. ROOF SYST M LISTING: ..., v UL NO. _____ I.C.C.E.S. Report# _____ _ ASTM ____ _ 10. IS THE EXISTING STRUC~ DESIGN SUFFICIENT TO SUSTAIN THE WEIGHT OF THE PROPOSED ROOF? ~ NO All roof coverings are required to be CLASS A Combustible roof COWlfings of any type or classification are prohibited. I understand the following inspections are required: 1. Tear Off/Pre-Inspection prior to install new roof covering 2. Final Inspection I agree to provide a ladder extending at least 2 rungs above the roof for inspection_ Signature Co,4 ~ ChAJ..riA ••. Contractor Owner Contractor Date 13' r 1 1 i~ r I A~en+ ✓ Name Caro\\~ C bx\ <;;-\i 0-..(°"'\ "6. Rolled Roofing, Standardll.i1e Tile, Asphalt/Comp fiberglass, Built Up, Other Re-,_ 04/14