Loading...
HomeMy WebLinkAbout2308 CAMINO ROBLEDO; ; CB983180; Permit,0/14/98 11 >age 1 of BUILDING PERMIT 29 1 k>b Address 2308 CAMINO ROBLEDO Suite: Permit No Project No Development No >ermit Type : SINGLE FAMILY *arcel No: 255-272-08-00 Valuation : 266 , 176 'ccupancy Group: Appl/Ownr Lot# Reference*: DWLNG - DETACHED 313 Construction Type CT 88-03 Status escription: PLN 4,3080+592 GAR,PHASE 6 Applied : LA COSTA VALLEY-VILLAGE G-SHEA HOME Apr/Issue Entered By SHEA HOMES 619 549-3156 10721 TREENA ST STE 200 SAN DIEGO CA 92131 Plan Check Numbers > ORIG 972878,PCK 983042 *** Fees Required *** *** Fees Collected & Credits CB983180 A9804142 DEV89110 VN ISSUED 06/29/98 10/14/98 RMA Fees : Adjustments: Total Fees: Fee description 12,241.32 .00 12,241. Number of Bedrooms Number of Bathrooms Building Permit Plan Check Strong Motion Fee Enter Plan Check Dis Enter "Y" to Autocal Snter "Y" to Autocal Payoff Fee for CFD Snter LFM Fee (Zones= Enter "Y" for Plumbing Sach Plumbing Fixture o Sach Building Sewer Each Install/Repair Water Each Water Heater and/or 3as Piping System Each Vacuum Breaker Enter "Y" for Electric Issue Fee > Single Phase Per AMP > Enter 'Y' for Mechanical Issue Fee> Install Furn/Ducts/Heat Pumps > 'Each Install Fireplace > Each Exhaust Fan > Each Install/Reloc Vent > Ve 100 1 2 4 2 .25 9.00 6.50 6.50 4.50 *** —S2 C-PRMT 12241-32 .00 .00 12,241.32 Ext fee Data 5. 3. 1224. 796. 27. -64. 4844. 540. 4254. 310. 20. 133. 15. 7. 7.7. 14. 10. 25. 15. 9. 13. 26. 9. 00 50 00 00 00 00 00 Y 00 Y 32 00 00 Y 00 00 00 0000 00 00 Y 00 00 Y 00 00 00 00 FINAL APPROVAL INSRy DATE CLEARANCE CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 Dept: Building Enginjftrlng Planning CMWD StLite Fire Plan Check #: Date: Permit^ CB983180 PermftType: Project Name: PLN 4,3080+592 GAR.PHASE 6 Sub Type: LA COSTA VALLEY-VILLAGE G-SHEA HOME Address: 2308 CAMINO ROBLEDO Lot: 313 Contact Person: MARK Phone: 7608017098 Sewer Dist LC Water Dist: O 5/5/99 SFD Inspected By: Inspected By: Inspected By: Date Inspected: Date Inspected: Date Inspected: Approved: V Disapproved: .Approved: Approved: Disapproved: Disapproved: Comments: CttytfCMlsM Dept: Building Engineering Ran Check #: Permit* CB983180 Project Name: PLN 4,3080+592 GAR, PHASE 6 LA COSTA VALLEY-VILLAGE G-SHEA HOME Address: 2308 CAMINO ROBLEDO Contact Person: MARK Phone: 7608017098 Sewer Dist: LC Water Dist: 0 CMWD StLlte Fire Date: Permit Type: Sub Type: 5/5/99 SFD Lot: 313 Inspected By: Inspected By: Inspected By: Date inspected: Date Inspected: Date Inspected: .Approved: .Approved: Approved: Disapproved: Disapproved: Disapproved: Comments: cnrtfGartsM Final Building Inspection Dept: Building Engineering Planning CMWD 91 Plan Check #: Permit*: CB983180 Project Name: PLN 4,3080+592 GAR, PHASE 6 LA COSTA VALLEY-VILLAGE G-SHEA HOME Address: 2308 CAMINO ROBLEDO Contact Person: MARK Phone: 7608017098 Sewer Dist: LC Water Dist: 0 Inspected f*X\ (T^ Date *" — - Bv: V \VV Inspected: ^°i "" \£) Inspected Date Bv: Inspected: Inspected Date Bv: Inspected: Comments: *ta»Flre Date: 5/5/99 Permit Type: SFD Sub Type: Lot: 313 Approved: /\ Disapproved: Approved: Disapproved: Approved: Disapproved: City of Carlsbad Inspection Request For: 5/5/99 Permit* CB983180 Inspector Assignment PY Title: PLN 4,3080+592 GAR.PHASE 6 Description: LA COSTA VALLEY-VILLAGE G-SHEA HOME Type:SFD Sub Type:Phone: 7608017098 Job Address: 2308 CAMINO ROBLEDO Suite: Lot 313 Location: Inspector: APPLICANT : SHEA HOMES Owner: SHEA HOMES LTD PARTNERSHIP Remarks: Total Time: Requested By: MARK Entered By: CHRISTINE CD Description Act Comments 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Inspection History Date 4/15/99 4/14/99 3/11/99 3/10/99 3/9/99 3/2/99 2/25/99 2/24/99 2/17/99 1/22/99 11/24/98 11/17/98 Description 39 Final Electrical 39 Final Electrical 82 Drywall/Ext Lath/Gas Test 82 Drywall/Ext Lath/Gas Test 82 Drywall/Ext Lath/Gas Test 16 Insulation 84 Rough Combo 84 Rough Combo 13 Shear Panels/HD's 15 Roof/Reroof 1 1 Ftg/Foundation/Piers 22 Sewer/Water Service Act PA NR AP NS NS AP AP NR AP AP AP AP Insp PY RB PY PY PY PY PY PY PY RB PY PY Comments EMR PREFERRED CONSTRUCTION INSPECTIONS, INC. 4888 Ronson^Court "G" San Diego, Ca. 92111 (619) 576-9110 Fax (619) 576-7028 TEST REPORT MONTEREY COLLECTIONS 2308 CAMINO ROBLEDO SHEA HOMES SHEA HOMES JOB NO.: 2374 JOB: ADDRESS: OWNER: CLIENT: ARCHITECT: INSPECTOR: TOM PAYNE CONTRACTOR: CHILDRESS CONCRETE ENGINEER: J.L. DAVIDSON BLDG AUTH: CITY OF CARLSBAD PERMIT NO: 983180 PLAN FILE: FIELD SAMPLE OF: CONCRETE LOCATION OF SPECIMEN IN JOB OR STRUCTURE:#313 LEFT SIDE MIX NO: 35P PROPORTIONS: 5 SACK ADMIXTURE: POZZ TYPE OF CEMENT: II CONCRETE SUPPLIER: ESCONDIDO READY MIX TICKET NO: 111096 MADE BY: SLUMP: DATE MADE: DATE RECEIVED: TOM PAYNE 4 1/2" 11/30/98 12/01/98 LABORATORY TEST DATA AGE TESTED 10 DAYS 28 DAYS SPECIMEN MARKINGS: DATE TESTED: AREA-SQ.IN. : ULTIMATE LOAD -LBS : UNIT STRESS - PSI : 33269 12/10 28.28 78000 2760 33270 12/28 28.28 105500 3730 &\ 28 DAYS 33271 12/28 28.28 107500 I 3800 H DAYS 33272 HOLD SPECIFIED STRENGTH AT 28 DAYS:2500 DISTRIBUTION: SHEA HOMES : CHILDRESS CONCRETE CITY OF CARLSBAD TEST METHODS - ASTM C39: C173: C231 C172: C143: C138 C1231: ENGINEER