Loading...
HomeMy WebLinkAbout2310 CAMINO VIDA ROBLE; ; 86-505; PermitDECLARATIONSLENDERWORKER'S COMPENSATION OWNER/BUILDER CONTRACTOR White — Inspector Green — (1) Finance Yellow — Assessor Pink — Applicant Gold — Temporary File PROJECT NO.: TYPE OF UNIT: CONTACT PERSON:. FINAL BUILDING INSPECTION RECEIVED APR 2 1 PLAN CHECK NUMBER: 36-505 PROJECT NAME: ADDRESS: DATE: X Jtirltnn Cnrp 2310 taaino Vida Robla UNIT NUMBER: TT NUMBER OF UNITS: PHASE NO.: ao CONTACT TELEPHONE: 436-41 38 EUg & Flra INSPECTED BY: INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: DATE INSPECTED: APPROVED APPROVED APPROVED DISAPPROVED DISAPPROVED DISAPPROVED COMMENTS: Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire 1 tit? tf Carlltafe REQUEST FOR INSPECTION RECORD INSPECTOR / ' ^.A/^- * PERMIT NO fit , — r-. ,— ~*~ TIME:^o-SO 5^ niTP. OWNER - £>, »-^ x-y . f ^{^ } IADDRESS **yjLJ ^asmjU.o V/dcL_ Ko bl-Z-^ - REOUESTEDBY /C Q (^oJioL^Y^p^i C^a— PHONF NO t/^X -"<-// ?)C ' " ^ BUILDING n FOUNDATION D FOOTING D SLAB G REINFORCING STEEL G MASONRY n GROUT -GUNITE G FLOOR AND CEILING SUB FRAME G SHEATHING G ROOF G SHEAR G FRAME G EXTERIOR LATH G INSULATION ^ INTERIOR LATH OR DRYWALL k FINAL xO) c^ A < t <ta-- * • , — ' PERSON TAKING REPORT V-'^ ? i /bio/— ^ ELECTRICAL G TEMPORARY SERVICE G UFFER GROUND D ELECTRIC UNDERGROUND G ROUGH ELECTRIC G POOL BONDING G ELECTRIC SERVICE G FINAL . 1 r&l1 1 \j 1 jf ^ PLUMBING D SEWER AND PL/CO D TOP OUT PLUMBING G TUB OR SHOWER PAN D GAS TEST D WATER HEATER D SOLAR WATER ^KF SPECIAL INSTRUCTIONS MISCELLANEOUS G CONDITIONED AIR SYSTEMS G SOLAR HEAT D PATIO G POOL G SPA G SIGN G GRADING p DRIVEWAY A] FINAL Ready For Inspection: D Monday D A.M. D P.M. D Tuesday D Wednesday D Thursday Friday dtp of Cartebab REQUEST FOR INSPECTION RECORD INSPECTOR Yl] A-*-^" DPRMIT NO c// <^/) ^s T1MP t? C^ —* ^ -? O^ HATF- >~J 0 OWNER p - J -J- ^iO^ ADDRESS C-W V_ / ' -. ^ 1' *"V*"~"iv^ •/)/"! * /i /t i/^S('— c // ^C V ^ **/-•REQUESTED BY ^ .[At-f ^ f O^^O^xv^ArCCS--^ PHONE NO. T^>£> V/ — ? ?S BUILDING D FOUNDATION D FOOTING D SLAB D REINFORCING STEEL D MASONRY D GROUT -GUNITE D FLOOR AND CEILING SUB FRAME D SHEATHING D ROOF D SHEAR D FRAME a EXTERIOR LATH D INSULATION D INTERIOR LATH OR DRYWALL a FINAL * /PFRRDNJ T*mt< j ft-H r nnHj ' TV 1 * ( ELECTRICAL ) D TEMTOaA£Y_£EBlAee^ D UFFER GROUND D ELECTRIC UNDERGROUND D ROUGH ELECTRIC D POOL BONDING C ELECTRIC SERVICE >C/FINAL «i . ^f r ' \d^ GT-~ \&if^~»j0£~ tfi A^F^i/^ ptJ^} PLUMBING D UNDERGROUND PLUMBING D SEWER AND PL/CO D TOP OUT PLUMBING D TUB OR SHOWER PAN a GAS TEST D WATER HEATER D SOLAR WATER D FINAL PATIO D POOL D SPA D SIGN C GRADING D DRIVEWAY D FINAL INSTRUCTIONS Ready For Inspection: D Monday D A.M. D P.M. D Tuesday D Wednesday ^^Ctjursd ^^ ursday D Friday Cttj» of Cartebab REQUEST FOR INSPECTION RECORD INSPECTOR j 0\L\— PERMIT NO. C ~ / TIMF- 1 *° *"<w~) O O RATF- 2--^-S OWNER ,— > - X"") f t ADDRESS ,„ °^3 | D C ^&-y^-i^ l/***-^ CX^&-&-a_ REQUESTED BY x-^£;p PHONE NO # 3 f^ *J / 3% _ BUILDING a FOUNDATION D FOOTING a SLAB D REINFORCING STEEL D MASONRY D GROUT -GUNITE D FLOOR AND CEILING SUB FRAME D SHEATHING D ROOF D SHEAR D FRAME D EXTERIOR LATH D INSULATION £^*$^*EC n INTERIOR LATH OR DRYWALL & /? D FINAL ^^ !**•! W/&* i///°yrt* PERSON TAKINfi RFPORT ( JL^^r ELECTRICAL D TEMPORARY SERVICE D UFFER GROUND D ELECTRIC UNDERGROUND D ROUGH ELECTRIC D POOL BONDING D ELECTRIC SERVICE V FINAL ' ts&Qf**0;*^ £>&&*/#£> •**- -*?r 69^**^-° *^//w=- *>A*JL\ ^^f=&>S <2c*ut -7#**t PLUMBING D UNDERGROUND PLUMBING D SEWER AND PL/CO D TOP OUT PLUMBING D TUB OR SHOWER PAN D GAS TEST D WATER HEATER D SOLAR WATER a FINAL SPECIAL INSTRUCTIONS Ready For Inspection: D Monday D A.M. D P.M. D Tuesday O Wednesday hursday)D Friday Citp of Cartebab REQUEST FOR INSPECTION RECORD TIME: INSPECTOR // \XJLS PERMITNn £ tX J LX ^ DATF- /—fir — <3 f OWNER . ADDRESS e^^~) //) C~6sW\stsM*l \JL^A^ t^fT^*- REOUESTEDBY Z^iO PHONENO. /£/<?' */^%'¥/.J&l *5<* ' BUILDING D FOUNDATION D FOOTING D SLAB 0 REINFORCING STEEL H MASONRY D FLOOR ANltjCEILING SUB FRAME^-^_ U bHbAIHING UHOUK'U yHEAH / n FRAME _-,,^0X<. n EXTERIOR LATH H INSULATION -^77^ D INTERIOR LATH OR DRYWALL /^X n FINAL jf&l/to Stytj PLUMBING D UNDERGROUND PLUMBING D SEWER AND PL/CO D TOP OUT PLUMBING D TUB OR SHOWER PAN D GAS TEST D WATER HEATER D SOLAR WATER D FINAL - , / /A/^ «VSV*9K W/X«^ "7-0-^ r/^A// PERSON TAKING REPORT /f^ fl ELECTRICAL D TEMPORARY SERVICE D UFFER GROUND D ELECTRIC UNDERGROUND D ROUGH ELECTRIC D POOL BONDING D ELECTRIC SERVICE D FINAL "9C/TO eye- &/t£pf7>t?f'£' S /^ xf /^ Gfc/*^ " ^5^ H7" JS&ylJ~7&~' / / *) / ^"7 *~* MISCELLANEOUS/ " D CONDITIONED AIR SYSTEMS D SOLAR HEAT G PATIO D POOL D SPA a SIGN D GRADING D DRIVEWAY D FINAL SPECIAL INSTRUCTIONS Ready For Inspection: D Monday D A.M. D P.M. D Tuesday Wednesday D Thursday n Friday Citp of Cartebao REQUEST FOR INSPECTION RECORD TIMF- INSPECTOR / PERMIT NO DATF- / /O/0& OWNER jP£/#-/'7&&v -jZ&sJ/^&jT. / ADDRESS JL3/& £AfrJ?W& £/£^ ^-&£l&* REQUESTED BY L&> T^A^rv^f^J TT^S PHONE NO. PERSON TAKING REPORT BUILDING D FOUNDATION D FOOTING D SLAB D REINFORCING STEEL D MASONRY D GROUT -GUNITE D FLOOR AND CEILING SUB FRAME D SHEATHING D ROOF D SHEAR O FRAME C EXTERIOR LATH D INSULATION D INTERIOR LATH OR DRYWALL D FINAL jrtt>fc tk—' ^L*l ELECTRICAL H TEMPORARY SERVICE D UFFER GROUND D ELECTRIC UNDERGROUND D ROUGH ELECTRIC D POOL BONDING D ELECTRIC SERVICE / D FINAL ^r^r&r p_ /^ fUl / ^i^- ^\- )r/J<s v£$ \*C\ A f^r' ti r-^ t 1 ' lv 1 M 10 1 /H . W 1 PLUMBING UNDERGROUND PLUMBING ae«es3SP_Euco D TOP OUT PLUMBING D TUB OR SHOWER PAN D GAS TEST D WATER HEATER D SOLAR WATER D FINAL MISCELLANEOUS D CONDITIONED AIR SYSTEMS D SOLAR HEAT D PATIO D POOL D SPA D SIGN D GRADING D DRIVEWAY D FINAL SPECIAL INSTRUCTIONS, Ready For Inspection: D Monday D A.M. D P.M. Tuesday D Wednesday D Thursday D Friday Citp of Carlstoab REQUEST FOR INSPECTION RECORD INSPECTOR 'f/U-A^' PERMIT ND 0 / , • TIUP- C- 5£O nATF- /Z- U OWNER ^ ,~ /-3 . * ADDRESS /) £^30 V_XV-YVl>v^il-J l/-AjLfiJ V L+^V-a_^ REQUESTED BY <^5&^~' PHONE NO BUILDING O FOUNDATION D FOOTING D SLAB D REINFORCING STEEL D MASONRY D GROUT -GUNITE D FLOOR AND CEILING SUB FRAME D SHEATHING D ROOF D SHEAR D FRAME x D.EXTERIOR LATH V INSULATION h, /** 'D INTERIOR LATH OR DRYWALLX* D FINAL yV PLUMBING ftf- D UNDERGROUND PLUMBING \J D SEWER AND PL/CO (jj D TOP OUT PLUMBING , D TUB OR SHOWER PAN D GAS TEST D WATER HEATER D SOLAR WATER D FINAL A -I ,[M PERSON TAKING REPORT ^J^ ELECTRICAL D TEMPORARY SERVICE D UFFER GROUND D ELECTRIC UNDERGROUND D ROUGH ELECTRIC D POOL BOND^J^^^" /^^f -^ » r *$P , Y\ rtfl /*Jt LT? \^ \r I/ T" nJ MiscEdtkNEous^ * \ tf D CONDITIONED AIR SYS/TEMSJ" 7D SOLAR HEAT 1 D PATIO a POOL a SPA D SIGN D GRADING D DRIVEWAY D FINAL SPECIAL INSTRUCTIONS Ready For Inspection: D Monday D A.M. D P.M. D Tuesday D Wednesday D Thursday ESGIL CORPORATION 932O CHESAPEAKE DR.. SUITE 208 SAN DIEGO, CA 92123 (619)560-1468 DATE: JURISDICTION: PLAN CHECK NO:8k ~ C IT PLAIT CHECKER FILE COPY UPS DESIGNER PROJECT ADDRESS: PROJECT NAME: VlD/3 D I I D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficien- cies identified _ £gLocJ _ are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. " ' - The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. The applicant's copy of the check list has been sent to: D . —I _ ) Esgil staff did not advise the applicant contact person that plan check has been completed. Esgil staff did advise applicant that the plan check has been completed. Person contacted: _ Date contacted: REMARKS: Telephone # JQ BY.xf^g ESGIL CORPORA Enclosures SAN DIEGO AREA ELECTRICAL NEWSLETTERft. / THE «AN DIEGO AREA CHAPTER OF THE INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS APPROVES THE CONTENT / OF THIS NEWSLETTER AND RECOMMENDS ITS ADOPTION BY THE MEMBERS OF THE CHAPTER. CHECK WITH THE LOCAL INSPECTION JURISDICTION BEFORE BEGINNING ANY INSTALLATION BASED ON THIS NEWSLETTER. CODE REFERENCE SUBJECT PUBLISHED - REVISED 450-9 TRANSFORMER VENTILATION DEC 81 - APR 85 Closets and rooms housing transformers shall have provisions to maintain an ambient temperature which does not exceed the ambient temperature rating of the transformer. This may be accomplished by natural or mechanical ventilation, by mechanical cooling, or by other means. 1. Natural ventilation which complies with the provisions of Section 450-45 shall be acceptable. 2. Mechanical ventilation which provides for air movement of 3 cubic feet per minute/ per KVA of transformer rating shall be acceptable. 3. Mechanical cooling which can be demonstrated to maintain an ambient temperature below that of the transformer rating shall be acceptable. 4. -Any other means, including combinations of the above methods, which can be demonstrated to maintain an ambient temperature below that of the transformer i rating shall be acceptable. Any ventilation openings from the room into the interior of the building shall be protected by a damper having a fire rating of not less than one hour. CODE REFERENCE SUBJECT PUBLISHED 450-21(b) TRANSFORMERS OVER 112-1/2 KVA APR 85 For the purposes of this subsection, a "transformer room of fire resistant construction" shall mean a room enclosed by not less than one hour rated walls and floor/ceiling assemblies, with metal or solid wood, non-rated doors with self-closing devices. Any ventilation openings from the room into the interior of the building shall be protected by a damper having a fire rating of not less than one hour. ESGIL CORPORATION 9320 CHESAPEAKE DR.. SUITE 208 SAN DIEGO, CA 92123 (619)560-1468 DATE: JURISDICTION: CWL4M& _ gTLAN CHECKER B FILE COPY __ _____ UPS _ -- DESIGNER PROJECT ADDRESS: 2.^-1/1 foftlfilO ViDA PROJECT NAME*: . — - The plans transmitted herewith have been corrected where I _ I necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply . — . with the jurisdiction's building codes when minor deficien- LJ cies identified _ •_ _ are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies | | identified on the enclosed check list and should be corrected and resubmitted for a complete recheck, The check list transmitted herewith is for your information. The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. I — - The applicant's copy of the check list is enclosed for the I _ I jurisdiction to return to the applicant contact person. The applicant's copy of the check list has been sent to: 253; Sffife Srm&T -<j)>TF A ^M ne&D. f&. D Esgil staff did not advise the applicant contact person that plan check has been completed. _-- Esgil staff did advise applicant that the plan check has IB8 been completed. Person contacted: ,/\i rnjTnrvj i Date contacted: IQ/IM/e^ Telephone *. REMARKS: BV:^te &%**<uq Enclosures ESGIL CORPORATION JURISDICTION OF TO; &1tf j>Drie.#iJ t ] APPLICANT COPY 2S3/ ^Tfrrg C.T- *>TP A ( ] JURISDICTION S/frJ &/AV> . UtLlftoMlA 32101 ( } PLAN CHECKER COPY [ 1 ESGIL FILE COPY TENANT IMPROVEMENT & INTERIOR ALTERATION CORRECTION SHEET A. Plan Check Number B. Site Address -23 iO CftffUuD \JlD6 C. Owner fulftGli Bt&toBTT D. Building Code Applicable 1982 U.B.C. E. Occupant Load CtfrvdoT &S V&~&?W)l*)t3DStQries /_ Previous Proposed F . Proposed Occupancy & 'Z. Occupancy £z. Use^/^gs / G. Type of Construction ,777"- *J _ Sprinklers : *-^yes No H. Allowable Floor Area Actual I. Basis for Area Increase J. Remarks CttLtiPAtiT' fsyfln Ste Be PteTte? w MJ fefl Date Plan Submitted :to Jurisdiction ?^;^>j^, to Esgil Date Initial Plan Check Completed /o~/3-$£ By Applicant Contact Person #ols£.e DUfi)£frd Tel. Zs^ - -to \ ~J FOREWORD: PLEASE REAP 1. This plan check is limited to technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and State laws regulating energy conservation, noise attenuation and access for the handicapped. The plan check is based on regulations enforced by the Building Inspection Department. 2. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. For information regarding those departments, please contact those departments. 3. The items listed below require plan clarification, modification or change. All items have to be satisfied before the plans will be in conformance with the cited codes and regulations. Per Section 303(c), 1982 Uniform Building Code, the approval of the plans does not permit the violation of any State, County or City law. 4. Please submit two sets of corrected plans and enclose a copy of this list with your notes indicating where corrections were made i.e., sheet, detail, etc—return corrected plans and documents ONLY to the locations checked below: Esgil Corporation at 9320 Chesapeake Dr., Suite 208, San Diego, CA, 92123 Telephone (619) 560-1WS Jurisdiction Building Department 10/22/85 The responsible designer is required to sign each sheet of the plans. A State-licensed Architect or Engineer is required where there are structural changes to an existing building or a structural addition. (Business and Professions Code) Provide the correct address and suite number of tenant space on the plans. Section 302 Provide a note on the plan indicating the previous use of the tenant space or building being remodeled Section 302 ^F When the character of the occupancy or use changes within a building, the building must be made to comply with current Building Code requirements for the new occupancy. Please provide complete details to show the building will comply. Section 502 UBC Section 304 requires the Building Official to determine the total value of all construction work proposed under this permit. The Value shall in- clude all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevator, fire extinguishing systems and any other permanent equipment. Please provide a signed copy of the designer's or contractor's construction cost estimate of all work proposed. Provide a plot plan showing the distances from the building to the property lines and the location of tenant space (or remodel) within the building. A-z, We erf f£&oocn"tcrtA Be. \ On the first sheet of the plans indicate: Type of construction of the existing building, present and proposed occupancy classifications of the remodel area and the occupant load of the remodel areas and total building area. . Specify on the plan title sheet the Building Code Edition used for the design of the proposed work. Provide a fully dimensioned floor plan showing the size and use of all rooms or areas within the space being improved or altered. Draw the plan to scale and indicate the scale on the plan. Indicate the use of all spaces adjacent to the area being remodeled or improved. Show any existing fire rated area separation walls, occupancy separation walls, shafts or rated corridors." Identify and provide con- struction details for proposed new fire rated walls. if PrPPucAfcLE C$£E *& R£ Specify on the plans the fire ratings of assemblies to protect proposed openings in existing or new fire walls. 61^ ri=S j l^" Identify existing walls to be removed, existing walls to remain and proposed new walls. Identify bearing walls, non-bearing walls, and shear Provide a section view of all new interior partitions. Show: UaJ Type, size and spacing of studs. ^-^ Indicate gauge for metal studs. Specify manufacturer and approval .number or indicate "to be ICBO approved". Method of attaching top and bottom plates to structure. (NOTE: Top or partition must be secured to roof or floor framing, unless suspended ceiling has been designed for partition lateral load.) Wall sheathing material and details of attachment. (Size and spacing of fasteners). Height of partition and suspended ceiling. Provide notes and/or details to show that the floor and wall finish in toilet rooms are surfaced with a smooth hard non-absorbent material extending five inches up the wall. Similar surfacing shall be provided on the walls from the floor to a height of 4 feet around urinals and within water closet compartments. Note on the plan: "All interior finishes must comply with Chapter 42 of the UBC".' Specify "class TflT" flame spread rating (minimum) for \AifoVfo toJO CPat t 1ft e.^ AtAfl Itou A-4. t T Lateral bracing for suspended ceiling must be provided. (UBC Table 23-J Where ceiling loads are less than 5 PSF and not supporting interior partitions, ceiling bracing shall be provided by four No. 12 gauge wires secured to the main runner within 2 inches of the cross runner intersection and splayed 90° from each other at an angle not exceeding 45° from the plane of the ceiling. These horizontal restraint points shall be placed 12 feet o.c. in both directions with the first point within 4 feet of each wall. Attach- ment of restraint wires to the structure above shall be adequate for the load imposed. Draft stop and suspended ceiling in wood frame floor construction every 1,000 sq. ft. and in attics of combustible construction every 3,000 sq. ft. The maximum distance allowed between draft stops is 60 feet. Section 2516{f) The tenant space and new and/or existing facilities serving the remodeled area must be accessible to and functional for the physically handicapped. See the attached correction sheet. Title 24, Part 2 Show the exit sign locations; show any required directional exit signs. Section 3314 Rooms with more than 10 occupants may have one exit ' through one adjoining room. Revise exits to comply. Section 3303(e) Two complying exits are required from Exits must be, and maintain, a distance apart of at least 1/2 the maximum diagonal dimension of the area served by the exits. Section 3303 Assembly rooms with more than 50 occupants shall not have a lock or latch on exit doors unless they are equipped with panic hardware. Section 3318. Note on the plans: "All exits are to be openable from inside without use of a key or special know- ledge". Section 3304(c). Or NOTE: "Provide a sign on or near the exit doors reading: THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS", and meet all other criteria of Section 3304(c) 1. Required exit doorways shall be not less than 36 : inches in width and not less than 6 feet - 8 inches in height. Section 3304(e) Exit doors shall swing in the direction of exit travel (occupant load exceeds 50). Section 3304(b). Show the locations of existing exits from the build- ing and show the path of travel from the remodel area to the existing exits. Corridors must provide continuous protection to the exterior of the building. Interruptions by inter- vening room is not permitted. Foyers, lobbies or reception rooms constructed as required for corridors are not considered intervening rooms. Show exit corridors as 44 inches wide minimum. Dead- end corridors are limited to 20 feet when more than one exit is required from the corridor. Section 3305 Provide one-hour construction details for all corridor walls and ceilings serving an occupant load of 30 or more. Identify all rated corridors. Walls of reception rooms and lobbies which are included within pro- tected corridors must have walls .and ceil- ings constructed as required for corridors. Protect all interior openings in corridor walls and ceilings. Door and frame must be labeled 20-minute smoke and draft control assembly with self-closers or automatic closers with smoke detectors. Section 3305(h). Glazing must be 1/4 inch-thick wired glass installed in steel frames and cannot exceed 25 percent of the common wall area. Section 3305(h)2. Show the location of fire dampers. Provide fire dampers at duct penetrations of fire-rated occupancy and area separations, shafts and corridor walls and ceilings. Section 4306{j) Provide mechanical ventilation in all rooms capable of supplying a minimum of 5 cubic feet per minute of outside air with a total circulation of not less than 15 cubic feet per minute per occupant. Section 605 and 705 If the tenant improvement area will not have a comfort heating or cooling system consuming more than 5 BTU per hour per square foot, note on the plan "Tenant Improvement area is not heated or cooled more than 5 BTU per hour per square foot and is exempt from Energy Conservation Regulations". If the tenant improvement area will have a comfort heating or cooling system consuming more than 5 BTU per hour per square foot, note on the plan "Tenant Improvement must comply with Energy Conservation Regulations". If the tenant improvement area must comply with the energy conservation regulations and the exist- ing building was originally constructed in com- pliance with the energy conservation regulations, provide two copies of the original Energy Com- pliance Documentation forms. If the tenant improvement area must comply with the Energy Conservation Regulations and the exist- ing building was not originally constructed in compliance with the Energy Conservation Regulations, address the appropriate items that will follow. (39) If HVAC is to be installed, provide two sets of ^^ energy conservation compliance forms 1, 2, 3, 4, 5 and 6. Title 24 Section 2-5312. If HVAC is to be installed, provide two sets of HVAC plans. Title 24 Section 2-5306. If lighting is to be installed, provide two sets of energy conservation compliance form 5. Title 24 Sections 2-5343 & 2-5344. If HVAC is to be installed, incorporate in the plans or specifications, the attached "Title 24 Mandatory Requirements". If HVAC is to be installed, the required energy documentation required to show compliance with the energy conservation requirements, is required to be signed by the California licensed person responsible for its preparation. Title 20 Section 1403(a)l. If HVAC is to be installed, recent charges in the regulations required specific signed construction compliance statements be filed with the Building Department prior to use or occupancy of the im- proved area. Incorporate in the plans or specifications the attached "Title 24-Construction Compliance Statement Requirements". Structural design calculations are required to show code compliance if any of the following conditions exist. Section 302(b): (a) Alteration of existing vertical or horizontal load carrying structure. (b) Increase in live or dead loads on floors or roof. (c) Other _^_^___ ELECTRICAL Submit complete one-line diagram of service and feeders; show conduit and wire sizes; specify aluminum or copper conductors and type of insulation. Indicate sizes of fuses and/or circuit breakers. [491 Submit electrical load calculations and/or panel ^-^ schedules. (so) Indicate ampere interrupting capacities (AIC) of ^^ service and subservice equipment. NEC 230-98/110-9. [511 Add note to plans indicating: a. All package A/C units shall be labeled by a recognized electrical testing agency. b. All light fixtures installed in suspended ceil- ings shall be secured to the main and/or cross runners with seismic clips unless installed in accordance with other approved engineering. c. All circuit breaker switched 120 VAC light circuits, must use only type "SWD" circuit breakers NEC-110-3b Indicate (a) existing building load, (b) added building load per item 49, and-(c) size of existing service when new service is not required. Plan File No. Jurisdiction_ Project Address Date_ REMODEL OR TENANT IMPROVEMENT BUILDING CODE INFORMATION In order to complete a plan review of a remodel or tenant improvement within an existing building it is necessary that the information in Items 1-9 be provided or the approved plans be provided for the exist- ing building. ****************************! Circle the existing type of construction for this building: I, II-FR., II-lhr., II-N, III-lhr., III-N, IV, V-lhr., V-N SL. Does this building have fire sprinklers throughout? Yes No© © © Does the proposed project create a change in use or occupancy classification? Yes No Describe the previous use of the project area Describe the proposed use of the project area Existing Building Area_ Improvement Area_ How many stories are in this building? What story is the improvement on? Does this project involve alterations to: Existing fire walls Yes No Existing floor or roof loads Yes No Existing building structure Yes No Existing HVAC equipment Yes No Existing electrical service loads Yes No What is the approximate date that construction of the existing building was completed? 8.) ENERGY CONSERVATION Which of the following were checked and approved for Title 24 Energy Conservation at the time the original building was approved: Building envelope Yes No HVAC equipment Yes No Area lighting Yes No Water heating Yes No Will the proposed project significantly alter any element that was approved? Yes, No HANDICAPPED ACCESS FACILITIES Which of the following has been approved for compliance with the handicapped access standards of Title 24, CAC: Parking & access to the building Yes No Building entrance doors Yes No Building stairs & elevators Yes No Existing public restrooms Yes No Date Information provided by: Bldg. Dept. verification of information by: 102385 TITLE 24 MANDATORY REQUIREMENTS (To be noted on plans or specifications) HVAC Controls Sec. 2-5315. (a) Each HVAC system shall: 1. Be equipped with at least one automatic device for reducing HVAC energy use during periods of nonuse or alternate uses of the building spaces or zones served by the system; 2. Be able to maintain space temperature set points from 55°F to 85°F. Two or more replaceable fixed set-point devices shall be permitted if installed so as to maintain space temperature set points in the zone that they control; 3. Be able to provide sequential temperature control of heating and cooling capacity in each zone, if both heating and cooling are provided; 4. Provide a range of temperatures up to 10°F in which no heating or cooling is provided to the space/ if the HVAC system has both heating and cooling capability; 5. Be able to terminate all heating at 70°F or less/- and 6. Be able to terminate all cooling at 78°F or more. EXCEPTION: Multiple zone HVAC sytems requiring concurrent operation of independent heating and cooling systems need not comply with Section 2-5315U) 4, 2-5315 la)5, and 2-5315(a)6. (b) Zoning. Each zone shall be provided with at least one of the devices specified in subsection (a) to control the HVAC system which serves the zone. Each floor of a building with conditioned space shall contain at least one zone. Ventilation Systems Sec. 2-5316. On mechanical ventilation supply and exhaust systems capable of moving more than 5,000 cfm of air, auto- matic dampers interlocked and closed on fan shut- down shall be provided. On gravity ventilating systems, either automatic or readily accessible manually operated dampers in all openings to the outside, other than combustion air openings, shall be provided. Doors and Windows Section 2-5317. (a) Doors and windows between conditioned and uncon- ditioned spaces, such as garages and closets for central forced air gas furnaces using outside air for combustion, shall be designed to limit air leakage into or from the building envelope. Control Devices for Indoor Lighting Sec. 2-5319. Controls for lighting loads within the building envelope shall meet each of the following re- quirements. (a) Each area enclosed by ceiling-height partitions shall have independent control of the lighting within that area. (b) Each area enclosed by ceiling-height partitions shall have at least one readily accessible manually operated switching device to control lighting within the area. For lighting controls, "readily accessible" means located so that a person using the device can see the controlled lights or the area being lit. Switching devices in addition to, but not instead of, the required readily accessible manually operated switching devices shall also be permitted. (c) The general lighting of any area 100 square feet or larger in which the connected lighting load equals or exceeds 1.0 watt per square foot throughout the entire area shall be controlled so that the load may be reduced by at least one-half while maintain- ing a reasonably uniform level of illumination throughout the area. Readily accessible switches, that control each luminaire in a space with more than one luminaire, or that control each lamp in a space independently meet the requirements of this section. (d) In all areas where effective use may be made of natural light, lighting circuiting shall be arranged so that units, in all portions of the area where natural light is available at the same time, are switched independently of the remainder of the area. Occupant Operating and Maintenance Information to be Provided by Builder The builder shall provide the building owner, manager, and the original occupants a list of the heating, cooling, water heating, and lighting systems and features, materials, components, and mechanical devices conservation or solar devices installed in the building, and instructions on how to use them efficiently. The instructions shall be con- sistent with specifications set forth by the Executive Director. Water Heaters and Plumbing Fixtures Water heaters, showerheads, lavatory faucets and sink faucets must be certified by the California Energy Commission (Excluding: waterheaters of the non-storage electric type and lavatories in public facilities having devices that limit the flow of hot water or have self-closing faucets or having devices that limit the outlet temperature to a maximum of 110°F) Section 2-5314, Table 2-53G. TITLE 24 CONSTRUCTION COMPLIANCE STATEMENT REQUIREMENTS (To-be noted on plans or specifications) CONSTRUCTION COMPLIANCE (a) Prior to occupancy of the buildings the person responsible for the construction or installation shall provide the building department a signed statement, showing the building permit number, and listing all the manufactured devices in- stalled, including the name of the manufacturer, model number date of manufacture, manufacturer's stated efficiency, including the source cooling power index, source heating power index and fan performance index of each HVAC system. In lieu of the list reference may be made to the • plans and specifications, if all the above in- formation was, contained in the plans and specifications. Each document shall be signed,by the person re- sponsible for its preparation. The signer shall be a civil engineer, mechanical engineer, electrical engineer, architect, building designer, general building contractor, or specialty con- tractor, licensed or registered to practice by the State of California; or shall be the building owner if he or she is allowed by law to prepare the document. If more than one person has responsibility for building design or construc- tion, each person may prepare and sign the document or documents applicable to that portion of the design or construction for which the person was responsible; or the person with chief responsibility for design or construction may prepare and sign the document for the entire design•or construction. INSULATION CERTIFICATION Prior to occupancy the insulation installer shall post in a conspicuous location in the build- ing, a signed certificate containing the build- ing permit number and stating the insulation was installed in accordance with the approved plans and specifications. The certificate should also show the manufacturer's name, material identifi- cation, "R" value and, for blown insulation, the minimum weight per square foot consistent with manufacturer's design data. Datei Jurisdiction Prepared £>yr VALUATION AND PLAN CHECK FEE Q Bldg. Dept. D Esgil PLAN CHECK NO. ?£,- BUILDING ADDRESS 2-"5\Q APPLICANT/CONTACT BUILDING OCCUPANCY \JlPfl- PHONE N0. DESIGNED PKONE ^PE 0? CONSTRUCTION tHl -CONTRACTOR PHONE VALUATION MULTIPLIER BUILDING PORTION BUILDING AREA Air Conditionin Commercial Res. or Comm. Fire Fee Adjusted To Reflect Building Permit Fee S Plan Check Fee 5 D Energy Regulations (Fee x 1.1 Q Handicapped Regulaj^jJLDs (Fee x/*'. 065) "7 C 0 / / T V Date:Jurisdiction Prepared byi VALUATION AND PLAN CHECK FEE Q Bldg. Dept, p Esgil PLAN CHECK NO. flg,~ BUILDING ADDRESS APPLICANT/CONTACT BUILDING OCCUPANCY ft<&, TYPE OF CONSTRUCTION TIL - \)\vA PHONE DESIGNER PHONE CONTRACTOR PHONE Fee Adjusted To Reflect 0 Energy Regulations (Fee x 1.1) Q Handicapped Regulations (Fee Building Permit Fee $. Plan Check Fee $ / C 0 S/4/82 Datei Jurisdiction Prepared byt VALUATION AND PLAN CHECK FEE n Bldg. Dept, O Esgil PLAN CHECK NO. £ BUILDING ADDRESS APPLICANT/CONTACT BUILDING OCCUPANCY ft-7^ TYPE 0? CONSTRUCTION Tfll - CflAuUfl VJlPA g Oi3fl)£A«J PHONE N0. DESIGNER PKONE CONTRACTOR PHONE Fee Adjusted To Reflect Q Energy Regulations (Fee x 1.1) Q Handicapped Regulations (Fee x/f.065) Building Permit Fee $ Plan Check Fee S COM MTMTS:^ 8/4/32 COPY DISTRIBUTION: Originator to keep last (goldenrod) copy, send first 3 parts Intact to proper manager. CAPITAL APPROPRIATIONS PROPOSAL UNIT NUMBER ONE TENANT IMPROVEMENT AND Sl'ILblNG RE -ARRANGEMENT Project Title Project Number (To be assigned by Budget Dept.) !1 Coding for General Ledger ~ o ?US ITAN-3ENNEIT COS?. PURITAN-3ENNETT DIVISION Company/Division/Location C. L. 3QREN 53 Requested By AUGUST 15. 195<5 Date Budgeted Project: ( Yes (Circle One) No COST SUMMARY 207;000_00 r«.f«fA«*ftnrl.T«v 5 $P$tf97- Suh Totnl Income from Trade In/Sole ( 1 207,000.00 N^C-. S .aw/w/ry llvftil lifAnfA«et Ypfir< r Anniinl n^preciaHon C APPROVAL CATEGORY heck One Budgeted Unbudgeted X S 500 5 2,000 S 5,000 S 25,000 $100,000 Excess of $100,000 Attached is (Required if $ 0 $ 1,000 $ 2,500 512,500 $50,000 Excess' of $50,000 Form 436-A request exceeds Department Manager Appointed Officers Division VP or Other General Managers Other Corporate Officers, Plant Manager, PB California Vice-President, Finance & Administration President or Chairman of the Board Board of Directors 59,999) JUSTIFICATION PLEASE SEE THE ATTACKED LETJEU Of JUST.ZflCATlON fOR A DETAILED EXPLANATION Of COSTS AND CEARSES TO ACCOMPLISH THIS PROJECT. APPROVALS Date President Date ate Chairman of Board Uate Vice President/Corporate Officer Form 436 (Rev. 10-80) 'Date"Board of Directors Date i AD OKI n FURITAN-UKINNI 1 CORPORATION BENNETT MEDICAL EQUIPMENT PO BOX 66934 12655 BEATRICE STREET LOS ANGELES, CALIFORNIA 90066 (213)827-9000 October 30, 1986 Duncan And Associates 2531 State Street, Suite A San Diego, Ca. 92101 Attention: Royce Duncan Dear Royce, Enclosed are copies of my accounting sheets for the Carlsbad tenant improve- ment project now in construction. I am also including a copy of the original "Capital Appropriation...... $207,000., "to conform the maximum allocation to this project. On the work sheets you will see "Estimated Cost" which is what I used as a pro-., jection figure while compiling the actual bid estimate forthe work. "Cost" is the actual bid price for each sub-contract. You will note that under "Purchase Order" there is a date indicating when the P.O. was issued. You may verify any of the quotations by calling the telephone number listed with the contractor identification. I sincerely hope this information will enable you to secure a reasonable per- mit cost with the Carlsbad administration. Good Luck. Most Sincerely, C.L. Doren Sr. Manager Facilities Engineer '•Wmm'- j ij.'t ifir^t^i^p^^wgK PLAN CHECK NO.ADDRESS <3 /O cd>DATE f f ZONE: PLANNING TYPE OF PROJECT AND USE: SCHOOL DISTRICT: SAN DIEGUITQ SETBACKS: FRONT ^/H^-" DISCRETIONARY ACTIONS:/V/J A ENCINITAS SIDE CARLSBAD SAN MARCOS REAR REDEVELOPMENT PERMIT REQUIRED'. LANDSCAPE PLAN COMMENTS: ENVIRONMENTAL REQUIRED: ADDITIONAL COMMENTS'.*>!$0 ENGINEERING LEGAL DESCRIPTION VERIFIED?APN CHECKED? PARK-IN-LIEU QUADRANT;__Af/fl __ „> FEE PER UNIT: P.F.F.; A///5 TRAFFIC IMPACT-FEE PER UNIT: FACILITIES'MGMT. FEE; IMPROVEMEN TS! TOfAL FEE: TOTAL FEE:3^ RIDGE Ik THOROUGHFARE FEE: FIELD CHECK DATE & INITIALS DRIVEWAY; RIGHT-OF-WAY: EASEMENTS: LATERAL: INDUSTRIAL WASTE PERMIT: GRADING PERMIT; DRAINAGE: GRADING COMPLETION CERTIFIED L OK TO ISS DPD2:DPD6t07/17/86 IU OLO 0& I ^6bS? -feoz J 1200 ELM AVENUE CARLSBAD, CA 92008-1989 TELEPHONE (619) 438-5523 Citp of Carlrtab FIRE DEPARTMENT PLAN CHECK REPORT PROJECT ru r ir**f £&***/<•# {***& ADDRESS $. ARCHITECT _ OWNER ^ OCCUPANCY ^SPRINKLERED ^TENANT IMP. PAGE1 APPROVED. DISAPPROVED PLAN CHECK* PHONE PHONE STORIES •"'-/ 2 o a APPROVAL OF PLANS IS PREDICATED ON CONFORMING TO THE FOLLOWING CONDITIONS AND/OR MAKING THE FOLLOWING CORRECTIONS: 1. 2. 3. 4. 5. 6. 7. JL 9. X 12- X 13- PLANS, SPECIFICATIONS, AND PERMITS Provide one copy of: floor plan(s); site plan; sheets Provide two site plans showing the location of all existing fire hydrants within 200 feet of the project. Provide specifications for the following: Permits are required for the installation of all fire protection systems (sprinklers, stand pipes, dry chemical, halon, COa, alarms, hydrants). Plan must be approved by the fire department prior to installation. The business owner shall complete a building information letter and return it to the fire department. FIRE PROTECTION SYSTEMS AND EQUIPMENT ( The following fire protection systems are required: [^Automatic fire sprinklers (Design Criteria: Nffffl /? D Dry Chemical, Halon, COi (Location: D Stand Pipes (Type: -nft D Fire Alarm (Type/Location: Fire Extinguisher Requirements: ^d One 2A rated ABC extinguisher for each extinguisher not to exceed 75 feet of travel. D An extinguisher with a minimum rating of sq. ft. or portion thereof with a travel distance to the nearest _ to be located: D Other: 8. Additional fire hydrant(s) shall be provided EXITS Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. A sign stating, '' This door to remain unlocked during business hours" shall be placed above the main exit and doors EXIT signs (6" x %" letters) shall be placed over all required exiits and directional signs located as necessary to clearly indicate the location of exit doors. GENERAL Storage, dispensing or use of any flammable or combustible liquids, flammable liquids, flammable gases and hazardous chemicals shall comply with Uniform Fire Code. Building(s) not approved for high piled combustible stock. Storage in closely packed piles shall not exceed 15 feet in height, 12 feet on pallets or in racks and 6 feet for tires, plastics and some flammable liquids. If high stock pil- ing is to be done, comply with Uniform Fire Code, Article 81. 14. Additional Requirements. .15. Comply with regulation£*>f} attached, sjjeetys). Plan Examiner Date-so-/v-fl Report mailed to architect Met with Attach to Plans STEDMAN & DYSON STRUCTURAL ENGINEERS 2247 San Diego Avenue, Suite 135. San Diego, California 92110 • (619) 297-2223 November 14, 1986 RECEIVED NOY1 1 1986 •DUNCAN ASSOCIATES 2531 State San Diego, CA 92101 Attention: Royce Duncan Project: Puritan - Bennett Roof Equipment 8660-1 Subject: 1500 pound Mechanical Units, Bldg. A Gentlemen: Enclosed, please find structural calculations page 1 of 1 and a sketch, SKI of 1 for the proposed roof mounted mechanical units. Three units are to be placed along Column Line 2 at the following locations: 1. The south end of the unit is to be supported by the purlins at Column Line C and the north end of the unit is to be supported by the purlins located 8 feet to the north of Column Line C. 2. The south end of the unit is to be supported by the purlins located approximately 2 feet south of Line D and the north end of the unit is to be supported by the purlins located approximately 6 feet to the north of Line D. 3. The'south end of the unit is to be supported by the purlins 8 feet to the south of Line F and the north end of the unit is to be supported by the purlins on Line F. The fourth piece of equipment is to be located on Column Line 4. 1. The south end of this unit is to be supported by the purlin located approximately 12 feet south of Line G and the north end of the unit is to be supported by the purlin located approximately 4 feet south of Line G. Page Two - #8&60-l" DUNCAN ASSOCIATES November 14, 1986 The heavy side of the mechanical equipment is to bear on the 5-1/8 glu-laminated beams. The lighter side is to bear directly over the new 4 x 6, as shown in the sketch SKI. Should you have any questions, please do not hesitate to call us. Sincerely, STEQKAN & DYSON Scott A. Stedman Structural Engineer Enclosure cc: Tom Fulshaw/ w/enc. i h — ^ 1 ^) £• \ — — . C "2 ^" P(T> 0- - AWX. €S)0\f?- 1^00 4 o2305 S- aj 05 0 en u. oft. fMDJUCT NO