HomeMy WebLinkAbout2310 HOSP WAY; ; 82-261; Permit, J I her!offirmthat I am licensed under
provisions of Chapter 9 (commencing with
Section 7000) of Division '3 of the Business
I and Professions Code, and my license is in
I full force and effect. / . / .& L '• No.g (/74L. Class 'J4Vi/ A'3
C)
- •.. I hereby affirm that I am exempt from the tractors License Law for the following reason (Sec.
7031 '5 Business and Professions Code: Any city or, county which requires a permit to construct
- alter, improve, demolish, or repair any structure,
prior to its issuance also requires the applicant for
such permit to file a signed statement that he is
licensed pursuant to the provisions of the Con.
tractor's License Law (Chapter 9 commencing with
Section 7000 of Division 3 of the Business and Pro.
- tessions Code) or that is exempt therefrom and the basis for the alleged exemption. Any violation of
Section 7031.5 by an applicant for a permit subjects
the applicant to a civil penalty of, not more than five
LU hundred dollars ($500).
0 I, as owner 01 the properly, or my employees5
5 *ith wages as their sole Compensation, will do the
work, and the structure is not intended or offered for
12 Sale (Sec. 704.4, Business and Professiohs Code:
W . The Contractors License Law does not apply to an Z owner of properly who builds or improves thereon
3 and who does such work himself or through his own
0 employees, provided that Such improvements are
not intended or offered for sale, it. however, the
building or improvement is sold within one year of completion, the owner-builder will have the burden
of proving that he did not build or improve for the purpose of sale).
FA 0:1, as owner of the properly, am exclusively contracting with licensed contractors to construct
- . the project (Sec. 7044. Business and Professions Code: The Contractor's License Law does not apply
to an owner of properly who builds or improves
thereon, and who contracts for each projects with a contractor(s) license pursuant to the Contractor's O . License Law(.
- .0 I am exempt under Sec. — ________-, B. & P.C.
for this reason
0 thereby affirm that-I have a certificate 01 consent
to self.insure, or. a -certificate of Workers' Compensation Insurance, or a certified copy thereof
(Sec. 3800. Labor Code(.
Z POLICY NO,
COMPANY'
0 Copy is filed with the city. ' Z
0 Certified copy is hereby tarnished. CL
. CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE
- (This section need not be completed it the permit cc is.tor one hundred dollars ($100( or less)
Cr S S !'_ certify that in the performance of the work for,. /'whtdh' this permit is issued. I shall not employ any
3 person in any manner so as to become subject to 11 the Workers' Compensation Laws of California.
NOTICE TO APPLICANT: If, after making this Cells. Iicate of Exemption, you should become subject to
- the Workers' Compensation provisions of the Labor Code, you muss forthwith comply with such
provisions or this permit shall be deemed revoked
-4
r DI hereby allirm that there is a Construction
I iendng agency for the performance 01 the work for
which this permit is issued (Sec 3097, Civil Code)
zi Lender's Name
Lender's Address
USE BALL POINT PEN'ONLY & PRESS HARD — ' APPLICANT TQfJLL IN INFORMATION WITHIN SHADED AREA AND DECLARATIONS.
I CARLSBALWUILDING DEPARTMENT
1200 m, Carlsbad, California 92008 (714) 438-5525 .. .
. AUCATION & PERMIT
JOB ADDRESS ' . 'f . . . . S AV. ST. D~1 fF APPJl ATION BUSINESS LtCENSE #
FO
OWNER'S NAME . . OW ER'S PH NE PRIME CONTRACTOR CONTRACTORS PHONE C
?o /4L /1 T
ZONE . .VN
V LUATION ' OF __ PERMIT NUMBER
OWNER'S MAILING ADDRESS ' .
. S4ZOZ -56 ?z//O
CON RACTOR' DDRESS 1/9 J4J17 ''2c77
LICENSE NO.
Z9yc1-70
PLAN ID. # BLDG USE CODE
LOT BLOCK SUBDIVISION ASSESSOR PARCEL NO. OESI NER .
.,4I//CA /A-c
STATE LICENSE #
.-
STANDARD PLAN #
.'
BUILDING SO. FOOTAG
_______ OESC TION F WORK
/r72fz4? cJV4 te z..e. 71- DESIGNER'SDORESS
'
ss DESIGNER'S PHONE
OOOlO 6 /2 /2
Not Valid Unless Machine Certified
F/PFLR ELEV.
YO NO
NO
STORIES
GP EDU
CENSUS TRACT GP LAND USE' - PARKING SPACE RES UNITS GRADiNG,PERMIT ISSUED
V D N 0
REDEVELOPMENT AREA
YO NO
TV
. 11 T
0CC LOAD
'
'
FIRE SPA
- 0 ND
•
QTY. PLUMBING PERMIT- ISSUE ,
750
QTY.
.
. MECHANICAL PERMIT - ISSUE 3.00
?-eee SUMMARY/ACCOUNT NUMBER
. -
EACH FIXTURE TRAP . - INSTALL FURN. DUCTS UP TO 100,000 BTU ' BUILDING PERMIT 01-000-4220
EACH BUILDING SEWER ' ' . , OVER 100,000 BTU SIGN PERMIT ' 01-000-4221
EACH WATER HEATER AND/OR VENT ' . BOILER/COMPRESSOR UP TO 3 HP PLAN CHECK 01-000-4806 '
.EACH GAS SYSTEM 1 TO 4 OUTLETS . BOILER/COMPRESSOR 3-15 HP t TOTAL PLUMBING 01-000-4222
— EACH GAS SYSTEM 5 OR MORE . . - METAL FIREPLACE -, - ELECTRICAL , - - 01-000-4223
EACH INSTAL., ALTER, REPAIR WATER PIPE — . VENT FAN SINGLE DUCT - MECHANICAL 01-000-4224
EACH VACUUM BREAKER - - , , . MECH EXHAUST - HOOD/DUCTS - S MOB(LEHOME - 01-000-4225
WATER SOFTNER --, . —. RELOCATION OF EA FURNACE/HEATER . MOBILEHOME PARK (NSP
EACH ROOF DRAIN (INSIDE) ' - . - SOLAR 01-000-4226
TOTAL MECHANICAL- •
= -
STRONG MOTION - 65-640-0519
TOTAL PLUMBING " I ' . FIRE SPRINKLERS • 01-000-4227
OTY. ELECTRICAL PERMIT - ISSUE
2 _Op
QTY. SOLAR - ISSUE -
- . .
i .,,
PUBLIC FACILITIES FEE 25-000-4933
BRIDGEFEE -. 'sr r• , t-4 5.•'
- NEW.CONST EA AMP/SWT/BK R ' - COLLECTORS . . SCHOOL FEE - DISTRICT
I PH ' ' 3 PH - ' ' STORAGE TANKS - Carlsbad. , 65-623-0519
EXIST BLDG EA AMP/SWT/BKR ' AOK STORAGE - - . , Encinitas' , - - 65-624-0519 -
1 PH 3 PH • , , PUMP ' - - San Dieguito - 65-625-0519
REMODEL/ALTER PER CIRCUIT PLAN CHECK FEE 1 'i "San Marcos,' , 165.626-0519;'r ,"k 1
TEMP POLE 200 AMPS - —
OVER 200 AMPS
TEMP OCCUPANCY (300AYS)
— TOTAL ELECTRICAL TOTAL SOLAR TOTAL FEESPAYABLE
I HAVE CAREFULLY EXAMINED THE COMPLETED "APPLICATION AND PERMIT" AND DO HEREBY . Expiration. Every permit issued bytheBuilding Official inderthe provisionso/this * AN OSHA PERMIT IS REQUIRED FOR EXCAVATIONS OVER
CERTIFY UNDER PENALTYpOF' PERJURY THAT ALL INFORMATION HEREON INCLUDING THE Code shall expire by, limitation and become null and void. If the building or work '-50" DEEP AND DEMOLITION OR CONSTRUCTION OF authorized 18b days from the date of such DECLARATIONS ARE TRUE AND CORRECT AND I FURTHER CERTIFY AND AGREE IF A PERMIT IS by such permit is not commence within
t, or ifthe b0ildi ork authorized by STRUCTURES OVER 3 STORIES IN HEIGHT perm
ISSUED: TO COMPLY WITH ALL,CITY5-'COUNTY AND STATE LAWS GOVERNING BUILDING CON- abandoned at any timZ;9a:,Thwwork is commenced for a period of 180 days.
STRUCTION, WHETHER S ECIFIEDJHEREINOR NOT. I ALSO AGREE TO SAVE INDEMNIFY AND APP NT' %jill
K q -- 19 . AJ P HARMLESS THE ~ tl`,C~~k*p-BAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND OWNER CONTRACTOR
EXF EKF-~te~~ViifllLqH,IV14Y IN ANY WAY-)-ACCRUE AG4'1t4ST SAID CITY IN CONSEQUENCE OFTHE B Y PHCNE 0 GRANTI is
- • -.
.-,- -p / I
I' It-- uusPFrTIrmJ TVPF I ' ¶ DATE INSEECTOft
BUILDING
FOUNDATION
REINFORCED -STEEL
MASONRY
GUNITE OR GROUT .. -
FLOOR & CEILING SUB FRAME
SHEATHING 1
FRAME . .
EXTERIOR LATH INSULATION
INTERIOR LATH & DRYWALL
PLUMBING
SEWER AND BL/CO
PLUMBING UNDERGROUND
PLUMBING TOP OUT
TUB AND SHOWER PAN -
GAS TEST 1
ELECTRICAL
TEMPORARY POWER
ELECTRIC UNDERGROUND
ROUGH ELECTRIC
ELECTRIC SERVICE
BONDING
G. F. I. -..SMOKE DETECTOR
MECHANICAL
DUCT & PLEM., REF. PIPING C
HEAT — AIR COND. SOLAR SYSTEMS
VENTILATING SYSTEMS
j
CALL FOR FINAL INSPECTION WHEN ALL APPROPRIATE
ITEMS ABOVE HA vl BEEN APPROVED. -
JOB SITE FINAL
PLUMBING -air ELECTRICAL $JJ
MECHANICAL
GAS ' \
BUILDING -
---.-'
SPECIAL CONDITIONS I - -
CERTOFOQ°ANCYISSUED
- "___7__ (_ ,_f•_— •.' --
--- •H1
FIELD INSPECTION RECORD
REQUIRED SPECIAL INSPECTIONS -
INSPECTION co INSPECTORS DATE
INSPECTORS NOTES
APPROVAL ç IiAAW &4.-
SOILS COMPLIANCE PRIOR TO . 'S • -- .•• - - - FOUNDATION INSP A -t4 sPAt Ia PtO- 16 o THE do o rt4
STRUCTURAL CONCRETE
OVER 2000 PSI - .Di • ojN:f to cAti A iajsf.
- PRESTRESSED
CONCRETE
- foo '
POST TENSIONED
CONCRETE .I5'
FIELD WELDING . - sai41& S![FAIC rom ?2L.
HIGH STRENGTH STRENGTH
BOLTS -
SPECIAL MASONRY - - -
PILES/CAISSONS
5, 5
'I •'I
-_I__'
-
-
\
- - --
- - — ---.?
--
___
W:.
• 0 I hereby affirm that j am lIcsaed under cc provisions of, Chapter 9 ,(commencing'wIth
'Section 7000) of Division '3 of the Business
-and Professions Code, and my license Is in
I full force and effect.
[jic. No. - Class
o .- .-.-. 0 .- • 1" ..a .'
'hereby affirm that I. am exempt from the 'Centrac
ton's License Law for the following reason (Sec. 7031.5
"'.Business and Professions Code:. Any city or county which re-quires a permit to construct, alter, improve, demolish, or repair any structure, prior toils Issuance also requires the up- - plicant for such permit to tile a signed statement that he is licensed pursuant, to the provisions of, the, Contractor's
License Law (Chapter 9 commencing with Section 7000 of Division 301 the Business and Professions Code) or that is ex-
empt therefrom and the basis for the alleged exemption. Any
violation of Section 7031.5 by an applicant for a permit sub-'
jocts applicant to a civil penalty of not more than tine hun-
Kas
dollars ($500).
as owner of the property, or my employees with wages
in sole componsatios, will do the work, and the struc-
O no intended or uttered for sale (Sec.' 7044, Business -
and Professions Code: .The Contractor's License Law does
D not apply to an owner Of property who builds or Improves
'thereon and who does such work himself or through his own
employees, provided that such improvements are net Intend-
- yr offered for sale, it, however, the building or imprsve- Z mont is sold within one year of completisn,the owner-ba will have the burden of proving that he did not boil OF irs O prove for the purpose of sale). - -
f, as owner of the property, am eclusivety
with li
1:09.1
censed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License
Law does not apply loan owner of property who builds or im-proves 'thereon, and who contracts for each projects with a - contractor(s) license pursuant to the Contractor's License Law). - .
f" • ' 4 '0 ow As a homeowner lam improving my horse, and the follow' log conditions exist: - • 1. The work is being performed prior to sale. 2.' I have'lived in my home for twelve months
'nnior to completion of this work." - 3...L,Imave out claimed: this exemption during the - last three years.. :
0 lam exempt under Sei. - ' - B & P.C.
- for this reason
- 'r- - . 0 I herebyafIirm that I have certificate of consent
-. 10 self.insure, or a certificate of Workers'
Compensation Insurance. or a certified copy thereof
(Sec. 3809, Labor Code).' - -.
I.. z POLICY NO.
- 1 . COMPANY - - -
0 C yls e,withfhe ci ty. - -
D'Cerfified copy is hereby furnished. - - -
-- - - .,-'-
CERTIFICATE' OF EXEMPTION FROM
- WORKERS' COMPENSATION INSURANCE
- - is section need'not be completed if the permit is to one hundred dollars 151001 or less) , -
- 0 I certify that in the performance of the wore for -
o which, this permit is issued. I shalt not employ any -
person in any manner so as to become sublecf to - - the Workers Compensation Laws of California.
NOTICE TO APPLICANT: If, after making this Cciii
• vii, ficaIe of Exemption, you should become subject to
the Workers Compensation provisions of the Labor - Code, !you must—forthwith comply with such
-' provisions or this permit shall be deemed revoked.
.0 1' h'eby afl,rm that thove is a construction - I lending agency for the performance 01 the work for
- - f zlu i
-3097. which this permit is issued (Sec Civil Code).
' ,
I - ,Lender s Name
L 'Lender's Address '
- -.-..- :, - •- .
USE BALL POINT PEN ONPRESS HARD APPLICANT TO FILL IN INFORMATION WITHIN SHADED AREA ANCLARATIONS.
W CARLSBAD BUILDING DEPARTMENT APPLICATION & PERMIT - 1200 Elm, Carlsbad, California 92008-1989 (714) 438-5525
JOB ACIDKESS AV. ST. DATE F APPLI
1BUSIéPJSE #
VALUATION , PERMIT NUMBER
OWNER'S NAME OWNER'S PHONE CONTRACTOR CONT1 ACTORS PHONE N ZONE 1 7S1
OWNER'S MAILING ADDRESS - CONTRACTOR'S ADDRESS LICENSE NO. PLAN I.D. # ' BLDG USE CODE
lry 1c 1arze4< SL v1VC 2-?97°
LOT BLOCK SUBDIVISION ASSESSOR PARCEL NO. DESIGNER LICENSE # STANDARD PLAN # '
. .
BUILDING SO. FOOTAGE
.. DES C IPTION OF WORK
DESIGNER'S ADDRESS DESIGNER'S PHONE
' - .
5f
-
t1l- If p F LR ELEV. NO ' CCO p EDU
(/rT1%—' ri LJE— OP LC - ' D D.
FIRE SPR CENSUS TRACT , OP LAND USE PARKING SPACE RES UNITS GRADING PERMIT ISSUED
- . REDEVELOPMENT TYPE' 0CC LOAD AREA --i - - CONST
y o N 0 YO NO - YO ND Not Valid Unless Machine Certified
-
QTY. lLUMBING'PERMIT- ISSUE QTY. 'MECHANICAL PERMIT -ISSUE
-
SUMMARY/ACCOUNT NUMBER
- EACH FIXTURE TRAP - ' ' ' INSTALL FURN. DUCTS UP TO 100,000 BTU - ' BUILDING PERMIT 01-00-00-8220 ' /'7 "
EACH BUILDING SEWER - - ' .. . 100,000 BTU. ' . -. - - SIGN PERMIT '.- 01-00-00-8221
EACH WATER HEATER AND/OR VENT ' . BOILER/COMPRESSOR UP TO 3 HP - ' ' ' - PLAN CHECK . " 01-00-00-8806
EACH GAS SYSTEM ) TO 4 OUTLETS . ' ' , BOILER/COMPRESSOR 3.15 HP , - - - - - TOTAL PLUMBING . ' 01-00-00-8222
-
EACH GAS SYSTEM 5 OR MORE - , -
-
FIREPLACE , - . - - - _METAL ., -. . ,....ELECTRICAL .. 01-00-00-8223
EACH INSTAL., ALTER: REPAIR WATER PIPE ' ' , VENTFANSINGLEDUCT _- - ' MECHANICAL ._',"__01-00-00-8224 - -
- EACH VACUUM BREAKER •---- ' -'' MECH EXHAUST"-HOOD/DUCTS ' -_-. 'MOBILEHOME "-01-00-00-8225
WATERSOFTNER RELOCATION OFEAFURNACE/HEATER MOB(LEHOME PARK INSP
I EACH ROOF ' , - ' ' ' . ' SOLAR_014)0-00-8226 .
- , TOTAL MECHANICAL ' ' .
-. __.
'; - ,
_. .''
STRONG MOTION 80-92-33-0519 .
TOTAL PLUMBING • d"_ . , ' ' FIRE SPRINKLERS 01-00-00-8227
PUBLIC FACILITIES FEE 32-00-00-8923
QTY - ELECTRICAL'PERMIT -ISSUE n, - QTY._SOLAR - ISSUE .".._'..
.
- ._-I ..' ' BR(DGEFEE
NEW .CONSTEAAMPISWT/BKR COLLECTORS ._-' SCHOOLFEE-DISTR(CT _-
-3PH '-°'• .. STORAGE TANKS Carlsbad _'80-92-21-0519 .-
- EXIST BLDG EAAMPISWT/BKR ROCK STORAGE . Encinitas-. 80-92-22-0519 - - -
1 PH - 3 PH, - •, . - PUMP San Dieguilo 80-92-23-0519
I REMODEL/ALTER PER CIRCUIT: - ... . ' . PLAN CHECK FEE '
. ..-
San Marcos' ' 80-92-24-0519
'TEMP POLE 200 AMPS - ' , • ,' ' '. . - j - . - - ., . - -
-OVER 200AMPS
TEMP OCCUPANCY (30 DAYS)
I
TOTAL ELECTRICAL -
-
TOTAL SOLAR TOTAL FEES PAYABLE
I HAVE CAREFULLY EXAMINED THE COMPLETED "APPLICATION AND PERMIT" AND DO HEREBY Expiration. Every permit issued bytheBuildlng Official underthe rovisionsofthis * AN OSHA PERMIT IS REQUIRED FOR EXCAVATIONS OVER
CERTIFY UNDER PENALTY OF PERJURY THAT ALL INFORMATION HEREON INCLUDING THE Code shall expire by limitation and become null and void. If the building or work ' o DEEP AND DEMOLITION OR CONSTRUCTION OF fbI commenced within 180 days from the date of such 8Uth0flZ8d by su
permit, DECLARATIONS ARE TRUE AND CORRECT AND I FURTHER CERTIFY AND AGREE IF A PERMIT IS or if 8i STRUCTURES OVER 3 STORIES IN HEIGHT work authorized by such pernaft"is suspended or
SEQIFIED HEREIN OR NOT. I ALSO AGREE TO SAVE INDE Nil Y ANU PPL.
ISSUED: TO COMPLY WITH ALL CITY, COUNTY AND STATE LAWS GOVERNING BUILDING CON- a
r
aodaped t-ói'a?ter the,,seo is commenced for peU6d 01180 days.
KEEP HARMLESS THE jC~RdBAD AGAINST ALL LIABILITIES, JUDGMENTS, S A URE~Vlzll OWNE CONTRACI
EXPENSES WHICH MAY IN A1VAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF . BY P 0 " -
- ." HONE
' -
GRANTING OF THIS PERMIT.' 1'
INSPECTION TYPE DATE - INSJFTOR, -
- BUILDING
FOUNDATION
REINFORCED STEEL
MASONRY
GUNITEOR GROUT
FLOOR & CEILING SUB FRAME I
SHEATHING
FRAME • - .• ______ _________
EXTERIOR L:ATH INSULATION
INTERIOR LATH & DRYWALL - -
'- PLUMBING
SEWER -AND BL/CO
PLUMBING UNDERGROUND - - -
PLUMBINGTOPOUT _. .,,• _____ _______
TUBAND SAOWERPAN -
GAS TEST -.
ELECTRICAL S -
TEMPORARY POWER
ELECTRIC UNDERGROUND
ROUGH ELECTRIC
ELECTRIC SERVICE
BONDING - *
G. F. I. - SMOKE DETECTOR
MECHANICAL
DUCT & PLEM.,'REF. PIPING . --- -
HEAT -AIR COND. - SOLAR SYSTMS
VENyLATING SYSTEMS
CALL- FOR FINAL INSPECTION -WHEN ALL APPROPRIATE
- - ITEMS ABOVE HAVE BEEN APPROVED.
JOB SITE FINAL -
PLUMBING
ELECTRICAL
MECHANICAL -
S
GAS - - *-.
BUILDING
SPECIAL CONDITIONS S
CERTOF OCCUPANCY ISSUED
FIELD INSPECTION RECORD
REQUIRED SPECIAL INSPECTIONS - ". INSPECTOR'S NOTES.. - . •. ...: -
INSPECTION REQ. IF DATE INSPECTORS
CHECKED APPROVAL
SOILS COMPLIANCE -
-S -
- -
PRIOR TO
FOUNDATION INSP S -
STRUCTURAL CONCRETE
OVER 2000 PSI
PRESTRESSED . - '. •
CONCRETE.
POST TENSIONED
CONCRETE•
N' FIELD WELDING
HIGH STRENGTH
BOLTS
SPECIAL MASONRY
__________ ____ ______
- -
I. -- -
'•S S
'S
PILES'CAISSOFSJS • - .. .
4
- S
4.
- -
- -- -- 4.
-
- . -I SI I' •*
-: - - • - - . S -. - - - -. '- - .. . -. - I5__ -' - - 5 - . 4 St P . - ' -. _______________
- ''
.: - - .. . -- - •: -; ; :. L
; Carlsbad IOUs-
- 41 ,. 7/Ib,b2922:
1200 ELM, CARLSBAD, CA 92008 • TEL. (714) 4385525A RECEIPT 0uO192 7/1/ LL2J P.
• 'Address 23/i) /5/a j.y' / MISCELLANEOUS FEE RECEIPT
Li * PLAN CHECK FEE 010000846 4tL4-3ç Owner—...j Esjr._L.aèOtJ C_Z)
Li VALUATIONO.k) ire r- Mailing
Address ..
City y• Zip . TeI. - Li DEMOLITION
Li HOUSE MOVING_____________________
on;ct9r 4
-
Li -PARKS AND RECREATION FEE_' -- Address / 4 Coal-
Li PUBLIC FACILITIES FEE______________________ :.City Zip
4—, Li SCHOOL' FEE- DISTRICT______________________ State Lic t city
S. Classit. DA7 L4.7f) - Lic.NO.
Li Carlsbad
1- COMPLETE FOR PLAN CHECK ONLY - Li Encinitas - -
• 4 1 c / LEGAL DESCRIPTION Li - San Diego
1 Li San Marcos
"I -
4
ASSESSORSPARCEL NO.. -. -
Li 01'000404 - .* LI) P?XhVç WC7'Z(ñ 7(i..
DESCRIpTIONOEWORK'-7/SgQe.jlWelXf -
14
,
rr,
Li . ____
r- /R:,JLi 71 5rr4
no Li _O
- ;,• . Li - ________
. PLANIDNO.'4&/ 4—
I1,•_* ____________ ' I 1 I
DESIGNER ADDRESS
PHONE--
TOTAL FEE' $\
.1 CONTACT PERSON ___.y4/'../A__)O)cT6L_.. *WARNING: PLAN CHECK FEES. WHERE NO ACTION IS TAKEN BY THE
APPLICANT IN 180 DAYS AND NO BUILDING PERMIT IS ISSUED, FEE ARE
FORFEITED TO THE CITY. *
-
COMMENTS: • _
4
- - -• • • -
- r • . • • -
*
__-
Signature of App int Date
lWhite - Annlicant Yellow - File Pink - (1 Finance (2 Data Process (I_ Assessor
I •T.i.. .......•- : -i --- -i:
TIME:
DATE:
PERSON TAKINGREPORT le
ELECTRICAL
: TEMPORARY SERVICE
:] UFFER GROUND
ELECTRIC UNDERGROUND
1 ROUGH ELECTRIC
POOL BONDING
ELECTRIC SERVICE
FINAL V
: City of CarLbab
REQUEST FOR INSPECTION RECORD
V
•
INSPECTOR
•
____________ REQUESTED BY .\/_J4AJ QkI.. ONEN(
-
• BUILDING
(FOUNDATION
D REINFORCING STEEL
0 MASONRY c • C
0 GROUT - GUNITE Of '2i3 4
0 FLOOR-AND CEILING SUB FRAME
El SHEATHING 0 ROOF 0 SHEAR ,, C
V
•
V
0 FRAME •
O-'•,
0 EXTERIOR LATH • V
DINSULATION
'0 INTERIOR LATH OR DRYWALL
V
DFINAL
V
V PLUMBING
D UNDERGROUND PLUMBING.
0 SEWER AND PL/CO
El TOP OUT PLUM BING
0, TUB OR SHOWER PAN
V o GAS TEST, •
• V
WATER HEATER
V
SOLAR WATER V
DFINAL V
V MISCELLANEOUS
O CONDITIONEDAIR SYSTEMS
0 SOLAR HEAT •
V 0 PATIO
O POOL 0 SPA
DSIGN • V
El GRADING
0 DRIVEWAY
£JFINAL
/ V
SECIAL INSTRUCTIONS
4
e
Reajdm For Inspection: 0 Monday V 0 Tuesday -. Wednesday V 0 Thursday 0 Friday
AV.,DPVM. , V
.3 8280 RIVEROALE STREET, P o. Box 206,7, SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
:'. SOUTHERN CALIFORNIA SOIL AND TESTING, INC. .'
V
165 WEST ORANGETHORPE, PLACENTIA. CG.LIFORNIIA 92670 (714) 524-9130
V -
V 74-831 VELIE WAY, PALr'..'I DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET ESCONDIDO CALIFORNIA 92025 (714) 746-4544
- . •V V V
V • V
REPORT OF COMPRESSION TESTS
V
V
FILE NUMBER: 5300 - DATE: September 24, 1982 V CONCRETE
JOB: The Grove Parking Structure V V 0 MORTAR
V ADDRESS:
., 2310 Hosp Way, Carlsbad V V 0 GROUT
OWNER:, • . V ' V V 0 GUNITE '
2 ARCHITECT: Blaylock & Willis & Associates.,V
V V
V V ENGINEER:
' V
V
.cONTACTOR: Waynes Concrete
'
'• V V '
, V
LOCATION !N STRUCTURE :'Shear wall atline C-8,9
CEMENT: ' ' V Portland Type 1111 V
Aorv1IxTuRE: V Pozz ,. . •.
SAND Escondido Ready Mix
ROCK: V Escondido Ready Mix ,
V
,.
• NO. OR PRO PORTiONS: 2087 - 7 sack
,TIME-IN MIXER. MINUTES: 80
SLUMP, INCHES: 4' ,.
' V - V •
V
,
FABRICATED BY John Dondro TRUCK NO: B81 TICKET NO 334302
LABORATORY ND:V V 1896 . 1897 1898
MARK:A B C
V
, DATE,,MAOE:
, '9-17-82'
VOATE RECEIVED:
V 9-22-82 V
V V
V ' 4' • DATE TESTED:
V
. V ,
' 9-24-82 V
DIAMETER.' INCHES: . ' 6.00 .
AREA 50 INCHES 28.27
MAxlrvlurvl:LOAD. LBS.: ,.. , 61,000 ' V V - •
• V
COMPRESSIVE. STRV, PSI: 2,160.
.AGE TESTED. DAYS: ' 7 Days
REDO PSI AT 28 DAYS 3,000 -
UNIT WT/CU FT (PLASTIC):
DISTRIBUTION (3) Value Plus Industries
(1) SCS&T, Escondido
(1) City of Carlsbad
- IIVE D SOUTHERN CALIFORNIA
- SOIL AND TESTING, INC.
SFP28982 V V REVIEWED BY
CI TY OF CAR:LSBAD cj
Su i Ild i n~g Department
V V • .' • , -
V '
David J Akers, R C E 026815
-
SOUTHERN CALIFORNIA SOIL AND TESTING, INC
- 4-S - 6280 RIVERDALE STREET. P 0. Box 20627, SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHORPE, PLACENTIA, C.LIFORNIA 92670 C 714 524-9130 = -
74-831 VELIE WAY PALM DESERT CALIFORNIA 92260 (714) 346-1078
678. ENTERPRISE STREET, ESCONDIDO; CALIFORNIA 92025 (714) 746-4544
REPORT.ÔF COMPRESSION TESTS
,,,FILE NUMBER: 51300 •' .
DATE: September 9, 1982 ,
CONCRETE
J08: - The Grove Aprtment Condominium .. 0 MORTAR
/DDRESS:
., 2310 Hosp Way, Carlsbad . . OGROUT
. OWNER: 0 GUNITE
ARCHITECT: Blaylock &' Willis Associates °
ENGINEER:
CONTRACTOR Waynes Concrete Co
:LOCATION IN STRUCTURE ' . aissons . ,CENI1ENT.. •I -Portland I/Il
-.'AO(AIxTuRE :
- Pozz- 122N. - SAND:
. Escdndido Ready Mix OC<:. ••
... Escondido Ready Mix MIX NO. OR PROPORTION 085
- 5.7 sack MIXER, MINUTES60
.
. .
- SLUMP. INCHES:
FABRICATED BY John Dondro TRUCK NO TICKET NO 55089
LABORATORY NO: 1609 1610 1611
MARK A B C
-DATE MAOE: 901-82 '- Discarded
DATE RECEIVEO: - '-- 9-08-82
OATETESTEO:. -9-09-82 9-29-82
DIAI'vIETER, INCHES: .,
AREA.SQ. INCHES:
6.00
28.27 :
MAXIMUM LOAO, BS.: - -
..
90,000 '113,500 *
t
COIPRESSIJE STRPSI: 3,180 4,010
'AGE TESTEO. DAYS: ' .8 pays 28 Days RE0:O PSI'AT28 OAYS -- ..,3,000
UNIT WT/CU FT (PLASTIC)
DISTRIBUTION (3) Value Plus Industries
', ,. '. .(1) SCS&T, Escondido • - -
(1) City of Carlsbad
E SOUTHERN CALIFORNIA - * -• -•, -
. :' • SOIL AND TESTING. INC.
-
-
- - ORE VIE WED BY: LSBA -
rtmentMir" DePa 5iqR_ ou
.........', '•
-
--- - .
-
David J. A ers, R.C.E. #26815
SOUTHERN CALIFORNIA SOIL AND TESTING, INC
-
: 6280 RIVERDALE STREET. P 0. BOX 20627. SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHORPE, PLACENTIA, COLIFORNiA 92670 (714) 524-9130
74-831 VELIE WAY. pALtv1 DESERT, CALIFORNIA 92260 (714) 346-1078
' 678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF. COMPRESSION TESTS
FILE NUMBER: 51300 ' DATE: September 28, 1982 91 CONCRETE
JOB: The Grove Parking Structure, Carlsbad OMORTAR
,..'AOORESS: 2310 Hosp Way ' ' . OGROUT
OWNER: '
-. 0 GUNITE
'ARCHITECT: Blaylock Willis & Associates 0'
ENGINEER: .. , .
CONTRACTOR:wayfles Concrete .
':rLOCATION IN STRUCTURE: All-col umns:
CEMENT: , •.' ' Portland Type I/Il -
ADMIXTURE:
SAND Escondido Ready Mix
ROCK:'
,.
. '. . Escondido Ready Mix ,
MIX-NO. DR PR0FORTIONS:2087 7 'sack i'M .)4'
TIME IN MIXER, MINUTES: 50
SLUMP INCHES: - "2 FABRICATED. BY:John Dondro ,TRUCK B6 TICKET "0- 55632 - -
LABORATORYNO:, ' 1907 1908 1.909.
MARK. , '. •. .. ,. A' B C
DATE MADE: - 9-21-82
DATE RECEIVED: - • 9-24-82
DATE TESTED: -
.. 9-28-82
DIAMETER, INCHES:
•
' 6.00
AREA , SQ. INCHES: ''•
. 28.27 .
MAXIMUM LOAD LBS 939500
C0MRESSIVESTR.. PSI: -. - 3,310'
AGE TESTED. DAYS:. ' • 7 Days .
REO'D PSI AT28-OAYS:-''. ' . '-' - .
UNIT WT./CUFT (PLASTIC): . ,.
.
.
DiSTRIBUTION:' (3) Value Plus' Industries
-' (1) City of Carlsbad .
(1)' .SCS&T, Escondido • . , .
-.' -. .,'- . S . ' -
— SOUTHERN CALIDRNIA
• SOIL AND TESTING, INC
- -. ••
,-.. S-V s) 0 , REVIEWED BY:.
David J. Akers, R..E.#26815
,
I IT J7C7/ S-c7
j)&-s /L-'T c7A.'L)
- JL=LJ
I --I•t---- --J ----• . -.
''- -'' --•.---- --•••-•-.
V
7 iav .. -. r'
B IT
-_-
-- -p23l982 _---
•cjtyofCALA.If )
WLD
A001-17
• . '/Y:.'.' I
F145'I. r
A21~1J,4AII-1 7'
. / /24 __________- _.• '-
'-
'H-
7c7' /-4/LL
V
121
SOUTHERN CALIFORNIA SOIL AND TESTING, INC
6280 RIVEROALE STREET. P 0. BOX 20627 SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WESTORANGETHORPE, PLACENTIA, CALIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCDNDIDO, CALIFORNIA 92025 (714) 746-4544
JOB: - SCST NO. S I. DATE
,'The Grove. . . 51300 4 10-5-82
ADDRESS: - , . ' BLDG. PERMIT NO. PLAN FILE NO.
2310jp_J Way . . 82-261
ARCHITECT:
TYPE INSPECTION: Blaylock - Willis
:. Structural Steel ' ENGINEER:
Blaylock - Willis I'AATERIAL INSPECTED: -
:Electrodes E. 9018 . . . . CONTRACTOR-:
. Waynes Concrete
Certified Welder: Bernhard Fritz 4980 . .
9:14_82
, Inspected fit-up and welding of reinforcing steel per detail D/S4. i....-,Matthew C., Jay ..Welds found',to be visually acceptable. Welding completed this date.
-W-168
V ..-.
ED
- -. - 1• - ' -
: AZCEIV
OCT 14 982
CITY OF CPRLSBD
BuIlding. DePartmen t
or
DISTRIBUTION:
(3) Value Plus Industries
•
. -
(1).-City.of Carlsbad
(1) SCS&T, Escondido -• SOUTHERN CALIFORNIA
. . - SOIL AND TESTING, INC.
REVIEWED BY:
David J. Akers, R.C.E. #26815
I'
-I
. SOUTHERN CALIFORNIA SOIL AND TESTING, INC..;
-S .. 6280 RIVERDALE STREET. P 0. BOX 20627 SAN DIEGO, CALIFORNIA 92120 (714)280-4321
165 WEST ORANGETHORPE, PLACENTIA, CALIFORNIA 92670 C 714 524-9130 -
74-B31 VELIE WAY. PALM DESERT, CALIFORNIA 92260 - (714) 346-1078
.678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA 92025 (714) 748-4544
JOB: . - - scsimjo. si.
The Groves ,. , . 51300 6
ADDRESS: - -. : BLDG. PERMIT NO.
2310 Hosp Way, Carlsbad 1982
- . . .. .. . ARCHITECT:
TYPE INSPECTION: Blaylock - Willis
Reinforced Concrete . .
. ENGINEER:
MATERIAL INSPECTED: . Blaylock - Willis
Reinforcing Steel: ASTM A615 Gr. 60 CONTRACTOR:
'Concrete: 2086 (6 sk., 3000 psi)
- Waynes Concrete
TE
105-82
PLAN FILE NO.
9-2882' . .Inspectéd reinforcing steel in-retaining wall between lines 1 and 2.
.GregWolfram '. Also, reinforcing for 2 columns on 3 line. . .
Placed approximately 8 yards of concrete in inspected area. Three test
-
. ..
-.
samples taken from west end of retaining wall. Slump 5.5 pumped..
Batch ticket showed mix to be 2087 (4000 psi) In inspector's opinion
the mix did not appear rich enough Driver was requested to contact
- plant. It was learned that mix was actually 2086 (3000 psi). Contractor
-- - notified of1this. Elected to use concrete as it was designed for the
required strength
5,
5__• - S _, ., . - -
' r
- --- S ,- S
I
-
DISTRIBUTION:
.(3)Vlue Plus,Indus&ies
(1).City of Carlsbad .. . . . .
(1) -5SCS&T,. Escondido. -, - SOUTHERN CALIFORNIA
SOIL AND TESTING, INC
REVIEWED BY:
Oavid J Akérs, R.C.E. #26815
I
1%.
V SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
'. 6280 RIVEPOALE STREET, P 0. BOX 20827, SAN DIEGO, CALIFORNIA 92120 , (714)290-4321
185 WEST ORANGETHORPE, PLACENTA, CALIFORNIA 92670 (714) 524-9130
74831.,VELIE 'WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA' 92025 (714) 746-4544
- JOB:. SCST NO. S.I. OATE
" The Groves 51300 5 10-5-82
ADDRESS: ' .' ' . ' ' BLDG. PERMIT NO. PLAN FILE NO.
2310' Hasp Way, Carlsbad ' '. ' 1982
ARCHITECT:
TYPE INSPECTION:. V
, Blaylock &, Willis .
Reinforced Concrete ENGINEER:
Blaylock & Will i s - - MATERIAL INSPECTED: . V
.. 'Reinforcing Steel: ASTM kA615 Gr. 60 CONTRACTOR:
Concrete 20 5 7 3000 PS1 Waynes Concrete
92182: , ' Inspected the reinforcing steel and concrete in the poured in place'
" 'John Dondro columns at the', gound level. Concrete provided by Escondido Ready Mix:
.., PCM 215
'V ''
Made 1 set (3 cylinders) of concrete samples.' .
'V ..V V , .. V 5_ V
944-82 Inspecte'd the reinforcing steel in the footing and stem wall at the
John Dondro V' 'ramp on -Line 2 and the two column footings on Line 3. Requested the
'-PCM 215 , prime contractor correct the missing #6 bar in the bottom of th&'footing,
V
' , Line 2, with two #5 bars.' "(There were no.#6 surplus bars on the job
site).'Witnessed the placing of 16 cubic yards of concrete in the
- footing and stem wall on Line 2 and the two column footings on line 3.'
V
" Concrete provided by Escondido Ready Mix. Concrete was placed from',
- the truck chute at a-3 to 4" slump. Made 1 set (3 cylinders) of
concrete samples
V.. V ,,V V' ' ' V ' V
-
.-.
. V $V•\• . .
, , V
V V
V •. V V
4
DISTRIBUTION:
(3) Value Plus Industries
(1) -City of Carlsbad,
.(1SCS&T, Escondido.. V
- - SOUTHERN CALIFORNIA ,
V
:".
V , -
' :'
V
- SOIL AND'TESTING, INC.
P V ' '•
V V REVIEWED BY: . V • , 'V* dV S ,, . • 'S ' ,. , V_ V V
V V,
,,, -• , V
•, ' r --------
- David J Akers', R C E #26815
SOUTHERN CALIFORNIA SOIL. AND TESTING, INC.
,. 6280 RIVERDALE STREET. P 0. BOX 20627 SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHORPE, PLACENTIA, CALIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY. PALM DESERT, CALIFORNIA 92280 (714) 346-1078
678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA 92025 (714) 748-4544
JOB: " - SCST NO. SI. DATE The
Gr:i
51300 3 9-21-82
BLDG. PERMIT
p Way, Carlsbad Carlsbad k
PLAN FILE NO
:3s:10 ~
TYPE INSPECTION:
Reinforced Concrete
. E B'Ia GIN T ER
MATERIAL INSPECTED yock & Willis & Associates
'. Concrete: 2087'-(7 sk., 3000 psi with Pozz) CONTRA
C
TOR
Waynes rete Co.
9-17-82 , Witnessed the placing of 54 cubic yardsóf 3000 psi concrete in the
"-John Dondro-" •, four shear walls at lower level of the parking structure. Concrete
- PCM 215 S.D. ' provided by Escondido Ready Mix, made 1 set (3 cylinders) of concrete
samples. Specifically areas placed were, shear wall at lines B12 as
shown on detail D1/S4, shear wall at lines A-8-9 as shown on detail C/S4
shear wall at lines C-8-9 as shown on detail C/S4 and shear wall BC-4
as shown on detail G/S4.
I
S E P 2,47982
CITY QF
B DISTRIBUTION: Uliuing Departme,t
(3)' Value Plus 'Industries.
(1) City of Carlsbad . . .
(1),SCS&T,Escondjdo - SOUTHERN CALIFORNIA
- SOIL. AND TESTING, INC.
REVIEWED BY:
David J. Akers. R.C.E. #26815
. - :. SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6280 RIVEROALE STREET, P 0. BOX 20627, SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
166 WEST ORANGETHORPE, PLACENTIA, CLIF0RNIA 92670 (714) 524-9130
74-631 VELIE' WAY. PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300 DATE October 26, 1982 )0 CONCRETE
JOB: The Groves 0 MORTAR
ADDRESS. 2310 Hosp Way, Carlsbad OGROUT
OWNER:. ' 0 GUNITE
ARCHITECT:' - 0
ENGINEER .-
CONTRACTOR: wayne's Conrete Co.
LOCATION IN STRUCTURE 2nd floor slab @ 10 lineand A
CEI\AENTr ' Portland Type II
ADMIXTURE ;: '. ,• Pozz
AND: ......... Escondido Ready Mix 5:
,,ROCK:, .' Escondido Ready Mix
MIX -NO. OR PROPORTIONS: p2087 7 sack
TIME IN MIXER. MINUTES: 1 hr. 5 mm.
SLUMP, INCHES: ' 4.75. -
FABRICATED By: SCS&T, TRUCK NO: B59 TICKET NO: 56724 -
LABORATORY NO ' 2374 2375 2376
MARK:
DATE MADE: ,10-19,-82 ' Discarded
DATE'RECEIVED:, 10-21-82 '
..DATE TESTED: ' 10-26-82. 11-16-82
OIAMETER INCHES 6.00
AREA, SQ. INCHES: 28.27
MAXIMUM LOAD, LBS.. 88,000 124,500 .
COMPRESSIVE STR., PSI: ' 3,110 4,400 . ' •
'AGE TESTEO. DAYS: , .7 Days 28 Days
,REQ'O PSI AT -2,8 DAYS:
-- 4,000 '-- - - - - - - -
UNIT WT./CU FT (PLASTIC):
9ISTRIBUTION:.(3) Value'Plüs Ind utries .
(1) City of Carlsbad'
(1SCS&T, Escondido
VV
SDUHERN CALIFORNIA
SOIL AND TESTING.INC.
REVIEWED BY •
.' - - , -' - • . , David J. Akers, R.C.E. #26815
S ' • . -. - ,.
I .
'
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300 .. DATE October 25, 1982 M CONCRETE
JOB: The Groves S 0 MORTAR
ADDRESS: 2310 Hasp Way, Carlsbad 0 GROUT
OWNER: , . . . . . 0 GUNITE
ARCHITECT: - 0
-ENGINEER:
- . -
'CONTRACTOR:Waynes'Concrete
LOCATION IN STRUCTURE: C line @ 11 line 2nd floor slab of parking structure
CEMENT:' Type II -.
. ADMJXTURE:,.', .. -Pozz SAND: ' Escondido Ready Mix ,
ROCK: .. . . Escondido Ready Mix
MIX NO. OR. PROPORTIONS:2087 7 sack
TIME IN MIXER. MINUTES: 1 hr.. 30 mm.
SLUMP. INCHES: 4 5 . . FABRICATED eY:SCS&T • TRUCK NO:B-84 TICKET NO: 56673
.LABDRATORY NO:
' 2336 • 2337 2338 MARK- . 4
DATE MADE: . 10-18-82 Discarded
DATE RECEIVED: 10-19-82 . .
'DATE TESTED: , .- 10-25-82 1I1582
DIAMETER, INCHES: ' -. 6.00 - AREA, SO. INCHES: . 28.27 -
MAXIMUM LOAD. LBS.: 77,500 . 115,0_00 ;
-4COMPRESSPVEST., PSI: ' 2,740 4,065
AGE TESTED, DAYS: ' 7 Days * 28 Days
REQO PSI AT 28 DAYS: -4,000 UNIT WT/CU FT (PLASTIC):
DISTRIBUTION: (3) Value Plus Industries '.
' (1) City of Carlsbad
-
.
(1) SCS&T, Escondido
S -
.4 -. .
SOUTHERN CALIFORNIA
SOIL AND TESTING, INC.
fly REV I E WED BY
David J. Akers, R.C.E. #26815
6280 RIVERDALE STREET. P 0. BOX 20627. SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST. ORANGETHORPE. PLACENTIA, CLIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET. ESCONDIDO. CALIFORNIA 92025 (714) 746-4544
- 'L
G
SOUTHERN CALIFORNIA SOIL AND TESTING, INC
3 .
6280 RIVERDALE STREET, P 0. BOX 20627, SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHORPE, PLACENTIA, CSLIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY, 'PALM DESERT, CALIFORNIA 92260 (714) 346-1078 . .,
- 676 ENTERPRISE STREET. ESCONDIOD, CALIFORNIA 92025 (714) 746-4544 -
REPORT OF COMPRESSION TESTS
FILE NUMBER: 5130O' . DATE: October 27, 1982 CONCRETE
JOB'The Groves - o MORTAR
ADDRESS: 2310 Hosp Way,',Carlsbad 0 GROUT
OWNER: • • ' . 0 GUNITE
ARCHITECT: ..• 0
ENGINEER:
. .
_CONTRACT0R:wayfles Concrete Co.
- -
LOCATION IN STRUCTURE:-Ramp to second floor parking SE corner
JCEMENT. . Portland Type II
- AOMIXTURE: Pozz
SAND:
' Escondido Ready Mix ,•• . .
ROCK Escondido Ready Mix
MIX No: OR PROPORTIONS: 2087 _7 sack
TIME IN MIXER, MINUTES: i hr. 45 mm.
SLUMP, INCHES: 3.75 .
FABRICATED BY SCS&T TRUCK NO B-6 TICKET NO 56805
LABOATOR' NO: . 2400 2401 2402
;"'MARK:'
•--. :' . .. S - -
.5
'
OATE MADE: . 10-20-82 . Discarded
DATE RECEIVED: - 10-21-82
DATE TESTED: ' , .10-2782 . 111782
i-OIAMETER, INCHES: "' • -6.00
S
, - ARE A, SQ. INCHES: 28.27
MAXIMUM LOAD. LEIS.: , 100,000 . 127,000
-COMPRESSIVE STR.. PSI: '- 3,540 4,490
AGE TESTED. DAYS: 7 Days ' 28 pays .
REDO PSI AT 28 DAYS:. • 4,000 .
UNITWTJCU.FT (PLASTIC): . - - . - -. S
DISTRIBUTION: (3) Value Plus Industries -
•
(1) City of Carlsbad . '- •. -S
- (1) SCS&T, Escondido
i
SOUTHERN CALIFORNIA
SOIL AND TESTING, INC
REVIEWED BY:
- I
- David J.- Akers, R.C.E. '#26815 -
'.; SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6280 RIVEROALE STREET, PD. BOX 20627, SAN DIEGO, CALIFORNIA 92120
-
(714)280-4321
165 WEST DRANGETHORPE, PLACENTIA, CALIFORNIA 92670 (714) 524-9;3O
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
- . - - 678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA 92025 (714) 746-4544 -,
JOB:- - . V - SCST NO. . S.I. DATE
The Grove ' V 51300 7 11-2-82
ADDRESS:. V -
V
V
V BLDG. PERMIT NO. PLAN FILE NO.
'. 2310 Hosp Wa9, Carlsbad, California Carlsbad 1982
ARCHITECT: . •.
TYPE INSPECTION: - V
Reinforced Concrete ' . ENGINEER:
MATERIAL INSPECTED: V V Blaylock, Willis & Associates . Reinforcing Steel: -ASTM A615 Grade 60 CONTRACTOR:
Concrete: 2087 (4000 psi 7 sack) . Waynes Concrete Company
10-18-82 '' - Inspected reinforcing on second floor of parking structure after minor
Gregory A. Wolfram adjestments. Reinforcing appears acceptable. .
Place concrete from 4 line to 12 line and B line to C line Cold joint
; V in slab from B to C line about 171V west f 12 line.
Cause- Pump brakedown, Delay of 21, hours.
V Contractor blocked out small area just west of 7.linè on C line 'for
anchor plates to be imbeded in slab. Plates not o'n job at this time.
V
.. . 3-test cylinders taken from' concrete placed at 11 and C lines. .
Slump 5.0",
V 10-19-82' . Placed concrete from A to B lines and 4 to 12-lines. V.
Gregory A Wolfram 3 test cylinders taken from 10 line to A line. -Slump 4.75.
•V
10-20-82 Inspected, reinforcing for 2nd floor ramp, placed concrete in inspected
Gregory A. Wolfram ' area, 3 test samples taken from SE corner of ramp. Slump 3-3/4. V V
All.work appears acceptable per plans and spec's. ' V
V V •' -- 1,-V .
. -
V
'a-- ,- •-.- ,.V. ' V V . V
-. ,. V. V V• V
DISTRIBUTION:'
(3). Valu
V
e Plus Industries '
(1) -City of Carlsbad
(1) SCS&T, Escondido V V
' SOUTHERN CALIFORNIA •, V
SOIL AND. TESTING, INC.
REVIEWED BY:
David .......................................................
-' •-.- 'V.
G
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
s-S 6280 RIVERDALE STREET. P 0. BOX 20627. SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHOPPE, PLACENTIA. CALIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078 -
- 678 ENTERPRISE STREET. ESCONDIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300 .
DATE: October 5, 1982 R CONCRETE
JOB: The Groves -
0 MORTAR
ADDPESS: 2310 Hosp 'Way, Carlsbad 0 GROUT
OWNER: . , . - ' 0 GUNITE
ARCHITECT:
-------- -- ----• ---------. ENGINEER:'
CONTRACTOR: Waynes Concrete Co.
- LOCATION IN STRUCTURE: -West end of retaining wall running from 1 line to 2 line
CEMENT:
* Portland Type II - ADMIXTURE: P'ozz 122N SAND:
. Escondido Ready Mix ROCK: Escondido Ready Mix MIX NO, OR PROPORTIONS: 2086 6 sack TIME IN MIXER. MINUTES: 45 - -SLUMP -INCHES: - 5.5 FABRICATED BY: SCS&T -
- TRUCK N01 TICKET NO: 335415
- LABORATORY NO: - 2016 2017 2018
MARK
DATE MADE:. ' - 9-28-82
- DATE RECEIVED:' 9-29-82-
DATE TESTED: ' 10-05-82 10-26-82
DIAMETER, INCHES: ., 6.00
AREA. SO. INCHE9 - 28.27
MAXIMUM LOAD. LBS.: - - 56,000 - 84,000
COMPRESSIVE STR.. PSI: 1,980 2,970
AGE TESTED. DAYS: •.-- Days 7 28 'Days
REO'D PSI-AT 2BDAYS: '3,000
UNIT WT/CU.FT'(PLASTIC): -.
-
DISTRIBUTION (3) Value Plus Industries
' :-'-.
-.- (1)' City of Carlsbad
(1) SCS&T,
•
Escondido
. •
s_ LI
-
SOUTHERN CALIFORNIA
SOIL AND TESTING, INC. -
REVIEWED BY
...............................................................
David J.-Ake,'s, R.C.E. #26815.
G
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
4-S .6280 RIVEROALE STREET. P 0. BOX 20627. SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANJGETHORPE. PLACENTIA, COLIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY. PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCONOIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300 - OATE October 26, 1982 JCCONCRETE
JOB: The Groves o MORTAR
ADDRESS: 2310 Hosp Way, Carlsbad . 0GR0UT.
OWNER: . 0 GUNITE.
ARCHITECT: . .
-------------------- -. ''--•---
CONTRACTOR: Waynes. Concrete Co.
LOCATION IN STRUCTURE: 2nd floor slab@ 10 line and A
CEMENT: Portland Type II
ADMIXTURE: . Pozz
SAND: Escondido Ready Mix
ROCK: ' Escondido Ready Mix
'MIX NO. OR PROPORTIONS: 2087 . 7 sack .
TIME IN MIXER. MINUTES: 1 hr. 5 mm.
SLUMP, INCHES: 4.75
FABRICATED BY: SCS&T - TRUCK NO: B59 TICKET NO: 56724
LABORATORY NO: 2374 2375 2376 .
MARK:
DATE MADE:, 10-19-82
DATE RECEIVED: . 10-21-82 . .
DATE TESTED: , 10-26-82 .
DIAMETER, INCHES:' 6.00
AREA. SO. INCHES:28.27
MAXIMUM LOAD. LBS.: -- 88,000
COMPRESSIVE STR., PSI: 3,110 '
AGE TESTED. DAYS: . ' .7 Day's '
-REQ'D PSI AT 28 DAYS: ' 4,000 '
UNIT WT/CUFT (PLASTIC): - . .
.
DISTRIBUTION (3) Value Plus Industries-
(1) City'of Carlsbad-
(1) SCS&T',.Escondido
-
- --
SOUTHERN CALIFORNIA
SOUL AND TESTING, INC.
REVIEWED BY:
David J. Akers, R.C.E..#268t5::
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6280 RIVERDALE STREET, P 0. BOX 20627, SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHORPE. PLACENTIA, CALIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
- 678 ENTERPRISE STREET, ESCONOIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300 . DATE: October 27, 1982 CONCRETE
JOB: The Groves . 0 MORTAR
ADDRESS: , 2310 Hosp Way, Carlsbad DGROUT
OWNER: OGUNITE
ARCHITECT: 0
ENGINEER --,.-.--.----..-, ------------------------- -------------
CONTRACTOR:Wayne5 Concrete Co.
-
LOCATION IN STRUCTURE: Ramp to second floor parking SE corner
CEMENT: . Portland Type II
- ADMIXTURE:
- Pozz .
SAND: Escondido Ready Mix
ROCK: Escondido Ready Mix
MIX NO. OR PROPORTIONS : 2087 7 sack
TIME IN MIXER. MINUTES: 1 hr. 45 mm.
SLUMP. INCHES: 3.75
FABRICATED BY: TRUCK NO: 8-6 TICKET NO: 56805
LABORATORY No: 2400
-
2401
-
2402
MARK:
DATE MADE: 10-20-82 -
- DATE RECEIVED: - 10-21-82 -
DATE TESTED: 10-27-82
DIAMETER, INCHES: 6.00
AREA. SQ. INCHES: -, 28.27
MAXIMUM LOAD. LBS.: - 100,000 . . .
COMPRESSIVE STR.. PSI: - 3,540
AGE TESTED. DAYS: -
, 7 Days
REQ'D PSI AT 28 DAYS: - 4',000' .. -
UNIT WT/CU FT (PLASTIC):
DISTRIBUTION (3) Value Plus Industries
(1) City of Carlsbad
(1) SCS&T, Escondido
.............. . . -
'-'--------:------ -------.--..-------------- .......=---- ------------- .
-- - ---.- ,' -
--,-
- - -
SOUTHERN CALFORNIA
SOIL AND TESTING INC.
- - , REVIEWED BY:
David-- J. Akers; RC E. #26815--.--:--: -
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6280 RIVERDALE STREET, P 0. BOX 20627. SAN DIEGO, CALIFORNIA 92120 (714)26 0-4321
165 WEST ORANGETHORPE, PLACENTIA, CLIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS V
FILE NUMBER: 51300 .. DATE: October 25, 1982 - CM CONCRETE
JOB: The Groves 0 MORTAR
ADDRESS: 2310 Hosp Way, Carlsbad V V OGROUT
OWNER:
V
0 GUNITE
ARCHITECT: - 0
ENGINEER:
CONTRACTOR:Waynes Cqpefte-... V
/ V .
LOCATION IN STRUCT RE: C line @'li 1 ne 2nd. floor slab of parking structure V
CEMENT: Type II
V Pozz
SANO:
do Ready Mix
ROCK: EscOndido Ready Mix
MIX NO. OR PROPORTIONS:2087 7 sack
TIME IN MIXER, MINUTES: 1 hr. 30 mm.
V SLUMP, INCHES: V 5
FABRICATED BY:SCS&T V
TRUCK NO: B-84 TICKET NO: 56673
LABORATORY NO: . 2336 2337 2338
MARK:
V V
V V
' . DATE MAOE: 10-18-82 VV V
DATE RECEIVED:
DATE TESTED:. 10-25-82
V DIAMETER, INCHES: ,V V ,76Z -
V
AREA. SQ. INCHES V -28.27 \ V
MAXIMUM LOAD. LEIS.:
. COMPRESSIVE STR. PSI: ( 2,740 y ]
AGE TESTED, DAYS: . 7 Days J V V
..RED'D PS!.AT-.28 DAYS: -. 4,001)-
UNIT WT/CL FT (PLASTIC):
,OIsTIBUTIoN: (3) Value Plus Industries V q'z 7f
(1) City of Carlsbad V '
(1)SCS&T, Escondido V ' V
SOUTHERN CALIFORNIA
SOIL AND TESTING, INC.
V • REVIEWED BY:
:.. VVV1
- V'
- -
V• - V V -
V
David J. Akers, R.C.E. #26815
-•- ,. ..., V
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6280 RIVERDALE STREET, P 0. BOX 20627, SAN DIEGO. CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHORPE, PLACENTIA. CALIFORNIA 92670 (714) 524-9130 -
74-831 VELIE WAY. PALM DESERT. CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE -STREET. ESCONOIDO. CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300 DATE October 1, 1982 CONCRETE
JOB: The Grove Parking Structure 0 MORTAR
ADDRESS: 2310 Hosp Way, Carlsbad ,
GROUT
OWNER: OGUNITE
ARCHITECT: Blaylock & Willis & Associates .
ENGINEER: -
CONTRACTOR:Waynes Concrete Co-.'.
.
'LOCATION IN STRUCTURE: Foàting and stem wall at ramp line 2 .
CEMENT: Portland Type I/Il
ADMIXTURE: - ' Pozz
SAND: Escondido Ready Mix
ROCK: 'Escondido Ready Mix
MIX NO. OR PROPORTIONS: 2085 5.7 sack
TIME IN MIXER, MIN UTES: 120
SLUMP.INCHES: ' 4 -
FABRICATED BY: John Dondro TRUCK NO:20 TICKET NO: 55867
LABORATORY NO: 1983 1984 1985 -
MARK: A B C
DATE MADE: 9-24-82 Discarded
DATE RECEIVED: 9-28-82
DATE TESTED: 10-01-82 10-22-82
DIAMETER. INCHES: , ' 6.00 - -
AREA. SQ. INCHES:
. 2827
MAXIMUM LOAD. LBS.: .66,000 94,800
-COMPRESSIVE STR.. PSI:
- 2,330 3,350
AGE rESTEO. DAYS:
' 7-Days 28 Days REGO PSI AT 28 GAYS: 3,000 UNIT WT./CU FT (PLASTIC): -
DISTRIBUTION: (3) Value Plus Industries
-. .. (1) City of Carlsbad . .
-:(i). SCS&T, Escondido
, . - SOUTHERN CALIFORNIA
,. . • . . .
SOIL AND TESTING, INC.
REVIEWED BY:
David JAkes,RCE#26815
st
.
,.1..• SOUTHERN CALIFORNIA SOIL. AND TESTING, INC.
62B0 RIVEROALE STREET, P o. BOX 20627, SAN DIEGO, CALIFORNIA 92120 714) 280-4321
165 WEST ORANGETHORPE, PLACENTIA, CALIFORNIA 92670 (714) 524-9130
74-631 vELIE WAY, PALM DESERT. CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCONOIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE 'NUMBER: 51300 DATE: September 28, 1982 M CONCRETE
JOB: The Grove .Parking Structure, Carlsbad MORTAR
ADDRESS: 2310 .Hosp Way GROUT
OWNER: , -
0 GUNITE
ARCHITECT: Blaylock Willis &, Associates o
ENGINEER.i
--.CONTRACTOR:WayfleS Concrete
--,LOCATION IN STRUCTUE:.All columns
",,CEMENT: .- - Portland Type I/Il
ADMIXTURE:
SANO Escondido Ready Mix ,
R0CK: ., . Escondido Ready Mix
- MIX NO. OR PROPORTIONS: 2087 7 sack .
-TIME IN MIXER, MIN UTES: 50 -
SLUMP,1NCHES: -• 3.1.
2 - .
FABRICATED BY:Johfl Dondro .
TRUCK NO: B6 TICKET NO 55632 . .
LABORATORY NO: 1907 . 1908 1909 ,
-,MARK:
' :-- A B C
OATE'MAOE: ., . 9-21-82 Discarded-
DATE RECEIVED: .. 9-24-82
DATE TESTED: . 9-28-82 10-19-82
DIAMETER, INCHES: .6.00
AREA. 90. INCHES: . 28.27
MAXIMUM LOAD, LBS.: 93,500 114,000
.:COMPRESSIVE STR.. PSI: , 3,310 49 030 .
AGE TESTED, DAYS: 7 Days 28 Days - . .•
RE0DPSIAT28 DAYS':
.,UNIT WT./CU FT (PLASTIC):
- ._. _____________________ __________
•
DISTRIBUTION (3) Value Plus Industries
__________ __________
(1)City of Carlsbad
(1) SCS&T, Escondido
\U
SOUTHERN CALIFORNIA
SOIL. AND TESTING. INC.
- . - - REVIEWED BY: -.
David J. Akers, R.C.E. #26815
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
Rfl RI\/FRDALE STREET. P 0. BOX 20627. SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHORPE, PLACENTIA. CLIFORNLA 92670 (714) 524-9130
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCONJOIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS .
FILE NUMBER: 51300 ,. DATE: September 24, 1982 CONCRETE
The Grove Parking Structure . 0 MORTAR
,.AOORESS: 23I0 Hasp Way, Carlsbad 0 GROUT
OWNER:' 0 GUNITE -
RCHITECT Blaylock & Willis & Associates 0 ,•
ENGINEER:
CONTRACTOR: Waynes Concrete .
.
LOCATION IN STRUCTURE: Shear wall at -line C- 8,9
CEMENT: , .., Portland Type 1111
ADMIXTURE: .Pozz ,
SAND . Escondido Ready Mix
ROCK: • Escondido Ready. Mix -
MIX NO. OR PROPORTIONS: 2087 7 sack . .
TIME IN MIXER, MINUTES: 80
SLUMP. INCHES: 4 . . .
FABRICATED BY: John Dondro TRUCK No: B81 ' TICKET NO: 334302
LABORATORY NO: . 1896 1897 1898
MARK: ...,
. - A ' B C
DATE MADE 9-17-82 Discarded
DATE RECEiVED: 9-22-82
DATE TESTED: . 9-24-82 10-15-82
DIAMETER? INCHES: " 6.00
AREA, S0:INCHESH. 28.27 ,
MAXIMUM LOAD. LBS... 61,000 97,000
COMPRESSIVE STR., PSI: -' 2,160 3,430
,AGE TESTED, DAYS: 7 Days 28 Days
REO'D PSI AT 28 DAYS: 3,000
UNIT WT./CU FT (PLASTIC):
DISTRIBUTION: (3) Value Plus Industries .
- (I) SCS&T, Escondido .. .
.(1) City of Carlsbad .
C p
/1 •. A ' SOUTHERN CALIFORNIA
SOIL AND TESTING, INC.
REVIEWED BY (Jv
:1
JAkers,R#26815
1 - -
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
,
6280 RIVEROALE STREET, P 0. BOX 20827 SAN DIEGO. CALIFORNIA 92120 (714) 280-4321
iBS. WEST ORANGETHORPE, PLACENTIA, CALIFORNIA 92670 (714) 524-9130
,,74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714)346-1078
678 ENTERPRISE STREET, ESCONOIDO, CALIFORNIA 92025 (714) 74674544
JOB: • , . SCST NO. SI. DATE
The Groves 51300 2 9-14-82
ADDRESS: . BLDG. PERMIT NO. PLAN FILE NO.
2310 Hosp Way I Carlsbad 1982
.1 -.
. ARCHITECT:
TYPE INSPECTION
. Reinforced Concrete ENGINEER:
MATERIAL INSPECTED Blaylock Willis & Associates
;Reinforcing Steel: ASTM A615 Gr. 60 CONTRACTOR:
Concrete 2085'.(5.7 sk , 3000 psi) Waynes Concrete
-- Inspected the following footings "A" line from 4 to 7, 12 line from "B"
Greg A Wolfram to "C", all of "C" line, and all of 4 line footings Reinforcing
appears to be acceptable per plans
Witnessed the placing of concrete in inspected areas Three test samples
fabricated from "A" line @ 4, slump 3.75..
SOUTHERN CALIFORNIA. SOIL AND TESTING, INC.
REVIEWED BY:
David J. Akers, R.C.E. #26815
SOUTHERN CALIFORNIA SOIL AND TESTING, INC. •'
6280 RIVEROALE STREET, P 0. BOX 20627. SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHORPE, PLACENTIA, COLIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY, PALM DESERT. CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300'. DATE: September 9, 1982 CONCRETE
'JOB: : The Grove Appartment Condominium 0 MORTAR
ADDRESS: '2310 HOSp Way, Carlsbad OGROUT
OWNER: 0 GUNITE
ARCHITECT: Blaylock '& Willis Associates
ENGINEER: '
coNTRACToRwaynes Concrete Co. :
LOCATION IN STRUCTURE :CajssQns
CEMENT: 'Portland I/Il. ADMIXTURE: ' Pozz.122N ' SAND:Escondido Ready Mix ROCK Escondido Ready Mix MIX NO. OR. PROPORTION 5.7 'sack
TIME IN MIXER, MIN UTES60
SLUMP, INCHES:, 2 FABRICATED BY: John Dondro , TRUCK NO: TICKET NO: 55089
LABORATORY NO: 1609 1610 1611
MARK:': A ' B :: c
DATE MADE:
, , 941-82.
DATE RECEIVED: ' ' 9-08-82
DATE TESTED: 9-09-82
—DIAMETER, INCHES: '
' 6.00
AREA. SO. INCHES: .. ' 28.27'
MAXIMUM LOAD. LBS.:
, ' 90,000 ,
.COMPRESS:IVE S,TR., PSI': 3,180,
AGE TESTED. DAYS: 8 Days
REDO PSI AT 28 DAYS:, 3,000
UNIT WT/CU FT (PLASTIC):
DISTRIBUTION':, (3) Value Plus Indutries
(1) S'CS&T, ,Escondi'do', '
SOUTHERN CALIFORNIA
SOIL 'AND TESTING, INC
REVIEWED BY:
David J A ers, R.C.E. #26815
AND-TESTING, INC.:. SOUTHERN CALIFORNIA SOIL ' •.
- 6280 RIVERDALE STREET. P 0. BOX 20627, SAN DIEGO, CALIFORNIA 92120 (714) 280-4321 C -
165 WEST ORANGETHORPE, PLACENTIA, COLIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
,- 678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA 92025 (714) 746-4544
'REPORT OF COMPRESSION TESTS
FILE. NUMBER: .51300 .
DATE: September 10, 1982 (X CONCRETE
JOB: -Th Grove Parking Structure 0 MORTAR
ADDRESS: 2310 Hosp Way, Carlsbad . OGROUT
OWNER; ' 0 GUNITE
ARCHITECT: Blaylock Willis & Associates . 0
ENGINEER:
CONTRACTOR Waynes Concrete Co
LOCATION IN STRUCTURE: Column footings and grade beam at line A-b
CEMENT: Port1andType 1 ' '
ADMIXTURE Pozz
SAND Escondido Ready Mix
ROCK: , ' Escondido. Ready Mix
MIX NO. OR PROPORTIONS:; 2085 5.7 sack
TIME IN MIXER, MINUTES:' 60.
SLUMP, INCHES:
,, . to lit
FABRICATED BY: John 'Dóndro TRUCK NO 84' TICKET NO: 55165 '
LABORATORY NO:
, .., 1615 1616 ' 1617 MARK Control Set D E F
DATE MADE 9-03-82
DATE RECEIVED: 9-08-82
'DATE TESTED: - '
' 9-10-82
DIAMETER, INCHES: 6.00
, APEA,SQ.'INCHES. '' 28.2:7: ;
MAXIMUM LOAD, LBS.: 85,500
'COMPRESSIVESTR., PSI:
, '3,020 AGE TESTED, DAYS:
' 7 Days' S
REDO PSI AT 28 DAYS:. 3,000
UNIT'-WT/CU FT (PLASTIC): '
DISTRIBUTION:. (3) Value Plus Indu's tr'ies
SOUTHERN CALIFORNIA
SOIL AND TESTING, INC.'
'I'
•".
'•
J
•,
.
REVIEWED BY:
David J. Aker, R.C.E. '#26815'
SOUTHERN CALIFORNIA SOIL AND TESTING, INC. *
- 6280 RIVERDALE STREET, P 0. BOX 20627 SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST, ORANGETHORPE, PLACENTIA, CLIFORNIA 92670 (714)524-9130
-
74-031 VELIE WAY. PALM DESERT, CALIFORNIA 92260 (714) 346-1078
S
678-ENTERPRISE STREET. ESCONOIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER 51300 1 DATE September 10, 1982 E CONCRETE
JOB: - . .-- The Grove Parking Structure 0 MORTAR
-ADDRESS: .2310Hosp Way, Carlsbad . OGROUT
.'OWNER: :. DGUNITE
'ARCHITECT:. Blaylock & Willis & Associates 0 -
ENGINEER: .. .
'CONTRACTOR:Wayfles Concrete Co.
LOCATION IN STRUCTURE: Column footir'igs B5 & B6 and shear wall footing starting south of shear
'CEMENT: - -... . Portland Type I/Il - (wall & thru to column footing FA near line 1:
ADMIXTURE Pozz
SAND:- Escondido:;Ready- Mix
ROCK: '-' Escondido Ready Mix ,
,MIX No. OR PROPORTIONS: 2085
TIME IN MIXER, MINUTES:
SLUMP, INCHES: - - to in
- FABRICATED BY:Johfl. Dondro TUCK NO: 48 TICKET NO: 55164
LABORATORY NO: 1612 .1613 - 1614
MARK:. A. B C
DATE MADE: • 9-03-82 . . .
DATE RECEIVED: 9-08-82 ' :
•. •
. :
DATE TESTED: ... •, 910-82
DIAMETER, INCHES: 6.00.
AREA,:SQ.INCHES-:; : •• 28.2.7..:
MAXIMUM LOAD. LBS.: • 76,500 . .• . .
* COMPRESSIVE STR., PSI: 2,710. • - : .
AGE TESTED, DAYS: 7 .Days
REDO PSI AT 28 DAYS: 3,000 • •• • . .
UNIT WT/CU FT (PLASTIC):
DISTRIBUTION: (3) Value Plus Industries .
- (1:) SCS&T-, Escondido . . .
SOUTHERN CALIFORNIA
SOIL AND TESTING, INC.
-
. . REVIEWED BY:
- ' . . .. .• .
..
. .
. David J. Akers, R.C.E. #26815
BOUTHEPr —CAUFDNIA'BOIL' ANc—ESTING, INC.
6280 PIVERDALE STREET.. P 0. BOX 20627, SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHORPE, PLACENTIA, CALIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA - 92025 (714) 746-4544
JOB: . . . SCST NO. S.I. DATE
The''Grové :• 51300 1 9-10-82
ADDRESS: ': •: . , S BLDG. PERMIT NO. PLAN FILE NO.
2310. Hosp Way, Carlsbad ,
Carlsbad 1982
ARCHITECT: '1 TYPE INSPECTION:'.
Reinforced Concrete ENGINEER:
MATERIALINSPECTED: .; Blaylock Willis & Associates
Reinforcing Steel: .ASTM A615 Gr. 60 CONTRACTOR:
t Co.Concrete': 2085 (5.7 sk., 3000 psi) aynes Concrete
9-01-82 . : PrOvided' continual inspection for the placing of' 27 cu. yd. of concrete
JohnDondro. ', ;in' the caissons. Concrete provided' by Escondido Ready Mix. Made 1
PCM 2I5 S.D.' • . sét.'of concrete samples.. Concrete was-placed directly from the truck
chute and vibrated continually from bottom to the top of the caisson
9-03-82 Inspected the placing of 40 cubic yards of concrete in the columñ;footing
John Dondro grade beams and ,tiebeams of the foundation system.
•
Concrete provided
PCM 215S.D. Escondido Ready 'Mix,: 2085:with pozz.122N.,Made.2 sets of concrete
samples First load of concrete delivered appeared to be improperly
S •• • . . S S •
S •
S S • batched.: Load seemed to contain only sand, cement, water and additive.
(No P or other aggregate) Load was rejected
SOUTHERN CALIFORNIA SOIL AND TESTING, INC
6280 RIVERDALE STREET. P 0. BOX 0627 SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
, ' 165 WESTORANGETHORPE, PLACENTIA, CO.LIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY. PALM DESERT, CALIFORNIA 92260 (714) 346-1078
-- - 678 ETERPRISE STREET. ESCONOIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER 51300 DATE September 14, 1982 W CONCRETE
JOB: The Groves.Parking Structure . OrViORTAR
ADDRESS: 2310'Hosp
,
Way OGROUT
,-OWNER: - 0 GUNITE
ARCHITECT: Blaylock Willis & Associates 0
ENGINEER: :
CONTRACTOR: Waynes Concrete
LOCATION IN STRUCTURE: A-line @ 4
CEMENT: . .., Portland Type II
'ADMIXTURE: POZZ. 122N
,-.SAND: •. ,: .. •Escondi.do ReadyMix
ROCK: - Escondido Ready Mix
MIX NO. OR PROPORTIONS: 2085 5.7 sack -
TIME IN MIXER, MINUTES: 50
SLUMP INCHES: ' 375
FABRICATED BY: SCS&T TRUCK NO: B48 TICKET NO: 333456
LABORATORY NO: 1712 1713 1714
MARK:
DATE MADE:- ' - 9-07-82
DATE RECEIVED: :: 9-10-82 ---
DATE TESTED: 9-14-82 0
,DIAMETER, INCHES: :6.00.:.-
AREA,SO..INCHES: 28.27
MAXIMUM LOAD. LBS.: ' 45,000
COMPRESSIVE STR., PSI: 1,590 •
AGE TESTED, DAYS: 7 Days
- REDO PSI AT 28 DAYS: 3,000
UNIT WT/CU FT (PLASTIC):
DISTRIBUTION: (3) Value Plus Industries (1) SCS&T, Escondido • . 0
SOUTHERN CALIFORNIA
- . - SOIL AND TESTING, INC..
* - .
0
•
REVIEWED BY:
0,
•
- •-- , -
- David J. Akers, R.C.E. #26815
SOUTHERN CALIFORNIA SOIL AND TESTING, INC. - -
6280 RIVERDALE STREET. P 0. BOX 20627 SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST DRANGETHORPE, PLACENTIA, CALIFORNIA 92670 (714) 524-9130-
74-831 VEL,16 WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCONDIDO. CALIFORNIA 92025 (714) 746-4544
.LREPORT OF COMPRESSION TESTS
j FILE NUMBER: 51300 DATE: September 10, 1982 JC0NCETE , JOB: The Grove Parking Structure - o MORTAR
1.AODRESS: 2310 Hosp Way, Carlsbad 0 GROUT :
OWNER: - 0 GUNITE
tARCHITECT: Blaylock & Willis & Associates o
.ENGINEER:
ICONTRACTOR:Waynes Concrete Co.
.
LOCATION IN STRUCTURE: Column footings B5 & B6 and shear wall footing starting south of shear
CEMENT: , Portland Type I/IF (wall & thru to column footing FA near line L
ADMIXTURE: - Pozz ,
SANO:, . Escondido Ready Mix . .
ROCK: ' , Escondido Ready Mix .
MIX NO. OR PROPORTIONS: 2085
TIME IN MIXER, MINUTES:
SLUMP, INCHES: , to i
-
: FABRICATED BY:john Dondro TRUCK NO: 48 TICKET NO: 55164
LABORATORY NO:' 1612 1613 1614
MARK: A B C :
DATE MADE: 9-03-82 Discarded
'DATE RECEIVED: " . 90882
DATE TESTED: . 9-10-82 10-01-82 -
DIAMETER. INCHES: ' 6.00
%AR. EA.SQ.INCHES:
. 28.27
MAXIMUM LOAD, LBS.:' 76,500 102,000
COMPRESSIVE STR., PSI: ' 2,710 3,610-
AGE TESTED. DAYS: -. 7. Days 28 Days
REO'D PSI AT 28 DAYS: -
UNIT WT/CU FT (PLASTIC):
' 39 000 R E C .E I V E D
DISTRIBUTION: (3) Value Plus Industries -.. OCT5 4982 - -,
-
•.:' .(l),SCS&T, Escondido CITY OF CARLSBAD : (i) City of Carlsbad
Building Department
SOUTHERN CALIFORNIA
SOIL AND TESTING, INC.
- - - - - REVIEWED BY: .
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
-. 6280 RIVEROALE STREET. P 0. BOX 20627. SAN DIEGO. CALIFORNIA 92120 (714) 2B0-432l
" 165 WEST ORANGETHORPE.PLACENTIA. CALIFORNIA, 92670 (714 524-9130
-
I- 74-831VELIE WAY. PALM DESERT. CALIFORNIA 92260 (714)346-1078 V
678 ENTERPRISE STREET ESCONDIDO CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS V
V
FILE NUMBER: 51300 V
V DATE: September 14, 1982 E CONCRETE
JOB: The Groves Parkiiig Structure
V V 0 MORTAR
ADDRESS: VV 2310 Hosp Way . o GROUT
V OWNER: V V V V V 0 GUNiTE V
ARCHITCT: Blaylock Willis& Associates
ENGINEER:'
V
CONTRACTOR: Waynes Concrete
V
V
LOCATION IN STRUCTURE: A line @ 4 V
.
CEMENT Portland Type II -
4ADMIXTURE: Pozz 122N
V Escondido Ready Mix SAND:
ROCK: .
V .-'Escondido Ready Mix
V
r'1IX NOOR PROPORTIONS: 2085; 5.7 sack V
' TIME IN MIXER. MiNUTES: 50 . V
SLUMP. INCHES V V
3-.75 V -
FABRICATEO BY:, SCS&T. TRUCK ND:B48 V TICKET NO: 333456 V
-'LABORATORY NO: 1712 V - 1713 1714
V MARK:*V V
V
V DATE MADE: V
OATE'RECEIVED: : V
9-07-82
9-10-82, V
V
cjJ
DATE TESTED: V 9-14-82 10-0542 V
V
V V
V V.0IAMET ,IN . 6.00
AREA. SO: INCHES:. •-. -28.27
V MAXIMUM LOA0.LBSV: V• -. 45,000 75,000 V
COtv1PRESSIVESTRV1PSIV: 1,590 2,650 •
AGE TESTED, DAYS:V. V V -7 Days. 28 Days
- V
V REQOPSIAT 28.OAYS:' 3,000 WT/CU- FT (PLASTIC):
-
DISTRIBUTION:.(3) Value Plus Industries
(1) V SCS&T, Escondido V
- (1) City of Carlsbad
V VV
• V V • V
' - V •
•
V
V :
' - V V V • V
V ' V
a 4
SOUTHERN CALIFORNIA SOI L AND TEST', INC
- REVIEWED BY
David J Akers, R C E #26815
- • -• - . - b
SOUTHERN CALIFORNIA SOIL AND TESTING,' INC.
6280 RIVERDALE STREET, P 0. BOX 20627, SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
185 WEST ORANGETHORPE. 'PLACENTIA. CALIFORNIA 92670 (714) 524-9130 - -.
747831 VELIE WAY. PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STPEET, ESCONDIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF 'COMPRESSION TESTS
FILE NUMBER: 51300 DATE: October 5, 1982 CONCRETE
,JOB:
. The roves . . ' '
0 MORTAR
'ADDRESS: 2310 Hosp 'Way,. Carlsbad 0 GROUT
OGUNITE
ARCHITECT:
., ENGINEER .' . . .
CONTRACTOR: Waynes Concrete Co.
LOCATION IN STRUCTURE: West end of retaining wall ruining from 1 line to'2- line
-'- Portland Type Ii ADMIXTURE:
.. . Pozz 122N' , /' .
', ,.SNO:
' Escondido Ready Mix ROCK:
,
. Escondido Ready Mix MIX NO. OR PROPORTIONS: 2086 ' ' 6' sack ' TIME IN MIXER; MINUTES: 45 .. -
SLUMP, INCHES:
, 5 5 FABRICATED BY SCS&T TRUCK N081 TICKET NO 335415
LABORATORY NO: ,, 2O6 2017 2018
,MARK:,
' -., V
'DATE MADE: ' , 9-28-82 '
0
DATE RECEIVED: 9-29-82
DATE TESTED:,, . 10-05-82 ,OIAMETER, INCHES: ' '. 6.00 ..',AREA.SQ.INCHES: -- 28.27 Y 1 'I
'MAXIMUM LOAD, LBS.: :56,000
,c,OMPRESSIvE.STR., PSI :n
AV
1,980
AGE TESTED. DAYS:' 7 Dys
AEQ'O PSI AT 28 DAYS: '3,000 •. - . . '
UNIT WT/CU FT(PLASTIC):
.
DISTRIBUTION:' (3) Value Plus Industies (1) City pf Carlsbad
(I) SCS&T, Escondido
'• .. ,•• . - I- - •. '. '- . -_. -, , - -,
1,s s
SOUTHERN CALIFORNIA SCIL AND TESTING, INC.
- REVIEWED BY:
............................
. • -
David J Ake s,,R C E #26815
'
:---. . - ' '4 r
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
- 62B0 RIVERDALE 'STREET. P 0. BOX 20627 SAN DIEGO, CALIFORNIA 92120 (714) 280-4321 -
165 WEST ORANGETHORPE, PLACENTIA, CLIFORNIA 92670 (714) 524-9130 -
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 - (714) 346-1078
678 ENTERPRISE STREET, ESCONDIOO.'CALIFORNI,A 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300 DATE: October I, 1982 jX CONCRETE
The Grove Parking Structure OMOR TAR , ,.ADDRESS: Hasp Way, .2310 Carlsbad GROUT
OWNER: . . . . . - 0 GUNITE
ARCHITECT: , Blaylock & Wi1lis& Associates
ENGINEER: . . .
CONTRACTOR 'Waynes Concrete Co
LOCATIONJIN STRUCTURE Footing and stem wall at ramp line 2
CEMENT -' Portland Type I/Il
..AOMIXTURE: :- Pozz
,SAND: Escondido Ready Mix
ROCK Escondido Ready Mix
MIX NO, OR PROPORTIONS: 2085. 5.7-' sack ,
.,TIME IN MIXER, MINUTES: 120' '
SLUMP, INCHES: . 4 . . .
FABRICATED BY John Dondro TRUCK NO 20 TICKET NO 55867
'LABORATDRY'NO: . 1983 1984 1985 .
MARK A B C
1DATE MADE :9-24-82
DATE RECEIVED: .:
DATE TESTED
9-28-82
10-01-82
.
' V
\'\\
DIAMETER, INCHES:
.
'6.00 SO. INCHES: 28.27 ' \
MAXIMUM LOAD, CBS.. '-' ' '66 000
COMPRESSIVE STR., PSI.:, 2 ,330
.
AGE TESTED, DAYS: 7 Days REDO PSI AT 28 DAYS:
'UNJIT WT./CUFT (PLASTIC): - ' 3000
REC!VE'.
.'6ITiBUTION:.(3) Value Plus IndustHes
OCT 5 1982 (1) City of Carlsbad
(I) SCS&T, Escondido CITY OF CARLSBAD
Building Department
- SOUTHERN CALIFORNIA
SOIL AND TESTING, INC
REVIEWED BY
I' ')
David J Akers, R C E #26815
I •:,,,, '.
• - . - •l,.
..
.'
-
SOUTHERN CALIFORNIA SOIL AND TESTING, INC.
6290 RIVERDALE STREET, P 0. BOX 20627, SAN DIEGO, CALIFORNIA 92120 (714) 280-4321
165 WEST ORANGETHORPE, PLACENTIA, CLIFORNIA 92670 (714) 524-9130 -
74-831 VELIE WAY, PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET; ESCONDIDO, CALIFORNIA 92025 (714) 746-4544 - --
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300 DATE September 10, 1982 (X CONCRETE
JOB:,, :- The Grove Parking StructUre " . S . 0 MORTAR
ADDRESS. 2310 Hosp Way, Carlsbad OGROUT, • OWNER: , . .' - 0 GUNITE
ARCHITECT: Blay.lock Wi1l.is &Associates
ENGINEER:
:-CONTRACTOR:Wayfles Concrete Co.:
LoCATION -IN sTRucTupE Column footings and grade beam at line A-10
CEMENT Portland Type I/Il
ADMIXTURE: :- Pozz .
SAND Escondido Ready Mix
ROCK: ' . . •' Escondido Ready Mix
MIX NO OR PROPORTIONS 2085 , 5.7 sack
TIME IN MIXER. MINUTES: 60 . .,
SLUMP, INCHES: ., to P
FABRICATED BY: John Dondro TRUCK NO: 84 ' TICKET NO: 55165
fr
-LABORATORY NO: - 1615 1616 1617 . MARK:-Control Set D E F
DATE MADE:. 9-03-82 Discarded
OATE RECEIVED:
. : . 9-08-82
DATE TESTED: -'-5 9-10-82 10-01-82 . DIAMETER, INCHES: , 6.00 AREA. SO. INCHES: ' 28.27 - 4/
MAXIMUM LOAD, LEIS.:' 85,500 112,500 \
COMPRESSIVE STR., PSI: ' 3,020 3,980
AA AGE' TESTED, DAYS: 75 Days .28 Days \ 'REQ'DPSI AT 28 OAYS: 3',000 ,
UNIT W T/C U FT (PLASTIC):
41 E C E I V E D
DISTRIBUTION (3) Value Plus Industries OCT 5
(1)
'982
City of Carlsbad
SCST,Escondido CITY OF CARLSBAD
Building Department
SOUTHERN CALIFORNIA
-4 SOIL AND TESTING INC '4,
S 3 4
REVIEWED BY: -
'David J Ake', R CE #26815
'4
:- :... . •'.- -. •. 4 .
- ' :. '-".
•'
. 'SOUTHERN CALIFORNIA SOIL AND TESI\NG, INC.
6280 RIVEROALE STREET, P 0. BOX 20627, SAN DIEGO, CALIFORNIA 92120 (714)280- 4321
165 WEST ORANGETHORPE. PLACENTIA, CLIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY, PALM DESERT. CALIFORNIA1 92260 (714) 346-1078
678 ENTERPRISE STREET. ESCONDIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300 . DATE: October 5, 1982 CONCRETE
JOB: The Groves -, o MORTAR
ADDRESS: 2310 Hosp Way, Carlsbad OGROUT
OWNER: . 0 GUNITE
ARCHITECT:. ''. . . 0
ENGINEER:
CONTRACTOR. Waynes COncrete Co.
.
LOCATION IN STRUCTURE: West end of ,retaining wall, running from 1 line to-2 line. - ,
CEMENT:
. Portland Type II -
ADMIXTURE:-.!.Pozz 122N .. . .
SAND:
., Escondido Ready Mix
ROCK:
, Escondido Ready Mix
MIX NO. OR PROPORTIONS: 2086- 6 sack ,
TIME IN MIXER, MINUTES: 45
SLUMP, INCHES. .. . 5.5 -
FABRICATED BY: SCS&T .
TRUCK N081
,
TICKET NO 335415
LABORATORY NO: 2016 2017 2018-
MARK:, .. ....
DATE MADE: ' ' 9-28-82 . . .
DATE RECEIVED: . . 9-29-82
DATE TESTED: . 10-05-82 10-26-82 111282
DIAMETER, INCHES: -. ' 6.00 . . .
AREA. SO. INCHES:. .. 28.27
MAXIMUM LOAD, LBS.: 56,000 84,000 91,000
COMRESSIVE STR.. PSI: 1,980 2,970 3,220 .
AGE TESTED, DAYS: 7 Days 28 Days 45 Days
RE0'D PSI AT 28 DAYS- 3,000 - - .. . . .•
.
UNIT WT/CU FT (PLASTIC):
Mow-
-DISTRIBUTION: (3) Value Plus Industries
(1) City of Carlsbad
. ). (1) SCS&T, Escondido
1
J \\
SOUTHERN CALIFORNIA
SOIL AND TESTING. INC. -
REVIEWED BY: . .
- .' .'
•-
: David J. Akes, R.C.E. #26815
Blaylock-WilliS:
and Associates.,
Engineers
1909 McKee Street San Diego, California 9211 0-1998 . Phone (714) 291-5460
J ,'
• .t,
"
$ S
5 -
r
, ..5•
I 1'
,
1
1.
1,
t,•i .(
1
-• H
,November.10, 1982, '-
'S.-,
City of Carlsbad .'.
Building Department
1200 Elm Avenue
Carlsbad, California 92008
t (S S
Attention: Mr. Martin Orenyak, Director I
Subject: The Groves arking Structure, 2310 Hosp Way - -- '
GentIerne'
Your letter of October 25, 1982 requested that we review
compression tests indicating low strength concrete in the
subject structure. The indicated concrete was, located in
'. 'Column ,A between grid lines A and B, and 5 and 6, and at
grid, line 4 between A and B, and grid line A between 5 and
6, andgrid line A at 7•r ,
We have reviewed the calculations and find that the concrete
'atJ'c 2600 psi-is adequate for the foundations of the subject
building.
'Very tri.ly'yours;
- BLAYLOCK-WILLIS AND ASSOCIATES -
Ja m e s A.-Willis
JAW:bd
cc: T. L. Sheldon Corporation • W. J. Van .Boxtel
71
't
'
-
S
ECEIVED tE
-- NOV 121982 -
CITY OF CARLSBAD
Building Department
SOUTHERN CALIFORNIA SOIL AND TESTING, INC..
6280 RIVERDALE STREET. P 0. BOX 20627 SAN DIEGO. CALIFORNIA 92120 (714) 280-4321
185 WEST ORANGETHORPE, PLACENTIA, CALIFORNIA 92670 (714) 524-9130
74-831 VELIE WAY. PALM DESERT, CALIFORNIA 92260 (714) 346-1078
678 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA 92025 (714) 746-4544
REPORT OF COMPRESSION TESTS
FILE NUMBER: 51300 DATE: September 14, 1982 E CONCRETE
JOB: The Groves Parking Structure , 0 MORTAR
.ADDRESS: 2310 Hosp Way 0 GROUT
--
OWNER.: f- / 0 GUN I TE
ARCHITECT: . Blaylock Willis & Associates - o
ENGINEER: -.
.
CONTRACTOR: Waynes Concrete
LOCATION IN STRUCTURE: A line @4
CEMENT: ' Portland Type II
ADMIXTURE: - Pozz 122N -
SAND: - , Escondido Ready Mix
ROCK: - - Escondido Ready Mix
MIX NO. OR PROPORTIONS: 2085 - 5.7 sack
TI ME I N MIX ER, M IN U TES: 50
SLUMP, INCHES:• 3.75
-
FABRICATED BY: SCS&T TRUCK No: B48 TICKET ND: 333456
LABORATORY NO: 1712 1713 1714
MARK:
DATE MADE: . 9-07-82
DATE RECEIVED: 9-10-82
DATE TESTED:
, 9-14-82 10-05-82 10-07-82
DIAMETER INCHES:' 6.00
AREA, SQ. INCHES:
MAXIMUM LOAO. LEIS.: 1! ,.COMPRESSIVE STR..',PSI:
AGE TESTED. DAYS: - - . 7' Days/ 28 0 s j0 D6s-" REQ'D PSI AT. 28 DAYS: - - .' 3,00 - - /- - - -
UNIT WT/CUFT(PLASTIC):' .' .
DISTRIBUTION:: (3) Value P1 us ' Indui
-. - (1) SCS&T, Escondido -
-. (1) City of. Carlsbad
--
lon
-
_______
-
- SOUTHERN CALI RNIA
SOIL AND TESTING, INC.
REVIEWED BY: -
- David J Akers, R C E #26815
APPLICANT COPY
0 PLAN CHECKER COPY
H Qitp of Carl
:: 444)ot8q/
-. JURISDICTION: DATE__________
POJECT ADDRESS: 3/O 5f
TO: Z/cd r
PLAN CORRECTION SHEET
Pljin .Chck No. 2
rccivedbyj 6 isdictionc
sate r.Iana received by plan checker/'
. ')ate initial plan check completed 4/by7
FeEwc'RO: PLEASE READ
Plan check is limited to technical requirements
contained in the Uniform Building Code, Uniform
Plumbing Code, Uniform Mechanical Code, National
Electrical Code and state laws regulating energy
conservation, noise attenuation and access for
the handicapped. The plan check is based on
regulations enforced by the Building Inspection
Department. You may have other corrections
based on laws and ordinances enforced by the
Planning Department, Engineering Department
or other departments.
The items circled below need clarification
modification or change. All circled items have
tc be satisfied before the plans will be in
conformance with the cited codes and regulation..
Per Sec. 303 (c).-1979 Uniform Building Code,
the approval of the plans does not permit the
violation of any state, county or city law.
A- PLANS
I. Please make a11 corrections on the original
tracings and submit two new sets of prints,
and any original plan sets that may have
been returned to you by the jurisdiction.
-
tC,:/2Ip7)f )7p'
i To facilitate rechecking, please identify.
next to each circled item, the sheet of
the plans upon which each correction on
this -sheet has been made and return this
check sheet with the revised plans.
-.
2! 4oz civ' .
i //t/specI ,-70POV
—
C.Sj,s €'wqi QeQfa
se 1Q' 6ijLo —
/N4t OP LL- L&). /?'1 7) -
/_a--
___ //2 /e'i --
A lo r o R vh f /7 ()
''ô,i 'c'
/'0547ed7'v1 ki -fle C7w
awc( c,e
1/2 c?Cco ,Z O,3itY1L
/14
1979 )1O1n
4p70 )
all .5 aJ
e2/c,zctIZciiçi S/ee/ ''-- ___
512
th' ccc, '-t2JiiJC&. cu
/ F79,91 g.e, 'g
'i-4 fccth ()
-ip. i2,%'/S
p /
h41) /fl9' ic4)2Q)
1iJOJ1 p ,Y
- 'za /2ef ccz{ C-uoc, :7
t 7 f3( iW2. t(-i'ZJCco
S
d Ii'
ZZA I 57 d' r 'q c 9-1,61 C27 5'&j a/ 1-5
;57
2+ 2 'h" ('5• 'Li/ (77L.
___ S / It1t J7 l-'- 92 4L5 7 C'(2i 352 3I4 1 '/ZAVZ7 'b'/ T/&7 ZfOP// C-V'C4 9:7' LJ/-7/7 ..ag J1/j7 44V/2 J4 ("1 ,7}
75 ''2JJ ? 2 6
777 h.•.__
L -It 7 Tc -'iez,'iiIry CLF _ fr)5ti /5'7L/) _7 7 /5t/74ø' '0.1
, / 2I9)/10 1i'io
___ , (zi-vo fl 7 7,1-( ' 0 '77-&f 9 Z--z/ C 5c/
-(c/C7 9)9/?It1/2P11Eqa,' _r(Q77? __/17T
__ ovb_1'fl?7_s92i /''6c3'E17_'1f'C7f'7 1271'17 '
(Qc2c, 7/i2/UN61 210__7/i'ZI -ItJ57 __2J -t Z/ _If/7W64'/7-zI-6/
___ 1 t(P7 ' ___k2 L1(-))2
C
'74 i (fc
- 1 //)/f'Z—t-W 1? J f • ,' //?2 u I J t'i 7
AU a3)13HD
-.
03I133I13 aLva
a.. tva
C1t'iMO - -•-- ''i, --•
t!.
(
'J 7/' C1 _
Date* Jurisdiction________________
Prepared byl - - Bldg. Dept,
VALUATION AND PLAN CHECK FEE D S.IL
PLAN CHECK !._82
BUILDING ADDRESS //sP
APPLICANT/CONTACT ().ZT V,1A1 L9oX JeL PHONE NO?
BUILDING OCCUPANCY ,81 DESIGNER PHONE_____________
TYPE OF CONSTRUCTION CONTRACTOR PHONE___________
BUILDING PORTION BUILDING AREA VALUATION
MULTIPLIER
VALUE
loi~-aT,~ az -L zi~
- c.
f
__ _________ __________ _______ •
Air Conditioning
Commercial
Residential
Fire _Sprinklers
Total Value •
•
L42ç
Building Permit Fee
Plan Check Fee 83, ----
•
cidj4J ,$ :
17 b /19'D//2A
-
--
- '-.---
V
: - - -
-
eEIVED 13U1LD1G_DEPARTMENT I iii :
BUILDING ADDRESS: g3,ZZ)
A.P.N: - - C.T:
JLANNING DEPARTMENT
'ZONE: SCHOOL FEES: SAN DIEGUITO.
ENCINITAS'
-
CARLSBAD -
SAN MARCOS_______
-UNITSREQ'D: PROVIDED:
COVERAGE ALLOWED: ' •PROVIDED:
PARKING SPACES REQ'D: PROVIDED:
J
IJILDING HEIGHT REQ'D: - PROVIDED:
FRONT SETBACK , SIDE SETBACK REAR SETBACK
ALLOWED:
r ' PROVIDED: S -
INTRUSIONS: ( -
RE -DEVELOPMENT APPROVAL REQ'D:
)' LANDSCAPE & IRRIGATION PLAN COMMENTS:
ENVIRONMENTAL PROTECTION REQ:
ADDITIONAL COMMENTS:
OK TO ISSUE: K TO FINAL:
-- ENGINEERING DEPARTNEN '_
R 0 v PPOV iENTS______________________
PUBLIC FACILITIES FEE:' SEWER CONNECTION:
'DRIVEWAY LOCATION(S) :$1o'-)_SLo _o Qt-{P
G RD I N G PERMIT: __I S -ro
EASEMENTS: - DRAINAGE: -
LEGAL DESCRIPTION:
ADDITIONAL COMMENTS:
DATE:
* IF THIS ITEM IS NOT CHECKED, BUILDING DEPARTMENT WILL MAKE
FINAL INSPECTION. -
IF-
- S
*CHECK' IF
OK TO ISSU
NGIN. RING INSPTIOj\I RE 'iL ON FINAL:
DATE: PWI: OK TO FINAL:
CARLSBAD 'FIRE DEPARTMENT ' APPROVED
.-kDISAPPROVED
PAGE 1'ÔF(_ 1275 ELM AVENUE; CARLSBAD, CA' 92008 '
(7114) 1438-5521 PLAN CHECK #ã?''267
PLAN CHECK REPORT' OTHER REF # CT f,'-'//
PROJECT J/4i ADDRESS 23/0
ARCHITECT , , ' ADDRESS " PHONE
OWNER ' ' ' ADDRESS. ' PHONE
' OCCUPANCY __________ CONST 227'V TOTAL SQ. FT. Z3 7- STORIES -
\ PRINKLERED 0 TENANT IMP
APPROVAL OF PLANS IS PREDICATED ON CONFORMING TO THE
FOLLOWING.CONDIT.IONS AND/OR MAKING THE'.FOLLOWING
CORRECTIONS: - ' -
1 Provide one copy of the f4 rtP.taI.4s3 Ean)ard hogts_.
Storage, dispensing or' use of any flammable or combustible liquids, flammable
liquids, flammable gases and --hazardous chemicals shall comply with Uniform
Fire Code and '. .
Building(s) not approved for high piled combustible stock. Storage in closely
packed piles shall not exceed 15 feet in he 12 feet on pallets or in racks
. and 6 feet for tires, plastics -and some flammable liquids. If high stock piling
is to be done; comply with Uniform Fire Code, Article 81.
14. Medicalgas system(s) shall comply with N.F.P.A. Standard 56F.
5. . Fire extinguishers shall' be provided based upon the following criteria:
1-2A rated ABC extinguisher for each. sq. ft. or portion thereof
maximum travel distance to an extinguisher of"__'feet-
other -
6: Fire sprinklersystem(s) per N.F.P.A. Standard ' shall, be
provided to protect /s/ /et/
Dry chemical extinguishing system(s) shall be installed per N.F.P.A. Standard'
96 to protect cooking equipment and exhaust system.
- Plans of Sp ri iv 1e'/e
system(s) shall bea'pprovedby the Fire Department prior to installation of
'- system(s).
)29. Show'on site plan locations of all nearby proposed or existing hydrants within
200 feet..
' Hydrant(s) shall be-provided and located '
Show location(s) on'site plan. Fire Flow: gpm for- hours from
hydrants. ' . . . • '
Access for fire apparatus is not, adequate. Provide
12'.,.--'h'l I" be of. ' hour construction
with-openings protected with hour assemblies
13. Comply with 'regulations on attached sheet(s). .. '• ' , -
.-''S " 7/Z/
Plan
,
E i'hr '
'
Date
• 1
::t niail:d to architect' Met with_______________________ ttach to Plan
Oe
- ;-= /
-i-- ';P -'------,._. ••
//
Blaylock- .T;:::::TT TT: DATE 82. .SHEET-NO.
'ENGINEERS _kOCj(J -
-
Engineers rfToB NO
I _1E1
--
L.
. JI*1 "IL t Hr
IJ... ............... NT
..... ..............,..1_. ...1 .....'.._,._..... .................: .. , ..............- .......
:- -i
GRADE_
_:..::L.::iLL::
:
-
t
_N ST
.
.....
.--y,-.... 1 • - ----t. .....--.- j.
..........-. .
..., ............................. ........ . ..
- - -- -
E'J
SER S E1L 1-:
cma-
"iLk&) --
-
-
-- -
L
::T:iT:a,tJth_IJljjfljs TT T:T:TTT:JT:'
DATE 1U
LITIiTaflIrASSOciateS.
L..EWGINEERS_.. . _4LL_L449O9McKee$tSan.Diego,C&9211O -
- - ----r------ ---t-- --r---------- •- .-E---:----- -fl.. -
--- J
-------- :
1 d. 4L TJT
r-- ----,----- 1t,. r.,
-
--i -. - ---- 1
Co14t '7 4 8
ircS V oV4i41a ±
-1- --- ----id -
- -
------
i-
-,---- -. - - .-- .-. - --.--- .-.--- -- - .----. - --
't E"±
.:iLT:iLr: :rT ::: Ai4g,c.:o j40Asi.. REfi F,Vc i.-..ioq •i: n 17 s ...JL.......1 .•
4-1- L. I
LJ1IciIEti
LA- I I3ITi - J: r;
-_..--- --------------._-. . .......... & - .
. 4 .t 4 . • '-4
IA I - - - IZ
-
: L A-Y-tA 67 OF *±4 ,Y
---i--j-
VLT( ') YeRr 1.
SCbrtALL CLS -'
RID :: ED ALL COLUkS 400
SHtA &'ro
"!:. t' -ff!T-
- fly TQ TI
gi:o :..:I...:o >4o
-
-
.--------- ------------
Lt- AM - - £P-NNN -
• DEPT H oEpTTO SPAN PAtO f4.'1G/: e41 .
GP R
yIock-WiOis ATE— AssociateL Engineers
JENGINEERS M" -
. i9McKee.StJan..DiegoA9211Q .
--SUBJECT-----
___- ----- - ----- - - lOPPiNG Ric
--FACT OQD LODJL I4(t5 sjio+i5xOi) - ILw ____:LL4
ILO M
-E-4 RDE.g-
I .----- ,- -- - .- —I -•-• - 7 1
IiTL
:.. ±
toll j LAIL
JTI J i::: IL1 (M.L QF SPAr1
H
qB - -
MA ____
__ ±1 : •
±Li[±TEi I
-. .J._
± TJIJ Ill
I_j. •7 . •
..J. . .
-------------
-01 48 lit
60
- —:
TOTAL iio.eq 6'441h -
'-L4S
- .•.- . . --I . - - . . - • --
:..ioi..(a:1.::.:. J:U.SE .. ::i-o . :soe
- .: .:: •. . 1. :: ::.•:
II
LENGTH
-
ji 5 ": T1ucbPb $(o8sAi:::i
- ..I._.
ECT
-
O 1(o Ayr19Ar — - 446 -16K
CR .
411S DC. LJcrw OF COL. ; 2.4
L - BAQsNG LEN&:
L'SL
TT :TBlaylock-VViIIis :-:1--:—T-:--:--T:----:
I-and Associates.
Engineers
JOB.NO
- -- ----- —---•------ - -----'- _I_ — SU9JECT
ES1GN1 OF tRAMP -
AC.flB,, I1TSLAe, SPANNING iTT
11 Ti : Eii14 'O -F ;-4- O ION) IO r.ii
—
L 04-
-. --us - A. g -{o i)') -----
jDsTPeroN LSTEL . 3 liT
OL M SLA6 PPCQVL
A '-.'-. :
- 1DtAi.. LOkD :.....O ll&O
::SFftc..N-s xq - ::s.foi
T KJ r
:.-urMT
1c0554ALL PA G:5EwER. E ASERENT :.'.
CWCLOCK-
&tDRAlL.ç,. [4. W:a1'/Fr
k
.
:1 .IOVLA1 RSeP1AtT - . -
- . )4As. koHr ovP. .
• 12
8
ck_WjII
Ii:IiHiNhfASSGdateS'
—.-.—.—ENGINEERS a
-: . •4 - ---- - ---- -i------ i -------_-•---- —-fl- -i------ -------------------r--
-- .
!145Y.
1TVs 13 00 ID
- TJ_
AiP o''io 1j'S1
:-USE "Top
Rp.::L:
-- AS4HL t'-tO 'S'Dt F1C '.iVM 4O O AØ.iNC, tI 0
-Vc3.14
T4X183
- TR LETroTsE!sWrcTT T: Q -4 0kS4
ALLOWA6LG
j . ii TiTTTT I
-
-- (7 - .......-.--. 5HB :R.it R :o.TT11TJ1TJT : - • . . I11TE.T1IiTLT 4TE ----- _-1-10t ...........-H-----f- ......i---ri ................ ---------I -.-. ---.-----.
.. -.I•--l ---•...................
-
.. ...... T tql
-I
—ASUTHENT .ALTL -,r'ro CSAL3 TOA11LN1N)jr
To s t-ic'.:'• -
-- -
Kof 6 0 Y. 1:4x D 4 Y,
Ab :.. ,. ..: ........... - - .- - ... -- ........................- . -. - ...............I --- I _01
'.
TT7.JI::TI .iT:1i 1 41::Toe CARIeb 8rcoJC .t14c.
-
US€_uJ RENV FOR SR2 w. ALL11 - -
- - __:i__-------------- -
:. ' - :i'-.?' 'Jf 0 -• . - . - • • - II__
- • :qi/.
-- ___
oth-Wjfl
- - -
SHEET afld Associates.
;.9ifl!8? j...ENGINEERS
- V • I ______ V t_V!V ;I •T.. 7 -- _•___•___-i --- SUBJECT •V V
V V -- ........-
_...4 VV------------------------ I V V V
TM6N1 #JALL:jTo CQ.S ALL SP
--------------JV:... --------
77 AN Ii it1:Ii
- -V.VL! I, ...................V -4 1a 'JiLi .
T1 -tto IQ
-
-ol
La -i 9
*V••V L V ,-
VVV
0:1
IITFIIi :9T
:A-ACE Top , 15 -BcrTrom I
±HMS1VSAR b - :i :T:( R G P :c.( 'IM 7L.):::::hT::±:::±H_T:±
- - - - - - H
LF-F TuBTLE :
nT TI::nTTTTTt:TTn:V xTI-TT--- :
s4EAg A'T _ ASE 5O: - -en
4V0 OC
-
- "CNECTIO oFPos EM&gRtO
T:J:VT1L:TL iT 1JH
ibH.EJt IiPcV -ro:viiN D, 5
Ajj
-
Y, ri PA?.icION ro 4t..icI-o.(1iN 14
-- /LL-eJ TEN51DN - •• 524o I1 - ALLO't..J - V
-,•
S.
-
e OUCéET
D0O6ETEE 170 ' PS I e ô t)f(
PSI 26 DA~f S
i U -r tIC) — At
I?ELE, JS E 1 re £) Th FoE DO) 6LETES 4 I3Ei fl) S —
As EQD BY DES 16 JJ INJT NOT LESS THi&) 3000 p's 1
rJ4 b S •
ULT-L 'yb
JAtv-(kk +eEss 7 (rio) 189 "fl
Los'Es
-• 10 ITTAL 0= oll
i. EEi
- ASThI A (o ( 40
U NLE NoyFLb O€rLWrE
-: WELiWIFA1eicL-ASTM A
ODES
. • t 7 9 U C • n.
A. uP€sa i rn Pa sear Lc s ie +€ -roTeu -Sp,
Es I &c 8* ru-€..A 0 '4 ITFC
joB c4ItL fAU 3EiEiJ DRN
: • STFUJCTURESJINCS CKD
PO. BOX 2578
.1 JICA i A I71 aOf LAC CT I
ULT. REACTIONS/STEM
ULT - 26.83 26.83
ZE'.
24" TEE 63 SPAN 36PSFLL 21JUN82--------- --------- SHEAR ANALYSIS--------- fl1HOUR FIRE RATING . .
x-- Vu Vc Av(s') 'DESIGH'# TI . L= 63.08 FT ,!(FT) (PSI) (PSI) .(&6''O/C)
- 1..13:196.--
- .273. .850 24.801H.TT4IITH 3.80 IN.TPG. 2.88 190. 316.. . .050 TI WIDTH= 96 IN. WT = 34398 *
. - 4.28 176. 279. .058 F'c .T.P=--5080 TPG= 4808 PSI 8.48 149.. 152. .049 TI COMPOSITE 12 60 122 -.126.,848 AREA -.524.88-1688 95 126 848 INERTIA 27896 47 41877.42 I i 68 126 847 Yb. . 16.57 . - 19.51 25.20 41. ' 126. 0.800 .t - . 29.40 .14. 126. 8.808. LOADS--------PSF-----K'L'I N Fl---- 33.68 14- . 126. 0.080 IT .'' . 68.4 5'' 37.80 41. 126. 0.080 TPG .38.8 304 -42:08 68. 126. .047 SDL . 2.0 .816 46.20 95. 126. .048. LL -: 36.0 .288 58.48 .122. 126. .048 ': HJC 106.4 .851 54.60 149. 152: .049 COMP 38.0 .384 58.88
,
176. 279. .850 ULTIMATE .212.9 1.703 . 60.92 190. 316. .850
• " 61.88- 196. 273. .850 16'-1'2 IN 278K STRAND .
IT IS HARPED @ MIOSPAN :-
CC OF STRAND IS 9.80 IN-@ END
CC OF. STRAND 'IS 3..75 IN.e HARP,
CR11. PT'. IS 26.70 FT. FROM END
r__.77[j5 HOPIEHTS(IN-KIPS)-----
& CEHTER e CRIT.PT. Mu REQ = .10808 9985 'Mu-CAP. = 12680' - 12483 1.2Mcr 8955 . M N/C -. = 5880 ' • 4948 M COMP = ,,1786 1768 Mti N/C REQ = 7088 Mu N/C CAP 11322
-----EFFECTIVE STRESSES --------
@. CENTER e CRIT.PT.. ('PSI) (PSI) TOPPING 328. - -316. TOP OF IT 1015.: 1019. -BOTTOM-IT -358.
•. -355. RELEASE STRESSES
& 25 IN., - & HARP - - - FROM END - POINT TOP OF IT 26. 239. BOTTOM-TT 2583. 2028.-
RELEASE'STREHGTH REQ = 4171.PSI
--------CAMBERS (INCHES)
LOAO &RELEASE &ERECTION FINAL P'S - 3.21 • 5.77 . 7.05 -IT -1.89 . -3.49 4 .53 I ',. 1.32 TPG '- '- , -.96 -2.28 I . 1.32 '32 SDL.-
. • -V.03 -.09 I - , - . 1.29 .22
-60
REACTIONS PER FOOT OF TEE WIDTH -. LEFT RIGHT. '
' KIPS KIPS • N/C . 3.35 3.35 - SOL '.86 .06 - LL 1.13 113
JOB 27 3'AsiL1 DRN
STRUCTURES, INC.
-. .' . -'
• P.O.BOX 2578 . CKD
CHULA VISTA. CA. ' (714)423-9030 SHEET OF
0 .... .I •-.HI?.
- -"
''24" TEE 46' SPAN 50PSFLL 19JUL82
1 HOUR FIRE RATING
DESIGN * T2 • .. L 46.88 FT
;24.00 'lH.TT WITH 3.80 .IU.TPG.
IT WIDTH= 96 IN. 'MT = .25118 * F'c' ;TT=.5808 TP&= 4008 PSI
IT •. COMPOSITE
-, AREA 524.88
'. INERTIA 27896.47 41877.42 Yb 16.57 19.51
LORDS ------- PSF-----K'LIH FT---- TI 68.4 .547 TPG 38.8 .384 SDL 2.8 .016 .LL . 42.8 .336 H'C 106.4 .851
. COMP - .. -448 .352 ULTIMATE 223.1, 1:785
8 -1112 IN 270K STRAND
STRAND CC = 5.88 IN FROM 801.11 STRAIGHT STRAND-NO HARPING
,CRIT,•. PT. IS AT CENTER OF
, SPAN
----DESIGN MOMENTS(If'4-KIPS)-----
Mu REQ •= 5665
Mu CAP , = 6266
1.2Mcr = 4734 M H'C = 2701
M COMP ' = 1117
•. Mu H'C REQ = 3781 Mu H'C CAP = 5421
----------------STRESSES------------
. EFFECTIVE STRESS' CENTER LINE
- -TOPPING -. - 280.PSI TOP IT 618.PSI BOTTOM TI -471.PSI
RELEASE STRESS @ 25" FROM END
TOP .11 -165-PSI
, BOTTOM TT . 1648.PSI
RELEASE STRENGTH REQ = 3000.PSI
CAMBERS( INCHES)---------
LOAD @RELERSE @ERECTION FINAL P'S 1.05 1:90 2.32 TT . -.63 -1.17 -1.52
- I - .42 .72 .80 TPG .-.27 -.63.
.45 .17 SOL • -.01 -.03 1 .44 - .15 LL -.20 Y. -.86
--------SHEAR
X Vu
(FT) (PSI)
1.67 366.
2.00 355-
2.70 334.
5.40 250.
8.10 167.
10.80 83.
13.58 8.
16.28 83.
18.98 167.
21.68 . .250-
24.30 334.
25.00 355.
25.33 366.
------- CAMBERS (IHOHES)- :LOADe-REL. .e ERECT p's ':30 -°. --.51•.
BM -.84-.07.
1 -' .26
N'C -.38 :1 .14
SDL -.00
-1 - .14
LL
I
FINAL -;
-59
- .89
.50
--.47
.83
--.81
.83
-.09
ANALYSIS----------
Vc AV
(PSI) (SQ.IH'FT)
297. .287
316. .164
316. .096
316. .096
189. .896
126. .096
126. 0.888
126. .896
189. . .096
316. .896
316. .096
316. .164
297. - .287
REACTIONS(KIPS) D L T ULT
LEFT 100 26 125 183
RIGHT 100 26 125 183
--14-lz2m 270K STRAND 3.25" CGB MASK 2 STRAND FOR 5.4 FT
CC OF UNMASKED STRAND= 3:25 IN
MILD STEEL REINFORCEMENT
TOP PiG 1.24 SQ IN € 32 IN
BEAM MOMENTS (in-k)----
CENTER @ END OF
MASKING
Mu REQ= 14776. 9457 Mu CRP= 18061. 15569
44
€, ,
hL'L4
I .2Mcr= 10525.
M BEAM= 679. 434 H N'C = 7228. 4626 M - COMP= '2284. 1411 J Mu N/C REQ=11870.
Mu N/C CRP=12951 tr I
EFFECTIVE STRESSES------- TOPPING 284 182 1 -'
TOP OF BM - 1840 1037
BOTTOM OF -623 - -80
RELEASE STRESSES
€ 25 IN € MASKING FROM END + TRANSFER; TOP OF BM -562 -534 BOTTOM BM 1381 1513 p Fci- REQ= 3000.PSI
TOP STEEL REQ= 1.29 SQ IN
10 B - JEP/1J . DRN LtYf
- . . STRUCTURES, INC.
P0. BOX 2578 CKD
- CHULA VISTA. CA. (714)423-9030 SHEET OF
',.PKGBM M'12'! LEDGE & 24"TEE x63',
. .•.-•1HOUR FIRE RATING
OESIGHNO BI L= 27.00 FT
fl . BM W/12" LEDGE & 24"T EE x63
1HOUR FIRE RATING
DESIGN NO Bi L= 27.88 FT
BEAM DiMENSIONS .'(INCHES) ---------
Bl= .24 .01= 12
B2= 14 02= 22'.
83= 15 03= 3
B4= 64 .04= 3
F'c P/C= 5808 F'c TPG= 4008
BEAM COMPOSITE
DEPTH 34.00 40.80
AREA 596.00
INERTIA 58891.18 143107.97
Yb 14.79 . 20.86
BEAM LORDS------K'LiH. FT.--
BEAM .621 TT 4.216
TOPPING 2.394
SDL .126
LL . 1.890
I H/C 6.610 I COMP 2.016 ULTIMATE 13.513
BEAM LORDS ------ K'LIN. FT. ------ BEAM .558
TT. 2.180
TOPPING 1.220 SDL .064 LL .960 1 H'C 3.400
I COMP 1.824 ULTIMATE 7--263
6-1'2'2701( STRAND Co 3.25" CGB MILD STEEL REINFORCEMENT
TOP P'C .6 SQ IN & 32 IN
"L' Em k'12' LEDGE & 24 TEE
••; . 1HOUR FIRE RATING
:. DESIGN NO 82, L= 2408 FT
* ,. • .
BEAM 'DIMENSIONS (INCHES)-------- 'Th •B1= .19 D1= 12 B2=14 .. .02=22
15 .03= 2
84= 55 04= 3
FC P'C= 5088 -F -c' TPG= 4800
BEAM COMPOSITE DEPTH 34.80 39.08 AREA 536.08
- INERTiA 53021.98 113248.25
yb 15.77 21.81
SHEAR ANALSIS----- --- --
X . Vu • Vc AV
(Fl) (PSI) (PSI)- (SO.-IN/FT)
1.63 177. 295. .;042
.2.00 • . 171. 316. .042
2.00 171. 316. - .042
4.80 137. .316. . 0.080
6.00 .102. 270. . 0.000
.8.00 ...68. •, 168. 0.080
10.00 • 34. 126. 8.880
12.00 0.:126. 0.880.
14.88 . 34. 126. 8.080
16.08. 68. 168.. 0.080
18.80 102. .270. 8000
20.08 137. 316. 0.080
22.00 171. 316. .042
22.38 177. 295. .042
REACTIONS(KIPS) LEFT RIGHT
SERVICE 60 68
ULTIMATE 87 87
USE STANDARD 5x12 BEARING PAD
-------BEAM MOMENTS (in-k)-------
& CENTER SPAN Mu REQ 6275.
((. Mu CAP 7671. 1.2 Mcr 5809.
M bean, = 482- M H'C = 2938-
M COMP = 885.
Mu t4'C REQ= 4788. Mu N'C.CAP= 6283.
----EFFECTIVE STRESSES & C'L----
4"
TOPPING 137. TOP OF BM 873. BOTTOMBM -346.
RELEASE STRESS & END
TOP OF BM -322. BOTTOM BM 829. .Fci REQ= 3080.PSI TOP STEEL REQ= 8.08 SQ IN.
-CAMBERS (INCHES) --------- LORD@ REL & ERECT FINAL P'S .12 .21 .25 BM -.02 -_04 -.06 1 .10 .17 ;19 H/C • . : -.11 -.18
4.
SDL -.08 -.08 I . . .05 .81 LL -.02
JOB - .
. JP1A\bi D R N
STRUCTURES, INC.
PO. BOX 2578 CKD
CHULA VISTA, CA. . (714)423-9030 SHEET OF
'PKG BM 14'12" LEDGE & 24"TEE x63' 43 FIRE RATING SHEAR ANALYSIS , 1 HOUR
DESIGN HO 83 L= 2408 FT X Vu Vc Av (FT) (PSI) (PSI) (SO IN/FT) 1 6? .. 319.297 ' 093 2 00 309 316.068 01= 12 2.40 .297. 316. .... .068
BEAM DIMENSIONS (INCHES)------------.
12.
B2= .14 02= 22 480
720
222 316 068 B3= 15 03= 3
.
148 208 868
64= 164 '. 04= 3 . 968 74. 126. .868 .12.00 . 0. 126.. 8.008 :F'c P'C=5800 -F'c TPG= -4800 14.48 74. 126. .068 BEAM COMPOSITE, .16.88 148. 208. .068 DEPTH •,34.08 .40.00 .. 19.28 222. 316. .068 AREA 596.08 . . . 21.68 297. 316. .068 INERTIA 58891.18 .143107.97 1 22.00 309. 316. .068 Yb 14.79 28.86 22.33 319. 297.. .093.
BEAM LOADS------K/UN. FT. ---------REACTIOHS(KIPS) D L T ULT BEAM .621 IT 4.216 . LEFT .. 89 23 111 163 TOPPING * 2.394 RIGHT 89 23 111 163 SUL .126 LL . 1.890 IN/C 6.610
I COMP . . • 2.816 ULTIMATE 13.513 ..
•
.
10-1'2" 270K STRAND e 3.25" CGB MILD STEEL REINFORCEMENT
TOP P'C .4 SQ IN & 32,JN
.. 5tiKg ab, fL .SI --------BEAM MOMENTS (in-k)-------
& CENTER SPAN F4 Mu REQ-= 11675. Mu CAP =. 13845. 1.2 Mcr= 7786.
M beam = 536. II N/C = 5711- M COMP 1742. .- V Mu N/C REQ= 8746. . . Mu H'C CRP= 9792. S
----EFFECTIVE STRESSES & C/L----
- TOPPiNG 229. TOP OF BM 1624. BOTTOM BM -667. RELEASE STRESS& END
, TOP OF BM • -4831. . .. . "BOTTOM BM 1153. . . Fci REQ= 3008.PSI . TOP STEEL REQ= 1.13 SO IN
.
. . .•
---------CAMBERS (INCHES)----------V V LOAD& REL & ERECT FINAL P'S .17 .29 .34 .BPI -.02 -.04 -.06 .1 .14 .25 .28
. N'C -.20 • -.34 •
I .05 -.06 SDL -.00 -.80 V I . 05 -.86 •
. LL V -.16 V V .-..22 • .
JOB •
.
DJ
STRUCTURES, INC.
P.O. BOX 2578
CHULA VISTA. CA. . (7)4)4239032 JSHEE - OF
- • 8-1'2 27LK STRAND @ 3.25" CGB .,.,MASK 2 STRAND FOR 5.4 I-I
CG OF UNMASKED SIKHNIJ IN
MILD STEEL REINFORCEMENT
TUPP'C .4 Sw 1P4 32 IN
---------BERM MOMENTS (in-k)---
Co Co END UE
: flHSKIt'I6
MU KLW= 1!:042. 5083 Mu CAP= 1164. (6(1
1..2Mcr= 6882.
- -Il BEFsii= 611. 391
MN/U = -71. 2379
fl UUMI-'= 11. . (if
nuN/C RE= 6060.
flu N/U CHr= 8.106-
-------- CAMBERS (INCHES) ---------
vLORIP@ REL ERECT ',,.FINAL P'S .21 .36. -.42-
BM --.84 -.87 -.89
".33
N/C - . -.18
• .11 81
ISUL -.88. -.88
LL -..82H -.82
SHEAR ANALYSIS ---------- X Vu Vc liv
(FT) (PSI) (PSI) (S.IN'FT),
1.63 283. 295. .855 2.00 196. 316- -055
3.88 .179. 316. 855
6.00 128. 286. 0.000 9.88 77. 154. 8.888
.12.88 26. 126. 8.888
15.88 26. 126. - 8.888 18.88 77. 154. 8.880
.21.00 128. 2 86. 0.000
24.88 179. 316. 855 25.88 196. 316. .855
j 25.38 203. 295. .055
-kLHUIiUt1S(t(IF'S) U L I • ULI
LEFT 55 13 68 99.
RIGHT 55 13 68 99
'A,tii R5bu-132
-iJ 7x/ 1 tU6JiID
..----- ..El-I-LU I lYE STRESSES ------- TOPPING . 174 112
--Top OF BM ii . 655
BOTTOM OF -381 -135-
- •• - .- KLLLHSL STRESSES
IN @0 MASKING
FROM END + TRANSFER - -
TOP OF BM -319 -314 BOTTOM bli •825 'Fci REQ= 3888.PSi .
- IUt'-StLLLkLw IN - -
1•
0---•-' . V .
JOB . . •
'
• DRN IOU %10
-
.
- STRUCTURES, INC. CKD -.
.' £0. BOX 2578 . -
.'
-- CHULA VISTA, CA. (714)4239O3O SHEET -OF
'.PKG BM W'12" LEDGE & 24" TEE.
1 HOUR FiRE RATING
DESIGN NO B5 .L=4480.FT
( BEAM DIMENSIONS (iNCHES)--------
BI= -19 .. 01 .12
B2= •k14 02= .22
-B3= 15 03=2
84= .55 D4= 3
F'c PzC= 5880 F'c TPG= 4000
BEAM COMPOSITE
DEPTH 34.88 39.00
AREA 536.00
INERTIA 53821.98 113248.25
Yb .15.77 21.01
BEAM LORDS ------ K'LIN. FT. ------
BEAM .558
TT. .909
TOPPING .511
SOL .027
LL .403
I H/C 1.420
I COMP . .430
ULTIMATE 3.493
18-1/2" 278K STRAND € 3..25- CGB
MILD STEEL REINFORCEMENT
TOP P/C 4 SQ IN € 32 IN
--BEAM MOMENTS (in-k)------
& CENTER SPAN
( Mu REQ = 10144.
Mu CAP = 12622.
1.2 Mcr= 6360.
M beam = 1621.
M H/C = 4125.
M COMP = 1249.
Mu N/C REQ= 8044.
Mu N/C CRP= 9792.
----EFFECTIVE STRESSES & C'L----
TOPPING 194.
TOP OF BM 1470.
BOTTOM BM -544.
RELEASE STRESS & END
TOP OF BM -532.
BOTTOM BM 1377.
Fci REG= 3008.PSI
TOP STEEL REQ= 1.18 SQ IN
(INCHES)---------
€ ERECT . FINAL
1.19 1.48 -.58 -.67
.69 .73 -.53 -.96
.16 -.23
.80 -.01
.15 -.24 -.11
-.35
IPKG BM.W'12" LEDGE & 24 TEE
!.1 HOUR FIRE RATING
DESIGN NO B5 •L= 44.80 FT
IT PT.LOAD= 5.984 K € 4.80
TPGPT..LOAD= 3.344 K-@ 4.00
SDLPT.LOAD= .176K-& 4.00
LL PT.LOAD= 2.640 K @ ,4.00
TT PT.LOAD= 5.440 K ,@ 9.08
TPGPT.LOAD= 3.840 K € 9.00
SDLPT.LOAD= -.16e K & 9.00
LL PT.LOAD= 2.408 K & 9.88
TI PT.LOAD= 5.832 K €13.00
TPGPT.LOAD= 2.812 K €13.80
;SDLPT.'LOAD= .148 K €13.00
LL PT.LOAD= 2.220 K €13.00
TT PT.LOAD= 4.768 K €19.80
TPGPT.LOAD= 2.668 K €19.00
jSDLPT.LOAD= .140 K €19.00
ILL PT.LOAD= 2.188 K €19.08
TT PT -LORD= 4.352 K €23.00
;TPGPT.LOAD= 2.432 K €23.88
SDLPT.LOAD= .128 K €23.80
,LL PT.LOAO= 1.928 K €23.00
:TT PT -LORD= 3.944 K €28.00
ITPGPT.LOAO= 2.204 K 228.00
SDLPT.LOAD= .116 K €28.00
LL PT.LOAD= 1.740 K €28.00
TI PT..LOAD= 3.536 K 233.00
'TPGPT.LOAD= 1.976 K €33.00
SDLPT.LOAD= ..184 K €33.00
LL PT.LOAD= 1.560 K €33.00
IT PT.LOAO= 3.128K €38.00
TPGPT.LOAD= 1..748 K €38.00
SDLPT.LOAD= .092 K €38.80
LL PT.LOAD= 1.380 K €38.00
flflI rillIlL I 0 £
Vu Vc As,
!(FT) (PSI) (PSI) (SQ.iN'FT)
1.63 183. 295. .069
2.00 182. 316. .869
4.00 179. 316. .069
8.00 130. 069
12.00 84. 144. .069
16.00 42. 126. 0 .000
20.00 1. 126. 0.000
24.08 37. 126. 0.000
28.00 44. 126. 8.000
32.00 79.. 149. .069
36.00 111. 0.000
48.00 140. 316. 8.880
42.00 316. 0.080
42.38 295. 8.000
REACTIONS(KIPS) 0 L T ULT .
LEFT 46 10 55 80
RIGHT 37 7 44 63
USE STANDARD 5x12 BEARING PAD
-------CAMBERS
LOAD@. REL
P'S .69
BM -.28
.40
H'C
I
SDL
I
LL
UI
FT
FT FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
-jos
- . .
. STRUCTURES, INC.
O.BOX 2578 CKD
CHULA VISTA. CA. . (714)4239O3O SHEET OF
PKG BM w,12 LEDGE- ,&,24u TEE
- 1 HOUR FIRE RAT IH
NO 86 L= 33.80 FT . DESlGH
BEAM DIMENSIONS (lII4CHES)---------PKG 8M. I4'12" LEDGE & 24 TEE C B1= 01= 12 . 1-HOUR FIRE RATING .19
82= . 02 22 . . DESIGN NO B6 L 33.00 FT ...14
83= 15 .03= 2 ..
55 04=: 3 IT PT.LOAD8.432 K € 3.Ø FT ... 64
• .• TPGPT.LOAD= 4.712 K € 3.80 FT F'c P'C= 5888 F TPG= 4808 SDLPT..LOAD= .248 K & 3.80 FT COMPOSITE LL PT.LOAD= .3.720 K & 3.80 FT BEAM
DEPTH 34• 39.08 IT PT.LOAD= 8.160 K & 8.80 FT
AREA 536.00 . TPGPT.LOF,0 4.560 K € 8.08 FT INERTIA 53821.98 113248.25 SDLPTLOAD= .248 K & 8.88 FT Yb 15.77 21.01 LL PT-LORD= 3.600 K & 8.80 FT
IT PT.LOAD= 7.752 K €13.00 FT BEAM LORDS ------ K/tL1H. FT. TPGPTLOAD= 4.332 K €13.00 FT
BEAM .558 SDLPT.LOAD= .228 K €13.08 FT TI 11.566 LL PT.LOAD= 3.420 K €13 08 FT
TOPPING . .878 : IT PT.LOAD= 7.344 K €17.80 FT
SOL .846 TPGPT.LOAD= 4.104 K €17.80 FT
LL : .693 SDLPT.LOAD= .216 K €17 80 FT I N'C • 2.444 .LL PT.LOAD= 3.240 K €17.88 FT
COMP .739 TT PT.LOAD= 7.072 K €22.88 FT
ULTIMATE .445 TPGPT.LORO= 3.952 1< €22.80 FT .SDLPT.LOAD= .208 K €22 00 FT 8-1'2" 270K STRAND, & 3.25" CGB 'LL PT.LOAD= 3.120 K €22.80 FT MILD STEEL REINFOR1EMENT IT PT.LOAD= 6.528 K &27.0e FT
TOP P/C 1 SQ IH & 32. IN TPGPT.LOAO= 3.648 K €27.80 FT SDLPT.LOAD= .192 K €27.00 FT ------BEAM MOMENTS (in-k) ------- LL PT.LOAD= 2.880 K €27.80 FT € CENTER 5PAN IT PT.LOA= 6.256 K €32.00 FT
Mu REQ = 8895. TPGPT.LOAO= 3.496 K €32.00 FT
Mu CAP = 10164. SOLPT.LUAO .184 K €32.00 FT 1.2 Mcr= 6178. LL PT.LOAD= 2.760 K €32.00 FT
M beam = 912.
N H/C = 3992.
P1 COMP = 1207. ---------SHEAR ANALYSIS---------- Mu H'C REQ= 6865. X Vu Vc AV Mu N/C CRP= 8192. (Fl) (PSI) (PSI) (SQ.IN'FT) 1.63 .208. 295. 055 ----EFFECTIVE STRESSES & C'L--- 2.80 287. 316. .055 TOPPING 185. .00 285. 316. .055 TOP OF BM 1236. 6.80 141. 316. 0.080 BOTTOM GM -539. 9:00 78. 154. 055 RELEASE STRESS € END . 1200 73. 131. .055 TOP OF BM -419. 15.00 13. 126 0.000 BOTTOM GM 1108. 18.80 44 1261 0.000 Fci REQ= 3000-PSI . 21.00 49 126. 0.000 TOP STEEL REQ= .92 SQ IN 24.00 184. 201. 055 .27.00 110. 265. 8000 (INCHES)---------:30.08 161. 316 055 LOAD€ REL @ ERECT FINAL 31.08 163. 316. .055 -
CAMBERS
'P'S .38 .53 .62 '.31.38 163. 295. 055 BM • -.09 -.16 -.21
7. .22 .37 .42 REFICTIONS(KIPS) 0 L I ULT N/C . - .28 -.42 7. .89 -.01 iLEFT 51 12 62 90 SDL • -.01 RIGHT 51 12 62 90 .09 :: L/e 7-0 Si I3'zc, P a o LL .
7.-.87 vw Ra.rt A 131
DR N
- -
JOB
C I I V T I I D C j .J I • . raJ I lJISI
CKD .
_-_--------------- P.O.BOX 2578
CHULA VISTA. CA. (7)4)423-9030 SHEET OF
• -
-kJ -- -
TABLE OF CONTENTS
BASIS OF DESIGN I
FLOOR PLAN ............................ II
-- LOADS. .........- .......................1
COLUMNS .2 3
SPREAD FOOTINGS 4
SEISMIC ANALYSIS 5 - 12
WALL FOOTINGS 13 - 16
WALL 17-24
DIAPHRAGM ANALYSIS 25 - 28
STAIRS 29
RAMP - 30-32
MANSARD CONNECTION 32
'PRECAST-BEAMS AND DOUBLE TEES N 33-36
•
•
•
•• ••, • • • •
-. - --
-- -
- •
)
BASIS OF DESIGN
BUILDING DESCRIPTION '
The Groves Parking Structure is a twostory structure consisting of reinforced
concrete columns- and walls with precast beams and double tees forming the upper
deck. - The lateral loads 'in this box system are resisted by the shear walls.
The foundation consists of spread footings with design asoil pressure: 4000-6000;psf,
and drilled piers with design soil pressur 10,000 psf.
LIVE LOADS
Floor Live Load - 50 psf reduced 8
LATERAL LOADS
Seismic loads in accordance to the Uniform Building Code 1979
MATERIALS
CONCRETE -
Precast Double 'Tees and Beams ' 5000 psi @28 Days -
Topping * - ' '4000 psi @ 28 Days •.-
All Other Concrete 3000 psi @ 28 Days
REINFORCING'. EINFORCING STEEL
ASTM A615, Grade 60, No 3 Bars Grade 40
Welding Wire Fabric - ASTM A185
PRESTRESSING STRAND
Ultimate Strength - 270 ksv
STRUCTURAL STEEL - ASTM 36 -•
S
STRUCTURAL TUBING - ASTM A500 Grade B
WELDING ELECTRODES
__5. -'5 - - 5_••
E70XX Unless otherwise specified
- --: -STRUCTURAL BOLTS • • S S ' - S --
ASTM A307 Unless otherwise noted
/
J
i 4
4 •-
Blaylock-Willis -DATE -JUNC and Associates.
Engineers ENGINEERS
- 19O9 McKee SL. San Diego, CA92110
SUBJECT THE G'oVES —°PARKNG C,AkAC,E
DEAD
,c 0 WIDE DDLJLC 1EE 0
°
TOPPING (MIN.)) 0
ADIrIo'-JAL CoRk.CTI0N 4rOPPING 6.0
11 G.0 ?.sif
PRECAST. GIRDER 01/F1 RJ
II •• 14 COL (10 -CD hAd)
BLOCK 61AP&PL(-4) o24 k/Fr
t-IANSAW TRUSS 0.1 K/FT PLffiJ
L,v LoAn I
UBciL L L
TABLE 2A t')" b L L 'O
ALLOWABLC o'L BEPING A PAC IT
SOIL tNYSflG SPREAD 'FOOTINGS- 400 sf To ( 000 (/.'lAs)
3
j-IPP'J W 'DTH —
1 rn 20 ArID.J LPOR DRILLED PiR - 1 1 e-&o
+ I
/1 .. . Blaylock-WillisDATE
Asso and ciates.
SHEET NO.___________
•
ENGINEERS
. . - -- . Engineers -- 0
JOB NO._____________ 19O9 McKee St, San DiegocA92110 .
SUBJECT
INTESPOR CoLuM1 0 0
L.L41..4D.L. L
-. .&IRDU COL
COL 0
1L4 DUE'ro LL IPJBALANC.E
MU
6 i x 05 44i 15 PFT
110 i Z17 0 :458
- I •' Its.)
(c.OL.
AcT Is1 kL (per Aet,gi
- AbPø
ID II 4- I
75 D I'JEhLECT SLCJbCRNEc5
(b) 05 k 05xt 0 8
C i 0 IN AOur Awf PRIPSC PAL Aj&
Hu -e -_ ' I %I 15E0
..- oHPuTiJG
456'0
- I4. -
(19
HANDSDOC - / 0
= o2. Asr O2x,00t 4011r
- . 0
USE (o W/ SPL 1•i5 '/' Prc
DATE ItANG fqBL
ENGINEERS _7H31
SUBJECT_____________
Blaylock-Willis S
and Associates. .
SHEET NO._________
Engineers • . -
S JOB NO.____________ l99 McKee SLSan Diego, CA 92110
- ..EKTF-QIDP COLUMNS S
S
S •c) It C.oL:
S LW; + 1.4 •bL W6 S L a.qi
BlayloCkWillis
:and Associates1
Engineers
1909 McKee St, San Diego, CA 92110
SHEET NO._____________
JOB NO._____________
TPN3E Or '70Qs'DNAL I4OI4EN7 Al COLLi1t4 •
I..- - •
T. •r sv PPCQT • 15 F .Kip 14
SOLID GkOuT
______ o.t61 - i:iii I
if
K •'
- 46'7 0 I'll'
'P0085
LASC ! B
"bESJGN OF Cows.4NJ 8ARI,.JG PLKrEc Al tNrL.IpQ. C.o
k'.- ''s..
MAX PL4
1. (AT It'JTC(,oZ C..bL-uF-N) '346
t\J !JAC 70 SWsQINKAC,C , Cif EP arC,: 24(s.0.1 4 (1K
*
A 1 (ARING ARA . . q-156-0 t"i
6P.1NO TR.JGTH ON COL4t4N Prb (o e5..}.EA,)
OK
- 06c0)L0b -
USE, 4-5 bAR5
- '.' • - - 'I It' ' If I ' Lo it 4 - /4. $ 1O AIICHCAQ BOLTS INC L.
- OF FOCCE AT BASE OF
B.AQitc, :STRtENGTp4 ON COLUP-D4
c,Pr, b 8+A,') D.(OS5YOlB4)11.4 9
-: 348 >t,4'
-
8c rPp. By pi,'F 483 -1 -74 -7 a -..4
lNC IrREivorH oAj For/N,
>2 • •IK -14 54Al --8
126.jfg6 DowE.L 6A4ZS.•
•-, -.-. •,_ •. A (N) o Y, 154 0
5 G,•TraLLS •
- - - •- .---••--- I - / • • -1
OR C. S (' 64 10 ) ' OL4i COL.. da--J
119.l4 g'lq +1,1 l1_v,
+ 2D
- 2.5 w/i5 EW 2oTroH
g:'-3
- o4°l
iz. + i.i 1002. \tqf5t6 1b1 eorrop-i ,
'7.0 4-l1 's'-' ,e.'3... 4. s.'-1_
a85 ...• .
'WI64 E Bo7roM.
q•04-I•-7 I I
,O. 4- 14 I?.' 1 V/sworroa-
AI C.5
Cf;C1,C1o,
dl
A7, AII',C4I 318'O
(A-e)IZ.
4.R.Apip
a
7
-
- ji I • .
- m o
DES,C,rJ oF C.OLLIt'-D.J oO'TlNC,S C.Rt A,JDI?00P 19
GRiD LoCATtotJ RfBuTAy LLI.t 1orAL 4ET FotIC, SrZ.E
OF AREA 1A 0 C,iPDR1 Co1 OLUP*J BEARING a
CoLut-4NS (Fi-' LOAD PPESsuP F.EINFORCCMEt4T Cot.oAD)'r
K1105 '(iP) KtP$
81, 68 5 '7 -0 ,'7 -O 'g 11
69, BiD, 61) Ii q4-, 1 251 q w'q Ew aowDPj
RAMP IL +
0,
0 +,6,0
A 6. C. 14.,0 tT1 1O +4. .OQ.O "
13
2DfI'i
lot -
A4' -'D g
4.'75
•
-
'tsj / (,tz 4 E w 61r.oM
-
'-o.i -
q3.5 4.2.5 LoN'r. I1Tok
____ • 4 AMS.__omoM
4• 4J-O',c.l'-D .
4-1 LONG. .or-i • 10 it 4- ¶P -NS 6 OTrOH.
U) I L p o Fri w -i
z z o p
Blaylock-Willis
DATE l 8'
and Associates. SHEET NO.___________
Engineers ENGINEERS___nHm
JOB NO.___________ 1909 McKee St., San Diego, CA 92110 :
SUBJECT______________________
_
_
_
_
_
_
_
£ilC ANAL?SI
TD1AL LATERAL V m 7-1 '.CS'.,j
CS: 0
V 'I3 ç 0'I4-''.J . 0I8oW
'TOTAL MEAD LoAD(II.JC.L_ RAMP STAS')
Q)I-z..a x I& )( 0 IL( 29'9
(2) GTRnsks
451' 0
( ID\/s1ALL
- 110
cod). COLLJHNS
200
/ K
V 0 1.8 6 ( - Ac.i___i -11
P-41N___LENGTHOFSNE.AR. WALL RD
f'4AL \iB[ P.S.
pop,S 213 PS I
IA.T LOAb ?4N. LREQ '2X5)(IOOO =47'o' 0 S(IOxv2-7q
LE.iGT 0 WA LL iN NS DIRECTION
a 'LENGTH 0F .JALL IN E-W DIRECTION .
BlaylockLltllillis JUNE q DATE_
.
. and Associates. SHEET N O.
. __________
.
Engineers
.
ENGINEERS_DH M
JOB NO.____________ 1909 McKee St; San Diego, CA 92110 ) SUBJECT____________________
_
_
_
_
_
_
_
_
_
_
_
_
.ENrEp, oF t4 SS
MASS TRISLATAWY ¶0 uPPER. LEVE L- P6F. PIG.
W(OTAL .k 'LiPPa 1-V
:NCLPAHP)
,. —3417'0 G 1 q4 SrA,&sg.
6LUtL.4,JS
187-0-b o 0
'ALL2. 8x 13° (.o4-0 1 01 71 t sqi ( (Q86
ALL B '5*:254 127k 17.41,0 t0 1-7 1-1-8
%"ALL I:
10-710 2117 B
2J541' 40
ENrc oF HAS
- 2.I41'(ø I
-
LTIVE 'GIDI7lE5 OF WALL
FOR Pb o14-1 IENDS
ROTATION
- Ph i4-Pk
17. GA
rorAL
( >¼lo 'SPLAC.4ElJT 'DUe TO SENDING
Blaylock-Willis-Willis
DATE ______________
and Associates. SHEET NO '1
Engineers ENGINEERS_____________
-
- 1909 McKee SL San Diego, CA 92110 JOB NO.____________
SUBJECT________________________________
•
. .-- 10 twAtL'O j:. c TOTAL TIFFNES ARE4A(A • .ALL LENGTH MEC41. L -
- 4IL (INS) h> 4.L /V&A I,, I _h
•
AS 6 I4I 4O 1Oi560 '0005 O- o-5B
4. lID5 43ZO (1'S4b4O '0o15 o''B 10
4 84. 5 3840 4JB57-D z. 04
41 -. .
CErcR OF
-f.-- -
- '(.IALL
-
4••" S •- -
I '38750 o
- - •• • -
-, •
Z 3° JJ4
3 291 !21 '(o4Zl
4 281 o
52t 0 S
'4 :12 -pit: l4
i4fr 68 -15
dA 514
Blaylock-Willis
and Associates.
Engineers
1909 McKee St., San Diego, CA 92110
ECC.Nr1CInES
e,-. L. (p -t '2.. . %4 > I-4u.Jo FT
Z'N
r
FoQ NE) - SHQ. -ro WALLS
t 'VDiR.V -r Z.'In5y -. + H,- .
- V56O
-S c 0.1 86A17. 3t(4_ 15o.1k-F7
Aoir CT ¶DQ -
N-S WAL R R/ R R a- R ,t.
1T /R&'
lEo 5 14 --S a 15 eb - é' 4
2 Boo 044 S 341,O '72-,.qe 281
io .D5O
- WA LL 0.
27 0 (o34 is,q (e !It2 ( C0
i6454 II5 2. —ic 1 1
--
J
-
I 6 01 1564 ,
I
Blaylock-Willis
and Associates. SHEET NO. IR
ENGINEERS H - .. .
Engineers
.... JOB NO.____________
. . , . 1909 McKee S San Diego, CA 92110 . .. . ....
SU8JECT
FOR _ .
. q B
WALL V
5 ;-7. -0 34 1 60-6 Il56z '5 (0
4- 05 s,.•o -Lo4--I844 I18(o
-•. .---.- H NS WALL .
-
,
_____________
( TD&SION CX 5L
& -33a4B 2.sc-243 —2.9 5
'2 3o 0 10-4 )342. 3 77.2q9
- -
- .- - •' - - . -
/
DATE U"JL I6(-
SUBJECT_____________
SHEAP, WALL. FOU AflOPJ LOAD
-: .. \ALL I
- LOADING NAT:o g o
0.q i"b#
II(p #21xb 1+ 2J14): o<
V4WALL :. 0 q '. II 5 5 o o
7'14(Il15
C: 2.14 O
- . •. ... . t C II1D + 9 + 54 4 40
'1 •
LOADING C0MINATION L b 4- L t S
1•' I( • •,I& 0:830 Pp41.Bk • 1.
44
ttz I tg
LrADINC Cck6tNArIo4 in -L
- r'ozJ- I .• .., -
i5 ______
50
__
1
-
'17 B+15Bt5 Ll.Sf50 q t41
ENGINEERS____________
Blaylock-Willis
and Associates.
Engineers -
19O9 McKee SL, San Diego, CA92110
SHEET NO._• I 0
JOB NO.
Blaylock-Willis
and Associates. SHEET NO
Engineers
- JOB NO 1909 McKee St., San Diego, CA 92110
WALL ! .LoAOIN Ob +5
WG,RoEoi(I'b1( +i.5s.O1) :q8i
*
- 54 c -
'2-
fc
C L +4 4 I IR 8
LoAiO Com biNA-rtOf'.J 'U bL4-
- D 10q,K
- " L. •z.5
T-. ttI 2
LOADING _Dt.4 INATgON D4 L
• -- -- -, 4-t-5•
DAr:E ui.4E
ENGINEERS .
SUBJECT -.
Blaylock-Willis
and Associates.
Engineers
1909 McKee St, San Diego, CA 92110
SHEET NO. I 2...
I
JOB NO.____________
\NftLL5
0.q
I_+W W ALL
'rr :O t'Dx .Ip
T -
T -2B
I
--.!9_P —458:
I t - ioo ' I- (04- 5 z O1 to
c:1
- -"[D +-L -
'DATE 7T ut.3t: 1&2
4ENGINEERS____________
SUBJECT_____________
Blaylock-Willis
and Associates.
Engineers
1909 McKee St, San Diego, CA 92110
SHEET NO.____________
JOB NO.
DEIC WALL OOTlt.JC,. .
- 40,1 K
So,- c.ves7. . . .
K . ..
PG 1 MPSHEAR Ar 6AS E b1
TIP '-O 4 'i4 /4'-o Br- LL . I2-—D PILL'b PiP
WT. OV PlR 40K (NC'LEC.T IN DES jGs,1 OF bOWNJ LOADS)
SHAFT ICTIOt.J ID eTT XS-0 x .500 t 2.. iT s 4- OXIODQ -
1000
ALLOW-
ENO BEARING. 1T,. 4 0 o
Kr 4O
UPLIT APACfl(
t-I4 .88 l<
LATE RAL CAPAC.T'OF DiLLE. PR.
tI'Je PASSNE FLUID PP.5SupF- 4.0o lb !cuff On Err 1YJIDfl4 0r2s4
LAiEQAL CA PAC TY/p/E . 2% 0 A. 4V . I.. -
1
.- 44
LA1RAL R&ssrNc ri-
FP.icTiot.J 4r,4c.ro. - 0 •
L,4TAL 0 x 2.14 0 to4 - (MM WALL)
brAt LAThRAL I5709NC - V. I1ì. 4-(4. OI(
J0TE , At,L(T ,ONAL L7.J(L Sr,-'C4 t...rj 6e By D. 'W L06L
FWOH ThiiO,f CoL.cA/-4N. Co'crD 10 (N/4U. For/MC.s '7'
-... •••••4 -.. . - ...:
DATE- _NNE lq -L
ENGINEERS DHM
SUBJECT________________
Blaylock-Willis
and Associates.
Engineers
1909 McKee St., San Diego CA 92110
SHEET NO. ____14 _________
JOB NO
RF__.J__CcorJ
tli4 (P 00o5) FoR ''-o 4) cpcsoJ - -s VRTCL
CONSIDER CiON AS CDLL.IMN 1T4 P . K 'DUC TO PActvc Qsti.
ACTOIZED
K
.- . r,j A . .
OF
r\
j
14'?
j, TIE &AM
:' •
4 . I ii
e
4
— 41 K
PLA
1
usec cpprry' fo Oz -o w/5 # fo ce': I " Z. 64-o
- >,(0P<
_____cscIo,.J'N/4.D BELL vJ/&t#i\iLT 4 _4. Lip /57le$
.5F 4 5. • *
p.
I
DATE_L4PJL 1q8t,
.ENGINEERS_____________
SUBJECT_____________
BIayIockWiIIis
and Associates.'
Engineers
1909 McKeeSt., San Diego, CA 92110 -
SHEET NO. •
JOB NO. - '
DESIGI4 DF w&LL % 4
• '• tA.A,&IAL ot.k
- .
••
., '. .HA- UPLIFT K
' k SHEAk frT BR$ 4-'; Lo '
W/ 4- -q LL v' '-O DQILLE.D P'(
1- OF PtEP ' (NEGLECT N O bovNLoc)
' 'T F RC1I ON lb ii F T 4. 5 -
00
H,K
OK>OHo
UPLIFT CAPAC,T'(
OK
LAT(&AL CAPACITY OF DQILLeD plep, 'lt E'(WALL
SAHE AS F 00,
I
LKTEQAL 42EVSTANCE7 -FRoH DEAD LoAD
O %'. •2.Lo q i8 jALL
AC. LAT1RAL.. —2- +S- 4.L• OI(
NOTE- ADOtTIONAL LA-TERL ViOULD IBE
BM DEAD LOAD ok C-TeQ.io . C.OLUHN C.o reD -ro viAL
IFF °°T'tJt S 9,%q -rt
IN tN CPlSSoNS - U5( P-4E A 'jALL 'I/L.
.. '-
U %lo J/4'- LL 'vf61*IO __ 4
'- t .. •. -.
418 ri
- ,• •
-
UNG
'ENGINEERS DHM
SUBECT_-
Blaylock-Willis
and Associates.
Engineers
1909 McKee St., San Diego, CA 92110
SHEET NO. _I (
JOB NO.____________
.-
1cp4 OF END '#.IALt. COLLAIANS
(CokP)•O'
.
Pu(T•( 441
LIStr 14I4 wj4 U 9 A 1,CPAc 4q4_ 0 Y_,
tNi TPJSION OI&-t
-
0 ((OK F01Q VCT' FORCE TIPANnp
'L)SE 49 'DOWELS
SHEAR CPP)C'rr cF T)ow(L.$ A4:40c'
VLA ct' /.41 f-I -
0
O; Br. -4D(ooxiO 204K FDZ1MDCOL t'tO4: 4D
k VACTOQ.D LA7AL 0 )c 'Io1 4 734 8 tDCR. TO BE RET) IvA J41
R'F IN
DESIGN O TC CAI-1$ PIERS Col.F00714C,ç
'S
U PC L1E BEA'1 SHALL CAP R.y A IiUJIkUP—i cF , IN ¶EI.JION) & 120-4Pgsctos,1
SEC-7 22 RILL iCQ LA
'K
• ''':. 'Px :&t(o
IiIN CT.uT 1= ORC.C. Lp 4-8 •••. 71
SiLL F -Tic I 'o '-''o
••':• . • - 0 •• .
04$ ' ' .' S •.
DATE- LJPJE 1q8i.
ENGINEERS_____________
SUBJECT_____________
Blaylock-Willis
and Associates.
Engineers
1909 McKee St San Dego CA 92110
SHEET NO. 1
JOB NO.____________
12EtNFORC.E4ENT ft')
ULTS4AT LOAD. C4DtTioJ U L'D
- St' SrsS VL Vu .
-
8)( IO%Os838x%L
Sl SHEAR s7gES5 cR'b 'CNC ID
50gA By H0i7-. REIiJF V-Y .. 1.IOq I175St
>5o/s, (')
S HEAP. PEINF ,Av _v LET SPACIP. I(O '
f'1
1215
( • .
,AcHIN? = 0025 x ox t
HOP.. . .
2 ___s1RSOF _4@. __ (0 '41
tcrio..,f
i. A $Zr . o ______ vr
SHE.P.-__A __SCbF_ NNALL t PL- t'
4EA CAP.RICD B'? END ',ALL COLLAkNS — 4DS (81*Q bovjELS),
SI-4E.PQ. -ro BC c..p4Rte f dEQ.r .JL( 6 -408
*44 VLE-r Qr.jF s. o 2. U Z
VL4 0 B II 2 aO$I 0 1I 2O_215
DE'OoFWALL_ AS AM - __5PANNIN r. —O
TO SPAN RATIO
T H Eee FDP Lf SMALL NOT ZE CLSi A OGtP FL1CL1Rt -1kR
i• ,•-. •' • • S •' - • . S .
L
DATE q8
ENGINEERS ifr1
SUBJECT_________________
Blaylock-Millis
and Associates.
Engineers
1909 McKee St.. San Diego, CA 92110
SHEET NO. ______16 _______
JOB NO. :
Act 118.111 4IQD
FAcToQtt LOPD W LA :I.4((,.Wt)
FRo-4
••t. + ii( I544. .00)
B K .
.
)' .2J-Ln
'L.5o.0I5 ,, / ID
ID AT CVJTlEr k
'184 "WALL OF SPAr.J
- 4':
4 4 e-
10 A.1 1 24-4 .:
'2 t,o-o IZo
(L 24.8i /24
4
IOl'o f- 'c c2..
05L f' x
~ 1A5 = 0 02.6 ,10yI11
I
?.l1A OF IV-JSso".J IN T: A1 7) 70 LA1Ut Fo6 (AF-F. Po 'e cm-c-s)
AS e600 OB 9 lv'
0.Q Y.6tillym
IL
TOTAL AS 4. 644vi, WSL
- - JO 1 L4 SF_ '- co
DEG-4 __OFCORBEL
SECNb I bVI1 BARtNG LPJC,7H
\/Li OR, b cb(0854-c.ACL
Li. :o2.Vu
A
s C120fS PIECE WELDED
it
A,: lO/ ,q •:.Iic' 'I
41I ts 4 0 C LLr'JC,n4 oF Co2&CL 24'
tLQING LfrNTh: 110A4
4,6 in
LASL 1' -t 'or o1: Co6L
73
. SUBJECT______________________
II
SEC °'ld ..0.12_ d 2M•2.-
o'i2
NLA V, LP 1\[Nw/vJ[IoJId]
S (' r 'bt /v.SJ &.1d
- t -o - o15] g( t[+ D] r 1
,q0
'004'L
- .O4(c7 ) = .4 XO/ '°°
0 - 0 05 oo(oS (o.)
As ? •004-2) 24 2 (a
us a
it CLOSED TARPS
o r. A q( t4rn
- I)SE 4*4 -Tin (A s -- HP0ir) LJNtFOPk ISRtATb Ovr-
OF
¶4E £FFC.TI%JL Dpn
ThRsSONAL /-40kEN7 IN V,4L.L.. ,4Cflt.IC. AS A BEAM (a )
- gq x . - .
,.- . .•
ACt i—fl 4'P,JT14 8.LDv,J 'NIp.4 1OQS'O4
4 Sur it - D4eCL.Ec7EO ia-o i
I \NALL TOPPISJC
Lh = o
L 4 9/2 1 J : O4 -b - 4t
TORSION Rr-'tF
DATE_AIJ
ENGINEERS___________
Blaylock -Willis and Associates.
Engineers
19O9 McKee St, San Diego, CA92110
SHEET NO.____________
JOB NO._________
DATE V
Blaylock-Willis
__________
ENGINEERS .
and Associates. SHEET NO. 0
V
Engineers V
V
JOB NO.
V •V
19O9 McKee SSanDegcA9211O
SUBJECT
L
V
-TORSI oNAL S1PEAiOTH AlTAISUTASLE 10 co#VC - 0 T V
0 re 08 ,'54 1
V
V. ______________ ____________________ = B, SIR z V
V - [7+. /04 V 14-1 98
V V CtT / V V
2J(, 1 IY\ V
V V ¶DSioAL
V
V •1 i:oR V ti 4 \RT- gss r'j WALL >.,. I41?.XIZ 7I
T cm
161x1 -e-O
-'ii
V
F L E)c L, P. Al SH (3- A 'RE tNFOLZkrJ1
Boro k1)4&)
bJ -" :2 _-t_ ,OY. I'll I
AI 11
- V
1 V..t4 •_V: Y-000 SV V
:VO 4 v .IN s
VL4
oV - o 4C9Ot
- -L AT . 0 oo7 1 1...s, 00L Dt
S
cob co° oo 16
5-
I frvi rl 2A1') :0 '-i.o -
(DI
I MPr)L 5 Y- ir1 44
- IKJ I'lLL. (Z— 16 O'_.
Blaylock-Willis
and Associates.
Engineers
1909 McKee.St, San D3ego, CA 92110
SHEET NO.
JOB NO.
2.1
LoI4C;r• S TCUL R çc 4L — 2.At ()L 4. Ll .
LOWCeiT TCJL p.J WAtLL. '5 AbtLt.A1t
RINFORC6HENT IN WALLS .. .
ULrIAr E LOD2 t.o x G t•0 .,,-L_•
S&iEr R SSS v Vu
4bd . 08
SHEAR Ca'ED 8y ONC 19 - J77 ioq
£HAE C,g,eo la y HoRZ PE'N P. Z Y r2 -'09 5 :I5c5bss
v-v bs ASsuHC %l'
gA v •:. 5o S.i,.ii,i1... -0 H 11,4
LAS( 2.. LAYCRS 4 J" i (o 4O) o:l1
:0
.4c 1 LfP.$ OF W 4I(o"VcLT
F WALL A C, CAt'j SPANI.JIP'4C) 't
DEPr- TO SPAN PflO o C43
Tl -f,ORL 54ALL toi qC cLrss,r,cD As A DP FLtvPE Pt7kISER
D-TIC(EGuiv VOL) L L
FAC-TO LOAD — 4Y. L -A 0
.J J'.LL
t I 4. rLq5
a -'- .• .. -. ..
DATE iujc :1q
'ENGINEERS___________
- - SUBJECT_____________
Blaylock-Willis
and Associates.
Engineers
1909 McKee St., San Diego, CA 92110
SHEET NO. _______
JOB NO
t4k -
B J tO __IN • L__
-
Lit
- io.tsq
-
II
• \ •; '-O0
FD 2.4 Z TE.E
K 11808 04. r- 0012. - -
V
41 - -
._._.sII
I I
-ç 1 00i2. ooi(
A- 006I0 I S 9 2 a-
I' Lfl
- L2. ,O
1OTAL A, 2.-4 •4-' Ih1 it
(4ou.i')
10 1p 1 4.I2Ji _I'4eQ'Z.I.J SIDE _ACE
-
'DES lC,4 _000EL oi wALL
I PANJ 1ETvJEN STEMS ' 4'-0
Vu
EFECT'\/ _.jIorh1 oP'LDc,
b 1 40. - i- 4 f:L1' CI Dir. RoHCJ. or. WALL 10 . OF PR1IjC
(c o1fll=wtorH OF BL-iP,t..,Cj
16 LO 'ST ET OF SeAQf 8 t.t or
-.
-SHE AR. 'FR ir_Ti0NJ __
4 f
O81r
p -
E'N ___OQ _bIRCT ¶eN5OF-.J
(\ Fo NIN) O LA
- -
2 0 Q'r •
.--.,. -: :t'f•-1 o- SbD • ,. ..
..
Blaylock-VVillis and Associates. SHEET NO._________
Engineers
19O9 McKee St. San Diego, cA9211O
JOB NO._____________
TO RIES1.5r HoH F. JT
NJ #t \J Ni u (k -d) - 1 5
4 195- 0
i(Od) O'SS N60 g.0-601'-L5
O4-2 - 0022.
I*i •Z.
f.4lN 'oO22$I OOZ. (GOVERNS)
'O OZ ILII L 5 z 0 OIN5
Dr5rp,6L4rtoNJ OF TOTAL tNF Asi,As)
- 3 ( LrH Qf Ppjç,
( o S a K
4B01 C.0.8 K
STEM
\/L4 21
PiR'y PINF /4s Ø oeA4#Ac i.
o so 010 o Avç. -A, -o&
o 4 USE 4 0 C
USC2.5 7NS':N1C
Ci4EC.t vCRT. P't.iF its. WALL A HANOAPLir
2,0.51
Aois"raisurm DvtR L 4B' A v 0
( 48
DATE 3ut.I°'S1.
ENGINEERS____________
SUBJECT_________________
Blaylock-WiOis
and Associates.
Engineers
1909 McKee St., San Diego, CA 92110
SHEET NO. ____-44 ________
JOB N
TOP.5IOt'JAL tMOI4Ct'.1T IN '.iqPLL At'flP'JC AS E.AH.
A SC u HV, DoBLC TE E LoAD'JC, ON WALL LLC C AS LAWFORM
d e 8co IS uiGS D4wU.
..
..-
'i(drcDcupPoT foo•tor -ip 4 iZ
At
SPPOQ1.
S AT ':
. . pPor
Vv AT ),Ie
.
..
S.kI.pPRT
Id I 00 0 2 4(.
I.
FOR'M ALL (F122.)
$4. )e X12. * I0II4 1q 1 UI
T BLW _W 4'C .t1 __ __ __iON 44y _13C We6WOTUD
= 086704.1sIq141, _I
Y.
= 1'1- iP > z. 4 rr
-. -- -- .. .. S• S . -
5,_S . -
- .
_ •-I•
_
Blaylock-UViHis
Va ciates. ndAsso Engineers
ENGINEERS •
. 19O9 McKee St.,San Diego, CA92110
( SUBJECT
.• -
SHEET NO. 2
JOB NO.__
.
V
.,
0PiH ANAL.Y51 5 (S's N-S
V S-4GeFLw IN _TOP SLa5 V
V - V lro,N'r V.
V
V V + V
V
V
PF 7F-fCKWE.S5 or roPP".iG
V
V AVE 02 AC."Lf __WALL V V
FAcT. LOAD V V
LA
'2 -)Z. -G PSI
bd 0 85x215 K 8 4 -L
2
MIN H V -'
PDQ WELDED WIRE 'A'C. 0 18 o u-
IE Cc( _2v2..ct
'SHC-AR, CaE'LD By, REINF A (Y y7r. _6.j5(vl%__ s _—Ioq _c)2.__25Y
vo
OK
<'06 PDVID
kIMijkrLo(L4PLSTQtSS
PrH 'ro SP4'I pqrto OF TOPP/N ' : 0 (.o5 <
IW )CC Ft. cO 6 1..P6 e1 4-ç Bc AS AN OiDINA1 FL-E)"'p4L 4eI4&
UMlFo2H ttD All oNTAL LoAD /Pr: "SK 5/,q8 414 PS/PT
t-4 X. rcNg:LE SrESS IN Cot.JCrC J.
414kIE't7. I( B
2_5_.(t8 CL
1410
L . V VV .V V, ••V . , V
C;ATF JL( L
ENGINEERS_____________
SUBJECT
-
-.
.Blaylock-WiOis
and Associates.
Engineers
1909 McKee St., San Diego, CA 92110
SHEET NO 2_b
JOB NO.____________
C4O-D FORCES SrHIC P.4-5
(L4P.3tFO LOAD /FT)WI (1.j,& .4 13IIr
:
8 .
-
CI.o FoL z 'L%84
-
ti..
(o CDP
-rOTA- L DAC OPC.C. : 4-7 GIZIDS (g) is
C.I.1oRb &.'DRAG FOR.C.ES S)IC
Wu 6 56 14K /Fr
= I5155
Ci4oP-D r0c6 Up CSRI.DS ®
fEN. o\ .
L oi-iP1
TDTAL DAC, FDQ-.E = I It 4.< 11 GAIDS
bStC4 OF DRAG HEMBER C,iD
DRAG R.4 466 L bA =,46.1 -0 -
ACT SLPID.RNESS EFFECT
0-11 0 iit
- 41 > S4 HI/
021
( Li SLe.iDNS E.FLCT kUS1. 6
OF_F L EC_Ttc>W OF D12RG HC stP, ACTtN& Ac 8tFJt1
LA ~JOE SLLF wi -D z: 4V 11 2..65'
j" 01< Fog - ELF 1 btii-
DATE_iL4L '2
-
ENGINEERS
SUBJECT -
Blaylock-Wilhis.
and Associatese
Engineers
1909 McKee St., San Diego, CA 92110
SHEET NO.____________
JOB NO._____________
ISTBTIO l`-J .0ir C)-Cr OCES ALONG LINE it
TOTAL FOR
LJALL o - V?ALL
'yrLoog 4(08'3,'64 5(41t
£tczS = 8.82.klF7' t,(c.ccc (A' K.Içc
-
LINE ai LINE (')
t
4co%1. 0 L t :
-
L WALL
fl 157 4f4• K
'8
t24l8.
I
MM DQC, P
IC - 4 SCtF'JT I 4x 0 III
roe. P lL16: 0.-fl s 423 ti .H4(1h1IXh1.. 0- t. 6. 2.10 o Al k 110 7(
I - rrs'o 5Co 1 S 0 Y. (O
7.
I I I
-rorAL. As.FO 48 f 2
2/NI .4LONC, Lir'.JES 04 '4- ®
Blaylack-Willis
and Associates
Engineers
1909 McKee St., San Diego, CA92110
SHEET NO.____________
JOB NO.____________
LItPDcoP OzoJTAL DPC ¶PJfr .
,P.f /L1
AT WALL A &8t/.s541.0 0. Ito Ir USE W4 1,5 " O LINE
Av~1D 1/8 DIOO USC 4I8' 0 C. LINE®
AT LOD SL LASE t'C Lis®
4
- ir US G W /" O'C Li
bISTRIBUT ION tF cQ,oc, FoQc.,E ALLJC, L_uJ65 (E)
I4JFLL 41
505'-o
- •... _'.. V FL ooP. 41 •2. ', K / /.-
/ q (tAIALL -
EXESS - :2 41 k/K
1A.8 K fit
S I-)
AT WALL o i . o c.
=
.
DATE - -
ENGINEERS______________
SUBJECT_____________
Blaylock-Willis
W Associates. Engineers
1909 McKee St, San Diego, CA 92110
SHEET NO. ___________
JOB NO.
-STAIRS
LoAi)S -: D.L(tI'.JCL. STRIPER4PCASTT'HRE4DS) 85 -sf
L.IVE LoAD ioofrcf
A- —C : DESIG N OF STIPsJCjE. -
- PRECAST SP4N I5-0
(ubL ( i!'4 454)x 15 K
- -
lcIoOo
- 2. -K ,Fr
"TtA
I[fl
TS
(tue TOLL) i x -55
S'GER
I Fr ALANC -. .. -
BENDING 1. TORSioNAL SrRsss.
tQf T
f AI20 + 0 o4L Vt —,
(okA1
ENF ,N PRECAST rRtAb
t? 4 K- FT /Fr
0.144 F: - t I
A s 00 (4 0 iS
Liss
TS COL '7 12 4)(4 (o Sy 41 IkI
~MAK P,4 - 4iK I i- 4.00e5) =115
£5
. :4 St ?/_ '2 : 14kI
KL. .i OK IASL 4x 4
Blaylock-Willis q IUL'( I and Associates. SHEET NO.SO
-. . Engineers ENGINEERS 9 JOB NO._____________ 1909 McKee St. San Diego, CA 92110
( . SUBJECT
DIGt1OFRAMP
- SLAB_SPANtsJlNC,ACI
q f-iN TWIC..e<NCSS : 'i..o I - 10 L)SC
X-05 4- Y.__0 _'&Y 4Olrr
F - b 405
04 ii. 00 . 1Ltyfro
U.L j OVL.(a 5 D -L (a i'
- *..
USE '.4.c (o .i WL
DisiR.iTio,'4 STEe = 'OOtB*'L s
(44_(oto)
(. bOvJLS __ppce _LEVLL
TA o PIAHP 2-ol24.-O: boo m4t 4,
DL O ,(p $ç4. T0rAL LOA LOA D wO iio KIt'S
SiSHsc Ni-S - 0 I8 Y, 69 6 8 01 K
4B/ o48 KFr - o Iv
. 4 OBS4-0 -
-. uc€__
AeUTMNJT_WALLS
C05S'4ALL 'SPAWN ING SEYJEQ EASEHENJT
CON ,C,-
2 I_---
;C'>_
-4-
0-6 K/Fr
SOIL OIL. .
&P42IN6 Il
-. 14'- _
tit 4
.4R% 40kT ovLR GASc %5#I2.
8
b10 4C) ... -.
-
DATE 3 . . V BIaIock-WiIIis Sq-
and Associates.
E V . Engineers NGINEERS
V V 19O9 McKee SL, San Diego,CA92110
SUBJECT -.
SHEET No.
JOB NO.___________
t1L4 - '45 Y tob V iO0
12b :2
- I35 V V .2•
V
. V
M ,j I s. 0010 o o I As oor3xio
USE (0 OP ,f TTDI1
MA SOIL 6EAki C PkSsu c ex t,o RAIiP
ASS L.H1 1 '-IO .J'Dt FTC1 OF Bt9INC. 2I 0
V .. V V V 4XI'83 VV:V SHEAR 0LJE7OSESI1lC
. L6 - V V o 4okS V
V
VL, 0 5 4. x ( IS'o:
144(IZ1
- V 4
-
0SI V 055*10Oo%i
V
V CPUiC-D
40 ReM c&irE -
-s•I5 -JI
F
,f,0U
UT1LT WALL jr70 ckoe,5 , WALL (3o' TOTAL tir) j SHC-AR D(.4t TO SISM,C
. -
VA- 2O$5Ox2.4xp' I -.--- ff
V V
. . V (i••O V
Vt 'CL4 V la Volo
08
V -Th
- W4 1'i."
V . USE .i IN. FoRSR.jALL
V V - - '
- Lit 6,TC, GOAZ AD -_lffz
it 14499
—I, 1,
DATE—
ENGINEERS____________
SUBJECT_____________
.
. .., AMEN : ALL r WALL (sPNI ASNT - '- o
4.•-•
-
e - 2±11 fl
F b - 83
--
-
LA St OO I OO'
O1 X ILB ' IlO .
•
. . I iii --I• —I L.ic 1 'TOP )4- oiioi-
45
MASAP.b (R L 9 AACM,DETAIL)
4 — •
-U e>C 18LE 24,
Po1z AB .' c -
SWEAR AT 'AS E 4X50 SOO lb H
U€C T6L 2-
(,.iovjA8Lc -VrjO 16) 'I
'2. o'-C' A8 4 0 a
I
CNEC 71 : oF -rp Ji o oc. ,I4-
12 HDHEJ7 •PLE 10 V1ND
TLNIof'J j pJC -P
LSE ?ntc!oN S7-1D )10 (iiN
,L(& TL"Jio,',i 52O ('sc ALLOJ e,-icn i
Blaylock-Willis
and. Associates.
Engineers
1909 McKee St., San Diego, CA 92110
SHEET NO. _____________
JOB NO
1-1
V
'F t C A1% o ) S
eOLXETE
D0 cr
BE 4S - psi o
o c'P t3G 4 'O PSI e. to
I?ELE.A E re E-i) £ TN Foe DOL BLEThES 4 E€ n S -
As CE BY DEStJJ NoTLESThk) 3Oop.st
IiJ
ULT -JTI.
7(#a70) 169
4.
LOSSES - (cnA ¶O?
Clo-
u coEct - AS TM A (o 40
U NOT OT€)E
WELD WIaE eic -14STM A-(o k5
C,oxgs 4 LoFx's
79 USC - Ac I L1- -
pep- LL i rn i9osc Lo# S A€.E P jV Z-1 fcaT TOT j-Spj
au c-ru , c rit€ i- NC
2 -•: t • V V
L StAD '
V V JORN joe STRU CTUR ES, Inca
PO. BOX 2578 CKD
4" 'TEE .63' SPAH 36PSFLL 21JUN82. --SHEAR RHALYSIS - IHOLIR FIRE RATING DESIGN x Vu Vc Av(st'') 0 TI L= 63.80 FT (FT) (PSI) (PSI) (&6' '0/C)
24. 00 IH.TT WITH 3.80 1H.TPG. 1.13
2.08
196.
190.
273.
316.
.050
.050 TI WIDTH- 96 IN. MT = 34398 0 4.20 176. 279. .058 F'C TT=-5888 TP&= 4080 PSI 8.40 149. 152. .049 TT COMPOSITE AREA 524.88 ' 12.68 122. 126. .048
INERTIA 27896.47 . 41877.42 16.88
I i.ee
95.
68.
126.
126.
.048
.047 Yb 16.57 19.51 2528 41. 126. 0.880
LOADS-------PSF-----K'L.IH F 29.48 .14. 0.808T---- 126.
I -IT 68.4 33.60 14. 126. 8.000
TPG 38.0 :384 37.80 41. 126. 0.008
S.DL 2.0 . .816 42.80 68. 126. .047
IL- 36.8 .288 46.20 95. 126. .048
. .106.4 . .851 5840 122. 126. .048
COMP '38.8 . .384 54.60 149. 152. .049
.;ULTIPfATE 212.9 1.783 58.80 176. 279. .858
• 68.92 198. 316. . .058
- 16 -12 IN 278K STRAND 61.88 196. 273. .050
1115 HARPED -e PIIDSPAH
CG 0F STRAND IS 9.08 IH.€ END 'CG REACTIONS PER FOOT OF TEE -WIDTH OF STRAND IS 3.75 IH.e HARP LEFT RIGHT. CRIT. PT. IS 26.70 FT. FROM END .<ip KIPS
*
----DESIGN -HOPIEHTS( IH-K.IPS)----- H'C
SOL
3.35
.86
3.35
.86 -
- & CENTER & CRIT.PT. LL 1.13 1.13 FlU KtU =.9905 Mu CAP 12680 =. l.Mcr . ..8955
.12483 ULT. REACT IONS/STEM
M'N'C : . . 5000 ULT 26.83 26.83 4948 Y:ti COMP . 11786' 1768 .
Mu NxC REG 7600 t'IE6N ZS ,E,.
.LI'7•• GL
---EFFECTIVE STRESSES--------
& CENTER € CRIT.PT . (PSI) . . (PSI)
-. TOPPING . 320. 316. TOP OF TT 1015. 1019. ..'B0TTOMTT -358. -355.
RELEASE STRESSES
a..' e 25 IN. ' e HARP
- FROM END POINT -TOP OF IT 26. . ' 239. BOTTOM IT 2503. 2828.
RELEASE STRENGTH REQ 4171 . PSI
-------- CAMBERS(INCHES) ---------
-LORD. &RELEASE &ERECTION FINAL * P/S - 3. 21 '. 5.77 . .7-05
. TT -1.89. -3.49
- 1.. 1'3 . 2.28 2.52 .
.T.PG • . -.96 -2.20
2.• : 1.32 .32
:SDL, *•• '
- .03 - .89
.22 LL .: ', .. : .•-. 60 2 -38
-" JOB4 P1A\EI . ORN
•. ••. •. .
. STRUCTURES, INC. -
-. - .. PO.BOX 2578 CKD
-•
.. . •,. .• . • CHULA VISTA. C (714)423.9030 SHEET OF - -
SH•
'-SHEAR ANALYSIS ----------
X Vu Vc Av
(F1') (PSI) (PSI) (SQ.IN'FT)
1.63 177. 295. .042
2.00 , 171. . 316.
2.88 171. 316. .042
4.00 137. 316. 0.080
6.88 102. 270. 0.008
8.08 68. 168. 0.000
10.00 34. 126. 0.080
12.08 8. 126. 0.080
1-4.00 34. 126. 0.080
16.00 68. 168. 0.080
18.00 102. 270. 0.000
20.00 137. 316. 0.088
22.00 171. 316. .042
22.38 ' .177. 295. ' .042
REACTIONS(KIPS) LEFT RIGHT
SERVICE 60 68
ULTIMATE 87 87 -.
USE STANDARD 5x12 BEARING PAD
"L" BM '12" LEDGE & 24"TEE
- . 1 HOUR FIRE RATING
-:: DESIGN NO 82 . L= 24.00 FT
BEAM DIMENSIONS (INCHES)--------
' 81= 19 01= 12
B2= 14 . 02= 22.
.83= 15 03= 2
v.A.... .0 . r.A- •:. D -? - ..J ,J iJ -I -
F'c P'C= 500€1 F'c TPG= 4000
BEAM COMPOSIqE
DEPTH 34.00 39.00
AREA. 536.00
INERTIA 53021.98 .113248.25
Yb 15.77 21.81
;BEAII -LOADS------K'LiH. FT. ------
- -' TT. ' 2.180
'TOPPING , 1.220
'-SOL •: .064
LL ' .968
'. IN/C 3.480
1-COMP 1.024
.,ULTIHATE . 7.263
- 6-1/2" 270K STRAND & 3.25" C:GB
MILD STEEL REINFORCEMENT
: TOP.P,'C .6. SQ IN. & 32 IN
-------BEAr9 MOMENTS <in-k)-------
&.CEHTERSPAH
Mu RE' 6275
CAP '= H 7671.
1". 2 .P1c.r= 5809.
.Mbeartu= - 482.
MN/C -:29 = ,. 38. -M COMP ' 885,.
4788.
Mu H'C CAP= €283
•• '----EFFECTIVE 'STRESSES & C'L----
'- TOPPING •: • .137.
TOP OF BM '. 873.
?.BOTTOM.BM ' -346.
. RELEASE' STRESS •& END
TOP OF BM . . • -322.
BOTTOM BM 829..
.:Fci REQ=,3000.PSI
TOP.STEEL,REQ= 8.00 SQ iN
"
------
- CAMBERS (INCHES)---------
LOADREL' '-& ERECT FINAL P'S 12 21 25
BM 'H ' -.02 -.04 -.06
1 10 17 19
H/C -.11 - 1
-k...-. - • .u,.., • .01
SOL ---08.
1 05 81
LL ,. -02
JOB
1' ''
.-.- •• -••.. :
DRN
STRUCTURES, INC.
£O.BOX 2578 CKD
CHUIA VISTA CA. 174423-903O SHEET • .• • -0 F
* PKG BM W'120 LEDGE & 24"TEE *63' -C.AMBERS (INCHES)- 1 HOUR FIRE RATING LOADe REL e ERECT FINAL DESIGN NO 81 L= 27.00 FT P'S .33 .58 .67
BM .-.04 -07 -.09
BEAM DIMENSIONS (INCHES) -------- .29 -N'C
.51
-.33
.58
-.58 BI= 21 DI= 1 I .18 -.80 82 ,14 D2 22 SDL -.00 -.01 .83= 15 03= 3 .17 84= 64 D4= 3 LL - .15
-.17 F'c P'C= 5880. F'c TPG= 4880
BEAM COMPOSITE l SHEAR ANALYSIS---------- DEPTH 34.00 40.08 x Vu - VC AV AREA 568.80 (ET) (PSI) (PSI) (SQ.IH'FT). 'INERTIA 55502.87 134358.51 1.67 364. 297. .281 Yb . 15.35 21.55 2.80 354. 316. .158
BEAM LOADS------K'LiH. FT. 2.25 346.
.277.
316.
316.
.126
458 .096 BEAM .583 IT 675 288. 250. .896 4.216
TOPPING 2.394 9.00 139. 157. .896
:1.26 .SDL .
11.25 69. 126. .096
LL 1.890 13.50 0. 126. 8.880
. . 2H'C 6:610 15.75 69. 126. .096
- . I COMP 2.816 18.00 139. 157. .896
ULTIMATE . 13.460 20.25 208. 250. .096
22.50 277. 316. .096
14-.I'2" 2781 STRAND e 3.25 CGB 24.75 346.
25.00 354.
316.
316.
.126
.158 MASK 2 STRAND FOR 4.5 FT
. 25.33 364. 297. .281 CG OF UNMASKED STRAND= 3.25 IN
MILD STEEL REINFORCEMENT
. REACTIONS(KIPS) LEFT RIGHT TOP P/C .4 SO IN & 34 IN .
SERVICE 124 124 MOMENTS (in-k)---- ULTIMATE 182 182 & CENTER & END OF
.................BEAM
MASKING
Mu REQ=.: .. 14719. 8177 Mu CAP= 18061. 15569
l.2f1cr= 10194.
P1BEAM= 638. 354 • M H'C = 7228. 4016 BEAM LEDGE REINFORCEMENT
P1 COMP= 2204. 1225 Mu H'C REQ=11012. F'c 5,000. Psi F40,000. psi
Mu Ni'C CAP=12718. . Ledge depth = 12 inches
Ledge width = 5 inches
-------EFFECTIVE- STRESSES-,-----. -
Bearing.width= 5 inches
TOPPING 295 164 TOP OF BM 1955 865 ULT REACTION FROM TT = 27 kips
BOTTOM OF -674 129 ULT SHEAR CAP = 58. kips
RELEASE STRESSES As rei'd/TT stem = .61 s-%. in
& 25 IN & MASKING *3 BAR REQ'O & 8.6in.o.c. or FROM END + TRANSFER TOP OF BM -643 -636 *4 BAR REQ'O & 15.7in.o.c..
BOTTOM BM 1562 1727 • 4* .3
TOP STEEL REQ= 1.49 SQ IN
TTT P1MI ORN - JOB
4' 7T f/A".JMIN& STRU CTLJ R ES, INC.
IO.BOx257$ CKD
CHULA VISTA. CA. (7)4)423-9030 SHEET OF
34U Kurti Street Woodward-Clyde Consitants Sari Diego. California 92110
714-224-2911 .
May 28, .1982 . ..
Project No. 51192A-PS01
t
' T. L. .Sheldon Enterprises
2254 Moore Street, Suite 202
.• San Diego, California 92110
Attention Mr. Terry Sheldon •
O - SOIL INVESTIGATION .
- PARKING STRUCTURE FOR ..
.. . --THE GROVE APARTMENTS . .
CARLSBAD; CALIFORNIA .
.
-:..'•
..
-. -.
•. 4 . .,.
-.. ..
Gentlemen: .
We are leTased., to provide the ,accompanying -report,, which pr&-
'sents,the.results of .our supplemental soil investigation for
. the subject project. This study .was performed in accordance
with our agreement dated May 7,- 1982 and your authorization of
. May 10,' 1982.
•- • . . The report presents'our conclusions and recommendations per
- taming to the project, as well as the results of our fiëId
explorations and laboratory tests
•• . Our engineer assigned to this project is Mr' John Moossazadeh.
If youhaVe- any questions or- if we can beof further service,
please give us a call. . .
S Very-,truly yours,
., . - WOODWARD-CLYDE CONSULTANTS . .
• :
Richard P While
RE 21992
RPW/JM/eej
(2) T. L.Sheldcn Enterprises ,• •
. -• '(2) Charles W. ,Christensen & Associates
(2) ..Blaylock-Will-is & Associates. .
. . Consulting Engineers Geologists
.. • • and Environmental Scientists •' -• . . • .
5 Offices in Other Principal Cites
Project No 51192APs01 WoodwardCaydeConsuftants
0 Sf
.5 •5
1
TABLE OF CONTENTS
Page
PURPOSE AND SCOPE OF INVESTIGATION 1 •
DESCRIPTION OF THE PROJECT 1
FIELD AND LABORATORY INVESTIGATIONS 2
• SITE CONDITIONS 2 • Surface Conditions 2
• Subsurface Conditions 3
. '. Ground Water .. S 4
' DISCUSSION, CONCLUSIONS, AND RECOMMENDATIONS 4
• Ground Water I 4
Soil and Excavation Characteristics 4
Foundations 5
• S - Spread Footings 1 5
• Bearing Capacity 5
. .
Lateral Capacity
S
5
Drilled Pier Foundations 6 -
S.
Downloads 6
• Uplift Resistance 6
Lateral Load Design 7
Pavements 7
UNCERTAINTY AND LIMITATIONS - 81
FIGURE :. • l Site Plan
I
S
•
i
5,
* Project No'.' o 51192A-PSO1 Woodward-Clyde Consultants
S
• . TABLE OF CONTENTS
* • . . Page
• ..•..,•
APPENDIXES -
'A. Field Investigation A-i
Figures • . •
.
-
• A-i Key to Logs
.A-2 through A-4.. Logs of Test Borings
B Laboratory Tests . B-i.
. .
-- Figures .
- •
B-i Grain Size Distribution Curves
• B-2 R-Value Test Results
C Logs of Test Borings 4 and 7
• - From Report Dated August 25, 1972 C-i
• .,•,• • • . . •
S • .
--
••
, p
S
S
p •
-
. *.- -; •., . • -. . .*. - . • . •. .. --.-• . . . * . . . -
* •, S - -• - - - •
-Project-No.51192APs01 Woodward-Clyde Consultants
S
S SOIL INVESTIGATION
'PARKING STRUCTURE FOR
THE GROVE APARTMENTS
- '
'
CARLSBAD, CALIFORNIA
.•:- ,
S ''
PURPOSE AND SCOPE OF INVESTIGATION
This 'report presents the results of our soil investigation
at the site of the proposed parking structure immediately north
I , of the existing pool and tennis courts at The subject apart-
ments. The apartment complex is located at the northwest'
•, corner of -the intersection of El Camino Real and Avenida Espana
,(Hosp Way) in Carlsbad, California.
' This report has been prepared exclusively for T. L. Shel-
don Enterprises and their consultants for use in evaluating the
property and in project design This report presents our
S conclusions and/or recommendations regarding the general site
and subsurface soil conditions; type and depth of'foundations;
,
' allowable soil bearing, lateral, and uplift pressures; and
asphalt pavement design recommendations for the proposed two-
level parking structure. .
DESCRIPTION OF THE PROJECT
, '
- For our study, we have discussed the project. with
"Mr. Sheldon and Mr. Dennis Morgan of Blaylock-Willis & Asso-
dates, .and we have, been provided with "Tentative Map of España
'Antigua," dated August 3, 1981,. revised November17, 1982,
prepared by Charles W. Christensen & Associates, as well as
undated topographic and grading plans for the site. In addi-
tion, we have reviewed a soil investigation report for the Hosp
Grove Apartments in Carlsbad, prepared by Woodward-Gizienski &
Associates, dated August 25, 1972. •
S S
-
•• • • •'
;5 . 'S
.5 •.- -'-5'-
Project No. 51192APS01 WoodwardCydeConsuftants
..- ,
-, We understand that the proposed project will include the.
construction of a second story parking structure to the exist-
ing on-grade asphalt concrete paved parking lot. We understand
• that the new addition will consist of 12 inch round concrete
• columns and concrete', floor panels and shear walls. Maximum
, loads will be on the order of 200 kips for download, 60 kips
for uplift, and 400 kips for lateral on the shear walls.
'. We further understand that the existing on-grade asphalt
• pavement will be left intact as much as possible to be re-used
following the end of construction. In addition the laundry and
storage buildings and dumpster areas will remain The location
• and 1ayout of the project are shown on the Site Plan
- (Figure 1).
-- .
,, FIELD AND LABORATORY INVESTIGATIONS
-
-, - '' ' Our - field investigation' included making a -visual recon-
naissance of the existing surface conditions, making three test
- borings, on May 7, 1982, and obtaining representative soil
samples. The.test boring's were advanced to;depths ranging from
• . 4 to 22 42 feet. The locations of the borings are shown' oh
-
Figure 1.
A Key to Logs is presented in Appendix A as .Figure A-i.
Final logs of the borings are presented in Appendix A as Fig-'
:'. ures A-2 -.through A-4. The logs of previous borings are pre-
sented. in Appendix C. The descriptions, on the logs are based.
-
,on"field logs, ,,sample inspection, and laboratory test results..,.
Results .of 1aboratry- tests are shown at the corresponding'
sample locations on the logs and in Appendix B. The field
- investigation and laboratory testing programs are'-discussed in
'
- 'Appendixes A and B.
' 1, , , , . .
•
. , .
' SITE CONDITIONS
Surface Conditions
', - ., • The project site encompasses a triangular gently sloping,
••' . asphalt 'paved parking, area near, the center of the existing •
2
•• . ••
.' ,• ..
Project No. 51192A-PS01 Woodward-Clyde Consultants
' • Grove Apartraents complex. The area includes two double rows of
northeast-southwest aligned covered carport spaces and a por-
tion of a single row which trends basically east-west. The
. northernmost double section is flanked to the southwest by a
storage building and refuse dumpster bay, and to the northeast
- - -by' a laundry and storage building with a' similar trash bin
recess'. Uncovered parking areas are' located to the east and
- -
north of the subject parking area and border 11,,:1 (horizontal
to vertical) slopes which descend 10 to 15 feet to a dwelling
structure level. -An ascending 11-,:1 slope, less than 10 feet in,
- height, is located to the south of the project area and leads
- to the pool and .tennis courts area at the site. Surface eleva-.
'; ' tions in the site area. range from approximately 107 feet (MSL
-
Datum) at the northwest corner to approximately 103 feet at the
i". ', eastern edge.
,"• '• Landscaping planter's with 'trees and low bushes are present
at the ends of the carport rows and in a triangle-shaped area
along the , southeast edge of the proposed structure. All
planter areas are serviced by a network of sprinklers. Accord-
'the ing to supplied plans and our visual observ"ations, a
.variety of utility lines including electrical, gas, telephone.-
water . sewer and cable television pass through the project
- area..
- Subsurface Conditions.
The subject' parking area -is a cut lot and is currentl
covered by asphalt concrete pavement and base course underlain
- • by the' -soils ''of the Santiago 'Formation. These formational
'. - materials extend to 'considerable depths and consist of dense to
-
,
very dense, brown silty to clayey sand and very stiff to hard,
• ,
gray silty clay (poorly to moderately indurated sandstone and
. . claystone).
'•••' '
% :•'. .-"• 3
H.
S .. Project No 51192APs01 Woodward .CaydeConsultants"
,.
Ground Wat'er
No ground water was encountered in any of our borings
within the maximum depths explored (42 feet). No wet surface-
areas or 'evidence 'of shallow ground water was observed at the
- time of our field investigation..
4 •'r •' I
- :DISCUSSION, CONCLUSIONS, AND RECOMMENDATIONS .
The discussion, conclusions, and recommendations presented
- -. .:" -, •- ' .,. --
--• in. this reportb are, based on the' information provided to 'us,
4.. ,- -' .. I f -
-•• results of our field and laboratory studies, analyses, and
.' .
professional judgment.
,.
.
.. ,':.'' Ground Water' . . .
. No ground' water was encountered in any of our borings at
the time of our investigation. The deepest boring (Boring 2)
.
. extended 'to- an elevation of 62 feet (MSL). However, Boring 7
- Of the previously mentioned soil investigation performed for
the site in 1972 encountered ground water at an approximately
--. .
'elevation of, 90 feet (MSL). The location of this boring is at
the northwest corner of the proposed structure. Boring 4 of
the same report, located at the northeast corner of the poposed
:,:' 'structur, i'ndicates that no ground water was encountered down
to an': elevation of 58 feet.
. .
Based on the results of our investigation and our exper-'
ience in the general site area, it is our opinion that a
shallow premanent ground water table condition is not present
at the site..
•
• •
- • •: We recommend surface drainage be. established around the
-
••" structure suOh that no ponding of water exists in paved areas :
or adjacent to foundations.
"'. ,_•.•:''
•. •
-Soi-landExcavation Characteristics
. . .
In our opinion, the formational soils at the site are
dense - and competent bearing materials and, can be excavated
S Project No 51192APs01 Woodward CydeConsuftants
- .
using conventional, trenching and pier drilling equipment. Some
resistance to excavation may be encountered in the very dense
formational soils.
In'our opinion, the'. clayey portions of the formational-
• soils at the site are moderately to highly expansive.
0
Foundations
Reáommendations are provided for shallow spread •founda-
tions for support of proposed column loads and drilled, pier
'foundations for .. support -of proposed downloads, uplift loads, : and lateral loads on shear walls.
$
Spread Footings .
Bearing Capacity. We recommend that spread footings for
• the proposed columns at the site, founded in undisturbed forma-
tional soils underlying the site, be designed for an allowable
. soil beai1ng pressure of 4,000 psf (dead plus live load). We
recommend 'that all footings have a minimum width and depth :
below lowest adjacent finish grade of 2 feet This bearing S pressure can be increased by 500 psf for each 12-inch increase
in, footing width or depth up to a maximum allowable pressure of
6,000 sf. We recommend that all footings be reinforced top.'
and bottom with steelrebars.
In our opinion' the' above bearing pressures can be in- -.
• creased' by, no more than one-third for loads that include wind
or seismic forces
Lateral' Capacity. To provide resistance for design lat-
eral-loads, we recommend using an equivalent fluid pressure of 5 400 pcf for footings "or shear keys poured neat against the
for'mational soils.' This value assumes a horizontal surface for
the soil mass extending at least 10 feet from the face of the
• footing, or three times the height of the surface generating
'passive pressure; whichever is greater. The upper 12 inches of
,material 'in 'areas not protected by pavement should not be
included in -design for passive -resistance to lateral loads.
5
'. .'Proi ect No. 51192A-Ps01 Woodward-Clyde Consuftants',
If friction is to be used to resist lateral loads,' we •
- . -
recommend using a coefficient of friction 0.4 between soil and
concrete for footings in formational soils. If it is desired
to combine frictional and passive resistance in design, we •
recommend using a friction coefficient of 0.3.
- . Drilled Pier Foundations
We recommend. that all piers be at least 8 feet in depth.
-. •,'. The length of all piers should be at least four times their
diameter.
f 'Downloads. DrilIed piers can be designed to support the
proposed. downward loads by side friction, end bearing resist-
0 ' ance, or a combination of both
We recommend that friction piers of minimum 18 inches in
diameter be designed for a concrete to soil skin friction value
of 500 psf for the top 10 feet of the pier depth Below a
depth of 10 feet, we recommend that the piers be designed for a
-
concrete to soil skin friction value of 1,000 psf.
Piers with minimum diameters of 30 inches can be designed
S for the above skin friction values plus an additional end
bearing value of 10,000 psf. All end bearing pierbottoms
should be carefully ,cleaned of all loose material We recom-
mend that all pier excavations be. inspected by Woodward-Clyde
consultants before placement of steel or concrete to further
evaluate soil conditions and cleanliness.
The weight of the piers themselves cn be neglected in
computing design downward loads.
1 We recommend that the clear distance between all adjacent
'foundations (shallow,' or deep) be equal to or greater than the
difference in elevations of bottoms of the foundations.
• Uplift Resistance Vertical upward loads can be resisted
br skin friction along the perimeters of drilled piers For
thispurpose, we recommend that drilled, cast-in-place piers be
designed for the concrete to soil skin friction values pre-
6
Project No 51192APs01 Woodward-Clyde Consultants
sented above under '.'Download." The weight of th6 piers can be
added to the total computed uplift resistance.
Lateral Load Design. Drilled piers can be designed to
• resist horizontal loads applied to the pier at or above the
ground surface. For this purpose, we recommend that the piers
be "designed for an equivalent fluid pressure of 400 pcf acting
on- a surface with a width equal to twice the pier diameter.
• The upper 12 inches, of material in areas not protected by
' •• pavement should not be included in design for passive resist-
ance to lateral loads.
.
Friction along . the base. of pier caps founded on undis-
turbed formational soils can be used to assist in resisting
lateral loads. We recommend that the values provided for
shallow foundations be used for this purpose..
:_ :'' .
O . .. Pavements .
•.. ' Recommendations are provided for asphalt pavements at the
- site inthe event that portions of the existing. pavement are
removed during construction and need to be replaced
I •.Werecomménd that,all subgrade areas consist of granular',
• dense, undisturbed native material or properly compacted fill
material consisting of granular, nonepansive soils similar .to
-
- , those available at the . site. We recommend that. the, top
6 inches't of the subgrade in both the dit and fill areas be
. compacted to at least 95. percent of the maximum. laboratory dry'
density. •
'. .
'Reultsof. laboratory strength tests performed on a sample
- of the'Santiago Formation sands indicate an R-,value of 70. For
. . - design purposes, we have used an R-value of 35. Our past
- , experience indicates similar sands can have.R-values as low as
• - -
30.. The test results, as submitted to us by Testing Engi-
- peers - San Diego, are included in 'Appendix B. '
We have assumed a - design traffic index :(TI) value of 4.,5
using the,California Department of Transportation guidelines.
.
';''-i.
. . H
• 7
Project No. 51192A-PS01 Woodward.CydeConsuftants
S ..
S.. . Based on the above assumptions, we recommend that pavement
• Sections consist of 3 inches of asphaltic concrete on 4 inches
of Class II aggregate base. This design assumes a pavement
S life of 20 years with normal maintenance.
We recommend that asphaltic concrete be provided and
• placed in accordance with Section 39 of the "Standard Specifi-
cations"of the State of California, Department of Transporta-
S tion. We cfurther recommend that asphaltic concrete utilize
5 . . AR8000 asphaltic cement.
• We recommend that Class II aggregate base be in general
. conformance with Section 26-1.02B of the Standard Specifica- Si. " tions of the Stae'ofCaiifôrñia Deartmentof Transportation.
. We recommend that. a mix design be made for asphaltic
concrete by an engineering company specializing in this tye of
5. . work, and that the paving operations be'inspcted' by a quali-
fied testing laboratory. -
. - - . We recommend that adequate surface drainage be provided to
reduce ponding and infiltration of water into the subgrâde
materials. We suggest that paved areas have a minimum gradient
S.. , of 1 percent. It is important to provide adequate drainag to
• 'reduce possible future depressions that could eventually leadS
to ponding and possible distress of the pavement section.
- UNCERTAINTY AND LIMITATIONS
. We have observed only a small portion of the pertinent
. . soil conditions at the site. The recommendations made herein
-. are based. on the assumption that soil conditions do not deviate
• appreciably from those found during our field investigation.' 5 We recommend that Woodward-Clyde Consultants review the founda-
tion plans to verify that the intent of the recommend atidns
• presented herein has been properly interpreted and incorporated
• into • the contract documents. We further recommend that Wood-
-
. ward-Clyde Consultants observe the subgrade preparation under
. paved areas and foundation excavations. If the plans for site.
S ..•
8
Project No. 51192A-PS01 Woodward-Clyde Cónsuftants
...: .'
development are changed, or if variations or undesirable geo-
technical conditions are encountered during construction, we
should be consulted for further recommendations. •
This .report is intended for design purposes only and may
not.be.sufficient to prepare an accurate bid.
California, including San Diego, is an area of high seis-
mic risk. It is generally considered economically unfeasible
to build a totally earthquake-resistant project, it is there-
,fore possible' that a large or nearby earthquake could cause
danage at' the site.
Geotechnical engineering and the geologic sciences are
characterized by uncertainty Professional judgments presented
herein are• based partly on our evaluations of the technical
information gathered, partly on our understanding of the pro-
0 '•: - posed construction,' and partly on our general experience. Our.
engineering work and judgments rendered meet current profes-
sional standards, we do not guarantee the performance of the
project in any respect
- This firm does not practice dr consult in the field of'
S safety engineering. We do not direct the contractor's opera-
tions, and we cannot be responsible for the safety of personnel
other than our own on the site, the safety of others is the
responsibility of the contractor. The contractor should notify
the owner if he considers any of the recommended actions
•pre-
sented herein to be unsafe..
•
fi •fl-
.. .:- ••'• •.'. ' fi ' I . • fi •,
9
- fi, -. - fi fi, -• fi • • fi -
Project No 51192APS01 Woodward C'yde Consultants
I
APPENDIX A -
Field Investigation - I
I
-
Three explor'ator borings were advanced at 'the cipproximate locations shown on the Site Plan (Figure 1). The drilling was
performed on May 7, 1982, using a 6-inch diameter, continuous-
flight power auger.
• Samples' of the subsurface materials were obtained from. the borings using a modified California drive sampler (2-inch
- inside diameter and 21-,-inch outside diameter) with thin brass
- liners. The sampler was generally driven 18 inches into the
- material at the bottom of the hole by a 140-pound hammer fal-
ling 30 inches; thin metal liner' tubes containing the sample
were. rthnoved from the sampler, sealed to preserve the natural
.; • .-moisture content of 'the sample, and returned to the laboratory.
for examination and testing. -
-- The. location -of each boring and the elevation of the ground
surface at each location were estimated from the plans provided
to us.
• '.. -.. =
:'..- •.. ' •• . -* ' ;
- A-i
Elevation
DEIN PTH DATA
OTHERI
SAMPLE
J
SO IL DESC RIPTION
FEET L~~_Cc J . TESTS NUMBER
12 110 65 1 Very dense, damp, brown silty sand (SM)
2
f .:J'IiI.iii
S
- ,
WATER LEVEL
At time of drilling or as indicated.
• ' SOIL CLASSIFICATION
Soil Classifications are based on the Unified Soil Classification System
and include color, moisture and consistency. Field descriptions have . -
- been modified to reflect results of laboratory analyses where
5',
• . appropriate.
- 5•.'
'.
- DISTURBED SAMPLE LOCATION
S Obtained by collecting the auger cuttings in a plastic or cloth bag.
. •, DRIVE SAMPLE LOCATION
- S . MODIFIED CALIFORNIA SAMPLER
S
.• - ' Sample with recorded blows per foot was obtained with a Modified . -- ..• •. '•
5' California drive sampler (2" inside diameter, 2.5" outside diameter)
. - ' . lined with sample tubes. TIe sampler was driven into the soil at the
bottom of the hole with a 140 pound hammer failing 30 inches.
---
-
.5
INDICATES SAMPLE TESTED FOR OTHER PROPERTIES
-
- . GS - Grain Size Distribution CT - Consolidation Test
- . . LC— Laboratory Compaction UCS— Unconfined Compression Test
Test SDS - Slow Direct Shear Test
. . .
.
- P1 - Atterberg Limits Test - DS - Direct Shear Test
ST - Loaded-Swell Test TX - Triaxial Compression Test
. .5 CC— Confined Compression 'R'— R—Valué - .
- Tess
NOTE: In this column the results of these tests may be recorded
.: - - -
•
where applicable.
BLOW COUNT
Number of blows needed to advance sampler one foot or as indicated.
- -
. DRY DENSITY
Pounds per Cubic Foot
.
. . MOISTURE CONTENT - % S ' - Percent of Dry Weight
S.
NOTES ONFIELD INVESTIGATION
1. REFUSAL indicates the inability to extend excavation, practically,
-, with equipment being used in the investigation.
54
KEY TOLOGS
I _
$ THE GROVE APARTMENTS PARKING STRUCTURE
[DRAWN BY: mrk CHECKED B I .,I PROJECTNO:51192A-PsO1 IDATE:5-17-82 __FIGURENO:A-i -
- . • - - - S isin a n~ a fl n ^2 Sun r an &lflhi . * •1a
- - . . . . .
.•- . VVUULIV1MflIJbL TUC I.U!UL I Mu I
V17
.i
Boring 1
• - Approximate El. 106' ____ ______
DATA'OTHER SOIL D E S C R I PT 10 N
PTH TEST {
IN
-BC EET *MC TESTS NUMBER DD
. 1-1 2" Asphalt Concrete
37 1-2 I
- Damp, gray brown silty sand
- •; 31 GS,PI 1-3 BASE. • - 1-4
Dense, damp, mottled gray brown clayey
• , - 1-5 [ L sand(SC) SANTIAGO FORMATION
S 65
C
16 f Stiff to hard, moist to wet, dark gray
- 1-7 silty clay (CH), jointed
I SANTIAGO FORMATION
Dense, damp, light brown silty sand (SM) -
• SANTIAGO FORMATION
10 - 50/4' 1-8 _________________________________________________
Stiff, moist, dark gray sandy clay (CL-CH) S 1-9 -[
SANTIAGO FORMATION
Very dense, moist, gray silty fine to l_lo[
medium sand (SM-SP) with gravels to 4
diameter at 8-9' SANTIAGO FORMATION
I 15
Very dense, moist, gray clayey fine sand - 50/ 1-11
3 to fine sandy clay (SC-CL)
3 SANTIAGO FORMATION
Very dense, moist, light gray silty fine
• to medium sand (SM-SP)
20 -
-
SANTIAGO FORMATION
Bottom of Hole -
.-
- .25 - -
$
• 30
I 35-
40- -
'For description of symbo's, see Figure A-1 - -
• LOG OF TEST BORING 1 -
• THE GROVE APARTMENTS - PARKING STRUCTURE
:DRAWNBV: mrk CHECKEDBAJI PROJECTNO: 51192AP501 DATE:: 5-17-82 FIGURENO:'A-2
---- •, - j---
WaUDWARD-CLYDE CONSULTANTS
Boring 2
Approximate El. 104'
SOIL DESCRIPTION
.
1-3/4" Asphalt Concrete
Damp, brown silty sand
BASE
Very dense, damp, olive brown to reddish
brown silty fine' sand (SM-SP)
SANTIAGO FORMATION
Becoming sandy
Very dense, moist, dark gray clayey to
silty sand (SC-SM) -
SANTIAGO FORMATION
Very 'stiff, moist, gray brown silty clay
(CH) , - •SANTIAGO FORMATION
-.. . .
Very dense, moist, dark gray clayey to
silty sand, (SC-SM)
SANTIAGO FORMATION
Bottom of Hole
- ror uescriptrori or ymoous, SUV rryur A-i' -
" LOG OF TEST BORING 2
-
- , THE GROVE APARTMENTS - PARKING STRUCTURE
DRAWN BY: mrk,1 CHECKED B PROJECT NO: 51192A-PS01 I DATE: 5-17-82 FIGURE NO: A-3
WOODWARD-CLYDE CONSULTANTS"
Boring
-
S Approximate El. 105'
• 3-1 2'' Asphalt Concrete
- 24
Damp, brown silty sand
S BASE '
Medium dense, moist, gray clayay sand to
-.5
5
-5 3-4 [ sandy clay (SC-CL) -' - -
27 95 41 UCS= 35 SANTIAGO FORMATION
5
- 3117 Medium dense, moist, light brown silty
•. psf sand (SM) SANTIAGO FORMATION
5,
3-6 E Very stiff, moist, gray silty clay (CL-CH)
10- SANTIAGO FORMATION
45 3-7 1
3-
8 15 -
3-9 Very stiff, moist, dark gray sandy clay
.
39
- S
; 5 5 (CL) and dense, gray clayey. sand (SC)
.5 interlayèred SANTIAGO FORMATION
S
20 -
- 41 3-10
• 3-11[
Very dense, moist, gray, silty to clayey 25 -
•
64 3-12] sand (SM-SC) SANTIAGO FORMATION
3_13[
I
30 T 79/6" .3-14jW
- .
-
•. Bottom of Hole
-
35 -
5 5- 5 -
•
.40- '
• For description
-S
;f symbols, see Figure A—i -
-
5
. :-•.
. .•• WOODWARD•CLYOE CONSULTANTS ,
IN
FEET
I.DEPTH TEST DATA OTHER
TESTS
SAMPLE
NUMBER SOIL DESCRIPTION
I .._
Woodward-Clyde Consugtants
APPENDIX B
Laboratory-Tests .
The materials observed in the borings were visually classified.
and.èval,uated with respect to strength, swelling, and compres-
sibility characteristics, dry density, and moisture content. The classifications were substantiated by performing grain size
analyses and evaluating plasticity characteristics of repre-
sentative samples of the soils
S The strength of the soils was evaluated by'performing an uncon-
• fined compression test and a direct shear test on selected
samples, and by considering the density andmoisture content of
-the aples and the penetration resistance of the sampler. A subgrade strength (R-value) test was performed on a sample of
the-pavement subgrade soils. . The. grain size distribution curves are shown in • Figure B-l.
. Th&results of the R-.value tests, as submitted to us by Testing
•
- Engineers.- San Diego, are presented in Figure B-2.
I
COBBLES
GRAVEL SAND I
SILT and CLAY Coarse Fine jCoarsej Medium Fine
Mesh Opening - Ins Sieve Sizes Hydrometer Analysis
3 I I - . 100
90
80
70
.60
r.
.c
•
30
• 20
• IC
0
- 100 50 10.0 50 lO 0.1 005 00I 0.005 000I
GRAIN SIZE IN MILLIMETERS
SAMPLE CLASSIFICATION AND SYMBOL *LL *PI
Silty clay (CH) 74 52
2-2 Silty fine sand (SM) - -
*LL - Liquid Limit
*PI - Plasticity Index
S
'/CC- GS-76
GRAIN SIZE DISTRIBUTION CURVES - THE GROVE APARTMENTS,- PARKING STRUCTURE
DRAWN BY: mrk CHECKEDB),IAJ PROJECT NO: 51192A—PS01 I DATE:. 5-18-82 FIGURE NO: B-i
I IAIflflflWADflPIVflC rflhaeIIITAIaTt
- . FORM 6 JP
FIGURE B-2
9 Testing Engineers—San Diego ot ,
3467KurtzSt,PO Box 80985 San Diego,. Ca 92138 (714)225-9641
1903 West Vista Way, Unit B, Vista, California 92083 (714) 758-3730
LABORATORY NUMBER 5D37-1449 REPORT OF SOIL TESTS DATE may 18, 1982
JOB DATA: File #507,, Job #5il92A PS01. : , SAMPLE DATA: Soil sample submitted
- . - to the laboratory on May. 10, 198
PROJECT: 'The Grove'Apartments Parking Structure . and identified as Sack 2-4...
jIENT: Woodward-Clyde Consultants
3467 Kurtz:Stréet
' San Diego,' California
R-VALUE DATA -
A B- C
MPAcTOR PRESS - P.S:I. ' 350 ' 350' .350
MOIST @COMPACTION -% 12.0 12.8, 13.7
ENSITY-#/CU.FT. . -119.8 119.0 . 117.7
VALUE 81 70 52'
Exuo. PRESSURE'- P.S.I. . 660 --' 300 200
STAB. THICK -FEET ' '0.27 0.43 0.69
EXPAN.'PRESS.THICK-FEET
e.
0.60 0.10 .0.03
TI. (ASSUMED) = • 45 '
W BY STAB. @ 300 P.5.1. Exuo. = 70 .
' > By EXPANSION PRESSURE, = 78
-
AT EQUILIBRIUM = ' 70 .
,AND EQUIVALENT
BEARING VALUE (CALIFORNIA HIGHWAY METHOD)
COMPACTED AND SOAKED FOUR DAYS'' D
PENETRATION ' STANDARD
INCHES P.S.I. P.S.I. 'STA
0.1 ' 1000
0.2 1500
0.3 ,' 1900
0.4 - - 2300
0.5 2600
MOISTURE AF-1-ER SOAKING ...................
EXPANSION ...............................
— COMPACTION TEST: • '
METHOD - CALIFORNIA BEARING
— OPTIMUM MOISTURE ............................
OPTIMUM DRY DENSITY. LBS.ICU. FT................
— PLASTIC CHARACTERISTICS:
LIQUID LIMIT
PLASTIC LIMIT
PLASTICITY INDEX
TESTING ENGINEERS DIEGO
REVIEWED BY 1 , /
//-'(
T. 111. Cptha R.C.E. #12882
-
Boring
:o • Hard, dry,d3rk gray sandy clay (CH)
• .. Porous
Hard, damp, light gray sandy day
(CH)
5_ Very dense, moist, light gray-brown
• sandy clay to clayey sand (CL-Sc)
Eocene
Sediments
10- 20. Very dense, damp, light gray clayey
• sand (SC)
• 15ca
Cn
70
Very dense, moist, light gray-brown • 20— silty sand (4-SP) with thin clay
stringers
CL
Very dense, moist, light gray silty
• 35 sand (v1)
I, 0—'
Continued on next page
* For'Legend, see Fig 6 LOG CFTEST BORING t
HOSP GROVE
W000t4ARD - GIZIENSKI & ASSOCIATES
CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS.:
SAN DIEGO, CALIFORNIA
I
- DR. BY: G AP1'ROXI SCALE: I" = ry 1PR0J. HO: 72-105-20
ilia-- 5 CK'D BY:/V' DATE; 7/18/72 lfiiREJO: •
-_)
Boring L, Continued
40 ---
------
, Same as Before
.4-I
Very dense, moist, light brown '.-
- gravelly coarse sand (SP-SW)
45 Clay Seam Hard, moist, dark gray silty clay
WCH)
•• W 9- I6N
Very dense, moist, light brown silty Eocene oarse sand (5)
Sediments
Firm, moist, dark gray silty clay (CH)
L. 50 Dense, moist, brown clayey sand (Sc)
0
Very stiff to hard, black silty
CL
55 — clay (CH)
70
-.
LEGEND:
(SM) = Group classification symbol in accordance with
the Unified SoilCiassification System.
= Water Level at time of drilling, •. .
= Water Level as noted at bottom of log.
• LOG OF TEST BORING L, CONTINUED
HOSP GROVE
WOODARD - GIZIENSKI & ASSOCIATES
CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS
SAN DIEGO, CALIFORNIA
. DR. BY: OS APPROX. SCALE: I" = 5' j PROJ. NO: 72-105-20
CK'D BY: /!44J DATE; 7/18/72 FIGURE N0 .6 -
Very stiff, mist, light gray silty 1
clay (CH)
Very dense, moist, light, gray clayey
silt (ML)
Very dense, mist, light gray silty
sand (4)
Hard, moist, brown silty clay (CH)
Very dense, moist, light,gray silty
sand() -
—Water Seep
Very stiff, saturated, brown silty
cl y(cH)
Hafd, mist, brown silty clay (01)
if *14 hours after drilling
Eocene
Sediments
Boring 7
0
riara, ary, gray siiiy ciay k uij rorous
Dense, nioist,gray-brown clayey sand
(Sc)
Terrace
5 Deposits
• :.
a)- -.
U.. 15-
-, I
.5, C) (0•
C,)
• .20- . - C
0
5)
ca 30_
-
0. 5) •
-
35
- .
. Clay Seam - 145 E-W
uN
••
-50—
'For Legend, see Fig. 6 HOSP GROVE
., ..
LOG OF TEST BORING 7.
JOODt1ARD - GIZIENSKI & ASSOCIATES..
CONSULTING SOIL AND FOUNDATION ENGINEERS AND GEOLOGISTS SAN DIEGO, CALIFORNIA
DR. BY: GS APPROX. SCALE: I" = 5' 1 PROJ. 1O 72-105-20
* CK'D BY: t'hl DATE: 7/1 9/72 FIGURE NO: 9