HomeMy WebLinkAbout2320 CAMINO VIDA ROBLE; ; CB070758; Permit05-02-2007
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No
Building Inspection Request Line (760) 602-2725
CB070758
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
Project Title
Applicant
LUND RICHARD
2320 CAMINO VIDA ROBLE CBAD
Tl Sub Type
2130500800 Lot#
$1 452 360 00 Construction Type
Reference #
LUXTERA INC 41 496 SF OFFICE
OFFICE SLIGHT MANUFACTURING
INDUST
0 Status
Applied
Entered By
Plan Approved
Issued
Inspect Area
Plan Check*
Owner
R J VIDA ROBLE INVESTORS L L C
ISSUED
03/20/2007
KG
05/02/2007
05/02/2007
3970 SORRENTO VALLEY BLVD
SAN DIEGO CA 92121
6199202134
2333 STATE ST #200
CARLSBAD CA 92008
Building Permit
Add I Building Permit Fee
Plan Check
Add I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add I Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add I Pot Water Con Fee
Reel Water Con Fee
IN STORAGE$S QQATTACHED $000
$3 995 34 Meter Size
$0 00 Add I Reel Water Con Fee
$2 596 97 Meter Fee
$0 00 SDCWA Fee
$0 00 CFD Payoff Fee
$30500 PFF (3105540)
$0 00 PFF(4305540)
$000 License Tax (3104193)
$0 00 License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
$0 00 Redev Parking Fee
$0 00 Additional Fees
HMP Fee
TOTAL PERMIT FEES
$000
$000
$000
$000
$000
$000
$000
$000
$000
$000
$251 00
$2000
$5050
$000
$000
$000
$000
77
$721881
Total Fees $7 218 81 Total Payments To Date $721881 Balance Due $000
Inspector
FINAL APPROVAL
Date Clearance
NOTICE Please take NOTICE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively
referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack
review set aside void or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired