HomeMy WebLinkAbout2320 Faraday Ave; 150; CBC2018-0650; Recycle(ci~of NONRESIDENTIAL GREEN Develotz.ment Services
BUILDING CODE STANDARDS Building Division
MANDATORY MEASURES 1635 Faraday Avenue Carlsbad CERTIFICATION CHECKLIST 760-602-2719
B-52 www.carlsbadca.gov
This form, signed and completed, and all receipts for the recycled materials shall be
submitted to the Bui/ding Inspector prior to Fina/ Inspection.
Site Development Mandatory
5.106.1 Storm water pollution prevention plan. For projects of one acre or less, develop a Storm
Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to (X)
the State Storm water NPDES Construction Permit or local ordinance, whichever is stricter, as is
required for projects over one acre. The plan should cover prevention of soil loss by storm water
run-off and/or wind erosion, of sedimentation and/or of dust/oarticulate matter air oollution.
5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or ( X)
meet local ordinance, whichever is stricter.
5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic, provide
permanently anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to (X)
passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two-
bike capacity rack.
5.106.4.2 Long Term bicycle parking. For buildings with over 10 tenant-occupants, provide secure
bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum (X)
of one space.
5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting,
fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.3.1. (X)
5.106.8 Light pollution reduction. Comply with lighting power requirements in the California
Energy Code and design interior lighting such that zero direct-beam illumination leaves the building (X)
site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 1-4 as defined in
Chapter 10 of the California Administrative Code, using the following strategies:
1. Shield all exterior luminaries or use cutoff luminaries (X)
2. Contain interior lighting within each source (X)
3. Allow no more than .01 horizontal foot candle 15ft. beyond the site (X)
4. Contain all exterior lighting within property boundaries (X)
Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking
facilities and walkwavs.
5.106.10 Grading and paving. The site shall be planned and developed to keep surface water
away from buildings. Construction plans shall indicate how site grading or drainage system will (X)
manasie all surface water flows.
Water Efficiency and Conservation
Indoor Water Use
5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503.1. 1 (X)
through 503.1.3.
5303.1.1 Buildings in excess of 50,000 square feet. Separate sub-meters shall be installed as
follows: (X) 1. For each individual leased, rented, or other tenant space within the building projected to
consume
more than 100 gal/day.
2. For spaces used for laundry or cleaners, restaurant or food service, medical or dental office,
laboratorv or beautv salon or barber shoo oroiected to consume more than 100 aal/dav.
B-52 Page 1 of 5 Rev. 5/17
5.303.1.2 Excess consumption. Any building within a project or space within a building that is
projected to consume more than 1,000 gal/day. (X)
5.303 Percent savings. A schedule of plumbing fixtures and fixture fittings that will reduce the
overall use of potable water within the building by 20 percent shall be provided (Calculate (X)
savings by Waler Use Worksheets or utilize Table 5.303.2.3).
5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are
served by more than one showerhead, the combined flow rate of all the showerheads shall not (X)
exceed the maximum flow rates specified in the 20 percent reduction column contained in
Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in
operation at a time.
5.303.6 Plumbing fixtures and fittings. Plumbing fixtures (water closets
and urinals) and fittings (faucets and showerheads) shall comply with the requirements listed As applicable
for each type in items listed in Table 5.303.6.
1. Water closets (toilets) -flushometer type (X)
2. Water closets (toilets) -tank type (X)
3. Urinals (X)
4. Public lavatory faucets (X)
5. Public metering self-closing faucets (X)
6. Residential bathroom lavatory sink faucets (X)
7. Residential bathroom lavatory sinks (X)
8. Residential showerheads (X)
9. Sinqle shower fixtures served bv more than one showerhead (X)
Outdoor Water Use
5.304.1 Water Budget. A water budget shall be developed for landscaping irrigation use. (X)
5.304.2 Outdoor potable water use. For new water service, separate meters or submeters
shall be installed for indoor and outdoor potable water use for landscaped areas between
1,000 and 5,000 square feet. (X)
5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500
square feet of landscaped area (the level at which the MLO applies), install irrigation controllers
and sensors which include the following criteria and meet manufacturer's recommendations.
5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of
final inspection shall comply with the following:
1. Controllers shall be weather-or soil moisture-based controllers that automatically adjust
irrigation in response to changes in plant's needs as weather conditions change. (X)
2. Weather based controllers without integral rain sensors or communication systems that As applicable
account for local rainfall shall have separate wired or wireless rain sensors which connects or (X)
communicates with the controller(s). Soil moisture-based controllers are not required to have
rain sensor input.
Construction Waste Management Plan
5.408.1 Construction waste diversion. Establish a construction waste management plan or
(X)
meet local ordinance, whichever is more stringent. (X)
5.408.2 Construction waste management plan. Submit plan per this section to enforcement
authority within the city.
5.408.1.4 Documentation. Provide documentation of the waste management plan (see form (X) 8-59) that meets the requirements listed in Section 5.408. 1.1 thru 5.408.1.3 and the plan is
accessible to the enforcement authority.
5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of
nonhazardous construction and demolition debris or meet local ordinance, whichever is more
stringent. (X) Exceptions:
1. Excavated soil and land-clearing debris
2. Alternate waste reduction methods, developed by working with local agencies if
diversion or recycle facilities capable of compliance with this item do not exist.
5.408.3 Excavated soil and land clearina debris. 100 percent of trees. Stumps, rocks and
8-52 Page 2 of 5 Rev. 5/17
I
I
associated vegetation and soils resulting primarily from land clearing shall be reused or
recycled.
Building Maintenance and Operation
5.410.1 Recycling by occupants. Provide readily accessible areas that serve the entire
building and are identified for the depositing, storage and collection of nonhazardous materials (X)
for recycling.
5.410.2 Commissioning. For new buildings 10,000 square feet and over, building (X)
commissioning for all building systems covered by T24, Part 6, process systems and
renewable energy systems shall be included in the design and construction processes of the
building project. Commissioning requirements shall include items listed in Section 5.410.2. -
5.410.2.6 (X)
5.410.2.1 Owner"s Project Requirements (OPR). Documented before the design phase of
the project begins the QPR shall include items listed in Section 5.410.4. (X)
5.410.2.2 Basis of Design (BOD). A written explanation of how the design of the building
systems meets the OPR shall be completed at the design phase of the building project and
updated periodically to cover the systems listed in Section 5.410.2.2. (X)
5.410.2.3 Commissioning plan. A commissioning plan describing how the project will be
commissioned shall be started during the design phase of the building project and shall include
items listed in Section 5.410.2.3. (X)
5.410.2.4 Functional performance testing shall demonstrate the correct installation and
operation of each component, system and system-to-system interface in accordance with the ( X)
approved plans and specifications.
5.410.2.5 Documentation and training. A Systems manual and systems operations training
are required. (X)
5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or
representative and facilities operator and shall include the items listed in Section 5.410.2. 5. 1. (X)
5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff
for each equipment type and/or system shall include items listed in Section 5.410.2.5.2. (X)
5.410.2.6 Commissioning report. A complete report of commissioning process activities
undertaken through the design, construction and reporting recommendations for post
construction phases of the building project shall be completed and provided to the owner or
representative.
5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for (X)
buildings less
than 10,000 square feet.
5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. (X)
Systems to be included for testing and adjusting shall include, as applicable to the project, the
systems listed in Section 5.410.3.2. (X)
5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry
best practices and applicable national standards on each system. (X)
5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or
space is operated for normal use, the system should be balanced in accordance with the
procedures defined by national standards listed in Section 5.410. 3. 3. 1. (X)
5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report (X)
of testing signed by the individual responsible for performing those services.
maintenance instructions and copies of guaranties/warranties for each system prior to final
inspection.
5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed
operating and maintenance manual
5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports
required by the enforcina agency.
8-52 Page 3 of 5 Rev. 5/17
I
Environmental Quality
Fireplaces
5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a (X)
sealed woodstove and refer to residential requirements in the California Energy Code, Title 24,
Part 6, Subchapter 7, Section 150. As Applicable
5.503.1.1 Woodstoves. Woodstoves shall comply with US EPA Phase II emission limits. ( X)
Weather Resistance and Moisture Management
5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope
as required by California Building Code Section 1403.2 and California Energy Code Section 150, (X)
manufacturer's installation instruction instructions or local ordinance, whichever is more stringent.
5.407.2 Moisture control. Employ moisture control measured by the following methods:
5.407 .2.1 Sprinklers. Prevent irrigation spray on structures. (X)
5.407 .2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion (X)
into buildings.
PoUution Control
5.504.3 Covering of duct openings and protection of mechanical equipment during
construction. At the time of rough installation or during storage on the construction site and until
final start up of the heating and cooling equipment, all duct and other related air distribution (X)
component openings shall be covered with tape, plastic, sheet metal or other methods to reduce
the amount of debris or duct which mav collect in the svstem.
5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly occupied areas of the
buildina with outside and return air orior to occuoancv that orovides at least a MERV of 8.
5.504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1
through 5.504.4.6
5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet
the requirements of the following standards: (X)
1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and
caulks shall comply with local or regional air pollution control or air quality management
district rules where applicable or SCAQMD Rule 1168 VOC limits as shown in Tables
5.504.4.1 and 5.504.4.2.
2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking
compounds (in units of product, less packaging, which do not weigh more than one pound
and do not consist of more than 16 fluid ounces) shall comply with statewide VOC
standards and other requirements, including prohibitions on use of certain toxic
compounds, of California Code of Regulations, Title 17, commencing with Section 94507.
5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3
5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product-
Weighted MIR limits for ROC in Section 94522 (a)(3) and other requirements, including prohibition
on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520
et seq.).
5.504.4 Carpet systems. All carpet installed in the building interior shall meet the testing and
product requirements of one of the standards listed in Section 5. 504.4.4.
50504.4.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the
requirements of the Carpet and Rug Institute Green Label Program.
5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 804.4.1.
5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density
fiberboard composite wood products used on the interior or exterior of the building shall meet the
requirements for formaldehyde as specified in Table 5.504.4.
5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as
requested by the enforcing agency. Documentation shall include at least one of the following:
1. Product certification and specifications
2. Chain of custody certifications -
3. Other methods acceptable to the enforcing agency
5.504.4.6 Resilient flooring systems. Comply with the voe emission limits defined in the 2009 (X)
CHPS criteria and listed on its Low-emitting Materials List (or product registry) or certified under
the FloorScore proqram of the Resilient Floor Coverina Institute.
B-52 Page 4 of 5 Rev. 5/17
;
\
Indoor Moisture and Radon Control
5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California
Buildina Code, Title 24 Part 2, Sections 1203 /Ventilation) Chaoter 14.1. (X)
Air quality and Exhaust
5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the (X)
minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and
Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent
5.506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation,
CO2 sensors and ventilation controls shall be specified and installed in accordance with the (X)
reauirements of the latest edition of the California Enerav Code, Title 24, Part 6, Section 120.1.(C) (4).
Outdoor Air Quality
5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and
fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. As
5.508.1 CFCs. Install HVAC and refrigeration equipment that does not contain CFCs. applicable
5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. (X)
(X)
I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items
listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016
California Green Building Standards. All receipts for recycled materials have been attached to this form.
Project Address: )"?)j) Fq~ k ~#{;~~ '"mW cJcJu1J-OJ,<(l
Print Name: Pkt"p U ;/ ti~ M Signed: ,_ ///
fY
License Number: & tyoc;r r Date: K:).7-r1
B-52 Page 5 of 5 Rev. 5/17
'
)
{'city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
De_11~/qp~f!lent Services_
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Section 4.408.1 and Section 5.408.l of the 2016 California Green Building Standards requires at least 65% of non-hazardous
construction debris is recycled and/or salvaged for reuse.
With the submitting of your application for a Building Permit or permit issuance, you must have completed a Construction Waste
Management Plan (CWMP) demonstrating how you will recycle a minimum of 65% of the construction waste generated from
your project.
NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to
collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working
with the City's franchised hauler, Waste Management, one cumulative project receipt is acceptable. However, it is the
Applicant's responsibility to confirm that the bins are collected for C&D Recycling.
1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper
storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible.
2. Waste Management Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The
commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and
create receipt(s), to demonstrate the project has met a 65% diversion rate or greater.
3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with, the City's exclusive
franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for
particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible.
4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up
companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion
receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to
http://www.sandiego.gov/environmental-services/recycling/cd/index.shtml.
5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded
from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source
Separated Recycling Facility.
Part 1 -Before the Project Begins
Prior to issuance of a Building Permit, Applicant must submit PART 1 of the Construction Waste Management Plan (CWMP) Table.
a. Submit completed and signed form to City with Building Permit application.
Part 2 -During and After the Project
Prior to receiving inspection for final sign off of the Building Permit or Certificate of Occupancy, Applicant must submit the fully
completed and approved PART 2 of the Construction Waste Management Plan (CWMP) Table.
a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where
materials were taken.
b. Complete the Debris Recycling Report (DRR) as your project progresses. Recycling/diversion goals are (at a minimum)
65% of the waste generated by your project.
c. Return completed form to: City of Carlsbad Building Division -1635 Faraday Ave, Carlsbad, CA 92008 or your inspector
prior to requesting final inspection.
Rev. 11112/18
Ccityof
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
8-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Many of the materials generated from your project can be recycled. You are required to list materials that will be
reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing
this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building
Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be
used for all construction projects within the City of Carlsbad.
PART l Complete and submit this form when applying for a Building Permit. Note: Permits will Mt be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. ______________ Project Title
Project Address ___________________________ APN
Applicant Name ------------------~ 0
Last First
Contractor
0
Architect Other
00--
ApplicantAddress -------------------------------------
Phone ~--~---------E-mail Address
Applicant Mailing Address
(if different than project address)
Project Type
{check all that apply):
Brief Description
Resldentlal Commercial
D □
Project Size ____________ Estimated Cost of Project$ _________________ _
(square footage)
Please check the appropriate box:
DI plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
DI plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name ______________ .Signature ______________ Date
•
Page 1 of4 Rev. 11112/18
•
.'
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
(cont'd) not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
___________ Project Title
_________________________ .APN
______________________ .Phone
Material Type
Complete this fine of the table only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&O Debris
Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Car et
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Roofing Materials
Sera Metal
Stucco
Other:
TOTAL =
Estimated
Waste Quantity
(tons)
First
Place a ( ✓) check
next to items to be
reused or salvaged
B
Place a ( ✓) check next
to items to be
recycled
C
Place a(✓) check next
to items to be
disposed at landfill
To meet 65% Diversion Requirement (estimate) -------~x 0.65 = ___________ tons
Total Estimated Waste from above Minimum Required Diversion
Contractor/Owner Signature _________________ ,Date
Page 2 of 4 Rev. 11112118
PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final
building approval,
DEBRIS RECYCLING REPORT (ACTUAL):
Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
Reused or Recycled Disposed in (Name, Address, Phone)
Salvaged Landfill
Examf!.le: Palomar Transfer Station, 5960 El
01/05/2018 Concrete (broken) 5 tons
Diversion Rate Achieved ________ J ___________ = _____ %
Total of columns A+ B al of columns A+ B + C DIVERSION
Contractor/Owner Signature,~~~~=======~==Date ;)-) t · f 1
Attach the following docum ntation to this Report:
Original recycling weight tickets, landfill weight tickets
Original donation receipts with photos and/or itemized descriptions
Any other relevant information to support Recycling Report
Return completed form and documentation to:
City of Carlsbad
Building Division {1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
"
Page 3 of 4 Rev. 11/12118
•
Conversion Table for Common Construction Waste
This document is informational onlv. It is here to helo vou convert truckload auantitles to tons. if necessarv.
Column A Column B Column C
Category Material Volume Tons[Unit Tons
Mixed Debris Construction cy X 0.18 =
Demolition cy X 1.19 =
Asphalt/Concrete Asphalt (broken) cy X 0.70 =
Concrete (broken) cy X 1.20 =
Concrete (solid slab) cy X 1.30 =
Brick/Masonry/Tile Brick (broken) cy X 0.70 =
Brick (whole, palletized) cy X 1.51 =
Masonry brick (broken) cy X 0.60 =
Tile sq ft X 0.00175 =
Building Materials (cabinets, doors, windows, etc.) cy X 0.15 =
Cardboard (flat) cy X 0.05 =
Carpet By square foot sq ft X 0.0005 =
By cubic yard cy X 0.30 =
Carpet Padding/Foam sq ft X 0.000125 =
Ceiling Tiles Whole (palletized) cy X 0.0003 =
Loose cy X 0.09 =
Drywall (new or used) 1/2" (by square foot) sq ft X 0.0008 =
5/8" (by square foot) sq ft X 0.00105 =
Demo/used (by cu. yd.) cy X 0.25 =
Landscape Debris (brush, trees, etc.) cy X 0.15 =
Asphalt Composition
Shingles, asphalt Shingle cy X 0.22 =
Unpainted Wood/Pallets By boa rd foot bd ft X 0.001375 =
By cubic yard cy X 0.15 =
Trash/Garbage cy X 0.18 =
Other (estimated weight) cy X estimate =
cy X estimate =
cy X estimate =
cy X estimate =
Total all =
Page 4 of4
Rev. 11/12118
Escondido Resource Recovery
1021.W Mission Ave
Escondido, CA 92025
(760) 745-3203
\0( _(~ ! ' ~ '
INVOICE
Customer: 0000 Ticket: 55899
Date: 01/23/19
In: 14:50
Out: 14:51
Truck: 6436/0000
Container:
Route: 08014
TRI. VISTA. INC Origin: 080 San Marco
Commodity
14 MIXED C & D
[Gross (In): 10,980. lbs
ESCOtlllOO RESOORCES
1044 W IJASHIOOTOO AVE ESCONDIDO, CA. 92925-1672 760-745-3203
.Sale
xxxxmxxxxx9618
VISA
Total: $
01;23119
Inv ff: IN0!l080
APPrVd: Online
~IlAl.111£ VISA
AID: A000'831010
TVR: Ill 80 00 8\l 00
TS!: F8 00
EntrY Method: ChiP
101.20
14:51:40
APPr Code: 042254
Custo1Wr' CoP't
THAlf< YOU!
Units
1.15
Scl#2
Rate
88. 00 per TON
Tare 8,680. lbs Scl#2 Net: 2,300.
PAID CREDIT CARD
Driver
ESCONDIDO
RESOURCE
· ECOVERY
AND WASTE TRANSFER SERVICE
"We'll Take Care of It"
.
ction & Demolition Diversion Certificate
Date: Q\ ~ 2-s-l9
Extended
Charge
101. 20
lbs]
·101.20
8752
Received at :Escondido Resource Recovery
Processed At: SRR Lemon Grove, CAD COi San Marcos, CA DZ]
Customer: Ticket# 5Q39q
Project: Number/Description ______________ _
Total Tons Received: l• lS Tons Diversion Percentage:
Scale house Operators Signature:_--'l:\~l'""yY\_._.=Ql_,__...,,G""1 . __
This certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance
with LEED requirements, The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility,
Escondido Resource Recovery
1021 W Mission Ave
Escondido, CA 92025
(760) 745-3203
·'/ I ,?, '/
---.---1 • ! -
INVOICE
Customer: 0000 Ticket: 48369
Date: 01/05/19
In: 15:15
Out: 15:16
Truck: 6436/0000
Container::
TRI.VISTA.INC
Units Commodity
11 SELFHAUL
[Gross (In) :
REFUSE 1.37
11,420. lbs Man Wt
ESCONDIDO RESOI.Jf<CE R 1044 IJ MASHINGTOH AVE
ESCONDIDO, CA. 92025·1672 760-745-3203
xxxxxxxxxxxx9678
VISA
Total: $
0l/05119
Inv I: 000000049
APPrvd: Online
Sale
CAP!l/1. ONE VISA
AID: A0Ml\131010
fl/R: 00 80 00 00 00
TS!: F8 00
EntrY Method: ChiP
109.60
15:16:24
APPr Code: 081406
Cu~t°",r CoPr
THIINK YOU!
Route: 01611
Origin: 016 Escondido
TON
Rate
80.00 per
Tare 8,680. lbs Stored Net: 2,740.
Extended
Charge
109.60
lbs]
ESCONDIDO
RESOURCE
ECOVERY
AND WASTE TRANSFER SERVICE
"We'll Take Care of It"
PAID CREDIT CARD 109.60
Driver
8319
Construction & Demolition Diversion Certificate
Received at :Escondido Resource Recovery Date: o/-s-1~ I:(
Processed At : SRR Lemon Grove, CA CJ COi San Marcos, CA~
Customer: Ticket# l/ g-5~ /
Project: Number/Description ______________ _
Total Tons Received: /c.,5J Tons Diversion Percentage: ? / %
Scale house Operators Signature: ,/Jl{J:/(JIIA -
This certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Escondido Resource Recovery
1021 W Mission Ave
Escondido, CA 92025
(760) 745-3203
,-.t C" /01 'b -I ~ ,._ -Ll q co
<.:,o"/o t't,. \ s .t-i -(q~ tD
INVOICE
Customer: 0000 Ticket: 58540
Date: 01/29/19
In: 11:43
Out: 11:43
Truck;: 6436/0000
Container:
TRI. VISTA. INC
Commodity
14 MIXED c·& D
[Gross(In): 11,180.
ESCOll>JDO RESOURCES 1044 W I-IASHIMiTOH AVE ESCONO!DO, CA. 92025-1672 760 -745-3203
Sale
xxxxxxxxxxxx96l8
VISA
Total: $
11129119
[nv I: 000000058
\ilPrvd: Online
:APmt 111£ VISA
II0:~1010
VR: 00 80 00 80 00
SJ: F8 00
EnlrY llethod: ChiP
110.00
11:'14:28
APPr Code: 028639
Custa.er CoP\'
THANK YOU!
Units
1. 25
lbs Scl#2
Rate
88.00 per TON
Tare 8,680. lbs Scl#2
Route: 01614
Origin: 016 Escondido
Net:
Extended
Charge
110.00
2,500. lbs]
PAID CREDIT CARD 110.00
ESCONDIDO
RESOURCE
ECOVERY
AND WASTE TRANSFER SERVICE
"We'll Take Care of It"
·Driver
8756
uction & Demolition Diversion Certificate
Received at :Escondido Resource Recovery Date:
Processed At : SRR Lemon Grove, CAD COi San Marcos, CA L5/:J
Customer: Ticket#
Project: Number/Description ______________ _
Total Tons Received: J .'l-5 Tons Diversion Percentage: ·71 %
Scale house Operators Signature:. _ __,\._.J'--· __,_n'\c..o....::::c..;r--=g::.i....,LP:,.:,,,:s,=>--
rhis certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Escondido Resource Recovery
1021 W Mission Ave
Escondido, CA 92025
(760) 745-3203
soo101 '6-1 ~ ~
0d ll q,-1'1..-I
Customer: 0000 Ticket: 33765
Date: 12/05/18
In: 12:25
Out: 12:26
TRI. VISTA. INC
Commodity
14 MIXED C & D
[Gross(In): 12,780.
Units
2.05
lbs Scl#l
Rate
88.00 per TON
Tare 8,680. lbs Scl#l
INVOICE
Truck: 6436/0000
Container..:
Route: 01614
Origin: 016 Escondido
Net:
Extended
Charge
180.40
4,100. lbs]
PAID CREDIT CARD 180.40
ESCOND IOO RESOURCE R
1044 1,1 WASHINGTON AVE ESCOIOIOO, CA. 92025-1672 760-745-3203
Sale
xxxxxxxxxxxx9678
VISA
Total: $
12105118
Inv It: MOO!l
APPrvd: Online
CAPITIV. M VISA
AID: /M0031010
TVR: 00 80 00 80 00
151: F8 00
Enlrv Method: ChiP
180.40
12:26:11
APPr Code: 08955 l
Cust11111l!'r COPY'
THANK YOU!
ESCONDIDO
RESOURCE
ECOVERY
AND WASTE TRANSFER SERVICE
"We'll Take Care of It"
Driver
,._,...,, ...... Jction & Demolition Diversion Certificate
8283
Received at :Escondido Resource Recovery Date: /2 -os--8
Processed At : SRR Lemon Grove, CAD COi San Marcos, CA ~
Customer: Ticket#
Project: Number/Description ______________ _
Total Tons Received: 2.of; Tons Diversion Percentage: ·+1 %
Scale house Operators Signature:-'-/)'--'ll...,7!e/iµ,,,,:;.1-4,~=-=c.:.·_· --==--
This certifies that the company listed above has utilized a EDCO facility to divert construction demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Escondido Resource Recovery "iC'iult-'.)..01
1021 W Mission Ave
Escondido, CA 92025 zoc1ol'6-\'-13
(760) 745-3203
Customer: 0000
TRI.VISTA.INC
Commodity
14 MIXED C & D
[Gross(In): 11,280.
Ticket: 41657
Date: 12/21/18
Rate
In: 9: 31
Out: 9:31
Units
1.30
lbs Scl#l
88.00 per TON
Tare 8,680. lbs Scl#l
INVOICE
Truck: 6436/0000
Container:
Route: 02914
Origin: 029 San Diego
Net: 2,600.
Extended
Charge
114.40
lbs]
PAID CREDIT CARD 114.40
ESCOtllIDO RESOJRCE R 1044 1,1 WASHINGT!J4 AVE ESCONDHXJ, Cit 92025·1£72
.760-7'15-3203
xxxxxxxxxxxx3618
VISA
Total: $
12111118
Inv n: 000000005
APPrVd: Online
Sale
CAPill 1H: VISA
AID: A0000000031010
M: 00 80 Ill 80 00
TS!: f8 00
EntrY Method: Ch1P
114.40
09:32:!J
APPr Code: l}i401l
Cu~t.o■~r Copy
THANK YOU!
ESCONDIDO
RESOURCE
ECOVERY
AND WASTE TRANSFER SERVICE
"We'll Take Care of It"
Driver
Construction & Demolition Diversion Certificate
Date: IJ-Jl-I
8306
Received at :Escondido Resource Recovery
Processed At : SRR Lemon Grove, CAD COi San Marcos, CA azf
Customer: Ticket#
Project: Number/Description ______________ _
Total Tons Received: \ · ':)D Tons Diversion Percentage: ::t:\ %
Scale house Operators Signature:. ___ \'\-\ __ VV\._~ __ C-'-· _. __
This certifies that the ccmpany listed above has utilized a EDCO facility to divert construction demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Escondido Resource Recovery
1021 W Mission Ave
Escondido, CA 92025
(760) 745-3203
IO b"l cJ
Customer: 0000 Ticket: 31906
Date: 12/01/18
In: 13:17
Out: 13:17
TRI. VISTA. INC
Commodity
14 MIXED C & D
[Gross(In): 14,740.
Units
3.03
lbs Scl#l
Rate
88.00 per TON
Tare 8,680. lbs Scl#l
INVOICE
Truck: 6436/0000
Container:
Route: 02914
Origin: 029 San Diego
Net: 6,060.
Extended
Charge
266.64
lbs]
PAID CREDIT CARD 266.64
ESC(WH>O RESOURCE R 1044 l.l WASHJtHiTON AVE ESCONOIDO, CA. 92025-1672
760 -745-3203
Sale
xxxxxxxxxxxx96l8
VISA
Total: $
12i01t18
Inv U: 000lml21
lliPrvd: Online
C(jlllri. lH VISA
AID: ~1010
TVR: 00 80 00 80 00
TS!: f8 00
EntrY ~!hod: ChiP
266.64
13:18:19
rtiiir Code: 045110
T~ VOU!
ESCONDIDO
RESOURCE
ECOVERY
AND WASTE TRANSFER SERVICE
"We'll Take Care of It"
Driver
Construction & Demolition Diversion Certificate
Date:
8284
Received at :Escondido Resource Recovery
Processed At : SRR Lemon Grove, CAD CDI San Marcos, CA 0
Customer: 'trf U [)"-h-t_ Ticket # 3 !C/'o,b
Project: Number/Description _____________ _
Total Tons Received: J,!)3 Tons tage:~%
This certifies that the company listed above has utilized a EDCO facility to divert con cti demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnag re age of the respective EDCO facility.
Escondido Resource Recovery
1021 W Mission Ave
Escoridido, CA 92025
(760) 745-3203
/00"/u l'6-11. I
Customer: 0000 Ticket: 19503
Date: 11/06/18
TRI. VISTA. INC
Commodity Rate
In: 13:07
Out: 13:07
88.00 per TON
INVOICE
Truck: 6436/0000
Container:
Route: 01614
Origin: 016 Escondido
14 MIXED C & D
[Gross(In): 9,700. lbs
Units
.51
Scl#l Tare 8,680. lbs Scl#l Net: 1,020.
Extended
Charge
50.00
lbs]
ESCONDIDO R£S0URL"E R
Hl44 1-1 WlSHINGTON AfJE
ESCOOIDO. CA. 92025-1672
760-745-3203
Sale
xxxxxxxxxxxx!618
VISA
Total: $
11106118
Inv n: 000000029
Al>Prv<l: Online
CNlllAL II[ VISA
A IO: i\0000000031010
lVR: 00 80 00 80 00
TS!: F8 00
EntrY Method: ChiP
50.00
13:07:56
APPr Code: 026959
Cu,;lomO:'r Copy
TliAiNI< YOU!
ESCONDIDO
RESOURCE
ECOVERY
AND WASTE TRANSFER SERVICE
"We'll Take Care of It"
PAID CREDIT CARD
Driver
vv• •~1.fuction & Demolition Diversion Certificate
Date: 1 D(g l
· 50. 00
8261
Received at :Escondido Resource Recovery
Processed At : SRR Lemon Grove, CAD COi San Marcos, CA ~
Customer: 5b' Vl S-k-i Ticket#
Project: Number/Description ______________ _
Total Tons Received: -~/ Tons entage: 7/ %
This certifies that the company listed above has utilized a EDCO facility to divert truction demolition materials in accordance
with LEED requirements. The diversion tonnage is based on an overall tonnag ercentage of the respective EDCO facility.