HomeMy WebLinkAbout2327 GEODE LN; ; CB102381; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
03-19-2012 Residential Permit Permit No: CB102381
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
2327 GEODE LN CBAD
RESDNTL Sub Type: SFD Status: ISSUED
Applied: 11/01/2010
Entered By: RMA
Parcel No:
Valuation:
2132721200
$386,006.00
Occupancy Group:
# Dwelling Units:
Bedrooms:
1
3
Lot#: 39
Constuction Type: VN
Reference #: CT040015
Structure Type: SFD
Bathrooms: 3.5
Plan Approved: 03/19/2012
Issued: 03/19/2012
Inspect Area: PD
Orig PC #: PC090040
MIRASOL-PHASE 5/BUILDOUT
Plan Check#: PC100050
Project Title:
PLAN 3, 3245 SF, 603 SF GAR, 113 SF PORCH
Applicant:
WILLIAM LYON HOMES
4490 VON KARMAN AV 92660
949 833-3600
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD#3 Fee
Renewal Fee
,\dd'I Renewal Fee
Other Building Fee
HMP Fee
Dot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Green Bldg Stands Plan Chk Fee
$1,690.61
$0.00
$1,098.90
($500.00)
($87.91)
$38.60
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,549.00
FS1
$0.00
$0.00
$12.00
??
Owner:
WILLIAM LYON HOMES INC
4490 VON KARMAN AVE
NEWPORT BEACH CA 92660
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF (3105540)
PFF ( 4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
Fire Sprinkler Fees
TOTAL PERMIT FEES
Total Fees: $25,738.81 Total Payments to Date: $25,738.81 Balance Due:
Inspector:
FINAL,?PROVAL
Date: , / J ' ( z_ Clearance:
FS1
$0.00
$403.00
$4,492.00
$3,122.05
$7,025.31
$0.00
$0.00
$0.00
$2,340.00
$0.00
$0.00
$189.00
$66.25
$136.00
$0.00
$0.00
$0.00
$0.00
$1,969.00
$195.00
??
$25,738.81
$0.00
NOTiCE: Please take NOTICE that approval cf your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." Yc.u have 90 days from the date this permit was issued to protest Imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set fcrth in Government Code Section 66020(a), and file the protest and any other required information witfl the City Manager for
processing in accordance with Ca•lshad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIHF.D that your right to protest tfle specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes. nor planning, zoning, graoing or other similar application processing or service fees in connection with this project. NOR DOES 1T APPLY to any
f f ·,revi I n iv n N Tl E im'l r hi f Ii i i h
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
03-19-2012
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW100536
Job Address:
Permit Type:
2327 GEODE LN CBAD
SWPPP Status:
Parcel No: 2132721200 Lot#: 39 Applied:
Reference #:
CB#:
Project Title:
Applicant:
CT040015
CB102381
MIRASOL -PHASE 5/ BUILDOUT
WILLIAM LYON HOMES INC
4490 VON KARMAN AVE
NEWPORT BEACH CA 92660
Emergency Contact:
WILLIAM LYON HOMES
ATTN:DAN
858 583-1681
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
Owner:
WILLIAM LYON HOMES INC
4490 VON KARMAN AVE
NEWPORT BEACH CA 92660
ISSUED
11/01/2010
RMA
03/19/2012
PD
1
M
$0.00
$208.00
$0.00
$208.00
Total Fees: $208.00 Total Payments To Date: $208.00 Balance Due:
FINAL APPROVAL
DATE /-1J-1 ~
SIGNATURE ___ .._(2.2j~Ac,__;""'-----
$0.00
Inspection List
Permit#: CB102381 Type: RESDNTL SFD
Date Inspection Item Inspector
08/14/2012 89 Final Combo
08114/2012 89 Final Combo PD
07/17/2012 39 Final Electrical MC
06/1312012 82 Drywall/Ext Lath/Gas Test PD
06/05/2012 84 Rough Combo PD
05/22/2012 13 Shear Panels/HD's PD
05114/2012 15 Roof/Reroof PD
04112/2012 11 Ftg/Foundation/Piers PD
04/0412012 21 Underground/Under Floor PD
04104/2012 22 Sewer/Water Service PD
Tuesday,August14,2012
Act
RI
AP
AP
AP
AP
AP
AP
AP
AP
AP
MIRASOL-PHASE 5/BUILDOUT
PLAN 3, 3245 SF, 603 SF GAR, 113 SF PO
Comments
NOD
Page 1 of 1
«~-~ CITY OF
CARLSBAD·
Building Depa1~f11ent
' t:
INflllCTIOR -RE£'1NiD .. ·~ ~ '· ~ --..... .
INSP.EGION RE'CQRD·.GARDW~PROVED
PLAN5MUSTSE'•KEPT ~lr<BE~.tib
CALL P,RIOR J;() 4:oo:l(M,-FQR,ftp;T
WQRK)DAYINSPECTIO'N . ' .,.
<,
CB102381 2327 GEODELN
MIRASOL-PHASE 5/BUILDOUT
PLAN 3 3245 SF 603 SF GAR 113 SF PORCH
RESDNTL SFD
Lot# 39 WILLIAM LYON HO MES
FOR 8DIUHNG 'INSPECTlbN:
CA~:-°Y6o-60247~5 l 1/{q/1;-·· ..... < ·*' .,-':t APPROVED 'f.O~C~VER I ~: ;-/1,, ...• :D'A-;.
'lype of lnspetjion ... --·-Date Inspector ··_: 'Notes'-../ 1 ..
SUIIDING . --. : •.
. ' .. , . ,
FOUNDATION ~ ... ;..., _J .. .r # ~,,,,. · . ,, *" In ·£• :, .. '•
RE[NOORCEO S"FEEL . ' .<•'
! ''1 ~, -·t 1,,-., ·~ ( W,, t ;,:,; ...
' . ~·. ,._, '; . ,,• ..
MASONRY. ·,
' .. .' •.: •GROUT •WAtLORA'lf"'S ~: r J.; .'-. ' .. -' .
TILT PANELS . . . --, •. -POUR·STRleS l'f," • '.. o:~~-. .
-' ·•·• 'I: -'!-•.i;,.--. ' "' .
COLUMN FOOTIN.GS . .)>~ .. •. ,' ,, ... -. .
SUBFRAME D FLOOR D CEftlN.G· I . ·, ,.·/f ... .;; •·. "' '
, .:, .. /
ROOF SHEATHING ,,:.-. /rf •. p_ -~~-,:; . .
.. . ' ·,
EXT. SHEAR·PANELS •' <" ·l,. i.. I Z, f/-<ft -' .. •'· <' ;r-~.
FRAME '/1·)·/L 7t,...7t-.. --... . '' . ,:-·· • J I·
INSUJ.AJ:iG>N ·,.; .. ''-J: .'.•
EXTERIOR. lATH s-.;.-._;,:;· ;f .A"',--
..
•. . I , .. • 4
INTERle.R.LATH &D.RYWALL ' ·,·.,. u.P~r-,·1£/ f C {_. .. ..
FINAL .. .. ,
PLUMBING. ..
-',. ·"-t a
D'SEWER ~NID Bl/CO • Pl/CO ,,( .( . ~ II -~ •
UNDERGROWND I;r,W'AST:E _9,WATER ._, I~ 7 • Iv , T c. 1.:--. ..
TOPOUT •WASTE D WAliER I ~-d-r-, .. . ~ ', .
TU~NQ 'SHOWER PAN di· -..J /Y l/4 I -
..t:J GASl'EST J6~GAS ·pf~JNG . .., J/11·11 -/J re'(/ .
0 WATER-HEATER D S~LARWA~R : ,. -~-, ·, ... .
' ., ' :, -.. ..· ' FINAL . . .... .. . '
ELEC1111CAL fl -.. . .
.f •·
0 ELECJRIC UNDERGROUND -er::LIFER 1f '.r--1,. • /1,,. •11c~ .. ..
I ... ,.,1'.... -~ -·-.... . '..
ROUGhf ELECTRIC WALLS . I \,. I ~ IJ;'~ ,. ~\' .. .,
ROUGH ELECTRIC CEILING ·v ·_J ,v-,.
~
_J..rELECTRIC SERVICE •TEMPORARY eT-IL1/1-z_ ~ ~n ---.k,·,~ '~_:..._, t:.IL. ~-. " •BONDING •POOL . I ' -~-t.i•" ... ·-1--:' ,r, ~-·~ ...i::t>. IZM -~ '.-..
f>l-!OTO V.OLTAIC i<-.t• ·-~ ( ~ -~-I ~-' J~ . . ----FINAi. '-'•·~; .. ,. . ' :J ! ... , . , -· . '":. .. ~·
ME~(:AL I it·' -..-; ,:"_. ·~ -:, -----. .. ~'
UNDERGROCJ~D DUCTS &·PIPfNG'
0 DUCT & PLEM. 0 REF. PIP1NG /I
HEAT -AIR COND. SYSTEMS I ( ., ' -//.f"~/
VENTILATING SYSTEMS ~ .., I .
FINAL ·. .. . . .. ' -· CAU FOR FINAL INSPECTIO'N WHEN ALLAPPROPRIA TE ITEMS ABOVE Ha\lE BEEN ~D·
FINAL Sijgn When Apj,rop~e . . .
Building Dept. (Inspections) (760) 602•2725 •• I •.
...
Fire Department (760) 602-4668 ,,-.J ... :=!0./? ~i 7,,-~ / ~A.,,1 .. , ... .
Planning Department f160J 602i.46d2 ,:.. ~" tJL ,.q.~ .
:
Engineering Dept. (Inspections) (7.60) 438-3891-~ !3./Bltl---.,<I ,, ' ~' ~ .
BuildlF)g lnspectors-f7am-4pmj 'f76!i.6~::Z~00 -< ,.
CMWD {760), ~38-27~Zext>7i'I 51. .
..
1635 Faraclay Ave: , •. crarfsbad, <£.A 9.2808' ·• 76o:602-2700 • www:,c:arlsbadca.gov
REV 8/2009 SEE BACK FOR SPECIAL NOTES
INSTALLATION CERTIFICATE CF-6R-ENV-01
Envelope -Insulation; Roofine:; Fenestration (Page 1 of3)
Site Address: 2327 GEODE LANE LOT 391 Enforcement Agency: I PermCE3102381 CARLSBAD CA 92009 City of Carlsbad
If more than one person has responsibility for installation of the items on this certificate, each person shall prepare and sign a certificate
applicable to the portion of construction for which they are responsible; alternatively, the person with chief responsibility for construction shall
prepare and sign this certificate/or the entire construction. All applicable Mandatory Measures with check boxes require to be checked to ensure
the mandatorv measures have been met.
Description of Insulation
I. RAISED FLOOR
Material: NA Brand Name: NA --------,~cc-~--------T hick n es s (inches): _____ ~-----Thermal Resistance (R-Value): c1 § 150( d): Minimum R-I 3 insulation in raised wood-frame floor or equivalent U-factor. --------
2. SLAB FLOOR/PERIMETER
Material: NA Brand Name: NA
Thickness (inches): ------------
------,--~-------The rm a I Resistance (R-Value): --------Perimeter Insulation Depth (inches): _____ _ • § 150(1): Water absorption rate for the insulation material alone without facings is no greater than 0.3%; water vapor permeance
rate is no greater than 2.0 perm/inch and shall be protected from physical damage and UV light deterioration.
3. EXTERIOR WALL
a. Insulation Type (e.x. Batt, Loose Fill, Spray Foam)
FIBERGLASS BATTS a. Thermal Resistance (R-Value): __ R_-_13 ____ _
b .. Insulation Type (e.x. Batt, Loose Fill, Spray Foam)
FIBERGLASS BATTS b. Thermal Resistance (R-Value): __ R_-1_9 ___ _
Brand: JOHNS MANVILLE
Spray/Loose fill) Spray/Loose fill) Installed Actual Thickness
(inches): NA Contractor's min installed weight/ft' __ lb
Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value) • § I 50(c): Minimum R-13 insulation in wood-frame wall or equivalent U-factor.
Exterior Foam Sheathing (rigid Insulation)
Material: NA Brand Name: NA
Thickness (inches) : -----------Thermal Resistance (R-Value) : -------
4. FOUNDATION WALL
Material: NA Brand Name: NA
Thickness (inches): _________ _ Thermal Resistance (R-Value): ______ _
5. CEILING
Batt or Blanket Type: FIBERGLASS BATTS Brand Name: JOHNS MANVILLE
Loose Fill Type: FIBERGLASS BLOWN Thermal Resistance (R-Value): __,....,R,_-=30~---
Spray Foam Type: NA Brand Name: JOHNS MANVILLE
Installed Actual Thickness (inches): 13.20" Contractor's min installed weight/ft' .972 lb
Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value): c1 § 150(a): Minimum R-19 insulation in wood-frame ceiling or equivalent U-factor.
6. ATTIC ROOF INSULATION AND/OR ATTIC RADIANT BARRIER
Material: NA Brand Name: NA --------------Mater i a 1: _______________ Brand Name: _____________ _
Thickness (inches):___________ Thermal Resistance (R-Value): ______ _ • § 11 S(a): Insulation installed meets Standards for Insulating Material.
D § I 50(g): Mandatory Vapor barrier installed in Climate Zones 14 or 16.
2008 Residential Compliance Forms August 2009
INSTALLATION CERTIFICATE CF-6R-ENV-0l
Envelope -Insulation; Roofine; Fenestration (Page 2 of 3)
Site Address: 2327 GEODE LANE LOT 391 Enforcement Agency: I PermC8102381 CARLSBAD CA 92009 Ci'" of f'<>rl"had
Descrintion of Rootin2 Products
CRRC Product ID Manufacturer Product Roof Roof Product Initial Solar Aged Solar Thermal
Number1 Information Brand/Model Tv= Area Sloflf'. Weight 2 Reflectance Reflectance4 Emittance
•'
•'
•'
I. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
ww.coolroofs.orglproductslsearch.php
2. The weight in lbs per square feet of the roofing product being installed.
3. Check box if the Aged Reflectance is a calculated value using the equation below.footnote 4.
4. If the aged reflectance is not available in the Cool Roof Rating CoW'lcil 's Rated Product Directory then use the initial reflectance value from the
directorv and use the en11ation /0.2+0. 7(Diri tin/-0.2) to obtain a calculated arzed value.
✓ DC HECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENT·
• The roof area covered by building integrated photovoltaic panels and building integrated solar thennal panels are exempt from the above Cool
Roof criteria.
• Roof constructions that have thennal mass over the roof membrane with a weight of at least 25 lb/ft'" is exempted from the above Cool Roof
criteria.
To apply Liquid Field Applied Coatings, the coating must be applied with a minimum dry mil thickness of 20 mils across the entire roof surface and
meet minimum rwrformance requirements listed in §1 l 8(i)3 and Table I 18-C. Select the annlicable coating
D Aluminum-Pie.mented Asohalt RoofCoatimz f D Cement-Based Roof Coating I D Other
✓ 0 CRRC-1 Label Attached to CF-6R
(Note i(no CRRC-1 label is available, this comoliance method cannot be used and another method is reauired to meet comoliance).
FENESTRATION/GLAZING
Product # Total Quantity Add. Exterior Comments/
Manufacturer/Brand Name U-Product of NFRC of Like Product Area Shading Dev. Location/ Special
Item (GROUP LIKE RODUCTS) factor1 SHGC1 Panes Certified1• 2 (Optional) ft' or Overhanj!; Features
1
2
3
4
5
6
7.
8.
I. Use values from a fenestration product's NFRC Certified label. For fenestration products without an NFRC label. use the default values.from Section 116, Table
1 /6-A and I 16-B of the 2008 Energy Efficiency Standards.
2. NFRC label Certificates shall not be removed until the buildinr! ins...,ctor has verified the efflciencv. Enter Yes or No.
D §I 16(a)l: Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
D §I 16(a)2 and 3: Actual fenestration products installed are equivalent to or have a lower U-factor and/or a lower SHGC than that specified on
the Certificate of Compliance (Fonn CF-IR).
D § 116(a)4: Fenestration products (except field-fabricated windows) have a label listing the certified Li-Factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration that meets the requirements of~ 10-11 l(a)
D § 117: Exterior doors and windows weather-stripped; all joints and penetrations caulked and sealed.
2008 Residential Compliance Forms August 2009
INSTALLATION CERTIFICATE CF-6R-ENV-0l
Envelope -Insulation; Roofin2; Fenestration (Page 3 of3)
Site Address: 2327 GEODE LANE LOT 391 Enforcement Agency: I Pert~~02;81 CARLSBAD CA 92009 City of Carlsbad
DECLARATION STATEMENT
• I certify under penalty of perjury, under the laws of the State of California, the infonnation provided on this fonn is true and correct.
• I am eligible under Division 3 of the Business and Professions Code to accept responsibility for construction. or an authorized representative
of the person responsible for construction (responsible person).
• I certify that the installed features, materials, components, or manufactured devices identified on this certificate (the installation) confonns
to all applicable codes and regulations, and the installation is consistent with the plans and specifications approved by the enforcement
agency.
• I reviewed a copy of the Certificate of Compliance (CF-IR) form approved by the enforcement agency that identifies the specific
requirements for the installation. I certify that the requirements detailed on the CF-IR that apply to the installation have been met.
• I will ensure that a completed, signed copy of this Installation Certificate shall be posted, or made available with the building
permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a
signed copy of this Installation Certificate is required to be included with the documentation the builder provides to the building
owner at occupancy.
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
QUALITY INTERIORS, INC.
Responsible Person's Name: Responsible Person's Signature:
Jennifer Dinsmore JenNlife,y V~e
CSLB License: I Date;;;~b12 Position With Company (Title):
802519 Admin.
2008 Residential Compliance Farms August 2009