HomeMy WebLinkAbout2335 KYANITE PL; ; CB073153; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
05-08-2008 Residential Perm it Permit No: CB073153
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
05/08/2008
# Dwelling Units:
Bedrooms:
Project Title:
Building Inspection Request Line (760) 602-2725
2335 KYANITE PL CBAD
RESDNTL Sub Type:
2132802300 Lot#:
$397,455.00 Construction Type:
Reference #:
SFD
53
VN
CT04-16
1 Structure Type: SFD
3 Bathrooms: 3.5
VIRIDIAN-LA COSTA GREENS-PHS3
PLAN 2: 3688SF LIV -687 SF GAR • 104 SF DECK • 130SF
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
12/20/2007
JMA
Plan Approved:
05/08/2008
PC060023
PC07-82
Applicant:
ANDREA ESPINOZA DAVIDSON GREENS NORTH 144 LL C
C/O DAVIDSON GREENS NORTH 144, LLC
1302 CAMINO DEL MAR
DEL MAR, CA 92014
858-259-8500
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,597.53
$0.00
$1,038.39
$0.00
($83.07)
$39.75
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,423.00
D5/8
$0.00
$0.00
1302C CAMINO DEL MAR
DEL MAR CA 92014
858-259-8500
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
Total Fees: $24,586.91 Total Payments To Date: $24,586.91 Balance Due:
Inspector: Date: Cleara~ce:
$0.00
$160.00
$4,492.00
$3,618.63
$7,233.68
$0.00
$0.00
$0.00
$750.00
$0.00
$0.00
$174.00
$60.00
$103.00
$0.00
$0.00
$0.00
$0.00
$1,980.00
$0.00
$24,586.91
$0.00
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, ri other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required in1ormation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar ;:my subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
i h h i I
City of Carlsbad Bldg Inspection Request
For: 06/09/2009
Permit# CB073153 Inspector Assignment: JM
Title: VIRIDIAN-LA COSTA GREENS-PHS3
Description: PLAN 2: 3688SF LIV -687 SF GAR -104 SF DECK -130SF
COV. PORCH
---
Type: RESDNTL Sub Type: SFD
Phone: 8583348205
Job Address: 2335 KYANITE PL
Suite: Lot: 53
Location: Inspector:
OWNER DAVIDSON GREENS NORTH 144 LL C
Owner: DAVIDSON GREENS NORTH 144 LL C
Remarks:
-----
Total Time: Requested By: ROBERT
Entered By: CHRISTINE
CD Description
19 Final Structural
Act Comments {
£;:_ 6k,, ~
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
---· --
Comments/Notices/Holds
Associated PCRs/CVs Original PC# PC060023
lns(2ection Histo!Y
Date Description Act lnsp Comments
01/28/2009 39 Final Electrical AP JM OK TO RELEASE ELC METER
09/26/2008 82 Drywall/Ext Lath/Gas Test AP JM
09/18/2008 16 Insulation AP JM
09/16/2008 84 Rough Combo AP JM
08/28/2008 13 Shear Panels/HD's AP JM
08/27/2008 13 Shear Panels/HD's AP JM MISSING SHEAR 1 ST FLR @ COURTYARD
08/04/2008 15 Roof/Reroof AP PC
06/20/2008 11 Ftg/Foundation/Piers AP JM UFER OK
06/04/2008 21 Underground/Under Floor AP JM BWV
06/04/2008 22 Sewer/Water Service AP JM
Christine Wauschek
From:
Sent:
To:
Subject:
Attachments:
Michael Elliott [mikeelliott2@cox.net]
Tuesday, June 02, 2009 11 :23 AM
Janean Hawney; Christine Wauschek; Meghan McKillop; Michele Masterson; Peter Dreibelbis
Villages of La Costa, La Costa Greens 1.06
302P -Villages of La Costa, La Costa Greens 1.06 (Lot 53) -lnsp1 .doc
Villages of La Costa, La Costa Greens 1.06
Project Number: CT04-16
Drawing Number: 427-71
Lot 53 -2335 Kyanite Place-CB073153
Landscape inspection comments are attached.
Approved -Permit card was signed on June 2, 2009.
1
F!!;I CIIY or Carlsbad l13 Rnal Bolldlna Inspection
n r
JUN -2 2009
Dept: Building Engineering Planning CMWD St Lite Fire
Plan Check#:
Permit#:
Project Name:
PC0?-82
CB073153
VIRIDIAN-LA COSTA GREENS-PHS3
. 'I
Date: 06/02/2009
Permit Type: RESDNTL
Sub Type: SFD
PLAN 2: 3688SF LIV -687 SF GAR -104 SF DECK -130S
Address: 2335 KYANITE PL Lot: 53
Contact Person: Phone:
Sewer Dist: CA Water Dist: CA ..........................................................................................................................................................
lnspectec_ bA:tos Date t,;; (e>'j_ Inspected: Approved: >< Disapproved: __ By: ni<(s. I
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
Comments: _______________________________ _
·w·
CHR.ISTIAN WHEELER.
DAILY REP O RT
P reject Name
Project Address
Contractor
Subcontractor
0 Reinforced Concrete 0 Shop Welding
J/1.0 5 ;/) ,,,,,)
,Kl Pre-Stressed Concrete 0 Field Welding
Moteri~t: -. \ ' € A/ ,-,., ,A.) .5 · () 1//_j,
Weather:
Date Time Arrived:
ENGINEER I N G
Time Departed:
Project#
Permit#
Architect
Engineer
0 Reinforced Masonry 0 Fireproofing
. /
/
Unless noted otherwise, the woric observed is, to the best of my knowledge, in compliance ·
Plan File#
0 Epoxy Anchors
□---------
I /) ?~
Hours Charged: i
1 -
'·,
4925 Mercury S treet ♦ San Diego, CA 92111 ♦ 858-496-9760 ♦ FAX 858-496-9758
fll./\NNINC
ENGINEERING
SURVEYING
HUNSAKER
&ASSOCIATES
S "'-N O I E Ci 0, I N C.
IRVINEJ 16 2 LOS ANGF.LES une ' 008
R:1vERSIOE
SAN Ol~GO
ARl20NA
City of Carlsbad
Engineering Department
1635 Faraday Avenue
Carlsbad, CA 92008
Subject: Civil Engineer's
Project:
Certification of Building Form
Title;
Dwg;
Tract:
Lots;
La Costa Greens Neighborhood 1 .Oli
427-7A
CT 04-16/04-14A
51 through 59
Lo, 5"3
Please be advised the building foundation forms are in cc nformance with the
precise grading plans as to horizontal and vertical location within one tenth of a
foot. !
DAVE HAMMAR
Ll:X Wll,LIMAr-,1
ALISA VIALPANDO
DAN SMITli
RAY MARTIN
CHUCK LATER
9707 Waples Street
5:m □lu~o.CA 92121
(8501558-<1500 l'H
(8'.:i0)55B-14l4 FX
www.l-lu1,:.,1L;,•rSl.),1.:11111
l11(f)@t-11.1ns:ikerSf'.i.cn1n
cOO/cOO It]
L.S. 6854
Hunsaker & Associates San Diego, Inc.
OS "80SSY PUB Ja~esun~
l,C:l•~~ K \:l~l)~l:.:!C!Jll\Lln due~
~.Cl. 2:l8'1·22 e/1a/2008 7.i3 ,o,M
t,I bl QCCQCOI V\..'.J or: C-1 0/'\/'\7 /r-, /nr,
Lo, 53
GEOCON 0
GEOTECHNICAL CONSULTANTS 0
6960 FLANDERS DRIVE ■ SAN DIEGO, CALIFORNIA 92121-297 4 ■ TEL (8581 558-6900 ■ FAX (8581 558-6159 ~
FOUNDATION OBSERVATION REPORT
INC0RP0RA'l'ED
PROJECT NAME: ____,_Th-'--'--'~'--'G..,1.c.,/-'-ece,cc .. '-'--"'.$~-'--' ,~0'-"'6~-.__.1_,')q,,__,,_y,,,1,1,.c,IL.,..,,-..-'------PROJECT NO. fJ (,,,f CJ-5 -Z -l ~
LOCATION: ~lt.-1_f_.,,;~5.,,.....,l,~5,-'-2~h~i~5c>--~),,__ ______ _ DATE: ~/19/of
FOUNDATION LOCATION l'f 1 no en ire Ul mg t' b 'Id' }
PLAN FILE NO. PERMIT NOS:
1,t ,, c. eo,31 9A 0 ADDITIONAL OBSERVATION REQUIRED
FOUNDATION TYPE: 5 2,.. CJo,319&
~VENTIONAL
POST-TENSIONED 53 C i3o7-s 15:J ~UBSTANTIAL CONFORMANCE
• PURPOSE Of OBSERVATION
10'verify soil conditions exposed are similar to those anticipated
~ify footing excavations extend to minimum depth recommended in soil report
D Verify foundation reinforcement complies with minimum recommended in soil report
D ~fy slab reinforcement, sand bedding and moisture barrier comply with
llil"'Verify footings have been extended to an appropriate bearing strata
minimum recommended in soil report
D Other ~ rt ('p t7r7 T(
• APPUCABLE SOIL REPORT:
• SOIL REPORT RECOMMENDATIONS BASED ON:
D Expansion Condition 0 VERY LOW 0 LOW ~EDIUM 0 HIGH
/V.!}f!f) I Ob
3/IJ /J I I
0 VERY HIGH
D Fill Geometry--··',.,,..,._____ _______________________________ _
D Other:---------------------------------------
• MINIMUM FOUNDATION RECOMMENDATIONS: H ~ Z-2, ,,
0 Footing Depth: 0 12 Inches O 18 Inches □ 24 Inches OTHER _____________ _
Footing Reinforcement: D No.4 T&B D 2-No.4 T&B D 2-No.5 T&B ~st-Tensioned OTHER:-~----
Interior Slab Reinforcement: D 6x6-10/10 D 6x6-6/6 D No.3@24Inches D No.3@18Inches ~st-Tensioned
Slab Bedding Material and Thickness : --------------Vapor Barrier :
Foundation Width: ------H---',.,fr)-,-,..-----~--------------------
• OBSERVATIONS:
D Substantial conformance with Soil Reports (see "Purpose of Observation")
D Substantial conformance with Foundation Plans. Identify: --~.,.._.l/c,¢4(,,..,,.,. ... , 9,-i1--~t:,..__,;/'--filJ,.'D,__1,_{p.,_.7<-------
D Other
• COMMENTS: #"'· ,4~ 1,, b.z.-C (,e4,-.,, e d
/; , 1 ;,-/ ii;, u I e (, J ,::;,..,. ,:,u.d. I
NOTE IT IS ASSUMED THAT All FOOTING EXCAVATIONS Will BE OEANED OF LOOSE MATERIAL PRIOil. TO PLACING CONCR~~~T 7 SOIL MOISTURE CONT™T Will BE MANTAINED
f , ✓/ 1~P~/ ( ;),#Ai/)r--) ,/,;, c.'./~~ A-t,, ;;,.,#/
RELD COPIES TO p GEOCON REPRESENTATIVE
. ·-~-·-------···----------
w
CHRISTIAN WHEELER.
ENGINEElllNG
COMPRESSIVE STRENGTH TEST RESULTS
Job Name: La Costa Greens Job#: 2070085
Job Address: 2335 Kyanite Pl. Penni!#: CB07-3153 Plan File#:
Contractor: Davidson Communities Architect: Dahlin Arch,
Subcontractor: Verdugo Concrete Engineer: Waddell Eng.
Test Location: Lot 53, P.T. slab Supplier: Hanson
Req. Strength: 4500 psi Mix#: 4533500
Date Sampled: 6-25-08 Admixture(s):
Date Received: 6-26-08 Truck#: 556 Ticket#: 263105
Sampled by: RSR Mix Temp: 81° Air Temp: 76°
Tested by: NS Slump: 5" %Air:
Sample Type: 4"x8" Min in Mixer: 59 Unit Wt:
Sample# Date Tested Age (days) Area (sq. inches) Maximum Load Comp. Strength Failure Type
(lbs) (psi)
96379 7-7-08 12 12.566 63,500 5,050
96380 7-23-08 28
96381 7-23-08 28
The sampling, hanclhng, cunng and compressive strength testing were performed by Chnstian Wheeler Engineering m accordance with the applicable ASTM standards. No other warranties express or implied.
Distribution:
(2) Davidson Communities
(1) Suncoast Post-Tension L.P
(1) City of Carlsbad
(1) Supplier
Michael B. Wheeler, RCE #45358
4925 Mercury Street ♦ San Diego, CA 92111 ♦ 858-496-9760 ♦ FAX 858-496-9758