Loading...
HomeMy WebLinkAbout2350 CAMINO VIDA ROBLE; 101; CB152176; PermitCity of Carlsbad 02-09-2016 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB152176 Building Inspection Request Line (760) 602-2725 Job Address: 2350 CAMINO VIDA ROBLE CBADSt: 101 Permit Type: Tl Sub Type: IN DUST Status: ISSUED Applied: 07/13/2015 Entered By: SLE Parcel No: 2130500900 Lot#: 0 Valuation: $1,117,093.00 Construction Type: 58 Occupancy Group: Reference# Plan Approved: 09/28/2015 Issued: 09/28/2015 Inspect Area PD Plan Check #: Project Title: CHUAO CHOCOLATE-25,787 SF Tl NEW RESTROOMS, OFFICE, EXISTING= 3100 SF, PROPOSED= 5253 SF// EXISTING STORAGE= 14,139 SF, PROPSED = 11,216 SF// MANUFACTURING-EXISTING =8,548 SF, PROPSED = 9,318 SF Applicant: TIM SEAMAN 619-993-8846 Building Permit Add'l Building Permit Fee Plan Check Add'l Building Permit Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Fire Expedidted Plan Review $3,768.33 $0.00 $2,637.83 $0.00 $0.00 $312.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $45.00 $0.00 Owner: DULCES REALTY LLC 2335 CAMINO VIDA ROBLE CARLSBAD CA 92011 Meter Size Add'l Reel. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF (3105540) PFF (4305540) License Tax (31 04193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees HMP Fee Green Bldg Standards Plan Chk TOTAL PERMIT FEES Total Fees: $17,918.29 Total Payments To Date: $17,918.29 Balance Due: Inspector: /1-;::f_ FINAL APf?YtL Date: d · f j Clearance: $0.00 $0.00 $0.00 $0.00 $4,431.85 $0.00 $0.00 $0.00 $4,387.00 $0.00 $536.00 $305.00 $218.49 $0.00 $1,276.00 $0.00 $0.00 ?? ?? $17,918.29 $0.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/ex::lctions of which vou have_[!feviouslv been <liven a NOTICE similar to this or as to which the statute of limitations has oreviouslv otherwise exoired. I:HE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: OPLANNING 0ENGINEERING Cicyof Carlsbad Eluilding Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov www.carlsbadca.gov SUITE#/SPACE#/UNIT# #BATHROOMS de Square Feet of Affected Atea(s) ~(L'-l ~~\· (GO<~'~') J £><\r (,{ \u r \..t.;orV'-\ "" t)."' ~0 "e.,w Q.N' ~V-'4"'\(JL-.4'1""\ (_,.,.....r.::, PROPOSED USE S-"'N- Primary Contact ADDRES~o ADDRESS ZIP '\\~\d-CITY PHONE EMAIL EMAIL 0BUILDING OFIRE Plan Check No. STATE FAX DESIGN PROFESSIONAL 1ft CONTRACTOR BUS. NAME ADDRESS ADDRESS CITY STATE ZIP PHON~c EMAIL STATE LIC. # ZIP (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions ofthe Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500)). r~policy I hereby affirm that I am exempt from Contractor's Ucense Law for thll following reason: D D D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within OnE! year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. DYes 0No 2. I (have I have not) signed an application for a building permit for the proposed work. 3. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone I contractors' license number): 4. I plan to provide portions of the work, but I have hired thE! following person to coordinate, supervise and provide the major work (include name I address I phone I contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address I phone I type of work): 2:) PROPERTY OWNER SIGNATURE 0AGENT DATE I certify that I have read the application and state that the above informatio~'is conectand thatthe information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned properly for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required ' demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by of this Code shall expire by limitation and beoome null and void if the building or work authorized by permit is not oommenced within ~APPLICANT'S SIGNATURE (Section 106.4.4 Uniform Building Code). ) 180 days from the date of such permit by such permit is or abandoned at any time after the work is oommenced for a · of 180 DATE STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection. OF OCCUPANCY {Commercial Projects o 11liy! Fax (760) 602-8560, Email building@carlsbadca.gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008. l CO#: (Office Use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE ZIP CITY STATE ZIP Carlsbad CA PHONE I FAX EMAIL OCCUPANT'S BUS. LIC. No. DELIVERY OPTIONS PICKUP; CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) ASSOCIATED CB# MAIL TO; CONTACT (Listed above) OCCUPAIIJT (Listed above) CONTRACTOR (On Pg. 1) NO CHANGE IN USE I NO CONSTRUCTION MAIL I FAX TO OTHER; CHANGE OF USE I NO CONSTRUCTION ~APPLICANT'S SIGNATURE DATE Inspection ist Permit#: C8152176 Type: Tl IN DUST CHUAO CHOCOLATE-25,787 SF Tl NEW RESTROOMS, OFFICE, EXISTING = Date Inspection Item Inspector Act Comments ---------~ 02/09/2016 89 Final Combo PD AP 02/09/2016 89 Final Combo Rl COF 01/21/2016 14 F rame/Steei/Bolting!Weldin PD PA 01/14/2016 44 Rough/Ducts/Dampers PD AP 01/11/2016 33 Service Change/Upgrade PD AP 01/05/2016 14 Frame/Steei!Bolting!Weldin PD AP 12/31/2015 11 Ftg/Foundation/Piers PD PA 12/29/2015 11 Ftg/Foundation/Piers PD AP 12/18/2015 34 Rough Electric PD NR 11/18/2015 17 Interior Lath/Drywall PD AP 11/13/2015 23 GasfT esURepairs WF AP 11/12/2015 23 Gas/Test/Repairs PD PA 11/06/2015 17 Interior Lath/Drywall PD AP 11/02/2015 17 Interior Lath/Drywall PD AP 1 0/26/2015 84 Rough Combo PD PA 10/19/2015 17 Interior Lath/Drywall MC PA SEEE APPROVED PLANS, ORANGE HI LITER 1 0/15/2015 84 Rough Combo PD PA 10/14/2015 17 Interior Lath/Drywall PD AP 10/08/2015 17 Interior Lath/Drywall PD AP 1 0/06/2015 17 Interior Lath/Drywall PD PA 10/01/2015 21 Underground/Under Floor PD AP 09/29/2015 21 Underground/Under Floor PD AP Wednesday, February 10, 2016 Page 1 of 1 EsGil Corporation In Cl'artnersfiip witfi government for a3ui(aing Safety DATE: 9/23/15 I D jPPLICANT JURISDICTION: City of Carlsbad PLAN CHECK NO.: 15-2176 SET: IV )J'JURIS. D PLAN REVIEWER D FILE PROJECT ADDRESS: 2350 Camino Vida Roble PROJECT NAME: Chuao Choc:olatier-TI D D D D D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone#: Date contacted: (by: ) Email: f\ Mail Teleph~\\) Fax In Person ;i\ / .V (}'\A.L-REMARK~Appllc~o slip sheets to create set identical to Owner IV anct?arl sheets of the plans must be signed by the person responsible for their preparation. By: Doug Moody EsGil Corporation D GA D EJ D MB D PC Enclosures: 9/16/15 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 EsGil Corporation In <Partnersfiip witfi government for (]3ui{aing Safety DATE: 9/9/15 JURISDICTION: City of Carlsbad PLAN CHECK NO.: 15-2176 PROJECT ADDRESS: 2350 Camino Vida Roble PROJECT NAME: Chuao Choc~olatier-TI SET: III ~_p?'PLICANT ~~URIS. D PLAN REVIEWER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. 0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ~ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: D EsGil Corporation staff did not advise the applicant that the plan check has been completed. ~ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Tim Se!aman Telephone#: 619-993-8846 pat~ c~ntacted:1/1 (by~mail: walk124@aol.com ~all 1 elephone Fax In Person D REMARKS: By: Doug Moody EsGil Corporation D GA D EJ D MB D PC Enclosures: 9/2/15 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 City of Carlsbad 15·-2176 9/9/15 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Buildin~~ Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Build in!~ Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. These corrections are in response to items not fully addressed or as the result of information provided, the text in bold underlined print indicates the unresolved issue. 1. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. All sheets of the plans are still not signed. The Civil, Structural, Mechanical and Food service plans are not signed. 4. Please provide the UL listing and manufacturer's installation information for all new equipment to be installed. Show all electrical requirements, plumbing requirements, exhaust or mechanical requirements, operational weight, anchorage and seismic restraints if required etc. Section 1 07.2. Per our phone conversation if the plans show specific plumbing, electrical or mechanical requirements tlhen the listing and installation requirements that show these specific requimments must be provided. Sheet A3.2 shows 87 pieces of equipment of which 40 have specific plumbing, electrical or mechanical requirements. These requirements indicate a specific piece of equipment is intended to be installed at this specific location therefore the listing and installation of t:hat particular equipment must be provided to determine if the plans are consistent with the manufacturer's installation requirement and the appropriate codes. A call was placed to Mike Peterson for verification. 6. Provide a section view of all new interior partitions. Show: a) Method of attaching top plates to structure. No information provided. The partition plan sheet A3.0 and the wall type sheet 01 do not reference the attachment detail added to sheet 03? City of Carlsbad 15··21 76 9/9/15 7. Please provide the listing of the roll up door 112C. Provide installation plans and details and show the glazing to be consistent with the ENV documents. No information provided. I still did not receive any information showing the door to comply with the ENV documents or installation information? 9. Provide complete kitchen hood plans, details, and calculations to show compliance with UMC, Chapter 5, Part II The installation of the Ranges require the installation of a Type I hood. Correct the plans. • Show the required replacement air for each kitchen hood. Include an air balance schedule. The exhaust and make-up air systems shall be connected by an electrical interlocking switch. UMC 511.3 The make up fan does not replace the air exhausted. Comment still applies. • Clearly show the material used to construct the hood and exhaust duct. UMC Section 508. '1.1 No information provided. Comment still applies. • Provide a section detail for the hood showing the relative dimensioned locations for the hood, ceiling, and overhead construction framing of the floor or ceiling . Be sure to describe the construction materials (combustible, limited combustible, or non-combustible) used adjacent to the hood and duct. UMC 507.2 INo information provided. Comment still applies. • Provide construction details for the fire rated grease duct enclosure. Note: Clearance distances from the grease duct to the enclosure inside face is not less than 6" (non-combustible) and 18" (combustible). UMC Sections 510.7 & 51 0.7.2.3. The State Fire Marshall does not adopt this design. No information provided. Comment still applies. • A single story non-rated building does not require an enclosure (shaft) protection for the grease duct installation above the ceiling. It does, however, mandate minimum clearance distances from the duct to combustible, limited, or non-combustible materials. Detail compliance with UMC 507.2 on the plans. Note: The State Fire Marshall does not recognize this design. No information provided. Comment still applies. • Detail the kitchen hood duct termination clearances as per UMC 51 0.8. No information provided. Comment still applies. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of correcti,ons from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: City of Carlsbad 1SI-2176 9/9/15 Yes D No D The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. EsGil Corporation In Partnersliip witli government for CBuiCd"ing Safety DATE: 8/19/15 JURISDICTION: City of Carlsbad PLAN CHECK NO.: 15-2176 PROJECT ADDRESS: 2350 Camino Vida Roble PROJECT NAME: Chuao Choc::olatier-TI SET: II :_:Y,PLICANT x~~RIS. D PLAN REVIEWER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ~ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: D EsGil Corporation staff did not advise the applicant that the plan check has been completed. ~ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Tim Seaman Telephone#: 619-993-8846 ~ate con)acted: 6j \ ~ (b~ Email: walk124@aol.com ~ail .!Telephone Fax In Person D REMARKS: By: Doug Moody EsGil Corporation D GA D EJ D MB D PC Enclosures: 8/12/15 9320 Chesapeake Drive, Suite 208 + San Diego, Califomia 92123 + (858) 560-1468 + Fax (858) 560-1576 City of Carlsbad 191-2176 8/19/15 Please make all corrections on the original tracings, as requested in the correction list. Submit thre~3 sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. These correcti<>ns are in response to items not fully addressed or as the result of information provided, the text in bold print indicates the unresolved issue. 1. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. All sheets of the plans are still not signed. 4. Please provide the UL listing and manufacturer's installation information for all new equipment to be installed. Show all electrical requirements, plumbing requirements, exhaust or mechanical requirements, operational weight, anchorage and seismic restraints if required etc. Section 1 07.2. Per our phone conversation if the plans show specific plumbing, electrical or mechanical requirements then the listing and installation requirements that show these specific requimments must be provided. Sheet A3.2 shows 87 pieces of equipment of which 40 have specific plumbing, electrical or mechanical requirements. These requirements indicate a specific piece of equipment is intended to be installed at this specific location therefore the listing and installation of that particular equipment must be provided to determine if the plans are consistent with the manufacturer's installation requirement and the appropriate codes. 5. On the cover sheet of the plans, specify any items requiring special inspection, in a format similar to that shown below. Section 1 07.2. No shown on the cover sheet of the plans. • REQUIRED SPECIAL INSPECTIONS In addition to the regular inspections, the following checked items will also require Special Inspection in accordance with Sec. 1701 of the Uniform Building Code. City of Carlsbad 15-2176 8/19/15 ITIEM FIELD WELDING EXPANSION/EPOXY ANCHORS REQUIRED? 6. Provide a section view of all new interior partitions. Show: REMARKS a) Method of attaching top plates to structure. No information provided. 7. Please provide the listing of the roll up door 112C. Provide installation plans and details and show the glazing to be consistent with the ENV documents. No information provided. 9. Provide complete kitchen hood plans, details, and calculations to show compliance with UMC, Chapter 5, Part II • Show the required replacement air for each kitchen hood. Include an air balance schedule. The exhaust and make-up air systems shall be connected by an electric;al interlocking switch. UMC 511.3 The make up fan does not replace the air exhausted. • Clearly show the material used to construct the hood and exhaust duct. UMC Section 508.1.1 No information provided. • Provide a section detail for the hood showing the relative dimensioned locations for the hood, ceiling, and overhead construction framing of the floor or ceiling . Be sure to describe the construction materials (combustible, limited combustible, or non-combustible) used adjacent to the hood and duct. UMC 507.2 No information provided. • Provide construction details for the fire rated grease duct enclosure. Note: Clearance distances from the grease duct to the enclosure inside face is not less than 6" (non-combustible) and 18" (combustible). UMC Sections 510.7 & 51 0.7.2.3. The State Fire Marshall does not adopt this design. No information provided. • A single story non-rated building does not require an enclosure (shaft) protection for the grease duct installation above the ceiling. It does, however, mandate minimum clearance distances from the duct to combustible, limited, or non-combustible materials. Detail compliance with UMC 507.2 on the plans. Note: The State Fire Marshall does not recognize this design. No information provided. • Detail the kitchen hood duct termination clearances as per. UMC 51 0.8. No information provided. 10. Please review the requirements, revise the plans appropriately and imprint on the plans the City of Carlsbad Policies and Procedures for Roof Mounted Equipment to the plans. The line of sight sections are Planning Department requirements and not the Building Department requirements for roof mounted equipment. Please correct the plans. City of Carlsbad 1S-2176 8/19/1S To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes D No D The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. EsGil Corporation In Cl'artnersfiip witfi (jovernment for (]Jui{aing Safety DATE: 7/23/15 JURISDICTION: City of Carlsbad PLAN CHECK NO.: 15-2176 PROJECT ADDRESS: 2350 Camino Vida Roble PROJECT NAME: Chuao Cho4::olatier-TI SET: I D;APPLICANT ~JURIS. D PLAN REVIEWER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. [g] The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: D EsGil Corporation staff did not advise the applicant that the plan check has been completed. [g] EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Tim Seaman Telephone#: 619-993-8846 ~te coryfacted::rf'l--3 (by:~mail: walk124@aol.com t:::Mail v'Telephone Fax In Person D REMARKS: By: Doug Moody EsGil Corporation D GA D EJ D MB D PC Enclosures: 7/16/15 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 City of Carlsbad 15-2176 7/23/15 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 15-21~r6 OCCUPANCY: B/F1/S1 TYPE OF CONSTRUCTION: VB ALLOWABLE FLOOR AREA: SPRINKLERS?: Yes REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 7/13/15 DATE INITIAL PLAN REVIEW COMPLETED: 7/23/15 FOREWORD (PLEASE READ): JURISDICTION: City of Carlsbad USE: Manufacturing/ Office ACTUALAREA: 25787~ STORIES: 1 HEIGHT: OCCUPANTLOAD: 247 DATE PLANS RECEIVED BY ESGIL CORPORATION: 7/16/15 PLAN REVIEWER: Doug Moody This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other cormctions based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the matrked up list when you submit the revised plans. City of Carlsbad 1~~-2176 7/23/15 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 1. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. 2. Doors and fire shutters in fire barriers shall comply with the following table. Table 716.5. FIRE BARRIER !RATING MINIMUM OPENING PROTECTION ASSEMBLY (hours) (hours) 1 % 3. Please revise the plans and the door schedule to show the door to Multi room 101 to be a pivoted or side hinged swinging door per Section 1 008.1.2. 4. Please provide the UL listing and manufacturer's installation information for all new equipment to be installed. Show all electrical requirements, plumbing requirements, exhaust or mechanical requirements, operational weight, anchorage and seismic restraints if required etc. Section 1 07.2. 5. On the cover sheet of the plans, specify any items requiring special inspection, in a format similar to that shown below. Section 1 07.2. • REQUIRED SPECIAL INSPECTIONS In addition to the regular inspections, the following checked items will also require Special lnspectiion in accordance with Sec. 1701 of the Uniform Building Code. ITEM FIELD WELDING EXPANSION/EPOXY ANCHORS REQUIRED? REMARKS City of Carlsbad 1S-2176 7/23/15 6. Provide a section view of all new interior partitions. Show: a) Method of attaching top plates to structure. 7. Please provide the listing of the roll up door 112C. Provide installation plans and details and show the glazing to be consistent with the ENV documents. 8. Please have the document author sign the ENV forms. 9. Provide complete kitchen hood plans, details, and calculations to show compliance with UMC, Chapter 5, Part II • Provide the UL listing card showing the exhaust sizing requirements used for the hoods. • Provide exhaust sizing calculations for kitchen hoods. UMC 508.4 • Show the required replacement air for each kitchen hood. Include an air balance schE~dule. The exhaust and make-up air systems shall be connected by an electrical interlocking switch. UMC 511.3 • Clearly show the material used to construct the hood and exhaust duct. UMC Section 508.1.1 • Provide a section detail for the hood showing the relative dimensioned locations for the hood, ceiling, and overhead construction framing of the floor or ceiling . Be sure to describe the construction materials (combustible, limited combustible, or non-combustible) used adjacent to the hood and duct. UMC 507.2 • Provide construction details for the fire rated grease duct enclosure. Note: Clearance diistances from the grease duct to the enclosure inside face is not less than 6" (non-combustible) and 18" (combustible). UMC Sections 510.7 & 51 0.7.2.3. Tlhe State Fire Marshall does not adopt this design. • A single story non-rated building does not require an enclosure (shaft) protection for the grease duct installation above the ceiling. It does, however, mandate minimum clearance distances from the duct to combustible, limited, or non-combustible materials. Detail compliance with UMC 507.2 on the plans. Note: The State Fire Marshall does not recognize this design. • Detail the kitchen hood duct termination clearances as per UMC 51 0.8. 10. Please review the requirements, revise the plans appropriately and imprint on the plans the City of Carlsbad Policies and Procedures for Roof Mounted Equipment to the plans. Advisory Note : When alterations, structural repairs or additions are made to an existing building, that building, or portion of the building affected, is required to comply with all of the following requirements, per Section 11 B-202.4: City of Carlsbad 1E•-2176 7/23/15 • The area of specific alteration, repair or addition must comply as "new" construction. • A primary entrance to the building and the primary path of travel to the altered areaL must be shown to comply with all accessibility features. • The path of travel shall include the existing parking. • Please addre!ss the following comments that are the result of the alterations. 11. Show that the water closet is located in a space which provides: a) A clear space in front of the water closet in Men's 133 not obstructed by the urinal measuring 60" wide by 48" in front. Section 118-604.3.1. 12. Show the toilet tissue dispensers to comply with the following: • Shall be located on the wall or partition closest to the water closet, 7 inches minimum and 9 inches maximum in front of the water closet measured from the center line of the dispenser. • Mounted below the grab bar with the outlet of the dispenser at a minimum height of 19 inches. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of correct1ions from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes D No D The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. City of Carlsbad 15-21 7'6 7/23/15 [DO NOT PAY-THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK NO.: 15-2176 PREPARED BY: Doug Moc~dy DATE: 7/23/15 BUILDING ADDRESS: 2350 Camino Vida Roble BUILDING OCCUPANCY: B/Fl/81 BUILDING AREA J Valuation PORTION (Sq. Ft.) Multiplier Tl 257B7 43.32 Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdk::tion Code cb By Ordina nee Bldg. Permit Fee by Ordinance .,.. Pian Check Fee by Ordina nee ..,... Type of Review: .£.Q_mplete Review 0Repetitive Fee .,.. Repeats D Other D Hourly EsGil Fee Reg. VALUE Mod. D Structural Only 1-------11 Hr @ • ($) 1 '117, 093 1,117,093 $3,768.331 $2,449.411 $2,110.261 Comments: ln~ddition to the above fee, an additional fee of $86 is due (1 hour@ $86/hr.) for the CaiGreenreview. Sheet 1 of 1 macvalue.doc + : J PLAN CHECK REVIEW TRANSMITTAL DATE:07-23-2015 PROJECT NAME: PLAN CHECK NO: SIET#: ADDRESS: VALUATION: Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www .carlsbadca.gov PROJECT ID: APN: This plan check review is complete and has been APPROVED by the Division. By: A Final Inspection by the Division is required Yes No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checlklist. Please resubmit amended plans as required. For questions or clarifications on the attached checklist please contact the following reviewer as marked: Chris Sexton 760-602-4624 Gina Ruiz 760-602-4675 Remarks: Chris Glassen 760-602-2784 Christopher.Giassen@carlsbadca.gov Linda Ontiveros 760-602-2773 Greg Ryan 760-602-4663 Cindy Wong 760-602-4662 Dominic Fieri 760-602-4664 BUILDING PLANCHECK CHECKLIST ClUICK-CHECK/APPROVAL Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov ENGINEERING Plan Check for Date: Project Address: Project Description: ENGINEERING Contact: Phone: RESIDENTIAL INTIERIOR RESIDENTIAL ADDITION MINOR ( <$20,000.00) CARLSBAD PREMIER OUTLETS OTHER: GYM APN: Valuation: Email: Fax: TENANT IMPROVEMENT PLAZA CAMINO REAL COMPLETE OFFICE BUILDING r··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··, OFFICIAL USE ONLY ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT BY: DATE: REMARKS: Notification of Engineering APPROVAL has been sent to via on -··-··-··-··-··-~~·-··-··-··-··-··-··-··-··-··-··-··-··-· E-36 Page 1 of 1 REV 4/30/11 F~ee Calculation Worksheet ENGINEERING DIVISION Prepared by: Date: GEO DATA: LFMZ: I B&T: Address: Bldg. Permit#: Fees Update by: Date: Fees Update by: Date: EDU CALCULATIONS: List types and square footages for all uses. Types of Use: Sq.Ft./Units EDU's: Types of Use: Types of Use: Types of Use: D Sq.Ft./Units Sq.Ft./Units Sq.Ft./Units ADT CALCULATIONS: List types and square footages for all uses. Types of Use: Sq.Ft./Units Types of Use: Types of Use: Types of Use: FEES REQUIRED: Sq.Ft./Units Sq.Ft./Units Sq.Ft./Units EDU's: EDU's: EDU's: ADT's: ADT's: ADT's: ADT's: Within CFD: YES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) NO 1. PARK-IN-LIEU FEE: NW QUADRANT NE QUADRANT SE QUADARANT SW QUADRANT ADT'S/UNITS: I X FEE/ADT: I =$ D 2.TRAFFIC IMPACT FEE: ADT'S/UNITS: I X FEE/ADT: 3. BRIDGE & THOROUGHFAIRE FEE: DIST. #1 ADT'S/UNIT.S: FEE/ADT: 4. FACILITIES MANAGEMENT FEE ZONE: ADT'S/UNITS: I X FEE/SQ.FT./UNIT: 5. SEWER FEE EDU's BENEFIT AREA: EDU's 6. DRAINAGE FEES: ACRES: 7. POTABLE WATER FEES: I X FEE/EDU: IX PLDA: IX FEE/EDU: HIGH FEE/AC: I=$ DIST.#2 1=$ I=$ I=$ I=$ MEDIUM I=$ LOW UNITS CODE CONN. FEE METER FEE SDCWA FEE [{] DIST.#3 TOTAL D D [{] [Z] D PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-29 Planning Division 1635 Faraday Avenue {760) 602-4610 www.carlsbadca.gov DATE: 9/22/15 PROJECT NAME: Chuao Chocolatier PROJECT ID: MCUP 15-16 PLAN CHECK NO: CB 15··2176 SET#: ADDRESS: 2350 Camino Vida Roble APN: 213-050-27 c\ \~q\!6 .__·~~¥_vt_ lhis plan check review is complete and has been APPROVED by the Planning Division. By: Chris Garcia A Final Inspection by the Planning Division is required Yes [gJ No You may also have corrections from one or more of the divisions listed below. Approval divisions may to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. 1:8J This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checlklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: Michael Antonorsi For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 D Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov D Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov Chris Garcia 760-602-4622 Chris.Garcia@carlsbadca.gov ENGINEERING 760"602-2750 FIRE PREVENTION 760-602-4665 Remarks: MCUP 15-16 must be approved prior to building permit issuance. If accessory retail not proposed under this permit, please show the floor plan for the tenant improvements. The parking table shall be expanded accoJ•ding to the 1st review of MCUP 15-16. PLANNING DIVISION BUILDING PLAN CHECK Planning Division REVIEW CHECKLIST 1635 Faraday Avenue P-28 DO NOT FORWAfclti~~2;:~~~ DATE: 9-2-15PROJECT NAME: PROJECT ID: PLAN CHECK NO: CB 151-2176 SET#: 4 ADDRESS: 2350 Camino Vida Roble APN: 213-050-27-00 D This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required DYes 1ZJ No You may also have corrE~ctions from one or more of the listed Approval from these divisions may prior to the of a building permit. Resubmitted plans should include corrections ~ This plan check review is NOT COMPLETE. Items missing or incorrect are liste::·J on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: For questions or clarifications on the attached checklist please contact the follm:ving reviewer as marked: 760-602-4624 Chris.Sexton@carlsbadca.gov 0 Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov D Remarks: REVIEW#: 1 2 3 ~DO DO~ ~DO ~DO ~DO Plan Check No. CB 15-2176 Address 2350 Camino Vida Roble Date 9-2-15 Review #4 Planner Chris Sexton Phone (760) 602-4624 APN: 213-050-27-00 Type of Project & Use: Tl Net Project Density: DU/AC Zoning: P-M General Plan: .El Facilities Management Zone: .Q CFD (in/out) #_Date of participation: __ Remaining net dev acres: __ (For non-residential development: Type of land use created by this permit: __ ) Legend: ~ Item Complete Environmental Review Required: D Item Incomplete -Needs your action YES 0 NO 0 TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Discretionary Actiion Required: YES 0 NO 0 TYPE not as this time. APPROVALIRESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require actlon. Conditions of Approval: __ Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES 0 NO 0 CA Coastal Commiission Authority? YES 0 NO 0 If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive, Suite 103, San Diego, CA 921 08-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): Habitat Management Plan Data Entry Completed? YES D NO D If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Ac:·es of Habitat Type impacted/taken, UPDATE!) lnclusionary Housing Fee required: YES D NO D (Effective date of lnclusionary Housing Ordinance -May 21, 1993.) Data Entry Completed? YES D NO D (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) ~ D D Housing Tracking1 Form (form P-20) completed: YES D NO D N/A D P-28 Page 2 of 4 07111 Site Plan: DDr8J r8JDD r8JDD DDr8J r8JDD r8JDD DDr8J DDr8J DOD P-28 Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existin!~ and proposed structures, streets, existing street improvements, right-of- way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal description of property and assessor's parcel number. City Council Policy 44-Neighborhood Architectural Design Guidelines 1. Applicability: YES D NO D 2. Project complies: YES D NOD Zoning: 1. Setbacks: Front: Interior Side: Street Side: Rear: Top of slope: Required 50' Shown 50' Required __ Shown __ Required __ Shown __ Required __ Shown __ Required __ Shown __ 2. Accessory structure setbacks: N/A Front: Required __ Shown __ Interior Side: Required __ Shown __ Street Side: Required __ Shown __ Rear: Required __ Shown __ Structure separation: Required __ Shown __ 3. Lot Coverage: no additionsRequired __ Shown __ 4. Height: Required __ Shown __ 5. Parking: Spaces Required __ Shown __ (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required __ Shown __ Additional Comments (1) Please apply for a Minor Conditional Use Permit (MCUP). Per the Planned Industrial (P-M) ordinance, retail sales are only allowed with the approval of a MCUP. The link to the applications and application requirements will be attached to the email. (2) The screening walls for the trash bins need to be architecturally integrated with the surrounding building design as well as v1holly screened. (3) Please shm.v the pC!:£.ls:i:og breakdovm for the entire building. Building is based on the square footage of use to ensure there is adequate parking with the addition of the retail use with the tenant improvement. (4) The front vard setback from Camino Vida Roble is 50 feet measured from the right of wav and shall be entirely landscaped and irrigated. 1\nv type of structure in the front yard setback cannot exceed 42 inches in height (5) Is there new roof mounted equipment? If so, please show how it will be screened. 1\n example is attached. 8-24-15 (1) Please apply for the MCU P. (2) The trash bins cannot be screened by a 'A'all but have to screened on all four sides. Additionally, the screen 'Nails cannot protrude into the drivewav. (3) Park.ing is based on square footage of use. The breakdown does not include the retail that is boing proposed. (4) Ho·N tall are the planters located within the front yard setback? Page 3 of 4 07111 8-28-15 (1) Please remove all retail information on the site plan as retail use is not being proposed at this tirr'l&.- 8-31-15 Have not r'eceived resubmittals but have been given updates from the applicant. On 8-28-15, applicant stated that the proposed retail will be removed at this time and will be proposed at a later date. This morning applicant relayed that the retail is still being proposed and a MCUP will be submitted for the retail. Please apply for a minor MCUP. 9-2-15-same correction as August 31 51. Applicant/owner needs to apply for a minor CUP. OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE P-28 Page 4 of 4 07111 ~ ·" W CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL BUilDING DEPT: ~Y & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 08/12/2015 PROJECT NAME: CHUAO CHOCOLATIER PROJECTID:CB152176 PLAN CK NO: SET#: 2/1 ADDFtESS: 2350 CAMINO VIDA ROBLE APN: 1:8:1 This plan check review is complete and has been APPROVED by the FIRE Division. ·. By: GR A Final Inspection by the FIRE Division is required ~Yes D No D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan check comments have been sent to: randy@whiteconstructioninc.com; mark@ociodesigngroup.com You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans shoulcf include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: . ............. ... . ... •:"'· . .•· '?·./' ·":;::·PU\tf-~~~~;~-.·····c· .":::~::i~I!NGINEERJILG FIRE PRB¥ENTION .·~·~·0<" y •• ~ y iii"*JL:,.~ :?• .· .~;~~~2-4665 :.· ... ii;760-602461:0 ' ' .. ' • . (j!SQ-602-2750< · .. ·~~-· .. "·· : ""· iJt\::?i,""''J. .•.• . ;~\![:!; .·•·· ; .· D Chris Sexton D ~ Greg Ryan 760-602-4624 760-602-4663 Ch ris.Sexton@carlsbadca.gov Gregory.Ryan@carlsbadca.gov D Gina Ruiz D Linda Ontiveros D Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia. Wong@carlsbadca.gov D D D Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Carlsbad Fire Department BUILDING DEPT" Plan Review Requirements Category: TI , INDUST COPY Date of Report: Name: Address: Permit#: Job Name: Job Address: 08-12-2015 Reviewed by: q J}al( WHITE CONSTRUCTION 2540 GATEVv A Y RD CARLSBAD, CA 92009 CB152176 CHUAO CHOCOLATE-25,787 SF TI 2350 CAMI1'.JO VIDA ROBLE CBAD St: 101 Please review carefully all comments attached. Conditions: CITY OF CARLSBAD FIRE DEPARTMENT-APPROVED: w/ COMMENTS THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. Entry: 08112/2015 By: GR Action: AP PCSD Engineering Corp 3529 Coastview Court Carlsbad, CA 92010 Ph: 760-207-1885 Structural Design Calculations Tenant Improvement Client Chuao Chocolatier 2345 Camino Vida Roble Carlsbad, CA 92011 Project July 9, 2015 Ri.v. !J j1/IS' PCSD File #: 15-043 C!T't OF CARLS~" (:l. O!ViSIO:, ~ 'i <f. l* Paul Christenson San Diego Engineering 3529 Coastview Ct-Carlsbad, CA 92010 Telephone (760) 207-1885-Email: paul.pcsd@gmail.com 1.0 Design Criteria: Chuao Chocolatier 15-043 Code: 2013 California Building Code-ASCE 7-10 Timber: Douglas Fir-Larch (DF-L), WWPA or WCLIB 2x Wall Framing: OF-L #2 (unless noted otherwise) 2x Rafters & Joists: DF-L #2 " " Posts & Beams: DF-L #1 " " Glue-Lam Beams: Simple Span: Grade 24F-V4 (DF/DF) Grade 24F-V8 (OF/OF) Cantilevers: Sheathing: Min. APA-Rated Sheathing, Exposure 1, Plywood or OSB (U.N.O.) Engineered Framing Wood !-Joists: TJI110,210,230,360,560 ICC ESR-1153 1.9E Microllam, 2.0E Parallam ICBO ER-4979 Concrete: Concrete Block: Mortar: Grout: LVL, PSL Compressive Strength @ 28 days per ASTM C39-96: Footings: f'c = 2500 psi Grade Beams: f'c = 3000 psi Grade N-1 per ASTM C90-95, fm = 1500 psi per ASTM E447-92 Type S Mortar Cement per ASTM C270-95, Min. f'm = 1800 psi @ 28 days. Coarse Grout w/ 3/8" Max. Aggregate per ASTM C476-91, Min. fm = 2000 psi @ 28 days. Reinforcing Steel: #4 & Larger: #3& Smaller: ASTM A615-60 (Fy = 60 ksi) ASTM A615-40 (Fy = 40 ksi) Structural Steel: 'W' Shapes: ASTM A992, Fy= 50-65 ksi Plates, Angles, ChannelsASTM A36, Fy = 36 ksi Tube Shapes: ASTM A500, Grade B, Fy= 46 ksi Pipe Shapes: ASTM A53, Grade B, Fy=35 ksi Welding Electrodes: Structural Steel: E70-T6 E90 Series Bolts: Soils: References: A615-60 Rebar: Sill Plate Anchor Botts & Threaded Rods: Steel Moment & Braced Frames: 1500 psf Bearing Pressure A307 Quality Minimum A325 (Bearing, U.N.O.) . ~ . ·-:··-~!:'~---"~~·=-~--,---'--· ~·' ,?i",Jt::i.~n""n ef~r:~~ 2J1'!fc b_pee~:Uy- JOB 15-043 SHEET NO l. OF CALCULA TED-B-=V=--....,p=s"""C,.... DA.~T=e--=7""'/9"""'11'"""5- CHECK BY DATE .311' 3529 Coastview Ct -Carlsbad, CA 92010 SCALE --- PM~l. l!-Ans!e»1m SA.» PiDP :A~..m., .. ] Telephone (760) 207-1885-Email: paul.pcsd@gmail.com 2.0 LOAD LIST 2.1 Roof <Vaulted) Roofmg 15/32" Sheathing Roof Framing 6.0 psf 1.5 psf 2.8 psf 2.8 psf 5/8" Gyp. Bd. Insulation and Misc. _1.9 psf InL = 15.0 psf !,LL = 20.0 psf Total Load = -35.0 psf 2.2 Roof (w/ ceiling) Roofmg 6.0 psf 1.5 psf 2.8 psf 15/32" Sheathing Roof Framing Insulation and Misc. _1.7 psf I.oL = 12.0 psf ~LL = _1:0.0 psf Total Load= 32.0 psf 2.3 Ceiling Ceiling Joists 1.3 psf 5/8" Gyp. Bd. Insulation and Misc. 2.8 psf _1.9 psf !,DL = 6.0 psf !,LL = 10.0 psf Total Load = l6.0 psf 2.4 Walls Exterior Wall 7/8" Stucco 15/32" Sheathing 2x4 Studs@ 16" o.c. 5/8" Gypsum Bd. Misc. 9.0 psf 1.5 psf l.l psf 2.8 psf _0.6 psf IoL = 115.0 psf Interior Wall l/2" Gyp. Bd. (2 Sides) 2x4 Studs @ 16" o.c. Misc. 4.6 psf 1.1 psf 2.3 psf 8.0 psf :PnJr;r~:n efg;n~ ~eeMJ 3529 CoasMew Ct -Carlsbad, CA 9201 0 JOB 15-043 '3 OF _P_S£_ DA~TE~-=7/-:=9":"!/1-=-5- SHEET NO CALCULATED BY CHECK BY SCALE _____ DATE --- Telephone (760) 207-1885-Email: paul.pcsd@gmail.com 2.0 LOAD LIST (CONTIN) 2.5 Floor Floor Cover Sheathing 2xF.J. 518" Gyp. Bd. Insulation and Misc. 2.6Wind ~DL = Iu, = Total Load= 0.0 psf 0.0 psf 0.0 psf 0.0 psf 0.0 psf 0.0 psf 0.0 psf 0.0 psf Ps = AKzt•I*Ps30 (ASCE 7. Equation 6-1) P = 26.6 psf P = 16.0 psf (*0.6 ASD) 2.7 Seismic SMs = 1.142 Sos = {2/3) SMs Sos = 0.761 Sos Cs = (RII) Cs= 0.217 USE: V= 0.217 WoL ASD BASE SHEAR VASD V ASo= 0.155 WnL Equation 12.8-1 Applies WIND PARAMETERS Basic Wind Speed = 110 mph Exposure Cat = B ). = 1.00 (fig. 6-3) Ps3o = 26.6 psf Kzt = 1.00 (fig. 6-4) I= 1.0 USGS APPLICATION s.= 1.061 F.= 1.08 R= 3.5 hn = 25.00 S1= 0.410 fv= 1.59 I= 1.00 Occupancy Category: Site Class: 2 D SEISMIC DESIGN CATEGORY sl <0.75 S1 >0.04 Ss>o 15 (11.6 ASCE 7-05) ( 11.4.1 ASCE 7-05) (fig. 6-3) (table 11.5-1) T a= C1 "' (hn)0"75 = 0.224 Ts == S0tfS0s ~ 0.435 Ta < (0.8)Ts, OK k = 1.0 Ta<0.5 Seismic Design Category: D PCSD Engineering Corp 3529 Coastview Court Carlsbad, CA 92010 Ph: 760-207-1885 ?d CA\) \-\VAL EtatutPhfNr IJKtr l : 6'f1'£~)"L ~' .. 'f.z.l'\ ll~rr 2·-\1W" 0\.1.r.\ -· L'f'•6") -DtEvt LE.) Job#: IS:O't' Page: "' of Date: 7/1/15 ,. , Engineer: ('f. w~ tsw. 2'«'= YJD~r (..Jtzu,: l2.P.('.:l'c ~,; uo tF P•nzoac.~) (£.) !'}~"' 2.S.Y.z. C.LV-Vitll do( '"') ~A -= L> sa.. ?G._~ Project: Chuao Location: (RB-1) Ex Girder Bm Multi-Loaded Multi-Span Beam [2013 California Building Code(2012 NOS)] 6. 75 IN x 25.5 IN x 40.0 FT 24F-V4 -Visually Graded Western Species -Dry Use Section Adequate By: 1.3% Controlling Factor: Moment DEFLECTIONS ~ Live Load 0.96 IN U500 Dead Load 1.60 in Total Load 2.56 IN U188 Live Load Deflection Criteria: U240 Total Loacl Deflection Criteria: U180 REACTIONS Live Load Dead Load Total Load Bearing Length BEAM DATA Span Length 8 5600 lb 8806 lb 14406 lb 3.28 in Unbraced Length-Top Unbraced Length-Bottom Live Load Duration Factor Camber Adj. Factor camber Required Notch Depth MATERIAL PROPERTIES B. 5600 lb 8806 lb 14406 lb 3.28 in ~ 40 It 8 ft 40 ft 1.25 1.5 2.4 0.00 24F-V4 -Visually Graded Western Species Base Values Adjusted Bending Stress: Fb = 2400 psi Controlled by: Fb_cmpr = 1850 psi Fb' = 2538 psi Cd=1.25 C/=0.98 Cv=0.85 Shear Stress: Fv = 265, psi Fv' = 331 psi Cd=1.25 Modulus of Elasticity: E"' Comp.l. to Grain: Fe .1.= Controlling Moment: 152662 ft-lb 1800 ksi 650, psi 20.0 Ft from left support of span 2 {Center Span) E' = 1800 ksi Fe -J..> = 650 psi Created by combining all dead loads and live loads on span(s) 2 Controlling Shear: -144061b At right support of span 2 {Center Span) Created by combining all dead loads and live loads on span{s) 2 Comparisons with required sections: Section Modulus: Area (Shear): Moment of Inertia (deflection): Moment: Shear: &Wi 721.:B9 ln3 65.:24 in2 6951.!96 in4 1526152 ft-lb -1441:>6 lb ~ 731.53 in3 172.13 in2 9327.02 ln4 154701 ft-lb 38011 lb Paul Christenson PCSD Engineering Carlsbad, CA 92010 StruCalc Version 9.0.1. 7 UNIFORM LQADS Uniform Live Load Uniform Dead Load Beam Self Weight Total Uniform Load ~ 280 plf 360 plf 37 plf 677 plf POINT LOADS • CENTER SPAN Load Number ~ Live Load 0 lb Dead Load 1720 lb Location 20 ft 7/912015 5:18:55 PM J~ ~ .,, ~MM~&J ,?fgu,j"r;-r~.mn elm~~ :EnJineerlnJ 3529 Coastview Ct-Carlsbad, CA 92010 JOB 15-043 SHEETNO 5"' OF CALCUlATED BY PSC DAT~E~-=7/~9~/1~5- CHECK BY DATE SCALE --- PP.I-lti!-fujJ'Un~"'~~et z~.,...,., Telephone (760) 207-1885-Email: paul.pcsd@gmail.com S.O Lateral Design & Analysis Wind: P = A Kzt I pSJo A"" 1.00 Kzt=o 1.0 PS30= 26.6 psf I= 1.0 P= 16.0 psf (1\SC£ 7 • Equation &-l) (1ig {,)) (Jig 6-4) we 6-3) (table !IS-I) Seismic: V = C5 W DL s.= 1.061 Fa= 1.1 R= 3.50 V = 0.155 "' Wt * p (IBC Equation 12.8-1) S1= 0.410 Fv= 1.6 I= 1.00 (p-Redundancy) Criteria 1st Story 2nd Story Each Story Resists ,. 35% Base Shear: not satisfied satisfied Wind Loads Any Shear Wall w/ (h/1)>1.0 is< 33% Story Force: P = 16.0 psfx Trib Area Roof Level Direction: N/S = 16.0 psf x ------551 sq. ft.= 8794 lbs. 953 sq. ft. = 15210 lbs. Direction: E/W ;;:; 16.0 psf x ------ Roof Weight RoofWt. = Exterior Wall Wt = Interior Wall Wt = Ceiling Wt = 13.0 psf x 25360 sq. ft.= 329680 lbs. 87.0 psf x 4658 sq. ft.= 405246 lbs. 8.0 psf x 3344 sq. ft. = 26752 lbs. 6.0 psf x o sq. ft. = 0 lbs. -----:::---Total Trib. WR = 761678 lbs. Total Seismic Dead Load: Wt = 761678 lbs. ASD Base Shear: V = 0.155 • Wt = 118307 lbs. satisfied satisfied p= l I --------------------------··- PCSD Engineering Corp 3529 Coastview Court Carlsbad, CA 92010 Ph: 760-207-1885 4 ... 0 \VAlL. Dt'tN\.lCS Job #: l S' c,"('l Page: ' of ___ _ Date: -y I "1[ Engineer:___;~------ PIU.ul.lf STlfrL FQAktt. I Ill THf. L't) Ala;w I()' LA\.l-DP~~ 5\1fiNL LiAO n> lt..9G-CsrJL PG .2_ J 'lf't:: l18?w:f7"'fC>.\-= ~ .. z.l( , lbTAI~ LVJJ.c."r11 Dl:' ewe.. LL.tt.u.. R..l}1J)JM:o = 'I()' tob.'L ~ c.~: UA\.L: I~" c: Wa.: lS~~r ... z·a \w~r Lu..~ Z.UP!r-tl~ lbu~ '1r 1«..:. il fr ... J 0' .. 2.e:t.: J., .,."( 1.. PCSD Engineering PROJECT : PAGE : CLIENT : DESIGN BY: JOB NO. : REVIEW BY: INPUT DATA CONCRETE STRENGTH (ACI 31 B 5.1 .1) REBAR YJElD STRESS :·;_,.,.~,·; = ;;': ~:: ksi FACTORED AXIAL LOAD FACTORED MOMENT LOAD FACTORED SHEAR LOAD Pu -,i<k Mu :/$~Jft-k = ··:·.:130:-It ",.:~i~' ·:~ LENGTH OF SHEAR WALL L THICKNESS OF WALL t DEPTH AT FLANGE D OUTPUT SUMMARY SHEAR WALL LENGTH L SHEAR WALL THICKNESS END REINFORCING 2 # WALL HORIZ. REINF # WALL VERT. REINF # WIDTH AT FLANGE B = ::_/s:.:ln THE WALL DESIGN IS ADEQUATE. TOTAL WALL HEIGHT TO TOP hw = :t~if/; rt ~~~; g~R;~~i~·~~;~N:. : ,,&!'~·-~: •J:;l:;•. , :~: ~ ~: ~gg~~~:~~:~~~Tii8o~~-"~ t~\·:::~! .·h:lL' WALL EFFECTIVELY CONTINUOUS ? "t;'(~ < (ACI 21.9.6.2 apply) MAX CONCRETE COMPRESSION STRAINS MAX REINFORCEMENT TENSILE STRAINS ANALYSIS j);;~.(ASCE6.3.3.1) ~;·g;O$\(ASCE41·06 Sec. 6.3.3.1) DETERMINE WHETHER THE WALL CAN RESIST SEISMIC LOADS (2013 CBC 1908A.1.18) Pu = 5 < 0.35 Ag fc' = 819 k [Satisfactory] where Ag = r, L t 13.00 6.00 4 4 @ 4 @ ::: F--------1~· ,_. ,.--,----.---, .. _ I C•n_l I I t J j-··c--, I --<Cl t 4> Pn (k) 800 j 600 j 400 200 -200 2000 2500 ~00--------------------------------~ ~ Mn (ft·k) CHECK MINIMUM REINFORCEMENT RATIOS AND SPACING (ACI318-11 21.9.2.1 & 14.3) (Pdcmn. = 0.0020 [for Acv (10')0 5 = 46.80 kips > (p, lm1n. = 0.0012 [for Aev (fc'l0 5 = 46.80 kips > (Pt )pcovd. "' 0.0021 (PI )prov<~ = 0.0021 > (Pt)min. > (p; ),;, [Satisfactory] {Satisfactory] : I c = ~-C I vu , and bar size # 4 horizonta~ vu , and bar size # 4 vertical] where Acv = 936 in2 (gross area of concrete sect;on bounded by web thickness and IB11Qth in the shear direction) ft in 16 16 The proposed spacing Is less than the maximum permissible value of 1 a in and is satisfactory. Si11C8 wall Vu < 2 Acv (f0')c.o , ~curtain reinforcement required. (ACI31B-11 21.9.2.2) CHECK SHEAR CAPACITY (ACI31B-1121.9.4.1 & 21.9.4.4) $Yn =MIN(tAev(Uc(f0')05'~'Ptf~),,8Aev(fc')0'5] = 126.36 kips > Vu (Satisfactory) where '!J 0.60 (conservatively, ACI 31&.11 9.3.4 a) Uc= 2.0 (for h.,.IL 1708 =-2) p1 > Pt [Satisfactory] (only for hw /l" 2.0, ACI 318-11 21.9.4.3) ino.c. In o.c. 1 CHECK FLEXURAL & AXIAL CAPACIW MAXIMUM DESIGN AXIAL LOAD STRENGTH (AC1318·11 21.9.5. \ & Eq.10·2) 4> Pm .. =0.8 +I 0.85 f0' (Ag ·}I'll~+ fy Astl = 1114 kips. > Pu [Satisfaelory] where $ = 01.65 (ACI318·11 9.3.2.2) Ast = :2.7 in2. DESIGN MOMENT CAPACITY AT MAXIMUM AXIAl LOAD STRENGTH ARE FROM 0 TO 1398 ft.kip!i. FOR THE BALANCED STRAIN CON'DITION UNDER COMBINED FLEXURE AND AXIAl lOAD, THE MAXIMUM STRAIN IN THE CONCRETE AND IN THE TENSION REINFORCEMENT MUST SIMULTANEOUSLY REACH THE VALUES SPECIFIED IN ACI 318-11 10.3.2 AS 80 AND S.INPUT. TH!: DEPTH TO THE NEUTRAL AXIS AND EQUIVALENT RECTANGULAR CONCRETE STRESS BLOCK ARE GIVEN BY Cb=d80 1(8c+8s) = 74 in a=Cbf!, = 63 in f!, = 0.85 (ACI318-1110.2.7.3) 4> = 0.65 + (Et -0.002)(250/3) = 0.656 (ACI 318-11 Fig. R9.3.2) d = (l-0.50) = 150 in DESIGN AXIAL AND MOMENT CAPl•.CITIES AT THE BALANCED STRAIN CONDITION ARE 515 kips AND 2356 fl·klps. IN ACCORDANCE WITH ACI 318-11 9.3.2 THE DESIGN MOMENT CAPACITY WITHOUT AXIAl lOAD IS ojJ Mn = 0.9 Mn = 1031 kips. TO KEEP TENSION SECTION Wffil SHEAR CAPACITY PER ACI SEC. 11.1 0.6, THE PURE AXIAL TENSION CAPACITY IS -+ P0 = • 0.9 MIN{Ast Fy, Ast Es f:s, 3.3 f0'0 54 L t) = -143 kips. SUMMARY OF LOAD VERSUS MOMENT CAPACITIES ARE SHOWN IN THE TABLE BELOW. AND THEY ARE PLOTTED ON THE INTERACTION DIAGRAM AT FRONT PAGE. + Pn (kiplt) + Mn (ft.kipa) AT AXIAL LOAD ONLY = 1114 0 AT MAXIMUM LOAD :;: 1114 1398 ATO%TENSION 1111 1411 AT 25% TENSION 878 2107 AT 50% TENSION = 719 2323 ATE 1=0.002 521 2341 AT BALANCED c:ONDITION 515 2356 ATe 1=0.005 346 2523 AT FLEXURE O~ILY 0 1031 AT TENSION ONLY -143 0 DESIGN FORCES Pu & M" ARE ALSO PLOTTED ON THE INTERACTION DIAGRAM. FROM THE INTERACTION DIAGRAM. THE ALLOWABLE MOMENT AT AN AXIAL LOAD Pu IS GIVEN BY ~ M, = 1058 kiJIS. > ~ [Satlsfactoly) where ~ = Min{0.9, MaX[0.65 + (Et • 0.002)(25013), 0.85]} = 0.900 (ACI 318-11 Fig. R9.3.2) CHECK BOUNDARY ZONE REQUIREMENTS AN EXEMPTION FROM THE PROVIISION OF BOUNDARY ZONE CONFINEMENT REINFORCEMENT IS GIVEN BY ACl318-05 21.9.6.2, 21.9.6.3, and 21.9.6.5(8} PROVlDED THAT c < (L hwl/ (600 ~) for ACI21.9.6.2 apply or fc < 0.2 fc' for ACl 21.9.6.3 apply [Satisfactory) where c = 14 ln. (distance from the extreme compression fiber to neutral axis at Pu & Mn loads. ) 3u = '18.6 in. (design displacement. assume 0.00711,. as a conservative short cut, seeACI318-11 21.9.6.2a.) fe " (Pu I A)+ (~ y I I) " 0.190 ksl. (the m<ll<imum extreme fiber compressive stress at Pu & Mu loads.) y = 78 in. (distance from the extreme compression fiber to neutral axis at Pu & ~ loads. } A = 963 in2• (area of transfOrmed section. ) I = 1952893 in'. ( moment of inertia of transformed section. ) Or the longitudinal reinforcemow ratio at the wall end = 0.006 < 400 I fy [Satisfactory) HENCE BOUNDARY ZONE DETAIL REQUIREMENTS ARE NOT NECESSARY AND OMIT THE CALCULATIONS BELOW The boundary element length = MAX{ c -0.1l , 0.5 c J " 6.98 in. ( ACI 318-11 21.9.6.4) The maximum hoop spacing := MIN[ BJ3, 6db, 6, 4+(14-hx)/3] = 8 in.o.c. (AC!318-1121.6.4.2&21.9.6.5a) Ash, BDIR = (0.09 5 he f0') I fy11 = N/A in2. Ash, LDIR = {0.09 She fc') I fyh = N/A in2. ·-· ·-·-··------------·--··· {conl"d) INPUT DATA & DESIGN SUMMARY BEAM SECTION :}fS$f~b1/i . ' ' Tube .Fb • ORIENTATION {~~x.y~y) : ,<:~,i~'f(~ .. (strong axis bending) 271 in• COLUMN SECTION ;~~~**}:~t:~·,x(:~ Tube /, '" 271 in• ORIENTATION (x-x, y-y) ;:.;;;\x;~!;':,:' , {strong axis bending) BEAM LENGTH BETWEEN COL CENTERS STORY HEIGHT GRAVITY LOAD HA = Ho= V,.,=Vo= LATERAl LOAD HA=Ho= VA=Vo= GRAVITY ANALYSIS w = · /! o;'!4'.ti , kif 0.3 kips 4.6 kips 3.9 10.3 kips kips 4.5 8.2 ft-kips ft-klps Me = Me "' 56.6 ft-kips 4< = 1.20 in Kti = 6.5 kips I in {KH is frame stiffness.) n ~ lb!!.. = 1.318 Ic L wL VA=Vo=-== 4.6 kips 2 WL2(2n+1} M ~-= 8(2n+3) = LATERAL ANALYSIS -P..:..:h__,l (~1 +_2_n-'-) .!!.H"' 12nEJ, 0.3 kips 8.2 ft-kips 3.9 kips 10.3 kips 1.20 in WL' Ma=Mc-4(3+2n) E= 29000 ksi 8 c r I, _::: lc 1 ;' D () . \ L ,______.__._ LLl::LJ:__,___,_-..L-1 _,I 4.5 ft-kips 56.6 ft-kips 6.5 kips I in /] 'Ac I ' / I I ! H ·: VD ---- Vo PCSD Engineering INPUT DATA & DESIGN SUMMARY COLUMN SECTION A d 10.3 12.5 BEAM SECTION A d 10.3 12.5 STRUCTURAL STEEL YIELD STRESS tw 0.30 ... 0.80 THE FACTOR AXIAL LOAD ON THE COLUMN BEAM LENGTH BETWEEN COL. CEINTERS AVERAGE STORY HEIGHT OF ABOVE & BELOW "'> Wtt.K~l~< , br tr s)l lx 6.56 0.52 45.6 285 = > :wtu~-:: . <., · b, ~ s. lx 6.56 0.52 45.6 265 THE DESIGN IS AJDEQUATE. (Continuity column stiffeners 0.6875 x 6 wltll1/4" fillet weld to web & CP to flanges. A doubler plate Is req~1lred with thickness or 3/4 in. ) ANALYSIS THE SEISMIC DESIGN FACTOR COMPARISON (ASCE 7-10, Table 12.2-1) r)l 5.26 '• 5.26 ry 1.54 ry 1.54 PAGE: DESIGN BY: z. k 51 0.82 z. k 51 0.82 FRAME TYPE SMRF IMRF OMRF R 8 4.5 3.5 Co 5112 4 [~ .·. -~~- .......... J---- 3 CHECK BEAM LOCAL BUCKLING LIMITATION (AISC 341·10 Tab. 01.1) br I (2tr)" 6.31 < 0.3 (E,J Fy)05 = 7.22 {Satisfactory] [52/ (Fy)0·5 for AISC Seismic 97, Tab. 1-9-1] Where E9 "' 29000 ksi hIt,. = 36.20 < 2.45 (E1 / F~)0 5 = 59.00 [Satisfactory] [418/(Fy)c.s forFEMASec.3.3.1.2) CHECK COLUMN LOCAL BUCKING LIMITATION (AISC 341-10 Tab. D1.1) br I (2tr) = 6.31 < 0.3 (E1/ Fl5 = 7.22 [Satisfactory] (52/ (F )0·" for AISC Seismic 97, Tab. 1-9-1] 3.14(E.,IFy)o.5(1-1.54PJ~bPy) = 71.85 , forPui"'Py< 0.125 h /!,. = 36.20 < [ 520 I (Fy)05(1-1.64Puf%Py) for AISC Seismic S7, Tab. 1-9-1] (EJFl5 MAX[1.49, 1.12(2.33-Ca)] = NIA , for Puf,bPy > 0.125 .__ _ __,_{ MAXI..:..;_c-"--'-191 I (Fy)<l5(2.33·Puf%Py), 2531 (Fy)0·~ for AISC Seismic 97, Tab. 1-9-1} [Satlsfaclctry) Where 'b = 0.9 , Py = FyA = 515 kips CHECK CONTINUITY PLATE REQUIHEMENT (AISC 358-10 Sec. 2.4.4) let= MIN{ bbl/6 , 0.4[1.8bbftbf (FybRyb) I (FybRyb)] o.s }= 0.99 in > actual lc1 (The continuity plates required.) 151 = lbr for Interior connection, or (ll)f 12) for exterior connection "' bm"' 6 in < 1.79(E5 /Fys~)05 t,1 = $cPn,st = ~cFcr A= 340.1 kips Where q0 = 0.9 K = 0.75 0.52 in,USE o:69 in 34.93 in, (LRFD Sec. K1.9) [satisfactory] h01 =de-2k = 10.86 K hst I fst " 200 (AISC 360, E2) (Satlllfactory] A.c= 0.029 Fer= 35.99 ksi I =lot (2bst ·~ lwc) 3112,. A = 2bstlst + 25(1wc) 2 = rst=(I/A)05= 3.19 in Fyst = 36·.: kips, plate yield stress Pu,st = Ryb Fyb b,b lrt>" 187.6 kips < +cPn,st (Satisfactory] The best fillet weld SizE! (AISC 380-1 0 Sec.J2.2b) 114 In 0.125 In w= 0.25 in [Satisfactory] The required weld leng1th between A36 continuity plates and column web (AISC 360.10 Sec.J2.2b) l..w = 0.61atl,stFy I ((2) ¢1 Fw (0.707 W)] = (0.6875 X 7.9) X 36/ [(2) 0.75 (0.6x70)(0.707X114)] = 7.41 in Where lnet = de-2:(k + 1.5) "' 7.9 < 2(Lnat -0.5) [Satisfactory} (Use complete joint pen6tration groove welds between continuity plates & column flanges.) ------.. -·-------·"·------- CHECK PANEL ZONE THICKNESS REQUIREMENT {AtSC 341-10 Sec. E2.6e) IReqD"' MAX {!1, t2)"' 1.04 in 11 = Cy Mpr (h -db) I [0.9 (0.6) Fyc Rye d0 (~-tlb) h] = 1.04 In Where Cy = Sb I (Cpr Zb) = 0. 77 Cpr= 1.15 (AISC358-10Sec.2.4.3) Ry= 1.1 (AISC341-10Tab.A3.1) Sb=21b/db= 46 in2 lb = lx = 285 in~ Mpr = Nb CprRyFyb Zt, = 540 fl-kips . ,. ·: (OO~i'/ l I . i ·-:J -C~Piuo ,•,e ::- ! ·') o lo doJbler ~ __ :..L___,)_--.L._ ~ CJ~_/'_/- Nb = 2 , (if double side connection of beams, input 2) !2 = (dz + Wz) /90 =(de -21st+ de-2k) /90 = 0.24 in ~~; Since 1wc = 0.30 In < IRoqO , a doubler plate is <-.5 k I 1.5 required with thickness or 3/4 in. CHECK BEAM TO COLUMN CP FLANGES WELD AT 0.02 RADIANS STORY DRIFT (AISC 341-10 Sec. E2.6) n= Io!!._= Ic L 1.273 b=h(3"+1)= 7.81 fl 6n+l a=h(2!:_J= 6n+l L1=0.02h= 3nh 6E !1= 606 6.72 in ft-kips, (conservative value at center line of column) M Beam 2(1 + 6n) [!!.. +a1(!!_ +_!::_)] J,. I, 21. NUMBER. B 98910-Paul Scott Christenson ·Single Package License Mu.f"' MAX(IVMeeorn, 0.8Mp)" Where Technical References: 0.9 213 547 ft-klps. (AISC 341-10 Sec E3.6b) < +Mn = ~ 0.6FrD<X 0.5trbt(d-t,)' = 643 ft-kips, (AISC 360-10 Sec. J2.4) [Satisfactory] , changeable factor tor beam moment at column face fl-klps 1. AISC 341-10: "Seismic Provisions for Structural Steel Buildings". American Institute of Steel Construction, 2010. 2. AISC 360-10: "Specification for Structural Steel Buildings", American lns~tute or Steel Construction, 2010. 3. AISC 358-10: "Prequalified Connections for Special ancttntermectiate Steel Moment Frames for Seismic Applications", American lnstltute of Steel Construction, 2010. 4. Thomas A. Sabol, Ph.D .• S. E.: "2005 AISC Seismic Provisions ancl Seismic Desllln Manual Seminar" AISC Oct. 12, 2006. ?mJ"C:~:n"'h etm'l &r bJI:niJ{;"'1f 3529 Coastvliew Ct -Car1sbad, CA 92010 Telephone (i'60) 207-1885-Email· paul pcsd@gmail com 6.6 FOUNDATION DESIGN 6.1 CONTINUOUS FOOTING JOB 15-043 SHEETNO lt... OF CALCULATED BY .......... ~=--PSC DATE 7/9/15 DATE CHECK BY SCALE ----------------- w == 1125 plf ASBP = 1500 psf width= ~plf = 0.75 ft (MIN.) => 9 INCHES (MIN.) 1500 psf (EX) 24 '' WrDE CONTIN. FTG WI 1 -# 4 TOP AND BOTTOM & EMBED. l:S "INTO UNDISTURBED SOIL (MIN.) 6.2 MAX POINT LOAD ON FOOTING pall = 1500 • 24 * 48 ~-·~-­ / " / "' I . 2{0+42.) I I 12 12 Pall = 12000 lbs BUILDING ENERGY ANALYSIS REPORT PROJECT: Chuao Chocolatier Office 2350 Camino VIda Roble Carlsbad, CA 92011 Project Designer: OCIO Design Group, Inc. 1717 5th Avenue San Diego, CA 92101 619.232.0261 Report Prepared by: Brian Bannock PACIFIC COAST DESIGNS 27306 Rowel Court Valley Center, CA 92082-6837 760.751.9060 Job Number: 15238 Date: 8/12/2015 OF CARLSBAD BUILDING DIVISION The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential2013 Building Energy Efficiency Standards. Thiis program developed by EnergySoft, LLC-www.energysoft.com. User Number: 2314 /D: 15238 r~~c;.~, TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form PRF-01-E Certificate of Compliance 3 Form ENV-MM Envelope Mandatory Measures 25 HVAC System Heating and Cooling Loads Summary 26 Zone Load Summary 35 1.1!'',""' Energy Pro 6. 7 by EnergySoft Job Number: ID: 15238 User Number: 2314 Project Name: Chuao Office NRCC-PRF-01-E Page 1 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml -- A. PROJECT GENERAL INFORMATION 1. Project Location (city) Carlsbad 7. #of dwelling units 0 2. CAZip Code 92011 8. Compliance Software (version) EnergyPro 6.7 3. Climate Zone 7 9. Building Orientation {deg) (E) 90 deg 4. Total Conditioned Floor Area 24,599 ft2 10. Permitted Scope of Work NewComplete s. Total Unconditioned Floor Area 0 ft2 11. Building Type(s) Nonresidential 1 6. 1 #of Stories (Habitable Above Grade) 1 i I I j j B. COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS 1§ 140.1 BUILDING COMPLIES 1. Energy Component 2. Standard Design (TDV) 3. Proposed Design (TDV) 4. Compliance Margin (TDV) 5. Percent Better than Standard Space Heating 10.6 3.0 7.6 71.7% Space Cooling 38.9 21.7 17.2 44.2% Indoor Fans 14.6 6.7 7.9 54.1% Heat Rejection -------- Pumps & Misc. 0.8 --0.8 -- Domestic Hot Water 5.3 6.6 -1.3 -24.5% Indoor Lighting 59.7 59.7 --0.0% COMPLIANCE TOTAL 129.9 97.7 32.2 24.8% Receptacle 62.1 62.1 0.0% Process ------ Process Ltg ------ TOTAL 192.0 159.8 16.8% CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: N RCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 2 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml C. PRIORITY PLAN CHECK/ INSPECTION ITEMS (in order of highest to lowest TDV energy savings) 1st Space Cooling: Check envelope and mechanical 2nd Indoor Fans: Check envelope and mechanical 3rd Space Heating: Check envelope and mechanical 4th Pumps & Misc.: Check mechanical 5th Heat Rejection: Check envelope and mechanical 6th Indoor Lighting: Check lighting 7th I Domestic Hot Water: Check mechanical D. EXCEPTIONAL CONDITIONS E. HERS VERIFICATION This Section Does Not Apply F. ADDITIONAL REMARKS Calc is Based on : 25,353 SF Chocolate Factory Office Bldg. Compliance Margin By Energy Component (from Table B column 4) Space Cooling Indoor Fans Space Heating Pumps & Misc. Heat Rejection Indoor Lighting Domestic Hot Water THIS TITLE 24 ENERGY ANALYSIS IS FOR DESIGN & BID PURPOSES ONLY. FINAL SPECIFICATION & LIABILITY OF EQUIPMENT & INSTALLATION MUST BE DONE BY A LICENSED MECHANICAL CONTRACTOR. CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 3 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml ---- G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY Identify which building components use the performance or prescriptive path for compliance. "NA"= not in project ! For components that utilize the performance path, indicate the sheet number that includes mandatory notes on plans. Building Component Compliance Path Compliance Forms (required for submittal) Location of Mandatory Notes on Plans ~ Performance NRCC-PRF-ENV-DETAILS (section of the NRCC-PRF-01-E) Envelope D Prescriptive NRCC-ENV-01 I 02 I 03 I 04 I 05 I 06-E D NA ~ Performance NRCC-PRF-MCH-DETAILS (section of the NRCC-PRF-01-E) Mechanical D Prescriptive NRCC-MCH-01 I 02 I 03 I 04 I 05 I 06 I 07-E D NA ~ Performance NRCC-PRF-PLB-DETAILS (section of the NRCC-PRF-01-E) Domestic Hot Water D Prescriptive NRCC-PLB-01-E D NA ~ Performance NRCC-PRF-LTI-DETAILS (section ofthe NRCC-PRF-01-E) Lighting (Indoor Conditioned) D Prescriptive NRCC-LTI-01 I 02 I 03 I 04 I 05-E D NA D Perform ace 52 (section of the NRCC-PRF-01-E) Covered Process: D Prescriptive NRCC-PRC-011 03-E Commercial Kitchens ~ NA D Performance 53 (section of the NRCC-PRF-01-E) Covered Process: D Prescriptive NRCC-PRC-01/ 04-E Computer Rooms ~ NA D Performace 54 (section of the NRCC-PRF-01-E) Covered Process: D Prescriptive NRCC-PRC-011 09-E Laboratory Exhaust ~ NA CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 4 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml -~------~--~--------------~--- G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY The following building components are only eligible for prescriptive compliance. Indicate which are The following building components may have mandatory requirements per Part 6. Indicate relevant to the project. which are relevant to the project. Yes NA Prescriptive Requirement Compliance Forms Yes NA Mandatory Requirement Compliance Forms Lighting (Indoor Commissioning: §120.8 0 ~ NRCC-LTI-01 I 02 / 03 I 04 I 05-E ~ 0 Simple Systems NRCC-CXR-01 /02 I 03 I 05-E Unconditioned) §140.6 ~ 0 Complex Systems NRCC-CXR-01 I 02 I 04 I 05-E 0 ~ Lighting (Outdoor) §140.7 NRCC-LT0-01 / 02 / 03-E ~ 0 Electrical: §130.5 N RCC-ELC-01-E 0 ~ Lighting (Sign) §140.8 NRCC-LTS-01-E 0 ~ Solar Ready: §110.10 NRCC-SRA-01 I 02-E Covered Process: §120.6 N RCC-PRC-01-E I 0 ~ Parking Garage N RCC-PRC-02-E 0 ~ Solar Thermal Water NRCC-STH-01-E 0 ~ Commercial Refrigeration NRCC-PRC-05-E I Heating: §140.5 0 ~ Warehouse Refrigeration N RCC-PRC-06/07 /08-E 0 ~ Compressed Air NRCC-PRC-10-E 0 ~ Process Boilers NRCC-PRC-11-E i CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 5 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV}- Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance Confirmed (Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify). See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment. Building Component Compliance Forms (required for submittal) Pass Fail [8:1 NRCI-ENV-01-E-For all buildings D D Envelope D NRCA-ENV-02-F-NFRC label verification for fenestration D D [8:1 NRCI-MCH-01-E-For all buildings with Mechanical Systems D D [8:1 NRCA-MCH-02-A-Outdoor Air D D [8:1 NRCA-MCH-03-A-Constant Volume Single Zone HVAC D D D NRCA-MCH-04-H-Air Distribution Duct Leakage D D [8:1 NRCA-MCH-05-A-Air Economizer Controls D D [8:1 NRCA-MCH-06-A-Demand Control Ventilation D D D NRCA-MCH-07-A-Supply Fan Variable Flow Controls D D D NRCA-MCH-08-A-Valve Leakage Test D D D N RCA-MCH-09-A-Supply Water Temp Reset Controls D D Mechanical D NRCA-MCH-10-A-Hydronic System Variable Flow Controls D D D NRCA-MCH-11-A-Auto Demand Shed Controls D D [8:1 NRCA-MCH-12-A-Packaged Direct Expansion Units D D D NRCA-MCH-13-A-Air Handling Units and Zone Terminal Units D D D NRCA-MCH-14-A-Distributed Energy Storage D D D NRCA-MCH-15-A-Thermal Energy Storage D D D NRCA-MCH-16-A-Supply Air Temp Reset Controls D D D NRCA-MCH-17-A-Condensate Water Temp Reset Controls D D D NRCA-MCH-18-A-Energy Management Controls Systems D D D NRCV-MCH-04-H-Duct Leakage Test D D CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office N RCC-PRF-01-E Page 6 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml ---- H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV)- Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance Confirmed (Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify). See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment. Building Component Compliance Forms (required for submittal) Pass Fail ~ NRCI-PLB-01-E-For all buildings with Plumbing Systems D D D NRCI-PLB-02-E-required on central systems in high-rise residential, hotel/motel application. D D D NRCI-PLB-03-E-Single dwelling unit systems in high-rise residential, hotel/motel application. D D D NRCI-PLB-21-E-HERS verified central systems in high-rise residential, hotel/motel application. D D Plumbing D NRCI-PLB-22-E-HERS verified single dwelling unit systems in high-rise residential, hotel/motel application. D D D NRCV-PLB-21-H-HERS verified central systems in high-rise residential, hotel/motel application. D D D NRCV-PLB-22-H-HERS verified single dwelling unit systems in high-rise residential, hotel/motel application. D D D NRCI-STH-01-E-Any solar water heating D D ~ NRCI-LTI-01-E-For all buildings D D D N RCI-LTI-02-E -Lighting control system, or for an Energy Management Control System (EMCS) D D D NRCI-LTI-03-E-Line-voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used to D D energize only line-voltage track lighting D NRCI-LTI-04-E-Two interlocked systems serving an auditorium, a convention center, a conference room, or a theater D D Indoor Lighting D NRCI-LTI-05-E-Lighting Control Credit Power Adjustment Factor (PAF) D D D NRCI-LTI-06-E-Additional wattage installed in a video conferencing studio D D D NRCA-LTI-02-A-Occupancy sensors and automatic time switch controls. D D D NRCA-LTI-03-A-Automatic daylighting controls D D D NRCA-LTI-04-A-Demand responsive lighting controls D D D NRCI-LT0-01-E-Outdoor Lighting D D Outdoor Lighting 0 NRCI-LT0-02-E-EMCS Lighting Control System D D D NRCA-LT0-02-A-Outdoor Lighting Control D D Sign Lighting D NRCI-LTS-01-E-Sign Lighting D D Electrical ~ NRCI-ELC-01-E-Electrical Power Distribution D D Photovoltaic D NRCI-SPV-01-E Photovoltaic Systems D D CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office N RCC-PRF-01-E Page 7 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV)- Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance Confirmed (Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify). See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment. Building Component Compliance Forms (required for submittal) Pass Fail D NRCI-PRC-01-E Refrigerated Warehouse D D D NRCA-PRC-01-F-Compressed Air Systems D D D NRCA-PRC-02-F-Kitchen Exhaust D D D NRCA-PRC-03-F-Garage Exhaust D D Covered Process D NRCA-PRC-04-F-Refrigerated Warehouse-Evaporator Fan Motor Controls D D D NRCA-PRC-05-F-Refrigerated Warehouse-Evaporative Condenser Controls D D D NRCA-PRC-06-F-Refrigerated Warehouse-Air Cooled Condenser Controls D D D NRCA-PRC-07F-Refrigerated Warehouse-Variable Speed Compressor D D D NRCA-PRC-08-F-Electrical Resistance Underslab Heating System D D I. ENVELOPE GENERAL INFORMATION (See NRCC-PRF-ENV-DETAILS for more information) 1. Total Conditioned Floor Area 24,599 ft2 5. Number of Floors Above Grade 1 Confirmed 2. Total Unconditioned Floor Area 0 ft2 6. Number of Floors Below Grade 0 3. Addition Conditioned Floor Area 0 ft2 ., ., Ill ?b 4. Addition Unconditioned Floor Area 0 ft2 Ill Ill 7. Opaque Surfaces & Orientation 8. Total Gross Surface Area 9. Total Fenestration Area 10. Window to Wall Ratio North Wall 0 ft2 0 ft2 00.0% D D East Wall 2,080 ft2 256ft2 12.3% D D South Wall 3,295 ft2 395 ft2 12.0% D D West Wall 3,030 ft2 Oft2 00.0% D D Total 8,405 ft2 651 ft2 07.7% D D Roof 24,607 ft2 0 ft2 00.0% D D CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 8 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml J. FENESTRATION ASSEMBLY SUMMARY § 110.6 Confirmed 1. 2. 3. 4. 5. 6. 7. 8. 9. ~ "CC .., Fenestration Assembly Name I Overall Overall Overall Ill Ill Fenestration Type Certification Method1 Assembly Method Area ft2 Ill Ill -.... Ill Tag or 1.0. U-factor SHGC VT c Ill N Double Metal Tinted Vertical Fenestration DefaultPerformance Site Built 651 0.76 0.60 0.55 N D D -----------------···--------L_ __ -L__ 1 Newly installed fenestration shall have a certified NFRC Label Certificate or use the CEC default tables found in Table 110.6-A and Table 110.6-B. Site-built fenestration less than 1,000 ft2, or more than or equal to 1,000 ff see Reference Nonresidential Appendix NA6. 2 Status: N-New, A-Altered, E-Existing Taking compliance credit for fenestration shading devices? (if "Yes", see NRCC-PRF-ENV-DETAILS for more information) K. OPAQUE SURFACE ASSEMBLY SUMMARY § 120.7/ § 140.3 Confirmed 1. 2. 3. 4. 5. 6. 7. 8. "CC Framing Cavity Continuous U-Factor I F-Factor ~ Ill ~ Surface Name Surface Type Area (ft2) Ill Ill .... Ill Type R-Value R-Value I C-Factor c "' .. 7 Concrete Wall w/R-139 ExteriorWall 8405 NA 0 NA U-Factor: 0.452 N D D R-19 Roof Attic15 Roof 24607 Wood 19 NA U-Factor: 0.052 N D D Slab On Grade17 Underground Floor 24607 NA 0 NA F-Factor: 0. 730 N D D 1 Status: N-New, A-Altered, E-Existing L. ROOFING PRODUCT SUMMARY 1 § 140.3 Confirmed 1. 2. 3. 4. 5. 6. 7. "CC Aged Solar Thermal Cool Roof Ill ~ Product Type Product ~25 lb ft2 SRI CRRC Product ID Number Ill Ill Reflectance Emittance Credit R-19 Roof Attic15 No 0.08 0.75 NA No NA D D CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 _I Project Name: Chuao Office NRCC-PRF-01-E Page 9 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml --·----~· ~ M. HVAC SYSTEM SUMMARY (see NRCC-PRF-MCH-DETAILS for more information) § 110.1/ § 110.2 Dry System Equipment 1 (Fan & Economizer info included below in Table N) 1. 2. 3. 4. s. 6. 7. 8. 9. 10. 11. System Type Total Heating Supp Heat Total Cooling Acceptance Ill Supp Heat Efficiency Testing .... (Simple 3 or Ill Equip Name Equip Type Qty Output Output Output .... Source (Y/N) Required? (Y/N) s::: Complex 4) (kBtu/h) (kBtuh) (kBtu/h) U> Cooling Heating 5 "' Zone 1-System SZHP Simple 12133 2 47 No 0 144 EER-10.6 COP-6.0 Yes N Zone 1 -System SZHP Simple 1 36 No 1118 0 35 SEER-14.0 HSPF-8.0 Yes N Zone 2 -System SZHP Simple 2 48 No 91029 0 46 SEER-14.5 HSPF-8.0 Yes N Zone 3 -System SZHP Simple 1 60 No 538 0 58 SEER-14.5 HSPF-8.0 Yes N Zone 4 -System SZHP Simple 2 48 No 4651 0 46 SEER-14.5 HSPF-8.0 Yes N Zone 5 -System SZHP Simple 1 48 No 357 0 46 SEER-14.5 HSPF-8.0 Yes N Zone 6-System SZHP Simple 1 36 No 265 0 35 SEER-14.5 HSPF-8.0 Yes N Zone 7 -System SZHP Simple 1 60 No 172 0 58 SEER-14.5 HSPF-8.0 Yes N Zone 8 -System SZHP Simple 2 116 No 7 893 0 114 EER-12.3 COP-6.0 Yes N Wet System Equipment 2 Pumps 12. 13. 14. 15. Equip Name Equip Type Qty Vol (gal) Glowcore GWH1502 Storage 1 80 -- -1 Dry System Equipment includes furnaces, air handling units, heat pumps, etc. 2 Wet System Equipment includes boilers, chillers, cooling towers, water heaters, etc. 3 Simple Systems must complete NRCC-CXR-03-E commissioning design review form 16. 17. 18. Rated Capacity Efficiency Standby Loss (kBtu/h) 150 Thrml. Eff.: 0.836 0.0700 19. 20. 21. 22. 23. 24. Tank Ill VSD .... Qty HP Ill Ext. R GPM .... (Y/N) s::: Value U> "' NA NA NA NA No N Confirmed "C ... Ill ~ U> U> D D D D D D D D D D D D D D D D D D Confirmed "C ... Ill ~ U> U> D D CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office Project Address: 2350 Camino VIda Roble Carlsbad 92011 Compliance Scope: NewComplete ---------- 4 Complex Systems must complete NRCC-CXR-04-E commissioning design review form 5 A summary of which acceptance tests are applicable is provided in NRCC-PRF-MCH-DETAILS 6 Status: N-New, A -Altered, E-Existing -- NRCC-PRF-01-E Page 10 of 22 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Input File Name: Chauo_Office.xml --------------····------ Discrepancy between modeled and designed equipment sizing? (if "Yes", see Table F. "Additional Remarks" for an explanation) No N. ECONOMIZER & FAN SYSTEMS SUMMARY1 § 140.4 Confirmed 1 1. 2. 3. 4. s. I Outside Supply Fan Return Fan Air " ., Economizer Type Ill ~ Equip Name Ill TSP TSP Ill (if present) CFM CFM HP BHP (inch Control CFM HP BHP (inch Control WC) WC) Zone 1 -System 456 5000 0.050 0.050 0.04 ConstantVolume 5000 0.050 0.050 0.04 ConstantVolume DifferentiaiEnthalp D D 12133 y Zone 1 -System 192 1200 0.050 0.050 0.13 ConstantVolume 1200 0.050 0.050 0.16 ConstantVolume DifferentiaiEnthalp D D 1118 y Zone 2 -System 202 1600 0.050 0.050 0.10 ConstantVolume 1600 0.050 0.050 0.12 ConstantVolume Differential Enthalp D D 91029 y Zone 3 -System 357 2000 0.050 0.050 0.10 ConstantVolume 2000 0.050 0.050 0.10 ConstantVolume DifferentiaiEnthalp D D 538 y Zone 4 -System 184 1600 0.050 0.050 0.10 ConstantVolume 1600 0.050 0.050 0.12 ConstantVolume DifferentiaiEnthalp D D 4 651 y Zone 5 -System 221 1600 0.050 0.050 0.10 ConstantVolume 1600 0.050 0.050 0.12 ConstantVolume DifferentiaiEnthalp D D 357 y Zone 6-System 79 1200 0.050 0.050 0.13 ConstantVolume 1200 0.050 0.050 0.16 ConstantVolume DifferentiaiEnthalp D D 265 y Zone 7 -System 478 2000 0.050 0.050 0.10 ConstantVolume 2000 0.050 0.050 0.10 ConstantVolume DifferentiaiEnthalp D D 172 y Zone 8-System 478 4000 0.050 0.050 0.05 ConstantVolume 4000 0.050 0.050 0.05 ConstantVolume DifferentiaiEnthalp D D 7 893 y 1 Mechanical ventilation calculations and exhaust fans are included in the NRCC-PRF-MCH-DETA/LS section CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office N RCC-PRF-01-E Page 11 of 22 Project Address: 2350 Camino Vida Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml --.... ----------- 0. EQUIPMENT CONTROLS 1 § 120.2 Confirmed 1. 2. 3. ~ ., Ill ~ "' Equip Name Equip Type Controls "' No DCV Controls Zone 1 -System 12 133 SZHP Differential Enthalpy Economizer D D No Supply Air Temp. Control No DCV Controls Zone 1 -System 1118 SZHP Differential Enthalpy Economizer 0 0 No Supply Air Temp. Control No DCV Controls Zone 2 -System 9 1029 SZHP Differential Enthalpy Economizer D D No Supply Air Temp. Control No DCV Controls Zone 3 -System 538 SZHP Differential Enthalpy Economizer D D No Supply Air Temp. Control No DCV Controls Zone 4 -System 4 651 SZHP Differential Enthalpy Economizer D D No Supply Air Temp. Control 1 Zones With C02Sensor Vent. Control Zone 5 -System 357 SZHP Differential Enthalpy Economizer D D No Supply Air Temp. Control No DCV Controls Zone 6 -System 265 SZHP Differential Enthalpy Economizer D D No Supply Air Temp. Control 1 Zones With C02Sensor Vent. Control Zone 7-System 172 SZHP Differential Enthalpy Economizer D D No Supply Air Temp. Control No DCV Controls Zone 8 -System 7 893 SZHP Differential Enthalpy Economizer D D No Supply Air Temp. Control DHW1-SHW Service Hot Water, Primary Only Fixed Temperature Control, No DDC D D P. SYSTEM DISTRIBUTION SUMMARY 1 § 120.4/ § 140.4(i) This Section Does Not Apply Does the Project Include Zonal Systems? (if "Yes", see NRCC-PRF-MCH-DETAILS for system information) CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 12 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml Does the Project Include a Solar Hot Water System? (if "Yes", see NRCC-PRF-MCH-DETAILS for system information) No Multifamily or Hotel/ Motel Occupancy? (if "Yes", see NRCC-PRF-MCH-DETAILS for DHW system information) No Q. INDOOR CONDITIONED LIGHTING GENERAL INFO (see NRCC-PRF-LTI-DETAILS for more info) § 140.6 Confirmed 1. 2. 3. 4. 5. "tl .., Conditioned Floor Area 2 Installed lighting Power lighting Control Credits Ill ~ Occupancy Type 1 Additional (Custom) Allowance "' "' (ft2) (Watts) (Watts) Area Category Footnotes Tailored Method (Watts) D D (Watts) Commercial and Industrial Storage Areas (conditioned 7,357 4,414 0 0 0 D D or unconditioned) General Commercial and Industrial Work Areas, low 9,071 8,164 0 0 0 D D Bay Office (250 square feet in 4,938 4,938 0 0 0 D D floor area or less) Corridors, Restrooms, Stairs, 1,279 768 0 0 0 D D and Support Areas Retail Merchandise Sales, 882 1,058 0 0 0 D D Wholesale Showroom Dining Area 524 576 0 0 0 D D laundry 264 238 0 0 0 D D locker/Dressing Room 284 227 0 0 0 D D Building Totals: 24,599 20,383 0 --L__ -- 1 See Table 140. 6-C 2 See NRCC-LT/·01-Efor unconditioned spaces R. INDOOR CONDITIONED LIGHTING SCHEDULE (Adapted from NRCC-LTI-01-E)l 1 § 13o.o This Section Does Not Apply 11f lighting power densities were used in the compliance model Building Departments will need to check prescriptive forms for Luminaire Schedule details. CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 13 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml Sl. COVERED PROCESS SUMMARY-ENCLOSED PARKING GARAGES l§ 140.9 This Section Does Not Apply 52. COVERED PROCESS SUMMARY-COMMERCIAL KITCHENS 1§ 140.9 This Section Does Not Apply lsi COVERED PROCESSSUMMARY-COMPUTER ROOMS I§ 140.9 I I This Section Does Not Apply ' I 54. COVERED PROCESS SUMMARY-LABORATORY EXHAUSTS 1§ 140.9 This Section Does Not Apply T. UNMET LOAD HOURS Thermal Zone Name Cooling Unmet Load Hour Limit for Proposed Cooling Unmet Load Hours Heating Unmet Load Hour Limit for Proposed Heating Unmet Load Hours Thermal Zone Thermal Zone 9-Zone 7-Lunch 150 4224.25 150 1.5 ---~~--~------- U. ENERGY USE SUMMARY Electric Natural Gas (kWh/yr) (therms/yr) Total Annual Baseline 154165 2228.83 Total Annual Proposed 133895 988.346 CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 14 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1§ 10-1o3 I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Brian Bannock Signature: ~~4/? -.V'· Company: PACIFIC COAST DESIGNS ~~~ 1/l/ Address: 27306 Rowel Court Signature Date: 08/12/15 City/State/Zip: 27306 Rowel Court CA 92082-6837 CEA Identification (If applicable): Phone: 760.751.9060 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1 I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. 2 I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. 3 I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Responsible Envelope Designer Name: Rodolfo Ocio (~rL1 / Signature: r0 ( r-~-Company: OCIO Design Group, Inc. "-_, Address: 1717 5th Avenue Date Signed( 08/12/15 City/State/Zip: 1717 5th Avenue CA 92101 Declaration Statement Type: Phone: 619.232.0261 Title: I License#: Responsible Lighting Designer Name: Kevin Patterson Signature:;{;JiAA ~faiuj) /UJj? Company: Progressive Electric Co. Address: 12622 Ocaso Drive Date Signed: 08/12/15 City/State/Zip: CA 92128 Declaration Statement Type: Phone: 858.524.6458 Title: I License#: Responsible Mechanical Designer Name: Gus Morrison t_IL Company: Action Air, Heat & Solar Signature: Address: 2750 S. Santa Fe Ave. Date Signed: 08/12/15 I City/State/Zip: 2750 S. Santa Fe Ave. CA 92069 Declaration Statement Type: Phone: 760.727.4152 Title: I License#: I --------·---- CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 15 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml NRCC-PRF-ENV-DETAILS -SECTION START- A. OPAQUE SURFACE ASSEMBLY DETAILS Confirmed 1. 2. 3. 4. '1:1 Ql ~ Surface Name Surface Type Description of Assembly Layers "' Notes "' 7 Concrete Wall w/R-139 ExteriorWall Concrete-140 lb/ft3-6 in. D D Air-Cavity= \AJall Roof Ceiling-4 in. or more Asphalt shingles-1/4 in. Vapor permeable felt-1/8 in. R-19 Roof Attic15 Roof Plywood-1/2 in. D D Air-Cavity-Wall Roof Ceiling-4 in. or more Wood framed roof, 24in. OC, 3.5in., R-19 Gypsum Board-1/2 in. Slab On Grade17 Underground Floor D D ------ B. OVERHANG DETAILS (Adapted from NRCC-ENV-02-E) This Section Does Not Apply NRCC-PRF-MCH-DETAILS -SECTION START- A. MECHANICAL VENTILATION AND REHEAT (Adapted from 2013-NRCC-MCH-03-E) Confirmed 1. DESIGN AIR FLOWS 2. VENTILATION (§ 120.1) ::1: c c :;1:1 -1 1'1"1 1'1"1 1'1"1 :s: n c 1'1"1 ~ VI :s: :s: :s: .q c :;1:1 i VI 0 1'1"1 )> c; c; z )> ... ~ c z s: VI z c 1'1"1 z VI z )>Z ... -X c < c z c; c; z 53: ... ~ 5~ n n< < VI C'l ;i:i'l:l 1'1"1 ::::j z 1'1"1 ... '1:1 z z 1'1"1 ........ ... ::!:! :E~ r-c: :ec: n 5 -< z ... 1'1"1 z c :;1:1 ~s: 0 -1 nm :s:z -1 -< :;1:1 '1:1 n n~ n ";] CONDITIONED 53: ..,S: z ~ z '"z c: nm ;e: < Ql -0 '"" s:_, s: _ _, )> "' co '"l> :e;; ~::!:! -:t: ::l:l:J: -1 !!l 1'1"1 'C '1:1 :i:i ..,z :;1:1 f:< "' -ZONE NAME ... S:;~:~ nm l>m :;1:1 c ""::;:;'1:1 ID 1'1"1 S:-1 ... z -< -< Q:s: ~~ g~ 0 1'1"1 )> ... 1'1"1 0 Ul :;1:1 ... -l> 5 ~ )> !ris: ... s: :;1:1 .!:::!:;~:~ ... 0 '1:1 5 :i:i p C'l -)> < :E :i:i s:-0:;~:~ -z oz 1'1"1 )> '1:1 ::s 1'1"1 ~ a )> 1'1"1 -:;~:~ :E ... -~ Z< C'l ZC'l ~ :;1:1 5 ... ;;; 1'1"1 0 VI n -1 ... :s: ;e: )> )> = )> '1:1 0 n :E ... 1'1"1 0 c: :;1:1 :i:i :i:i N ... z ... ~ s: :E :s: -1'1"1 ~ 1-Zone 1 Zone 1-Zone 1- Warehouse System 12 5,000 NA NA NA NA N System 12 6,079 0.15 12 75.0 912 912 NA N D D 133 133 --------- CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 16 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml ----------------- A. MECHANICAL VENTILATION AND REHEAT (Adapted from 2013-NRCC-MCH-03-E) Confirmed 1. DESIGN AIR FLOWS 2. VENTILATION (§ 120.1) :::t c c ::1:1 .... m m c m m s: s: s: n s: .Q c ::1:1 !j "" "" 0 m )> C5 C5 z ~ )> c z s: "" z c m z "" z z )>Z ., -... 3: .,x c < c z C5 -n< < C5 "" Gl $-c 5S: 53: n m :::j z m ., "" z z m ....... ::1:1 .,2!:! :e~ 5C:: :ec:: n 6 -< z .,m z c n 0 .... nm s:z .... -< ::1:1 !2 "" ., CONDITIONED _o n3: 5S: :es: .,S: z ~ z .,z c:: ........... )> nm ~ !II ~ .,"" s: .... s: .,z Ill co .,)> :E$; ~2!:! -:::t ::l:l:::t .... !!! m -c "" $ ::1:1 t< Ill ZONE NAME ,.... S:::~:~ nm )om ::1:1 c ....... "" m m S:-1 ., z -< -< Qs: ~~ g~ 0 m )> ;::m 0 ;;! ::1:1 ., -)> 5 ~ ~ !ris: ,.... s: ::1:1 ~::1:1 ., 0 "" 5 $ p Gl -)> < :e s:-0;:~:~ -z oz m )> "" :I m :e ~ ::1:1 _z Z< Cl ZCl ~ 0 )> ::1:1 m -::~:~ ., 0 "" ,.... n !!! ., 3: )> )> )> -;: m 0 n 0 ,.... = )> "" :e ., m 0 c:: $ $ $ ~ ,.... z ., .§ s: :e s: m .§ 2-Zone 1 Zone 1-Zone 1-Warehouse System 1118 1,200 NA NA NA NA N System 1118 1,278 0.15 3 75.0 192 192 NA N D D Shipping . 3-Zone 2-Zone 2-Zone 2- System 9 1,600 NA NA NA NA N System 9 2,694 0.15 27 15.0 404 404 NA N D D Packaging 1029 1029 4-Zone 3 -Office Zone 3-1,649 NA NA NA NA N Zone 3-1,961 0.15 20 15.0 294 294 NA N D D Ring System 538 System 538 5-Zone 3-RR I Zone 3-351 NA NA NA NA N Zone 3-418 0.15 4 15.0 63 63 NA N D D Carr System 538 System 538 6-Zone 4 -Open Zone 4-1,600 NA NA NA NA N Zone 4-2,453 0.15 25 15.0 368 368 NA N D D Office System 4 651 System 4 651 7-Zone 5-Retail Zone 5-1,600 NA NA NA NA N Zone 5-882 0.25 29 7.5 221 221 NA y D D System 357 System 357 8-Zone 6-Multi Zone 6-1,200 NA NA NA NA N Zone 6-524 0.15 5 15.0 79 79 NA N D D Room System 265 System 265 9-Zone 7-Lunch Zone 7-542 NA NA NA NA N Zone 7-524 0.50 35 7.5 262 262 NA y D D System 172 System 172 10-Zone 7-Zone 7-273 NA NA NA NA N Zone 7-264 0.15 3 13.5 40 40 NA N D D Laundry I Jani System 172 System 172 11-Zone 7-Zone 7-294 NA NA NA NA N Zone 7-284 0.17 6 7.5 47 47 NA N D D Lockers System 172 System 172 12-Zone 7 -RR I Zone 7-891 NA NA NA NA N Zone 7-861 0.15 9 15.0 129 129 NA N D D Carr System 172 System 172 -- CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 17 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml A. MECHANICAL VENTILATION AND REHEAT {Adapted from 2013-NRCC-MCH-03-E} Confirmed I 1. DESIGN AIR FLOWS 2. VENTILATION(§ 120.1) ::t c c ;;l;l -t m m c m m s: s: :5: n s: .q c ;;l;l ~ II> VI 0 m l> 15 15 .... ~ l> l> c z :5: II> z c m z l>Z X ..,x c < 15 II> z z c :z < 15 II> Cl $~ 5S: .... ll: 5li: n m ::::j z -n< m .... ~ 8 z -< z z m I ......... ;;l;l ..,2:! :ec: r-c: :ec: -t 0 z .., m ;;l;l c ~ n nli: r-:s: ..,s: 0:5: nm c: :s:z -t -< n Ill .... CONDITIONED -0 ~::t ..,:5: z ~ z ..,z .......,-t l> nm l> < "' ~ co "TTl> ol> ;;l;l"'CI ;;l;l::t -t m :5:-t :5: -c ~ ii ..,z ii '< "' ZONE NAME ,.... :s:;;l;l :E;;I;l l>2:! nm l>m ;;l;l !!I c '::;;~ 11) m :S:-t .... ~ z --< --< n,. "TT'b n'b 0 ~ )> .... '" 0 ~ :tl .,., -)> 6 ;!:: !;i:s: ........ :5:::! ::!::! ,.... ;;l;l ~::0 ... 0 ~ ,.... ii p Cl -J> q 0 :E :s:-o;;l;l -z oz m l> ~ ::J m II> ;;l;l 6 l> m -;;l;l :E ... -~ Z-< Cl ZCI § ;;l;l ,.... n -< ... ~ m 0 II> 0 !!I ,.... :5: !!: l> ;!:: p l> ~ 0 n :E ... I m 0 c: ;;l;l ii ;;l;l N ,.... z ... :5: :5: :E :5: -m .§ - 13-Zone 8-Zone 8-4,000 NA NA NA NA N Zone 8-6,377 0.15 64 15.0 957 957 NA N D D Production System 7 893 System 7 893 I I TOTAL 24,599 242 3,968 3,968 NA D D ---------- B. ZONAL SYSTEM AND TERMINAL UNIT SUMMARY § 140.4 1. 2. 3. 4. 5. 6. 7. s. Confirmed Rated Capacity Airflow (cfm) Fan (kBtuh) ~ ... System ID System Type Qty Economizer Zone Name Ill ~ "' Min. ECM "' Heating Cooling Design Min. Ratio BHP Cycles Motor Zone 1 Uncontrolled 2 NA NA NA 1-Zone 1 Warehouse 5000 NA NA NA D D D Warehouse5-TRM NA Zone 1 Warehouse Uncontrolled 1 NA NA NA 2-Zone 1 Warehouse 1200 NA NA NA NA D D D Shipping20-TRM Shipping Zone 2-Uncontrolled 2 NA NA NA 3-Zone 2-Packaging 1600 NA NA NA NA D D D Packaging31-TRM Zone 3 -Office Uncontrolled 1 NA NA NA 4-Zone 3-Office Ring Ring40-TRM 1649 NA NA NA NA D D D Zone 3-RR I Uncontrolled 1 NA NA NA 5-Zone 3 -RR I Carr 351 NA NA NA NA D D D Corr45-TRM Zone 4-Open Uncontrolled 2 NA NA NA 6-Zone 4-Open Office 1600 NA NA NA NA D D D Office52-TRM Zone 5-Retaii58-TRM Uncontrolled 1 NA NA NA 7-Zone 5-Retail 1600 NA NA NA NA D D D -1......--------------- CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 18 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml B. ZONAL SYSTEM AND TERMINAL UNIT SUMMARY § 140.4 1. 2. 3. 4. 5. 6. 7. 8. Confirmed Rated Capacity Airflow (cfm) Fan (kBtuh) "0 ~ System ID System Type Qty Economizer Zone Name Ql "' Min. ECM "' Heating Cooling Design Min. Ratio BHP Cycles Motor Zone 6-Multi Uncontrolled 1 NA NA NA 8-Zone 6-Multi Room 1200 NA NA NA NA D D D Room67-TRM Zone 7-Lunch73-TRM Uncontrolled 1 NA NA NA 9-Zone 7-Lunch 542 NA NA NA NA D D D Zone 7-Laundry I Uncontrolled 1 NA NA NA 10-Zone 7-Laundry I Jani 273 NA NA NA NA D D D I Jani78-TRM Zone 7-Uncontrolled 1 NA NA NA 11-Zone 7-Lockers 294 NA NA NA NA D D D I Lockers83-TRM Zone 7-RR I Uncontrolled 1 NA NA NA 12-Zone 7-RR I Corr 891 NA NA NA NA D D D Corr87-TRM Zone 8-Uncontrolled 2 NA NA NA 13-Zone 8-Production 4000 NA NA NA NA D D D Production95-TRM ---. -----. --- C. EXHAUST FAN SUMMARY This Section Does Not Apply D. DHW EQUIPMENT SUMMARY-(Adapted from NRCC-PLB-01} § 110.3 Confirmed 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. "0 ..., Distribution Rated Input Pilot Energy External Tank Vol. of Suppl. Ql !'1: DHWName Fuel Type Qty Efficiency Vol Standby Loss "' "' Type kBtuh (Btu/h) Insulation Storage Tank Glowcore NaturaiGas Storage 1 Nonrecirculating 150 Thrml. Eff.: 0 NA 80 0.07 NA D D GWH1502 0.836 E. MULTI-FAMILY CENTRAL DHW SYSTEM DETAILS This Section Does Not Apply F. SOLAR HOT WATER HEATING SUMMARY (Adapted from NRCC-STH-01) This Section Does Not Apply CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office N RCC-PRF-01-E Page 19 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml G. MECHANICAL HVAC ACCEPTANCE TESTS & FORMS (Adopted from 2013-NRCC-MCH-01-E) §RA4 Declaration of Required Acceptance Certificates (NRCA)-Acceptance Certificates that may be submitted. (Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify). s: s: s: s: s: s: s: s: s: s: s: s: s: s: s: s: s: Test Description n n n n n n n n n n n n n n n n n Confirmed ":f :I: :I: :I: :I: :I: :I: :I: ":f :I: :I: ":f :I: :I: :I: ":f ":f 0 6 6 6 6 6 6 6 .... .:.. .:.. .... .:.. .:.. .:.. .... .... N IN ..,. U1 en ...... co ID 0 .... N IN ..,. U1 en ...... co l> l> l> l> l> l> l> l> l> l> l> l> l> l> l> l> l> Vl rn Vl l> 0 ~ :;-n <: I <: .., l> v;· "0 n 0 Vl "0 < <: "0 OQ ~ :::l <: ~ "0 a. ... 0 ... ... < ;;oO 0 iii" 0 0 0 0 -1 Ill :::l Equipment ., "0 < rn rn V> a. <: 0 3 "0 < n~ no 0' .., o:J Vl ~ Ill Ill ... N < Ill "gj'~ 0 Ill NO ... :::l rn Requiring #of a. 0 v;· i'i" 0 0 ., ., X~ Vl ..., n -o .., 0 :::l ... Ill n .., iii" :::l -· :::l 3 0 0 l>~ < rot nV> "' "' Testing or units Q Ill ..., < "' V> ... ... "' ... "' 0 :::l -V> 0 Ill s: "' 0 "' Ill Ill a Q: Q.5_ X Ill Q ... 3 :::l ., "' -n :::l " ... ., nVl Ill Vl Verification ~ c <: 0 "' -Ill c ... 3 "0 ~::iE :::l n :;;; rot l> ., ;:;: ... :::l OQ .., Vl :::l 0 V> 0 "' V> ... Ill 3 0 :::r ;:;: ., OJ ;;o Vi'"(ij "' a < -< ::: Ill V> !20 OQ Ill ..., V> "0 a. Ill "' Ill ... DHWl-1 D D ---- -- ---- -------- ---- -------- ----SHW Zone 1- System 12 2 X X --X ------------X -- -------- --D D 133 Zone 1- System 1 X X --X ------ -- -- ---------- -- -- --D D 1118 Zone 2- System 9 2 X X --X -- -------- -- -- ------ -- -- --D D 1029 Zone 3-1 X X X X D D ------------ ---- ----------System 538 Zone 4- System 4 2 X X --X --------------------------D D 651 Zone 5-1 X X X X D D System 357 ---------------- ---------- Zone 6-1 X X X D D System 265 ------------------ ---------- -------L__ --L___ CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 20 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml I -- G. MECHANICAL HVAC ACCEPTANCE TESTS & FORMS (Adapted from 2013-NRCC-MCH-01-E) §RA4 I Declaration of Required Acceptance Certificates {NRCA)-Acceptance Certificates that may be submitted. (Retain copies and verify forms are completed and signed to post in field for Field I Inspector to verify). s: s: s: s: s: s: s: s: s: s: s: s: s: s: s: s: s: Test Description n n n n n n n n n n n n n n n n n Confirmed :I: :I: :I: :I: :I: :I: :I: :I: :I: =F :I: =F =F :I: :I: =F =F 6 6 6 6 6 6 6 6 .:.. ... .:.. ... ... .:.. .:.. ... ... N w .1> U1 en ...... co 1.0 ~ ... N w .1> U1 en ...... co l> l> l> l> l> l> l> l> l> l> l> l> l> l> l> l> V> V> m V> l> l> 0 c 5" n c :I: c .., v;· "0 n 0 V> "0 -< c "0 ;:oO OQ l> :::J c ~ "0 0.. .... 0 .... .... -< 0 iii" :::;· 0 0 0 0 -! ro :::J Equipment "0 -< m m V> 0.. c 0 3 "0 < n~ no 0' .., o:::J V> l> ro ro #of .... N -< ro if?~ o ro NO :::;· .... :::J m Requiring 0.. 0 v;· ;::;· 0 0 ..., ..., X~ ~ n "g .., 0 :::J r'" ro n .., iii" :::J -· :::J 3 g 0 l>OQ n;l n"' s: Ill Ill Testing or units 0 ro ..., < Ill V> .... .... QJ .... OJ 0 V> o ro Ill ..., 0 QJ ro ro ..., c-Q.a_ X ro 0' n-< .... 3 :::J ..., V> Ill -c n :::J ><" .... ..., 0 -..., V> ro ~ :2: Verification ?. c 0 QJ -ro c .... 3 "0 :::J n :;:;; n;l l> ..., ;:;: .... :::J OQ .., V> :::J 0 V> 0 QJ V> .... ro 3 0 :;J" ;:;: :::;· Ql :::0 in~ QJ a < -< ~ ro V> 120 OQ ro v;-"0 0.. ro V> ro .... Zone 7-1 X X X X X D D ------------------ -- ----System 172 Zone 8- System 7 2 X X --X ---- ------ --X ------------D D 893 ~------· L__ -L_ ___ ---- NRCC-PRF-LTI-DETAILS -SECTION START- A. INDOOR CONDITIONED LIGHTING CONTROL CREDITS (Adapted from NRCC-LTI-02-E) 1§ 140.6 This Section Does Not Apply B. INDOOR CONDITIONED LIGHTING MANDATORY LIGHTING CONTROLS (Adapted from NRCC-LTI-02-E) 1§ 130.1 This Section Does Not Apply §130.1(a) =Manual area controls; §130.0(b} =Multi Level; §130.1(c) =Auto Shut-Oft §130.1(d) =Mandatory Daylight; §130.1(e) =Demand Responsive C. TAILORED METHOD LIGHTING POWER ALLOWANCE SUMMARY AND CHECKLIST (Adapted from NRCC-LTI-04-E) § 140.6 General lighting power (see Table D) 0 General lighting power from special function areas (see Table E) NA Additional "use it or lose it" (See Table G) 0 Total watts 0 ------------------- CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: N RCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 21 of 22 Project Address: 2350 Camino Vida Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml ------ D. GENERAL LIGHTING POWER (Adapted from NRCC-LTI-04-E) I§ 140.6-D This Section Does Not Apply E. GENERAL LIGHTING FROM SPECIAL FUNCTION AREAS (Adapted from NRCC-LTI-04-E) § 140.6(c) 3H illuminance Value Room Cavity Ratio Confirmed Room Number Primary Function Area (LUX) (Table G) Allowed LPD Floor Area {ft2) Allowed Watts Pass I Fail • , A ... ., A ... . .. .. . ... , , I I "" I "" i "" i "" i ~~f-\ i r•J-\ I j'\jJ-\ I u I u I Note: Tailored Method for Special Function Areas is not currently implemented F. ROOM CAVITY RATIO (Adapted from NRCC-LTI-04-E) Rectangular Spaces Confirmed Room Number Task/Activity Description Room Length (ft) Room Width (ft) Room Cavity Height (ft) RCR Pass Fail NA NA NA NA NA NA D D Non-Rectangular Spaces This Section Does Not Apply ----------Note: All applicable spaces are listed under the Non-Rectangular Spaces table G. ADDITIONAL "USE IT OR LOSE IT" (Adapted from NRCC-LTI-04-E) 1. 2. 3. 4. Confirmed Combined Floor Display and Task Combined Ornamental and Special Allowed Watts -g ., Wall Display Very Valuable Merchandise Ill Lighting Effects Lighting Ill ~ Ill 0 0 0 0 0 D D - s. Wall Display This Section Does Not Apply 6. Floor Display and Task Lighting This Section Does Not Apply CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 Project Name: Chuao Office NRCC-PRF-01-E Page 22 of 22 Project Address: 2350 Camino VIda Roble Carlsbad 92011 Calculation Date/Time: 18:57, Thu, Aug 06, 2015 Compliance Scope: NewComplete Input File Name: Chauo_Office.xml 7. Combined Ornamental and Special Effects Lighting This Section Does Not Apply 8. Very Valuable Merchandise This Section Does Not Apply H. INDOOR & OUTDOOR LIGHTING ACCEPTANCE TESTS & FORMS (Adapted from NRCC-LTI-01-E and NRCC-LT0-01-E) § 130.4 Declaration of Required Acceptance Certificates (NRCA) -Acceptance Certificates that must be verified in the field. (Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify). Indoor Outdoor Confirmed Test Description NRCA-LTI-02-A NRCA-LTI-03-A NRCA-LTI-04-A NRCA-LT0-02-A "g Equipment Requiring Occ Sensors I Auto Time Ill ~ #of units Auto Daylight Demand Responsive Outdoor Controls Ill Ill Testing or Verification Switch Occupant Sensors 0 D D D D D D . Automatic Time Switch 0 D D D D D D Automatic Daylighting 0 D D D D D D Demand Responsive 0 D D D D D D Outdoor Controls 0 D D D D D D -·-·-·-· --------~-- CA Building Energy Efficiency Standards-2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-07272015-760 Report Generated at: 2015-08-06 18:59:16 ENVELOPE MANDATO~lY MEASURES: NONRESIDENTIAL ENV-MM Project Name I Date Chuao Choco/atier Office 8/1212015 DESCRIPTION Building Envelope Measures: §11 0.8(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §11 0.8(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §110.8(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-13 betwelen framing members. §11 0.7(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/fP of §11 0.6(a): window area, 0.3 cfm/fP of door area for residential doors, 0.3 cfm/fF of door area for nonresidential single doors (swingil"lg_ and sliding1 ancl 1.0 cfm/ft! for nonresidential double doors (swin_ging). §11 0.6(a): Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor. §110.6(a): Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the applicable default SHGC. §110.6(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-0B-12T01 :21:58 ID: 15238 Page25of43 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Chuao Chocolatier Office 8/12/2015 System Name Floor Area Zone 1 -System 12, 13 6,079 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 46,500 Total Room Loads 2,407 38,466 5,775 501 14,539 Total Output (Btu h) 93,000 Return Vented Lighting 0 Output (Btuh/sqft) 15.3 Return Air Ducts 1,923 727 Cooling System Return Fan 301 -301 Output per System 150,000 Ventilation 912 8,351 4,578 912 35,357 Total Output _{_Btuhl 300,000 Supply Fan 301 -301 Total Output (Tons) 25.0 Supply Air Ducts 1,923 727 Total Output (Btuh/sqft) 49.4 Total Output (sqft/Ton) 243.2 TOTAL SYSTEM LOAD 51,265 10,353 50,748 Air System CFM per System 5,000 HVAC EQUIPMENT SELECTION Airflow (cfm) 10,000 CARRIER 50TJ-14 236,230 66,257 71 '144 Airflow (cfm/sqft) 1.65 Airflow (cfm/Ton) 400.0 Outside Air(%) 9.1% Total Adjusted System Output 236,230 66,257 71 '144 Outside Air (cfm/sqft) 0.15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul2 PM I Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 Of 67 °f 97 Of 97 °f I @ ~c-r---T 1 c ~ Outside Air -4 ~ Supply Fan 912 cfm Heating Coil 97 °F 10,000 cfm jROOM 70 Of Return Fan 70 Of 70 °f • ~--rr r-c I 10,000 cfm COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 83 I 68 °F 75 I 64 °F 75 I 64 °F 59 I 58 °F • Cl _____ l I c Outside Air t"" ~ _. 912 cfm Supply Fan Cooling Coil 59 I 58 °F 10,000 cfm [ROOM 56.0% Reiurn Fan 74 I 63 °F ~~-1·---[ 74 I 63 °F T _c I -• 10,000 cfm ... . .. EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-08-12T01 :21:58 10: 15238 Page 26 of43 HVAC SYSTEM HEATIN~:; AND COOLING LOADS SUMMARY Project Name Date Chuao Chocolatier Office 8/12/2015 System Name Floor Area Zone 1 -System 11 1,278 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 36,0100 Total Room Loads 594 9,381 1,214 207 5,974 Total Output (Btuh) 36,0100 Return Vented Lighting 0 Output (Btuh/sqft) 28.2 Return Air Ducts 469 299 Cooling System Return Fan 150 -150 Output per System 36,000 Ventilation 192 1,534 899 192 7,418 Total Output (Btuh) 36,000 Supply Fan 150 -150 Total Output (Tons) :3.0 Supply Air Ducts 469 299 Total Output (Btuh/sqft) 28.2 Total Output (sqft/Ton) 42!).0 TOTAL SYSTEM LOAD 12,154 2,113 13,688 Air System CFM per System 1,200 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,200 TRANE WCC036F 28,721 7,970 27,540 Airflow (cfm/sqft) 0.94 Airflow (cfm/Ton) 400.0 Outside Air (%) 16.0% Total Adjusted System Output 28,721 7,970 27,540 Outside Air (cfm/sqft) 0.15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul1 PM I Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F 64 °F 97 °F 97 °F @ ~ ~-l--L r-·-~ l Outside Air ~ t--Supply Fan 192 cfm Heating Coil 97 °F 1,200 cfm /ROOM 70 °f Return Fan 70 °F 70 °F • ~-·-·r-T T ~ I 1,200 cfm COOLING SYSTEM PSYCHROMETRIC:S (Airstream Temperatures at Time of Cooling Peak) 82 I 67 °F 76 I 64 °F 76 I 64 °F 59 I 58 °F • "' ~--T-1-[ ~ --+ l Outside Air .-4t-' 192 cfm Supply Fan Cooling Coil 59 I 58 °F • 1,200 cfrn I 56.4% ROOM Return Fan 74164 °F 74164°F 74 I 63 °F ~ ~-T-r· ~ I 1,200 cfm EnergyPro 6. 7 by EnergySoft User Numb.er: 2314 RunCode: 2015-0B-12T01 :21:58 ID: 15238 Page 27of43 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Chuao Chocolatier Office 8/12/2015 System Name Floor Area Zone 2-System 9, 10 2,694 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 48,000 Total Room Loads 2,618 40,678 12,797 311 9,020 Total Output (Btu h) 96,000 Return Vented Lighting 0 Output (Btuh/sqft) 35.6 Return Air Ducts 2,034 451 Cooling System Return Fan 301 -301 Output per System 48,000 Ventilation 404 3,147 571 404 15,667 Total Output (Btuh) 96,000 Supply Fan 301 -301 Total Output (Tons) 8.0 Supply Air Ducts 2,034 451 Total Output (Btuh/sqft) 35.6 Total Output (sqWTon) 336.8 TOTAL SYSTEM LOAD 48,494 13,367 24,988 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 3,200 CARRIER 50VT-A48-6 73,450 25,602 73,439 Airflow (cfm/sqft) 1.19 Airflow (cfm/Ton) 400.0 Outside Air(%) 12.6% Total Adjusted System Output 73,450 25,602 73,439 Outside Air (cfm/sqft) 0.15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul1 PM I Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 Of 66 Of 97 °f 97 Of I @ ~~~[~[ul :~ l Outside Air ~ r Supply Fan 404 cfm Heating Coil 97 °F 3,200 cfm fRo~ 70 Of Return Fan 70 °f 70 °F • ~---T--1-T-~ I 3,200 cfm COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 82 I 67 °F 76 I 65 °F 76 I 65 °F 59 I 58 °F ·"""""'1 ~ ~--1----,--l -~ • Outside Air ..-4t-~ 404 cfm Supply Fan Cooling Coil 60 I 58 °F 3,200 cfm I ROOM 60.1% Return Fan 75 I 65 °F 75 I 65 °F 74164°F ~ ~--T--] l -~ I 3,200 cfm EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-08·12T01 :21:58 ID: 15238 Page28of43 HVAC SYSTEM HEATIN43 AND COOLING LOADS SUMMARY Project Name Date Chuao Chocolatier Office 8/12/2015 System Name Floor Area Zone 3 -System 5 2,379 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 60,000 Total Room Loads 2,601 39,494 4,967 392 11,302 Total Output (Btuh) 60,000 Return Vented Lighting 0 Output (Btuh/sqft) 2~5.2 Return Air Ducts 1,975 565 Cooling System Return Fan 150 -150 Output per System 60,000 Ventilation 357 2,661 1,133 357 13,778 Total Output (Btu h) 60,000 Supply Fan 150 -150 Total Output (Tons) S.O Supply Air Ducts 1,975 565 Total Output (Btuh/sqft) 2~5.2 Total Output (sqft/Ton) 47~5.8 TOTAL SYSTEM LOAD 46,405 6,100 25,909 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow (cfm) 2,000 CARRIER 50VT-A60-6 47,605 14,082 45,899 Airflow (cfm/sqft) 0.84 Airflow (cfm/Ton) 400.0 Outside Air(%) 17.8% Total Adjusted System Output 47,605 14,082 45,899 Outside Air (cfm/sqft) 0.15 (Adjusted for Peak Design conditions) Note: values above given at ARI condition!> TIME OF SYSTEM PEAK Jul1 PM I Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F 63 °f 97 °F 97 °F I @ ~~ I c l Outside Air -4 ..... Supply Fan 357 cfm Heating Coil 97 °F 2,000 cfm [ROOM 70 °F Return Fan 7{) 0f 70 °F • ~--r--1-·l c I 2,000 cfm COOLING SYSTEM PSYCHROMETRIC:S (Airstream Temperatures at Time of Cooling Peak) 82 I 67 °F 76 I 65 °F 76 I 65 °F 59 I 58 °F • --+ ~ ] c Outside Air ~ I"" l 357 cfm Supply Fan Cooling Coil 60 I 58 °F 2,000 cfrn I 58.1% ROOM Return Fan 75164 °F 75 I 64 °F 74 I 64 °F %2,000cfm ~r-r -, c I EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-08-12T01 :21:58 ID: 15238 Page 29 of43 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Chuao Chocolatier Office 8/12/2015 System Name Floor Area Zone 4 -System 4, 6 2,453 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 48,000 Total Room Loads 2,805 43,462 4,906 299 8,673 Total Output (Btu h) 96,000 Return Vented Lighting 0 Output (Btuh/sqft) 39.1 Return Air Ducts 2,173 434 Cooling System Return Fan 301 -301 Output per System 48,000 Ventilation 368 1,580 -872 368 14,267 Total Output (Btu h) 96,000 Supply Fan 301 -301 Total Output (Tons) 8.0 Supply Air Ducts 2,173 434 Total Output (Btuh/sqft) 39.1 Total Output (sqft/Ton) 306.6 TOTAL SYSTEM LOAD 49,990 4,034 23,207 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 3,200 CARRIER 50VT-A48-6 76,908 21,956 73,439 Airflow (cfm/sqft) 1.30 Airflow (cfm/Ton) 400.0 Outside Air(%) 11.5% Total Adjusted System Output 76,908 21,956 73,439 Outside Air (cfm/sqft) 0.15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Oct2 PM I Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F 66 °F 97 °F 97 °F i @ ~ ~-T"--1 I C l Outside Air ~ ~ Supply Fan 368 cfm Heating Coil 97 °F 3,200 cfm f-RO~ 70 °F Return Fan 70 °F 70 °F • c-T-·rr· c I 3,200 cfm COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 79 I 64 °F 75 I 64 °F 75 I 64 °F 59 I 58 °F ___ M, ~ ~--1·---, r ··~ • ~ Outside Air -' t-l 368 cfm Supply Fan Cooling Coil 60 I 58 °F 3,200 cfm [ROOM 56.8% Return Fan 75 I 64 °F ~ 75 I 64 °F 74164°F ~-1--r r ~ I 3,200 cfm EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-08-12T01:21:58 ID: 15238 Page30of43 HVAC SYSTEM HEATINC:; AND COOLING LOADS SUMMARY Project Name Date Chuao Chocolatier Office 8/12/2015 System Name Floor Area Zone 5 -System 3 882 ENGINEERING CHECKS SYSTEM LOAD Number of Systems COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 48,000 Total Room Loads 1 ,641 25,243 5,880 176 5,108 Total Output (Btu h) 48,000 Return Vented Lighting 0 Output (Btuh/sqft) 54.4 Return Air Ducts 1,262 255 Cooling System Return Fan 150 -150 Output per System 48,000 Ventilation 176 738 -866 176 6,836 Total Output (Btu h) 48,000 Supply Fan 150 -150 Total Output (Tons) 4.0 Supply Air Ducts 1,262 255 Total Output (Btuh/sqft) 54.4 Total Output (sqft/Ton) 220.5 TOTAL SYSTEM LOAD 28,807 5,014 12,154 Air System CFM per System 1 ,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,600 CARRIER 50VT-A48-6 37,285 12,697 36,719 Airflow (cfm/sqft) 1.81 Airflow (cfm/Ton) 400.0 Outside Air(%) 11.0% Total Adjusted System Output ~--~~~~~------~-------~ Outside Air (cfm/sqft) 0.20 (Adjusted for Peak Design conditions) 37,285 12,697 36,719 Note: values above given at ARI conditions TIME OF SYSTEM PEAK Oct 2 PM I Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F 66 °F 97 °F 97 °F I @ • c· Outside Air ~ r-Supply Fan 176 cfm Heating Coil 97 °F 1,600 cfm 70 °F Return Fan 70 °F 70 °F • c·-T~~r T c 1,600 cfm I COOLING SYSTEM PSYCHROMETRIC:S (Airstream Temperatures at Time of Cooling Peak) 79 I 64 °F 75 I 65 °F 75 I 64 °F 59 I 58 °F • ~--~: .. R--~--~. --~---.. , lR 1 Ou-1-sid_e_A•i-::r.e-T ..-4t-"_....., ____ --l --+ :~~ ~---------•,.. H lbJ t 176 cfm Supply Fan Cooling Coil 60 I 58 oF 1,600 cfrn Return Fan 59.7% I ROOM 75165°F 75165°F 74164oF .__....,...__.______\!)--1,6-00cf-m c--l-]"1 _c.---------1' EnergyPro 6.7 by EnergySoft User Numb<r~r: 2314 RunCode: 2015-08-12T01 :21:58 10: 15238 Page 31 of43 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Chuao Chocolatier Office 8/12/2015 System Name Floor Area Zone 6 -System 2 524 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 36,000 Total Room Loads 861 13,443 1,048 132 3,825 Total Output (Btu h) 36,000 Return Vented Lighting 0 Output (Btuh/sqft) 68.7 Return Air Ducts 672 191 Cooling System Return Fan 150 -150 Output per System 36,000 Ventilation 79 344 -92 79 3,048 Total Output (Btuh) 36,000 Supply Fan 150 -150 Total Output (Tons) 3.0 Supply Air Ducts 672 191 Total Output (Btuh/sqft) 68.7 Total Output (~ft/Ton) 174.7 TOTAL SYSTEM LOAD 15,433 956 6,955 Air System CFM per System 1,200 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,200 CARRIER 50VT-A36-6 29,067 7,790 27,540 Airflow (cfm/sqft) 2.29 Airflow (cfm/Ton) 400.0 Outside Air (%) 6.6% Total Adjusted System Output 29,067 7,790 27,540 Outside Air (cfm/sqft) 0.15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Oct2 PMI I Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 °F 68 °F 97 °F 97 °F I @ • ~-T--T-~~r--~ ~ Outside Air ... .... Supply Fan 79 cfm Heating Coil 97 °F 1,200 cfm I ROOM 70 °F Return Fan 70 °F 70 °F • ~T-rT ~ I 1,200 cfm COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 79/64 °F 75/63 °F 75/63 °F 59/58 °F _;:t c--r-,--l c • ~ Outside Air ~ .... ~ 79 cfm Supply Fan Cooling Coil 60/58 °F 1,200 cfm !ROOM 55.4% Return Fan 75/63°F ~ -- 74/63 °F r-·c I • 1,200cfm Cl I EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-0B-12T01 :21:58 ID: 15238 Page 32 of43 HVAC SYSTEM HEATIN(; AND COOLING LOADS SUMMARY Project Name Date Chuao Chocolatier Office 8/12/2015 System Name Floor Area Zone 7 -System 1 1,933 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 60,000 Total Room Loads 2,170 33,298 14,070 385 11 '1 01 Total Output (Btuh) 60,000 Return Vented Lighting 0 Output (Btuh/sqft) 31.0 Return Air Ducts 1,665 555 Cooling System Return Fan 150 -150 Output per System 60,000 Ventilation 4,886 42,979 -2,201 4,886 188,665 Total Output (Btu h) 60,000 Supply Fan 150 -150 Total Output (Tons) ~i.O Supply Air Ducts 1,665 555 Total Output (Btuh/sqft) 31.0 Total Output (sqft/Ton) 386.6 TOTAL SYSTEM LOAD 79,907 11,869 200,575 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow (cfm) 2,000 CARRIER 50VT-A60-6 54,641 9,365 45,899 Airflow (cfm/sqft) 1.03 Airflow (cfm/Ton) 400.0 Outside Air(%) 244.3% Total Adjusted System Output 54,641 9,365 45,899 Outside Air (cfm/sqft) 2.!53 (Adjusted for Peak Design conditions) Note: values above given at ARI condition~~ TIME OF SYSTEM PEAK Aug 3 PM I Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 34 Of 34 Of 97 °f 97 Of I @ ~ ~-r··rT·· c l Outside Air -4 r-Supply Fan 4,886 cfm Heating Coil 97 °F 2,000 cfm ~ROOM 70 °f Return Fan 70 °F 70 °F • ~-···r-·r .~ I 2,000 cfm COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 83 I 68 °F 83 I 68 °F 83 I 67 °F 59 I 58 °F • --+ ~--r-r·]·--·.~ Outside Air ~t-l 4,886 cfm Supply Fan Cooling Coil 60 I 58 °F 2,000 cfnn I 62.2% ROOM Return Fan 75 I 65 °F ~ 75 I 65 °F 74 I 65 °F ~--T-·r --~ I 2,000 cfm EnergyPro 6. 7 by EnergySoft User Numb,~r: 2314 RunCode: 2015-0B-12T01 :21:58 ID: 15238 Page 33 of43 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Chuao Chocolatier Office 8/12/2015 System Name Floor Area Zone 8-System 7, 8 6,377 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 116,000 Total Room Loads 5,117 80,191 30,291 642 18,628 Total Output (Btuh) 232,000 Return Vented Lighting 0 Output (Btuh/sqft) 36.4 Return Air Ducts 4,010 931 Cooling System Return Fan 301 -301 Output per System 119,000 Ventilation 957 8,458 1,517 957 37,055 Total Output (Btu h) 238,000 Supply Fan 301 -301 Total Output (Tons) 19.8 Supply Air Ducts 4,010 931 Total Output (Btuh/sqft) 37.3 Total Output (sqft/Ton) 321.5 TOTAL SYSTEM LOAD 97,270 31,808 56,944 Air System CFM per System 4,000 HVAC EQUIPMENT SELECTION Airflow (cfm) 8,000 CARRIER 50HCQD-12A2A6 181,125 63,056 177,477 Airflow (cfm/sqft) 1.25 Airflow (cfm/Ton) 403.4 Outside Air (%) 12.0% Total Adjusted System Output 181,125 63,056 177,477 Outside Air (cfm/sqft) 0.15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul2 PM I Jan 1 AM HEATING SYSTEM PSYCHROMETRieS (Airstream Temperatures at Time of Heating Peak) 34 °F 66 °F 97 °F 97 °F ·I @ • ~~1-J-bT-bC ~ Outside Air -4 t-Supply Fan 957 cfm Heating Coil 97 Of 8,000 cfm [ROOM 70 °F Return Fan 70 °F 70 °F • ~--r]-T c I 8,000 cfm COOLING SYSTEM PSYCHROMETRieS (Airstream Temperatures at Time of Cooling Peak) 83/68 °F 75/65 °F 76/65 °F 59/58 °F I ~---r·r J--~ • Outside Air ... ~ ...... 957 cfrn Supply Fan Cooling Coil 59 I 58 °F 8,000 cfm [ROOM 59.9% Return Fan 74/65 °F ~ ---· 74/64°F ··r c I -• 8,000 cfm ~l ~ EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-0B-12T01 :21:58 ID: 15238 Page 34of43 ZONE LOAD SUMMARY Project Name Date Chuao Chocolatier Office 811212015 System Name Floor Area Zone 1 -System 12, 13 6,079 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OACFM PeakHr CFM Sensible Latent CFM Sensible Zone 1 Warehouse 1.0 912 Ju/2PM 2,407 47,020 15,145 501 49,934 I ! I TOTALS 0 0 0 912 Ju/2 PM 47,020 15,145 49,934 (BLOCK LOAD) EnergyPro 6. 7 by EnergySoft User Number: 2314 Run Code: 2015-0B-12T01 :21:58 10: 15238 Page 35 of43 ZONE LOAD SUMMARY Project Name Date Chuao Chocolatier Office 811212015 System Name Floor Area Zone 1 -System 11 1,278 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OACFM Peak Hr CFM Sensible Latent CFM Sensible Zone 1 Warehouse Shipping 1.0 192 Ju/1 PM 594 11,014 3,190 207 13,415 ~ TOTALS 0 0 0 192 Ju/1 PM 11,014 3,190 13,415 (BLOCK LOAD) EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-08-12T01 :21:58 ID: 15238 Page 36 of 43 1 --- ZONE LOAD SUMMARY Project Name Date Chuao Chocolatier Office 811212015 System Name Floor Area Zone 2 -System 9, 10 2,694 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OACFM Peak Hr CFM Sensible Latent CFM Sensible Zone 2 -Packaging 1.0 404 Ju/1 PM 2,618 44,120 16,961 311 24,706 TOTALS 0 0 0 404 Ju/1 PM 44,120 16,961 24,706 (BLOCK LOAD) EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-0B-12T01 :21:58 10: 15238 Page 37 of43 ZONE LOAD SUMMARY Project Name Date Chuao Chocolatier Office 811212015 System Name Floor Area Zone 3 -System 5 2,379 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OACFM Peak Hr CFM Sensible Latent CFM Sensible Zone 3 -Office Ring 1.0 294 Ju/1 PM 2,359 38,333 6,953 341 21,235 Zone 3 -RR I Corr 1.0 63 Aug 1 PM 243 4,219 1,691 51 3,918 TOTALS 0 0 0 357 Ju/1 PM 42,534 8,644 25,153 (BLOCK LOAD) EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-08-12T01 :21:58 ID: 15238 Page 38 of43 -----·····- ZONE LOAD SUMMARY Project Name Date Chuao Chocolatier Office 811212015 System Name Floor Area Zone 4 -System 4, 6 2,453 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OACFM Peak Hr CFM Sensible Latent CFM Sensible Zone 4 -Open Office 1.0 368 Oct2PM 2,805 45,326 6,234 299 22,956 TOTALS 0 0 0 368 Oct 2 PM 45,326 6,234 22,956 (BLOCK LOAD) EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-08-12T01 :21:58 10: 15238 Page 39 of43 ZONE LOAD SUMMARY Project Name Date Chuao Chocolatier Office 811212015 System Name Floor Area Zone 5 -System 3 882 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OACFM Peak Hr CFM Sensible Latent CFM Sensible Zone 5 -Retail 1.0 176 Oct2PM 1,641 26,137 6,517 176 11,956 I . TOTALS 0 0 0 176 Oct2PM 26,137 6,517 11,956 (BLOCK LOAD) EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-08-12T01 :21:58 ID: 15238 Page 40of43 ZONE LOAD SUMMARY Project Name Date Chuao Chocolatier Office 811212015 System Name Floor Area Zone 6 -System 2 524 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OACFM Peak Hr CFM Sensible Latent CFM Sensible Zone 6 -Multi Room 1.0 79 Oct2 PM 861 13,841 1,332 132 6,876 TOTALS 0 0 0 79 Oct2PM 13,841 1,332 6,876 (BLOCK LOAD) EnergyPro 6. 7 by Energy Soft User Number: 2314 RunCode: 2015-0B-12T01:21:58 10: 15238 Page 41 of43 ZONE LOAD SUMMARY Project Name Date Chuao Chocolatier Office 811212015 System Name Floor Area Zone 7 -System 1 1,933 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OACFM Peak Hr CFM Sensible Latent CFM Sensible Zone 7 -Lunch 1.0 262 Oct2PM 1,510 24,494 10,552 156 14,680 Zone 7 -Laundry I Janitor 1.0 4,400 Aug3PM 214 45,984 45,901 83 173,194 Zone 7 -Lockers 1.0 95 Ju/3PM 271 5,083 2,550 66 5,569 Zone 7 -RR I Corr 1.0 129 Ju/1 PM 480 8,465 3,483 80 7,311 TOTALS 0 0 0 4,886 Aug3PM 80,711 64,225 200,754 (BLOCK LOAD) EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-08-12T01 :21:58 ID: 15238 Page 42of43 ZONE LOAD SUMMARY Project Name Date Chuao Chocolatier Office 811212015 System Name Floor Area Zone 8 -System 7, 8 6,377 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK .ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OACFM Peak Hr CFM Sensible Latent CFM Sensible Zone 8 -Production 1.0 957 Jui2PM 5,117 89,164 40,121 642 55,758 TOTALS 0 0 0 957 Ju/2 PM 89,164 40,121 55,758 (BLOCK LOAD) EnergyPro 6. 7 by EnergySoft User Number: 2314 RunCode: 2015-08-12T01 :21:58 ID: 15238 Page 43 of43 Christopher Glassen From: Sent: To: Subject: Mark Rojas <mark@ociodesigngroup.com> Thursday, July 23, 2015 10:09 AM Christopher Glassen RE: Chuao Chocolate, Carlsbad Engineering Chris, not a problem at all please see the information below Proposed: Office: 5,253 Manufacturing: 9,318 Storage: 11,216 Existing: Office: 3,100 Manufacturing: Storage: From: Christopher Glassen [mailto:Christopher.Giassen@carlsbadca.gov] Sent: Thursday, July 23, 2015 10:03 /\M To: Mark Rojas Subject: RE: Chuao Chocolate, Carlsbad Engineering Good Morning Mark, I hate to keep bothering you with this project, but I want to make sure we are taking the proper steps towards approval status. Thank you for sending the proposed breakdown. Can you please provide the existing use breakdown: Proposed: Office: 5,253 Manufacturing: 9,318 Storage: 11,216 Existing: Office: 3,100 Manufacturing: Storage: This information insures accurate credit will be given. Please contact Raenette Abbey with the Building Department regarding the existing and proposed suite number. There are factors to consider pertaining to the Fire Department's guidelines when numbering suites. Her number is (760) 602-2718. Thanks Mark, 1 Sewer: f:.DV off,'ce. : 3t/(}u 7 l,th ':. I ·7 /")OI"utc.dv"i'~f f>1S~8 ~ S, Ooo :: 1. 7 'S+~>n.j: II.{J l '3 ~: S,o\\~ :: ~ ~-d. Cre.A.l: off',<c~ : 1 ,q.1, • f:'.l. E-0\J (\ ~ ~ 11'\(.lf'u <Mdv/~j.: ./ -1.1 -: ,). 'l·hr~//'1.1--:. to' ~f.C::.<..e : S 11) 3 -': I, 8<~ o -:.. l. 'l M'\llvf..vh,,,·~: q1 ~I~ 7 S,()oo -: I.~ ')~ rc..~H. : 1\1 :t I (., ..l. ), Oo 'fl :. l. . l. J • -:::-:--. 7 1·~/ () t.f: ~CR. : {'A.u ~ " ~ ' {vr~) : Sior(l~~ : 6f~~: S1.l5$ ~ t11ou ~5·s 'l<.l.<.\-: \~)(a Al\"o: q,11~~\b0(\~~.3 x.'-f-: rJ.l. s~~~.-&.,e~fl,21~~~1)1>~':.11.l10 ... ::-)),.~ I(, S. (, -I). '1. 7 ::: {Ijn }]tO£] ~ ( U4 )( '1 0 · 1 ::: t Lf1 )_ 5 3 · f:, () / -------- -/(o5.(; PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET B-18 Project Address: ~~350 Camino Vida Roble Permit No.: Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Building@carlsbadca.gov Information proviided below refers to worl:! being done on the above mentioned permit only. This form must be completed and returned to the Building Division before the permit can be issued. B-18 Building Dept. Fax: (760) 602-8558 Number of new or nelocated fixtures, traps, or floor drains ....................................................... ~ New building sewer line? ......................................................................................... Yes_!__ No __ Number of new roo1f drains? ............................................................................................................... N/A Install/alter water line?......................................................................................................................... YES Number of new water heaters?......................................................................................................... 2 Number of new, reiC>cated or replaced gas outlets? .................................................................... _9_ Number of new host~ bibs?.................................................................................................................. 0 Residential Permits: New/expanded service: Number of new amps: Minor Remodel only: Yes__ No Commercial/lndust:rial: Tenant Improvement: Number of existing amps involved in this projed: 1000 Number of new amps involved in this projed: 1000 New Construdion: Amps per Panel: Single Phase ............................................................... Number of new amperes _______ _ Three Phase ................................................................. Number of new amperes _______ _ Three Phase 480 ...... , ................................................. Number of new amperes _______ _ Number of new furnaces, A/C, or heat pumps? ............................................................................ ~ New or relocated duct worR? .......................................................................... Yes X No __ _ Number of new fireplaces? ................................................................................................................. _o_ Number of new exhaust fans? ........................................................................................................... . 8 Relocate/install vent? ............................................................................................................................ _o_ Number of new exhaust hoods? ....................................................................................................... . 0 Number of new boilers or compressors? ........................................................... Number of HP 0 Page 1 of 1 Rev. 03/09 Business Name Street Address Email Address IT PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS) Check all below that are present at your facility: Acid Cleaning Ink Manufacturing Nutritional Supplement I Assembly Laboratory Vitamin Manufacturing Automotive Repair Machining I Milling Painting I Finishing Battery Manufacturing Manufacturing Paint Manufacturing Biofuel Manufacturing Membrane Manufacturing Personal Care Products Biotech Laboratory (i.e. water filter membranes) Manufacturing Bulk Chemical Storage Metal Casting I Forming Pesticide Manufacturing/ Car Wash Metal Fabrication Packaging Chemical Manufacturing Metal Finishing Pharmaceutical Manufacturing Chemical Purification Electroplating (including precursors) Dty Cleaning Electroless plating Porcelain Enameling Electrical Component Anodizing Power Generation Manufacturing Coating (i.e. phosphating) Print Shop Fertilizer Manufacturing Chemical Etching I Milling Research and Development Film I X-ray Processing Printed Circuit Board Rubber Manufacturing Food Processing Manufacturing Semiconductor Manufacturing Glass Manufacturing Metal Powders Forming Soap I Detergent Manufacturing Industrial Laundry Waste Treatment I Stora~Je SIC Code(s) (if l<nown): or evaporated): Estimated volume of industrial wastewater to be discharged (gal/ day): -'--'""'---1.-'--'~~-'---­ List hazardous wastes generated (type/volume):--'--"'-'--.:...:-'------------ Date operation began/or will begin at this location: ....:._:::;__.:,__~------------­ Have you appJ~d for a Wastewater Discharge Permit from the Encina Wastewater Authority? Yes ~o) If yes, when:---------------------- Site Contact OFFICE USE ONLY RECORDID# __________________ ~ SAN DIEGO REGIONAL HHMBP# _______ -i HAZARDOUS MATERIALS QUESTIONNAIRE BPDATE ____ ~--~----I Telephone# The following questiions represent the facility's activities, NOT the specific project description. PART 1: FIRE DEPARTMENT-HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled, applicant must contac. t the Fire Prote.c\iorlA.c gency with jurisdiction prior to plan submittal. N~"~"' -trtf, :~t t.il:: Occupancy Rating:V Facility's Square Footage (including proposed project): 1. Explosive or Blasting Agents 5. Organic Peroxides 9. 13. Corrosives 2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards 3. Flammable/Combustible Liquids 7. Pyrophorics 11. 4. Flammable Solids 8. Unstable Reactives 12. Highly Toxic or Toxic Materials Radioactives 15. None of These. PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH-HAZARDOUS MATERIALS DIVISION (HMO): If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123. Call (858) 505-6700 prior to the issuance of a building permit. FEES ARE REQUIRED. Project Completion Date: Expected Date of Occupancy: YES N~ (for new construction or remodeling projects) 1. 0 @'/ Is your business listed on the reverse side of this fonn? (check all that apply). 2. 0 !d" /Will your business dispose of Hazardous Substances or Medical Waste in any amount? 3. 0 bf Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500 4. 5. 6. 7. 8. 0 0 0 0 0 /pounds and/or 200 cubic feet? WWill your business store or handlie carcinogens/reproductive toxins in any quantity? 1.;1 0 Will your business use an existin!~ or install an underground storage tank? 112( Will your business store or handli" Regulated Substances (CaiARP)? [E/)11/ill your business use or install El Hazardous Waste Tank System (Title 22, Article 1 0)? (Jl/ Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act). 0 CaiARP Exempt I Date Initials 0 CaiARP Required I Date Initials 0 CaiARP Complete I Date Initials PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCD): If the answer to Question #1 below is no or the answer to any of the Questions #2-5 is yes, applicant must contact the APCD at 10124 Old Grove Road, San Diego, CA 92131-1649 or telephone (858) 586-2600 prior to the issuance of a building or demolition permit. If the answer to questions #4 or #5 is yes, applicant must also submit an asbestos notification fonn to the APCD at least 10 working days prior to commencing demolition or renovation. (Some residential projects may be exempt from the notification requirements. Contact the APCD for more infonnation.) 1. YrSS li:f;Aas a survey been performed to detennine the presence of Asbestos Containing Materials? 2. 0 [:f Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD factsheet at rJ[i.Q.ii1Q'l'f':i,:212.R.c!QJlro/infoifalde~rmi~i!, and the list of typical equipment requiring an APCD permit on the reverse side of this from. Contact APCD if you have any questions). 3. 0 (ANSWER ONLY IF QUESTION 1 IS YES) Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through 12)? (Search the California School Directory at t.tJ!.E:N\vw.cde.ca.goVitQ!.'!.tJ! for public and private schools or contact the appropriate school district). Will there be renovation that involves handling of any friable asbestos materials, or disturbing any material that contains non-friable asbestos? Will there be demolition involving the removal of a load su ortin structural member? FOR OFFICAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: ___________________________________ _ BY· DATE· I I EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMO' APCD COUNTY-HMO APCD COUNTY-HMO APCD .. *A stamp m thts box .Q.!1.!y: exempts businesses from completmg or updating a Hazardous Matenals Busmess Plan. Other perm1tt1ng reqUirements may still apply. HM-9171 (03/14) County of San Diego-DEH Hazardous Materials Division