Loading...
HomeMy WebLinkAbout2351 OCEAN ST; ; CB131229; Permit• City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 02-25-2014 Residential Permit Permit No: CB131229 Building Inspection Request Line (760) 602-2725 Job Address: 2351 OCEAN ST CBAD Permit Type: RESDNTL Sub Type: CONDO Status: ISSUED Parcel No: 2030404200 Lot #: 0 Applied: 05/14/2013 Valuation: $257,631.00 Constuction Type: 5B Entered By: JMA Occupancy Group: Reference #CT050012. Plan Approved: 02/25/2014 # Dwelling Units: 1 Structure Type: MF2-4 Issued: 02/25/2014 Bedrooms: 3 Bathrooms: 3 Inspect Area: Orig PC #;PC130030 Plan Check #: Project Title: OCEAN ST. CONDOS: 2,094 SF LIV 266 SF COMMON AREA / 204 SF PATIO/DECK Applicant: SHAWN MONTEITH #130 11750 SORRENTO VALLEY RD SAN DIEGO CA 92121 858-461-5126 Owner: OCEAN STREET 8 OWNERS, LLC #130 11750 SORRENTO VALLEY RD SAN DIEGO CA 92121 Building Permit $1,314.98 Meter Size Add'I Building Permit Fee $0.00 Add'I Red. Water Con. Fee $0.00 Plan Check $920.49 Meter Fee $0.00 Add'I Plan Check Fee ($500.00) SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $25.76 PFF (3105540) $4,688.88 Park in Lieu Fee $0.00 PFF (4305540) $4,328.20 Park Fee $0.00 License Tax (3104193) $0.00 LFM Fee $0.00 License Tax (4304193) $0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541) $0.00 Other Bridge Fee $0.00 Traffic Impact Fee (4305541) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $137.00 Renewal Fee $0.00 ELECTRICAL TOTAL $70.00 Add'I Renewal Fee $0.00 MECHANICAL TOTAL $83.93 Other Building Fee $0.00 Housing Impact Fee $0.00 HMP Fee $0.00 Housing InLieu Fee $0.00 Pot. Water Con. Fee $0.00 Housing Credit Fee $0.00 Meter Size Master Drainage Fee. $0.00 Add'I Pot. Water Con. Fee $0.00 Sewer Fee $0.00 Red. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (5B1473) Fee $8.00 Fire Sprinkler Fees $0.00 Green Bldg Stands Plan Chk Fee $0.00 TOTAL PERMIT FEES $11,077.24 Total Fees: $11,077.24 Total Payments to Date: $11,077.24 Balance Due: $0.00 FINAL AI6PR VA, Inspector: Date: 3/ 2.?)/ 14/(. Clearance: NOTICE: Please take NOTICE that Wpproval of your project includes the 014sition0 dfees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions. You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. Inspection List Permit#: CB131229 Type: RESDNTL CONDO OCEAN ST. CONDOS: 2,094 SF LIV 266 SF COMMON AREA! 204 SF PATIO!D Date Inspection Item Inspector Act Comments 03/17/2016 89 Final Combo - RI AM PLEASE 03/17/2016 89 Final Combo PY AP 10/29/2015 39 Final Electrical PY PA 08/25/2015 23 Gas/Test/Repairs PB NR 08/24/2015 23 Gas/Test/Repairs PY NR 08/10/2015 39 Final Electrical PY PA 07/22/2015 17 Interior Lath/Drywall PY AP 07/22/2015 39 Final Electrical PY PA 07/16/2015 17 Interior Lath/Drywall. PY PA 07/16/2015 39 Final Electrical PY PA 07/14/2015 18 Exterior Lath/Drywall PY NS 06/30/2015 16 Insulation PY PA 06/18/2015 84 Rough Combo PY PA 06/16/2015 24 Rough/Topout PY AP 05/12/2015 13 Shear Panéls/HD's PY AP 04/14/2015 13 Shear Panels/HD's PY PA 04/14/2015 15 Roof/Reroof PY PA 03/11/2015 13 Shear Panels/HD's PY NR 02/25/2015 11 Ftg/Foundation/Piers PY AP 02/24/2015 11 Ftg/Foundation/Piers PY PA 02/03/2015 21 Underground/Under Floor PY AP 01/08/2015 21 Underground/Under Floor PY NR 12/10/2014 23 Gas/Test/Repairs PY AP 05/05/2014 12 Steel/Bond Beam PY WC Tuesday, March 22, 2016 Page 1 of 1 k •2•I I 1 I Imw&l - -'• I •-- -. . .:::'::: - wMO. commvo .... ,..., CB-131229 2351 rOCEptN5T CARLSBAD OCEAN ST. CONDOS: 2094 8FILIV -INSPECTION RECORD 266SFCOMON AREA , ,2O4SFPATIO/DECK Building son INSPECTION RECORD CARD WITI APPROVED RESDNTL.. CONDO PLANS MUST BE KEPT ON THE JOB : Lot#: SHAWN MONTE ITH CALL BEFORE 3:30 m FOR 'NEXT WORK DAY INSPECTION- FOR BUILDING - -. INSPECTION CALl: 760-602-2725 . .. . 0 TO: CarIsbadca.gov/E ufiding AND CLICK ON - ion 71 Vol NO YES Required Prior to Requesting Building Final If Checked YES Date Inspector Notes. 'Planning/Landscape 760-944-8463 Al10w48hours , nc.. CM41(Engiricering lnpectlon) 760-438-3891 Call be-0re 2pm Fire Prevention 760-602-4660 Allow 48 hours - - 'Type of hspection Type of Inspection - -i.i Date Inspector #11 FOUNDATION L'Ir -'i, #31 Li ELECTRIC UNDERGROUND 0 UFER #12 REINFORCED-STEEL I /' 04',ROUGH ELECTRIC', #66 MASONRY PRE GROUT 0 ELECTRIC SERVICE 0 TEMPORARY OGROUT 0 WALL DRAINS -- #35 PHOTOVOLTAIC j - . 410 TILT PANELS •' - . #39 FINAL -- #11 PO UR STRIPS '#11 COLUMN FOOTINGS 941 UNDERGROUND DUCTS & PIPING 914 SUBFRAME DFLOOR DCEILING - . #44 ODUcT&PLENUM OREF.PIPING - #15 ROOF SHEATHING 4'?, '#43 HEA!-AIR'COND. SYSTEMS . -#13 EXI.SHEARPANELS . kI?IIb #49 FINAL 916'INSULATION . . #18 EXTERIOR LATH ./ /• ,j - #&1 UNDERGROUND (11,12,21,31) INTERIORLATH&DRYWALL l'( #82 DRYWALL,ml.AIH,GASTES(17,18.23) #51 POOL EXCA/STEEL/BOND/FENCE _________ ____________ #83 ROOF SHEATING, EXTSHEAR(13,15) #55 PREPLASTER/FINAL . - #84 FRAME ROUGH COMBO (14,24,34,44) - 485 T-Bar,(14,24,34,44) -: FINAL - - __________ Date . . Inspector #89 FINALOCCUPANCY(19,29,39,49) - - 42.! SEWER&8L/C0 DPI/CO - ------ .—.---,"—.-.-.---- - 'Date Inspector - #2I UNDERGROUND DWASTEDWrit #24 TOP-OUT 0 WASTE DWTR I(,Ip.i.c - -r- - ., -VISUAL.- A/S INDERGROUND - ...--.-.-. ---- ---- #27 TiB-& SHOWER PAN A/SbNDERGROUNDH(DRO - - #230 GAS TEST 0 GAS PIPING - -A/S UNDERGROUND FLUSH — #25 WATER HEATER - -__- A/SGVERHEAD-VISUAL - -: A/S OVERHEAD HYDROSTATIC , #28 SOLAR WATER - ..j./J #19 - -A/SFINAL FINAL F/AFOUGH-IN #600 PRE-CONSTRUCTION MEETING - -. F/A FINAL 4603 FOLLOW UP INSPECTION' - -- - - FIXED. EXTINGUISHINGSYSTEM ROUGH-IN FIXED EXTING SYSTEM-HYDROSTATICTEST - #oO5 NOTICE TO CLEAN - ------- - = -- -- - - --- ----- -- - - - '- - FIXED EXTINGUISHING SYSTEM FINAL - - - - - '607 WRITTEN WARNING - - -—-- — - - - -MEDICALGASPRESSURETi ._- --_'-_-_-- -_ #609 IInTICEOFVIOIATION - - --- —------ - ________ AL _; cFINA!,.._ SEEeAKRS ClALt401E j . - -'-- -- - -',---- -- (26 - -