Loading...
HomeMy WebLinkAbout2353 OCEAN ST; ; CB131248; PermitCity of Carlsbad - 1635 Faraday Av Carlsbad, CA 92008 62-25-2014 Commercial/Industrial Permit Permit No: CB131248 Building Inspection Request Line (760) 602-2725 Job Address: 2353 OCEAN ST CBAD Permit Type: COMMIND Sub Type: COMM Parcel No: 2030101200 Lot #: 0 Valuation: $236,115.00 Construction Type: 5B Occupancy Group: Reference #CT050012 Project Title: OCEANS ST. CONDOS: 2,010 SF CLUBHOUSE Status: ISSUED Applied: 05/14/2013 Entered By: JMA Plan Approved: 02/25/2014 Issued: 02/25/2014 Inspect Area Plan Check-#: Applicant: SHAWN MONTEITH #130 11750 SORRENTO VALLEY RD SAN DIEGO CA 92121 858-461-5126 Owner: OCEAN STREET 8 OWNERS, LLC #130 11750 SORRENTO VALLEY RD SAN DIEGO CA 92121 Building Permit $1,232.66 Meter Size Add'I Building Permit Fee $0.00 Add'I Red. Water Con. Fee $0.00 Plan Check $862.86 Meter Fee $0.00 Add'I Building Permit Fee ($500.00) . SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $49.58 PFF (3105540) $4,297.29 Park Fee $0.00 PFF (4305540) $3,966.73 LFM Fee $0.00 License Tax (3104193) $0.00 Bridge Fee $0.00 License Tax (4304193) $0.00 BTD #2 Fee $0.00 . Traffic Impact Fee (3105541) $0.00 BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00 Renewal Fee $0.00 PLUMBING TOTAL $95.00 Add'I Renewal Fee $0.00 ELECTRICAL TOTAL $70.00 Other Building Fee $0.00 MECHANICAL TOTAL $80.85 Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Meter Size Sewer Fee $0.00 Add'I Pot. Water Con. Fee $0.00 Redev Parking Fee . $0.00 Red. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (SB1473) Fee $8.00 HMP Fee $0.00 Fire Expedidted Plan Review $0.00 Green Bldg Standards Plan Chk TOTAL PERMIT FEES $10,162.97 Total Fees: $10,162.97 Total Payments To Date: $10,162.97 Balance Due: $0.00 insnectorY FINAL APJPRØVAL _____________ Date: 2-I &iu/L Clearance: NOTICE: Please take Nj)TlCVthat approval of your project includes the Imposition bf fees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions. You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any DATE SIGN City of Carlsbad '., 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit 02-25-2014 Permit No:'SW130193 Job Address: 2353 OCEAN ST CBAD Permit Type: SWPPP Parcel No: 2030101200 Reference #: CT050012 CB#: CBI 31248 Project Title: OCEAN ST. CONDOS Applicant: SHAWN MONTEITH #130 11750 SORRENTO VALLEY RD SAN DIEGO CA 92121 858-461-5126 Emergency Contaôt: SHAWN MONTEITH Status: ISSUED Lot #: .0 Applied:' 05/20/2013 Entered By JMA Issued: 02/25/2014 Inspect Area: Tier: I Priority: M Owner: ZEPHYR OCEAN STREET INVESTORS L L C 11750 SORRENTO VALLEY RD #130 SAN DIEGO CA 92121 858-461-5126 SWPPP Plan Check , $0.00 SWPPP Inspections $216.00 Additional Fees $0.00 TOTAL PERMIT FEES $216.00 Total Fees: $216.00 Total Payments To Date: $216.00 Balance Due: $0.00 Inspection List Permit#: C13131248 Date - Inspection Item 02/05/2016 89 Final Combo Type: COMMIND COMM OCEANS ST. CONDOS: 2,010 SF CLUBHOUSE Inspector Act Comments - RI CARD MARKED TEMP OCCUPANCY FOR CM&I/ASKED TONY TO SEND COPY OF BACK OF CARD 02/05/2016 89 Final Combo PY AP 08/26/2015 23 GasllestlRepairs PY AP 08/10/2015 39 Final Electrical PY PA 07/22/2015 39 Final Electrical PY PA 06/23/2015 17 Interior Lath/Drywall PB AP 06/16/2015 24 Rough/Topout PY AP 05/28/2015 84 Rough Combo PY AP 05/18/2015 84 Rough Combo PD NR 05/15/2015 14 Frame/Steel/BoltinglWeldin PB PA 01/30/2015 18 Exterior Lath/Drywall PY AP 11/04/2014-84 Rough Combo PY AP 07/16/2014 13 Shear Panels/HO's PY AP 07/10/2014 15 Roof/Reroof PY AP 05/05/2014 11 Ftg/Foundation/Piers PY AP Monday, February 08, 2016 Page 1 of 1 - Y I 21\ • I z 1" cig i 1, ARLSBAD i' CB131248 2353OCEANST INSPECTION:: Building Division RECORD: OCEANS ST. CONDOS: 2 -10 SF INSPECTION RECO CARD WITH APPROVED CiUHOUSE RD COMM PLANS MUST BE KEPT ON THE JOB ot# SHAW4 MOM 1TH - I CALL BEFORE 33O em FOR NEXT WORK DAY Ic INSPECTION 1 J FOR BUILDING INSPECTION .CALL 760;' / I ORGOTO ?1dcOVUIIdIfl 02e2725 ._.-RANDCLICK Insp Request Ction" ON DATE e4udst1n4A3uI1d1ng Required Prior to R Final Checked YES Date Inspector NotOS - - hcur5 tons- - - CM&I (Engineering 750-q38-3891. Call before 2 pir. ire Pro Allow 48 ourz 1p Ins ptio - - . 41) Inspector ateIflSPect0 - #12 REINFORCED STEEL __________ #34 ROH ELECTRI UG C #66 MASONRYPREGROUT #33 0 ELECTRIC SERVICE 13 GROUT DWALLDRAINs . . 435 PHOTOVOLTAIC #1O TILT PANELS . #39 FINAL #UPOURSTRIPS #11 COLUMN FOOTINGS UNDER-3 ROUND DUCTS & PIPING #14SU8FRAME 0 FLOOR 0 CEILING #44 DDUcT&PLENUM 0REF.PIpI6 015 ROOFSHEATHINC #43 HEAT-AIRCOND.SYSTMS EXT. SHEAR PANELS 7jJ/( 4-. 449 #16 INSULATION #18 EXTERIOR LATH . #81 UNDERGROUND (u,12.21 )1) - #11 INTERIOR LATH DRYWALL TZ.5 —/J 7j' #82 DR"WALL,EXT LATh, GAS ItS (1),18,23) #51 POOL-EXCA/STEEL/BOND/FENCE #83 -RO)FSNEATING,EXTSHEAR(13,15) -,-- -,-- #55 PREPLASTER/FINAL . -- . ..................- #84 FR4ME.WUGH COMBO (14,24,34,44) - I i -: '1i I---' 019 FINAL . #85 T-Bar(4,24,34,44) -_________________________ _______________ Date . Inspector #9FItlAL OCCUPANCY (i9,29,39,49) #22 0 SEWER 0 PL,'CO -. ___________ - - : . . Date Inspector 21 UNDERGROUND0WASTE0WTI 24 TOP OUT WASTE 0 WTR "- ______ - ... A/SUNDERGROUNDVISUAL ; TUB& SHOWER PAN -- . A/S UI1DERROUND HYDFO 23 0 GS TEST o 25 WArERHF.ArER - - OVERHE&VISUAL Crt -- 28 SOLARWATER - - - — 29 FINAL - - - A/srIrIL - - F/AROIJGH-IfI __________ OO PRE-CO MEETING - -- -... ---- F/AFIN.L ----..--.•--•-- 603 FOLLOW UP (USPF.CTICI' . . . . -. P FIXED TI,UISHtFlGSrSTE?. R-lI_ . . . FIXED ONO SYSTEM HYDROSTATIC TEST 605 NOTICETOCIFAN - . . - .—.------------------ FIXED EXTiNGUISHING SYSTEM FINAL . -. .- --.. -. ki-WRITIEN WARNIM - - - - 609 NOFICEOVIO1A (OF-I .- . - - -.- MEDICA.G,4S PRESSURE TEST --. - - - - --i-- - .• MEDlCA$FIUAL 610 VF.RBAI WARNIFBe -- gF VIM ........... 110 66t; ldis,flh zo S. TAW.' CCOU fracOona prt thateT9 at a rm -E to 14 AVIOfatIOfloffh1SSect1ôP shall oorMtute g"' rusdemeanor 4 ?an e Location on which actual OnSt(Uct;Ofl o a Al 4. 14 V it In Øball remain acessibI4iandxdsect fprpspctton puroseu IL such oistructton or wotk OP. the poItt tndicated in each sucaessie niecuon ed'bY t nspto Work hill not be bone th DATE- AbDJtIONAl44O1Es ) 'I : iç 4i j r lo E36.-wWm, , A iii&- yJ imc 4 4 ' - fiLO& ()cvOLFfl - ; 41 S Al Wt ~el 01V1 Iri Ki It 44 '' ' 2 /' c •'r - T : : - . . I ç;