HomeMy WebLinkAbout2368 LARIMAR AVE; ; CB050181; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
,.01-2}-2005 Residential Permit Permit No: CB050181
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
01/27/2005
# Dwelling Units:
Bedrooms:
Project Title:
Applicant:
Building Inspection Request Line (760) 602-2725
2368 LARIMAR AV CBAD
RESDNTL
2132210400
Sub Type:
Lot#:
$307,824.00 Construction Type:
Reference #:
SFD
19
VN
CT020022
Structure Type: SFD
4 Bathrooms: 4
LA COSTA GREEN-AREA 1.09-PHS 3
PLAN 2-3219 SF,428 SF GAR,106 SF DECK
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
11/16/2004
RMA
Plan Approved:
01/27/2005
JM
PC040081
PC040124
WESTERN PACIFIC HOUSING
STE 210
REAL ESTATE COLLATERAL MANAGEMENT CO
C/O LIZ LAYMAN/ MORROW DEV
5790 FLEET ST
CARLSBAD CA 92008
760 929-1600
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
STD #2 Fee
STD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,187.20
$0.00
$771.68
$0.00
($61.73)
$30.78
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
05/8
$0.00
$0.00
1903 WRIGHT PL #180
CARLSBAD CA 92008
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$160.00
$2,004.00
$2,848.90
$5,602.40
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$196.00
$47.50
$43.50
$0.00
$0.00
$0.00
$0.00
$1,735.00
$0.00
$18,224.23
Total Fees: $18,224.23 Total Payments To Date: $0.00 Balance Due: $18,224.23
0545 01/27/05 0002 01 02
CGP 18224,23
Inspector: ::r Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of I es, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these lees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020{a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack.
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this proiect. NOR DOES IT APPLY to any
fees/exactions of which ou have reviousl been iven a NOTICE similar tot is or as to which the statute of limitations has reviousl otherwise ex ired.
IJ CHIii C1rln1•
Flnal Buildlna Inspection SEP 1 2 2005
Dept: Building Engineering Planning CMWD St Lite Fire
Plan Check #: PC040124 Date: 09/12/2005
PermH#: CB050181 PermHType: RESDNTL
Project Name: LA COSTA GREEN-AREA 1.09-PHS 3 Sub Type: SFD
PLAN 2-3219 SF ,428 SF GAR, 106 SF DECK
Address: 2368 LARIMAR AV Lot: 19
Contact Person: KEVIN Phone: 7608027050
Sewer Dist: CA Water Dist: CA ..........................................................................................................................................................
Inspected Date
By: <c • <:,c,'1,a~.,.,.... Inspected: 9 lz.1 las Approved: ✓ Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __ ...........................................................................................................................................................
Comments: _ _J\.a.,♦/UMl!l....Jle~o!!t:L.Jl'e'X.flpu!Jo<e-&,l,jCC.d'1..+1 _.St!f..M14:l;•t,1Ci:...J•t.!J~e~0 ... ,,..n.,,.._.;,ifw-Q2;,:.,;l<~1..2.~.i.i.!o.'>Ut+c,£.......!..J::::.~~ .. »!!:::51J:!•:t:,..:....
fr t fC. Pl\ such dd. w, oa b?':':k:' s-\c n"-I \ 01\ SmM-cb i
City of Carlsbad Bldg Inspection Request
For: 09/29/2005
Permit# CB050181
Title: LA COSTA GREEN-AREA 1.09-PHS 3
Description: PLAN 2-3219 SF,428 SF GAR,106 SF DECK
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
2368 LARIMAR AV
Lot 19
APPLICANT WESTERN PACIFIC HOUSING
Owner: WESTERN PACIFIC HOUSING INC
Remarks:
Total Time:
CD Description Act Comment
19 Final Structural ~
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
lns12ection Histo!Y
Date Description Act lnsp Comments
09/12/2005 89 Final Combo NR JM
08/31/2005 39 Final Electrical AP JM EMR
08/04/2005 17 Interior Lath/Drywall AP JM SHOWERS
08/02/2005 17 Interior Lath/Drywall AP JM
07/26/2005 82 Drywall/Ext Lath/Gas Test AP PC
07/19/2005 15 Roof/Reroof AP JM
07/18/2005 84 Rough Combo AP JM
07/15/2005 84 Rough Combo NS JM
07/14/2005 84 Rough Combo co JM
07/06/2005 13 Shear Panels/HD's AP JM
Inspector Assignment: JM ---
Phone: 7608016463
Inspector: -----
Requested By: FELIX
Entered By: CHRISTINE
07/05/2005 13 Shear Panels/HD's co JM PRELIM & NAIL PROTECTION
06/28/2005 13 Shear Panels/HD's NR JM
06/27/2005 13 Shear Panels/HD's NR JM
06/2412005 13 Shear Panels/HD's NS JM
06/06/2005 15 Roof/Reroof AP JM
04/01/2005 11 Ftg/Foundation/Piers AP JM UFER OK
·--·-----··--· --··
• City of Carlsbad Bldg Inspection Request
For: 08/31/2005
Permit# CB050181
Title: LA COST A GREEN-AREA 1.09-PHS 3
Description: PLAN 2-3219 SF ,428 SF GAR, 106 SF DECK
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
2368 LARIMAR AV
Lot 19
APPLICANT WESTERN PACIFIC HOUSING
Owner: WESTERN PACIFIC HOUSING INC
Remarks:
Total Time:
CD Description Act Comment
39 Flnal Electrical AL f!vvzl?
Associated PCRs/CVs
lns(lection Histoty
Date Description Act lnsp Comments
08/04/2005 17 Interior Lath/Drywall AP JM SHOWERS
08/02/2005 17 Interior Lath/Drywall AP JM
07/2612005 82 Drywall/Ext Lath/Gas Test AP PC
07/19/2005 15 Roof/Reroof AP JM
07/18/2005 84 Rough Combo AP JM
07/15/2005 84 Rough Combo NS JM
07/14/2005 84 Rough Combo co JM
07/0612005 13 Shear Panels/HD's AP JM
Inspector Assignment: JM ---
Phone: 7608024148
Inspector: -----
Requested By: SCOTT
Entered By: JANEAN
07/05/2005 13 Shear Panels/HD's co JM PRELIM & NAIL PROTECTION
06128/2005 13 Shear Panels/HD's NR JM
08/27/2005 13 Shear Panels/HD1s NR JM
06/24/2005 13 Shear Panels/HD's NS JM
06/0612005 15 Roof/Reroof AP JM
04/01/2005 1 1 Fig/Foundation/Piers AP JM UFEROK
03/31/2005 1 1 Fig/Foundation/Piers NR JM
03/15/2005 21 Underground/Under Floor AP JM
03/15/2005 22 Sewer/Water Service AP JM
----------
GEOCON
INCORPORATED
6960 FLANDERS DRIVE ■
FOUNDATION LOCATION ("f t r b "Id" 1 no en ire UI mg
PLAN FILE NO. PERMIT NOS:
181 C );:, 0501~<.,,
l'l; ~t,SO 18 I FOUNDATION TYPE: ~. 0 orri
0 CONVENTIONAL ~1 : l(il,oSo :i :c ~oso i;;J/POST-TENSIONED ~-W'e:.o~ ~o
• PURJOSE OF OBSERVATION
PROJECT NO. C, & 'j?~ 5?: -I 3
DATE, oi·al -'5
0 ADDITIONAL OBSERVATION REQUIRED
~ANTIAL CONFORMANCE
aiverify soil conditions exposed are similar to those anticipated
rn-<erify footing excavations extend to minimum depth recommended in soil report
□ Verify foundation reinforcement complies with minimum recommended in soil report
□ yerify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report
fl( y.erify footings have been e:tended to an appropriate bearing strata
orother Cai X ,it 1t
· trd :23 1.-o-tr !I, -~
• S0_1.l.. REPORT RECOMMENDATIONS BASED ON:
'Cf Expansion Condition D VERY LOW 0 LOW □ MEDIUM □ HIGH 0 VERY HIGH
[i<l"Fill Geometry Oq:/: .I. 4 1C
D other: ~.i.H ,;i. ? 1.-J:,L:; 1..•• ,::,.3 I Loh )8 -;, "-
• M~IMUM FO~IGN--R~OMM!,NDA.IJOblS.:.._ ._ \ ,,, ,. .. r
'@' Footing D~~th: ~ In~ (lld'fs _ lncr2s .• 024. Inches OTHER·) :.:,,3) J!&"""'f /l'lih .. c.,-t · f fi-r, ,i!)(: /J.::
Footing Reinfo~cfe1.ii~rrt:· D No.~·,-'a,S:b.2=JIL;j,ii"s.,tJ 2-No.5 T&B □ Post-TensionJd OTHER: ______ ) l .,
Interior Slab Reinforcement: □ 6x6-10/10 □ 6x6-6/6 □ No.3@24Inches D No.3@18Inches ~I-Tensioned
Slab Bedding Material and Thickness: ;_/. ,, j_ Vapor Barrier: _ _c.V __ -____ _ ,, Foundation Width: _ __1=,. _ _µ_!.J.J!l'-''"'•..>e:..... ________________________ _
• OBSERVATIONS:
10"'substantial conformance with Soil Reports (see "Purpos!j .C>f O~ser;'!ftion") .{· ,
~ubs·t· antia_i __ confo_rmance. with. Fqund,itio. n Plars-, lden!\IY,: -...,_:'~_'-. _+-'-,-/--'(-'-! ;-.c~~1,.,:"";~---'·,_.•·....,,,L_o ___ = ____ ~ ~ ~: _ ·/ _, I . O ,/,,-, (.I )P. ':f.fr r\ I~-ti C!"tl ( -H ,\, 1~;1 k r-r•, J L!
D Other ·/'J /)" ,·.' .. { ,, l,
NOTE: IT IS ASSUMED THAT ALL FOOTING EXCAVATIONS WILL BE QEANED Of LOOSE MATI:RIAL PRIOR TO PLACING CONCRETE AND THAT Tl·E SOIL MOISTURE CONTENT WILL RE MAINTAINED
l //' . , . , :. TI
" . I . J , . q r::J-!. \ Va ·ffli ( I r,C ~•--ct t. ) .,,
RELD COPIES TO GEOCON REPRESENTATIVE