Loading...
HomeMy WebLinkAbout2375 CAMINO VIDA ROBLE; BLDG 6; CB020851; Permit09-22-2006 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit NO: CB020851 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: Applicant: DAVID BOYD SUITE200 701 B STREET SD 92101 619-231-0751 2375 CAMINO VIDA ROBLE CBAD Tl Sub Type: COMM 2130502700 Lot #: 0 Status: < $459,330.00 Construction Type: NEW Applied: Reference #: Entered By: ONTOGEN CORP/15311 SF SHELL TO Plan Approved: 4500 SF LAB/ 10743 SF OFFICE Issued: Inspect Area: Plan Check*: Owner: WELLS FARGO BANK TR P O BOX 63700 SAN FRANCISCO CA 94163 S" \CABANDQML^ 03/21/2002 CB 07/16/2002 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $1,655.36 Meter Size $0.00 Add'l Reel. Water Con. Fee $1,075.98 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $96.46 PFF (3105540) $0.00 PFF (4305540) $0.00 License Tax (3104193) $0.00 License Tax (4304193) $0.00 Traffic Impact Fee (3105541) $0.00 Traffic Impact Fee (4305541) $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Master Drainage Fee Sewer Fee $0.00 Redev Parking Fee $0.00 Additional Fees HMP Fee TOTAL PERMIT FEES $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $5,865.60 $5,414.40 $3,458.00 $3,192.00 $601.00 $210.00 $154.50 $0.00 $8,573.85 $0.00 $0.00 ?? $30,297.15 Total Fees:$30,297.15 Total Payments To Date:$1,075.98 Balance Due:$29,221.17 Inspector: FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as lees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project, NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.