Loading...
HomeMy WebLinkAbout2382 Faraday Ave; 250; CBCA2018-0091; Recycle1 "';--------------------------------------, {City of Carlsbad WASTE MANAGEMENT PLAN B-59 Contractor: Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Owner: to{(.'l) f'l>/l.rh~e, ) Job Address2 S ~ L FA~P... QA\/ ¢2.Sl> AYE Phone Number:_,lf""--"'S:----'$i.,__-_~~c.~'~------"~---'·2..='---o=--<...-~ __ _ Permit#: Cl2, C.A lo\b-u~<\ I Estimated Cost of Project: $ _____________ _ Type of Project: D New Construction XJ Remodel or T.I. □ Residential □ Commercial D Demolition (check all that apply) D Other _____________________________ _ Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area _______ X 2 lbs.= ________ lbs. of allowable waste. 0 I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 -Estimated Waste (To be filled out priorto permit issuance -refer to example on Page 2.) MATERIALS lbs. of waste to be taken to I bs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt/ Concrete &: ,,..""'5 r,, .._: \(. 1".I A.a. ,. ,. --' • '', I ._" -Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash / Garbaee Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled ______ % I certify that the informat[oJI provided herein, to the best of my knowledge, is true and correct. ,;,., c... e ot<6",,, ~r Owner (print name) z~/1 f , bontractoror Owner (signature) --;D;=~c,e-""'1---"-'--------- Official Use Only D Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by:. _________________ _ Page 1 of 2 REV.01-2017 Table 2 -Actual Waste (To be completed after construction.) MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED (complete only if different than Table 1) Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste I'\ 11'1 43~D ~ 12i:;:~ 12~=~ . Trash / Garbaoe Dther: TDTAL lbs.: Actual Percentage Re-Used or Recycled __ -?_,_-1-f-~.,_/,,.?J'---_% ptf)cial Use Only t,(65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _ Reviewed/ Approved by .. · __________________ _ EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be token to lbs. of waste to be LANDFILL RE-USED o, RECYCLED Asphalt / Concrete 0 3000 Brick/ Masonry 100 950 Cardboard 0 150 Drywall 0 50 Landscape Debris 0 120 Lumber I Wood 500 0 Metals 300 200 Mixed Waste 1500 0 Trash/ Garbage 300 0 Other: Pool c;uvclte 0 ')00 TOTAL lbs.: 2700 5,3J-0 Percentage to be Re-Used or Recycled 6 7 % Formula: Total Re-used or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) Waste Hauling Company or Re-Use Method AlsC t-tilullvv> Co. WM / Re-vlSed lsvltlz ovc-slte "-lsC '-'Clull,v> Cn. AlsC 1-tilullvcC\ Co. Mulched E; Re-used ovc-slte Wilste Mil vcilC\eVvCevct WM/ AlsC t-tciullvcg WM WM l,,\sed cis Crushed lsilse Ovc-slte 5370 X 100 = 67% Re-Used or Recycled (2700 + 5370) Since 67% exceeds the minimum requirement of 65%, this plan complies. Page 2 of 2 PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): SECTION A Acknowledgement I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and bel ief. Permit No. ~ A ;)..O l -DO Print Name Address a3Fa. ft_trc;td4:J Qµe. Ste o{SO Date c)..-- SECTION B Use this Final Log below to track loads of materials as they leave the job site. @@SAVE RECEIPTS@@ Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date Example: 01/05/2018 SECTION C Material Type Concrete {broken) <D>TOTAL Actual Amt Reused or Salvaged Actual Amt Recycled 5 tons Actual Amt Disposed in Landfill Destination Facility (Name, Address, Phone) Palomar Transfer Station, 5960 El Camino Real -760 603-0153 Diversion Rate Achieved ----------' ___________ = _____ % :2: 65% s 6s%0 DIVERSION Contractor/Owner Signatur·IIC....L~~~~\..2~~U(Ll~:::::::=:::_Date o)-\-I '1 Attach the following documentation to this Report: Return completed form and documentation to: • Original recycling weight tickets, landfill weight tickets • Original donation receipts with photos and/or itemized descriptions • Any other relevant information to support Recycling Report City of Carlsbad Building Division (1st Floor) 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 Rev. 11/12/H SANCO Resource Recovery 6750 Federal Blvd. Lemon Grove. CA 91945 (619) 287-7555 Customer: 0548 Ticket: 23829 Date: 11/26/18 BYCOR GEN. CONT., INC. 6490 MARINDUSTRY PLACE #A SAN DIEGO, CA. 92121 Rate In: ·11: 58 Out: 11:58 64.00 per TON INVOICE Truck: 6075/0000 Container: Route: 02034 Origin: 020 SAN DIEGp Commodity Units 34 CONSTRUCTION/ DEMOL .78 [Gross(In): 12,700. lbs Scl#l Tare 11,140. lbs Stored Net: Extended Charge 49.92 1,560. lbs] TOTAL DUE 49.92 Constructio & Demolition Diversion Certificate --Diversion Percentage 71X This certifies th the co■panJ 11 ted above has utilized an EDCO facllltJ to divert construction de■o ion terlals in accordance 11th LEED requlr n on tonnaae based on an overall tonnaae percentaae oft =,7 ,.,.. •• ~ facllltJ. SANCO Reeo.urce Recovery 6750 Federal Blvd. Lemon Grove, CA 91945 (619) 287-7555 Customer: 0548 Ticket: 25660 Date: 12/13/18 BYCOR GEN. CONT., INC. 6490 MARINDUSTRY PLACE #A SAN DIEGO, CA. 92121 Rate In: 14:50 Out: 14:51 64.00 per TON INVOICE Truck: 6075/0000 Container: Route: 02034 Origin: 020 SAN DIEGO Commodity Units 34 CONSTRUCTION I DEMOL 1.41 [Gross(In): 13,960. lbs Scl#l Tare 11,140. lbs Stored Net: Extended Charge 90.24 2,820. lbs] TOTAL DUE 90.24 Construct o & lition Diversion Certificate --Diversion Percentage 71X This certifies h th9--yu,'ll'fl'Ji !is above has utilized an EDCO facilltJ to divert construction de■olition ■aterials ·n accordance with LEED req her on tonnage is based on an overall tonnage percentaae of the res e K f · y. ERICK MENDOZA