Loading...
HomeMy WebLinkAbout2383 OCEAN ST; ; CB131241; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 02-25-2014 Residential Permit Permit No: CB131241 Building Inspection Request Line (760) 602-2725 Job Address: 2383 OCEAN ST CBAD Permit Type: RESDNTL Sub Type: CONDO Status: ISSUED Parcel No: '2030t0t200- Lot #: 0 Applied: 05/14/2013 Valuation: $255,322.00 Constuction Type: 5B. - Entered By: JMA Occupancy Group: Reference #CT050012 Plan Approved: 02/25/2014 # Dwelling Units: I Structure Type: MF24 Issued: 02/25/2014 Bedrooms: 3 Bathrooms: 3 Inspect Area: Orig PC #:PC13003O Plan Check #: Project Title: OCEAN ST. CONDOS: 2,141 SF LIV 238 SF PATIO/DECK Applicant: Owner: SHAWN MONTEITH OCEAN STREET 8 OWNERS, LLC #130 #130 11750 SORRENTO VALLEY RD 11750 SORRENTO VALLEY RD SAN DIEGO CA 92121 SAN DIEGO CA 92121 858-461-5126 Building Permit $1,307.14 Meter Size Add'l Building Permit Fee $0.00 AddI Red. Water Con. Fee $0.00 Plan Check $915.00 Meter Fee $0.00 Addi Plan Check Fee ($500.00) SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $25.53 PFF (3105540) $4,646.86 Park in Lieu Fee $0.00 PFF (4305540) $4,289.41 Park Fee $0.00 License Tax (3104193) $0.00 LFM Fee $0.00 License Tax (4304193) $0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541) $0.00 Other Bridge Fee $0.00 Traffic Impact Fee (4305541) $0.00 BTD #2 Fee $0.00 Sidewalk Fee • $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $172.00 Renewal Fee $0.00 ELECTRICAL TOTAL $70.00 Add'l Renewal Fee $0.00 MECHANICAL TOTAL $90.61 Other Building Fee $0.00 Housing Impact Fee $0.00 HMP Fee $0.00 Housing lnLieu Fee $0.00 Pot. Water Con. Fee $0.00 Housing Credit Fee $0.00 Meter Size Master Drainage Fee $0.00 Add'I Pot. Water Con. Fee $0.00 Sewer Fee $0.00 Red. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (SB1473) Fee $8.00 Fire Sprinkler Fees $0.00 Green Bldg Stands Plan Chk Fee $0.00 • TOTAL PERMIT FEES $11,024.55 Total Fees: $11,024.55 Total Payments to Date: $11,024.55 Balance Due: $0.00 Inspector: FINAL OVA A#//Clearance: NOTICE: Please take NOTVE that approval of your project includes the imposition of fees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions? You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit 02-25-2014 Permit No:SWI 30196 Job Address: 2383 OCEAN ST CBAD Permit Type: SWPPP Status: ISSUED Parcel No: 2030101200 Lot #: 0 Applied: 05/20/2013 Reference #: CT050012 Entered By: JMA CB#: CB131241 Issued: 02/25/2014 Inspect Area: Project Title: OCEAN ST. CONDOS Tier: 1 Priority: M Applicant: SHAWN MONTEITH #130 11750 SORRENTO VALLEY RD SAN DIEGO CA 92121 858-461-5126 Emergency Contact: SHAWN MONTEITH Owner: ZEPHYR OCEAN STREET INVESTORS L L C 11750 SORRENTO VALLEY RD #130 SAN DIEGO CA 92121 858-461-5126 SWPPP Plan Check $0.00 SWPPP Inspections $216.00 Additional Fees $0.00 TOTAL PERMIT FEES $216.00 Total Fees: $216.00 Total Payments To Date: $216.00 Balance Due: $0.00 IAL APPROVAL Li I12j21)/1 Fl DA SIGN Inspection List Permit#: CB131241 Type: RESDNTL CONDO OCEAN ST. CONDOS: 2,141 SF LIV 238 SF PATIOIDECK Date Inspection Item Inspector Act Comments 04/19/2016 89 Final Combo PY AP 04/19/2016 89 Final Combo - RI COF/LATE PM PLEASE 08/26/2015 23 Gas/Test/Repairs PY AP 08/25/2015 23 Gas/Test/Repairs PB NR 08/24/2015 23 Gas/Test/Repairs PY NR 08/10/2015 39 Final Electrical PY PA 07/22/2015 39 Final Electrical PY PA 07/16/2015 39 Final Electrical PY PA 01/29/2015 18 Exterior Lath/Drywall PY AP 01/28/2015 18 Exterior Lath/Drywall PY PA 12/10/2014 23 Gas/Test/Repairs PY AP 10/29/2014 17 Interior Lath/Drywall PY AP 10/22/2014 17 Interior Lath/Drywall PY NS 10/16/2014 84 Rough Combo PY AP 10/08/2014 16 Insulation PY PA 10/06/2014 84 Rough Combo PY PA 08/26/2014 14 Frame/Steel/Bolting/Weldin PY PA 08/25/2014 24 Rough/Topout PY - WC 08/20/2014 24 Rough/Topout PY AP 08/19/2014 34 Rough Electric PY WC 08/18/2014 14 Frame/Steel/Bolting/Weldin PY PA 07/16/2014 13 Shear Panels/HO's PY AP 07/10/2014 15 Roof/Reroof PY AP 04/30/2014 11 Ftg/Foundation/Piers PY AP Friday, April 22, 2016 Page 1 of 1 Ilk NO YES Required Prior to Requesting Building Final If Checked YES Date -_Inspector l NOteS Planrting,'Landscape . . : 768463 AlI ow, 48hour;. .io.tI rt CM&l lEnlnccring Inspections) 76O-4338S I . Call before — FirePrevention 760:6024660 Albw48hóurs Type of Inspection . Type of Inspection #1 1 FOUNDATION pat, Inspector__= - Date nspector . #3L _ELtCTRIC UNDERGROUN D_0 UFER . REINFORCED STEEL _#12____ #34 ROUGH ELECTRIC #66 MASONRY PRE GROUT ELEcTRIC SERVICE._0 TEMPORARY 0 GROUT 0 WALL DRAINS . #S5 PHOT3V6LTAIC________. - - #10 TILT PANELS .___. #33 #11 POUR STRIPS #11____COLUMNFOOTINGS 7 77, #14__SUBFRAME___0 FLOOR_0 CEILING / ._. . #44 DDUcT&PLENUM__.0_REF. PIPING #15 ROOFSHEATHING . 7//// )' -. ._- #.3 HEAT-AIRCOND.SYSTEMS___. #13 #16___INSULATION #18 EXTERIOR LATH._____________________. 'F #81 UNDERGROUND(11,12,21,31)___I - #17 INTERIOR LATH & DRYWALL #82-_.DRYWALL,EXr LATH,__GAS TES (17,1823) #51 POOL EXcA/STEEL/BOND/FENCE _. .__.__________. . _/ . #33 ROOF SHEATING,_EXT SHEAR (:3,15) #55PREPLASTER/FINAL . #4 FRAME ROUGHCOMBO(14__2434,44)________: 104___V _#19 FINAL '#22,,,P.!EW!& BL/CO_____0 FL/CO Date Inspector #85 T-Bar (14,2 4,34,44) _____________. __• _._____ .___1 #89__FINAL OCCUPANCY c'!99L : I . - _-. _.•___. __4Date - Inspector #21 UNDERGROUND OWASTE_0 WTR __________ ..____.__•-_____. . - #24 TOP OUT 0 WASTE 0 WIR_ 4 /5_UNDERGROUND VISUAL #27 TUB & SHOWER PAN I_____-._ /5_UNDERGROUND__HYDRO #23 GASTEST OGAS PIPING I_____$ A/S UNDERGROUND FLUSH #25 -WATER HEATER #28 SOLAR WATER ___•__ _________ -________ A/S OVERHEAD HYDROSTATIC #29 FINAL /S FINAL F/A ROUGH-IN,I. F/A FINAL #OO_ !RE-COFSTRUcT!ON MEETING -- • #603 FOLLOW U! INSPETION - -- . -- --. -- FIXED EXTINGUISHING SYSTEM ROUGH-IN 46015 - _•___i AOTICET0,CLEM ED EXTiNQ SY9TEM 40690STATIC TM_ j -- #607 WRITTEN WARNING . FIXED EXTINGUISHING SYSTEM FINAL #609 NOTICE OFVIOLATON 1v1DICAL GAS PRESSURETEST . #GIO VERDAL WARNING - - - — MEDICAL GAS FINAL ?F.V It!..l2 SU BAC f POWSPECiAt.;J,)-_ . i-;-.-,r. -:. •.- - . .. . .• ., - -