HomeMy WebLinkAbout2383 OCEAN ST; ; CB131241; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
02-25-2014 Residential Permit Permit No: CB131241
Building Inspection Request Line (760) 602-2725
Job Address: 2383 OCEAN ST CBAD
Permit Type: RESDNTL Sub Type: CONDO Status: ISSUED
Parcel No: '2030t0t200- Lot #: 0 Applied: 05/14/2013
Valuation: $255,322.00 Constuction Type: 5B. - Entered By: JMA
Occupancy Group: Reference #CT050012 Plan Approved: 02/25/2014
# Dwelling Units: I Structure Type: MF24 Issued: 02/25/2014
Bedrooms: 3 Bathrooms: 3 Inspect Area:
Orig PC #:PC13003O Plan Check #:
Project Title: OCEAN ST. CONDOS: 2,141 SF LIV
238 SF PATIO/DECK
Applicant: Owner:
SHAWN MONTEITH OCEAN STREET 8 OWNERS, LLC
#130 #130
11750 SORRENTO VALLEY RD 11750 SORRENTO VALLEY RD
SAN DIEGO CA 92121 SAN DIEGO CA 92121
858-461-5126
Building Permit $1,307.14 Meter Size
Add'l Building Permit Fee $0.00 AddI Red. Water Con. Fee $0.00
Plan Check $915.00 Meter Fee $0.00
Addi Plan Check Fee ($500.00) SDCWA Fee $0.00
Plan Check Discount $0.00 CFD Payoff Fee $0.00
Strong Motion Fee $25.53 PFF (3105540) $4,646.86
Park in Lieu Fee $0.00 PFF (4305540) $4,289.41
Park Fee $0.00 License Tax (3104193) $0.00
LFM Fee $0.00 License Tax (4304193) $0.00
Bridge Fee $0.00 Traffic Impact Fee (3105541) $0.00
Other Bridge Fee $0.00 Traffic Impact Fee (4305541) $0.00
BTD #2 Fee $0.00 Sidewalk Fee • $0.00
BTD #3 Fee $0.00 PLUMBING TOTAL $172.00
Renewal Fee $0.00 ELECTRICAL TOTAL $70.00
Add'l Renewal Fee $0.00 MECHANICAL TOTAL $90.61
Other Building Fee $0.00 Housing Impact Fee $0.00
HMP Fee $0.00 Housing lnLieu Fee $0.00
Pot. Water Con. Fee $0.00 Housing Credit Fee $0.00
Meter Size Master Drainage Fee $0.00
Add'I Pot. Water Con. Fee $0.00 Sewer Fee $0.00
Red. Water Con. Fee $0.00 Additional Fees $0.00
Green Bldg Stands (SB1473) Fee $8.00 Fire Sprinkler Fees $0.00
Green Bldg Stands Plan Chk Fee $0.00
• TOTAL PERMIT FEES $11,024.55
Total Fees: $11,024.55 Total Payments to Date: $11,024.55 Balance Due: $0.00
Inspector:
FINAL OVA
A#//Clearance:
NOTICE: Please take NOTVE that approval of your project includes the imposition of fees, dedications, reservations, or other exactions hereafter collectively
referred to as fees/exactions? You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
02-25-2014 Permit No:SWI 30196
Job Address: 2383 OCEAN ST CBAD
Permit Type: SWPPP Status: ISSUED
Parcel No: 2030101200 Lot #: 0 Applied: 05/20/2013
Reference #: CT050012 Entered By: JMA
CB#: CB131241 Issued: 02/25/2014
Inspect Area:
Project Title: OCEAN ST. CONDOS Tier: 1
Priority: M
Applicant:
SHAWN MONTEITH
#130
11750 SORRENTO VALLEY RD
SAN DIEGO CA 92121
858-461-5126
Emergency Contact:
SHAWN MONTEITH
Owner:
ZEPHYR OCEAN STREET INVESTORS L L C
11750 SORRENTO VALLEY RD #130
SAN DIEGO CA 92121
858-461-5126
SWPPP Plan Check $0.00
SWPPP Inspections $216.00
Additional Fees $0.00
TOTAL PERMIT FEES $216.00
Total Fees: $216.00 Total Payments To Date: $216.00 Balance Due: $0.00
IAL APPROVAL
Li I12j21)/1
Fl
DA
SIGN
Inspection List
Permit#: CB131241 Type: RESDNTL CONDO OCEAN ST. CONDOS: 2,141 SF LIV
238 SF PATIOIDECK
Date Inspection Item Inspector Act Comments
04/19/2016 89 Final Combo PY AP
04/19/2016 89 Final Combo - RI COF/LATE PM PLEASE
08/26/2015 23 Gas/Test/Repairs PY AP
08/25/2015 23 Gas/Test/Repairs PB NR
08/24/2015 23 Gas/Test/Repairs PY NR
08/10/2015 39 Final Electrical PY PA
07/22/2015 39 Final Electrical PY PA
07/16/2015 39 Final Electrical PY PA
01/29/2015 18 Exterior Lath/Drywall PY AP
01/28/2015 18 Exterior Lath/Drywall PY PA
12/10/2014 23 Gas/Test/Repairs PY AP
10/29/2014 17 Interior Lath/Drywall PY AP
10/22/2014 17 Interior Lath/Drywall PY NS
10/16/2014 84 Rough Combo PY AP
10/08/2014 16 Insulation PY PA
10/06/2014 84 Rough Combo PY PA
08/26/2014 14 Frame/Steel/Bolting/Weldin PY PA
08/25/2014 24 Rough/Topout PY - WC
08/20/2014 24 Rough/Topout PY AP
08/19/2014 34 Rough Electric PY WC
08/18/2014 14 Frame/Steel/Bolting/Weldin PY PA
07/16/2014 13 Shear Panels/HO's PY AP
07/10/2014 15 Roof/Reroof PY AP
04/30/2014 11 Ftg/Foundation/Piers PY AP
Friday, April 22, 2016 Page 1 of 1
Ilk
NO YES Required Prior to Requesting Building Final If Checked YES Date -_Inspector l NOteS
Planrting,'Landscape . . : 768463 AlI ow, 48hour;. .io.tI rt
CM&l lEnlnccring Inspections) 76O-4338S I . Call before
— FirePrevention 760:6024660 Albw48hóurs
Type of Inspection . Type of Inspection
#1 1 FOUNDATION
pat, Inspector__= -
Date nspector
. #3L _ELtCTRIC UNDERGROUN D_0 UFER .
REINFORCED STEEL _#12____ #34 ROUGH ELECTRIC
#66 MASONRY PRE GROUT ELEcTRIC SERVICE._0 TEMPORARY
0 GROUT 0 WALL DRAINS . #S5 PHOT3V6LTAIC________. - -
#10 TILT PANELS .___. #33
#11 POUR STRIPS
#11____COLUMNFOOTINGS 7 77,
#14__SUBFRAME___0 FLOOR_0 CEILING / ._. . #44 DDUcT&PLENUM__.0_REF. PIPING
#15 ROOFSHEATHING . 7//// )' -. ._- #.3 HEAT-AIRCOND.SYSTEMS___.
#13
#16___INSULATION
#18 EXTERIOR LATH._____________________. 'F #81 UNDERGROUND(11,12,21,31)___I
- #17 INTERIOR LATH & DRYWALL #82-_.DRYWALL,EXr LATH,__GAS TES (17,1823)
#51 POOL EXcA/STEEL/BOND/FENCE _. .__.__________. . _/ . #33 ROOF SHEATING,_EXT SHEAR (:3,15)
#55PREPLASTER/FINAL . #4 FRAME ROUGHCOMBO(14__2434,44)________: 104___V
_#19 FINAL
'#22,,,P.!EW!& BL/CO_____0 FL/CO
Date Inspector
#85 T-Bar (14,2 4,34,44) _____________. __• _._____
.___1 #89__FINAL OCCUPANCY c'!99L : I
.
- _-. _.•___. __4Date - Inspector
#21 UNDERGROUND OWASTE_0 WTR __________
..____.__•-_____. . -
#24 TOP OUT 0 WASTE 0 WIR_ 4 /5_UNDERGROUND VISUAL
#27 TUB & SHOWER PAN I_____-._ /5_UNDERGROUND__HYDRO
#23 GASTEST OGAS PIPING I_____$ A/S UNDERGROUND FLUSH
#25 -WATER HEATER
#28 SOLAR WATER ___•__ _________ -________ A/S OVERHEAD HYDROSTATIC
#29 FINAL /S FINAL
F/A ROUGH-IN,I.
F/A FINAL
#OO_ !RE-COFSTRUcT!ON MEETING -- •
#603 FOLLOW U! INSPETION
- -- . --
--. --
FIXED EXTINGUISHING SYSTEM ROUGH-IN
46015 - _•___i AOTICET0,CLEM
ED EXTiNQ SY9TEM 40690STATIC TM_ j --
#607 WRITTEN WARNING . FIXED EXTINGUISHING SYSTEM FINAL
#609 NOTICE OFVIOLATON 1v1DICAL GAS PRESSURETEST .
#GIO VERDAL WARNING -
- - — MEDICAL GAS FINAL
?F.V It!..l2 SU BAC f POWSPECiAt.;J,)-_
. i-;-.-,r. -:. •.- - . .. . .• ., - -