HomeMy WebLinkAbout2386 FARADAY AVE; 200; CB141396; PermitCity of Carlsbad
01-29-2015
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB141396
Building Inspection Request Line (760) 602-2725
Job Address: 2386 FARADAY AV CBADSt: 200
Permit Type: Tl Sub Type: IN DUST Status: ISSUED
Applied: 06/19/2014
Entered By: JMA
Parcel No: 2120621800 Lot#: 0
Valuation: $708,881.00 Construction Type: 5B
Occupancy Group: Reference# Plan Approved: 09/15/2014
Issued: 09/15/2014
Inspect Area PB
Project Title: HAVAS EDGE: 19,079 OFF TO OFF
Applicant:
AMBER BOONE
STE 300
2173 SALK.AVE
CARLSBAD CA 92008-7383
760-431-6571
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Building Permit Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Fire Expedidted Plan Review
$2,957.50
$0.00
$2,070.25
$0.00
$0.00
$148.87
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$28.00
$1,015.00
Total Fees: $7,000.77 Total Payments To Date:
Plan Check #:
Owner:
KW FUND I CARLSBAD I LP
9701 WILSHIRE BLVD #700
BEVERLY HILLS CA 90212
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
Redev Parking Fee
Additional Fees
HMP Fee
Green Bldg Standards Plan Chk
TOTAL PERMIT FEES
$7,000.77 Balance Due:
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$54.00
$476.80
$250.35
$0.00
$0.00
$0.00
$0.00
??
??
$7,000.77
$0.00
Inspector:
FINAL APPROVAL
Date: /-21, LS: Clearance: ------
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), a.nd file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
. / / / ---, THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: ~LANNING [2!€NGINEERING [2!'13UILDING ~FIRE OHEALTH []MAZMAT/APCD
~ Building Permit Application Plan Check N~. CBI L/-. ( 3q b « 1635 Faraday Ave., Carlsbad, CA 92008 /I -. '7t>8&a / Est. Value ,-, -. .~ 7~V CJ W CITY OF Ph: 760-602-2719 Fax: 760-602-8558 I
Plan Ck. ~epo.,sit
,
CARLSBAD email: building@carlsbadca.gov
www.carlsbadca.gov Date {;;/ ;q/JiJ ISWPPP
JOB ADDRESS .. SUITE/1/SPACE#/UNIT# rN 212 2386 Faraday Ave 200 -062 -17 -
CT/PROJECT# rOT# I PHASE# . r OF UNITS I' BEDROOMS #BATHROOMS I TENANT BUSINESS NAME I CONST~ TYPE l occ, ~OUP
Havas Edge
DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) "' ( '1, OC/1. ~-
Tenant improvement to an existing building of approximately 2&;000':SF including the following: demolition of (e) non-bearing
walls, construction of new interior partitions,ceilings, new mechanical equipment and distribution, new electrical lighting
distribution and power and new break area.
EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) I DECKS (SF) FIREPlACE rlR CONDITIONING I FIRE SPRINKLERS
Office Office na -na na YESO, No[ZJ YES [Z]No D YES[Z] NoO
APPLICANT NAME Amber Boone PROPERTY OWNER NAME
Primary Contact
ADDRESS ADDRESS
2173 Salk Ave. Ste. #300
CITY STATE ZIP CITY STATE ZIP
Carlsbad CA 92008
PHONE IFAX PHONE tAX 760.431.6571
EMAIL EMAIL
. amber.boone@havasedge.com
DESIGN PROFESSIONAL Attn: David Semon, ACRMArchitects CONTRACTOR BUS, NAME BYCOR GENERAL CONTRACTORS. INC.
ADDRESS ADORES$
104514th St., Suite 100 6490 Marindustry Pl., Ste. A
CITY STATE ZIP CITY STATE ZIP
San Dieao CA 92101 San Dieao CA 92121
PHONE PHONE
619.398.3480 rAX 858a587•1901 IFAX 858-587-1903
EMAIL EMAIL
. dsemon@acrma.com tbrunson@bycor.com I STATE LIO.# STATELIC.# ICLASS B I CITY BUS, LIO.# 653400 Tom Awbrev ·. 017578 444203
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, Improve, demolish or repair an)' structure, prior to its Issuance, also applicant for such permit to file a signed statement mat he Is licensed pursuant to the provisions of the Contractor's License Law /Chapter 9, commending with Section 7000 of Business and Professions Code} or that he Is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects t civil penalty of not more than five hundred dollars ($500)).
Workers' Compensation Declaration: I hereby afflnn under penalty of pe!jury one of the fol/owing declarations: 0 I have and wlll maintain a certificate of consentto self-Insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ILi I have and wlll maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation Insurance carrier and policy
number are: Insurance Co. ZURICH AMERICAN INSURANCE CO. Polley No. WC654245705 Expiration Dale 6/1/2015
l]l.!§,sectlon need not be completed ff the permit Is for one hundred dollars ($100) or less. LJ Certificate of Exemption: I certify thatln the performan of the for which this permit is Issued, I shall not employ any person In any manner so as to become subject to Ihe Workers' Compensation Laws of
California. WARNING: Fallure to secure workers' c a atl co rage Is unlawful, and shall subject an employer to criminal penaltles and ciVII fines up to one hundred thousand dollars {&100,000), In
addition to the cost of compensation, damages ifs ovlded r action 3706 of the Labor code, Interest and attorney's fees .
.J!5 CONTRACTOR SIGNATURE
I hereby afflnn that I am exempt from Contractor's Ucense Law for the following reason: D I, as ovmer of the property or my employees with wages as their sole compensation, wlll do the work and the structure is not intended or offered for sale (Sec, 7044, Business and Professions Code; The Contractor's
License Law does not apply to an owner of property who builds or Improves thereon, and who does such work himself or through his own employees, provided that such Improvements are not inlended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-bullder will have the burden of proving that he did not build or improve for the purpose of sale). 0 I, as owner of the property, am exclusively contracting with ffcensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply Io an owner of
property who builds or Improves thereon, and contracts for such projects with contractor(s} licensed pursuant to the Contractor's License Law), D I am exempt under Secllon ____ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. OYes 0No
2. I (have / have not) signed an application for. a bulldlng permit for the proposed work.
3. I have contracted with the following person (firm} to provide the proposed construction (Include name address/ phone I conlractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (Include name I address I phone/ contractors' license number):
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work Indicated (Include name/ address I phone/ type of work):
fl! PROPERTY OWNER SIGNATURE OAGENT DATE
J
,
~~<?vl;®~-r><!>q; '.w@~~~m@6®@&1trq~11 -
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials regisltaUon form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hatardous Substance Account Act? Yes ,/ No
Is tho applicant or future building occupant required lo obtain a pe11nit from the air pollution control dislricl or air quality management district? Yes I No
Is the facility to be constructed within 1,000 feet of the outer bouodaiy of a school site? Yes ./ No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING TIIE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
I hereby affirm that there is a construction lending agency for the performance of the walk this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name I.ender's Address
I certify that I have read the application and state that the above infonnation is correct and thatthe infonnation on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction.
I hereby aulhorize representative of the City of Carlsbad to enlerupon lhe above mentioned property for inspection purposes, I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OFTHIS PERMIT.
OSHA: An OSHA permit is mquffod for excavations over 5'0' deep and demolition or coostructlon of slruclures over 3 stories in height.
EXPIRATION: Eveiy pennit issued by the Building Official under the provisions of this Code shall expire by fimitalion and become null and void if the building or work aulhorized by such pennit is not commenced within
180 days from lhe date of such pennitorif the building or ized by such permit is suspended or abandoned at any lime after lhe work is commenced for a period of 180days (Section 106.4.4 Uniform Building Code).
A( APPLICANT'S SIGNATURE DATE ~/J //+//1.j
STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE.
Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection.
Fax (760) 602-8560, Email building@carisbadca.gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Car1sbad, California 92008.
CONTACT AME GREG JOHNSON
AOORl!SS 2173 SALK AVE, SUITE 300
err< CARLSBAD STATE CA
PHONE FAX 760.431.6571
EMAIL
AMBER.BOONE@HAVASEDGE.COM
DELIVERY OPnONS
t PICK UP: CONTACT (Listed above) I OCCUPANT (Listed above)
CONTRACTOR (On Pg. 1)
1 MAIL TO: ,1 CONTACT (Listed nbove) OCCUPAMT (Listed above)
CONTRACTOR (On Pg. 1)
MAIL/ FAX TO OTHER: ____________ -+----
s"APPUCAAT'SSIGNATURS ~"' ~-
CO#! (Office Use Only)
eo15o~o8'
OCCUPANT NAME HAVAS EDGE
EIUILOING ADDRESS 2386 FARADAY AVE, SUITE 200 & SUITE 110
CITY STATE
Carlsbad CA
OCCUPANT'S BUS. LIC. No. 1213188
ASSOCIATED CB# 00 l Lt 1 => q <.tJ
NO CHANGE IN USE/ NO CONSTRUCTION
CHANGE OF USE/ NO CONSTRUCTION
DATE 06/17/14
21?
92008
Inspection List
Permit#: CB141396 Type: Tl INDUST HAVAS EDGE: 19,079 OFF TO OFF
Date Inspection Item ____ _ ~"!~p_ector Act Comments ---------
01/28/2015 89 Final Combo RI STE 200/ EMAILING CARD
01/15/2015 89 Final Combo PB NR
01/07/2015 89 Final Combo PB NR
11/19/2014 85 T-Bar PB AP
10/20/2014 17 Interior Lath/Drywall PB AP
10/08/2014 84 Rough Combo PB AP
10/07/2014 84 Rough Combo PB NR
Thursday, January 29, 2015 Page 1 of 1
EsGil Corporation
In Q'artnersnip witn (]011ernment for <.Bui{aing Safety
DATE: 09/08/2014
JURISDICTION: City of Carlsbad
PLAN CHECK NO,: 14-1396
PROJECT ADDRESS: 2386 Faraday Ave
PROJECT NAME: Havas Edge -TI
SET: III
D APPLICANT
D JURIS.
D PLAN REVIEWER
D FIL-E
~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
~ EsGil Corporation staff did not advise the applicant that the plan check has been completed.
D EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Email: Fax#:
Mail Telephone Fax In Person
D REMARKS:
By: John Le Vey
EsGil Corporation
D GA D EJ D MB D PC
Enclosures:
09/02/2014
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
EsGil Corporation
In (l'artnersliip witli government for (Bui(aing Safety
DATE: 08/04/2014
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 14-1396
PROJECT ADDRESS: 2386 Faraday Ave
PROJECT NAME: Havas Edge -TI
SET: II
~ 1PPLICANT
YJURIS.
'D PLAN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
[;8J The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D EsGil Corporation staff did not advise the applicant that the plan check has been completed.
~ EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Amber Boone Telephone#:
Date contacted: '9 )4-(by:~) Email: amber.boone@havasedge.com Fax #:
.Jt7Mail Telephone Fax In Person
D REMARKS:
By: John L~ Vey
EsGil Corporation
D GA D EJ D MB D PC
Enclosures:
07/28/2014
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
. '
City of Carlsbad 14-1396
08/04/2014
Please make all corrections on the original tracings, as requested in the correction list.
Submit three sets of plans for commercial/industrial projects (two sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted in one
of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-
2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning,
Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of plans and calculations/reports directly to the City of Carlsbad Building
Department for routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by
the City Planning, Engineering and Fire Departments until review by EsGil Corporation is
complete. These corrections are in response to items not fully addressed or as the
result of information provided, the text in bold print indicates the unresolved
issue.
1. Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes. Business and
Professions Code. No Response
3. Please revise the plans and the door schedule to show the doors to conference
room 256 to be a pivoted or side hinged swinging door per Section 1008.1.2.
Partial response, Door for 256 still appears to be sliding doors, occupant
load is greater than 10.
4. Please provide the required ENV forms for the new opening in the building
envelope. (It appears the amount of glazing in the roll up exceed the door
amount and must be modeled as a window) Please clarify the plans to show how
the new roll up door will comply with the mandatory measures for the exterior
openings to conditioned areas. No response, you are adding 50 sq feet or
better, show compliance with the u -factor and the gasket sealing to not
allow the conditioned air from the conditioned side to the exterior.
5. Please revise the plans to show adequate emergency egress lighting per section
1006.3 of the CBC Please provide an exit analysis plan (may be 8 1/2" x 11"
or any convenient size). Show in this analysis the occupant load of each
area, the general exit flow patterns (by using arrows), accumulated
occupant loads and required exit widths. Section 107 .2.3
21. It is apparent from the plans the restrooms servicing the tenant improvement are
not disabled accessible, please provide a dimensioned restroom plans showing
' ' City of Carlsbad 14-1396
08/04/2014
the restroom to be accessible compliant. Please show the first and second
floor restrooms to be in compliance, the accessible stall door for the men
and women for the second floor is not in compliance 18 inches on the pull
side of the door, No first floor restrooms are shown.
22. Please revise the plans to show where food or drink is served at a counter
exceeding 34" in height for consumption seated or standing at the counter, a
portion of the main counter which is 60" in length minimum shall be provided in
compliance with Section 11 B-226.3 (28" to 34" in height). No response, also
please provide this requirement at the coffee clarify the elevations On A7 .3
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes lJ No lJ
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact John Le Vey at
Esgil Corporation. Thank you.
EsGil Corporation
In <Partnersliip witli government for (}Jui(d'ing Safety
DATE: 7/1/14
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 14-1396
PROJECT ADDRESS: 2386 Faraday Ave
PROJECT NAME: Havas Edge -TI
SET: I
~PLICANT
~:~RIS.
D PLAN REVIEWER
0 FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D EsGil Corporation staff did not advise the applicant that the plan check has been completed.
~ EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Amber Boone Telephone#:
Date contacted: 1-2, (by~) Email: amber.boone@havasedge.com Fax #:
@Jail)( Telephone Fax In Person
D REMARKS:
By: Doug Moody
EsGil Corporation
D GA D EJ D MB D PC
Enclosures:
6/19/14
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
City of Carlsbad 14-1396
7/1/14
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: 14-1396
OCCUPANCY: B
TYPE OF CONSTRUCTION: VA
ALLOWABLE FLOOR AREA:
SPRINKLERS?: Yes
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 6/19/14
DATE INITIAL PLAN REVIEW
COMPLETED: 7 / 1/ 14
FOREWORD (PLEASE READ):
JURISDICTION: City of Carlsbad
USE: Office
ACTUAL AREA: 19097 sf
STORIES: 2
HEIGHT:
OCCUPANT LOAD: 243
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 6/19/14
PLAN REVIEWER: Doug Moody
This plan review is limited to the technical requirements contained in the California version of
the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National
Electrical Code and state laws regulating energy conservation, noise attenuation and access for
the disabled. This plan review is based on regulations enforced by the Building Department.
You may have other corrections based on laws and ordinances enforced by the Planning
Department, Engineering Department, Fire Department or other departments. Clearance from
those departments may be required prior to the issuance of a building permit.
Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2012 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
. City of Carlsbad 14-1396
7/1/14
Please make all corrections on the original tracings, as requested in the correction
list. Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
1. Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes. Business and
Professions Code.
2. Please provide a statement on the Title Sheet of the plans to show compliance
with the current Codes. The following are the correct current Codes:
a) The 2013 edition of the California Building Code (CBC) adopts the 2012
International Buildin_g Code (IBC) and the 2012 California Amendments.
b) The 2013 edition of the California Electrical Code (CEC) adopts the 2011
National Electrical Code (NEC) and the 2012 California Amendments.
c) The 2013 edition of the California Mechanical Code (CMG) adopts the
2012 Uniform Mechanical Code (UMC) and the 2012 California
Amendments.
d) The 2013 edition of the California Plumbing Code (CPC) adopts the 2012
Uniform Plumbing Code (UPC) and the 2012 California Amendments.
e) The 201 0 edition of the California Energy Efficiency Standards.
3. Please revise the plans and the door schedule to show the doors to conference
rooms 232, 254 and 256 to be a pivoted or side hinged swinging door per
Section 1008.1.2.
4. Please provide the required ENV forms for the new opening in the building
envelope. (it appear the amount of glazing in the roll up exceed the door amount
and must be modeled as a window) Please clarify the plans to show how the
new roll up door will comply with the Mandatory Measures for exterior openings
to conditioned areas.
, City of Carlsbad 14-1396
7/1/14
5. Please revise the plans to show adequate emergency egress lighting per section
1006.3 of the CBC.
6. Please clarify the single line to show the feeder for panel B2.
7. Please clarify the plumbing plans to show the connection of the new sink in the
first floor suite. (Sheet P2.1)
• NON-RESIDENTIAL GREEN BUILDING STANDARDS
(Additions and Alterations)
The California Building Standards Commission (BSC) has adopted the Green Building
Standards Code which became effective January 1, 2011, and must be enforced by the
local building official. The Green Building Standards apply to nonresidential additions
or tenant improvements throughout California. These standards apply to
nonresidential additions of 1,000 sq. ft. or larger or alterations (tenant
improvements) with a value of $200,000 or more. CGC Section 301.3. Provide a
sheet on the plans labeled "Green Building Code Requirements" and include the
following notes as applicable.
8. Waste management. Note on the plans that the contractor must submit to the
Engineering Department or other Agency that regulates construction waste
management a Waste Management Plan that outlines the items listed in CGC
Section 5.408.1.1.
9. Recycling. Note on the plans that a minimum of 50% of construction waste is to
be recycled. CGC 5.408.1. Documentation shall be provided to the enforcing
agency which demonstrates compliance. CGC Section 5.408.1.4.
10. Recycling. Note on the plans that an identified, readily accessible area shall be
provided that serves the entire building for collecting recycling, such as paper,
cardboard, glass, plastics, metals, etc. CGC Section 5.410.1.
11. Documentation. Note on the plans that a building "Systems Manual" as listed in
CGC Section 5.410.2.5 shall be delivered to the building owner or representative
and the facilities operator. Further, note on the plans that the "Systems Manual"
shall contain the required features listed in CGC Section 5.410.2.5.1.
12. Pollutant control. Note on the plans that during construction, ends of duct
openings are to be sealed, and mechanical equipment is to be covered. CGC
5.504.3.
13. Pollutant control. Note on the plans that VOC's must comply with the
limitations listed in Section 5.504.4 and Tables 4.504.1, 5.504.4.1 5.504.4.2,
5.504.4.3 and 5.504.4.5 for: Adhesives, Sealants, Paints and Coatings, Carpet
and Composition Wood Products. CGC 5.504.4.
, City of Carlsbad 14-1396
7/1/14
14. Pollutant control. Note on the plans that mechanically ventilated buildings shall
provide regularly occupied areas with air filtration media for outside and return air
that provides at least a Minimum Efficiency Reporting Value (MERV) of 8.
MERV 8 filters shall be installed prior to occupancy. CGC Section 5.504.5.3.
15. Environmental comfort. Note on the plans that wall and floor assemblies
separating tenant spaces (and tenant spaces from public spaces) shall have an
STC of at least 40. CGC Section 5.507.4.3.
16. Environmental comfort. Wall and roof assemblies exposed to noise sources
shall have an STC rating of at least 50, with exterior windows having a minimum
STC of 40 in the following locations, per CGC Section 5.507.4.1:
a) Within the 65 CNEL noise contour of a freeway, railroad or industrial
source, as determined by the jurisdiction's Noise Element of the General
Plan.
b) Within the 65 CNEL noise contour of an airport.
c) Note on the plans whether or not this addition or tenant improvement is
located within the areas listed above.
17. Outdoor air quality. Note on the plans that installations of HVAC, refrigeration
and fire suppression systems will not contain CFC's or Halons, per CGC 5.508.1.
18. Water reduction. Show on the plans the following maximum fixture flow rates
from Table 5.303.2.3 and Section 5.303.3, as shown below. Revise general
notes, plumbing plans, etc. to match. CGC 5.303. For additions or alterations,
this only applies to new fixtures.
MAXIMUM FIXTURE FLOW RATES
FIXTURE TYPE MAXIMUM FLOW RATE
Showerheads 2 gpm @80 psi
Lavatory faucets-0.5 gpm @60 psi
nonresidential
Kitchen faucets 1.8 gpm @60 psi
Metering faucets 0.2 gallons/cycle
Water closets 1.28 gallons/flush
Urinals 0.5 gallons/flush
19. Note on the plans that prior to final inspection the licensed contractor, architect
or engineer in responsible charge of the overall construction must provide to the
building department official written verification that all applicable provisions
from the Green Building Standards Code have been implemented as part of the
construction. CGC 102.3.
, City of Carlsbad 14-1396
7/1/14
Advisory Note : When alterations, structural repairs or additions are made to an
existing building, that building, or portion of the building affected, is required to
comply with all of the following requirements, per Section 11 B-202.4:
• The area of specific alteration, repair or addition must comply as "new"
construction.
• A primary entrance to the building and the primary path of travel to the
altered area, must be shown to comply with all accessibility features.
• The path of travel shall include the existing parking.
• Existing toilet and bathing facilities that serve the remodeled area must be
shown to comply with all accessibility features.
20. Show on the site plan the complying disabled accessible path of travel from the
disabled accessible parking spaces to the primary entrance of the tenant space.
Please provide detailed plans of the path of travel, indicate slope and width, any
pedestrian ramps, curb ramps, walks, handrails, provide dimensioned parking
stall details etc.
21. It is apparent from the plans the restrooms servicing the tenant improvement are
not disabled accessible, please provide a dimensioned restroom plans showing
the restroom to be accessible compliant.
22. Please revise the plans to show where food or drink is served at a counter
exceeding 34" in height for consumption seated or standing at the counter, a
portion of the main counter which is 60" in length minimum shall be provided in
compliance with Section 11 B-226.3 (28" to 34" in height).
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes Q No Q
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Doug Moody at
Esgil Corporation. Thank you.
C.ity of Carlsbad 14-1396
7/1/14
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad
PREPARED BY: Doug Moody
PLAN CHECK NO.: 14-1396
DATE: 7/1/14
BUILDING ADDRESS: 2386 Faraday Ave
BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VA
BUILDING AREA Valuation Reg. VALUE
PORTION ( Sq. Ft.) Multiplier Mod.
Tl 19097 37.12
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code Cb By Ordinance
Bldg. Permit Fee by Ordinance .,...
Plan Oleck Fee by Ordinance
Type of Review: El Complete Review D Structural Only
ORepetitive Fee
.,... Repeats
Comments:
D Other
D Hourly
EsGil ·fee 1---------11 Hr @ •
($)
708,881
708,881
$2,957.50!
$1,922.381
$1,656.201
Sheet 1 of 1
macvalue.doc +
«~ ~ CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANS MITT AL
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE: 7/15/14 PROJECT NAME:Havas Edge PROJECT ID:
PLAN CHECK NO: CB141396 SET#: I ADDRESS: 2386 Faraday Av APN: 212-062-17
VALUATION: $708,881 APPLICANT CONTACT: amber.boone@havasedge.co1n
I !
D
Tlis plan check review transmittal is to notify you of clearance by:
LAND DEVELOPMENT ENGINEERING DIVISION
Final I:nspe ctio~ by the Construction & Inspection Division is required: Yes NoX
~ For status from a division not marked below, please call 760-602-2719
This plan check review is Na'COMPLBTBitems missing or incorrect are listed
on the attached checklist. Please resubmit amended plans as required.
J I l: ; ', / ~ l LANi>-D~ELoPMENl' ENG. 11 1 (· k -J ~ : f ~ :.:: l l '. ' { ! '
11
t. 11 I l' ) ~ i ..
·-. .. ' ' ' . I;,'
" . i 760-602-:2750 ; ,, ..
. . . , " -T ••• -.. -··. -~-"' ~--~,.,,, ----·---...... ~ ,. --.,.,. _ _,_.,,,_,., -~ --.
Chris Sexton Kathleen Lawrence Greg Ryan
: ' 760-602-4624 ; 760-602-27 41 760-602-4663
Chris.Sexton@carlsbadca.gov Kath!een.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov
' ,,
Gina Ruiz :i[Z] Linda Ontiveros Cindy Wong
760-602-4675 760 -602-2773 ,, 760-602-4662
Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carls bad ca.gov Cynthia.Wong@carlsbadca.gov
Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
.•. -· • :Cc. • =--.c---.::.. • ~# -. .. ----·---·---------•·
Remarks:
«~)'
~ CITY OF
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
CARLSBAD P-28
DATE: 7/25/14 PROJECT NAME: T.I. PROJECT ID:
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.izov
PLAN CHECK NO: CB141396 SET#: ADDRESS: 2386 FARADAY AV
APN:
~ This plan check review is complete and has been APPROVED by the
PLANNING Division. .
By: GINA RUIZ
A Final Inspection by the PLANNING Division is required D Yes ~ No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: AMBER.BOONE@HAVASEDGE.COM
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNIN,G ENGINEERING FIRE PREVENTION
760-602-4610 760-602-2750 7 60-602-4665
D Chris Sexton D Kathleen Lawrence D Greg Ryan
760-602-4624 760-602-27 41 760-602-4663
Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov
~ Gina Ruiz D Linda Ontiveros D Cindy Wong
760-602-4675 760-6Q2-2773 760-602-4662
Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov
D D D Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
REVIEW#:
1 2 3
[8l D D
[8l DD
Plan Check No. CB141396 Address 2386 FARADAY AV Date 7/25/14
Review#g
Planner GINA RUIZ Phone (760} 602-4675
Type of Project & Use: L1 Net Project Density: DU/AC
Zoning: C-M General Plan: .e..LFacilities Management Zone: §
CFD (in/out) #_Date of participation: __ Remaining net dev acres: __
(For non-residential development: Type of land use created by this permit: __ )
Legend: [8l Item Complete
Environmental Review Required:
DATE OF COMPLETION:
D Item Incomplete -Needs your action
YES O NO [8l TYPE
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
Discretionary Action Required: YES O NO [8l TYPE __
APPROVAL/RESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not; state conditions which require action.
Conditions of Approval: __
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES D NO _[8l_
CA Coastal Commission Authority? YES O NO _[8l_
If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive,
Suite 103, San Diego, CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Requirep or Exempt):
Habitat Management Plan
Data Entry Completed? YES O NO [8l .
If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application
and assess fees in Permits Plus
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of
Habitat Type impacted/taken, UPDATE!)
lnclusionary Housing Fee required: YES D NO [8l
(Effective date of lnclusionary Housing Ordinance -May 21, 1993.)
Data Entry Completed? YES D NO D
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct
Housing Y/N, Enter Fee, UPDATE!)
[8l D D Housing Tracking Form (form P-20) completed: YES O NO O N/A [8l
P-28 Page 2 of 3 07/11
Site Plan:
[g]00
[g] DD
[g] DD
[g] DD
D~D
[g] D D
City Council Policy 44 -Neighborhood Architectural Design Guidelines
1. Applicability: YES O NO ~
2. Project complies: YES D NOD
Zoning:
1. Setbacks:
Front:
Interior Side:
Street Side:
Rear:
Top of slope:
Required __ Shown __
Required __ Shown __
Required __ Shown __
Required __ Shown __
Required __ Shown __
2. Accessory structure setbacks:
Front:. Required __ Shown __
Interior Side: Required __ Shown __
Street Side: Required __ Shown __
Rear: Required __ Shown __
Structure separation: Required __ Shown __
3. Lot Coverage: Required __ Shown __
4. Screening of Equipment: Required YES Shown SECTIONS ADDED TO SHEET A0.0
5. Parking: Spaces Required __ Shown __
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required __ Shown __
Additional Comments #1. PER POLICY 80 6 (ATTACHED) ALL ROOF MOUNTED
EQUIPMENT MUST BE SCREENED FROM VIEW FROM /\DJ/\CENT PROPERTIES /\ND
STREETS. PLE/\SE /\DD SECTIONS TO THE PLANS SHOWING HOW THE NEW ROOF
MOUNTED EQUIPMENT SHOWN ON SHEET M2.3 VVILL BE SCREENED. AN EXAMPLE
OF A SECTION IS INCLUDED IN THE ATTACHED POLICY.
PLAN CHECK #2: SECTIONS ADDED TO SHEET A0.0
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER GINA RUIZ DA TE 7 /25/14
P-28 Page 3 of 3 07/11
'"·
BUILDING DEP'fo
«~ PLAN CHECK
REVIEW
TRANSMITTAL
,t'\''11"'\lr':'J'~f Ci:om'tfful1ity & Economic
~ CITY OF
CARLSBAD
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE: 09.10.2014 PROJECT NAME: HAVAS EDGE PROJECT ID: CB141696
PLAN CHECK NO: 3 SET#: 1 ADDRESS: 2386 FARADAY AV STE 200 APN:
[XI This plan check review is complete and has been APPROVED by the FIRE Division.
By: G. RYAN
A Final Inspection by the FIRE Division is required ~ Yes D No
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to:
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
.. •'
. I ' • PLANNINtl' :.. . < ENGfNEERIN(f'' : ' ; I
' ' ·-7BO•Q~2-46d.() . · . · ,. · .·' 76fl,$02•i7501 , I .. / _ _-.·< i:'f ... :. i:' -'-;Ii.-·::• ;:1• • c'', •iY.·,, :':.:]\/_.: :-,_ .... : '-:
D Chris Sexton
760-602-4624
Chris.Sexton@carlsbadca.gov
D Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
D
Remarks: See Attached
D Kathleen Lawrence
760-602-27 41
Kathleen.Lawrence@carlsbadca.gov
D
D
Linda Ontiveros
760-602-2773
Linda.Ontiveros@carlsbadca.gov
·: :f:iR:SPREVENTIPl\li .:':
· . ·1,99~so~-4se$·
.. · \ .. _;" .. /.i, .. :. ·,,\ ;·· ..
Greg Ryan
760-602-4663
Gregory.Ryan@carlsbadca.gov
D CindyWong
760-602-4662
Cynthia.Wong@carlsbadca.gov
D Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
·, .,
...
Carlsbad Fire Dep~rtment
Plan.Review
Date of Report:
Name:
Address:
Permit#:
Job Name:
Job Address:
Requirements Category: TI , INDUST
09-10-2014
AMBER BOONE
2173 SALK AVE
STE 300
CARLSBAD CA
92008-7383
CB141396
HAVAS EDGE: 19,079 OFF TO OFF
2386 FARADAY AV CBAD St: 200
Please review carefully all comments attached.
CITY OF CARLSBAD FIRE DEPARTMENT -APPROVED:
Reviewed by: ~ /4}al(
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF
BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON,
CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW.
At or prior to Final Fire and Building inspection an Emergency lighting facilities test shall be conducted by CFD
personnel during pre-dawn or dusk hours when ambient light is at 0.00 Lux or 0.0 Foot-candle.
This test shall be conducted to test the initial loss of power· reading of illumination that is at least an average of 1 foot
candle (11 lux) and a minimum of 0.1 foot-candle (1 lux) measured along the path of egress at the floor level.
And tested after 60-minutes to 0.6 fc (6 lux). Failure to provide sufficient lighting in egress aisles, corridors, exit
enclosures, exit passageways and stair enclosures is the AO R's responsibility. CFC Ch. 10, Sec. 1006.
Entry: 09/10/2014 By: GR Action: AP
..
Page 1 or:,
CONDITIONAL RECOMMENDATION FOR APPROV~ COPY
THE ITEMS BELOW, IN BLUE FONT, REQUIRE CORRECTION, dil{RJii/JA~tl -
ADDITIONAL INFORMATION BEFORE THIS PLAN CHECK CAN. BE RECOMMENDED
FOR APPROVAL FOR PERMIT ISSUANCE BY THE FIRE OFFICAL AT THE FARADAY
CENTER.
Daryl K. James & Associates, Inc.
205 Colina Terrace
Vista, CA 92084
T. (760) 724-7001 Email: kitfire@sbcglobal.net
APPLICANT: Amber Boone
PROJECT NAME: Havas Edge
Checked by: Daryl Kit James
Date: 8/28/2014 ·
JURISDICTION: Carlsbad Fire Department
PROJECT ADDRESS: 2386 Faraday Ste 200
PROJECT DESCRIPTION: CB141396 Tl to an existing building of approximately 19,097ctJ
Including the following: demo of existing non-bearing walls. Construction of new interior partitions,
ceilings, new mechanical equipment and distribution, new electrical lighting distribution and power and
new break area.
COMMENTS
ADDITIONAL COMMENTS MAY BE GENERATED BASED ON RESUBITTAL RESPONSES
PLEASE ADDRESS ALL REMAINING COMMENTS SHOWN IN BLUE FONT
EACH SHEET IN THE PLANS MUST BE STAMPED AND SIGNED BY THE PERSON
RESPONSIBLE FOR THEIR PREPARATION, EVEN IF THERE ARE NO STRUCTURAL CHANGES.
BUSINESS AND PROFESSIONS CODE.
v'T1.0
Tenant Address: Include Suite #
Project Data
Description of Use: Update occupancy classification in accordance with 2013 CBC Chapter 3. Revise
82 to B.
Project Address: Include Suite #
Construction Type: Update construction type in accordance with 2013 CBC Chapter 6 Table 601.
Occupancy Type: Update occupancy classification in accordanc~ with 2013 CBC Chapter 3. Revise 82
to B.
Deferred Submittals
Add the Following List of Deferred Submittals
Provide the Following List of Deferred Submittals
Fire Sprinkler System 2013 CFC 903 and 2013 NFPA 13.
Fire Alarm System 2013 CFC 907 including CFC 907.2 and 2013 NFPA z2 -Revise NFPA 12 to
NFPAZ2.
Applicable Codes
Complete the Following List of Applicable Codes
Add 2013 CFC as adopted by theT24 California Building Standards Code
Yage 1, or~-
~01-3 California .Building Code ......... based on the 2012 International Building Code
201,3 California Fire, Code ............. base<;I. on the ~012 International Fire Code
2013 California Electrical Gode ...... based on the 20t1 National l;lectrical Code
201"~ Calif9rn.ia Mecbanical Code .... b~i$ed onthe 2012 .. l:.Jniform Mechanical Code
2013 California Plumbing Code ...... based on the 2012 Uniform Plumbing Code
2013 California Energy Code
v'A0_.0
Update corastrl,Jction type>in accordance with 2013 CBC Chapter 6 Table 601.
VA1.1
First Floor Demo Plan
Denote Keynote 9 on 'floor :Plan.
Provide a note: All demolition operations shall be carried .out as prescribed in CFC Chapter 33.
V.A2~0.
Second. Floor De·mo Plan
Provide a note: All demolition op~rations shall be carried out as prescribed in CFC Chapter 33.
A2.1
2"-~ Overall Floor & Exiting Plan·
~Denote the occupancy group, square. foota!'i)_e, occupant load factor and occupant load for· each
occupied room/area based on t~e function of the rnom CBC Table 1004.1.1.
V Calculate Occupant loads at 15 sqaare feet per occupant in brf,:lak rooms and conference rooms.
e./Denote the actual number of occupants in open o.ffice workstation spaces and in areas where
furniture layout has: been provided, as denoted in-Analytics.
E;:iting Area .
t/Revise occupant load in the A-3 Employee Eating Area to 74, based on the area size. The occupant
'load is based on tl:le latgest number derived by the. applic:ation of CBC 1004.1 through 1004.6.
t/Provtcle an occupant load. sign for the cqmuJ:ative occ.upant load. in the eating area that includes the
occupant load of the kitchen area.
e./Revise calculations fc;>r egress.·.
el'Denote common paths and lengths of egress travel to exit discharges. CBC 1014.3, CBC 101.6
Label and show p~nic hardware on new and existing applicable doors, along the path of Egress
from ttw Emph:>yee !=ating Area to each reqU:ireq .exit ,discharge leading to a public way ..
Clearly show ·compliance With CBC 1008.1·.9.3 or 1008.1.10 for all doors in the Pclth of egress
from all areas to an exit disgharge.
-Denote all new ancJ existin_g· doors e>n the DQor S~hedule shown oh A8.0.
V Revise the. number of .occuparits exiting at ea.ch exit discharge leading to a-public way.
...
,, '
!'age j or:,
tl'De~ote the aggregate square-footage, required number of exits·, revised required and actual width of
exits. CBC 1005.
tl'Denote all symbols on 2nd Overall Floor & Exiting Plan as provided under Exiting Plan Legend.
tl'Show fire extinguisher symbols on plan at their required locations
V Exiting Plan Legend
Add type of fire extinguishers to symbol
VA2,2A,A2,28,A2,2C,A2,2D,A2,2E
Wall Plan Legend
Indicate rated walls, where applicable.
VA2.3
Provide a note: All finish materials shall comply with CBC Chapter 8.
Revise CBC Table 803.5 to 803.9.
Provide manufacturer's specifications, or California State Fire Marshal listings, or other acceptance
criteria for flame spread and smoke developed index for new carpet, padding and carpet base. CFC
804
.Provide manufacturer's specifications. or California State Fire Marshal listings, or other acceptance
Cfi~eria for flame spread and smoke developed index for Acoustical Ceiling Tiles. CBC 803. ·
V A3.1, A3.2A, A3.28, A3.2C, A3.2D & A3.2E
Provide a reference to Electrical Lighting Sheet E3.1 for means of egress exit signs, egress illumination
and photometric plans.
VA5.0
Materials Finish Schedule
Provide data for PL2 ·
V A5.1, A5.2, A5.4, A5.5 & A5.6
Key Note Symbols
Provide a number inside all symbols.
VA7.1
Rated wall details to be labeled as rated, where applicable. N/A
Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2013
CBC Table 721.1 (2), where applicable.
A8.0
DOOR SCHEDULE 1sr & 2No FLOORS
DEADLOCK NOT PERMITTED ON DOOR 11 SA.
Page 4 6:t :,.
DENOTE ALL NEW AND EXISTING DOOR TYPES, 1-iAROW_ARE AND RATINGS, WHEREct
APPLICABLE., :PROVIDE DOOR HARDWARE SPECIFICATIONS, AND HARDWARE GROUPS !N-
ORDER_ TO_ '!ERIFY THAT H~RDWARE IS READIL y OPENAB_LE FROM THE EGRESS' SIDE
WITHOUT THE USE OF A KEY OR SPECIAL -KNOWLEDGE OR EFFORT FROM ALL OCClJPIED
.AREAS FROM IMPROVED AREAS WITHIN THE PATH OF EGRESS TO ALL EXIT DISCHARGES. -:~~~~~~~r~RM EXISTING HiRDWARE-AND DENOTE ON THE DOOR SCHEDULE PRIOR-TO
·Poor Schedule Remarks
Vldentify the Main .Exit Door., csc-1:008~1.9.3.2. Remark #12 is listed for Doors 100A & 200A.
There c~n J:)e j'-1~t one main exit dpor. CBC' 1 cm(i.1.9.-3.
v'Door _202 -Justify !;lliding door. csc-1008.2 (Swing door provided)
;'Doors by Others" cannot be approved under 08141396. ·(will provide hardware type)
elG,·eneral Door N_otes . _
Update references to code s_ections in accordc;1nce with the 201.3 Ec;lition of the CBC.
Revise Note H. content to: All doors shall be readily openable from the egress side without the use of a
key or special 'knowle<;lge or effort. CSC 1'008.1.9.3
v'M0.1
Mech~riical. Notes & Mechanical Plan Che.ck Notes
Update references to code edition and code sections,. in accordance-with the 2013 l=dition-of the CMC.
IIM2.3
Mechanical Roof ~Ian
Denote .-any new mechani'c::al 1.;1nits ,oh a roof plan.
Imprint Carlsbad Policy 80-66ri-to roof plan. ·
Provide a note that Intent B -(Firemc;1n Safety) Will be maintained· arid indicate provisions taken to .comply
With Carisbad 'Policy 80-6 Jntent B. (Fireman Safety}.
e/Et.1
Verify ES represents emerg$ncy lighting. Not shown on E1 .3.
E3.1
2_nd Fioor Lighting Plan _
v'lllustrate means of egress illumination and exit signs on plan that match symbols shown on $heet
E1. 1' & E1 .3. CBC 1-006.2 ahd 1011 , -
COORDINATE EXIT SIGN LOCATIONS WITH A3.1, A3.2A, A3.28, A3.2C, AND A3.2D & A3.21;.
DENOTE DIRECTIONAL EXIT SIGNS,. WHt,:RE 'l~EQU-IRED; FROM ALL OCCUPIED AREA:S TO
THE f:XIT DISCHARGE:-csc 1011-. ·
-a-'-Generai Notes _
Add the following -note: Means of egress illumination level shall be not ·les~ than 1·-foot candle at the.
-walking-surface CBC 1006.2. · ·
a-f.Pho_to_metric Plan ,.,... _
Provide a photometri.c plan. Indicate means .of egre$s illumination that illustrates illumination ,levels of
not less than -1 foot-candle for lighting, oth~r than bug_-eye, at th_e walking_ surface thro1,.1ghout the
_ Means of Egress System,_ which consists of.the Exit Access, Exit and Exit Discharge. The ·exit access .is
i ...
Yage ~or~
• tiia't portion of the means of egress system that consists of all floor areas that lead from usable spaces
~. within the building to the exit or exits serving that floor area. Exit access begins at the furthest points
within each room or space and ends at the entrance to the exit, that portion of the means of egress
system between the exit access and the exit discharge or public way. CBC 1006.2.
END OF COMMENTS
Daryl K. James & Associates, Inc.
205 Colina Terrace
Vista, CA 92084
CORRECTION LIST 2
T. (760} 724-7001 Email: kitfire@sbcglobal.net
.l:'age 1 or~
BLDG. DEPT COPY
Checked by: Daryl Kit James
Date: 7/26/2014
APPLICANT: Amber Boone JURISDICTION: Carlsbad Fire Department
PROJECT NAME: Havas Edge PROJECT ADDRESS: 2386 Faraday Ste 200
P~OJECT DESCRIPTION: CB141396 Tl to an existing building of approximately 19,097t!l
Including the following: demo of existing non-bearing walls. Construction of new interior partitions,
ceilings, new mechanical equipment arid distribution, new electrical lighting distribution and power and
'new break area.
This plan review is to verify conformance to minimum requirements of codes adopted by the Carlsbad
Fire Department. The items below require correction, clarification or additional information before this
plan check is recommended for approval for permit issuance.
RES~Osnn1ftA[.lNSTRfJoticfNs.·toAVbio'.oeLAYJN"EXFieoitetf]RECEIECK!SERVfCES
• Corrections or modifications to the plans niusf]ie clb:ode.d and provided with numbered deltas
and revision dates.
• Provide a written response following each comment, On ~Thi~ :Cbrr~ctiorrt.1si, explaining how and
where each plan review comment has been addressed.
• Please direct any questions regarding this review to: Daryl K. James 760-724-7001 or
kitfire@sbcg lobal. net
• COMMENTS MUST BE SUBMITTED DIRECJ-LY'TO THE FOLLOWING ADDRESS
DARYL K. JAMES & ASSOCIATES, INC.
205 COLINA TERRACE
VISTA, CA 92084
P,LE;A$JS:pq NQtREQJJIRE'. MY Sl$NA i-UFU~ TQ.:A¢CE;P1 0.El11V'=ijY QP:_:RJ:YIS[;B:\~.~AN~
COMMENTS
ADDITIONAL COMMENTS MAY BE GENERATED BASED ON RESUBITTAL RESPONSES
PLEASE ADDRESS ALL REMAINING COMMENTS SHOWN IN BLUE FONT
Each sheet in the plans must be stamped and signed by the person responsible for their
preparation, even if there are no structural changes. Business and Professions Code.
T1.0
v'Tenant Address: Include Suite #
Page i, or:,
:Project Data
·oescription of Use; Upclate occµpancy classification in accordance with 2013 CBC Chapter 3. Revise
82.toB.
V Project Address: Include Suite#
Construction Type: Update construction tYpe in accordahce with 201·3 CBC Chapter 6 Table 601.
_Occupancy Type: Update occupancy classification_:in accordance with 2013 C.BC Chapter 3. Revise
82 to B. .
Deferred Submittals
Add the Following List of Deferred Submittals
Provide the Following List of Deferred Submittals·
Fir~ 'Sprinkler System 2013 CFC 903 and 2013 NFPA 1'3.
Fire Alarm ·System 2013 CFC 907' includin_g CFC 907.~ and .2.013· NFPA z2 -Revise NFPA 12 to
NFPA ,t2. .
Applicable Codes
.Complete. the Following List of Applicabl~ Codes
Add 2013 CFC as adopted by theT24 Caiifotnia Buildin9 Stan_dards .Code
201,3 California. Building Code ........ :based. on the 201·2 International Building Code
2013 California Fir~ Code ............. based on the•2012'.lnternational Fire Code
2013 California Electricijl Code .•... : based on the 201"1 National Electrical Code
2013 California Mechanical Code ... based on the 201,2 Uniform Mechanical Code
2013 California Plum.bing Code ...... based on tbe 2012 Uniform Piumbing Code
2013 California Energy Code
v'AO.O
Update construction type in accordance with 2013 CBC Ch?pter 6 Table 601.
At.1
First Flopr Demo Plan.
Oenote Keynote 9 on floor plan.
v'Provide a.note: All demolition operations shall be carried out as pre·scribed in CFC Chapter 33.
v'A2.0
Second Floor Demo Plan
Provide a note: All demoli.tion operations shall be ·car.ried out as prescribed in CFC Chapter 33 .
.A2.1
2nd Overall Floor & E.xiting Plan
v'Denote the occupancy gtqup, sqqare foota·ge_, occupant load factor and occupant load for each
occupied room/area based :on the function of the room_. CB.C Table 1004.1.1.
v'Calclllate Occupant loads at 15 square feet per occupant in break rooms and conference rooms.
v'Denote the. actµal number of occupants in op:en office workstation spaces and in areas where
furniture ·layout has been provided, .as denoted. in AnaJytics.
.t'age ..i or:,
Eating Area
Revise occupant l(:>ad in the A-3 Employee Eating Area to 74, based on the area size. The
occupant load is based on the largest number derive~ by the application of CBC 1004.1 through
1004.6.
Provide an occupant.load sign for the cumulative occupant load in the eating area that includes
the occupant load of the kitchen area.
Revise calculations for egress.
cl'Denote common paths and lengths of egress travel to exit discharges. CBC 1014.3, CBC 1016
Label and show panic hardware on new and existing applicable doors, along the path of Egress
from the Employee Eating Area to each require~ exit discharge leading to a public way.
Clearly show compliance with CBC 1008.1.9.3 or 1008.1.10 for all doors in the path of egress
from all areas to an exit discharge.
Denote all new and existing doors on the Door Schedule shown on A8.0.
Revise the number of occupants exiting at each exit discharge leading to a public way.
Denote the aggregate square footage, required number of exits, revised required and actual
width of exits. CBC 1005.
cl'Denote all symbols on 2nd Overall Floor & Exiting Plan as provided under Exiting Plan Legend.
cl'Show fire extinguisher symbols on plan at their required locations
Exiting Plan Legend
Add type of fire extinguishers to symbol
ti A2, 2A, A2, 2B, A2, 2C, A2, 20, A2, 2E
Wall Plan Legend
Indicate rated walls, where applicable.
A2.3
ti Provide a note: All finish materials shall comply with CBC Chapter 8.
Revise CBC Table 803.5 to 803.9. ·
Provide manufacturer's specifications, or California State Fire Marshal listings, or other
acceptance criteria for flame spread and smoke developed index for new carpet, padding and
carpet base. CFC 804
Provide manufacturer's specifications, or California State Fire Marshal listings, or other
acceptance criteria for fiame spread and smoke developed index for Acoustical Ceiling Tiles.
CBC 803.
o/ A3.1, A3.2A, A3.2B, A3.2C, A3.20 & A3.2E
Provide a reference to Electrical Lighting Sheet E3.1 for means of egress exit signs, egress illumination
and photometric plans.
e/As·.o
Materi~ls Finish Schedule
Provide d,;1ta for PL2
et.A5.1, As·.2, A5.4r A5.5 & A5.6
Key.Nc;>te Symbols·· · · · ·
Provide a number inside all' symbols,
. VA7.1
f'age 41. or :,.
RatedwalLdetaiJ~ to·be.lab~leda!;i rated, where applicable. NIA.
Rated w~II ·detail· to include ICC evaluation report#., UL Listing or reference to Item number in 2019
.CBC Table 721.1(2), where applicat;>le. · ·
A8.0
Door Schedule 1st &2nd Flo.ors
Denote ,all new .and existing· door types, hardware and ratings, where applicable. Provide Door
Hardware Specifications-, and Hardware Groups in .order to· verify that hardware is readily
openable ·fr.om .the egress side without the use, of a key or speciai knowledge or effort from all
c;>ccupied areas from improved areas within the path. of egress to all exit discharges.
Pleas~ confirm existing hardware and denote on the ·door schedule prior to resubmittal.
Door· Schedule ·Remarks
Identify the Main ExitOoor. CBC 1008.1.9.3.2. Remark #12 is lh,ted·for Doors 100A & 200A. ihere
c~n be jlJst one main exitdQor. Cl,3C 10()8.1~.9;3.
Door 202 -Justify sliding door, CBC 1008.2
"Doors by Ottiers'' cannot be approved under CB141396.
v'General Poc;>r Notes
'Upclate refer~nces to code ~ection~ in accorc;lance. with t.he 2013 .Edition of the CBC.
Revise Note H. content to: All .doors shall be reaqily openal;>le froni the egress side without th.e use of a
·.key or special knowledg,e or effort. CBC 1008.1.9.3
·t/M0.1
l\llecbanic~I Notes & Mech~nicctl Plan·Check.Note$ .
Updat~ refer13nces to code ~dition anti code sections, in accordance with the 2013 Edition o.f the OMC.
_v'M2.3'
l\l!echt;tnical Roof' Plan
Denote ~ny new mech.anical units on a roof plan.
,,. ;;. ''..i<;,
lnipriht Carlsbad Policy 80-6 on to roof plan. .
Provide a n·ote that l11ient B (Firern,;111 $a.fety) will be maihtainea and indicate provisions taken to comply.
with ·Carlsbad Policy 80-6 Intent B. (Firemp'rt S~fety). ·
E3.1
2nd' Floor Lighting Plan .
llh,.1strate means of egre$s illumination and exit $lgns on plan. that .111,atch :symbols shown on Sheet Et 1
& E1 .3. CBC 1'006.2 ancl· 1011
Verify EB repre$ents,.ernergency lighting.' Not.snQwn oh.-E1.3.
·coordinateexit sign locations withA3:.1, A3;·2A, A3.2B, A3.~C, and A3.2_D ~ A3.2E.
t'age ·:, or :,
. -...
Denote directional exit signs, where required, from all occupied areas to the exit discharge. CBC
1011.
ti' General Notes
Add the following note: Means of egress illumination level shall be not less than 1-foot candle at the
walking surface CBC 1006.2. ·
Photometric Plan -
Provide a photometric plan. Indicate means of egress illumination that illustrates illumination levels of
not less than 1, foot-candle for lighting, other than bug-eye, at the walking surface throughout the
Means of Egress System, which consists of the Exit Access, Exit and Exit Discharge. The exit access is
that portion of the means of egress system that consists of all floor areas that lead from usable spaces
within the building to the exit or exits serving that floor area. Exit access begins at the furthest points
within each room or space and ends at the entrance to the exit, that portion of the means of egress
system between the exit access and the exit discharge or public way. CBC 1006.2.
END OF COMMENTS
Daryl K. James & Associates, Inc.
205 Colina Terrace
Vista, CA 92084
CORRECTION LIST
.!:'age 1 or .:J ,
BLDG. DEPT COPY
Checked by: Daryl Kit James
Date: 6/23/2014
T. (760) 724-7001 Email: kitfire@sbcglobal.net
APPLICANT: Amber Boone
PROJECT NAME: Havas Edge
JURISDICTION: Carlsbad Fire Department
PROJECT ADDRESS: 2386 Faraday Ste 200
PROJECT DESCRIPTION: CB141396 Tl to an existing building of approximately 19,097CIJ
Including the following: demo of existing non-bearing walls. Construction of new interior partitions,
ceilings, new mechanical equipment and distribution, new electrical lighting distribution and power and
new break area.
This plan was reviewed in order to verify conformance to minimum requirements of codes adopted by
the Carlsbad Fire Department. The items below require correction, clarification or additional information
before this plan check can be approved for permit issuance.
RESl:IBMIT'l:Al -I NSJR:tictlONS TO AtVQID. DE-LAY'::IN -'EXP,EDIT-ED RECHECKSERVl,CES'
• Corrections or modifications to the plans hiusfbe,:dolided and provided with numbered deltas and
revision dates.
• Provide a written response following each comment, 011: This -Efoirtectid1i -List, explaining how and
where each plan review comment has been addressed.
• Pr:6vide: a i;opy 9fs~1k!iiig;_ t,ep.artm~nf (E$G_iiY:d~rrirneQfs
• Please direct any questions regarding this review to: Daryl K. James 760-724-7001 or
kitfire@sbcg lobal. net
• COMMENTS MUST BE SUBMITTED DiRSCtl:YlO THE FOLLOWING ADDRESS
DARYL K. JAMES & ASSOCIATES, INC.
205 COLINA TERRACE
VISTA, CA 92084
PLE;Ase,po:,N,Ql[,jf~QUl~!fMYSfGNA~Vfll;JQ'.,AC~lEf'I:{:)E_l:;.I\L~Y-()f..~§Vl,Sl;DjP:~~N$'
COMMENTS
ADDITIONAL COMMENTS MAY BE GENERATED BASED ON RESUBITTAL RESPONSES
T1.0
Tenant Address: Include Suite #
Project Data
Description of Use: Update occupancy classification in accordance with 2013 CBC Chapter 3.
Project Address: Include Suite #
Construction Type: Update construction type in accordance with 2013 CBC Chapter 6 Table 601.
Occupancy Type: Update occupancy classification in accordance with 2013 CBC Chapter 3.
,'I_
Deferred Submittals·
Add the .Following List of .Peferred Subrhittals
.Provide the,Following, l,.ist of Deferreq Submittals
Fire·Spti'nkler System 2013 CFC 903 and 2013.:NFPA 13.
Fire Alarm .System :20t3:CFC 907 including CFC 907.2' and 2013 NFPA 72
Applicabie Codes ·
:Provide the. Folfowirig List Qf Applicable Codes
2013 Californi~ Eh,iilding -Code ... , .... based on the .2012 rnternational 'Bu.ilding Code
2013 C~!ifomia fire Code ........... , .. based on the 2.014 rnternation~I Fire Code
2cr13 California Elecfri~al _Code· ..•.... based on the 2011 National Electrical Code
201'3-Califorhia Mf;3chariical Code ... based on the 2012 Uniform Mechanical Code
20t3. California Plumbing Code .. , .. ,, based on tbe 2012 Uniform Plumbing Code
· 2013' California .Energy Code . ·
AO:O.,
Upd~te construction type in accordanceWith ·2ot3 CB9 Chapter 6 Table 601.
A1.1
First Fl.oar P~mo :Plc,tn.
Denote Keynote·9 on floor plr:in .
l'ag~"' or 4
. Provide a ,note: All demolifiorr operations sh~ll'tie Cqrried out as .prescribed in CFC Chapter 33.
A2:0
Second Floor Demo ·Plan·
Provide a .note: All,demolition operatiom~.:$hall.be c~rrie~t out as _prescribed in CFC Chapter 33.
A2.1
2nd Overc,tll Flo.or & Exiting Plan
.. ·-· ::,
Denote the occup~ncy group, sql,lare footage; occur;>ant load factor and occupant load for each
o.c:;cupi~d :roQm/area 'based on tbe function of the.room cac Table 1'004.1.1. ·
C~lculate, Occupant loads_ at t5 squ:are .feet per occ1,1par:,t in break rooms arid conference room$.
De·note the ~ctual number of occupants in. open .office. Workstatio·n spaces and in areas where· 'furniture
layout has been provi.ded,.·as.denoted ih Analytics.
Denote common paths. and lengths· ofegres$ traverto exit 1disch~rge$. CBC 1014.3, CBC 101:6
. Path of ~gress-from improved area$. ·terminate at existing ·exit discharge doors. Denote $xisting doors
on the Door Schedule shown on AB.O. ·
Show the r:iumber of occupants exiting,ateach exit dlsdnarge.
Oenote the agg,regate .squ~re fqo~ijge, ·required number. of exits, and required and actual widtb of exits.
CBC 1005. .
· Denote all symbols on 2nd OveraU. Floor & Exiting Plan as provided under Exiting Plan Legend:.
Clearly sbow compliance with CBC 1008.1.9.3 for al! doc.rs i.n the path of egress from ali a.teas to~ an
exit .discharge. ·
Show .fire extinguis.her $ymboJs oh. pl~n;at .their teqqired locations .
~--~ ... Exiting Plan Legend
Add type of fire extinguishers to symbol
A2,2A,A2,2B,A2,2C,A2,2D,A2,2E
Wall Plan Legend
Indicate rated walls, where applicable.
A2.3
Provide a note: All finish materials shall comply with CBC Chapter 8.
.t'age .-s or 'I
Provide manufacturer's specifications, or California State Fire Marshal listings, or other acceptance
criteria for flame spread and smoke developed index for new carpet, padding and carpet base. CFC
804
Provide manufacturer's specifications, or California State Fire Marshal listings, or other acceptance
criteria for flame spread and smoke developed index for Acoustical Ceiling Tiles. CBC 803.
A3.1, A3.2A, A3.2B, A3.2C, A3.2D & A3.2E
Provide a reference to Electrical Lighting Sheet E3.1 for means of egress exit signs, egress illumination
and photometric plans.
AS.O
Materials Finish Schedule
Provide data for PL2
AS.1, AS.2, A5.4, A5.5 & A5.6
Key Note Symbols
Provide a number inside all symbols.
A7.1
Rated wall details to be labeled as rated, where applicable.
Rated wall detail to include ICC evaluation report #, UL Listing or reference to Item number in 2013
CBC Table 721.1 (2), where applicable.
A8.0 .
Door Schedule 1st & 2nd Floors
Denote all new and existing door types, hardware and ratings, where applicable. Provide Door
Hardware Specifications and Hardware Groups in order to verify that hardware is readily openable from
the egress side without the use of a key or special knowledge or effort from all occupied areas from
improved areas within the path of egress to all exit dischc;!rges.
Door Schedule Remarks
Identify the Main Exit Door. CBC 1008.1.9.3.2.
Remark #12 is applicable to Doors 200A, 200B & 200C. Justify applicability to doors other than the
Main Exterior Door. CBC 1008.1.9.3.
Door 202 -Justify sliding door. CBC 1008.2
General Door Notes
Update references to code sections in accordance with the 2013 Edition of the CBC.
.!:'age 4 or 4
Revise Note H. content to: All doors shall ·be· readily op~hable from -the egress side without the use of a ··~· .,,
key or speci~I knowledge or effort.· CBC 1008.1 :9.;3 · ·
M0 .. 1
Mechanical NQtes & N!echanical Plan· Check Notes
Upda.te references to code ·edition and code sections, in accordance with the 2013 Edition of the CMC.
M2.3
Me~hanic(ll Roof Plan
. D.enote any .new mechanical units on a roof plan. ·
Imprint Carlsbad Policy 80-6 on to-roofplan.
Provide a note that lntent B (Firemi:ln Safety) will be main.tained. and indicate provisions taken .to comply
with Carlsb.ad Policy 80-6 Intent B. -(Fireman.Safety).
City of Carlsbad Policies and Proc.edures document number 80-6: Roof Mounted equipment is intended
to pr.event the in$tallation of ha_zardous itertrs-.sucli as propane tank§, wind driven gen'era.tion equipment,
and_'. any other hazardous or ·potentially hazarqous equipment. . This includes utility piping and conduit
1 .4-inches or higher above J'qqf surface. Electrical or other utility wiring or cabling not securely placed in
conquit, raceways -or. properly .affixed to the ·str1:1.cture, or that which may be a trip ·or strangulation
hazard . .Additionally, it was intended to address building· openings and roof coverings or features that
pos·ed a fa!I hazard t0 those unfamiliar or subject to impaired senses as might be encountered .during
smoky and/or fire conditions at night ·
E3.1
2nd Floor Lighting Plan·
Illustrate means of egress illumination and exit sigl'.l_S on p1$ri that match symbols shown on $beet E1 .1
& E1 .3. CBC 1006.2 and 1011., .
C_oordinate exit sign locations with A3.1, A3.2A, A3.2B, A3.2C, and A3.2D & A3-.2E.
Denote directio!'l~I exit signs, where-required', from aU occupied areas to the exit discharge'. CB'C 1011.
General Notes
Add the following note: Means of egress illumination level shaU be not less than 1-foot candle at the
walking sur.face. CBC 1006,2.
Photometric Plan
Provide a photometri¢ plan. Indicate means of egress illUminatton th~t ilJustrates illumination levels. of
.not less than t fo.ot.,.Gandie at the walking. surface thr9ughout the Means of Egress System, which
consists of the Exit Access, ·.Exit ahd Exit Oischa~ge. The exit access is that portion of the means of
egres~ system that cons.ists of all Jloor ·areas that lead from usable-spaces within the buildihg to the .exit
or ,exits serving that floor are.a. 'i;xit :access peg ins at the furthest .points within each room or space and
.ends at the entrance to -the· exit, that portion· of the ~ea0s of egress system between the exit acce$s
and the exit discharge or public·wc;1y. CBC 1006.t
END OF COMMENTS
CERTfFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHEC~f§«rEIVED (Part 1 of 5) MECH-1C
Project Name Date
Havas Edge Tenant Improvement JUN 19 2014 6/17/2014
Project Address Climate Zone I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad Cl -Y OF CAR~S~~-D 21,239 n/a
GENERAL INFORMATION 01.. ILUU\1\::1 UI V lvlVI 'II
BuildinQ Type: IZl Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
0 Schools (Public School) D Relocatable Public School Bldg. It! Conditioned Spaces D Unconditioned Spaces
( affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: I 1aodeg I
HV AC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Eauioment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP1-1 D D (i.e. AC-1, RTU-1, HP-1)
Eauioment Tvoe3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed HeatinQ Capacity1 26,859 Btu/hr D D
Minimum Heating Efficiency1 4.20COP D D ~
Max Allowed Coolina Caoacitv1 42,505 Btu/hr D D ~ ~ Coolina Efficiencv1 11.0EER D D I~ '
Duct Location/ R-Value Attic, Roof Ins I 4.2 D D .... .. ~
When duct testing is required, submit ~ ' ~
MECH-4A & MECH-4-HERS No D D ~~
Economizer No Economizer D D ~) Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST ~
Eauipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP1-2 D D
Eauioment Tvpe3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Caoacitv1 48,403 Btu/hr D D
Minimum Heatina Efficiencv1 4.20 COP D D
Max Allowed CooUna Caoacity1 51,687 Btu/hr D D
Coolina Efficiencv1 11.0 EER D D
Duct Location/ R-Value Attic, Roof Ins I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed {from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas {Pkg or, Split), VAV, HP {Pkg or split), Hydronic, PTAC, or other.
EneravPro 5.1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Paae 1 of73
CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone l I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 n/a
GENERAL INFORMATION
Buildina Tvoe: IZI Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. Iii Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: I 180 deg I
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Equipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags HP2--1 D D (i.e. AC-1, RTU-1, HP-1)
Equipment Type3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed Heatina Caoacitv1 15,542 Btu/hr D D
Minimum Heatina Efficiency1 4.19COP D D
Max Allowed Coolina Caoacitv1 28,551 Btu/hr D D
Coolina Efficiencv1 13.4 EER D D
Duct Location/ A-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Equioment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP2-2 D D
Eauioment Tvoe3: Hydronic Heat Pµmp D D
Number of Systems 1 D D
Max Allowed Heatina Capacity1 40,894 Btu/hr D D
Minimum Heatina Efficiencv1 4.20 COP D D
Max Allowed Coolina Caoacitv1 48,296 Btu/hr D D
Coolina Efficiencv1 11.0EER D D
Duct Location/ A-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
Ener.qvPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Paae 2of73
'I.. CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 nla
GENERAL INFORMATION
· Buildina Type: IZI Nonresidential [J High-Rise Residential [J Hotel/Motel Guest Room
[J Schools (Public School) [J Relocatable Public School Bldg. @ Conditioned Spaces [J Unconditioned Spaces
(affidavit)
Phase of Construction: [J New Construction [J Addition [J Alteration
Approach of Compliance: [J Component [J Overall Envelope TDV [J Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: I 1aodeg I
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Eciuipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-3 D D (i.e. AC-1, RTU-1, HP-1)
Eouioment Tvoe3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Capacity1 23,873 Btu/hr D D
Minimum Heatina Efficiencv1 5.35 COP D D
Max Allowed Coolina Capacitv1 55,089 Btu/hr D D
CoolinQ Efficiencv1 14.7 EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Eauioment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags D D (i.e. AC-1, RTU-1, HP-1) HP2-4
Eouioment Tvoe3: Hydronfc Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Caoacitv1 25,226 Btu/hr D D
Minimum Heatinq Efficiencv1 4.20COP D D
Max Allowed Coolina Capacity1 44,074 Btu/hr D D
CoolinQ Efficiencv1 11.0EER D D
Duct Location/ R-Value Conditioned I 4. 2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split}, VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnemvPro 5.1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 3of73
CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 nla
GENERAL INFORMATION
Buildinq Type: IZI Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. Iii Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: I tBOdegl
HV AC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Equipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-5 D D (i.e. AC-1, RTU-1, HP-1)
Eauioment Tvoe3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed HeatinQ Capacity1 21,612 Btu/hr D D
Minimum Heatina Efficiency1 4.10 COP D D
Max Allowed Coolina Caoacitv1 37,723 Btu/hr D D
CoolinQ Efficiency 1 12.9 EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Equioment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP2-6 D D
Eauioment Tvoe3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed HeatinQ Capacity1 20, 196 Btu/hr D D
Minimum Heatina Efficiencv1 4.28 COP D D
Max Allowed Coolina Capacitv1 42,102 Btu/hr D D
Coolini:i Efficiency1 14.1 EER D D
Duct Location/ R-Value Conditioned I 4. 2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
Enerr:1vPro 5. 1 bv Enerr:1vSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Paqe 4of73
CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 n/a
GENERAL INFORMATION
Buildinq Type: 121 Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. @ Conditioned Spaces D Unconditioned Spaces
( affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: I 1aodeg I
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Reauirements
Equipment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-7 D D (i.e. AC-1, RTU-1, HP-1)
Equipment Type 3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Capacitv1 11, 784 Btu/hr D D
Minimum Heatina Efficiencv1 4.10COP D D
Max Allowed Coolina Caoacitv1 34, 162 Btu/hr D D
CoolinQ Efficiency1 12.9 EER D D
Duct Location/ R-Value Conditioned 14.2 D D
When duct testing is required; submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D.
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Eauioment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP2-8 D D
Equipment Type3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Capacity1 20, 146 Btu/hr D D
Minimum HeatinQ Efficiency1 4.20 COP D D
Max Allowed Coolina Caoacitv1 37,694 Btu/hr D D
Coolini:i Efficiencv1 11.0EER D D
Duct Location/ R-Value Conditioned 14.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Paae 5of73
'-CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 nla
GENERAL INFORMATION
Buildina Type: IZI Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. @ Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: I 180 deg I
HV AC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Reauirements
Eauioment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-9 D D (i.e. AC-1, RTU-1, HP-1)
Equipment Type3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Capacity1 38,237 Btu/hr D D
Minimum Heatina Efficiencv1 4.20COP D D
Max Allowed Coolina Caoacitv1 58, 765 Btu/hr D D
Coolina Efficiencv1 11.0EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Equipment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags D D (i.e. AC-1, RTU-1, HP-1) HP2-10
Equipment Type3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Caoacitv1 27,340 Btu/hr D D
Minimum Heatina Efficiency1 4.28COP D D
Max Allowed Coolina Capacity1 47,714 Btu/hr D D
Coolina Efficiencv1 14.1 EER D D
Duct Location/ R-Value Conditioned I 4. 2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 6of73
\. CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 n/a
GENERAL INFORMATION
Building Type: IZI Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. Iii Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: I 1sodeg I
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Reauirements
Eauipment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-11 D D (i.e. AC-1, RTU-1, HP-1)
Equipment Type 3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Caoacitv1 12,782 Btu/hr D D
Minimum Heatina Efficiencv1 4.20COP D D
Max Allowed Coolina Capacitv1 31,438 Btu/hr D D
Coolina Efficiencv1 11.0EER D D
Duct Location/ R-Value Conditioned 14.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Eauipment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags D D (i.e. AC-1, RTU-1, HP-1) HP2-12
Equipment Type3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed Heatina Caoacitv1 18,032 Btu/hr D D
Minimum Heatina Efficiencv1 5.20 COP D D
Max Allowed Coolina Capacity1 · 32,605 Btu/hr D D
Coolina Efficiencv1 14.7 EER D D
Duct Location/ R-Value Conditioned I 4. 2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required. D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnemvPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 7of73
\ CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 nla
GENERAL INFORMATION
Buildina Tvoe: 121 Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. ~ Conditioned Spaces D Unconditioned Spaces
/affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: I 1aodeg I
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Equipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-13 D D (i.e. AC-1, RTU-1, HP-1)
Equipment Type3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed HeatinQ Capacity1 4,232 Btu/hr D D
Minimum Heating Efficiency1 4.13 COP D D
Max Allowed Cooling Caoacity1 7,577 Btu/hr D D
Coolina Efficiencv1 14.0 EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Equipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags D D (i.e. AC-1, RTU-1, HP-1) HP2-14
Eauioment Type 3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatinq Capacity1 1 ~. 032 Btu/hr D D
Minimum HeatinQ Efficiency1 5.20COP D D
Max Allowed Coolina Caoacitv1 32,605 Btu/hr D D
Cooling Efficiency1 14.7 EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnerqvPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Paae 8 of73
'-CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 n/a
GENERAL INFORMATION
Building Tvoe: 121 Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. li2I Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: I 180 deg I
HV AC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Reauirements
Eauioment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-15 D D (i.e. AC-1, RTU-1, HP-1)
Eauioment Type3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heating Capacity1 49,272 Btu/hr D D
Minimum Heatino Efficiencv1 4.20COP D D
Max Allowed Coolino Capacitv1 58,571 Btu/hr D D
Coolina Efficiencv1 11.0EER D D
Duct Location/ R-Value Conditioned 14.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume 0 0
FIELD INSPECTION ENERGY CHECKLIST
Eauioment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags D D (i.e. AC-1, RTU-1, HP-1) HP2-16
Eauioment Tvoe3: Hydronic Heat Pump D 0
Number of Systems 1 D D
Max Allowed Heating Caoacity1 22,339 Btu/hr D 0
Minimum Heating Efficiency1 4.20COP 0 0
Max Allowed Coolina Caoacitv1 54,886 Btu/hr D D
Coolino Efficiencv1 11.0EER D 0
Duct Location/ R-Value Conditioned I 4. 2 0 0
When duct testing is required, submit
No 0 D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume 0 D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAY, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5. 1 by EneravSoft User Number: 8004 Run Code: 2014-06-17711 :51 :29 ID: 14112 Par:,e 9of73
'
' CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 n/a
GENERAL INFORMATION
Building Type: 121 Nonresidential [J High-Rise Residential [J Hotel/Motel Guest Room
[J Schools (Public School) [J Relocatable Public School Bldg. @ Conditioned Spaces [J Unconditioned Spaces
(affidavit)
Phase of Construction: [J New Construction [J Addition [J Alteration
Approach of Compliance: [J Component [J Overall Envelope TDV [J Unconditioned (file affidavit) Enerov
Front Orientation: N, E, S, W or in Degrees: I 1ao deg I
HV AC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Reauirements
Eauioment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-17 D D (i.e. AC-1, RTU-1, HP-1)
Equipment Type3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed Heating Capacity1 17,589 Btu/hr D D
Minimum Heating Efficiency1 4.10COP D D
Max Allowed Coolina Caoacitv1 34,128 Btu/hr D D
Coolino Efficiency 1 12.9 EER D D
Duct Location/ R-Value Conditioned 14.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Eauioment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP2-18 D D
Equipment Tyoe.3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed HeatinQ Capacity1 18, 1-24 Btu/hr D D
Minimum Heatina Efficiencv1 4.20 COP D D
Max Allowed Coolino Capacity1 37, 723 Btu/hr D D
CoolinQ Efficiency1 11.0EER D D
Duct Location/ R-Value Conditioned I 4. 2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EneravPro 5. 1 by EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 10of73
'
' CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 nla
GENERAL INFORMATION
Buildinci Type: IZI Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. @ Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerciv
Front Orientation: N, E, S, W or in Degrees: I 1aodegl
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Eauipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-19 D D (i.e. AC-1, RTU-1, HP-1)
Eauioment Tvne3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed Heatina Capacitv1 23,064 Btu/hr D D
Minimum Heatina Efficiencv1 4.28COP D D
Max Allowed Coolina Caoacitv1 47,990 Btu/hr D D
Coolinci Efficiency1 14.1 EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Equipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags D D (i.e. AC-1, RTU-1, HP-1) HP2-20
Equipment Tvoe3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Caoacity1 13,636 Btu/hr D D
Minimum Heatina Efficiencv1 4.19 COP D D
Max Allowed Coolina Capacitv1 20,327 Btu/hr D D
Coolinq Efficiency1 13.4 EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EneravPro 5. 1 by EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 11 of73
\ CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 n/a
GENERAL INFORMATION
Building Type: IZI Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. !ti Conditioned Spaces 0 Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enen:iv
Front Orientation: N, E, S, W or in Degrees: I 1BOdegl
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Equioment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-21 D D (i.e. AC-1, RTU-1, HP-1)
Eauioment Tvoe3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed Heatina Caoacitv1 32,211 Btu/hr D D
Minimum Heating Efficiencv1 4.20COP D D
Max Allowed Coolina Capacitv1 64,356 Btu/hr D 0
Coolina Efficiencv1 11.0EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D 0
FIELD INSPECTION ENERGY CHECKLIST
Equioment2 Insoection Criteria Pass Fail -Describe Reason2
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP2-22 D D
Equipment Tvoe3: Hydronic Heat Pump D D
Number of Systems 1 0 D
Max Allowed Heatina Caoacitv1 42, 136 Btu/hr D D
Minimum Heatina Efficiencv1 4.93COP D D
Max Allowed Coolina Capacitv1 86, 789 Btu/hr D D
Coolina Efficiencv1 14.0EER D D
Duct Location/ A-Value Conditioned I 4.2 D 0
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volumf; 0 D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Paqe 12 of73
'-CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 n/a
GENERAL INFORMATION
Buildina Type: 121 Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. ~ Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Energy
Front Orientation: N, E, S, W or in Degrees: I 1aodeg I
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Equipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags HP2-23 D D (i.e. AC-1, RTU-1, HP-1)
Eauioment Tvoe3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed Heating Caoacitv1 25,513 Btu/hr D D
Minimum Heatina Efficiencv1 4.10COP D D
Max Allowed Coolina Capacitv1 37,972 Btu/hr D D
Coolina Efficiencv1 12.9 EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Equipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags D D (i.e. AC-1, RTU-1, HP-1) HP2-25
Equipment Type3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Capacitv1 28,879 Btu/hr D D
Minimum Heatinq Efficiency1 5.20 COP D D
Max Allowed Cooling Capacity1 32,504 Btu/hr D D
Coolina Efficiencv1 14.7 EER D D
Duct Location/ A-Value · Conditioned I 4. 2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergvPro 5. 1 by EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Paae 13 of73
'-CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 nla
GENERAL INFORMATION
Building Tvoe: 121 Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. @ Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Energy
Front Orientation: N, E, S, W or in Degrees: I 1aodeg I
HV AC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Reauirements
Eauipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-26 D D (i.e. AC-1, RTU-1, HP-1)
Equipment Type 3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Capacitv1 9,425 Btu/hr D D
Minimum HeatinQ Efficiencv1 4.13 COP D D
Max Allowed Coolina Capacitv1 19,490 Btu/hr D D
Coolina Efficiencv1 14.0 EER D D
Duct Location/ R-Value Conditioned 14.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Eauipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) HP2-27 D D
Equipment Type3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed HeatinQ Capacitv1 34,466 Btu/hr D D
Minimum HeatinQ Efficiency1 4.20COP D D
Max Allowed Coolina Capacitv1 50,358 Btu/hr D D
Coolina Efficiencv1 11.0EER D D
Duct Location/ R-Value Conditioned 14. 2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D -D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
Ener_qvPro 5. 1 bv EneravSoft User Number: 8004 Run Code: 2014-06-17711 :51 :29 ID: 14112 Paae 14 of73
\-
'-CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 n/a
GENERAL INFORMATION
Buildinq Type: 121 Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) i:J Relocatable Public School Bldg. @ Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: j 180degj
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Eauipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags HP2-28 D D (i.e. AC-1, RTU-1, HP-1)
Equipment Type 3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatinq Caoacitv1 25,982 Btu/hr D D
Minimum Heatina Efficiencv1 5.51 COP D D
Max Allowed Coolina Caoacitv1 28,359 Btu/hr D D
Coolinq Efficiencv1 14.0 EER D D
Duct Location/ R-Value Conditioned 14.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Eauipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags D D (i.e. AC-1, RTU-1, HP-1) HP2-29
Equipment Type3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Caoacitv1 21,066 Btu/hr D D
Minimum Heatino Efficiencv1 5.12 COP D D
Max Allowed Cooling Capacity1 45,001 Btu/hr D D
Coolina Efficiencv1 13.SEER D D
Duct Location/ R-Value Conditioned 14. 2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 15 of73
.,.
CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 nla
GENERAL INFORMATION
Buildino Tvoe: 121 Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. liZI Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Energy
Front Orientation: N, E, S, W or in Degrees: I 180 deg I
HV AC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Reauirements
Equipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-30 D D (i.e. AC-1, RTU-1, HP-1)
Eauipment Tvpe3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed Heatino Caoacitv1 17,231 Btu/hr D D
Minimum Heating Efficiency1 4.10 COP D D
Max Allowed Coolina Caoacitv1 36,511 Btu/hr D D
Coolina Efficiencv1 12.9 EER D D
Duct Location/ R-Value Conditioned 14.2 D D
When duct testing is required, submit No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Equipment2 Inspection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-31 D D (i.e. AC-1, RTU-1, HP-1)
Equipment Type3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed Heatina Caoacitv1 10,074 Btu/hr D D
Minimum HeatinQ Efficiencv1 4.13 COP D D
Max Allowed CoolinQ Capacity1 16,279 Btu/hr D D
Coolino Efficiencv1 14.0EER D D
Duct Location/ A-Value Conditioned I 4. 2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EneravPro 5.1 bv EneravSoft User Number: 8004 Run Code: 2014-06-17711 :51 :29 ID: 14112 Paqe 16of73
'-CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
Project Address I Climate Zone
7
I Total Cond. Floor Area Addition Floor Area
2386 Faraday Avenue Carlsbad 21,239 nla
GENERAL INFORMATION
Buildina Type: IZI Nonresidential D High-Rise Residential D Hotel/Motel Guest Room
D Schools (Public School) D Relocatable Public School Bldg. @ Conditioned Spaces D Unconditioned Spaces
(affidavit)
Phase of Construction: D New Construction D Addition D Alteration
Approach of Compliance: D Component D Overall Envelope TDV D Unconditioned (file affidavit) Enerav
Front Orientation: N, E, S, W or in Degrees: I 1Bodeg I
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Meets Criteria or Requirements
Equipment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags
HP2-32 D D (i.e. AC-1, RTU-1, HP-1)
Equipment Type3: Hydronic Heat Pump D D
Number of Svstems 1 D D
Max Allowed Heatina Capacitv1 9,223 Btu/hr D D
Minimum Heatina Efficiencv1 4.13 COP D D
Max Allowed Coolina Caoacitv1 18,982 Btu/hr D D
Coolina Efficiencv1 14.0EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
FIELD INSPECTION ENERGY CHECKLIST
Eauipment2 lnsoection Criteria Pass Fail -Describe Reason2
Item or System Tags D D (i.e. AC-1, RTU-1, HP-1) HP2-33
Eauioment Tvoe3: Hydronic Heat Pump D D
Number of Systems 1 D D
Max Allowed HeatinQ Capacity1 7,847 Btu/hr D D
Minimum Heatinq Efficiency1 4.13 COP D D
Max Allowed Coolina Caoacitv1 17, 149 Btu/hr D D
CoolinQ Efficiency1 14.0EER D D
Duct Location/ R-Value Conditioned I 4.2 D D
When duct testing is required, submit
No D D MECH-4A & MECH-4-HERS
Economizer No Economizer D D
Thermostat Setback Required D D
Fan Control Constant Volume D D
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 17 of73
._ CERTIFICATE OF COMPLIANCE and (Part 2 of 5) MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Discrepancies:
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Paqe 18of73
I'
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 5) MECH-1C ~
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be
part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.
The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the
properly filled out and signed forms before the building can receive final occupancy.
TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-SA MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A
Hydronic
Outdoor Constant Demand Supply System Automatic
Ventilation Volume& Air Control Supply Valve Water Variable Demand
For Single-Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed
Eauioment Reauirina Testina or Verification Qty. VAV&CAV Unitarv Ducts Controls DCV VAV Test Reset Control Control
McQuay WCCH4019 2 It'.] It'.] D 0 0 0 D 0 0 D
McQuay WGTH0381 1 Ill Ill 0 0 0 D D 0 0 0
McQuay WCCH4024 5 Ill Ill D 0 0 D D 0 0 0
McQuay WCCH5030 3 Ill Ill D 0 0 0 0 0 0 0
McQuay WGTH0261 3 121 121 D 0 0 0 D 0 D 0
McQuay WCCH4012 5 121 121 D 0 0 0 0 0 0 0
McQuay WGTH0641 1 Ill Ill 0 0 D D 0 0 0 0
McQuay WGSH0191 1 Ill Ill D 0 0 0 0 0 0 0
McQuay WGTH0321 1 Ill Ill 0 0 D 0 0 0 0 0
0 0 D 0 0 0 0 0 0 0
0 0 0 0 D 0 0 0 0 0
0 0 D 0 D D 0 0 D 0
0 0 0 0 D 0 0 0 0 0
0 0 0 0 D D 0 0 D 0
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Paae 19 of73
,,
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 5) MECH-1C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-i5A
Fault Automatic Fault Distributed
Detection & Detection & Energy Storage Thermal Energy
Diagnostics Diagnostics for DXAC Storage (TES)
Eauioment Reauirina Testing Qtv. for DX Units Air&Zone Systems Svstems Test Performed Bv:
McQuay WCCH4019 2 D D D D
McQuay WGTH0381 1 D D D D
McQuay WCCH4024 5 D D D D
McQuay WCCH5030 3 D D D 0
McQuay WGTH0261 3 D D D D
McQuay WCCH4012 5 D D D 0
McQuay WGTH0641 1 D D D D
McQuay WGSH0191 1 0 0 D 0
McQuay WGTH0321 1 0 0 0 0
0 0 D D
0 0 D 0
0 0 D D
0 0 D D
0 0 D D
0 0 D D
D 0 D D
0 0 D D
0 0 D D
D 0 D D
D 0 D D
D D D D
D 0 D D
D D D D
D 0 D D
D 0 D D
D D D D
D 0 D D
D D D D
D 0 D D
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Paae 20of73
' CERTIFICATE OF COMPLIANCE (Part 5 of 5) MECH-1C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Documentation Author's Declaration Statement
I certifv that this Certificate of Compliance documentation is accurate and complete.
Name Brandon T. Plum, PE Signature D/1fizdon T. 'fUtl11
Company Plum Engineering, Inc. Date 6/17/2014
Address 11835 Carmel Mtn Road #1304-209 CEA#
CEPE#
City/State/Zip San Diego, CA 92128-4609 -Phone 858-672-2100
The Principal Mechanical Designer's Declaration Statement
• I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical
design.
• This Certificate of Compliance identifies the mechanical features and performance specifications required for compliance
with Title-24, Parts 1 and 6 of the California Code of Regulations.
• The design features represented on this Certificate of Compliance are consistent with the information provided to document
this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the
enforcement agency for approval with this building permit application.
Name Brandon T. Plum Signature Dl1f.rtdon T. 'fUtl11
Company Plum Engineering, Inc Date 6.17.2014
Address 11835 Carmel Mtn Road#1304-209 License# M3237 4
City/State/Zip San Diego, CA 92129 Phone 858-672-2100
Mandatory Measures M0.3, M0.4 Indicate location on building plans of Note Block for Mandatory Measures
MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the 2008 Nonresidential Manual.
Note: The Enforcement Agency may require all forms to be incorporated onto the building plans.
@ MECH-1C Certificate of Compliance. Required on plans for all submittals.
@ MECH-2C Mechanical Equipment Summary is required for all submittals.
@ MECH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation.
@ MECH-4C Fan Power Consumption is required for all prescriptive submittals.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 21 of73
'-AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/1712014
Item or System Tags
Indicate Air Svstems Tvpe {Central, Sinale Zone, Packa1 e, VAV, or etc ... }
(i.e. AC-1, RTU-1, HP-1) HP1-1 HP1-2 HP2-1
Number of Systems 1 1 1
Indicate Pa :ie Reference on Plans or Schedule and indicate the aoolicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112(al 4.20COP 4.20COP 4.19 COP
Cooling Equipment Efficiency 112/al 11.0EER 11.0EER 13.4 EER
HV AC Heat Pump Thermostat 112/bl, 112/c) Yes Yes Yes
Furnace Controls!fhermostat 112(c), 115(a) nla nla nla
Natural Ventilation 121 (bl No No No
Mechanical Ventilation 121/b) 228cfm 211 cfm 84cfm
VAV Minimum Position Control 121/cl No No No
Demand Control Ventilation 121/c) No No No
Time Control 122/e) Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122/e) Setback Required Setback Required Setback Required
Outdoor Damper Control 122/f) Gravity Gravity Gravity
Isolation Zones 122(a) nla n/a nla
Pipe Insulation 123
Duct Location/ A-value 124 Attic, Roof Ins I 4.2 Attic, Roof Ins I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144/a& b) 26,859 Btu/hr 48,403 Btu/hr 15,542 Btu/hr
Proposed Heating Capacity 144la& bl 37,826 Btu/hr 42,975 Btu/hr 19,737 Btu/hr
Calculated Design Cooling Load 144(a& bl 29,754 Btu/hr 36, 181 Btu/hr 19,986 Btu/hr
Proposed Cooling Capacity 144/a & bl 35,498 Btu/hr 40,892 Btu/hr 18,023 Btu/hr
Fan Control 144/c) Constant Volume Constant Volume Constant Volume
DP Sensor Location 144(cl
Supply Pressure Reset (DOC only) 144(c) No No No
Simultaneous Heat/Cool 144/d) No No No
Economizer 144/el No Economizer No Economizer No Economizer
Heat Air Supply Reset 144/f) Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144/f) Constant Temp Constant Temp Constant Temp
Electric Resistance Heating1 144/al
Air Cooled Chiller Limitation 144/i)
Duct Leakage Sealing. If Yes, a No No No MECH-4-A must be submitted 144/k)
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RtinCode: 2014-06-17711:51:29 ID: 14112 Page 22 of73
... AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags Indicate Air Systems Type (Central, Sinale Zone, Packa1 e, VAV, or etc ... )
(i.e. AC-1, RTU-1, HP-1) HP2-2 HP2-3 HP2-4
Number of Systems 1 1 1 "
Indicate Pa le Reference on Plans or Schedule and indicate the aoolicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112(a) 4.20 COP 5.35COP 4.20 COP
Cooling Equipment Efficiency 112(a) 11.0 EER 14.7EER 11.0EER
HVAC Heat Pump Thermostat 112{b), 112{c) Yes Yes Yes
Furnace Controlsffhermostat 112{c), 115/a) nla nla nla
Natural Ventilation 121/b) No No No
Mechanical Ventilation 121{b) 131 cfm 43cfm 171 cfm
VAV Minimum Position Control 121/c) No No No
Demand Control Ventilation 121/c) No No No
Time Control 122(el Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122/e) Setback Required Setback Required Setback Required
Outdoor Damper Control 122(f) Gravity Gravity Gravity
Isolation Zones 122/ol nla nla nla
Pipe Insulation 123
Duct Location/ R-value 124 Conditioned I 4.2 Conditioned I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144(a& bl 40,894 Btu/hr 23,873 Btu/hr 25,226 Btu/hr
Proposed Heating Capacity 144(a& bl 32,066 Btu/hr 40,290 Btu/hr 32,265 Btu/hr
Calculated Design Cooling Load 144(a & bl 33,807 Btu/hr 38,562 Btu/hr 30,852 Btu/hr
Proposed Cooling Capacity 144(a & bl 30,825 Btu/hr 31,697 Btu/hr 30,677 Btu/hr
Fan Control 144{c) Constant Volume Constant Volume Constant Volume
DP Sensor Location 144(c)
Supply Pressure Reset (DOC only) 144(c) No No No
Simultaneous Heat/Cool 144/dl No No No
Economizer 144lel No Economizer No Economizer No Economizer
Heat Air Supply Reset 144/f) Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp
Electric Resistance Heating 1 144/ol
Air Cooled Chiller Limitation 144(i)
Duct Leakage Sealing. If Yes, a No No No MECH-4-A must be submitted 144(k)
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 23of73
..,_ AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags
Indicate Air Svstems Tvoe (Central Sinale Zone, Packac e, VAV, or etc ... )
(i.e. AC-1, RTU-1, HP-1) HP2-5 HP2-6 HP2-7
Number of Svstems 1 1 1
Indicate Pa 1e Reference on Plans or Schedule and indicate the aoolicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112(al 4.10 COP 4.28COP 4.10 COP
Cooling Equipment Efficiency 112/al 12.9EER 14.1 EER 12.9EER
HVAC Heat Pump Thermostat 112/b\, 112fc) Yes Yes Yes
Furnace Controls/rhermostat 112fc), 115/al nla nla nla
Natural Ventilation 121 (b) No No No
Mechanical Ventilation 121 {b) 123 cfm 65cfm 115 cfm
VAV Minimum Position Control 121<c\ No No No
Demand Control Ventilation 121<c\ No No No
Time Control 122/el Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122/e\ Setback Required Setback Required Setback Required
Outdoor Damper Control . 122/f) Gravity Gravity Gravity
Isolation Zones 122/a\ nla nla nla
Pipe Insulation 123
Duct Location/ A-value 124 Conditioned I 4.2 Conditioned I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144fa& b\ 21,612 Btu/hr 20,196 Btu/hr 11, 784 Btu/hr
Proposed Heating Capacity 144/a & bl 23,841 Btu/hr 29, 792 Btu/hr 23,745 Btu/hr
Calculated Design Cooling Load 144/a& bl 26,406 Btu/hr 29,471 Btu/hr 23,914 Btu/hr
Proposed Cooling Capacity 144/a& b\ 20,090 Btu/hr 25,101 Btu/hr 20,066 Btu/hr
Fan Control 144/c\ Constant Volume Constant Volume Constant Volume
DP Sensor Location 144(c)
Supply Pressure Reset (DDC only) 144(c) No No No
Simultaneous Heat/Cool 144(d\ No No No
Economizer 144/e\ No Economizer No Economizer No Economizer
Heat Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp
Electric Resistance Heating 1 144/n\
Air Cooled Chiller Limitation 144{i)
Duct Leakage Sealing. If Yes, a
144(k) No No No MECH-4-A must be submitted
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 24 of73
' AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags Indicate Air Systems Tvoe (Central, Sinale Zone, Packac e, VAV, or etc ... )
(i.e. AC-1, RTU-1, HP-1) HP2-8 HP2-9 HP2-10
Number of Svstems 1 1 1
Indicate Paqe Reference on Plans or Schedule and indicate the aoolicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112/al 4.20 COP 4.20COP 4.28COP
Cooling Equipment Efficiency 112/al 11.0 EER 11.0 EER 14.1 EER
HV AC Heat Pump Thermostat 112/b\, 112/c\ Yes Yes Yes
Furnace Controlsfrhermostat 112fo\, 115/al nla nla nla
Natural Ventilation 121/b\ No No No
Mechanical Ventilation 121(b) 64cfm 134 cfm 144 cfm
VAV Minimum Position Control 121/c) No No No
Demand Control Ventilation 121/c) No No No
Time Control 122/el Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122/el Setback Required Setback Required Setback Required
Outdoor Damper Control 122/f) Gravity Gravity Gravity
Isolation Zones 122/a\ nla nla nla
Pipe Insulation 123
Duct Location/ A-value 124 Conditioned I 4.2 Conditioned I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144/a & bl 20, 146 Btu/hr 38,237 Btu/hr 27,340 Btu/hr
Proposed Heating Capacity 144/a& b\ 21,178 Btu/hr 32,076 Btu/hr 30,454 Btu/hr
Calculated Design Cooling Load 144/a& b\ 26,386 Btu/hr 41,136 Btu/hr 33,400 Btu/hr
Proposed Cooling Capacity 144/a & bl 20,747 Btu/hr 30,774 Btu/hr 24,678 Btu/hr
Fan Control 144/c\ Constant Volume Constant Volume Constant Volume
DP Sensor Location 144/c)
Supply Pressure Reset (DOC only) 144/c\ No No No
Simultaneous Heat/Cool 144/dl No No No
Economizer 144/e\ No Economizer No Economizer No Economizer
Heat Air Supply Reset 144/fl Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144/fl Constant Temp Constant Temp Constant Temp
Electric Resistance Heating1 144/n\
Air Cooled Chiller Limitation 144/i)
Duct Leakage Sealing. If Yes, a No No No MECH-4-A must be submitted 144/k)
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 25 of73
~ AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags
Indicate Air Systems Type (Central, Sinale Zone, Packa< e, VAV, or etc ... )
(i.e. AC-1, RTU-1, HP-1) HP2-11 HP2-12 HP2-13
Number of Svstems 1 1 1 ,.,
Indicate Pa Je Reference on Plans or Schedule and indicate the aoolicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112/al 4.20COP 5.20COP 4.13 COP
Cooling Equipment Efficiency 112/al 11.0EER 14.7EER 14.0EER
HVAC Heat Pump Thermostat 112/b\, 112fcl Yes Yes Yes
Furnace Controlsffhermostat 112(c), 115fal nla nla n/a
Natural Ventilation 121(bl No No No
Mechanical Ventilation 121 /b) 147cfm 36cfm 60cfm
VAV Minimum Position Control 12Hcl No No No
Demand Control Ventilation 121fcl No No No
Time Control 122/el Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122/e\ Setback Required Setback Required Setback Required
Outdoor Damper Control 122(f\ Gravity Gravity Gravity
Isolation Zones 122/a\ n/a nla nla
Pipe Insulation 123
Duct Location/ R-value 124 Conditioned I 4.2 Conditioned I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144/a & b\ 12, 782 Btu/hr 18,032 Btu/hr 4,232 Btu/hr
Proposed Heating Capacity 144/a & bl. 16,015 Btu/hr 26, 115 Btu/hr 15,033 Btu/hr
Calculated Design Cooling Load 144/a & b\ 22,006 Btu/hr 22,824 Btu/hr 5,304 Btu/hr
Proposed Cooling Capacity 144fa& b\ 15,402 Btu/hr 22, 140 Btu/hr 11,169 Btu/hr
Fan Control 144/cl Constant Volume Constant Volume Constant Volume
DP Sensor Location 144/cl
Supply Pressure Reset (DDC only) 144/c) No No No
Simultaneous Heat/Cool 144/d\ No No No
Economizer 144/el No Economizer No Economizer No Economizer
Heat Air Supply Reset 144/f) Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144/fl Constant Temp Constant Temp Constant Temp
Electric Resistance Heating1 144/a\
Air Cooled Chiller Limitation 144/il
Duct Leakage Sealing. If Yes, a No No No MECH-4-A must be submitted 144/k\
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergvSott User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 26of73
---AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags
Indicate Air Svstems Tvoe {Central, Sinale Zone, Packa• e, VAV, or etc ... )
(i.e. AC-1, RTU-1, HP-1) HP2-14 HP2-15 HP2-16
Number of Systems 1 1 1
Indicate Pa ie Reference on Plans or Schedule and indicate the annlicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112<al 5.20 COP 4.20COP 4.20COP
Cooling Equipment Efficiency 112(al 14.?EER 11.0 EER 11.0 EER
HV AC Heat Pump Thermostat 112(bl, 112(cl Yes Yes Yes
Furnace Controls/Thermostat 112/c\, 115/al nla n/a nla
Natural Ventilation 121(b) No No No
Mechanical Ventilation 121 (b) 36cfm 159 cfm 257cfm
VAV Minimum Position Control 121fc\ No No No
Demand Control Ventilation 121/c) No No No
Time Control 122(el Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122(el Setback Required Setback Required Setback Required
Outdoor Damper Control 122(f) Gravity Gravity Gravity
Isolation Zones 122(al nla n/a nla
Pipe Insulation 123
Duct Location/ A-value 124 Conditioned I 4.2 Conditioned I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144(a & b\ 18,032 Btu/hr 49,272 Btu/hr 22,339 Btu/hr
Proposed Heating Capacity 144/a& bl 26,115 Btu/hr 42,622 Btu/hr 43, 161 Btu/hr
Calculated Design Cooling Load 144/a & bl 22,824 Btu/hr 40,999 Btu/hr 38,420 Btu/hr
Proposed Cooling Capacity 144/a& bl 22,140 Btu/hr 41,229 Btu/hr 40,620 Btu/hr
Fan Control 144(c) Constant Volume Constant Volume Constant Volume
DP Sensor Location 144(cl
Supply Pressure Reset (DDC only) 144(cl No No No
Simultaneous Heat/Cool 144/d) No No No
Economizer 144(el No Economizer No Economizer No Economizer
Heat Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp
Electric Resistance Heating1 144/a\
Air Cooled Chiller Limitation 144(i)
Duct Leakage Sealing. If Yes, a No No No MECH-4-A must be submitted 144/k)
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144{g) apply.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 27of73
'-AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags Indicate Air Svstems Tvne {Central, Sinale Zone, Packa1 e, VAV, or etc ... )
/i.e. AC-1, RTU-1, HP-1) HP2-17 HP2-18 HP2-19
Number of Systems 1 1 1
Indicate Pa le Reference on Plans or Schedule and indicate the aoolicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112(a) 4.10 COP 4.20COP 4.28 COP
Cooling Equipment Efficiency 112(a) 12.9EER 11.0 EER 14.1 EER
HVAC Heat Pump Thermostat 112/bl, 112/cl Yes Yes Yes
Furnace Controlsffhermostat 112/c), 115/al nla nla n/a
Natural Ventilation 121 (b) No No No
Mechanical Ventilation 121(b) 87cfm 64cfm 88cfm
VAV Minimum Position Control 121/cl No No No
Demand Control Ventilation 121/c) No No No
Time Control 122/el Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122/el Setback Required Setback Required Setback Required
Outdoor Damper Control 122(f) Gravity Gravity Gravity
Isolation Zones 122/al nla nla nla
Pipe Insulation 123
Duct Location/ A-value 124 Conditioned I 4.2 Conditioned I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144(a & bl 17,589 Btu/hr 18,124 Btu/hr 23,064 Btu/hr
Proposed Heating Capacity 144(a& bl 23,602 Btu/hr 21,172 Btu/hr 29,989 Btu/hr
Calculated Design Cooling Load 144/a & bl 23,890 Btu/hr 26,406 Btu/hr 33,593 Btu/hr
Proposed Cooling Capacity 144/a& bl 20,265 Btu/hr 20,691 Btu/hr 24,924 Btu/hr
Fan Control 144/c) Constant Volume Constant Volume Constant Volume
DP Sensor Location 144(c)
Supply Pressure Reset (DOC only) 144/c) No No No
Simultaneous Heat/Cool 144(d) No No No
Economizer 144/el No Economizer No Economizer No Economizer
Heat Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144/fl Constant Temp Constant Temp Constant Temp
Electric Resistance Heating1 144/a\
Air Cooled Chiller Limitation 144(i)
Duct Leakage Sealing. If Yes, a No No No MECH-4-A must be submitted 144/kl
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5. 1 by EnergvSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID:14112 Page 28 of73
.. AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags Indicate Air Svstems Tvoe (Central,' Sinale Zone, Packac e, VAV, or etc ... )
(i.e. AC-1, RTU-1, HP-1) HP2-20 HP2-21 HP2-22
Number of Svstems 1 1 1
Indicate Pa Je Reference on Plans or Schedule and indicate the aoolicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112(al 4.19 COP 4.20COP 4.93 COP
Cooling Equipment Efficiency 112<al 13.4 EER 11.0 EER 14.0EER
HV AC Heat Pump Thermostat 112/bl, i i2fc) Yes Yes Yes
Furnace Controlsffhermostat 112(c\, 115/a\ nla n/a nla
Natural Ventilation 121 (bl No No No
Mechanical Ventilation 12Hb\ 210cfm 154 cfm 121 cfm
VAV Minimum Position Control 121<c\ No No No
Demand Control Ventilation 121/c\ No No No
Time Control 122(e\ Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122(e\ Setback Required Setback Required Setback Required
Outdoor Damper Control 122/f\ Gravity Gravity Gravity
Isolation Zones 122/n\ nla nla nla
Pipe Insulation 123
Duct Location/ A-value 124 Conditioned I 4.2 Conditioned I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144<a & bl 13,636 Btu/hr 32,211 Btu/hr 42, 136 Btu/hr
Proposed Heating Capacity 144/a& b\ 20,388 Btu/hr 42,496 Btu/hr 68,582 Btu/hr
Calculated Design Cooling Load 144/a& bl 14,229 Btu/hr 45,049 Btu/hr 60,753 Btu/hr
Proposed Cooling Capacity 144fa& b\ 17,332 Btu/hr 41,257 Btu/hr 50,342 Btu/hr
Fan Control 144(c\ Constant Volume Constant Volume Constant Volume
DP Sensor Location 144(c\
Supply Pressure Reset (l:lDC only) 144/c\ No No No
Simultaneous Heat/Cool 144/dl No No No
Economizer 144/e\ No Economizer No Economizer No Economizer
Heat Air Supply Reset 144(f\ Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144!f\ Constant Temp Constant Temp Constant Temp
Electric Resistance Heating 1 144/o\
Air Cooled Chiller Limitation 144/il
Duct Leakage Sealing. If Yes, a
144/k\ No No No MECH-4-A must be submitted
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5. 1 by EnergvSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 29of73
. AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags lnd_icate Air Systems Type (Central, Sinale Zone, Packac e, VAV, or etc ... )
(i.e. AC-1, RTU-1, HP-1) HP2-23 HP2-25 HP2-26
Number of Systems 1 1 1
Indicate Pa ie Reference on Plans or Schedule and indicate the aoolicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112/al 4.10COP 5.20COP 4.13 COP
Cooling Equipment Efficiency 112/al 12.9EER 14.7 EER 14.0EER
HVAC Heat Pump Thermostat 112/bl, 112/c\ Yes Yes Yes
Furnace Controls!fhermostat 112lc), 115/a\ nla nla nla
Natural Ventilation 121(b) No No No
Mechanical Ventilation 121/b) 133cfm 60cfm 41 cfm
VAV Minimum Position Control 121/c\ No No No
Demand Control Ventilation 121/cl No No No
Time Control 122/el Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122/e\ Setback Required Setback Required Setback Required
Outdoor Damper Control 122/f\ Gravity Gravity Gravity
Isolation Zones 122/n\ nla nla nla
Pipe Insulation 123
Duct Location/ R-value 124 Conditioned I 4.2 Conditioned I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144/a& bl 25,513 Btu/hr 28,879 Btu/hr 9,425 Btu/hr
Proposed Heating Capacity 144la & bl 23,924 Btu/hr 26,344 Btu/hr 14,973 Btu/hr
Calculated Design Cooling Load 144la & bl 26,581 Btu/hr 22,753 Btu/hr 13,643 Btu/hr
Proposed Cooling Capacity 144la & bl 20, 183 Btu/hr 21,981 Btu/hr 11,205 Btu/hr
Fan Control 144/c) Constant Volume Constant Volume Constant Volume
DP Sensor Location 144/c)
Supply Pressure Reset (DOC only) 144/c\ No No No
Simultaneous Heat/Cool 144ld) No No No
Economizer 144/e) No Economizer No Economizer No Economizer
Heat Air Supply Reset 144/f) Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144/f\ Constant Temp Constant Temp Constant Temp
Electric Resistance Heating 1 144lal
Air Cooled Chiller Limitation 144/i)
Duct Leakage Sealing. If Yes, a
144/kl No No No MECH-4-A must be submitted
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception{s) to §144(g) apply.
EnergyPro 5. 1 bv EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 30of73
. AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags Indicate Air Systems Type (Central, Sinale Zone, Packai e, VAV, or etc ... )
(i.e. AC-1, RTU-1, HP-1) HP2-27 HP2-28 HP2-29
Number of Systems 1 1 1
Indicate Pa :ie Reference on Plans or Schedule and indicate the aoolicable exception{s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112/a\ 4.20COP 5.51 COP 5.12 COP
Cooling Equipment Efficiency 112/al 11.DEER 14.0EER 13.5 EER
HV AC Heat Pump Thermostat 112/b\, 112/c\ Yes Yes Yes
Furnace Controls/Thermostat 112/c), 115/a) nla n/a n/a
Natural Ventilation 121/bl No No No
Mechanical Ventilation 121/b) 143 cfm 60cfm 38cfm
VAV Minimum Position Control 121lcl No No No
Demand Control Ventilation 121/cl No No No
Time Control 122(e) Programmable Switch Programmable Switch Programmable Switch
Setback and Setup Control 122/el Setback Required Setback Required Setback Required
Outdoor Damper Control 122m Gravity Gravity Gravity
Isolation Zones 122fn\ nla nla nla
Pipe Insulation 123
Duct Location/ R-value 124 Conditioned I 4.2 Conditioned I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144/a&bl 34,466 Btu/hr 25,982 Btu/hr 21,066 Btu/hr
Proposed Heating Capacity 144/a& b\ 29,651 Btu/hr 20,972 Btu/hr 32,970 Btu/hr
Calculated Design Cooling Load 144/a & bl 35,250 Btu/hr 19,851 Btu/hr 31,500 Btu/hr
Proposed Cooling Capacity 144/a& bl 27,960 Btu/hr 14,566 Btu/hr 25, 730 Btu/hr
Fan Control 144/c) Constant Volume Constant Volume Constant Volume
DP Sensor Location 144(c)
Supply Pressure Reset (DDC only) 144(c\ No No No
Simultaneous Heat/Cool 144/d\ No No No
Economizer 144<el No Economizer No Economizer No Economizer
Heat Air Supply Reset 144{f) Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144(f\ Constant Temp Constant Temp Constant Temp
Electric Resistance Heating 1 144/q)
Air Cooled Chiller Limitation 144(il
Duct Leakage Sealing. If Yes, a No No No MECH-4-A must be submitted 144/k\
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 31 of73
'
~ AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags Indicate Air Svstems Tvoe (Central, Sinale Zone, Packai e, VAV, or etc ... )
(i.e. AC-1, RTU-1, HP-1) HP2-30 HP2-31 HP2-32
Number of Systems 1 1 1
Indicate Pacie Reference on Plans or Schedule and indicate the aoolicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112/al 4.10COP 4.13COP 4.13 COP
Cooling Equipment Efficiency 112/al 12.9EER 14.0EER 14.0EER
HV AC Heat Pump Thermostat 112/bl, 112/cl Yes Yes Yes
Furnace Controlsffhermostat 112/cl, 115(a) nla nla n/a
Natural Ventilation 121/bl No No No
Mechanical Ventilation 121/bl 193 cfm 150cfm 77cfm
VAV Minimum Position Control 121lcl No No No
Demand Control Ventilation 121/c) No No No
Time Control 122/el Programmable Switch Programmable Switch Programmable Switch
Setback, and Setup Control 122/el Setback Required Setback Required Setback Required
Outdoor Damper Control 122(f) Gravity Gravity Gravity
Isolation Zones 122/al nla nla nla
Pipe Insulation 123
Duct Location/ R-value 124 Conditioned I 4.2 Conditioned I 4.2 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144/a & bl 17,231 Btu/hr 10,074 Btu/hr 9,223 Btu/hr
Proposed Heating Capacity 144(a & bl 24,261 Btu/hr 15,412 Btu/hr 15,115 Btu/hr
Calculated Design Cooling Load 144/a & bl 25,558 Btu/hr 11,395 Btu/hr 13,288 Btu/hr
Proposed Cooling Capacity 144/a & bl 19,661 Btu/hr 10,883 Btu/hr 11,098 Btu/hr
Fan Control 144(cl Constant Volume Constant Volume Constant Volume
DP Sensor Location 144(c)
Supply Pressure Reset (DOC only) 144/c) No No No
Simultaneous Heat/Cool 144/dl No No No
Economizer 144(el No Economizer No Economizer No Economizer
Heat Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp
Cool Air Supply Reset 144/f) Constant Temp Constant Temp Constant Temp
Electric Resistance Heating1 144/al
Air Cooled Chiller Limitation 144(i)
Duct Leakage Sealing. If Yes, a No No No MECH-4-A must be submitted 144(kl
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 32of73
' AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
Item or System Tags
Indicate Air Svstems Tvoe (Central, Sinale Zone, Packa~ e, VAV, or etc ... )
HP2-33 (i.e. AC-1, RTU-1, HP-1) ''
Number of Systems 1
Indicate Pa le Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES T-24 Sections
Heating Equipment Efficiency 112(al 4.13 COP
Cooling Equipment Efficiency 112(al 14.0EER
HVAC Heat Pump Thermostat 112(bl, 112(c) Yes
Furnace Controlsffhermostat 112(cl, 115(a) nla
Natural Ventilation 12Hbl No
Mechanical Ventilation 121 (b) 21 cfm
VAV Minimum Position Control 121(c) No
Demand Control Ventilation 121(c) No
Time Control 122(el Programmable Switch
Setback and Setup Control 122(e) Setback Required
Outdoor Damper Control 122/fl Gravity
Isolation Zones 122(Q) n/a
Pipe Insulation 123
Duct Location/ R-value 124 Conditioned I 4.2
PRESCRIPTIVE MEASURES
Calculated Design Heating Load 144(a & bl 7,847 Btu/hr
Proposed Heating Capacity 144(a & bl 14,887 Btu/hr
Calculated Design Cooling Load 144(a & bl 12,005 Btu/hr
Proposed Cooling Capacity 144(a& bl 11,300 Btu/hr
Fan Control 144(c) Constant Volume
DP Sensor Location 144(c)
Supply Pressure Reset (DDC only) 144(c) No
Simultaneous Heat/Cool 144(dl No
Economizer 144(e) No Economizer
Heat Air Supply Reset 144(f\ Constant Temp
Cool Air Supply Reset 144(f\ Constant Temp
Electric Resistance Heating 1 144la\
Air Cooled Chiller Limitation 144(i)
Duct Leakage Sealing. If Yes, a No MECH-4-A must be submitted 144/k)
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 /D:14112 Page 33 of73
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name Date
Havas Edge Ten~nt Improvement 6/17/2014
MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)}
AREA BASIS OCCUPANCY BASIS VAVMINIMUM
A B C D E F G H I J K L M N
MinCFM REQ'D Design 50%of Max. of Design
Condition CFM MinCFM Number CFM by V.A. Ventilation Design Zone Columns Minimum
Area per By Area Of per Occupant Max of Air Supply BX0.4 H,J, K, Air Transfer
Zone/Svstem {ft2) ft2 BXC People Person EXF DorG CFM CFM CFM / ft2 300CFM Setpoint Air
Zone 1 1,520 0.15 228 228 228
HP1-1 Total 228 228
Zone 1 1,405 0.15 211 211 211
HP1-2 Total 211 211
Zone 1 280 0.15 42 5.6 15.0 84 84 84
HP2-1 Total 84 84
Zone 1 870 0.15 131 131 131
HP2-2 Total 131 131
Zone 1 215 0.15 32 2.9 15.0 43 43 43
HP2-3 Total 43 43
Zone 1 685 0.15 103 11.4 15.0 171 171 171
HP2-4 Total 171 171
Zone 1 490 0.15 74 8.2 15.0 123 123 123
HP2-5 Total 123 123
Zone 1 431 0.15 65 65 65
Totals Column I Total Design Ventilation Air
C Minimum ventilation rate per Section &121, Table 121-A.
E Based on fixed seat or the qreater of the expected number of occupants and 50% of the CBC occupant load for emess purposes for soaces without fixed seatinq.
H Required Ventilation Air (REQ'D V.A.\ is the laraer of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column Dor G).
I Must be oreater than or equal to H, or use Transfer Air (column N) to make up the difference.
J Desiqn fan suoolv CFM (Fan CFM) x 50%; or the desiqn zone outdoor airflow rate per &121.
K Condition area (ft2) x 0.4 CFM / ft2; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than or equal to Column Land qreater than or equal to the sum of Columns H plus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air (Column Hl and the Desion Minimum Air (Column M), Column H minus M.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Paae34 of 73
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d))
AREA BASIS OCCUPANCY BASIS VAVMINIMUM
A B C D E F G H I J K L M N
MinCFM REQ'D Design 50%of Max. of Design
Condition CFM MinCFM Number CFM by V.A. Ventilation Design Zone Columns Minimum
Area per By Area Of per Occupant Max of Air Supply BX 0.4 H,J, K, Air Transfer
Zone/Svstem (ft2) ft2 BXC People Person EXF DorG CFM CFM CFM/ft2 300CFM Setpoint Air
HP2-6 Total 65 65
Zone 1 1,146 0.15 172 172 115 57
HP2-7 Total 172 115
Zone 1 424 0.15 64 64 64
HP2-8 Total 64 64
Zone 1 893 0.15 134 134 134
HP2-9 Total 134 134
Zone 1 575 0.15 86 9.6 15.0 144 144 144
HP2-10 Total 144 144
Zone 1 979 0.15 147 147 147
HP2-11 Total 147 147
Zone 1 180 0.15 27 2.4 15.0 36 36 36
HP2-12 Total 36 36
Zone 1 190 0.15 29 4.0 15.0 60 60 60
HP2-13 Total 60 60
Totals Column I Total Design Ventilation Air
C Minimum ventilation rate per Section &121, Table 121-A.
E Based on fixed seat or the areater of the expected number of occupants and 50% of the CBC occupant load for eoress purposes for spaces without fixed seatina.
H Reauired Ventilation Air lREQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column Dor G).
I Must be areater than or eaual to H, or use Transfer Air (column N) to make UP the difference.
J Desian fan supply CFM (Fan CFM) x 50%; or the desian zone outdoor airflow rate per &121.
K Condition area (ft2) x 0.4 CFM / ft2; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than or equal to Column Land areater than or equal to the sum of Columns H plus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air (Column Hl and the Desian Minimum Air (Column M), Column H minus M.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Paae35 of73
;
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
MECHANICAL VENTILATION (§121 (b)2) REHEAT LIMITATION (§144(d))
AREA BASIS OCCUPANCY BASIS VAVMINIMUM
A B C D E F G H I J K L M N
MinCFM REQ'D Design 50%of Max. of Design
Condition CFM MinCFM Number CFM by V.A. Ventilation Design Zone Columns Minimum
Area per By Area Of per Occupant Max of Air Supply BX0.4 H,J,K, Air Transfer
Zone/System (ft2) ft2 BXC People Person EXF DorG CFM CFM CFM /ft2 300 CFM Setpoint Air
Zone 1 180 0.15 27 2.4 15.0 36 36 36
HP2-14 Total 36 36
Zone 1 1,059 0.15 159 159 159
HP2-15 Total 159 159
Zone 1 1,712 0.15 257 257 257
HP2-16 Total 257 257
Zone 1 580 0.15 87 87 87
HP2-17 Total 87 87
Zone 1 429 0.15 64 64 64
HP2-18 Total 64 64
Zone 1 584 0.15 88 88 88
HP2-19 Total 88 88
Zone 1 420 0.15 63 14.0 15.0 210 210 210
HP2-20 Total 210 210
Zone 1 770 0.15 116 10.3 15.0 154 154 154
Totals Column I Total Design Ventilation Air
C Minimum ventilation rate oer Section §121, Table 121-A.
E Based on fixed seat or the areater of the expected number of occupants and 50% of the CBC occupant load for earess purooses for soaces without fixed seatina.
H Required Ventilation Air (REQ'D V.A.) is the larQer of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G).
I Must be areater than or eaual to H, or use Transfer Air (column N\ to make uo the difference.
J Desian fan suoolv CFM (Fan CFM\ x 50%; or the desian zone outdoor airflow rate per §121.
K Condition area (ft2) x 0.4 CFM / ft2; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than or eaual to Column Land areater than or eaual to the sum of Columns H olus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
eaual to the difference between the Reauired Ventilation Air (Column H) and the Desian Minimum Air (Column Ml, Column H minus M.
EneravPro 5.1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Paae36of 73
~
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
MECHANICAL VENTILATION (§121(b}2} REHEAT LIMITATION (§144(d))
AREA BASIS OCCUPANCY BASIS VAVMINIMUM
A B C D E F G H I J K L M N
MinCFM REQ'D Design 50%of Max. of Design
Condition CFM MinCFM Number CFM by V.A. Ventilation Design Zone Columns Minimum
Area per By Area Of per Occupant Max of Air Supply B X0.4 H,J, K, Air Transfer
Zone/System (ft2) ft2 BXC People Person EXF DorG CFM CFM CFM /ft2 300 CFM Setpoint Air
HP2-21 Total 154 154
Zone 1 363 0.15 54 8.1 15.0 121 121 121
HP2-22 Total 121 121
Zone 1 665 0.15 100 8.9 15.0 133 133 133
HP2-23 Total 133 133
Zone 1 402 0.15 60 60 60
HP2-25 Total 60 60
Zone 1 272 0.15 41 41 41
HP2-26 Total 41 41
Zone 1 950 0.15 143 143 143
HP2-27 Total 143 143
Zone 1 397 0.15 60 60 60
HP2-28 Total 60 60
Zone 1 253 0.15 38 38 38
HP2-29 Total 38 38
Totals Column I Total Design Ventilation Air
C Minimum ventilation rate per Section §121, Table 121-A.
E Based on fixed seat or the areater of the expected number of occupants and 50% of the CBC occupant load for earess purposes for spaces without fixed seatina.
H Required Ventilation Air (REQ'D V.A.) is the laraer of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column Dor G).
I Must be Qreater than or equal to H, or use Transfer Air (column N) to make up the difference.
J Desian fan suoolv CFM (Fan CFM) x 50%; or the desian zone outdoor airflow rate oer &121.
K Condition area (ft2) x 0.4 CFM / ft2; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than or equal to Column L and greater than or equal to the sum of Columns H olus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
eaual to the difference between the Reauired Ventilation Air (Column H) and the Desian Minimum Air (Column M), Column H minus M.
EneravPro 5.1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page37 of73
MECHANICAL VENTILATION AND REHEAT MECH-3C .
Project Name Date
Havas Edge Tenant Improvement 6/17/2014
MECHANICAL VENTILATION {§121{b)2) REHEAT LIMITATION {§144(d))
AREA BASIS OCCUPANCY BASIS VAVMINIMUM
A B C D E F G H I J K L M N
MinCFM REQ'D Design 50%of Max. of Design
Condition CFM Min CFM Number CFM by V.A. Ventilation Design Zone Columns Minimum
Area per By Area Of per Occupant Max of Air Supply B X0.4 H,J, K, Air Transfer
Zone/System (ft2) ft2 BXC People Person EXF DorG CFM CFM CFM /ft2 300CFM Setooint Air
Zone 1 902 0.15 135 135 193
HP2-30 Total 135 193
Zone 1 370 0.15 56 10.0 15.0 150 150 150
HP2-31 Total 150 150
Zone 1 511 0.15 77 5.1 15.0 77 77 77
HP2-32 Total 77 77
Zone 1 137 0.15 21 1.4 15.0 21 21 21
HP2-33 Total 21 21
Totals Column I Total Design Ventilation Air
C Minimum ventilation rate oer Section §121, Table 121-A.
E Based on fixed seat or the oreater of the expected number of occuoants and 50% of the CBC occupant load for eoress purposes for spaces without fixed seatino.
H Required Ventilation Air (REQ'D V.A.) is the laroer of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column Dor G).
I Must be oreater than or eaual to H, or use Transfer Air (column Nl to make up the difference.
J Desian fan sunnlv CFM (Fan CFM) x 50%; or the desian zone outdoor airflow rate per §121.
K Condition area (ft2) x 0.4 CFM / ft2; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than or equal to Column Land areater than or eaual to the sum of Columns H plus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air (Column H) and the Desion Minimum Air (Column Ml, Column H minus M.
EnemvPro 5. 1 by EnemvSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Paae38of73
' FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/1712014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (GAV)
Fan Systems or Variable Air Volume (VAV) Systems when usina the Prescriotive Aooroach. See Power Consumption of fan §144(c).
A B C D E F
Efficiency Peak Watts
Design Brake Number of BX EX746/
Fan Description HP Motor Drive Fans (CX D)
HP1-1 -Supply Fan 0.650 76.0% 97.0% 1.0 658
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 658 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,400
A) If filter pressure drop (SPa) is greater than i inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row i / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-( SP8-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.470 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11 :51 :29 ID: 14112 Page 39of73
1
' FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Svstems or Variable Air Volume (VAV) Svstems when usina the Prescriptive Aooroach. See Power Consumption of fan §144(c).
A B C D E F
Efficiency Peak Watts
Design Brake Number of BX EX 746 /
Fan Description HP Motor Drive Fans (CX D)
HP1-2 -Supply Fan 0.750 77.0% 97.0% 1.0 749
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFMl 1,600
A) If filter pressure drop (8Pa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SP a
5) SP1
Bl Calculate Fan Adiustment and enter on line 6. 61 Fan Adiustment = 1-{ SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.468 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5. 1 by EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 40of73
' FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when usinQ the Prescriptive Aooroach. See Power Consumption of fan §144(c).
A B C D E F
Efficiencv Peak Watts
Design Brake Number of BX E X746 /
Fan Description HP Motor Drive Fans (CX D)
HP2-1 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFMl 1,000
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX /Row 1 / Row 2l W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-/ SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnerqvPro 5.1 by Ener.avSoft User Number: 8004 RunCode: 2014-06-17T11 :51 :29 ID: 14112 Paqe 41 of73
' FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
A 8 C D E F
Efficiency Peak Watts
Design Brake Number of B XE X746/
Fan Description HP Motor Drive Fans (CXD)
HP2-2 -Supply Fan 0.550 76.0% 97.0% 1.0 557
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM Fl 557 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,200
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2\ W/CFM 245 Pascal then enter SPa on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5l SP1
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment= 1-( SPa-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6) 1 0.464 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5. 1 by EnemvSoft User Number: 8004 RunCode: 2014-06-17T11 :51 :29 ID: 14112 Page 42of73
' FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV} Systems when usina the Prescriptive Aooroach. See Power Consumption of fan §144(c).
A 8 C D E F
Efficiency Peak Watts
Design Brake Number of 8 X EX746/
Fan Description HP Motor Drive Fans (CXD)
HP2-3 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment= 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11 :51 :29 /D:14112 Page 43of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Svstems or Variable Air Volume (VAV) Systems when usinQ the Prescriptive Approach. See Power Consumption of fan §144(cJ.
A 8 C D E F
Efficiencv Peak Watts
Design Brake Number of 8 X EX746/
Fan Description HP Motor Drive Fans (CX D)
HP2-4 -Supply Fan 0.550 76.0% 97.0% 1.0 557
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS. SUM COLUM F) 557 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,200
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
Bl Calculate Fan Adiustment and enter on line 6. 6l Fan Adiustment = 1-/ SPa-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.464 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W /CFM for V AV systems.
EnergyPro 5. 1 by Ener_qySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 44of73
. FAN POWER CONSUMPTION MECH-4C
Project Name l Date Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Aooroach. See Power Consumption of fan §144(c).
A B C D E F
Efficiencv Peak Watts
Design Brake Number of BX EX746/
Fan Description HP Motor Drive Fans (CXD)
HP2-5 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM Fl 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SP.) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SPt
B\ Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment = 1-( SP a -1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 45of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Svstems when usinq the Prescriotive Aooroach. See Power Consumption of fan §144(c .
A 8 C D E F
Efficiencv Peak Watts
Design Brake Number of 8 XE X746/
Fan Description HP Motor Drive Fans (CXD)
HP2-6 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) ff filter pressure drop (SP a) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP0 on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
13) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment= 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5.1 bv EnemvSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 /D:14112 Page 46of73
~ FAN POWER CONSUMPTION MECH-4C
Project Name I Date Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when usina the Prescriptive Approach. See Power Consumption of fan §144(cJ.
A B C D E F
Efficiencv Peak Watts
Design Brake Number of 8 XE X746/
Fan Description HP Motor Drive Fans (CX D)
HP2-7 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SP a) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SPa
5) SP1
8) Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-( SP.-1) / SP1
CJ Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAY systems.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 47of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/1712014
NOTE: Provide one,copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
A 8 C D E F
Efficiency Peak Watts
Design Brake Number of 8 XE X746/
Fan Description HP Motor Drive Fans (CX D)
HP2-8 -Supply Fan 0.250 64.0% 97.0% 1.0 300
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 300
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 800
A) If filter pressure drop (SPa) is greater than i inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX /Row i / Row 2) W/CFM 245 Pascal then enter SP. on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment= 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.376 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or i .25
W/CFM for VAV systems.
EneravPro 5.1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Paae 48of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (GAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumotion of fan §144(c).
A B C D E F
Efficiencv Peak Watts
Design Brake Number of B XE X746/
Fan Description HP Motor Drive Fans (CX D)
HP2-9 -Supply Fan 0.550 76.0% 97.0% 1.0 557
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 557 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,200
A) If filter pressure drop (SP.) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX /Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
Bl Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment= 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.464 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5.1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 /D:14112 Page 49of73
' FAN POWER CONSUMPTION MECH-4C
Project Name I Date Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Svstems when usina the Prescriotive Approach. See Power Consumption of fan §144(c).
A 8 C D E F
Efficiency Peak Watts
Design Brake Number of 8 XE X 746 /
Fan Description HP Motor Drive Fans (CXD)
HP2-10-Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SPa
5) SP1
B) Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergvPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11 :51 :29 ID: 14112 Page 50of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (GAV)
Fan Systems or Variable Air Volume (VAV) Systems when usins;i the Prescriptive Aooroach. See Power Consumption of fan §144(c).
A B C D E F
Efficiencv Peak Watts
Design Brake Number of BX E X746/
Fan Description HP Motor Drive Fans (CXD)
HP2-11 -Supply Fan 0.550 76.0% 97.0% 1.0 557
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 557 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,200
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SPt
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adiustment = 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6) 1 0.464 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5. 1 bv Ener_qvSoft User Number: 8004 RunCode: 2014-06-17711:51:29 /D:14112 Page 51 of73
... FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Svstems when usina the Prescriptive Approach. See Power Consumption of fan §144(c .
A 8 C D E F
Efficiency Peak Watts
Design Brake Number of 8 XE X746/
Fan Description HP Motor Drive Fans (CX D)
HP2-12-Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SPa
5) . SPr
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment= 1-( SP.-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergvPro 5. 1 by EnergvSoft User Number: 8004 RunCode: 2014-06-17711 :51 :29 ID: 14112 Paae 52of73
' FAN POWER CONSUMPTION MECH-4C
Project Name I Date Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when usinQ the Prescriptive Approach. See Power Consumption of fan §144(c).
A B C D E F
Efficiency Peak Watts
Design Brake Number of B XEX746/
Fan Description HP Motor Drive Fans (CXD)
HP2-13-Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP,) on Line 5. 4) SPa
5) SP,
8) Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-/ SPa-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5.1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 53 of73
111111111
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Svstems when usina the Prescriptive Approach. See Power Consumption of fan §144(c1.
A B C D E F
Efficiency Peak Watts
Design Brake Number of BX EX746/
Fan Description HP Motor Drive Fans (CXD)
HP2-14-Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SP.j is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
Bl Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment= 1-( SPa-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM forVAV systems.
EneravPro 5.1 bv Ener.avSoft. User Number: 8004 RunCode: 2014-06-17711:51 :29 ID: 14112 Page 54 of73
•
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Svstems or Variable Air Volume (VAV) Svstems when usino the Prescriptive Approach. See Power Consumption of fan §144(c .
A B C D E F
Efficiency Peak Watts
Design Brake Number of BX E X746/
Fan Description HP Motor Drive Fans (CX D)
HP2-15-Supply Fan 0.750 77.0% 97.0% 1.0 749
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER /WATTS, SUM COLUM F) 749 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,600
A) If filter pressure drop (SP a) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP2 on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-( SP.-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.468 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5.1 bv Ener.avSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 55of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
A B C D E F
Efficiencv Peak Watts
Design Brake Number of BXEX746/
Fan Description HP Motor Drive Fans (CX D)
HP2-16 -Supply Fan 0.750 77.0% 97.0% 1.0 749
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,600
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX {Row i / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = i-( SPa-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.468 W/CFM
i. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or i .25
W/CFM for VAV systems.
EnergvPro 5. 1 bv Ener.avSoft User Number: 8004 RunCode: 2014-06-17T11 :51 :29 ID: 14112 Page 56of73
..,.
FAN POWER C.ONSUMPTION MECH-4C
Project Name I Date Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Aooroach. See Power Consumption of fan §144(c).
A 8 C D E F
Efficiency Peak Watts
Design Brake Number of 8 XE X 746 /
Fan Description HP Motor Drive Fans (CXD)
HP2-17 -Supply Fan 0.350 66.0 % 97.0 % 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SP a) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SPr
Bl Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment= 1-( SPa-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5. 1 bv EneravSott User Number: 8004 RunCode: 2014-06-17711 :51 :29 ID: 14112 Paae 57of73
...
\ FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Svstems or Variable Air Volume (VAV) Svstems when usina the Prescriptive Approach. See Power Consumption of fan §144(c).
A B C D E F
Efficiencv Peak Watts
Design Brake Number of B XEX746/
Fan Description HP Motor Drive Fans (CXD)
HP2-18-Supply Fan 0.250 64.0% 97.0% 1.0 300
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM Fl 300
of the Energy Standards.
800 2) SUPPLY DESIGN AIRFLOW (CFM)
A) If filter pressure drop (SP a) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SPt
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment= 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.376 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnemvPro 5.1 by Eners:;vSoft User Number: 8004 RunCode: 2014-06-17711:51:29 fD: 14112 Paae 58of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/1712014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Svstems or Variable Air Volume (VAVl Svstems when usino the Prescriotive Aooroach. See Power Consumption of fan §144(c).
A B C D E F
Efficiency Peak Watts
Design Brake Number of BX EX746/
Fan Description HP Motor Drive Fans (CXD)
HP2-19-Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SP a) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2\ W/CFM 245 Pascal then enter SPa on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-1 SP.-1) / SP,
CJ Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 59of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when usihQ the Prescriptive Approach. See Power Consumption of fan §144(c).
A B C D E F
Efficiencv Peak Watts
Design Brake Number of BX EX746/
Fan Description HP Motor Drive Fans (CXD)
HP2-20 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SPr) on Line 5. 4) SPa
5) SP,
B) Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnerqyPro 5.1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Paae 60of73
..
,
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system liorsepower greater than 25 hp for Constant Air Volume (GAV)
Fan Systems or Variable Air Volume (VAV) Svstems when usino the Prescriptive Aooroach. See Power Consumption of fan §144(c).
A B C D E F
Efficiencv -Peak Watts
Design Brake Number of BX EX 746 /
Fan Description HP Motor Drive Fans (CX D)
HP2-21-Supply Fan 0.750 77.0% 97.0% 1.0 749
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,600
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-( SPa-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.468 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EneravSoft User Number: 8004 RunCode: 2014-06-17711:51:29 ID: 14112 Page 61 of73
' FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one ~opy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (GAV)
Fan Svstems or Variable Air Volume (VAV) Svstems when usina the Prescriptive Approach. See Power Consumption of fan §144(c).
A B C D E F
Efficiencv Peak Watts
Design Brake Number of BX EX746/
Fan Description HP Motor Drive Fans (CXD)
HP2-22 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SP a) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment= 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5. 1 by EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID:14112 Paae 62of73
••
' FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Svstems when usino the Prescriptive Annroach. See Power Consumption of fan §144(c.
A B C D E F
Efficiency Peak Watts
Design Brake Number of BX EX 746 /
Fan Description HP Motor Drive Fans (CX D)
HP2-23 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c} 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFMl 1,000
A) If filter pressure drop (SP a) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP. on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
B) Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-1 SP.-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5.1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 63of73
\ ..
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Svstems or Variable Air Volume (VAV\ Svstems when usino the Prescriptive Approach. See Power Consumption of fan §144(c).
A B C D E F
Efficiency Peak Watts
Design Brake Number of BXE X746/
Fan Description HP Motor Drive Fans (CX D)
HP2-25 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
B\ Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment= 1-( SPa-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5.1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11 :51 :29 ID: 14112 Paae 64of73
,, '
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (GAV)
Fan Systems or Variable Air Volume (VAV) Systems when usini:i the Prescriptive Aooroach. See Power Consumption of fan §144(c).
A B C D E F
Efficiency Peak Watts
Design Brake Number of BX E X746/
Fan Description HP Motor Drive Fans (CX D)
HP2-26 -Supply Fan 0.350 66.0% 97.0 % 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SP.) is greater than i inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SPa on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5. 1 by EneravSoft User Number: 8004 RunCode: 2014-06-17T11 :51 :29 ID: 14112 Paae 65of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume /VAV) Svstems when usino the Prescriptive Approach. See Power Consumption of fan §144(c).
A B C D E F
Efficiencv Peak Watts
Design Brake Number of BXE X746/
Fan Description HP Motor Drive Fans (CXD)
HP2-27 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SPr
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-( SP.-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5.1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 /D:14112 Page 66of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (GAV)
Fan Systems or Variable Air Volume (VAV) Systems when usina the Prescriptive Approach. See Power Consumption of fan §144(c).
A 8 C D E F
Efficiencv Peak Watts
Design Brake Number of 8 XE X 746 /
Fan Description HP Motor Drive Fans (CX D)
HP2-28 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FIL TEA PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SP a) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
B) Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment= 1-( SPa-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergvPro 5.1 bv Ener_qySoft User Number: 8004 RunCode: 2014-06-17T11 :51 :29 ID: 14112 Page 67of73
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c).
A B C D E F
Efficiency Peak Watts
Design Brake Number of BXEX746/
Fan Description HP Motor Drive Fans (CX D)
HP2-29 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SPa) is greaterthan 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP. on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
B} Calculate Fan Adiustment and enter on line 6. 6) Fan Adiustment = 1-{ SP.-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5. 1 by Ener_qySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID:14112 Page 68of73
\, 1\
... FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Aooroach. See Power Consumption of fan §144(c).
A B C D E F
Efficiency Peak Watts
Design Brake Number of BX E X746/
Fan Description HP Motor Drive Fans (CX D)
HP2-30 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM\ 1,000
A) If filter pressure drop (SP.) is greater than i inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row i / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
Bl Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment= 1-( SPa-1) / SP1
CJ Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W /CFM for V AV systems.
EneravPro 5. 1 bv Ener.avSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Page 69of73
r."
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV} Systems when using the Prescriotive Approach. See Power Consumption of fan §144(c).
A B C D E F
Efficiency Peak Watts
Design Brake Number of BX EX 746 /
Fan Description HP Motor Drive Fans (CX D)
HP2-31 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F} 408
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row i / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
8) Calculate Fan Adiustrnent and enter on line 6. 6) Fan Adjustment= 1-( SP8-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or i .25
W/CFM for VAV systems.
EneravPro 5. 1 bv EneravSoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Paae 70of73
r-
• FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c .
A B C D E F
Efficiency Peak Watts
Design Brake Number of 8 XE X746/
Fan Description HP Motor Drive Fans (CX D)
HP2-32 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM Fl 408
of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SP a) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP,
B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment= H SP.-1) / SP,
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EneravPro 5. 1 bv EneravSoft User Number: 8-004 RunCode: 2014-06-17711:51:29 ID: 14112 Paae 71 of73
..
FAN POWER CONSUMPTION MECH-4C
Project Name I Date
Havas Edge Tenant Improvement 6/17/2014
NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV)
Fan Systems or Variable Air Volume (VAV) Systems when usini:i the Prescriptive Approach. See Power Consumption of fan §144(c).
A B C D E F
Efficiencv Peak Watts
Design Brake Number of BXE X746/
Fan Description HP Motor Drive Fans (CX D)
HP2-33 -Supply Fan 0.350 66.0% 97.0% 1.0 408
TOTALS AND ADJUSTMENTS
FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM Fl 408 of the Energy Standards.
2) SUPPLY DESIGN AIRFLOW (CFM) 1,000
A) If filter pressure drop (SP 8) is greater than 1 inch W. C. or 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM 245 Pascal then enter SP a on line 4. Enter Total Fan
pressure drop across the fan (SP1) on Line 5. 4) SPa
5) SP1
B) Calculate Fan Adiustment and enter on line 6. 6) Fan Adjustment= 1-( SPa-1) / SP1
C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)1 0.408 W/CFM
1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25
W/CFM for VAV systems.
EnergyPro 5.1 by EnergySoft User Number: 8004 RunCode: 2014-06-17T11:51:29 ID: 14112 Pa.ae 72 of73
~ MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name I Date Havas Edge Tenant Improvement 6/17/2014
Eauipment and System Efficiencies
§111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply
with the applicable standard.
§115(a): Fan type central furnaces shall not have a pilot light.
§123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
equipment, shall be insulated in accordance with Standards Section 123.
§124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of
the CMC Standards.
Controls
§122(e): Each space conditioning system shall be installed with one of the following:
1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's proaram and time settina for at least 10 hours if power is interrupted; or
18. An occupancy sensor to control the operating period of the system; or
1C. A 4-hour timer that can be manually operated to control the operating period of the system.
2. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000
§122(g): square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
indeoendently of other isolation areas; and shall be controlled by a time control device as described above.
§122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
authorized personnel.
§122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
heating load can be met by the heat pump alone
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
§122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
§121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
on these plans.
§122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
openings to the outside, except for combustion air openings.
Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a
§121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the
buildina or space shall be certified as meetino the Acceptance Reauirements for Code Compliance
Service Water Heating Systems
§113(c) Installation
3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
2. Circulating service water-heating systems shall have a control capable of automatically turning off the circulating pump
when hot water is not required.
EnergyPro 5. 1 by EnergySoft User Number: 8004 RunCode: 2014-06-17711 :51 :29 ID: 14112 Page 73of73
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
SCREENING SURVEY
Date 3Ut-E 1!1 fk
Business Name ¼Av~ e.Q§t;:
Street Address f \13 '5&lf! /he, J 5:re'. ~661 C'/1.µA.~ho I GA: CfZ.Co'3
Email Address bM~Bs.. Be.bt-\"e (J> t\;A\lt§@f(t. • ~
PLEASE CHE.CK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS) g]
Check all below that are present at your facility:
Acid Cleaning Ink Manufacturing Nutritional Supplement/
Assembly LabGratory Vitamin Manufacturing
Automotive Repair Machining I Milling Painting/ Finishing
Battery Manufacturing Manufacturing Paint Manufacturing
Biofuel Manufacturing Membrane Manufacturing Personal Care Products
Biotech Laboratory (i.e. water filter membranes) Manufacturing
Bulk Chemical Storage Metal Casting/ Forming Pesticide Manufacturing/
CarWash Metal Fabrication Packaging
Chemical Manufacturing Metal Finishing Pharmaceutical Manufacturing
Chemical Purification Electroplating (including precursors)
Dry Cleaning Eleotroless plating Porcelain Enameling
Electrical Component Anodizing Power Generation
Manufacturing Coating (i.e. phosphating) Print Shop
Fertilizer Manufacturing Chemical Etching I Milling Research and Development
Film / X·ray Processing Printed Circuit Board Rubber Manufacturing
Food Processing Manufacturing Semiconductor Manufacturing
Glass Manufacturing Metal Powders Forming Soap /Detergent Manufacturing
Industrial Laundry Waste Treatment/ Storage
SIC Code(s) (if known): _____________________ _
Brief description of business activities (Production f Manufacturing Operations): _____ _
Description of operations generating wastewater (discharged to sewer, hauled or evaporated):
Estimated volume of industrial wastewater to be discharged (gal I day): _______ _
List hazardous wastes generated (type/ volume): ______________ _
Date operation began/or will begin at this location: ______________ _
Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? Yes No If yes, when: ___________________ _
Site Contact _______________ Title. ___________ _
• ~ Phone No[J(fo) ~31" Ce51-I
ORITY, 6200 Avenida Encinas Carlsbad, CA 92011 (760} 438-3941
FAX: (760) 476-9852
Business Name
Project Address
Mailing Address
Project Contact
OFFICE USE ONLY
SAN DIEGO REGIONAL
HAZARDOUS MATERIALS QUESTIONNAIRE
UPFP# ______ _
HV# _______ _
BP DATE. _ __._ ....... .__
Business Contact TeleQhone # A".2 ,.,. 1'° ---,;;;1J. ~ 'S''\
City Statee,A
City State C." Zip Code Plan File# ~2..1>~~
The following questions represent the facility's activities, NGT the specific project description.
T I: Fl E DE ,A T T A _ -ION: occu CY CLAS l . c Tl -N: Indicate by circling the item, whether your business
will use, process, or store arty o e hazardous materials, If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submiltat. Facllit.y's Square Footage Qnclucling propoi;ed project}:_______ Occupancy Rating: _______ _
1, Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 1 o. Cryogenics )4;_ Other Health Hazards
3. Flammable/Combustible liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials ~ None of These.
4. Flammable Solids 8. Unstable Reactives 12. Radloacuves
P RT • ANJJ>le he answer to any of the
, CA 92123. questions ls yes, appll us co Call (858} 505-6700 prior ta the issuance of a building permit.
FEeS ARE REQUIAED. ProJect Completion Date: l -z... ,_!_tJ1_
YES NO
Expected Date of Occupancy: l 2.. / I 1.!1._
{for new construction or remodeling projects)
D CalAAP Exempt
1.
2.
3.
4.
5.
6.
7.
D ~ D g
D g
D
D
D
D
Is your business listed on the reverse side of this form? (check all that apply}.
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantities equal to or greater than 55 gallons, 500 pounds
200 cubic feet, or carcinogens/reproductive toxins rn any quantity?
WIii your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalAAP)?
Will your business use or Install a Hazardous Waste Tank System (Tftle 22, Article 10)?
Will your business store petroleum in tanks or containers at your facility wllh a total storage capacity equal to
or greater than 1,320 gallons? {California's Aboveground Petroleum Storage Act}.
Date Initials
D CalARP Required
Date Initials
0 CalARP Complete
Date Initials
P the answer to any of the questions below is yes. applicant must contact the Air Pollution Control District (APCD), 1012 1 ·1649, telephone (858) 586-2600 prior to the issuance of a building or demolition
permit. Note: if the answer to queslfons 4 or 5 is yes, applicant must also submit an asbestos notification form to the APCD at least 10 working days prior to
commencing demofllion or renovation, except demolilion or renovation of residential structures of four units or less. Contact the APCD for more Information.
YES NO
1. D )&I' Will the subject facmty or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the
APCD factsheet at http://www.sdapcd.org/info/facts/qermlt$.pdf. and the list of typical equipment requiring an APCO permit on lhe reverse side
of this from. Contact APCO if you have any questions}.
2.
3.
4.
5.
D
D
D
D
D (ANSWER ONLY IF QUESTION 118 YES) WIii the subject facility be located within 1,000 feet of the outer boundary of a school (Kthrough 12)?
(Search the California School Directory at b1tg:{/www.cde.ca.goylre/sdf for public and private schools or comact the appropriate school district).
~ Has a survey been performed to determine the presence of Asbestos Containing Materials? '.r8C Will there bo tenovation that involves handling of any friable asbestos materials, or disturbing any material that contains non-friable asbestos? Jig' wm there be demolitton involving the removal of a load supporting structural member?
Briefly describe business activities: ~ .,;~ O$e. Briefly describe proposed project: "2.q 4,c, -S. f: ~ri'f' l W\{>f!,.J;:. ~N.t"
correct.
$
Date
FOR OFFICIAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: _____________________________ _
BY: ________________________ _ DATE: __ _._ __ ...,_ __ _
EXEiMP'!' OR N9 FtlRTH_S[t 11',!FOl'IMATIOl',1 REQUIRED RELEASEO FOR Blll~ING PERMIT sur NOT Fl)R OCP!JP4NCV RfiL~~ED FOR OCCUPANCY
COUNTY·HMD* APC.O COUNTY·HM0 APCO COUNTY-HMO APCD
*A stamp in this box · nl axempts:businesses from completln g or updating a Hazardous Materials :Business Pla·n. 0tner petmitling requirements may still apply.
I-IM-9171 (02/11) County of San Diego -DEH -Hazardous Materials Division
L ~ ~---~ -·-----____ ¥ __ _
CB141396 2386 FARADAY AV 200
Final Inspection required by:
0 Plan O CM&I O Fire o{P
ro{q/;L(-TD f7!M0 lDlf; Fi'tee ~&&iL wj £N6f.l SW OISSUED I ocv.
Approved Dat~ By I
-J) 1 / 1 r..f' ~ fr I L-LLfY'---
7 / ,0(''-f ~ @_, pc.
,J:;,'f/"f ~ K -~ @uAU E-es&-1L fll'e...:rr-f'
1
re v~
7/:rs-J,4 ~ .n:-~re
5t/Y-\14 e~c ~
;1)3-o/ (/,j ~-le, (Mj~ . . ~ fJ# JJJ /JJ cu/41 #l -(}Jj Md Fe
<1lfAl1 m: f» !SC I l
BUILDING 7//g-//c/ JLV
PLANNING -,/~ffi:..f OR..,.
ENGINEERING 7/1.:S/,<.? t-()
FIRE Expedite?'{ v) N qJ,o / u.fJ ~
DIGITAL FILES Reauired7 y N
HazMat
APCD
Health
Forms/Fees Sent Ri;c'd / Due? By
Encina ,f, /19/ le./ y N
Fire ' y N
HazHealthAPCD "/{9//GI y N
PE&M hl/9/jc/ y N
School y N
Sewer y N
Stormwater y N
Special lnspectiQn y N
1(rofl't -f!tvJt,,o £fe--
q (r(/ N D'.:l~
CFD: y ~
LandUse: Density: lmpArea: FY: Annex: Factor:
PFF: y '/N')
Comments Date Date Date Date
Building 7/1{/tf-~/<.{/ le./
Planning 01?--~~
Engineering
Fire ~/~},y '1/;,//J/ ,<-f;
Need?
ODone
ODone
ODone
ODone 1