HomeMy WebLinkAbout2401 LAPIS RD; ; CB131888; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
08-15-2013 Pool Permit Permit No: CB131888
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
2401 LAPIS RD CBAD
POOL
2132320700
Status:
Lot#: 0 Applied:
Valuation: $20,360.00 Construction Type: 5B Entered By:
Reference #:
PC#:
Project Title:
Applicant:
CHAPIN: 500 SF POOL/SPAW/ 2
FIREPITS
SUNDANCER POOLS
728 INSPIRATION LN
ESCONDIDO CA 92025
760-489-5850
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Electrical Fee
Plumbing Fee
Strong Motion Fee
Green Bldg Standards (SB1473) Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Additional Fees
TOTAL PERMIT FEES
Plan Approved:
Owner:
CHAPIN THOMAS W
2401 LAPIS RD
CARLSBAD CA 92009
Issued:
Inspect Area:
ISSUED
08/07/2013
JMA
08/15/2013
08/15/2013
$234.67
$0.00
$164.27
$0.00
$31.00
$31.00
$2.04
$1.00
$0.00
$0.00
$0.00
$0.00
$463.98
Total Fees: $463.98 Total Payments To Date: $463.98 Balance Due:
Date: Clearance:
$0.00
NOTICE: Please take E th at approval of your project includes the "Im position' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as 'fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right lo protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
hi r h h I
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
08-15-2013
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW130273
Job Address: 2401 LAPIS RD CBAD
Permit Type: SWPPP
Parcel No: 2132320700
Reference#:
CB#: CB131888
Project Title: CHAPIN RES:
500 SF POOUSPA
Applicant:
SUNDANCER POOLS/SUE MONGOVEN
728 INSPIRATION LN
ESCONDIDO CA 92025
760-489-5850
Emergency Contact:
DAVE WILLIAMS
760-489-5850
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Lot#: 38
Owner:
CHAPIN THOMAS W
2401 LAPIS RD
CARLSBAD CA 92009
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Tier:
ISSUED
08/07/2013
JMA
08/15/2013
Priority:
$47.00
$56.00
$0.00
$103.00
L
Total Fees: $103.00 Total Payments To Date: $103.00 Balance Due: $0.00
FINAL~ APPROVAL
DArE~~/!!'!._cLEARANc _ ----
SIGNATURE ____ --/-;,
'THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0 PLANNING 0 ENGINEERING □BUILDING OARE □HEALTH 0HAZMAT/APCD
«~ ~ CITY OF
CARLSBAD
JOB ADDRESS
CT/PROJECT#
Building Permit Application
1635 Faraday Ave., Garlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: bulldlng@carlsbadca.gov
www carlsbadca.g:ov
SUITE#/SPACE#/UNIT#
# BEDROOMS # BATHROOMS
Plan Check No. •
Est. Value
Date
·00
OCC. GROUP
EXISTING USE GARAGE (SF} PATIOS (SF) DECKS (SF) FIREPLACE AIR CONDITIONING FIRE SPRINKLERS ~~ YES □#_ NO □ YES □ NOD YES □ NO □
APPLICANT NAME (Secondary Contact)
ADORES
CITY CITY STATE ZIP
PHONE PHONE FAX
EMAIL EMAIL
ITY
PHONE
EMAIL ---
(Sec~ 7031.5 Business and Professions Code: My City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the
applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's license LawJChapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or {hat he ts exemP.t therefrom, and the basis for the alleged exemption. Any violation of Section 031.5 by any applicant for a permit subjects the applicant to a
civil penalty of not more than five hundred dollars ($500)).
WORKERS' COMPENSATION
Workers' Compensation Declaration: / hereby affilTn under penalty of perjury one of the following declarations:
□ I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the perfonnance of the work for which this pennit is issued.
~ _ I have and wlll maintain workers' cof p~uired by Section 3700 of the Labor Code, for the performance of the work for which this pe~it is issued. My workers' compensation insurance carrier and policy
/ ~nornberare lnsuram:eeo)C \..U l~~.,f4".II• iu,rl<1¢PoUcyN1;)". /w,')(0147;?1' &~rationDa),'C'.".ln/ Z/'/ //?
This section need not be completed if the permit is for one hundred dollars ($100) or less. D Certificate of Exemption: I certify that in the performance of the work for which this pennit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), In
addition to the cost of compensation, dama es as provi for In S on 3706 of the Labor code, Interest and attorney's fees.
,,1$ CONTRACTOR SIGNATURE
I hereby affirm that I am exempt from Contractor's Ucense Law for the following reason:
□ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement IS sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale),
□ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
□ I am exempt under Section _____ ,Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. □ Yes □ No
2. I (have/ have not) signed an application for a building pennit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone I contractors' license number):
4, I plan to provide portions of the work, but I have hired the following person to coordinate, supeNise and provide the major work (include name/ address I phone/ contractors' license number):
5. ! will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated {include name/ address I phone I type of work)·
,,5 PROPERTY OWNER SIGNATURE □AGENT DATE
COMPLETE THIS SECTION FOR NON-lfESIIH!NTIAL IIUILOING Pl!RMITS ONLY
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registratlon form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? □ Yes □ No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? □ Yes □ No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? □ Yes □ No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the work this permit 1s issued (Sec 3097 (1) Civil Code)
Lender's Name Lender's Address
APPLICANT CERTIFICATION
I certtry that I have read the application and state that the alxwe lnfonnatlon Is coneel:and that the lnfonnallon on the plans is accurate. I agree to comply\Wlh all City on:llnances and S1ate laws relatlng ID building oonsb'Uction.
I hereby authorize representative of the City of Carlsbad to enter UPJfl the alxwe menooned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE DF THE GRANTING Of THIS PERMIT.
OSHA: All OSHA permit is required tr excavations over 5'0' deep and demolltion or oonstructk:m of structures over 3 stores in height.
EXPIR.A. TION: Every permit ISSued by the Buikling Official under the provisions of this Code shall expire by limitaOOn and become null and vok:I if the buik:iing or Y,Qrk. authorized by such permit is not commenced 'Mlhin
180 days from the date of sudl pennlt or if ~~irl~ or rk authorized by sudl ~rmlt is suspended or abandoned at any time after the v.ork is comrr-enced br a pe · of 180 days (Sectkln 100.4.4 Unitmn BuildJlg Code).
,es' APPLICANT'S SIGNATURE {1/L(/ DATE f?[)
Inspection List
Permit#: CB131888 Type: POOL
Date lnspe_ctio_11 Item
12/10/2013 59 Final Pool
12/10/2013 59 Final Pool
11/27/2013 55 Fence/Pre-Plaster
11/27/2013 59 Final Pool
11/07/2013 51 Excav/Steel/Bonding/Fence
09/18/2013 23 Gas/Test/Repairs
09/11/2013 11 Fig/Foundation/Piers
09/11/2013 23 Gas/Test/Repairs
09/10/2013 51 Excav/Steel/Bonding/Fence
Wednesday, December 11, 2013
Inspector Act
RI
PY AP
PY AP
PY NR
PY AP
PY AP
PY AP
PY AP
PY NR
CHAPIN: 500 SF POOUSPA W/ 2
FIREPITS
Comments
eco bond
No plans or card
Page 1 of 1
~ «~I)\
~ CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRAN SM ITT AL
DATE: 8/14/201 .l PROJECT NAME: Chapin Residence
PLAN CHECK NO: CB 13-1888 SET#:I ADDRESS: 2401 LAPIS RD
VALUATION:$20,340 SCOPE OF WORK: gunite pool/spa 500 sf
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www .carlsbadca.gov
PROJECT ID:CT 02-23
APN: 215-535-01-00
!✓ This plan check review is complete and has been APPROVED by:
CJ
LAND DEVELOPMENT ENGINEERING DIVISION
Final Inspection by the Construction Management Division is required Yes X No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to:
For questions or clarifications on the attached checklist please contact the reviewer as marked.
'>'<-. '' '. PLANNING·.
760-602-461((,
r!.~ Sexton
/bO r-;o~'. 4G24
Remarks:
Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.gov
Linda Ontiveros
760-602-2773
Linda.Ontiveros@carlsbadca.gov
••·i:,.''11eir!YiR.'···1dN}i{il
/. ·: 1tli~0~Mrlfi~'~ft
Greg Ryan
760-602-4663
Cindy Wong
760 602-4662
Cv:; t 11 l i:l. Wong Ji_1( :<1 ri s ba dcc1 .gov
Dominic Fieri
760-6024664
Dominic.Fieri@cmlsbadca.gov
«,
~ CITY OF
CARLSBAD
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
P-29
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadc;umv
DATE: 8/14/13 PROJECT NAME: POOL/SPA/FIREPIT (FIREPIT SENT TO FIRE PREVENTION
FOR REVIEW) PROJECT ID:
PLAN CHECK NO: CB131888 SET#: ADDRESS: 2401 LAPIS RD APN:
l:8J This plan check review is complete and has been APPROVED by the PLANNING
Division.
By: GINA RUIZ
A Final Inspection by the PLANNING Division is required □ Yes ~ No
You may a/so have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: SUM0223@COX.NET
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING ENGINEERING FIRE PREVENTION
760-602-4610 760-602-2750 760-602-4665
□ Chris Sexton □ Kathleen Lawrence □ Greg Ryan
760-602-4624 760-602-27 41 760-602-4663
Chris.Sexton<!l1carlsbad~i!-gov Kathleen.L9wren~~@carlsbad~a.gov Gregory.Ryan~~grlsbadca.gQv
□ Gina Ruiz □ Linda Ontiveros □ Cindy Wong
760-602-4675 760-602-2773 760-602-4662
Ging.Ruii~kgrl~bgQ~g.gQV Lla!;!a.Qn!iv~rQ§<!l1~arls!md~a.gQv Cyatbla.WQ□gl!l/~arl§bi!d~i! gQV
□ □ □ Dominic Fieri
760-602-4664
DQminik,Ei~rl@kgrlibiU!kg.gQ~
Remarks:
CB 13-1888 Chapin Residence
Please Read
Instructions
Outstanding issues will be marked with X
Items that conform to permit requirements are marked
with ✓ -or-have intentionally been left blank.
E-37
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale. Show:
✓ North arrow
✓ Existing & proposed structures
✓ Property line dimensions
✓ Easements
Show on site plan:
✓ Drainage patterns
✓ Existing & proposed slopes
✓ Existing topography
✓ Retaining Walls (location and height)
Indicate what will happen with soil excavated from pool area.
Include on title sheet:
✓ Site address
✓ Assessor's parcel number
✓ Legal description/lot number
Grading: Quantities of
Cut Fill Import Export
Project does not comply with the following engineering conditions of approval
for project no:
Conditions were complies with by:
Lot/ Map No.: 38 / MAP 14803
SubdivisionfTract: er 02-23
Reference No(s): DWG 406-6B / sheet 11
Page2of4
Date:
REV 6/2012
CB 13-1888
E-37
Chapin Residence
2. GRADING PERMIT REQUIREMENTS
The conditions that require a grading permit are found in Section 11.06.030 of the Municipal
Code.
Inadequate information available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
Minor Grading Permit required. NOTE: The grading permit must be issued and grading
approval obtained prior to issuance of a building permit. A separate grading plan prepared a
registered civil engineer must be submitted together with the completed application form attached.
✓ No grading permit required.
3. MISCELLANEOUS PERMITS
✓ RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work
adjacent to the public right-of-way.
✓ A separate right-of-way issued by the engineering division is required for the following:
RW 13-186
Please complete attached right-of-way application form and return to the engineering
department together with the requirements on the attached right-of-way checklist, at
the time of resubmittal.
Right-of-way permit and pool permit will be issued simultaneously.
Page 3 of 4 REV 6/2012
CB 13-1&88
Attachments:
E-37
Chapin Residence
4. STORM WATER
Construction Compliance
✓ Project Threat Assessment Form complete.
Enclosed Project Threat Assessment Form incomplete.
✓ Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form
and return (SW 13-273 )
Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development (SUSMPl Compliance
Storm Water Standards Questionnaire complete.
Storm Water Standards Questionnaire incomplete. Please make the corrections, re-sign
the questionnaire and resubmit with next submittal.
Project is subject to Standard Storm Water Requirements. See city Standard Urban
Storm Water Management Plan (SUSMP) for reference.
http://www.carlsbadca.gov/business/building/Documents/EnqStandsw-stds-vol4-ch2.pdf
Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
Engineering Application
Rainwater harvesting (rain barrels or cistern)
Vegetated Roof
Bio-retentions cell/rain garden
Pervious pavemenVpavers
Flow-through planter/vegetated or rock drip line
Vegetated swales or rock infiltration swales
Downspouts disconnect and discharge over landscape
Other:
Storm Water Form Right-of-Way Application/Info
Page 4 of 4
Reference Documents
REV 6/01/12
«~~ ~ CITY OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
B-24
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Sprinkler
Water Discharge
Project Storm Water Threat Assessment Criteria*
No Threat Assessment Criteria
□ My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because
it meets the ~no threat" assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or low Threat criteria described below.
Tier 1 -,iow Threat Assessment Criteria
0 My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt pem,it type (See list above) and the project
meets one or more of the following criteria:
• Results in some soil disturbance; and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling).
Tier 2 -Moderate Threat Assessment Criteria
□ My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria:
• Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30).
Tier 3 -Significant Threat Assessment Criteria
□ My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
□ My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or,
□ My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-stonn water discharge(s).
I certify to the best of my knowledge that tho above
checked statements are tllle and correct I understand
and acknowledge that even though this project does
not require preparaUon of• constlllcUon SWPP, I must
sot/ adhere to, and at all times during constlllcUon
acUv/Ues for tho permit typo(s) check above comply
with the storm water best management practices
pursuant to T/Ue 15 of the Carlsbad Mun/cf pa/ Code
and to City Standards.
Assessor Parcel No.
*The City Engineer may authorize minor variances from the Storm
Water Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Construction SWPPP Tier Level is
warranted.
8-24 Page 1 o Rev.03/09
«~~ ¥ CITY OF
CONSTRUCTION THREAT
ASSESSMENT WORKSHEET FOR
DETERMINATION OF PROJECT'S
PERCEIVED THREAT TO
STORM WATER QUALITY
E-33
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov CARLSBAD
Construction Perceived
SWPPPTler Construction Threat Assessment Criteria* Threat to
Storm Water Level Qualltv
Tier3 High Construction Threat Assessm~nt Criteria □ Project site is 50 acres or more and grading will occur during the rainy season
□ Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda
Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or
discharges directly to an ESA High □ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
Tier3 USDA-NRCS Erosion factors kt greater than or equal to 0.4)
□ Site slope is 5 to 1 or steeper □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
□ through April 30).
Owner/contractor received a Storm Water Notice of Violation within past two years
Tier 3 -Medium Construction Threaj Assessment Crijeria Medium □ All projects not meeting Tier 3 High Construction Threat Assessment Criteria
Tier 2 High CQnstruction Threat As§essment Criteria
□ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA
□ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors k1 greater than or equal to 0.4) High
□ Site slope is 5 to 1 or steeper Tier2 □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
□ Owner/contractor received a Storm Water Notice of Violation within past two years
□ Site results in one half acre or more of soil disturbance
Tier2 Medium Construction Threat Assessment Criteria Medium □ All projects not meeting Tier 2 High Construction Threat Assessment Criteria
Tier 1 -Medium lnsgection Threat Assessment Criteria
□ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or
directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA
□ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kt greater than or equal to 0.4) Medium □ Site slope is 5 to 1 or steeper Tier 1 □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
□ Owner/contractor received a Storm Water Notice of Violation within past two years
□, Site results in one half acre or more of soil disturbance
Ti.Ir 1 -Low lnsnection Threat Assessment Crijeria Low [ZI All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria
Exempt -Not Applicable -Exempt
*The city engrneer may authonze minor variances from the construction threat assessment cntena m special circumstances
where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of
the city engineer
E-33 Page 1 of 1 REV 4/30/10
«~ ~ CITY OF
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov CARLSBAD This form is required for all pools, retaining walls or whenever a building footprint is enlarged.
STORM WATER COMPLIANCE CERTIFICATE
✓ My project is not in a category of permit types exempt from the Construction
SWPPP requirements
✓ My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
✓ My project does not require a grading plan pursuant to the Car1sbad
Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code)
✓ My project \MIi not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
• located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
• disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
• disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
• construction v.iill be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND. (2) ADHERE TO, AND AT ALL TIMES. COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
5t4£l'vio~
OWNER(S)/OWNER'§ AGENT NAME (PRINT)
7JU./A,1,,.,.1,,,_/J
OWNER(S)/OWNER"S AGEi NAME (SIGNATURE) ~I??
E-29
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 314 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
Page 1 of 3
PROJECT INFORMATION
Site Address: '2,,-l/ 0 [ lA{ls (Z/)
Estimated Construction Start Date v, _. 1 -VZ..."'
Project Duration 8 Months
Emergency Contact:
Name T)/:nle,: v,1; ft~
24 hour Phone: ?b()-1./ft/-r;FtO
Perceived Threat to Storm Water Quality
D Medium
~w
If medium box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
REV 4/30/10
Best Management Practice
(BMP) Description ➔
CASQA Designation ➔
Construction Activity
Grading/Soil Disturbance
Trenching/Excavation
Stockpiling
Drilling/BorinQ
Concrete/Asphalt Saw
cutting
Concrete flatwork
Paving
Conduit/Pipe Installation
Stucco/Mortar Work
Waste Disposal
Staging/Lay Down Area
Equipment Maintenance
and FuelinQ
Hazardous Substance
Use/Storage
Dewaterina
Site Access Across Dirt
Other (list):
j ..
~
J
~
&:
Erosion Control
BMPs
"' C> -g ~ .5 n, I IJ) -fj :g(/) .5 ~ a & i5
"'C .c:2! Q) 0 ~--a. 0 n,l!! .2 3:; WO (I)
"i'
&:
"i' (.) w 0 w
g
~
"' cii
LU en
C. ~
1 l
:z en
Sediment Control BMPs
E m CJ n " .c (.)
"'t w en
"' ~
~ u:
"1 w en
X
-g
m E "' ~ Cl> .5 ·E m ~ n, CIQ>Cl[D ~ :t.5 C) en E m <D -::J .0 > ~ ,l -g e ..,n, n,
(!) (/) > (/)
"I w en ~ en :i: en
;;
E
C "f! C □·Q Ei .9 e en a_
0 ~ LU en
LL
X
Tracking
Control
BMPs
C C 0 0
I I "'"' "' C <h C 0 I!? 0
(.) "' (.) -cw ~"' .,, >, -~ t = IJ) :c e Jll"' en£
~
_._
-'<
=.::, .c m Jll 0 en«
~ I-
C
1 §
(.)
I
~ ch z
Non-Storm Water
Management BMPs
"' C 'g ·c
Cl -g
m
"' C ·;;
m Q_
;;; z
C ~ "' .E
J
:1! ~ Q_
;;\ z
E " §.
·5 o-w .,,
C m
-1l ·
:2 ~
"i' en z
-g
m
~ 1 ~
~~ $1 ~ ~
::1 s:
-1....,_
.A
Waste Management and Materials
Pollution Control BMPs
" "' :::,
m ·c ~ ::;;
~ ~
i g
C ~
~ t bl
i
-<-il..i ,,xt 'II,
-g
m
I !l? I!' -
Q_ '
·a. . en t
i
:I<'
-m ~
:E 0 en.
"1 ::;; s:
-m ~
"' il 1! ~ :,:
"I ::;; s:
j
i C 8:
"i' ::;; s:
Yl~,x -I "'I.~ "
Instructions: Begin by revieYling the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top of the fonn. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was
checked off and for each of the selected BMPs selected from the list. For Example -If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review
the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction
Ingress/Egress" column and place an X in the box 'Nhere the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the list of BMPs, then Ylfite in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box 'Nhere the "Stockpiling" row intersects the new "Cover Ylith
Plastic" column.
To learn more about 'Nhat each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the s~ection of appropriate Best Management Practice
measures. The reference also explains the California Stonnwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 of 3 REV 4/30/10