Loading...
HomeMy WebLinkAbout2406 ALTISMA WAY; BLDG 3; 73-1567; PermitI I ISSUMCE OF WH PEMT II REWDEL ALTERATION, NO CHANGE INOREASE IN SERVICE, FOR EA. MPERE OF , TW. SERVICE UP TO AND WWD IN0 m UP. I. ! I. THIS PERMIT 8ECWES NULL ANDVOID IF WORK OR CDNSTRUC CONSTRUCTtDN OR WORK IS SUSPENOED OR ABANDONED FOR A PERIOD OF 120 DAYS AT -ANY TIME AFTER WORK IS co" nm AUTHORIZED IS NOT COMMENCED WITHIN BO DAYS, OR IF I HEREBY CERTIFV THAT I HAVE REAO AND EXAMINED THIS ALL PROVISIONS OF LAWS AN0 OROINANCES QOVERNING THIS APPLICATION AN0 KNOW THE SAME TO E€ TRUE AND CORRECT. TYPE OF WORK WILL BE COMPLIEO WITH WHETHER SPECIFIED HEREIN OR NOT 'THE QRANTINQ OF A PERMIT WE5 NOT PR UME TO QlVk AUTHORITY TO VIOLATE OR CANCEL THE PR%SIONS OF ANY OTHER STATE OR LOCAL LAW RE ULATINQ CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. ., PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.0. CASH 0 0 I v- LEUCADIA COUNTY WATER DISTRICT APPLICATION FOR SEWER SERVICE Owner's Name: American General Finance Corporation Receipt No. 2519' Mailing Address: 111 Elm Street San Diegob California Phone No. Job Address: Altisma Way SERVICE REQUESTED: Lot No. 245, La Costa Valley Unit No. 5 Bldg..# 3 - for -- (type of building) If a multiple unit building, indicate no. of living units 7 COST $ 2,100,o SERVICE LATERA& If service lateral previously installed - No Fee If service lateral required: 400. C Check size lateral required: Amount Rec'd $- (4 'I) - (6 ") - Other Saddle connection required: Yes- No- Date Paid 10-25-73 Rec'd by: c. Bartkiwicz TOTAL CHARGES $2.5Do,c (Ck.#1588 pays for Bldg. 3 & 4 Lot 245) The application must be signed by the owner (or his authorized representative) of the property to be served. The total charges must be paid to the District at the time the application is submitted: If a service lateral is required, it will be installed by the Leucadia County Water District. The service lateral is that part of the sewer system that extends from the main collection line in the street (or easement) to the point in the street (at or near the applicant's property line) where the service lateral is connected to the applicant's building sewer. The applicant is responsible for the construction, at the applicant's expense, of the sewer pipeline (building sewer) from the applicant's plumbing to the point in the street (or easement) where a connection is made to the service lateral. The connection of the applicant's building sewer to the service lateral shall be made by the applicant at his expense. The connection must be made in conformity with the District's specifications, rules and regulations; adlLmust be insDe-oved before the sewer system may be used by the applicant. The applicant. or his authorized rep- resentative, must notify the District at the time inspection is desired. Any connection made to the service lateral or collection line without prior approval and inspection by the District will be considered invalid and will not be acknowledged. After connection is complete, the property described above is subject to a monthly sewer senr- ice charge. The rate will be governed by the use of the property - residential, commercial, or multiple dwelling. Non-payment of the sewer service charge is subject to a 5% penalty per month, plus disconnection if necessary. The undersigned hereby agrees that the above information given is correct and agrees to the conditions as stated: Owner's