Loading...
HomeMy WebLinkAbout241 Date Ave; ; CBR2017-2816; Recycle{city of Carlsbad RESIDENTIAL GREEN BUILDING CODE STANDARDS MANDATORY MEASURES CERTIFICATION CHECKLIST Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov B-51 This form, signed and completed, and all receipts for the recycled materials shall be submitted to the Building Inspector prior to Final Inspection. Site Development Mandatorv 4.106.2 A plan is developed and implemented to manage storm water drainage during construction. (X) pf., 4.106.3 The site shall be planned and developed to keep surface water away from buildings. (Xlr11 Construction plans shall indicate how site grading or a drainage system will manage all surface water flows. Energy Efficiency 4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by (X) P6 the California Energy Standards. Water Efficiency and Conservation Indoor Water Use 4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following methods: (X) PP., 1. Water saving fixtures or flow restrictors shall be used. 7/01/2011 2. A 20 percent reduction in baseline water use shall be demonstrated. 4.303.2 When using the calculation method specified in Section 4.303.1, multiple showerheads shall not (X) NA_ exceed maximum flow rates. 7/01/2011 4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and shower heads) shall (X) p~ comply with specified performance requirements. 7/01/2011 Outdoor Water Use 4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather-(X) P6 based. Enhanced Durability and Reduced Maintenance 4.406.1 Joints and openings. Annular spaces around pipes, electric cables, conduits or other openings (X) Pl!, in plates at exterior walls shall be protected against the passage of rodents by closing such openings with cement mortar, concrete masonry or similar method acceptable to the enforcing agency. Construction Waste Management Plan 4.408.1 A minimum of 50 percent of the construction waste generated at the site is diverted to recycle or (X) />6 salvage. Recycled material receipts from approved recyclers must be attached to this form. 4.408.2 Where a local jurisdiction does not have a construction and demolition waste management (X)NA ordinance, construction waste management plan, per form B-59, shall be submitted for approval to the enforcina aaencv. Building Maintenance and Operation 4.410.1 An operation and maintenance manual shall be provided to the buildin!l occupant or owner. (X) N,.. Environmental Quality Fireplaces 4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable. (X)PD Woodstoves, pellet stoves and fireplaces shall also comply with aoolicable local ordinances. B-51 Page 1 of 2 Rev. 11/15 Pollutant Control 4.504.1 Duct openings and other related air distribution component openings shall be covered (X) P6 during construction. 4.504.2.1 Adhesive, sealants and caulks shall be compliant with VOC and other toxic compound (X)PO limits. (X)f'~ 4.504.2.2 Paints, stains and other coatings shall be compliant with VOC limits. (X)ft} 4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for (x)t+ ROC and other toxic compounds. 4.504.2.4 Documentation shall be provided to verify that compliant VOC limit finish materials have been used. (X) PD 4.504.3 Carpet and carpet systems shall be compliant with voe limits. 4.504.4 50 percent of floor area receiving resilient flooring shall comply with VOC-emission limits (X) pi, defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or be certified under the Resilient Floor Covering Institute (RFCI) FloorScore program. (X)pe, 4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior finish svstems shall comolv with low formaldehvde emission standards. Interior Moisture Control 4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. (X)N" 4.505.3 Moisture content of building materials used in wall and floor framing is checked before (X)P"I! enclosure. Indoor Air Quality and Exhaust • 4.506.1 Exhaust fans which terminate outside the buildina are orovided in everv bathroom. IXlf'~ Environmental Comfort 4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (x)µ,-._ fan is off. Covers or louvers shall have a minimum insulation value of R-4.2. 4.507.2 Duct systems are sized, designed, and equipment is selected using the following (x)I-IAr methods: 1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent. 2. Size duct systems according to ACCA 29-D (Manual D) or equivalent 3. Select heatina and coolina eauipment accordina to ACCA 36-S (Manual S) or eauivalent. Installer and Spe~iai Inspector Qualifica.tions . 702.1 HVAC system installers are trained and certified in the proper installation of HVAC (X) P6 systems. 702.2 Special inspectors employed by the owner must be qualified and able to demonstrate <x>r fl competence in the discipline thev are inspectina. I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2013 California Green Building Standards. All receipts for recycled materials have been attached to this form. Project Address: ·24 I D(tW /tVGZ Pwb.£'.i\:7-2BJj, Print Name: 1) AAL 13~c.};J1A /r.,.J Signed: License Number: Date: 1/'J/J(J_ B-51 Page 2 of 2 Rev. 11/15 ""' ,-,,,,,,=-'="'~' ~-c.•=•~'"=""=c,e-•==--'''-''""'-''='''""'"''''''''''~'"'"""'~=•--=-=,~""-'"'"'='''"~~,, •=•,,-,,,,,mcs=•cm,~=•"'"••••~=·•'--'~'•••'"·'' . "'-'''''-•'•'•'"'''''""'" ''""' v< •-J<k I T ESCONDIDO RESOURCE ECOVERY AND WASTE TJl:A,t(SF"t!R SERVICE "We'll Take Care of It" Construction & Demolition Diversion Certificate Received at :Escondido Resource Recovery Date: c:£-02-l 8 9053 Processed At : SRR Lemon Grove, CAD COi San Marcos, CA ctz( Customer:-:S-\'~ 1::)e,., .. \~~:o,.,. Ticket# £}.. 3S'Q\ Project: Number/Description 2 '-\ '-3:).,._\e.. .A"«:'-G.c I s:~d Total Tons Received: b· 1\ Tons Diversion Percentage: _3j_ % Scale house Operators Signature: l\:\ W\ Q. ~, This certifies that the company listed abOve has utilized a EDCO facility to divert construction demolition materials in accordance with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. " C .·,, · . c...,.,._,"'-"'"'· i.i: -~ --<,.',o,C·-~--.•er..,,.,,.--,,,, ... o/ ... , ....... ~ -· --· -~ a-;, +· ··c.\S.-c, •. ,··,< .. ,_·? ~ •. 0 ""'?,...;.:.~...,.,.,,.,., -..,.~1/,z',.4.,·;;,.,;,"""'' -".. .. , ••. ...,, ... ~..,.___,....,..,,_~~S..:.-"""~" .. ,i :=~-:r .. _,~:,c ... d• · •. · 'k~ H·n,:,,.,s >,"1. ·•··· • . ., ~--·,,_· .. ,. · + "·. -., ·+~-~·•.«-": .. c_,-7 YL~ .:,,·,_,. ,., .. ·.-,.:· .... · --· .-"•Y•<L,~ 9020-608 (. , ESColilDIDO R:I~:~~ AND WASTE t•jt(SFER SERVICE 9028 "We'll Takef are of If' Construction & Demolition Diversion Certificate Received at :Escondido Resource Recovery Date: '-1130/1~ Processed At: SRR Lemon Grove, CAO CDI San Marcos, CA 0 Customer:--:S~~ ~0\:\:0..,, Ticket# -Z./ G q '7 Project: Number/Description ?-'-ft .:C .... \e. Ave,... Total Tons Received: S.%Tons ·Diversion Percentage: GclskJ rt % Scale house Operators Signature:~-·--···:::-, This certifies that the company listed above has utilized a EDC() facility to divert construction demolition materials in accordance with LEED requirements. The diversion tonnage is based 011 an overall tonnage percentage of the respecitlve EDCO facility. "'•'"'"·~·~,,-,.,,,,c-,,,,,,,,==.,.«•~•••-==••=•~"~·•<=c,,,,.,.,,,~,==-•'•••'•••••••K••••••--•~•••m•.~~,=•=••••••••ss,c•a,, ,,,., •••••••~·• ~'«C.~¢"'""--'k"-"'-"<-'"'"'''-"'""="'-'"'''·""'-""-"~"-"---"'"--"=-"""'''"-""'•~''~·-,sr.•~-"'7-"''·'-"-•'""-'C'='-""°"~""'" _,~..,.,_-,,,,:"'-"GO.'-=s·oa --'"-""=• ; , ~8 I I -· SSCONDIOO ··R·• ESOLtRCE ECOVERY 9058 AND WA-STE TAANSFE1t _SE8VIC£ "We'll Take Care of It'' Construction & Demolition Diverljon Certificate .. · ·:;'f-,. Received at :Escondido Resource Recovery • Daj: ~-z:r-tg; ' PrQcessed At: S.RR Lemon Grove, CAO cgtSanMarcos, CA l ' vtS .... · . '· .. Customer:~~"'-~""0 "~"'" Ticket# fJ I/ &-2 J ' .·•·· Project: NumbefDescription ~ 'fr J:>.,_\e.. Ave.... ~clsk c:\ Total Tons Recei+d: C/, {Jrons Diversion Percentage: B_ % Scale house Op~tors Signature:;'/'f/f/tk;~ This certifies that the company lllled above has utilized a EDCO facility to divert con$®ction demolition materials in accordance with LEED requirements. The dfyersion tonnage is based on an overall tonnage perqpntage of the respective EDCO facility. """ 't,· / ::,~·~a:::.•-'Oc,-~,._~.;;,-S-f:...{:.~<s. -~~"'"'"''""'"'""~=""~"''""'""~"'~"•"..:h'""',s. =··•~~, Cx~>-Z'-""',~-"-'<"1CC4""","'''~""'-""'-"'•-"~·"·==""'-" "'"'_;,,·""'"""''~,-u,2.,,,,."->"-'-"-'""----•-"'···==•'e"C ~""~""""' =,,,,_,.,,.,.,_,,,..,._..,,.""·''"'"'"""'·"'"""'''"'""•"~'.Z.~~~-=-=;~--" --~-'1''°""""'·.C. ""-» ~ ,wa,-,,,,g,:.r,"""', .-.~cr:,,a,•, •;.c.'..C:_C,C•·"-'•"'.a'.."~-'-"'-='---',. I i ~20-608 ESCOf!IJ)IDO RESC)IJRCE ECOVERY AND WASTE TRAfrlSFER SERVICE "We'll Take Care of It" I I 9033 Construction & Demolition Diversion Certificate Received at :Escondido. Resource Recovery Date: SIIOJI~ Processed At: SRR Lemon Grove, CAD COi San Marcos, CA o:::z( Customer: -:S-~ ~ ~e. .n ... t· L·,. "'I Ticket # Z 6 6 q z.. I Project: Number/Description Z'-11 's> ..... ~e. Ave.. Total Tons Received: L/, 75 Tons Diversion Percentage: Scale house Operators Signature: §{, .-::::-:-:---,. C,rlsb,;J lJ_ % This certifies that the company listed above has utilized a EDCO facifity to divert construction demolition materials in accordance with LEED requirements. The diversion tonnage is based on an overall tonnage percentage of the respeclive EDCO facility. 902o-ro& ~', ESCONDIDO RESC,URCE ECOVERY ANO WASTE TltA·~-fElt SERVICE "We'll Take Care of It'' I I Construction & Demolition Diversion Certificate Received at :Escondido Resource Recovery• Processed At : SRR Lemon Grove, CAD Date: 5/1¥-JIJ • CDI San Marcos, CA Customer:.\ \X°'-~\:l: .. .., Ticket # Z. 'S t; 'Z-ct Project: Number/Description Z 'f I ~ ..;\ e.._ owe Cc..c;~l~ .J Total Tons Received: l8£.... Tons Diversion Percentage: _:lf._ % 9054 [if. $ Scale house Operators Signature: <; :::::---,,. This certifies that the company listed above has utilized a EDCO .:;::p nstruc!lon ~itlon materials in accordance with LEED requirements, The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.