Loading...
HomeMy WebLinkAbout2410 ALTISMA WAY; BLDG 1; 73-3555; PermitCity of CARLSBAD, CALIFORNIA 92008 I1 VJlwtioIl of rrwl: L . ~ . . ~. l&tON RECORD DATE 1-00 REWARIO FOUNDATIONS SET BACK TREW REINFORCING FOUNDATION WALL & WEATHER PROOFtmi CONCRETE SIAB FRAMING IMT. LATHING OR DRYWALL EXT. LATHING WASoNW FIN USE SPACE WLO(I, FOR NOTES, FOLL~~WP. ETC 2-5-74 Stem.ralls: O.K. B. bhmn " Etrp ==11=. n 1 lw.ma -- 1-23-74 Pour Fdn. Corrected deDt. of footings and rebar. No suoervision on Job to see that working progress is done proberly. E. Plude 2-1-74 Masonry: and footings: 0.X. 8. Nelson 2-2-74 Footings: Pour. Interior and slab 3 units. 0.K. B. Nelson 2-18-74 Grout: O.K. B. Neleon 2-23-74 Partial Tll+.,,,.+nr. n F nw .- I c I.... . i I NEW SERVICE ON EXISTING BLDG. FOR EA. AYPERE OF INCREASE IN MAIN SERVICE, SWITCH. NSE OR BREAKER REMOOEL, ALTERATION, NO CHANGE IN SERVICE, FOR EA AYPERE OF INCREASE TUP. SERVICE UP TO AN0 INCUD- ING Po UP. Ill I . INSPECTOR PLAN CHECK VALIDATION cm M.O. CIH~ PERMIT VALIDATION a. M.O.' CASH y/6s IC 50 Job Address: Altisma Way SERVICE REQUESTED: Lot 245, La Costa Valley Unit 'No. 5 -. AQd5 + I FONNECTION CHARGE for Condominiums - (type of building) If a multiple unit building, indicate no. of living units 8 SERVICE LATERkI, (Ck. No. 1871 dated 12-19-73) If service lateral previously installed - No Fee If service lateral required: I SURCHARGE FEE i Check size lateral required: ! (4")- (6")- Other R' tn be inst. in manhole Date Paid 12-20-73 Saddle connection required: Yes- No- TOTAL CHARGES COST $AA!+!LO 450.0 350.0 $ 3,200.0 The application must be signed by the owner (or his authorized representative) of the property to be served. The total charges must be paid to the District at the time the application is submitted: 1 If a service lateral is required, it will be installed by the Leucadia County Water District. ~ The service lateral is that part of the sewer system that extends from the main collection line in the street (or easement) to the point in the street (at or near the applicant's property line) where the service lateral is connected to the applicant's building sewer. The applicant is responsible for the construction, at the applicant's expense, of the sewer pipeline (building sewer) from the applicant's plumbing to the point in the street (or easement) where a connection is made to the service lateral. The connection of the applicant's building sewer to the service lateral shall be made by the applicant at his expense. The connection must be made in conformity with the District's 'specifications, rules and regulations: a before the sewer system may be used by the applicant. The applicant, or his authorized rep- resentative, must notify the District at the time inspection is desired. Any connection made to the service lateral or collection line without prior approval and inspection by the District will be considered invalid and will not be acknowledged. ! : After connection is complete, the property described above is subject to a monthly sewer serv- ~ ice charge. The rate will be governed by the use of the property - residential, commercial, or multiple dwelling. Non-payment of the sewer service charge is subject to a 5% penalty per ' month, plus disconnection if necessary. The undersigned hereby agrees that the above information given is correct and agrees to the conditions as stated: \%7Q-l Date L. ,