HomeMy WebLinkAbout2410 BURGOS CT; ; CB152452; Permit08-03-2015
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Demolition Permit Permit No: CB152452
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Occupancy Group:
PC #:
# Dwelling Units:
Bedrooms:
Project Title:
2410 BURGOS CT CBAD
DEMO
2162404000
Full Demo:
Lot #:
Reference #:
Status
Applied
Entered By:
Plan Approved
0 Structure Type: Issued:
0 Bathrooms: 0 Inspect Area:
BROWN RES - DEMO POOL
NO GRADING PERMIT OR SOILS REPORT ASSOCIATED. NOT
ISSUED
08/03/2015
SLE
08/03/2015
08/03/2015
Applicant:
HOWE CONSTRUCTION
Owner:
BROWN RICHARD E&SHARON D
1525 CALLE PENSAMIENTOS
ENCINITAS CA 92024-4720
760-685-2457
2410 BURGOS CT
CARLSBAD CA 92009
Building Permit
Plumbing Fee
Other Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$0.00
$65.00
$0.00
$65.00
Total Fees: $65.00 Total Payments To Date: $65.00 Balance Due: $0.00
Inspector:
FINAL APR
Date: .
^PROy AL
Clearance:
NOTICE: Please take NOTICEthat approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
reten-ed to as "fees/exactions." You have 90 days from the date this pemiit was issued to protest imposition of these fees/exactions. Ifyou protest them, you must
follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously othenwise expired.
08-03-2015
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW150295
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
2410 BURGOS CT CBAD
SWPPP
2162404000
SWPPP FOR POOL DEMO
Applicant:
HOWE CONSTRUCTION
1525 CALLE PENSAMIENTOS
ENCINITAS CA 92024-4720
760-685-2457
Emergency Contact:
KEREK HOWE
Status: ISSUED
Lot#: 0 Applied: 08/03/2015
Entered By: SLE
Issued: 08/03/2015
Inspect Area:
Tier: 1
Priority: L
Owner:
BROWN RICHARD E&SHARON D
2410 BURGOS CT
CARLSBAD CA 92009
760-685-2457
SWPPP Plan Check
SWPPP Inspections
Additional Fees
$48.00
$58.00
$0.00
TOTAL PERMIT FEES $106.00
Total Fees: $106.00 Total Payments To Date: $106.00 Balance Due: $0.00
FINAL APPROVAL
DArE_^^'//W4EARANpE
S!GNArURE_^
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: • PLANNING •ENGINEERING •BUILDING DFIRE • HEALTH nHAZMAT/APCD
C City of
Carlsbad
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax:760-602-8558
email: building@carlsbadca.gov
www.carlsbadca.gov
Plan Check No. Qj^ |^ Q.'4S^2-
Est. Value
Plan Ck. Deposit
Datet^- S> K |SWPPP15025\
JOBADDRKS _ SUITE</SPACE«/UNIT«
CT/PROJECT » It OF UNITS # BEDROOMS # BATHROOMS TENANT BUSINESS NAME
DESCRIPTION OF WORK: Inctude Square Feet or Affected Area(s; T^^VWO P ^^O^ .^'O (^A<—|C *~/.iO/Ll\
(^fl&^\.^ SC^b^ bou-JKj
CONSTR. TYPE OCC. GROUP
EXISTING USE PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE
YES[~|* N0| I
AIR CONDITIONING
YES I I NO I I
FIRESPRINKLERS
YES I |NO| I
APPLICANT NAME
Prhiafv Contact
PROPERTYOWNER NAMI
ADDRESS ADDRESS
CITY STATE ZIP CITY STATE ZIP
PHONE FAX PHONE ^ FAX
EMAIL EMAIL
DESIGN PROFESSIONAL CONTRACTOR BUS. NAME
ADDRESS ADDRESS
CITY STATE ZIP CITY STATE ZIP
£N&kt A ^ _ [FAX PHONE
EMAIL EMAIL
iTELIC.# , , > f. CITY BUS. Lie*. ,
(Sec 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to fite a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) ortnat he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicantfor a permit subjects the applicant to a Civil penalty of not more than five hundred dollars ($500)).
WORKERS' COMPENSATION
Workers' Compensation Declaration: / hereby affirm under penalty of perjury one ofthe foiiomng deciarations:
Bl have and will maintain a certificate of consent to selMnsure for workers' compensation as pravided by Section 3700 of the Labor Code, for ttie perfomiance of the work for which this pemiit is issued.
1 have and will maintain workers' compensation, as required bv Section 3700 of the Labor Code, for the perfonnance of the work for which this permit is issued. My workers' compensation insurance canier and policy
number are: Insurance Co. Policy No. Expiration Date
TJis section need not be completed ifthe permit is for one hundred dollars ($100) or less.
Certificate of Exemption: 1 certify that in the perfonnance of the wort< for which this pennit is issued, 1 shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
C^fomia. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, damagra as providad for In Section 3706 of the Labor code, interest and attomey's fees.
^gT CONTRACTOR SIGNATURE /r^^'r/i ^'*"*-^V.__^ QAGENT DATE
OWNER-BUILOER DECLARATION
/ hereby affimi t/iat / am exempt from Contractor's Ucense Law for the foiiowing reason:
I I I, as owner of the praperty or my employees with wages as their sole compensation, will do the work and the stmcture is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or impraves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the bunJen of proving that he did not build or improve for the purpose of sale).
I I 1, as owner of the property, am exclusively contracting with licensed contractors to constmct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an ovmer of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
• I am exempt under Section _ ^Business and Prafessions Code for this reason:
1.1 personally plan to provide the major labor and materials for construction of the proposed property improvement. I lYes I iNo
2.1 (have / have not) signed an application for a building pemiit tor the proposed work.
3.1 have contracted with the following person (firni) to pravide the proposed constmction (include name address / phone / contractors' license number):
4.1 plan to pravide ponions of the work, but 1 have hired the following person to coordinate, supen/ise and provide the major work (include name / address / phone / contractors' license number):
5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the wori( indicated (include name / address / phone / type of work):
^efpROPERTY OWNER SIGNATURE •AGENT DATE
COM}>|.sre THIS SECTION rOR NON«l$&SIDEN[TIAI. VUILOINQ PERMITS ONLY
Is the applicant or future building occupant requiied to submit a business plan, acutely hazardous materials registration fonn or risk management and prevention program under Sections 25505,25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? • Yes • No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? • Yes • No
Is the facility to be constmcted within 1,000 feet of the outer boundary of a school site? • Yes DUo
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION LENOING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name Lender's Address
APPLICANT CERTIFICATION
I certif ttiat I have lead the appikatkin and state that the above infbimation is conectand that the Infbimation on the plans Is accuiate. I agree to comply vMi all City oidinances and Stale laws relating to building constniction.
I hereby authorize representative ofthe City of Carlsbad to enter upon the above mentioned property for inspectbn puiposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HAIRLESS THE CITY OF CAF!LSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEOUENCE OF THE GRANTING OF THIS PERMIT,
OSHA: An OSHA pemiit Is required for excavations over 5'0' deep and demolitbn or constructkjn of stmctures over 3 stories in height,
EXPIRATION: Every pennit issued by the Bulkiing Official under the provisbns of this Code shall expire by limitation and become null and void if the building or work authorized by such pennit is not commenced within
180 days from the date of such pennit or If thg^iljJIng or ^ au|)erized by such pennit is suspencied or abandoned at any time after the va\<. is commenced fbr a period of 180 days (Sectbn 106.4.4 Unifonn BuikJing Code).
APPLICANT'S SIGNATURE DATE
Inspection List
Permit* CB152452 Type: DEMO BROWN RES - DEMO POOL
NO GRADING PERMIT OR SOILS REPORT
Date Inspection Item Inspector Act Comments
08/10/2015 19 Final Structural PY AP
08/10/2015 59 Final Pool - Rl POOL DEMO
08/04/2015 11 Ftg/Foundation/Piers PY AP
08/04/2015 54 Pre-Site - Rl PRE-CON INSPECTION
Tuesday, August 11, 2015 Page 1 of 1
Ax
CITY OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
B-24
Development Services
Building Division
1635 FaradayAvenue
760-602-2719
www.carlsbadca.sov
I am applying to the City of Carlsbad for the following type{s) of construction permit:
• Building Permit • Right-of-Way Permit
• My project is categorically EXEMPT from
the requirement to prepare a storm water
pollution prevention plan (SWPPP) because it
only requires issuance of one or more of the
following permit types:
Electrical
Fire Additional
Fire Alarm
Fixed Systems
Mechanical
Mobile Home
Plumbing
Patio/Deck
Photo Voltaic
Re-Roofmg
Sign
Spa-Factory
Sprinkler
Water Discharge
Project Storm Water Threat Assessment Criteria''
No Threat Assessment Criteria
• My project qualifies as NO THREAT and Is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because
it meets the "no threaf assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
Tierl • Low Threat Assessment Criteria
My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt pennit type (See list above) and the project
meets one or more of the following criteria:
• Results in some soil disturbance: and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling).
r/er 2 - Moderate Threat Assessment Criteria
• My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria:
• Project requires a grading plan pursuantto the Carlsbad Grading Ordinance (Chapter 15.16 ofthe Carlsbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30).
Tier 3 • Significant Threat Assessment Criteria
• My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
• My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or,
• My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receiving waters by way ot storm water runoff or non-storm water discharge(s).
/ certify to the best of my knowledge that the above
checked statements are true and correct. I understand
and acknowledge that even though this project does
not require preparation of a construction SWPP, I must
still adhere to, and at all times during construction
activities for the permit type(s) check above comply
with the storm water best management practices
pursuant to Title 15 ofthe Carlsbad Municipal Code
and to City Standards.
•The City Engineer may authorize minor variances from the Storni
Water Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Constmction SWPPP Tier Level is
wan'anted.
Project Address: Assessor Parcel No.
Owner/Owner's Authorized Agent Name: Title:
OwrierlOm^r'^i^^^i Agent Signature: Date:
City Concurrence: By: Date:
• YES DNO
Project ID:
B-24 Page 1 of 1 Rev.03/09
CITY OF
CARLSBAD
CONSTRUCTION THREAT
ASSESSMENT WORKSHEET FOR
DETERMINATION OF PROJECT'S
PERCEIVED THREAT TO
STORM WATER QUALITY
E-33
Development Services
Land Development Engineering
1635 FaradayAvenue
760-602-2750
www.carlsbadca.gov
Construction
SWPPP Tier
Level
Construction Threat Assessment Criteria*
Perceived
Threat to
Storm Water
Quality
Tiers
Tier 3 - Hiati Construction Ttireat Assessment Criteria
O Project site is 50 acres or more and grading will occur during the rainy season
• Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda
Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or
discharges directly to an ESA
• Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kf greater than or equal to 0.4)
• Site slope is 5 to 1 or steeper
• Construction is initiated during the rainy season or will extend into the rainy season (Oct 1
through April 30).
• Owner/contractor received a Storm Water Notice of Violation within past two years
High
Tiers
Tier 3 - Medium Construction Threat Assessment Criteria Medium
Tiers
• All projects not meeting Tier 3 High Construction Threat Assessment Criteria Medium
Tier 2
Tier 2 Hiah Construction Threat Assessment Criteria
• Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA
• Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kf greater than or equal to 0.4)
• Site slope is 5 to 1 or steeper
• Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
• Owner/contractor received a Storm Water Notice of Violation within past two years
• Site results in one half acre or more of soil disturbance
High
Tier 2
Tier 2 - Medium Construction Threat Assessment Criteria Medium
Tier 2
• All projects not meeting Tier 2 High Construction Threat Assessment Criteria Medium
Tierl
Tier 1 - Medium Inspection Threat Assessment Criteria
Medium
Tierl
• Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or
directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA
• Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kf greater than or equal to 0.4)
• Site slope is 5 to 1 or steeper
• Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
• Owner/contractor received a Storm Water Notice of Violation within past two years
• Site results in one half acre or more of soil disturbance
Medium
Tierl
Tier 1 - Low Insoection Threat Assessment Criteria
8^ All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Low
Exempt - Not Applicable -Exempt
*The city engineer may authorize minor variances from the construction threat assessment criteria in special circumstances
where it can be shown that a lesser or higher amount of stomi water compliance inspection is warranted in the opinion of
the city engineer
E-33 Page 1 of 1 REV 4/30/10
CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 FaradayAvenue
760-602-2750
www.carlsbadca.gov
INSTRUCTIONS:
To address post-development pollutants that may be generated from development projects, the City requires that new development and
significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project
design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards
(Volume 4, Chapter 2) at www.carisbadca.aov/standards.
Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary pennits and/or construction permits). The results of the questionnaire determine the level of stonn water standards that
must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to
'Standard Stomiwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many
aspects of project site design are dependent upon the storni water standards applied to a project.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has
responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire
was incorrectly filled out and is subject to more stringent stonn water standards than initially assessed by you, this will result in the return
ofthe development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City.
If you are unsure about the meaning of a question or need help in detennining how to respond to one or more of the questions, please
seek assistance from Land Development Engineering staff.
A separate completed and signed questionnaire must be submitted for each new development application submission. Only one
completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently.
In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits
for the project.
Please start by completing Step 1 and follow/ the instructions. When completed, sign the form at the end and submit this with your
application to the city,
STEP1
TO BE COMPLETED FOR ALL PROJECTS
To determine if your project is a priority development project, please answer the following questions:
YES NO
1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet
the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or
other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from
paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in
accordance with USEPA Green Streets guidance?
y
2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are
designed and constructed in accordance with the USEPA Green Streets guidance? y
If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is
NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my
project does not meet PDP requirements" and complete applicant information.
If you answered "no" to both questions, then go to Step 2.
E-34 Page 1 of 3 Effective 6/27/13
STORM WATER Development Services
Land Development Engineering STANDARDS Development Services
Land Development Engineering
^ CITY OF
CARLSBAD
QUESTIONNAIRE
E-34
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
To determine if your project is a priority development project, please answer the following questions: YES NO
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively
over the entire project site? This includes commercial, industrial, residential, mixed-use, and public
development projects on public or private land. K
2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire
project site on an existing site of 10,000 square feet or more of impervious surface? This includes commerciai,
industrial, residential, mixed-use, and public development projects on public or private land.
3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared
foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared
foods and drinks for immediate consumption. Y
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a hillside development project? A hillside development
project includes development on any natural slope that is twenty-five percent or greater
5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the
temporary pari<ing or storage of motor vehicles used personally for business or for commerce.
V
6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a street, road, highway freeway or driveway? A street,
road, highway, freeway or driveway is any paved impen/ious surface used for the transportation of
automobiles, trucks, motorcycles, and other vehicles.
y
7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of
impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive
Area (ESA)? "Discharging Directly to" includes flow that is conveyed overiand a distance of 200 feet or less
from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the
project to the ESA (i.e. not commingles with flows from adjacent lands).*
V
8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a
facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013,
5014, 5541, 7532-7534, or 7536-7539.
9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's
that meet the foliowing criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of
100 or more vehicles per day.
10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and
are expected to generate pollutants post construction? Y
11.1s your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of
impervious surface or (2) increases impervious surface on the property by more than 10%?
If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to
implementing structural Best Management Practices (BMP's) in addition to implementing Standard Stomi Water Requirements such
as source control and low impact development BMP's. A Storni Water Management Plan (SWMP) must be submitted with your
application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this
questionnaire, check the "my project meets PDP requirements" box and complete applicant information.
If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to
implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all
development projects. A Stonn Water Management Plan (SWMP) is not required with your application(s) for development Go to step
4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant
information.
E-34 Page 2 of 3 Effective 6/27/13
CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 FaradayAvenue
760-602-2750
www.carlsbadca.gov
TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPEMENT PROJECTS ONLY
Complete the questions below regarding your redevelopment project: YES NO
Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than
50% ofthe surface area ofthe previously existing development?
Ifyou answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of
impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and
complete applicant information.
If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4,
check the "my project meets PDP requirements" box and complete applicant information.
CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION
• My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stonnwater
criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application.
I understand flow control (hydromodification) requirements may apply to my project Refer to SUSMP for details.
3 My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per
the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project.
Applicant Information and Signature Box
Address:
Applicant Name:
Applicant Signature:
Accessor's Parcel Number(s):
Applicant Title:
Date:
This Box for City Use Only
City Concurrence: YES NO
By:
Date:
Project ID:
* Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas
designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the
San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources
Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their
quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
E-34 Page 3 of 3 Effective 6/27/13
CITY OF
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
Development Services
Land Development Engineering
1635 FaradayAvenue
760-602-2750
www.carlsbadca.gov
STORM WATER COMPLIANCE CERTIFICATE
1^ My project is not in a category of permit types exempt from fhe Construction
SWPPP requirements
My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing poiiutants to nearby
receiving waters by way of storm water runoff or non-storm water
disGharge(s).
My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 ofthe Carlsbad Municipal Code)
My project will not result in 2,500 square feet or more of soils disturbance
including any associated constmction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more ofthe additional following criteria:
• located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
• disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical: and/or
• disturbed area is located along or within 30 feef of a storm drain inlet, an
open drainage channel or watercourse: and/or
• construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
O^NER(S)/OWNER'SflAGENT NAME (PRINT)
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPEFIATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
PROJECT INFORMATION
Site Address:PV(0 <gaR.(aQS
Assessor's Parcel Number:
Project ID:
Constmction Permit No.:
Estimated Construction Start Date
Project Duration Months
Emergency Contact:
Name: 145^6 HOAJ^T
24 hour Phone:
Perceived Threat to Stonrn Water Quality
Q Medium
H^Low
If medium box is checked, must attach a site plan
sheet showing proposed wodc area and location
of proposed structural BMPs
For City Use Only
CITY OF CARLSBAD
STANDARD TIER 1 SWPPP
Approved By: _
Date:
E-29 Page 1 of 3 REV 4/30/10
Erosion Control
BMPs Sediment Control BMPs
Tracking
Control
BMPs
Non-Storm Water
Management BMPs
Waste Management and Materials
Pollution Control BMPs
Best Management Practice
(BMP) Description -> Geotextiles & Mats Wood Mulching Earth Dikes and Drainage Swales Slope Drains Silt Fence Sediment Trap Check Dam Fiber Rolls Gravel Bag Berm street Sweeping and Vacuuming Sandbag Barrier Storm Drain Inlet Protection Stabilized Construction Ingress/Egress Stabilized Construction Roadway Water Conservation Practices Paving and Grinding Ooerations Potable Water/Irrigation Vehicle and Equipment Cleanina Material Delivery and Stnrane Material Use Stockpile Management Spill Prevention and Cnntrnl Solid Waste Manaaement Hazardous Waste Mananement Concrete Waste Manaaement CASQA Designation ->
Construction Activity EC-7 EC-8 EC-9 EC-11 SE-1 SE-3 SE-4 SE-5 SE-6 SE-7 SE-8 SE-10 TR-1 TR-2 NS-1 NS-3 NS-7 NS-8 WM-1 WM-2 WM-3 WM-4 WM-5 WM-6 WM-8 Grading/Soil Disturbance X Trenching/Excavation
Stockpiling
Drilling/Boring
Concrete/Asphalt Saw
cutting
Concrete flatworic
Paving
Conduit/Pipe Installation
Stucco/Mortar Woric
Waste Disposal
Staging/Lay Down Area
Equipment Maintenance
and Fueling
Hazardous Substance
Use/Storage
Dewatering
Site Access Across Dirt
Other (list):
Instructions: Begin by reviewing the list of constmction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descmbed, pick one or more best
management practices (BMPs) from the list located along the fop of the fonn. Then place an X in fhe box af fhe place where the activity row intersects with the BMP column. Do this for each activity thaf was
checked off and for each ofthe selected BMPs selected from the lisf. For Example - Ifthe projecf includes sife access across dirt, then check fhe box to the left of "Sife Access Across Dirt". Then review
fhe list for something that applies such as "Stabilized Constmction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get fo the "Stabilized Constmcfion
Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile thaf you intend to cover with a plasfic sheet. Since plasfic sheeting is nof on
fhe list of BMPs, then write in "Cover wifh Plastic" in fhe blank column under fhe heading Erosion Confrol BMPs. Then place an X in the box where fhe "Stockpiling" row intersects the new "Cover with
Plastic" column.
To leam more about what each BMP descripfion means, you may vwsh fo review fhe BMP Reference Handout prepared to assist applicants in fhe selection of appropriate Best Management Practice
measures. The reference also explains fhe Califomia Stomiwater Quality Association (CASQA) designafion and how fo apply the various selected BMPs fo a projecf.
E-29 Page 2 of 3 REV 4/30/10
PRINT ON 11X17
Carlsbad
Comrnunity & Economic
Development
Site Plan for
Pools &
Retaining Walls
1\8 inch scale shown
A.P.N SiteAddress: 2H (O -^^OGCS CT. CJ^^f^^, OA.
StateLic.#: /^V27^ Phone: ^(^O ^QS'2'<X^
Phone: ^^Q HIZ-^^^'^'^O
Legal Description:
Contractor's Name ^OtOfc
Owner's Name 4-^f<ArtON> \^/ZO^t^
Address: ^cf^p ^M^CoS CT rMCSG^^ CvA
Site Plan Checklist
• Dimensioned & to scale
Shown:
• North Arrow
• All existing and proposed
structures
• Legal description
• Property lines dimensions
• Drainage patterns
• Existing & proposed slopes
• Slope cross section
• Distance from pool to property
lines and all structures
• Distance- house to water's edge
• Distance- pool heater to P/L and
any operable window
• Length, width & sq. ft. of pool
• Existing topography and pool's
distance from toe/top of slopi
• Easements
• Pool fencing w/height & gate
compliance noted 6
• Will a ROW permit be required?
-S-4ndicate what will happen w/ soil
excavated
For Retair)ing Walls Add:
• Wall heights at ends of walls or at
any change in height. TW=top of
wall, BW=bottom of wall.
• Cross-section of wall stating wall
height above and below grade
• Grading quantities:
Cut Fill_
Import/Export
The discharge of pollutants to any storm drainage
system is prohibited. No solid waste, petroleum
byproducts, soil particulate, construction waste
materials, or waste water generated on
construction site or by construction activities shall
be placed, conveyed or disctiarged into the street,
gutter or storm drain system.
This project shall comply with the 2013 CA
Building Code, 2013 CA Mechanical Code,
2013CAglumbina Code, 2013 CA Electrical
laJLc/tyf