HomeMy WebLinkAbout2420 LAPIS RD; ; CB053890; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
01-0!J-2006 Residential Permit Permit No: CB053890
Building Inspection Request Line (760) 602-2725
Job Address: 2420 LAPIS RD CBAD
Permit Type: RESDNTL Sub Type: SFD Status: ISSUED
10/17/2005
SB
Parcel No: 2132320900 Lot#: Applied:
Valuation: $392,849.00 Construction Type: Entered By:
Occupancy Group:
01/06/2006
Reference #:
40
NEW
CT02-23 Plan Approved:
# Dwelling Units: Structure Type: SFD Issued: 01/06/2006
Bedrooms: 4 Bathrooms: 4.5 Inspect Area: PY
Project Title: CASTLEMARE @ THE GREENS PHS 5 Orig PC#: PC040071
PLAN 2 3993 SF LIV, 809SF GAR, 178 SF DECK, 168SF PORCH Plan Check#: PC05-107
Applicant:
WARMINGTON HOMES
3090 PULLMAN STREET
COSTA MESA, CA 92626
714-557-5511
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,449.00
$0.00
$941.85
$0.00
$0.00
$39.28
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,188.00
D5/8
$0.00
$0.00
Owner:
WARMINGTON LC G ASSOCIATES LP
C/O AMELIE GILBERT
3090 PULLMAN ST #A
COSTA MESA CA 92626
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
Total Fees: $22,987.95 Total Payments To Date: $22,987.95 Balance Due:
Inspector:
FINAL APPROVAL
Date: ID-!(-tJ{.,, Clearance:
$0.00
$160.00
$4,138.00
$2,820.97
$7,149.85
$0 00
$0.00
$0.00
$700.00
$0.00
$0.00
$217.00
$60.00
$105.00
$0.00
$0.00
$0.00
$0.00
$1,844.00
$175.00
$22,987.95
$0.00
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.· You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
....:F~ROM=-~--------------.:_F.:_:AX:.;_.:N0_:::•_:,:;6=029:::3=35:,:_ ___ -:--:---=0:.=.ct. 11 2006 06: 4EA1 Pl
A-rrN·.
C ~~l~:r,•N~•.
·-'City of .Carlsbad
_1635 Faraday Avenue, C..rbbad Califomi~ . 92008
INSPECTION ~ECORD . ·
INSPECTION REOORD CARD WJTH·APPROVED PLANS ·
· MUST BE KEPT ·oN THE Joe-
· .... cAtl PRiolito 4;00 P.M: .FoR NEXTWORK .oAv 1NsPecriqN ..
BUILDING'INSPECTION: (760) 602-2725
:·····
. :. i._._. ;If~.• •.
,I ·.,
. . e . City of Carlsbad Bldg Inspection Request
For: 10/10/2006 .
Permit# CB053890 Inspector Assignment: PY ---Title: CASTLEMARE@ THE GREENS PHS 5
Description: PLAN 2 3993 SF LIV, 809SF GAR, 178 SF DECK, 168SF
PORCH
Type: RESDNTL Sub Type: SFD
Job Address: 2420 LAPIS RD
Suite: Lot 40
Location:
OWNER WARMINGTON L C G ASSOCIATES L P
Owner: WARMINGTON LC G ASSOCIATES LP
Remarks:
Total Time:
CD Description Act Comment
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
-·--~-
Comments/Notices/Hold
Phonen71878
lnspec~
Requested By: BILL
Entered By: KAREN
Associated PCRs/CVs Original PC# PC040071
lnsgection HistO[Y
Date Description Act lnsp Comments
07117/2006 39 Final Electrical PA PY EMR
05116/2006 82 Drywall/Ext Lath/Gas Test AP PY
0511512006 82 Drywall/Ext Lath/Gas Test NR PY
0510812006 84 Rough Combo AP PY
0510112006 13 Shear Panels/HO's AP PY
0412712006 13 Shear Panels/HD's co JM PRELIM & FIRESTOP COURTYARD FIREPLACE
04/0412006 15 Roof/Reroof AP PY
02/0312006 11 Ftg/Foundation/Piers AP PD
01/25/2006 21 Underground/Under Floor AP PY
0112512006 22 Sewer/Water Service AP PY
Southwest Inspection and Testing, Inc.
10826 South Norwalk Blvd., Santa Fe Springs, CA 90670
(562) 941-2990 • (714) 526-8441 • Fax (562) 946-0026
REGISTERED INSPECTORS'$ DAILY REPORT
I SWIT Job No. -.,. I Date
TYPE OF O Reinforced Concrete D Strticturol Steel Assembly D Quality Control
INSPECTION ~ Post Tensioned Concrete D Fire Proofing □ Other
REQUIRED Reinforced Masonry □ Asphalt
Job Address I A~I < City
,//;A,,./T~ /?1. ,I, I<' ( ./)
Job Nome Permit No. I Issued By / / ,1,,,., /) 1,) / A ·1 1-/ ,,-.,.·./ <. "(.,., ./<r/ J. I
Type of Structure Architect W.
) / I/ LI I 1 I I --HA//,,,,, ' ~I
Material Description (type. grade. source) Engineer
/1,)/_!7/AAJ ·1 1 I L
I , I I I' I/, _J -/, '7 ( ;£) ,;f ..J /)
Contractor /.,, __ Ml A/,;:__-rr,1,,-../ I ,~11/ ""-
lnspector(s) Nome -Subcontractor JI,.. I A, ,
) I'
TESTS PERFORMED
TYPE OF SAMPLE SLUMP QUANTITY IN SET ADDITIONAL REMARKS ON SAMPLES
;, I} r _
,/
INSPECTION SUMMARY -LOCATIONS OF WORK INSPECTED. TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS, REMARKS, ETC.
INCLUDES INFORMATION ABOUT-AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT. NO'S OF
TEST SAMPLES TAKEN: STRUCT. CONNECTIONS (WELD MADE H.T. BOLTS T0ROUED) CHECKED, ETC.
) ,"' j '//I/" / /V ~ /.)./ 7 I /.JA/ .
~ .•11'1 /• < 1)) . )IA ~I -.
I) I"~ .1>K ;)/ /.)/A,./ .
/, ) / ./ \ I ) ,,, ,_
o> I r-/,,-;--:> v -C/?o,'{ ;< .-., 2---r -
I -2-1 -1 J<~ 94? -. -
I (,/)-~ I ....... ~ xCJ ✓--i --
CERTIFICATION OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE OBSERVED TO THE BEST OF MY KNOWLEDGE All OF THE ABOVE REPORTED
WORK UNLESS OTHERWISE NOITO. I HAVE FOUND THIS WORK TO COMPlY WITH TllE APPROVED PLANS,
SPECIFICATIONS, AND APPllCABLE SECTIONS OF THE GOVERNING BUILDING LAWS.
SPECIALTY
SIGNATLIRE OF REGISTERED INSPECTOR
/
NO. AGENCY
I,... -:r-? ,,, 2Q l'/r1 -/ I < '"7 -r' r, 1-n? j))./ -,,
'J '-/ J I LA f) ;) -? ./1 ,,.. -
') I;,,,, I, I -,..
1 '-I...) '.) I -rl -
CONTINUED ON NEXT PAGE 0 PAGE OF
TIMEIN TIME OUT REG. HOURS 0.T.HOURS CYLINDERS
'1 IJ /, 7 .) ~ ... .,... ---All inspecti6ns based on a minimum of 4 hours and over 4 hours -8 hour
minimum. In addition, any inspection extending past noon hour will be an 8
hour minimum.
Approved by ---
Project Superintendent
WHITE -OFFICE COPY. CANARY -ACCOUNTING COPY, PINK -INSPECTOR'S COPY, GOLDENROD -JOB SITE COPY
GEOCON
INCOfl,J:'PJ3.ATED
6960 FLANDERS DRIVE ■
e
GEOTECHNICAL CONSULTANTS C'~~
SAN DIEGO, CALIFORNIA 92121-2974 ■ TEL (858) 558-6900 ■ FAX (858) 558-6159 .,
FOUNDATION OBSERVATION REPORT
PROJECT NAME: :?,f.E.f/\1 \J
LOCATION : ,,_f ~OS'Ifr:
PROJECT NO. l (d./-03-52..-/j:
DATE : -=--.,=e-~·--=--0~3-•_dp....,.__ __ _
FOUNDATION LOCATION (if not entire building) __,:..,__...__'::-:r(""-+-+'-.---3 ......... 9'-,,_,,,-;.•3_ti--'-.,,._~-~-"-'-,".,,_) ___________ _
PLAN FILE NO. PERM T NOS :
FOUNDATION TYPE :
□...,.CONVENTIONAL
)j" POST-TENSIONED
• PUJU>()SE OF OBSERVATION
LB 05 3<2>Cfi
3~; tB 0~ 8£\~
: ~('I 28 0
0 ADDITIONAL OBSERVATION REQUIRED
~UBST ANTIAL CONFORMANCE
M'°.Verify soil conditions exposed are similar to those anticipated ~ Verify footing excavations extend to minimum depth recommended in soil report
□ Verify foundation reinforcement complies with minimum recommended in soil report
□ Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report
ri/ Verify footings have been extended to an appropriate bearing strata
□ Other -------------------------------------
• MINIMUM FOUNDATION RECOMMENDATIONS:
~ Footing Depth : □ 12 Inches ~ 18 Inches □ 24 Inches
footing Reinforcement: □ No.4 T&B □ 2-No.4 T&B □ 2-No.5 T&B E:YPost-Tensioned OTHER :
Interior Slab Reinforcement : □ 6x6-10/10 □ 6x6-6/6 □ No.3@24Inches D No.3@18Inches [8 Post-Tensioned ,, L.. Slab Bedding Material and, Thickness : ,.::) Vapor Barrier: .-Vc..,Jf---"""""""---=-=·l.__
Foundation Width : ~f.N~}J-=------------------------------
• OJSERV ATIONS :
ts/ Substantial conformance with Soil Reports (see "Purpose of Observation")
□ Substantial conformance with Foundation Plans. Identify : -------------------
D Other _
N TE: lr"IS.,-SSUMEO THAT ALL FOOTING EXCAVATIONS WILL BE OEANEO Of LOOSE MATERIAL PRIOR TO PLACING CONCRETE AND THAT Tl-£ SOIL MOISTURE CONTENT WILL BE MAINTAINED
/(Kl --Ka.f' r, '"" J~ } , :rer
FIELD COPIES TO GEOCON REPRESENTATIVE