Loading...
HomeMy WebLinkAbout2421 MICA RD; ; CB101365; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-28-2010 Residential Permit Permit No: CB101365 Building Inspection Request Line (760) 602-2725 Job Address: 2421 MICA RD CBAD Permit Type: RESDNTL Sub Type: SFD Status: Parcel No: 2132701500 Lot#: 68 Applied: Valuation: $334,941.00 Construction Type: VN Entered By: Occupancy Group: Reference #: CT040015 07/28/2010 # Dwelling Units: Structure Type: SFD Issued: Bedrooms: 5 Bathrooms: 4 Inspect Area: Project Title: MIRASOL-PHS 2A-PLN 2X Orig PC#: 3104 SF, 622 SF GAR, 171 SF PORCH Applicant: WILLIAM LYON HOMES 4490 VON KARMAN AV 92660 949 833-3600 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee HMP Fee Pot Water Con. Fee Meter Size Add'I Pot Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee $1,501.33 $0.00 $975.86 ($500.00) ($78.07) $33.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,549.00 D5/8 $0.00 $0.00 $12.00 Plan Check# Owner: WILLIAM LYON HOMES INC 4490 VON KARMAN AVE NEWPORT BEACH CA 92660 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES ISSUED 07/13/2010 RMA Plan Approved: 07/28/2010 PD PC090040 PC100030 $0.00 $331.00 $4,492.00 $3,122.05 $6,095.93 $0.00 $0.00 $0.00 $2,242.00 $0.00 $0.00 $182.00 $66.25 $136.00 $0.00 $0.00 $0.00 $0.00 $1,969.00 $0.00 $24,129.84 Total Fees: $24,129.84 Total Payments To Date: $24,129.84 Balance Due: $0.00 Inspector: FINAL/ PPROV'L Date: · ,( · ( l Clearance: l, l.s ~,, NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020{a), and file the protest and any other required infotmation with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-28-2010 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW100242 Job Address: Permit Type: Parcel No: Reference #: CB#: Project Title: Applicant: 2421 MICA RD CBAD SWPPP 2132701500 CT040015 CB101365 MIRASOL PHASE 2A -PLAN 2X WILLIAM LYON HOMES INC 4490 VON KARMAN AVE NEWPORT BEACH CA 92660 Emergency Contact: WILLIAM LYON HOMES ATTN: MIKE MCMILLEN 949 476-5231 SWPPP Plan Check SWPPP Inspections Additional Fees TOTAL PERMIT FEES Status: Lot#: 68 Applied: Entered By: Issued: Inspect Area: Tier: Owner: WILLIAM LYON HOMES INC 4490 VON KARMAN AVE NEWPORT BEACH CA 92660 ISSUED 07/20/2010 RMA 07/28/2010 Priority: $0.00 $54.00 $0.00 $54.00 Total Fees: $54.00 Total Payments To Date: $54.00 Balance Due: L $0.00 FINAL APPROVAL . . ... cnv II Clrllbld ~ '; Flnal Bulldlll IIIPICIIOI " '."'""'-P"'" .. 1 . . Dept: Buildin~nning CMWD St Lite Fire Plan Check#: PC 100030 Date: Permit#: CB101365 Permit Type: Project Name: MIRASOL-PHS 2A-PLN 2X Sub Type: 3104 SF, 622 SF GAR, 171 SF PORCH Address: 2421 MICA RD Lot: 68 Contact Person: Phone: Sewer Dist: CA Water Dist: CA • • ·• ■• llltl I Ill I 1•1 I I Ill I Ill 111111111111111 II I I I I Ill 1111111 I I Ill 111111 I I I II I ltl I II lllt 111 I t t I I 11111 I 11 I I 1111 I tit I I 1111111 I I I It I I I 111 I I ti I I It 11111 It I ltl I I I Inspected o4.. Date 1~/v/2~ /' Disapproved: __ By: ~ -Inspected: Approved: Inspected Date By: Inspected: Approved: Disapproved : __ Inspected Date By: Inspected: Approved: Disapproved: __ Ill I I 11111 1 I ltt I Ill I I Ill I Ill I I Ill I I I I It 11 t I I ti I I I 111111 lfl I I I It I I I I I 11 I I I I I I 1111111 t i I tll t I I I 11111 I II I I I II I I I tit I I ti I I 111111 ti I I I ltl 1111 I t t l ■fl I ti I I I I I I 111 Comments: _______________________________ _ Christine Wauschek From: Sent: To: Subject: Attachments: Michael Elliott [mikeelliott2@cox.net] Monday, December 06, 201 O 3:03 PM Corey Funk; dan.scott@lyonhomes.com; Chris DeCerbo; Christine Wauschek; Janean Hawney; Peter Dreibelbis Villages of la Costa, The Greens -1. 07 322B -Villages of La Costa -1.07 -Lots 57-68 -lnsp1 .doc Villages of la Costa, The Greens -1.07 Project Number: CT 04-15 Drawing Number: 427-6L Lot 57 -6630 Titanite Place -CB101390 Lot 58 -6626 Titanite Place -CB101384 Lot 59 -6622 Titanite Place -CB101387 Lot 60 -6618 Titanite Place -CB101389 Lot 61 -6614 Titanite Place -CB101388 Lot 62 -6610 Titanite Place -CB101385 Lot 63 -2401 Mica Road -CB101338 Lot 64 -2405 Mica Road -CB101336 Lot 65 -2409 Mica Road -CB101366 Lot 66-2413 Mica Road -CB101364 Lot 67-2417 Mica Road -CB101337 Lot 68 -2421 Mica Road -CB101365 Landscape review comments are attached. Approved -Permit cards for Lots 57-65 and 67-68 were signed on December 6, 2010. Not Approved -Permit card for Lot 66 was not signed. Mike Elliott landscape architect 637 arden drive encinitas, ca. 92024 phone: (760) 944-8463 fax: (760) 944-8943 e-mail: mikeelliott2@cox.net 1 City of Carlsbad Bldg Inspection Request For 01/05/2011 Permit# CB101365 Tille: MIRASOL-PHS 2A-PLN 2X Description: 3104 SF, 622 SF GAR, 171 SF PORCH Type: RESDNTL Sub Type: SFD Job Address: 2421 MICARD Suite: Lot: 68 Location: APPLICANT WILLIAM LYON HOMES Owner: WILLIAM LYON HOMES INC Remarks: Total Time: CD Description Act Comments Inspector Assignment: PD --- Phone: 8585831681 Inspector.(/£ Requested By: DAN Entered By: CHRISTINE 19 Final Structural -f-____.l)'..-l'k,__ro'--'o,,__,IZ=f,µ/4""s~c----'=?e:~1:L.s:L--____ _ 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Comments/Notices/Holds Associated PCRs/CVs/SWPPPs Original PC# PC090040 SW100231 FINAL SW100238 FINAL SW100239 FINAL SW100240 ISSUED SW100241 FINAL MIRASOL: PHASE 2A -PLAN 2 MIRASOL; PHASE 2A -PLAN 4 MIRASOL; PHASE 2A -PLAN 4 MIRASOL: PHASE 2A -PLAN 2 X MIRASOL: PHASE 2A -PLAN JX SW100242 ISSUED MIRASOL; PHASE 2A -PLAN 2X Inspection History Date Description Act lnsp Comments 11/03/2010 39 Final Electrical AP PD 09/28/2010 17 Interior Lath/Drywall AP PD 09/28/2010 18 Exterior Lath/Drywall AP PD 09/28/2010 23 Gas/Test/Repairs AP PD 09/22/2010 16 Insulation AP PD SW100242 09/21/2010 84 Rough Combo CA MC PER PHONE CALL-SW100242 09/21/2010 84 Rough Combo AP PD 09/13/2010 13 Shear Panels/HD's AP MC OK TO WRAP !'LANNING ENGINEERING SURVEYING IRVINE LOS ANGELES RIVERSIDE SAN DIEGO ARIZONA Ot\VE HAMMAR LEX WILLIMAN ALISA VIALPANDO DAN SMITH RAY MARTIN CHUCK CATER 9707 Waples Street San Diego, CA 92121 (858) 558-4500 PH (858) 558-1414 FX www.HunsakerSD.com lnfo@HunsdkerSD.com HUNSAKER &ASSOCIATES S A N lJ I E G 0, I N C. July 30, 2010 City of Carlsbad Engineering Department 1635 Faraday Avenue Carlsbad, CA 92008 Subject: Civil Engineer's Project: Certification of Building Form Title: Dwg: Tract: Lots La Costa Greens Neighborhood 1.07 427-7A CT 04-16/04-14A 57 through 68 Please be advised the building foundation forms are in conformance with the precise grading plans as to horizontal and vertical location within one tenth of a foot Daniel P Sm~~ S 6854 Hunsaker & Associates San Diego, Inc. l)S ~c K \OO~n2010\fl96 dm., wo 591-34 "//30/201Q2321'M Job Name: fYJ ,' 8 A • o I.. Job Number: Special Inspection Report -------------- GEOCON Date: 2 ,5 -I() Day: 6960 Flander Drive • San Diego, CA • 858.558.6900 • 858-558-6159 Fax Job Address } · c-r ,A~9 Owner or Project Name f I A nl Description of Materials ., /~ --1 I'll) f -r Ctl.t3l..G ' ft-. J:::?: s f IZ.~1.H. f: c;,J1C,,, .LU r ~--,-,I='..£~ ~~ f'~R. f--1-.AAl"-A..ui) -.S-,b1;. uescription of Work Observed Building Permit Number/ Plan Number Engineer General Contractor I /I ,, Sub Contractor DAV, ( (_ N L....:b I<-. v t-~ •. & -/).I-A c. e m ,::t:.A..l -r /<e, ,-41-to /Z c..., AlJ ...f.__,,.-d~ 1--.A-Al.£2 -f.t.b . .S. L-o ,Z L, S --7"1; c9 ../JE t...~UJ lJ'-2/<.fL a.(J..S1=.~l/e,E} 1 ..S A CC. 0~2£2 r 4lf 1/,AJ.0 di:, (Jc; c:... > CIJA;~ At,.L -;:;;:;::-/\).s,'"/'AL..'-- ~r) ....................................................................... ........................................................................ -:♦:♦:-:-:-:-:-:-:-:-:•:•:•:•:•:•:-:-:♦:♦:-:-:-:-:-:•:•:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:-:­:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•: •:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:• ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::; •:•:-:-:-:-:-:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:• I hereby certify that, at the time of inspection, I observed the above reported work, and to the best of my knowledge, found it complied substantially with approved plans, specifications and details. •,••.·.•.·.·.·.·.·.·.•.·.·.····.·.·.·.·.··.•·.·.··.···.·.·.·.·.·.·.··.·.·.·.··.·.·.•.·.·.•·.·•.·.··.·•·.·.•.•.•.•.•.•.•.•••.• I acknowledge that Geocon Incorporated performed the above observation. ( Ji, :, I Signature ~f Inspector Approved by: --~---,.,,c------.'-==-,-----,-------=:Z:........,,-,,,,:c~--~" .... ,_9.,.,6,._1-r41_ .. 2: ____________ _ Ct!l!nf RepresentativeTSuperintendent SpecTalty ;:n I No. Agency White -Geocon Folder, Canary -Geocon Office, Pink -Job Site 3 GEOCON INCORPORATED GEOTECHNICAL CONSULTANTS ~~~ 6960 FLANDERS DRIVE ■ SAN DIEGO, CALIFORNIA 92121-2974 ■ TEL 1858) 558-6900 ■ FAX 1858) 558-6159 • FOUNDATION OBSERVATION REPORT PROJECT NAME: ,;;~ G.et::,;;.,.;,,S.. /. o 7/-PROJECT NO. o~ fo3 -~7 -3 '-/ 4- LOCATION : LoT £ 4:J J/ ..,.....~ "'4-~ 8 DATE : _J'.....c../_>-/_/ '1_\.0 ____ _ FOUNDATION LOCATION (if not entire building) -------------------------- PLAN FILE NO. PERMIT NOS : b"/; c:.e/CJ/33() 0 ADDITIONAL OBSERVATION REQUIRED t, 5" : 7 l<>1Si,,(o FOUNDATION TYPE : "6 ; I el 3~'-i D CONVENTIONAL "17' [!f"'sussT ANTIAL CONFORMANCE D POST-TENSIONED '", 33 7 • PU SE OF OBSERVATION t,8: --v/o/~ ~fy soil conditions exposed are similar to those anticipated D Verify footing excavations extend to minimum depth recommended in soil report D Verify foundation reinforcement complies with minimum recommended in soil report D Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report [!(' Verify footings have been extended to an appropriate bearing strata 0 Other • APPLICABLE SOIL REPORT : TITLE : U P.D-• r-'5£C'TR:'~ . r J V. ~ · a,r: le. Cc sr-4-T ,...c:.. ----=G=-'~=c...;.. __ e--_-.._s. __ N_d_d_a __ f_o_=,-..:....___,__Loc......=....;r_.i. __ /_-_.;_7_/ _______ DATE : 1 2S / ID • SOIL REPORT RECOMMENDATIONS BASED ON: 0 J xpansion Condition O VERY LOW O _!::2..W ~ Fill Geometry UL/~,..,,,,,_, a I I II ~~EDIUM 0 VERY HIGH 0 Other :-------------------------------------- • Ml IMUM FOUNDATION RECOMMENDATIONS: Footing Depth : D 12 Inches D 18 Inches D 24 Inches OTHER __ Q._r-=JD=--~-~_j_._T_Q_r_O_L-_ Footing Reinforcement: 0 No.4 T&B O 2-No.4 T&B O 2-No.5 T&B O Post-Tensioned OTHER : _____ _ Interior Slab Reinforcement : D 6x6-10/10 D 6x6-6/6 D No.3@24Inches D No.3@18Inches D Post-Tensioned Slab Bedding Material and Thickness : ____________ Vapor Barrier : Foundation Width : ---------------------------------- • OBSERVATIONS : □ Substantial conformance with Soil Reports (see "Purpose of Observation") 01 pr s.., G"' ..... ,,c-ii:. c:.} 1...b •,{, Substantial conformance with Foundation Plans. Identify : --------~--""---~------.! \Q 0 Other NOTE: IT IS ASSUMED THAT All FOOTING EXCAVATIONS Will BE Q EANED Of LOOSE MATERIAL PRIOR TO PLAONG CONCRETE AND THAT THE SOIL MOISTURE CONTENT WILL 8E MAINTAINED FIELD COPIES TO GEOCON REPRESENT A TM