HomeMy WebLinkAbout2426 BADAJOZ PL; B; 83-194; PermitDECLARATIONS -___ OWNERNJUILDER CONTRACTOR WORKER'S COMPENSATION r--- Ir- Yr---l LENDER rn -.
0 .€ f
0
+
i
I White - Inspector Green - (1) Finance (2) Data Process, Yellow - Assessor Pcnk i- Applicant i- Id Gold - Temporary File
3 m 0 I D 2 0 D I- - - - b
1
1 i
I
I
BUILDING ADDRESS: &=
=+7muw -L7-&--\7&-&~*!~j..-~-s -
1 *@ SAN MARCOS
PLANN-RTNENT '
ZONE : -SCIJOOL FEES: SAN DIEGUITO
1 L' ENCIK- CARLSBAD
UNITS REQ -$-e- ---
PARKING SPACES REQ l D :
K PkOV lDED :
% COVERAGE ALLOWED: -
PROVIDED:
-__I_
BLIIL,DING HEIGHT REQ'D: - PROVIDED: --
.__- FRONT SETBACK SIDE SETBACK REAR SETBACK --
RE- DEVELOPFIENT APPROVAL REQ ! D : -
LANDSCAPE E, IRRlGATION PLAN COMI\.lENTS :
--
--._I bu
I
I_ - DATE: OK ro rssm TO FINAL:
PIIBL'TC FACILITIES FEE: SEWER CONNECTION:
DRIVEWAY LOCAT I ON (S) : -_ -~
-- GRADING PERMIT:
EASEMENTS : -- DRAINAGE : - -~
LEGAL DESCRIPTION: -
ADI1'1 TI ONAL COMMLNTS :
I: 1 NAL 1 NSI'IICI' I ON.
ESGIL CORPORATION
9.320 CHRLSAIWAKI.: 33R.. MUTE 122
SAN DIECKD, CA 92123
Date1
I
Res. Baths (over 311 @ 2,200 I
Prepared by:
Res.Fireplaces( over, 2
Air Conditionine Commercial
Residential
fire Sprinklers
Res. or Corn.
VALUATION AND PLAN CHECK FEE
@ 1,760
@ 2.80
@ 2.40
@ 1.50
0 Bldg. Dept.
0 Esgil
APFLXCANT/CONTACT& &GI U~A/ PHONE NO. +F 1- 7/GT
Hf BUILDING OCCUPANCY E-3 4 DESIGNER PHONE
TYPE OF CONSTRUCTION I/-M CONTRACTOR PHONE ZmVL&X
I
Total Value
.. '\ '. /--- /= Lr-- ____ PHILIP HENKING BENT0 ICSIDKNT - CIVIL LMGINCCR 1
BENTON ENGINEERING, INC.
ArPLltD SOIL MECHANICS - FOUNDATIONS
US40 RUFFIN ROAD
IAN OILGO. CALIFORNIA 92121
~ June 24, 1983
Runnel 1s
ub ject: Project No. 83-6-12F Inspection of Footing Excavations Unit No. 1
Dear Mr. Runnells:
This is to report the results of our inspection made of the footing excavations at
the subject site on June 23, 1983.
It was concluded that the footing excavations were properly founded in suitable firm natural solls similar to those described for footing support in our report on Project No. 68-2-2C. dated March 8, 1968. It was further concluded that the foundatfon exca- vations, forming and reinforcement comply with the soils report and the approved plan.
It is understood that inspection of the final clean-out prior to pouring Concrete
wi 11 be accompllshed by others.
Respectfully submi tted,
BENTON ENGINEERING, INC.
By- e A X. C. Remer
Re viewed. by
RCE NO. 10332 -
RCR/PHB/l aa
Distribution: (3) Addressee
BENTON ENGINEERING, INC.
5540 Ruffin Road SAN DIEGO. CALIFORNIA 92123
714 565-1955
THE FOLLOWING WAS NOTED:
1 JOE NO DATE
WEATHER TEMF Oat AN
Oat PN
ENClNlTAS UNION SCHOOL DISTRICT
189 UNION STREET
ENCINITAS. CALIFORNIA 92024
AREA CODE 71 4 753-1 152
BOARD OF TRUSTEES
. ___ Mary JO Normvan President
Norman L Mac Iniyre. Clerk
Anthony J Brandenburg Member
Ronald A Countryman Member
Sandra Schuiiz Member
Donald E Lndstrom. Superintendent
and Board Secretary
'%xcellence Is Our Goal"
October 13, 1982
Ms. Adrienne Landers P 1 ann i n g Department
City of Carlsbad
1200 Elm Avenue Carlsbad, California 92008
Dear Ms. Landers:
As- you requested, this is to inform you
that school fees are not applicable to
the property located at 2426 Badajoz
Place, Carlsbad.
La Costa Land Company donated a school
site in lieu of fees.
Superintendent of Schools
h