Loading...
HomeMy WebLinkAbout2429 BYRON PL; ; CB960392; Permit3751/2463 B U I L D I N G P E R M I T Permit No: Project. No: Development No: 04/0 (+- /g6 08:51 PaTe 1 of 1 Job Address: 2429 BYRON PL Suite: Permit Type: SINGLE FAMILY DWLNG - DETACHED Parcel No: 212-143-24-00 Lot#: 136 Valuation: 161,628 Construction Type: Occupancy Group: Reference#: CT91-3 Status: Description: 1908 SF+582 SF GAR,PLAN 1, Applied : : PHASE l-B,WINDSONG,SHEA,8 SFD,CT91-3 Apr/Issue: Entered By: Appl/Ownr : SHEA HOMES 619-549-3156 (389 6 0392 A9 6 0 1.1 5 67 UEV89 0 07 VN ISSUED 03/10/96 04/02/96 RMA 10721 TREENA ST SAN DIEGO CA 92131 Plan Check Number > CB960301 *x* Fees Required *** *** Fees Collected & Credits *** ______________-_-----_------ Fees : Adjustments: Total Fees:. Fee description -__________----_-__--- Number of Bedrooms . Number of Bathrooms Building Permit Plan Check Strong Motion Fee Enter Number of EDU’ or Enter Park-in-Li Enter “Y“ to Autocal or manually enter T. Payoff Fee for CFD * BUILDING TOTAL Enter “Y” for Plumbing Each Plumbing Fixture o Each Building Sewer Each Install/Repair Water Each Water Heater and/or Vent Gas Piping System . 00 350, 00 16,595.14 Ext fee Data 4.00 2 * 00 857.00 557.00 16,0@ 2400.00 1755.00 1 2942.00 Y 540.00 4666.14 13733.14 20.00 Y 98.00 15.00 7.00 7.00 7.00 -------------- Each Vacuum Breaker > Single Phase Per AMP > Install Furn/Ducts/Heat Pumps > Each Install Fireplace > Each Exhaust Fan > Each Install/Reloc Vent > * MECHANICAL TOTAL Construct Housing(Y/N)? > Enter Impact Fee > * PLUMBING TOTAL Enter “Y” for Electric Issue Fee > * ELECTRICAL TOTAL Enter ’Y’ for Mechanical Issue Fee> 2 7.00 14.00 168.00 10.00 Y 200 .25 50.00 60.00 15.00 Y 1 9.00 9.00 1 6.50 6.50 3 6.50 19.50 2 4.50 9.00 59.00 2925 2925.00 N CITY OF CA 2075 Las Palmas Dr., CarlsW, '.( FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATER PLAN CHECK#: CB960392 DATE: 08/16/96 PERMIT#: CB960392 PERMIT TYPE: SFD PROJECT NAME: 1908 SF+582 SF GAR,PLAN 1, PHASE 1-BfWINDSONG,SHEAf8 SFD,CT91-3 ADDRESS: 2429 BYRON PL LOT# 136 CONTACT PERSON/PHONE#: MW/DAVE/982-6985 SEWER DIST: CA WATER DIST: CA .......................................................................... ............................................................................. I APPROVED & DISAPPROVED - INSPECTED DATE BY: INSPECTED: INSPECTED DATE BY: INSPECTED : APPROVED - DISAPPROVED - INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING U/M PLAN CHECK#: CB960392 PERMIT#: CB960392 PROJECT NAME: 1908 SF+582 SF GAR,PLAN 1, PHASE l-B,WINDSONG,SHEA,8 SFD,CT91-3 WATER DATE : PERMIT 08/ 16/9 6 TYPE: SFD ADDRESS: 2429 BYRON PL ID”# 136 CONTACT PERSON/PHONE#: MW/DAVE/982-6985 SEWER DIST: CA WATER DIST: CA INSPECTED DATE BY: INSPECTED : APPROVED - DISAPPROVED - INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - COMMENTS.: FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING PLANNING U/M WATER PIAN CHECK#: CB960392 PERMIT#: CB960392 PROJECT NAME: 1908 SF+582 SF GAR,PLAN 1, PHASE l-B,WINDSONG,SHEA,8 SFD,CT91-3 ADDRESS: 2429 BYRON P CONTACT PERSON/PHONE#: MW/DAVE/982-6985 SEWER DIST: CA WATER DIST: CA DATE: 08/16/96 PERMIT TYPE: SFD INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - * FINAL BUILDING INSPECTION DEW: BUILDING ENGINEERING FIRE PLANNING U/M W&!PER PLAN CHECK#: CB960392 DATE: 08/16/96 PERMIT#: CB960392 PERMIT TYPE: SFD PROJECT NAME: 1908 SF+582 SF GAR,PLAN 1, ADDRESS: 2429 BYRON PL WBT) 136 CONTACT PERSON/PHONE#: MW/DAVE/982-6985 PHASE l-B,WINDSONG,SHEA,8 SFD,CT91-3 SEWER DIST: CA WATER DIST: CA INSPECTED DATE BY: INSPECTED: INSPECTED DATE BY: INSPECTED : INSPECTED DATE BY: INSPECTED : -4th 2, &APPROVED APPROVED APPROVED A DISAPPROVED - DISAPPROVED - DISAPPROVED COMMENTS : t FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING U/M PLAN CHECK#: CB960392 PERMIT#: CB960392 PROJECT NAME: 1908 SF+582 SF GAR,PLAN 1, PHASE l-B,WINDSONG,SHEA,8 SFD,CT91-3 ADDRESS: 2429 BYRON PL LOT# 136 CONTACT PERSON/PHONE#: MW/DAVE/982-6985 SEWER DIST: CA WATER DIST: CA WATER DATE: 08/16/96 PERMIT TYPE: SFD APPROVED - DISAPPROVED - INMTED UTE INSPECTED: BY: INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - \ 1 10/10/96 INSPECTION HISTORY LISTING FOR PERMIT# CB960392 DATE 08/ 16/ 9 6 08/ 16/ 9 6 07/ 0 1/ 9 6 07/ 0 1/ 9 6 06/28/9 6 06/ 2 8/9 6 06/ 2 8/9 6 06/28/9 6 06/2 8/ 9 6 06/2 8/ 9 6 06/2 8/9 6 06/2 7/9 6 06/2 7/ 9 6 06/2 7/9 6 0 6/ 2 7/ 9 6 06/26/96 06/26/96 06/2 6/96 06/2 6/96 06/25/96 06/25/9 6 06/25/9 6 0 6/2 1/9 6 0 6/ 2 1/9 6 06/2 0/96 0 6/2 0/9 6 0 6/ 19/ 9 6 0 6/ 19/ 9 6 0 6/ 19/9 6 0 6/ 19/9 6 0 6/ 19/ 9 6 0 6/ 0 5/ 9 6 06/05/96 0 6/ 04/9 6 06/ 04/9 6 0 6/ 03/ 9 6 06/ 03/9 6 05/29/96 0 5/ 2 9/ 9 6 05/2 8/9 6 05/28/96 05/24/96 05/ 2 4/9 6 05/2 3/ 9 6 05/2 3/ 9 6 05/2 2/9 6 05/2 2/9 6 04/ 16/9 6 04/ 16/9 6 04/ 08/9 6 INSPECTION TYPE Final Combo Final Combo Interior Lath/Drywall Gas/Test/Repairs Interior Lath/Drywall Interior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Exterior Lath/Drywall Exterior Lath/Drywall Gas/Test/Repairs Interior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Exterior Lath/Drywall Interior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Exterior Lath/Drywall Interior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Rough Combo Rough Combo Rough Combo Rough Combo Frame/Steel/Bolting/Wel Rough/Topout Rough Electric Rough/Duct s/ Dampers Rough Combo Shear Panels/HD's Shear Panels/HD's Shear Panels/HD's Shear Panels/HD's Shear Panels/HD's Shear Panels/HD's Roof/Reroof . Roof/Reroof Roof /Reroof Roof/Reroof Roof/Reroof Roof/Reroof Roof/Reroof Roof/Reroof Roof/Reroof Roof/Reroo f Ftg/Foundat ion/Piers Ftg/Foundat ion/Piers Underground/Under Floor INSP RI PY RI RI RI RI PY RI RI PY PY RI PY RI PY RI PY RI PY RI PY RI RI PY RI PY PY PY PY PY RI RI PY RI PY RI PY RI . PY RI PY RI PY RI PY RI PY RI PY PY ACT RI PA RI RI RI RI AP RI RI AP AP RI PA RI AP RI NR RI NR RI NS RI RI AP RI AP NR AP NR NR RI RI AP RI NR RI NS RI AP RI NR RI NS RI NR RI NS RI AP AP COMMENTS Mw/DAVE/982 -6985 ELEC MTR REL Mw/DAVE/PM PLEASE MW/DAVE/PM PLEASE MW/DAVE/9 82 -6985 PG MW/DAVE/982 -6985 PG MW/DAVE/982 -698 5 PG Mw/DAVE/9 82 -69 8 5 PG Mw/DAVE 1ST LAYER Mw/DAVE Mw/DAVE/9 8 2-69 8 5 Mw/DAVE/9 8 2 - 69 8 5 MW/DAVE/982-6985/PM PLEASE MW/DAVE/982-6985/PM PLEASE Mw/DAVE MW/DAVE Mw/SCOTTY Mw/DAVE/982-6985 AM PLEASE Mw/DAVE RS/DAVE/ 9 8 2 -6 9 8 5 P . M. PLEASE BJN/DAVE/982-6985 Mw MW/SCOTT/930-9492 Mw/DAVE/9 8 2 -69 8 5 BJN/DAVI D/ 9 8 2 - 69 8 5 HIT <RETURN> TO CONTINUE... PREFERRED CONSTRUCTION INSPECTIONS, INC. 4888 Ronson Court "G" 'Sari Diego, Ca. 92111 I f I I SPECIMEN MARKINGS 18721 DATE TESTED 4/26 AREA - SQ. IN. 28.28 (619) 576-9110 Fax (619) 576-7028 18722 18723 18724 5/15 5/15 HOLD 28.28 28.28 I ULTIMATE LOAD - LBS. UNIT STRESS - PSI SPECIFIED STRENGTH AT 28 DAYS - PSI 4 85000 3010 2500 1 I > TEST REPORT 8 WINDSONG JOB ADDRESS PHONE 2429 BYRON PLACE CHILDRESS CONCRETE CONT R ACTO R SHEA HOMES OWNER CLIENT SHEA HOMES ENGINEER J.L. DAVIDSON ARCHITECT BLDG. AUTH. CITY OF CARLSBAD INSPECTOR JEFFREY GAYLER PERMIT ~0.960392 PLAN FILE OF SPEC'MEN LOT #136 EAST SIDE OF SLAB * FIELD SAMPLE OF: CONCRETE IN JOB OR STRUCTURE: i JEFFREY GAYLER MADE BY MIX NO. 3475P 4 1/21' PROPORTIONS 4.75 SACK SLUMP 4/17/96 ADMIXTURE PO22 DATE MAOE 4/18/96 TYPE OF CEMENT I1 DATE RECEIVED CONC. SUPPLIER ESCONDIDO READY MIX SOURCE OF ROCK INSPECTOR SIGN 370236 TICKET NO. DISTRIBUTION: SHEA HOMES CHILDRESS CONCRETE CITY OF CARLSBAD DEVIATIONS: TEST METHODS - ASTM C39: C173 : C231: ('138: C1231:. . C172: C143: