HomeMy WebLinkAbout2457 LAPIS RD; ; CB051115; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
04-14-2005 Residential Permit Permit No: CB051115
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
04/14/2005
# Dwelling Units:
Bedrooms:
Project Title:
Building Inspection Request Line (760) 602-2725
2457 LAPIS RD CBAD
RESDNTL
2132300600
$352,128.00
Sub Type:
Lot#:
Construction Type:
Reference #:
SFD
6
NEW
CT02-23
Structure Type: SFD
4 Bathrooms: 3.5
CASTLEMARE@ THE GREENS PHS 2
PLAN 1 3,652SF LIV, 648SF GAR, 74SF PORCH
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
03/11/2005
SB
Plan Approved:
04/14/2005
PY
PC040071
PC05-34
Applicant:
WARMINGTON HOMES WARMINGTON LC G ASSOCIATES LP
C/0 AMELIE GILBERT
3090 PULLMAN STREET
COSTA MESA, CA 92626
714-557-5511
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,325.80
$0.00
$861.77
$0.00
$0.00
$35.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
D5/8
$0.00
$0.00
3090 PULLMAN ST #A
COSTA MESA CA 92626
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$160.00
$2,461.00
$2,820.97
$6,408.73
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$203.00
$60.00
$98.50
$0.00
$0.00
$0.00
$0.00
$1,735.00
$0.00
$19,828.98
Total Fees: $19,828.98 Total Payments To Date: $0.00 Balance Due: $19,828.98
Inspector: /4. { }rµ-0
FINAL APPROVAL,
Date: /J.-{b-Or'
6091 04/14/05 0002 01
CGP
Clearance:
NOTICE: Please take NOTICE that approval of your project includes the ~Imposition~ of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.~ You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required infom,ation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
in hvrvi ir rvil xir
02
19828-98
Clll 11 C■rlllllll
~ ·; Flnal B1Hdln1 lnspacuon
-"'11"· '
Dept: Building Engineering Planning CMWD St Lite Fire
Plan Check#: PC05-34 Date:
Permit#: CB051115 Permit Type:
Project Name: CASTLEMARE@ THE GREENS PHS 2 Sub Type:
PLAN 1 3,652SF LIV, 648SF GAR, 74SF PORCH
Address: 2457 LAPIS RD Lot: 6
Contact Person: Phone:
Sewer Dist: CA Water Dist: CA
7
NOV 2 3 2005
11/22/2005
RESDNTL
SFD
..........................................................................................................................................................
Inspected Date / By: jl-f) r.,.t>lc-,-:, Inspected: L l-;o -dSApproved: Disapproved: __
Inspected Date
By: Inspected : Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
···························································································································································
Comments: _______________________________ _
City of Carlsbad Bldg Inspection Request
For: 12/12/2005
Permit# CB051115
Title: CASTLEMARE@ THE GREENS PHS 2
Description: PLAN 1 3,652SF LIV, 648SF GAR, 74SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address: 2457 LAPIS RD
Suite: Lot 6
Location:
APPLICANT WARMINGTON HOMES
Owner: WARMINGTON LC G ASSOCIATES LP
Remarks:
Total Time:
CD Description Act Comment
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Comments/Notices/Hold
Associated PCRs/CVs
Inspection History
Date Description Act lnsp Comments
Inspector Assignment: PY ---
Phone: 7604271878
Inspector: _ _.{_?)} __
Requested By: BILL
Entered By: JANEAN
6, IJ,f, /2,
12/08/2005 19 Final Structural CO JM 36IN STOOP@ FRONT DOOR & LABEL BOTH DISCONNECTS@
PANEL
12/08/2005 39 Final Electrical WC JM
12/07/2005 89 Final Combo NR BN
12/05/2005 89 Final Combo CA BN per Bill
10/31/2005 39 Final Electrical PA PY EMR
08/29/2005 82 Drywall/Ext Lath/Gas Test AP PY
08/22/2005 84 Rough Combo AP PY
08/17/2005 84 Rough Combo NR PY
08/09/2005 13 Shear Panels/HD's AP PY
08/08/2005 13 Shear Panels/HD's AP PY
08/08/2005 18 Exterior Lath/Drywall WC PY
07/18/2005 15 Roof/Reroof AP PY
Southwest Inspection and Testing, Inc.
10826 South Norwalk Blvd., Santa Fe Springs, CA 90670
(562) 941-2990 • (714) 526-8441 • Fax (562) 946-0026
• REGIST6RED INSPECTORS'S DAILY REPORT
I S'~? Job No . '-vdl.s v lcr. -. ;J '1· ,n
TYPE OF O Reinforced Concrete D Strcictural Steel Assembly 0 Quality Control
INSPECTION □ Post Tensioned Concrete 0 Fire Proofing O Other
REQUIRED O Reinforced Masonry 0 Asphalt
Job Address ,1) I "'A ALt,;1 ./7 .1::. p!_ j) • City (A/l.LStA ✓-> '1
Job Nome 1 '!1.>7L ~·11,4/!. t JA ::_'.,,, ,,, ~ I:? t:. E ,._,I .!'
Permit No Sec: /jrL.:.HJ
I Issued By
( /f'-r'
Type of Structure s. r i), Architect W, ILL/AM /-Ir Z H/1 L H/1 L c /-I
Material Description (type. grade. source) Engineer .l) C /112.IS 71A ,,,.../ A\ 1 rl .1. /_r '• 'I v 'AL~
/10/?A --11, 1l_'',;J;;ok.. 7S"1AA.-v.U Contractor W c;, ,.J /1trMIN -;-u /J..,M£ S
lnspector(s) Nome {1/yt)£_ L A~llclt Subcontractor ( '-.. ~/IS7'A ( ,J ,,._/c,.. /!../:.. 7 £.
TESTS PERFORMED
TYPE OF SAMPLE SLUMP QUANTITY IN SET ADDlTIONAL REMARKS ON SAMPLES
INSPECTION SUMMARY -LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS. PROGRESS, REMARKS, ETC.
INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT. NO'S OF
TEST SAMPLES TAKEN: STRUCT. CONNECTIONS (WELD MADE H.T. BOLTS T0RQUED) CHECKED, ETC.
( p"{ I • L /Ire Ir ) / M..>/1 c.... 7/0~ ;> J j ~ 7 ~,,.J r 1 .1 ,.J ..> .i?. '").
J A. l 7 (" h ~~,\ 7 /~rlc I 0~ --2 3 j)/IASc ~
('?J.... /) ALL P .r: f-11 "You T s I Nt/""11'? ,r _ ,!_ / ~ ,.JA('I vt,) I/()-,-/ tvtS (
I ~I--f),1-,,> 77/ ,/ W 10 771 I ('J r 11 ,v I-I .IV [ J ! _ /)J-.,., 77, of Lt,tc(s-·) f1k, o
S7t-r-L I I ,l u w ,-J ,< >--:> lt-v /21 j/ I _ _l(11,i../G, IJ /1 J L /1,) .s /J11-d ..S .
C'OL.JH1.J / .h:J7'/ /I.I{:, .S / ~ !)1-,l]IN 6,-W /<./J ,, ..S . I./ J: l: ~ tJ t1 fl. /2 I _,, t1 ... :s'
(}/,; IZ:) r-:-r:1n 7 I /J !)a,..;~ L / ',1\/1."' I_, 1) ,,. ./ r ;), /1; L (1 Lr 11 ,-t,.,.., /C~S
ti',1 ~ d /£ 1J //,) r"v!J£.
/)rSJC.tJ f'1u ,..,,/-'i ie--J w,,71 /1/'t',-J~vc ,) I' I. ;)1 /1 ,v \ ,' )/,,,. tYtl' /C ,-t 71 (I A/ 1
/~/P ·/'f·OI./
p,:_/Z. HI JI' j CJ/ t. -l 'I!. .J s' I I I s -I -1 -,)I.{} 7 1 A/Jl.5 /1!)
I 7-C /!,t.nt fir?-I -~11 -olYr J L11/J/5 /U).
CERTIFICATION OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE OBSERVED TO THE BEST OF MY KNOWLEDGE ALL OF THE ABOVE REPORTED
WORK UNLESS OTHERWISE NOTED. I HAVE FOUND THIS WORK TO COMPLY WITH THE APPROVED PLANS.
SPECIFICATIONS, AND APPLICABLE SECTIONS OF THE GOVERNING BUILDING LAWS.
/~ _ !A SIGN~R,E OF REGISTERED INSPECTOR
/J/f!....-'tvi./!f1,;.. /JI ,,..,.rl.-f
SPECIALTY NO. AGENCY
CONTINUED ON NEXT PAGE 0 PAGE OF
TIMEIN TIME OUT REG. HOURS O.T. HOURS CYLINDERS
7· <JJ 9 ~ 1" '1 --All inspections based on a minimum of 4 hours and over 4 hours -8 hour
minimum. In addition, any inspection extending past noon hour will be an 8
hour minimum. /
Approved by }1--._ /
Project Superintendent
WHITE -OFFICECOPY,CANARY -ACCOUNTING COPY.PINK -INSPECTOR'SCOPY,GOLDENROD -JOBSITECOPY
~\ ~puA-
G EOCON
• INCORPORATED
6960 FLANDERS DRIVE
GEOTECHNICAL CONSULTANTS C'~ ■ SAN DIEGO, CALIFORNIA 92121-2974 ■ TEL (858) 558-6900 ■ FAX (858) 558-6159 •
FOUNDATION OBSERVATION REPORT
PROJECT NAME: __ o--'-... -"'_c_..,_::;_-_\.-'\/ __ .__.__,...._,.J_cr_r_0_✓ _______ _ PROJECT NO. Ol 'fo.:, S2-. -I+
LOCATION : ___ c _ ___._ ........ __ s_,a_4_o-'--_C4-___________ _ DA TE : -/ J!. / Is I
FOUNDATION LOCATION ('f 1 not entire b ·1d· l UI ing L iS I '
..,.
PLAN FILE NO. PERMIT NOS:
' "l < r s11,5
'7'g -1 D ADDITIONAL OBSERVATION REQUIRED
FOUNDATION TYPE : S 117....I
0 CONVENTIONAL g ~-s,,2.c; ,,[] SUBSTANTIAL CONFORMANCE D POST-TENSIONED
• PURPOSE Of OBSERVATION
D Verify soil conditions exposed are similar to those anticipated
~ Verify footing excavations extend to minimum depth recommended in soil report
D Verify foundation reinforcement complies with minimum recommended in soil report
D Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report
D Verify footings have been extended to an appropriate bearing strata
D Other --------------------------------------
• APPLICABLE SOIL REPORT: TITLE : --=(.J.==-,_0_"'_i'r---'---_G...:...)_~_-_r _r;;_c_r_, ...:...K_',.J_f'r.---.J,''--V._. _ ... _"_r_-_l-4 __ / __ , __,_, --"-/_.,.._,.__:6:c..~--£_..,.=..S,
/'.J I '.1 (;, .) DATE : 01,;, l'l e,+
• SOIL REPORT RECOMMENDATIONS BASED ON :
0 Expansion Condition D VERY LOW ~ LOW 0 MEDIUM 0 HIGH 0 VERY HIGH
[!I Fill Geometry ______ F_,1-_&-. ___________________________ _
D Other :--------------------------------------
• MINIMUM FOUNDATION RECOMMENDATIONS: ~--rrr,_
D Footing Depth : D 12 Inches D 18 Inches I[:)~ Inches OTHER _t-_l_~ __ n_·_, ________ _ u o" I ... I
Footing Reinforcement: D No.4 T&B D 2-No.4 T&B D 2-No.5 T&B ES! Post-Tensioned OTHER : _____ _
Interior Slab Reinforcement : D 6x6-10/10 D 6x6-6/6 □ No.3@24Inches D No.3@18Inches IEl' Post-Tensioned I/ ✓ Slab Bedding Material and Thickness : ----~-------Vapor Barrier: ________ _
Foundation Width : /1,, 1 .... / 2.
• OBSERVATIONS :
Kl Substantial conformance with Soil Reports (see "Purpose of Observation") ~ Substantial conformance with Foundation Plans. Identify : __ I_T __ l_:__..i ___ .:...F_'-' __ -,;._,,._r __ c;=:,-~_•_{li__...,_{,,c..,..._
A.JI-I-tr, I 8 I I {)14 ,, -,.._, 0 -.JI', c._., J o,S .:s,/ /2.30
D Other
COMMENTS: ),_-'/...'---'-'---"-I ___ A __ ,.._T __ ...,_ .. _L,,=---c =-'--~_ ... ______ r.:._)_c_~-'--c::i=__._ ________ _
TE : IT IS ASSUMED THAT ALL FOOTING EXCAVATIONS WILL BE Q EANED OF LOOSE MATERIAL PRIOR TO PLACING CONCRETE AND THAT Tl-£ SOIL MOISTURE CONTENT WILL BE MAINTAINED
1r,_(L c Cc
FIELD COPIES TO GEOCON REPRESENTATIVE