Loading...
HomeMy WebLinkAbout2483 WELLSPRING ST; ; CB153587; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 11-09-2015 Mobile Home Building Permit Permit No: CB153587 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: 2483 WELLSPRING ST CBAD MOHO Sub Type: 2081929300 Lot#: $0.00 Construction Type: Reference #: 0 Structure Type: 0 Bathrooms: ROBERTSON RANCH: SALES TRAILER AT THE VISTAS (LOT 209) INSTALL 0 NEW 0 Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: Applicant: Owner: TOLL BROTHERS STE 200 725 W. TOWN AND COUNTRY RD ORANGE CA 92868 760-877-9885 Mobile Home Issuance Fee Earthquake Bracing Fee Coach Setup Fee Cabana/Ranada Fee Private Garage Fee Awning/Carport Fee Porch Fee Fence Over 6ft Other Building Fee Building Permit Plan Check Park in Lieu Fee Bridge Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Meter Size Add'l Reel. Water Con. Fee $20.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meter Fee SDCWA Fee CFD Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) Plumbing Fee Electrical Fee Mechanical Fee Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES ISSUED 10/22/2015 SLE 11/09/2015 11/09/2015 PC#: Total Fees: $120.00 Total Payments To Date: $120.00 Balance Due: FINAL APPROVAL Inspector: Date: Clearance: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $120.00 $0.00 I\OTlCE: Ra:re ta<e I\OTlCE lhct ~ d y:u pqoct indudes tre "lfllX"Stiai' d fa:s, drlc:cticrs, rEm\/Cticrs, cr etta" eroim; t-Era:iter cdlocti...ey retara::ltocs ''foos'~crs." Yru h:Ml fficitysfiuntred:tettis pmit '1\ffi iss..a:Jto pd:ESt i~tim dth:s3foos'eroicrs. If~ pd:ESt ttan ~ m..st fdiONtre pd:ESt r;rcarl.rcs &:i fath in G:>..ennrt O:rla Srlim fBJJ:Xa), ad filetre pctESt ad my etta" rcq.ira:l irfarretim W1h tre Oty ~fa ptX:BSSrg in amd:t re W1h QrlS:a:J M.lidr:B O:rla Srlim 3.32.cro. FciiLIB to tirl"EJy fdiONtt-a: pmrl.re VIi II tH my~ lcyi a:tim to atta:k, I'EMw, &:i asics, l.tid, cr ani trer i~m Yru ere tatbj R..RTHRI\OT1Rffitmt y:u rigt to pd:ESt tre sp:dfie:l foos'eroim; ca:s N:Jf Pfft. Ytow:ter ad S3J\Er a:rra:iim fa'S ad cq:a:jty chrg:s, ncr pcrrirg. zairg. gcrlrg cr cth:r simla-cqjic:ctim ptX:BSSrg cr Sffiice foos in a:rra:iim wth ttis pqoct. 1\CR ca:s IT Pfft. Y to my foos'eroia-sdv.Jldl h:Ml "a.S 0031 ·\e'la I\OTlCEsirrila-to · crcstoWidltrestctLted lirritr:tim; hcs "a.S ctt-m\ioo ·rm City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 11-09-2015 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW150416 Job Address: Permit Type: Parcel No: Reference #: CB#: Project Title: 2483 WELLSPRING ST CBAD SWPPP 2081929300 Lot#: ROBERTSON RANCH SALES TRAILER FOR THE VISTAS (LOT 209) 0 Applicant: Owner: TOLL BROTHERS STE 200 725 W. TOWN AND COUNTRY RD ORANGE CA 92868 760-877-9885 Emergency Contact: CHRIS JACKSON 760-889-5038 SWPPP Plan Check SWPPP Inspections Additional Fees TOTAL PERMIT FEES Status: Applied: Entered By: Issued: Inspect Area: Tier: ISSUED 10/22/2015 SLE 11/09/2015 $54.00 $228.00 $0.00 $282.00 Priority: Total Fees: $282.00 Total Payments To Date: $282.00 Balance Due: $0.00 FINAL~ A.PPRC,~\fAL M {City of Carlsbad CITY PHON~- ADDRESS CITY PHONE EMAIL Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov www.carlsbadca.gov STATE ZIP CITY FAX PHONE EMAIL STATE LIC. # Plan Check No. Est. Value Plan Ck. Deposit Date STATE FAX STATE FAX ZIP ZIP FIRE SPRINKLERS YES 0 NO](_ (Sec. 7031.5 Busmess and Professions Code: Any C1ty or County wh1ch requ~res a permit to construct, alter, 1m prove, demol1sh or repair any structure, prior to its Issuance, also requires the applicant for such perm1t to f1le a s1gned statement that he 1s licensed pursuant to the prov1s1ons of the Contractor's L1cense Law [Chapter 9, commend1ng with Sect1on 7000 of D1v1sion 3 of the Busmess and Professions Code} or that he IS exempt therefrom, and the bas1s for the alleged exempt1on. Any v1olat1on of Sect1on 7031.5 by any appl1cant for a permit sub;ects the appl1cant to a c1v11 penalty of not more than f1ve hundred dollars {$500}). Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: 0 I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the pertormance of the work for which this permit IS issued. I have and will maintain workers' COf!!£ensation, as required b :;ection 370?}1'the La)lPr Code, for the pertorma e f th wo k for whi~ number are: Insurance Co. Ot...·V t:'? Policy No. --t-~-"'--L--~_,{..,=:___~""'"-"'=""'-~----'- This section need not be completed if the permit is for one undred dollars ($1 00) or less. 0 Certificate of Exemption: I certify that in the pertormance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California WARNING: Failure to secure coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in s ~;btovi•ded for in Section 3706 of the Labor code, interest and attorney's fees. ~ENT I hereby affirm that I am exempt from Contractor's Ucense Law for the following reason: 0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). 0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law) 0 I am exempt under Section _____ Business and Professions Code for this reason 1. 1 personally plan to provide the major labor and materials for construction of the proposed property improvement 0 Yes 0 No 2. I (have I have not) signed an application for a building permit for the proposed work. the proposed construction (include name address I phone I contractors' license number): 4. I plan to provide portions of the work, but 5. I will provide some of the work, but I the following person to coordinate, supervise and provide the major work (include name I address I phone I contractors' license number): the following persons to provide the work indicated (include name I address I phone I type of work): ~PROPERTY OWNER SIGNATURE ~GENT DATE lo I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby aulhorize representative of lhe City of Carlsbad to enler upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT OSHA An OSHA permit is required for excavations over ' i or oonstruction of structures over 3 stories in he~ht EXPIRATION Every permit issued by lhe Building i of lhis Code shall expire by limitatkln and beoome null and vokl if the buikling or 'Mlri< aulhorized by such permit is not commenoed within 180 days from the date of such permit or 1f the by such permit is suspended or abandoned at any time after the 'Mlri< is oommenoed for . of 180 days (Section 106.4.4 Uniform Building Coce). JiS APPLICANT'S SIGNATURE DATE 'u Inspection List Permit#: CB153587 Date lnspect!()n Item . 01/14/2016 89 Final Combo 01/14/2016 89 Final Combo Type: MOHO 11/16/2015 11 Ftg/Foundation/Piers Friday, January 15, 2016 INSTALL Inspector Act Rl PB AP PB AP ROBERTSON RANCH: SALES TRAILER AT THE VISTAS (LOT 209) Comments LATE PM SALES TRAILER Page 1 of 1 CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL DATE: 10-29-2015 PROJECT NAME: ROBERTSONS RANCH PA6 SALES TRAILER PLAN CHECK NO: SET#: 1 ADDRESS: 2483 WELLSPRING ST. VALUATION: $ Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov PROJECT ID: CB15-3587 APN: 208-192-93-00 This plan check review is complete and has been APPROVED by the ENGINEERING Division. By: CG 10/29/15 A Final Inspection by the Division is required Yes 1 No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: CJACKSON®TOLLBROTHERSINC.COM For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton Chris Glassen Greg Ryan 760-602-4624 7 60-602-2 7 84 760-602-4663 Chris.Sexton@carlsbadca.gov Christogher.Giassen@carlsbadca.gov Gregory.Ryan@carlsbadca.gov Gina Ruiz Linda Ontiveros Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov Dominic Fieri 760-602-4664 Pominic.Fieri@carlsbadca.gov Remarks: CITY OF CARLSBAD BUILDING PLANCHECK CHECKLIST QUICK-CHECK/APPROVAL Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov ENGINEERING Plan Check for CB15-3587 Project Address: 2483 WELLSPRING ST. SET 24' X 60' OFFICE TRAILER ON STATE Project Description: APPROVED FOUNDATION Date: 10-29-2015 APN: 208·192-93-00 Valuation: $ ENGINEERING Contact : CHRIS GLASSEN Phone: 760-602-2784 Email: Christopher.Giassen@carlsbadca.gov Fax: 760-602-1052 RESIDENTIAL INTERIOR RESIDENTIAL ADDITION MINOR (<$20,000.00) CARLSBAD PREMIER OUTLETS OTHER: ROBERTSONS RANCH TENANT IMPROVEMENT PLAZA CAMINO REAL COMPLETE OFFICE BUILDING r .. -··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··1 OFFICIAL USE ONLY ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT BY: CG 10/29/15 DATE:10·29-2015 REMARKS: NO ADDITIONAL ENGINEERING FEE Notification of Engineering APPROVAL has been sent to CJACKSON@TOLLBROTHERSINC.COM via EMAIL on 10-29-2015 -··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-· E-36 Page 1 of 1 REV 4/30/11 ~-,~,11:-, ~ CITY OF CARLSBAD STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 STORM WATER COMPLIANCE CERTIFICATE ../ My project is not in a category of permit types exempt from the Construction SWPPP requirements ../ My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). ../ My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) ../ My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. r'\ .... ,-Llc. ... "-W\~ ~.:.-~"....'<~'\ -..-.................... lr"''o ........ _..~ \-c., J z..-z, l \ S"' OAT E-29 STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES Page 1 of 3 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov PROJECT INFORMATION SiteAddress: ;A'"\~!:> \.V~\\*:"1::\ <:s· Assessor's Parcel Number: J..o~ \~1 ~-~Co Project ID: C.:.\ - \ ~ ' v ~ ·· /, Construction Per'init No.f)\rJ I '504-\\..p Estimated Construction Start Date \~I h b J \ ~ Project Duration ?.. Months Emergency Contact: Name: C.:..~r-\~ 3~~-~ 24hourPhone: (lbv) ~~·\·':~~ Perceived Threat to Storm Water Quality ~ Medium lif(tow If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only CITY OF CARLSBAD STANDARD TIER 1 SWPPP Approved By: C (,... Date: ( U -J.. ~ __. () REV 4/30/10 Erosion Control Tracking Non-Storm Water Waste Management and Materials Sediment Control BMPs Control BMPs BMPs Management BMPs Pollution Control BMPs c: c: c: "E "E 0 0 0 ""0 u u Ol ~ Q) ""0 Q) c: c: E c: E ""0 .l!l <0 0 c: Ol <0 c: 2 2 'C c. Q) 2 <0 "' E Q) ~ 'E ·:; <0 :2 Ol ""0 Q) Ol Q; (ij"' (ij c: ~ Ol c: "' 2 c: 'E: <0 Best Management Practice c: c:-c. Q) ·;::: c c: "' c: 2: ('5 0" Q) c: 0 ~ "' <>IS :.c <0 ~ "' <0 ((} ·a. n; -0 Q) 0 Q) ~ LlJ -~ Q) <0 "E <O- (BMP) Description 7 c: .= E Q) c: <..:>~ (.) "' ""0 Qi 2 s: ~ "' u ~U) -~ "' Ol Q)Ol ((} "(ij c: Ol c: ""0 c: "' :2 ~ "' Q) "5 Ql "E <0 <0 ;;: -~ ""OUJ ""0>. 0 c: 0 :::J "' ::J Q) E ~Q) u 0 ((} Ol ~ 0 <0 .: -~ Q) <0 ~ :2 OOl 0 c: Q) 0 U)E <0 0:;::; Q)-Q) <0 (.) Q) I! (ij i~ s: 0 -a; 0::: N til ~== Ol ·a. "E ~ c: 2 <0 Q) E -" Qi -::J .c E~ ==en ~. :0 2 ""0 .r:.c: Q) LL u Q; > Q) ::J ""0 :0~ ·-""0 2 c: ~~ -" :2 <0 u <t 0 0 t:: ·-c. 'C Q) ~ ~ u c: .c<O ·:;; <0 u N c: c: Q) ~ <0~ 0 Q) .J::. .c <0 .se <00) .l!!o ~ <0 15 <0 0 0 ~~ 0 <t ii5 -<0 -c: Ci5 (!) UJO U5 U) (.) u::: (!) U)> U) U)Cl. U)_ U)C::: c.. c.. :2 U) <..:>::2 CASQA Designation 7 1'-co Ol ~ ~ (') ,. Ll) ~ 1'-· co 0 ~ N ~ (') 1'-co ~ N (') ,. Ll) CD co c.) c.) c.) ~ w w w w w ~ r± ch ch ch ch ~ ~ ~ ~ ~ ~ c.) LlJ LlJ w :2 LlJ LlJ LlJ U) U) U) U) U) U) U) I-I-z z z z s: s: s: s: s: s: Construction Activity LlJ U) ~ / Gradir1!J!Soil Disturbance v ,/ V, v v o/ ,/ v V' ;/ ,/ Trenching/Excavation v .....-::: ,/ o/ L_ _1/ v v ,/ Stockpiling v v '-"""' ./ v ,/ ./ ,/ ,/ v Drilling/Boring Concrete/Asphalt Saw v v cuttil}g Concrete flatwork ./ Paving " Conduit/Pipe Installation ·.,/ Stucco/Mortar Work Waste Disposal ~ Staging/Lay Down Area ,/ Equipment Maintenance and Fueling Hazardous Substance Use/Storage Dewatering ' Site Access Across Dirt ~ L__ Other (list): ___ --------L_ __ Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example -If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 !! REV 4/30/10 STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services land Development Engineering 1635 Faraday Avenue 760-602-2750 www .carlsbadca.gov To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.gov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. 1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in .,,...r·nrnl-=>nt'o with USEPA 2. or roads that are YES NO If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet PDP requirements" and complete applicant information. 2. E-34 Page 1 of 3 Effective 6/27113 STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov determine if your project is a priority development project, please answer the following questions: 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public on land. 2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, ~d 00 ~~ 3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking Jot is a land area or facility for the of motor vehicles used for · or for commerce. 6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of and other vehicles. 7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or Jess from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the ESA not with flows from • 8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 501 5541 or 7536-7539. 9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles 1 O.ls your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? Pacific Ocean creates 2,500 square feet or more of i rvious su surface on the more than 10%? you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to lementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your lapplic;ation(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this uestionnaire, check the "my project meets PDP requirements" box and complete applicant information. you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject plementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for ln"''''"'l''n"'"'nt projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applica rmation. E-34 Page 2 of 3 Effective 6/27113 ~' :r~. ~ CITY OF CARLSBAD STORM WATER COMPLIANCE ASSESSMENT 8-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www .carlsbadca.gov I am applying to the City of Carlsbad for the following type(s) of construction permit: ~Building Permit D Right-of-Way Permit 0 My project is categorically EXEMPT from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it only requires issuance of one or more of the following permit types: Patio/Deck Photo Voltaic Re-Roofing Sign Spa-Factory Sprinkler Electrical Fire Additional Fire Alarm Fixed Systems Mechanical Mobile Home Plumbing Water Discharge Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria 0 My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the "no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tier 1 • j.ow Threat Assessment Criteria ISr' My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 • Moderate Threat Assessment Criteria 0 My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: • Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). Tier 3 • Significant Threat Assessment Criteria 0 My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or 0 My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, 0 My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). I certify to the best of my knowledge that the above checked statements are true and correct. I understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards. Project Address: Assessor Parcel No. 'The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. B-24 ~~-~-~ Wu\\ · ~ES DNO Page 1 of 1 Title: Date: 10: fl'l-1'1-IS C&IS:~S 137 Rev.03/09 <l~~ ~ CITY OF CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov CARLSBAD Construction '" Perceived SWPPPTier Construction Threat Assessment Criteria* Threat to Storm Water Level Quality Tier 3 -High Construction Threat Assessment Criteria 0 Project site is 50 acres or more and grading will occur during the rainy season 0 Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA High 0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with Tier 3 0 USDA-NRCS Erosion factors k1 greater than or equal to 0.4) Site slope is 5 to 1 or steeper 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 0 through April 30). Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3-Medium Construction Threat Assessment Criteria Medium 0 All projects not meeting Tier 3 High Construction Threat Assessment Criteria Tier 2 High Construction Threat Assessment Criteria 0 Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA 0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kr greater than or equal to 0.4) High 0 Site slope is 5 to 1 or steeper Tier 2 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). 0 Owner/contractor received a Storm Water Notice of Violation within past two years 0 Site results in one half acre or more of soil disturbance Tier 2 -Medium Construction Threat Assessment Criteria Medium 0 All projects not meeting Tier 2 High Construction Threat Assessment Criteria Tier 1 -Medium lnsQection Threat Assessment Criteria 0 Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA 0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors k1 greater than or equal to 0.4) Medium 0 Site slope is 5 to 1 or steeper Tier 1 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). 0 Owner/contractor received a Storm Water Notice of Violation within past two years 0 Site results in one half acre or more of soil disturbance Tier 1 -Low lnsQection Threat Assessment Criteria Low 0 All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Exempt -Not Applicable -Exempt *The c1ty eng1neer may authonze mmor vanances from the construction threat assessment cntena m spec1al circumstances where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Does the of impervious surface in an amount of less than 50% of i existi If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the " meets PDP irements" box and com icant information. D My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Address: Accessor's Parcel Number(s): t\:f6\"\1~0-t..:r\,) Date: • l l .-t-oz.z_ '':, This Box for City Use Only City Concurrence: I YES I NO I '><I By: [G Date: (~-lCI(-(5 Project ID: c__g f5 ) S'f ~7 * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27/13 ~ «~: -~ CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-29 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.crlrlsbrldcrl.flOV DATE: Nov 3, 2015 PROJECT NAME: VISTAS PROJECT ID: PUD 13-06(A) PLAN CHECK NO: CB 15-3587 SET#: 1 ADDRESS: 2483 WELLSPRING ST APN: 208-192-93-00 ~ This plan check review is complete and has been APPROVED by the PLANNING Division. By: CHRISTER WESTMAN A Final Inspection by the PLANNING Division is required DYes IS] No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: cjackson@tollbrothersinc.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ~ Christer Westman 760-602-461.4 Christer.Westman@Carlsbadca.gov D Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov D Veronica Morones 760-602-461.9 Veronica.Morones@carlsbadca.gov Remarks: ENGINEERING 760-602-2750 Chris Glassen 760-602·2784 760-602-2773 FIRE PREVENTION 760-602-4665 Greg Ryan 760-602-4663 Gregory.Ryan<il?carlsbvdca.gov Cindy Wong 760-602-4664