HomeMy WebLinkAbout2483 WELLSPRING ST; ; CB153587; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
11-09-2015 Mobile Home Building Permit Permit No: CB153587
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
2483 WELLSPRING ST CBAD
MOHO Sub Type:
2081929300 Lot#:
$0.00 Construction Type:
Reference #:
0 Structure Type:
0 Bathrooms:
ROBERTSON RANCH: SALES TRAILER
AT THE VISTAS (LOT 209)
INSTALL
0
NEW
0
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Applicant: Owner:
TOLL BROTHERS
STE 200
725 W. TOWN AND COUNTRY RD
ORANGE CA 92868
760-877-9885
Mobile Home Issuance Fee
Earthquake Bracing Fee
Coach Setup Fee
Cabana/Ranada Fee
Private Garage Fee
Awning/Carport Fee
Porch Fee
Fence Over 6ft
Other Building Fee
Building Permit
Plan Check
Park in Lieu Fee
Bridge Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Meter Size
Add'l Reel. Water Con. Fee
$20.00
$0.00
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Plumbing Fee
Electrical Fee
Mechanical Fee
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
ISSUED
10/22/2015
SLE
11/09/2015
11/09/2015
PC#:
Total Fees: $120.00 Total Payments To Date: $120.00 Balance Due:
FINAL APPROVAL
Inspector: Date: Clearance:
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$120.00
$0.00
I\OTlCE: Ra:re ta<e I\OTlCE lhct ~ d y:u pqoct indudes tre "lfllX"Stiai' d fa:s, drlc:cticrs, rEm\/Cticrs, cr etta" eroim; t-Era:iter cdlocti...ey
retara::ltocs ''foos'~crs." Yru h:Ml fficitysfiuntred:tettis pmit '1\ffi iss..a:Jto pd:ESt i~tim dth:s3foos'eroicrs. If~ pd:ESt ttan ~ m..st
fdiONtre pd:ESt r;rcarl.rcs &:i fath in G:>..ennrt O:rla Srlim fBJJ:Xa), ad filetre pctESt ad my etta" rcq.ira:l irfarretim W1h tre Oty ~fa
ptX:BSSrg in amd:t re W1h QrlS:a:J M.lidr:B O:rla Srlim 3.32.cro. FciiLIB to tirl"EJy fdiONtt-a: pmrl.re VIi II tH my~ lcyi a:tim to atta:k,
I'EMw, &:i asics, l.tid, cr ani trer i~m
Yru ere tatbj R..RTHRI\OT1Rffitmt y:u rigt to pd:ESt tre sp:dfie:l foos'eroim; ca:s N:Jf Pfft. Ytow:ter ad S3J\Er a:rra:iim fa'S ad cq:a:jty
chrg:s, ncr pcrrirg. zairg. gcrlrg cr cth:r simla-cqjic:ctim ptX:BSSrg cr Sffiice foos in a:rra:iim wth ttis pqoct. 1\CR ca:s IT Pfft. Y to my
foos'eroia-sdv.Jldl h:Ml "a.S 0031 ·\e'la I\OTlCEsirrila-to · crcstoWidltrestctLted lirritr:tim; hcs "a.S ctt-m\ioo ·rm
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
11-09-2015
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW150416
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
2483 WELLSPRING ST CBAD
SWPPP
2081929300 Lot#:
ROBERTSON RANCH SALES TRAILER
FOR THE VISTAS (LOT 209)
0
Applicant: Owner:
TOLL BROTHERS
STE 200
725 W. TOWN AND COUNTRY RD
ORANGE CA 92868
760-877-9885
Emergency Contact:
CHRIS JACKSON
760-889-5038
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Tier:
ISSUED
10/22/2015
SLE
11/09/2015
$54.00
$228.00
$0.00
$282.00
Priority:
Total Fees: $282.00 Total Payments To Date: $282.00 Balance Due: $0.00
FINAL~ A.PPRC,~\fAL
M
{City of
Carlsbad
CITY
PHON~-
ADDRESS
CITY
PHONE
EMAIL
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: building@carlsbadca.gov
www.carlsbadca.gov
STATE ZIP CITY
FAX PHONE
EMAIL
STATE LIC. #
Plan Check No.
Est. Value
Plan Ck. Deposit
Date
STATE
FAX
STATE
FAX
ZIP
ZIP
FIRE SPRINKLERS
YES 0 NO](_
(Sec. 7031.5 Busmess and Professions Code: Any C1ty or County wh1ch requ~res a permit to construct, alter, 1m prove, demol1sh or repair any structure, prior to its Issuance, also requires the
applicant for such perm1t to f1le a s1gned statement that he 1s licensed pursuant to the prov1s1ons of the Contractor's L1cense Law [Chapter 9, commend1ng with Sect1on 7000 of D1v1sion 3 of the
Busmess and Professions Code} or that he IS exempt therefrom, and the bas1s for the alleged exempt1on. Any v1olat1on of Sect1on 7031.5 by any appl1cant for a permit sub;ects the appl1cant to a c1v11 penalty of not more than f1ve hundred dollars {$500}).
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
0 I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the pertormance of the work for which this permit IS issued.
I have and will maintain workers' COf!!£ensation, as required b :;ection 370?}1'the La)lPr Code, for the pertorma e f th wo k for whi~
number are: Insurance Co. Ot...·V t:'? Policy No. --t-~-"'--L--~_,{..,=:___~""'"-"'=""'-~----'-
This section need not be completed if the permit is for one undred dollars ($1 00) or less. 0 Certificate of Exemption: I certify that in the pertormance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California WARNING: Failure to secure coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
s ~;btovi•ded for in Section 3706 of the Labor code, interest and attorney's fees. ~ENT
I hereby affirm that I am exempt from Contractor's Ucense Law for the following reason:
0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law)
0 I am exempt under Section _____ Business and Professions Code for this reason
1. 1 personally plan to provide the major labor and materials for construction of the proposed property improvement 0 Yes 0 No
2. I (have I have not) signed an application for a building permit for the proposed work.
the proposed construction (include name address I phone I contractors' license number):
4. I plan to provide portions of the work, but
5. I will provide some of the work, but I
the following person to coordinate, supervise and provide the major work (include name I address I phone I contractors' license number):
the following persons to provide the work indicated (include name I address I phone I type of work):
~PROPERTY OWNER SIGNATURE ~GENT DATE lo
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction.
I hereby aulhorize representative of lhe City of Carlsbad to enler upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSHA An OSHA permit is required for excavations over ' i or oonstruction of structures over 3 stories in he~ht
EXPIRATION Every permit issued by lhe Building i of lhis Code shall expire by limitatkln and beoome null and vokl if the buikling or 'Mlri< aulhorized by such permit is not commenoed within
180 days from the date of such permit or 1f the by such permit is suspended or abandoned at any time after the 'Mlri< is oommenoed for . of 180 days (Section 106.4.4 Uniform Building Coce).
JiS APPLICANT'S SIGNATURE DATE 'u
Inspection List
Permit#: CB153587
Date lnspect!()n Item .
01/14/2016 89 Final Combo
01/14/2016 89 Final Combo
Type: MOHO
11/16/2015 11 Ftg/Foundation/Piers
Friday, January 15, 2016
INSTALL
Inspector Act
Rl
PB AP
PB AP
ROBERTSON RANCH: SALES TRAILER
AT THE VISTAS (LOT 209)
Comments
LATE PM SALES TRAILER
Page 1 of 1
CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
DATE: 10-29-2015 PROJECT NAME: ROBERTSONS RANCH PA6 SALES TRAILER
PLAN CHECK NO: SET#: 1 ADDRESS: 2483 WELLSPRING ST.
VALUATION: $
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
PROJECT ID: CB15-3587
APN: 208-192-93-00
This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
By: CG 10/29/15
A Final Inspection by the Division is required Yes 1 No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: CJACKSON®TOLLBROTHERSINC.COM
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING ENGINEERING FIRE PREVENTION
760-602-4610 760-602-2750 760-602-4665
Chris Sexton Chris Glassen Greg Ryan
760-602-4624 7 60-602-2 7 84 760-602-4663
Chris.Sexton@carlsbadca.gov Christogher.Giassen@carlsbadca.gov Gregory.Ryan@carlsbadca.gov
Gina Ruiz Linda Ontiveros Cindy Wong
760-602-4675 760-602-2773 760-602-4662
Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov
Dominic Fieri
760-602-4664
Pominic.Fieri@carlsbadca.gov
Remarks:
CITY OF
CARLSBAD
BUILDING PLANCHECK
CHECKLIST
QUICK-CHECK/APPROVAL
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
ENGINEERING Plan Check for CB15-3587
Project Address: 2483 WELLSPRING ST.
SET 24' X 60' OFFICE TRAILER ON STATE Project Description: APPROVED FOUNDATION
Date: 10-29-2015
APN: 208·192-93-00
Valuation: $
ENGINEERING Contact : CHRIS GLASSEN
Phone: 760-602-2784
Email: Christopher.Giassen@carlsbadca.gov
Fax: 760-602-1052
RESIDENTIAL INTERIOR
RESIDENTIAL ADDITION MINOR
(<$20,000.00)
CARLSBAD PREMIER OUTLETS
OTHER: ROBERTSONS RANCH
TENANT IMPROVEMENT
PLAZA CAMINO REAL
COMPLETE OFFICE BUILDING
r .. -··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··1
OFFICIAL USE ONLY
ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT
BY: CG 10/29/15 DATE:10·29-2015
REMARKS: NO ADDITIONAL ENGINEERING FEE
Notification of Engineering APPROVAL has been sent to CJACKSON@TOLLBROTHERSINC.COM
via EMAIL on 10-29-2015
-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-·
E-36 Page 1 of 1 REV 4/30/11
~-,~,11:-,
~ CITY OF
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
STORM WATER COMPLIANCE CERTIFICATE
../ My project is not in a category of permit types exempt from the Construction
SWPPP requirements
../ My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
../ My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code)
../ My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
• disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
• construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
r'\ .... ,-Llc. ... "-W\~ ~.:.-~"....'<~'\
-..-.................... lr"''o ........ _..~
\-c., J z..-z, l \ S"'
OAT
E-29
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
Page 1 of 3
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
PROJECT INFORMATION
SiteAddress: ;A'"\~!:> \.V~\\*:"1::\ <:s·
Assessor's Parcel Number: J..o~ \~1 ~-~Co
Project ID: C.:.\ - \ ~ ' v ~ ·· /,
Construction Per'init No.f)\rJ I '504-\\..p
Estimated Construction Start Date \~I h b J \ ~
Project Duration ?.. Months
Emergency Contact:
Name: C.:..~r-\~ 3~~-~
24hourPhone: (lbv) ~~·\·':~~
Perceived Threat to Storm Water Quality
~ Medium
lif(tow
If medium box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
For City Use Only
CITY OF CARLSBAD
STANDARD TIER 1 SWPPP
Approved By: C (,...
Date: ( U -J.. ~ __. ()
REV 4/30/10
Erosion Control Tracking Non-Storm Water Waste Management and Materials Sediment Control BMPs Control BMPs BMPs Management BMPs Pollution Control BMPs
c: c: c: "E "E 0 0 0 ""0 u u Ol ~ Q) ""0 Q) c: c: E c: E ""0 .l!l <0 0 c: Ol <0 c: 2 2 'C c. Q) 2 <0 "' E Q) ~ 'E ·:; <0
:2 Ol ""0 Q) Ol Q; (ij"' (ij c: ~ Ol c: "' 2 c: 'E: <0 Best Management Practice c: c:-c. Q) ·;::: c c: "' c: 2: ('5 0" Q) c: 0 ~ "' <>IS :.c <0 ~ "' <0 ((} ·a. n; -0 Q) 0 Q) ~ LlJ -~ Q) <0 "E <O-
(BMP) Description 7 c: .= E Q) c: <..:>~ (.) "' ""0 Qi 2 s: ~ "' u ~U) -~ "' Ol Q)Ol ((} "(ij c: Ol c: ""0 c: "' :2 ~ "' Q) "5 Ql "E <0 <0 ;;: -~ ""OUJ ""0>. 0 c: 0 :::J "' ::J Q) E ~Q) u 0 ((} Ol ~ 0 <0 .: -~ Q) <0 ~ :2 OOl 0 c: Q) 0 U)E <0 0:;::; Q)-Q) <0 (.) Q) I! (ij i~ s: 0 -a; 0::: N til ~== Ol ·a. "E ~ c: 2 <0 Q) E -" Qi -::J .c E~ ==en ~. :0 2 ""0 .r:.c: Q) LL u Q; > Q) ::J ""0 :0~ ·-""0 2 c: ~~ -" :2 <0 u <t 0 0 t:: ·-c. 'C Q) ~ ~ u c: .c<O ·:;; <0 u N c: c: Q) ~ <0~ 0 Q) .J::. .c <0 .se <00) .l!!o ~ <0 15 <0 0 0 ~~ 0 <t ii5 -<0 -c: Ci5 (!) UJO U5 U) (.) u::: (!) U)> U) U)Cl. U)_ U)C::: c.. c.. :2 U) <..:>::2
CASQA Designation 7 1'-co Ol ~ ~ (') ,. Ll) ~ 1'-· co 0 ~ N ~ (') 1'-co ~ N (') ,. Ll) CD co c.) c.) c.) ~ w w w w w ~ r± ch ch ch ch ~ ~ ~ ~ ~ ~ c.) LlJ LlJ w :2 LlJ LlJ LlJ U) U) U) U) U) U) U) I-I-z z z z s: s: s: s: s: s: Construction Activity LlJ U)
~ /
Gradir1!J!Soil Disturbance v ,/ V, v v o/ ,/ v V' ;/ ,/
Trenching/Excavation v .....-::: ,/ o/ L_ _1/ v v ,/
Stockpiling v v '-"""' ./ v ,/ ./ ,/ ,/ v
Drilling/Boring
Concrete/Asphalt Saw v v cuttil}g
Concrete flatwork ./
Paving " Conduit/Pipe Installation ·.,/
Stucco/Mortar Work
Waste Disposal ~
Staging/Lay Down Area ,/
Equipment Maintenance
and Fueling
Hazardous Substance
Use/Storage
Dewatering '
Site Access Across Dirt ~
L__ Other (list): ___ --------L_ __
Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was
checked off and for each of the selected BMPs selected from the list. For Example -If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review
the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction
Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice
measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 of 3 !! REV 4/30/10
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
land Development Engineering
1635 Faraday Avenue
760-602-2750
www .carlsbadca.gov
To address post-development pollutants that may be generated from development projects, the City requires that new development and
significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project
design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards
(Volume 4, Chapter 2) at www.carlsbadca.gov/standards.
Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that
must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to
'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many
aspects of project site design are dependent upon the storm water standards applied to a project.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has
responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire
was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return
of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please
seek assistance from Land Development Engineering staff.
A separate completed and signed questionnaire must be submitted for each new development application submission. Only one
completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently.
In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits
for the project.
Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city.
1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet
the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or
other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from
paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in
.,,...r·nrnl-=>nt'o with USEPA
2. or roads that are
YES NO
If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is
NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my
project does not meet PDP requirements" and complete applicant information.
2.
E-34 Page 1 of 3 Effective 6/27113
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
determine if your project is a priority development project, please answer the following questions:
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively
over the entire project site? This includes commercial, industrial, residential, mixed-use, and public
on land.
2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire
project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial,
~d 00 ~~
3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared
foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared
foods and drinks for immediate
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a hillside development project? A hillside development
project includes development on any natural slope that is twenty-five percent or greater.
5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a parking lot. A parking Jot is a land area or facility for the
of motor vehicles used for · or for commerce.
6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a street, road, highway freeway or driveway? A street,
road, highway, freeway or driveway is any paved impervious surface used for the transportation of
and other vehicles.
7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of
impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive
Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or Jess
from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the
ESA not with flows from •
8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a
facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013,
501 5541 or 7536-7539.
9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's
that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of
100 or more vehicles
1 O.ls your project a new or redevelopment project that results in the disturbance of one or more acres of land and
are expected to generate pollutants post construction?
Pacific Ocean creates 2,500 square feet or more of
i rvious su surface on the more than 10%?
you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to
lementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such
source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your
lapplic;ation(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this
uestionnaire, check the "my project meets PDP requirements" box and complete applicant information.
you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject
plementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for
ln"''''"'l''n"'"'nt projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to
the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applica
rmation.
E-34 Page 2 of 3 Effective 6/27113
~' :r~.
~ CITY OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
8-24
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www .carlsbadca.gov
I am applying to the City of Carlsbad for the following type(s) of construction permit: ~Building Permit D Right-of-Way Permit
0 My project is categorically EXEMPT from
the requirement to prepare a storm water
pollution prevention plan (SWPPP) because it
only requires issuance of one or more of the
following permit types:
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Sprinkler
Electrical
Fire Additional
Fire Alarm
Fixed Systems
Mechanical
Mobile Home
Plumbing Water Discharge
Project Storm Water Threat Assessment Criteria*
No Threat Assessment Criteria
0 My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because
it meets the "no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
Tier 1 • j.ow Threat Assessment Criteria
ISr' My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project
meets one or more of the following criteria:
• Results in some soil disturbance; and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling).
Tier 2 • Moderate Threat Assessment Criteria
0 My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria:
• Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30).
Tier 3 • Significant Threat Assessment Criteria
0 My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
0 My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or,
0 My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s).
I certify to the best of my knowledge that the above
checked statements are true and correct. I understand
and acknowledge that even though this project does
not require preparation of a construction SWPP, I must
still adhere to, and at all times during construction
activities for the permit type(s) check above comply
with the storm water best management practices
pursuant to Title 15 of the Carlsbad Municipal Code
and to City Standards.
Project Address: Assessor Parcel No.
'The City Engineer may authorize minor variances from the Storm
Water Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Construction SWPPP Tier Level is
warranted.
B-24
~~-~-~ Wu\\ ·
~ES DNO
Page 1 of 1
Title:
Date: 10:
fl'l-1'1-IS C&IS:~S 137
Rev.03/09
<l~~ ~ CITY OF
CONSTRUCTION THREAT
ASSESSMENT WORKSHEET FOR
DETERMINATION OF PROJECT'S
PERCEIVED THREAT TO
STORM WATER QUALITY
E-33
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov CARLSBAD
Construction '" Perceived
SWPPPTier Construction Threat Assessment Criteria* Threat to
Storm Water Level Quality
Tier 3 -High Construction Threat Assessment Criteria
0 Project site is 50 acres or more and grading will occur during the rainy season
0 Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda
Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or
discharges directly to an ESA High 0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with
Tier 3 0
USDA-NRCS Erosion factors k1 greater than or equal to 0.4)
Site slope is 5 to 1 or steeper
0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
0
through April 30).
Owner/contractor received a Storm Water Notice of Violation within past two years
Tier 3-Medium Construction Threat Assessment Criteria Medium 0 All projects not meeting Tier 3 High Construction Threat Assessment Criteria
Tier 2 High Construction Threat Assessment Criteria
0 Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA
0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kr greater than or equal to 0.4) High
0 Site slope is 5 to 1 or steeper Tier 2 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
0 Owner/contractor received a Storm Water Notice of Violation within past two years
0 Site results in one half acre or more of soil disturbance
Tier 2 -Medium Construction Threat Assessment Criteria Medium 0 All projects not meeting Tier 2 High Construction Threat Assessment Criteria
Tier 1 -Medium lnsQection Threat Assessment Criteria
0 Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or
directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA
0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors k1 greater than or equal to 0.4) Medium 0 Site slope is 5 to 1 or steeper
Tier 1 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
0 Owner/contractor received a Storm Water Notice of Violation within past two years
0 Site results in one half acre or more of soil disturbance
Tier 1 -Low lnsQection Threat Assessment Criteria Low 0 All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria
Exempt -Not Applicable -Exempt
*The c1ty eng1neer may authonze mmor vanances from the construction threat assessment cntena m spec1al circumstances
where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of
the city engineer
E-33 Page 1 of 1 REV 4/30/10
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
Does the of impervious surface in an amount of less than
50% of i existi
If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement
impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and
complete applicant information.
If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4,
check the " meets PDP irements" box and com icant information.
D My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater
criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application.
I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details.
My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per
the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project.
Applicant Information and Signature Box
Address: Accessor's Parcel Number(s): t\:f6\"\1~0-t..:r\,)
Date: • l l .-t-oz.z_ '':,
This Box for City Use Only
City Concurrence: I YES I NO
I '><I
By: [G
Date: (~-lCI(-(5
Project ID: c__g f5 ) S'f ~7
* Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas
designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the
San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources
Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their
quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
E-34 Page 3 of 3 Effective 6/27/13
~ «~:
-~ CITY OF
CARLSBAD
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
P-29
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.crlrlsbrldcrl.flOV
DATE: Nov 3, 2015 PROJECT NAME: VISTAS PROJECT ID: PUD 13-06(A)
PLAN CHECK NO: CB 15-3587 SET#: 1 ADDRESS: 2483 WELLSPRING ST APN: 208-192-93-00
~ This plan check review is complete and has been APPROVED by the PLANNING
Division.
By: CHRISTER WESTMAN
A Final Inspection by the PLANNING Division is required DYes IS] No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: cjackson@tollbrothersinc.com
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
~ Christer Westman
760-602-461.4
Christer.Westman@Carlsbadca.gov
D Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
D Veronica Morones
760-602-461.9
Veronica.Morones@carlsbadca.gov
Remarks:
ENGINEERING
760-602-2750
Chris Glassen
760-602·2784
760-602-2773
FIRE PREVENTION
760-602-4665
Greg Ryan
760-602-4663
Gregory.Ryan<il?carlsbvdca.gov
Cindy Wong
760-602-4664