HomeMy WebLinkAbout2500 CAMPBELL PL; ; CB063431; Permit01-14-2008
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No
Building Inspection Request Line (760) 602-2725
CB063431
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
Project Title
2500 CAMPBELL PL CBAD
COMMIND Sub Type
2132610500 Lot*
$738 047 00 Construction Type
Reference #
21069 SF SELF STORAGE
BLDG B-3
COMM
14
5B063266
Applicant
BEVERLEY RUTHERFORD
VALLI ARCHITECTURAL
81 COLUMBIA #200
ALISO VIEJO, CA 92656
949-349-1777
Status
Applied
Plan Approved
Issued
Inspect Area
Plan Check*
Owner
V P I BRESSI STORAGE L L C
C/0 TEEL PALMER&ROEPER LLP
11455 EL CAMINO REAL #300
SAN DIEGO CA 92130
ISSUED
11/14/2006
Entered By
01/14/2008
01/14/2008
JMA
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
Reel Water Con Fee
$2,402 35 Meter Size
$0 00 Add'l Reel Water Con Fee
$1,56153 Meter Fee
$0 00 SDCWA Fee
$0 00 CFD Payoff Fee
$15499 PFF (3105540)
$8 427 60 PFF (4305540)
$0 00 License Tax (3104193)
$0 00 License Tax (4304193)
$000 Traffic Impact Fee (3105541)
$0 00 Traffic Impact Fee (4305541)
$0 00 PLUMBING TOTAL
$0 00 ELECTRICAL TOTAL
$0 00 MECHANICAL TOTAL
$0 00 Master Drainage Fee
Sewer Fee
$0 00 Redev Parking Fee
$0 00 Additional Fees
HMP Fee
TOTAL PERMIT FEES
$000
$000
$000
$14 748 30
$13,43246
$000
$000
$000
$1 260 00
$000
$41 00
$13500
$3450
$000
$000
$000
$000
$000
$4219773
Total Fees $42,197 73 Total Payments To Date $0 00 Balance Due $42,197 73
Inspectol
FINAL
Date
PROVAL
Clearance
NOTICE Please take NOTICE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively
referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these feeb/exactions If you protest them you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bai any subsequent legal action to attack
review set aside void or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired
City of Carlsbad
Final Building Inspection
Dept Building Engineering Planning CMWD St Lite F
Plan Check #
Permit # CB063431
Project Name 21 069 SF SELF STORAGE
BLDG B-3
Address 2500 CAMPBELL PL
R
E
rp
EC
JUL
El
-9
( in of CAKNGIM Hvy"!V
YE
2008
ID
! SE5VD
I'MjtrMENT
Lot
Date 07/09/2008
Permit Type COMMIND
Sub Type COMM
14
Contact Person MARK
Sewer Dist CA
Phone 6192474697
Water Dist CA
Inspected
By (2r^i(f5^ Af&t
Inspected
Bv
Inspected
Bv
Comments
Date
QHO5> Inspected
Date
Inspected
Date
Inspected
rAr/j;£> Approved
Approved
Approved
Disapproved *L
Disaooroved
Disapproved
City of Carlsbad
Final Building Inspection
Dept Building Engineering Planning CMWD St Lite l=ire>
Plan Check #
Permit*
Project Name
Address
Contact Person
Sewer Dist
Inspected .,
Bv L
Inspected
Bv
Inspected
Bv
Comments
CB063431
21069 SF SELF STORAGE
BLDG B-3
2500 CAMPBELL PL
MARK Phone 6192474697
CA Water Dist CA
f~1J Date / / /
^flf—-" Inspected ll°i\GO
1 1 f '
' Date
Inspected
Date
Inspected
• •
Date
Permit Type
Sub Type
Lot 14
Approved r
Approved
Approved
07/09/2008
COMMIND
COMM
Disapproved
Disapproved
Disapproved
City of Carlsbad Bldg Inspection Request
For 07/24/2008
Permit* CB063431
Title 21069 SF SELF STORAGE
Description BLDG B-3
Inspector Assignment PY
Sub Type COMM
2500 CAMPBELL PL
Lot 14
Type COMMIND
Job Address
Suite
Location
OWNER V P I BRESSI STORAGE L L C
Owner V P I BRESSI STORAGE L L C
Remarks A M PLEASE - FINAL B/3
Inspec
Total Time Requested By MARK
Entered By CHRISTINE
CD Description
19 Final Structural
Comments
Comments/Notices/Holds
Associated PCRs/CVs Original PC#
Inspection History
Date Description Act
07/09/2008 89 Final Combo NR
05/23/2008 18 Exterior Lath/Drywall AP
05/01/2008 18 Exterior Lath/Drywall PA
05/01/2008 84 Rough Combo PA
04/04/2008 66 Grout AP
03/31/2008 66 Grout AP
03/26/2008 14 Frame/Steel/Bolting/Welding PA
03/19/2008 66 Grout PA
03/14/2008 66 Grout PA
03/12/2008 66 Grout PA
03/11/2008 66 Grout PA
03/07/2008 66 Grout AP
03/05/2008 66 Grout PA
02/29/2008 66 Grout AP
02/19/2008 11 Ftg/Foundation/Piers AP
02/11/2008 66 Grout AP
02/07/2008 66 Grout PA
01/31/2008 11 Ftg/Foundation/Piers PA
Insp Comments
PY NEED ENGINEERING
PD south side
PY
PY
PY STAIRS AND ELEVATOR
PY ELEVATOR & STAIR
PY 2ND FLOOR DECK
PY COLUMNS & WALL
PD EAST WALL 2ND LIFT
PY EAST WALL AND COLUMNS
PY EAST WALL PARTIAL OK
PY NORTH WALL COMPLETE
PY STAIRWELL AND NORTH WALL @ EAST END
PD 1ST LIFT NORTH
MC SFG & STEEL @ LINE 32 37 39-40 & 41 42 RECEIVED COPY OF
SOILS & SPECIAL INSP REPORTS
PY 2ND LIFT @ SECTION #1
PY ELEVATOR 3RD LIFT WALL SECTION #1 1ST LIFT
TP CLEAN MUD OFF REBAR NEED SPECIAL INSP / SOILS OK
i nr^TWINING
LABORAJORtES
o r SOUTI i r. RN CALI TOR.V i A
3310 Airport'Waiy,' Long Beach"' CA~9"08d6
Ph 562 426 3355 Fax 562 426 6424
www twmmglabs com
Compression Test On Concrete
Customer QUALITY ASSURANCE INSPECTIONS
17942 SKY PARK CIRCLE
SUITE J
IRVINE CA 92614
Project ,QAI^BRESSI-RANC-H-SEFF-ST0RAG'E>
LOT 14, SEC - PALOMAR AIRPORT ROAD & EL CAMINO REAL
CARLSBAD, CA
Print Date 05/16/2008
Lab Number 2-11-080097207
Project No 0705362
Permit No
OSHPD
DSA AP #
Architect
VALLI
Engineer
RASKIN
Ghent's Customer
DSA File #
Contractor
SAN DIEGO CONTRACTING
Subcontractor
CPE
VERIALLIANCE PROPERTIES
Sampled From -B.aii:DING:B..3:2ND-L"EVEL:DECK
•^2 + 39 3
Specified
Slump (in) 4
Air Content (%)
Density (pcf)
Ambient Temp (F)
Concrete Temp (F)
Test Date 4/3/2008
Specimen* 1-1
Gust Spec # 1
Age (Days) 7 oay
Dims (in) 601X1200
Area (sq in) 28 37
LID or hp/tp 2 00
Total Load (Ibf) 99050
Comp Str (psi) 3492
Corr Factor 1 00
Corr Str (psi) 3490
Measured
5*T
Date Cast 3/27/2008 Specimen By M KINGERY QAI
Received On 3/28/2008 Delivered By WT TLSC
MIX RS3 ORB31
Spec Str (Psi) 3000 @ 28 Days
Spec Str (Psi) 0 @ 0 Days
4/24/2008 4/24/2008
2-2
2
28 Day
601X12
2837
200
128640
4535
1 00
4540
3-3 4-4
3 4
28 Day Hold
00 601X1200
2837
200
131890
4649
1 00
4650
Average 28 Day Strength 4595
Procedures ASTM C31 (Specimen Prep) ASTM C39 (Compressive Strength) ASTM C143 (Slump) Specimen Shape Cylinders
Compliance Most Recent Test Results Comply Did Not Comply With Specified Strength
QUALITY ASSURANCE INSPECTION
Comments
BENITO CABAN - FILE COPY
Benito Caban Project Engineer Date
All Reports Remain The Property Of TWINING LABORATORIES of SOUTHERN CALIFORNIA INC Authorization For The Publication Of Our Reports
Conclusions Or Extracts From Or Regarding Them Is Reserved Pending Our Written Approval As A Mutual Protection To Clients The Public And Ourselves
^*™^?^J£!S!£3«S^i'Lff^?ftf2!a^ ™T..«ErT-™--1i~
TWINING
LABORATORIES
or SOUTH F.HN
-/
3310 Airport Way, Long Beach, CA 90806
Ph 562 426 3355 Fax 562 426 6424
www twininglabs com
Compression Test On Grout
Customer QUALITY ASSURANCE INSPECTIONS
17942 SKY PARK CIRCLE
SUITE J
IRVINE CA 92614
Project ~QAI^:BRESS|-RANCH_SELE:ST_ORAGE-
LOT 14, SEC - PALOMAR AIRPORT ROAD & EL CAMINO REAL
CARLSBAD, CA
Architect
VAILLI
Engineer
ROSKIN
Client's Customer
Print Date 05/01/2008
Lab Number 2-11-080091908
Project No 0705362
Permit No
OSHPD
DSA AP #
DSAFile#
Contractor
SAN DIEGO CONTRACTING
Subcontractor
JB MASONRY
Sampled From --1ST LIFT ABOVE SLAB ON GRADE 39 LINE AND
Specified
Slump (in) 8-10
Air Content (%)
Density (pcf)
Ambient Temp (F)
Concrete Tern p (F)
Test Date 3/10/2008
Specimens 1-1
Gust Spec # 1
Age (Days) 7 Day
Dims (in) 315X324X594
Area(sq in) 1021
L/D or hp/tp 1 89
Total Load (Ibf) 32411
CompStr(psi) 3176
Corr Factor 1 00
CorrStr(psi) 3180
Measured
9
72
65
3/31/2008
2-2
2
28 Day
310X321X5
995
1 92
36208
3639
1 00
3640
Date Cast 3/3/2008 Specimen By M KINGERY QAI
Received On 3/5/2008 Delivered By TLSC
M|X 2000P3/8
SpecStr (Psi) 2000 @ 28 Days
Spec Str (Psi) 0 @ 0 Days
3/31/2008
3-3
3
28 Day
95 316X321X597
1014
1 89
36494
3598
1 00
3600
Average 28 Day Strength 3620
Testing ASTM C1019 Specimen Shape Prisms
Compliance Most Recent Test Results Comply O Did Not Comply With Specified Strength
QUALITY ASSURANCE INSPECTION
Comments
BENITO CABAN - FILE COPY
Benito Caban Project Engineer Date
All Reports Remain The Property Of TWINING LABORATORIES of SOUTHERN CALIFORNIA INC Authorization For The Publication Of Our Reports
Conclusions Or Extracts From Or Regarding Them Is Reserved Pending Our Written Approval As A Mutual Protection To Clients The Public And Ourselves
TWINING
LABORATORIES
OF SOUTH tRN CALIFORNIA
3310 Airport Way, Long Beach, CA 90806
Ph 562 426 3355 Fax 562 426 6424
www twimnglabs com
Compression Test On Masonry
Customer QUALITY ASSURANCE INSPECTIONS
17942 SKY PARK CIRCLE
SUITE J
IRVINE, CA 92614
Project^QAI^BRESSIrRA'NCH-SELF^SfTORAGE
TOT 14, SEC - PALOMAR AIRPORT ROAD & EL CAMINO REAL
CARLSBAD, CA
Architect
VALLI
Engineer
ROSKIN
Client's Customer
Print Date 04/21/2008
Lab Number 1-11-080095140
Project No 0705362
Permit No
OSHPD
DSA AP #
DSA File #
Contractor
SAN DIEGO CONTRACTING
Subcontractor
JB MASONRY
Sampled From N/l
Specified Measured Date Cast 3/20/2008 Specimen By M KINGERY QAI
Slump (in) 8-10 90 Received On 4/8/2008 Delivered By TLSC
Air Content (%) M)x 2000P38
Amb,eneSp
P(F) Spec Str (Ps,, 2000 @ 28 Days
Concrete Temp (F) Spec Str (Psi) 0 @ 0 Days
Test Date
Specimen #
Cust Spec #
Age (Days)
Dims (in)
Area (sq in)
L/D or hp/tp
Total Load (Ibf)
Comp Str (psi)
Corr Factor
Corr Str (psi)
4/17/2008
1-1
1
28 Day
7 50X9 00X16 25
6750
217
229920
3406
1 01
3440
4/17/2008
2-2
2
28 Day
750X900X1625
6750
217
227550
3371
1 01
3410
Average
4/17/2008
3-3
3
28 Day
750X900X1625
6750
217
230520
3415
1 01
3450
28 Day Strength 3433
Testing ASTM C1314 Specimen Shape Prisms
Compliance Most Recent Test Results 0 Comply Did Not Comply With Specified Strength
QUALITY ASSURANCE INSPECTION
Comments
BENITOCABAN FILE COPY
MAY 0 6 2008
Ed Che Civil Engineer Date
All Reports Remain The Property Of TWINING LABORATORIES of SOUTHERN CALIFORNIA INC Authonzdtion For The Publication Of Our Reports
Conclusions Or Extracts From Or Regarding Them Is Reserved Pending Our Written Approval As A Mutual Protection To Clients The Public And Ourselves
FINAL REPORT OF INSPECTION AND TESTING
City of Carlsbad Department of Building and Safety
1200 Carlsbad Village Dnve
Carlsbad, CA 92008
August 11, 2008
Project No 070536
Permit Nos Bldg 1 CB063426/
Bldg 2 CB063430K
, Bldg A CB063266 jL* J3
Project •, Bressj Ranch Self Storage
'25WCampbell Place"
Carlsbad, California
This letter may be considered the final report and is to affirm the material testing and inspections by registered
special inspectors, through Quality Assurance Inspections, Inc, on the
Reinforcing Steel Inspect placing at job, inspection of epoxy rebar dowels, Structural Steel Inspection of welds -
field, inspection of bolting - field, Brick and Block Inspection of placing, test masonry prisms, Concrete Inspect
placing, field sampling, compression tests, pick-up samples at job, Masonry Grout Inspect placing, field sampling,
compression tests, pick-up samples at job, Mortar Inspect placing, field sampling, compression tests, pick-up
samples at job, Non-Shrmk Grout Inspect placing, field sampling, compression tests, pick-up samples at job, Other
Tests and Inspections Inspection of anchor bolt installation, Laboratory testing performed by Twining
Laboratories of Southern California
To the best of our knowledge, the work items noted above are in compliance with approved plans, revisions,
specifications, and all applicable codes
Submitted
Unas Vitkus R C E 63163
Civil Engineer
Distribution
(1)
(1)
(D
(1)
(D
(D
Inc
VPI Bressi Storage, LLC
Carlsbad Self Storage Investors, LLC
San Diego Contracting, Inc
Raskin Engmeenng, Inc
Valli Architectural Group
17942 Sky Park Circle, Suite J, Irvine, CA 92614 Phone (949) 553-0370 Fax (949) 553-0371
0<-~3^3I
17942 Sky Park Circle Ste J Irvine California 92614
Phone (949) 553-0370
Fax (949) 553-0371
www qannc com
INSPECTION REPORT
INSPECTORCODE
K\
JOB NUMBER DATE W
NAME ., . O
SvlV
BUILDING / OSHPD PERMIT # / DSA APP#DSA FILE*
GENERAL RACTOR RISDICTION
ARCHI ENetMEERtC SUBCONTRACTOR (idhy)
REQUIREMENTS Limit of one job number one permit number per sheet Identify all work by type and SPECIFIC location Non compliant work must be
specifically identified Communication (RFI Sketch etc ) voiding previous non-compliant items must be listed record conversations and communications
with project designers, building and permit granting authority officials
HOURS
REGULAR
f^iv <m\
15X
*&*>rw TMEXtf
2X
k- 2?r l\rs
TIME IN TIME OUT MEAL PERIOD
| Mileage [ | Expenses
[^Reinforcement.
Q Fireproofmg
| Concrete Placement.
I Quality Control
j Masonry.
Administration.
. | | Prestress Post Ten.
.PI Other
Batch Plant.
DESCRIPTION OF WORK INSPECTED
MIX USED DESIGN SLUMP ADMIXTURE DESIGN PSI CUBIC YARDS SPECIMENS
Certification of Compliance
I declare under penalty of perjury that all of the above statements are true
and that of my own personal knowledge the work during the period covered
by tl>«. report has been performed and installed in compliance with the
( (a.rkViiOol approved plans specifications
(approving authority e g DSA OSHPD City o! LA etc )
and all applicable codes except as noted below
Exoeption(s) noted in report Yes
(Initial at Yes / No as applicable)
|~~[ Additional Page (Page #) CM.
No
Inspector's Name
Inspector's Signature
Inspector's ID / Lie #
All inspections based on minimum of 4 hours and over 4 hours 8 hours minimum
In addition any inspection extending past noon will be cin 8 hour minimum
If inspector is called to a project and no work is performed a 2 hour minimum
charge will be applied
Approved/Authorized by
Submitted by
Quality Assurance Inspections
17942 Sky Park Circle Ste J Irvine California 92614
Phone (949)553-0370
Fax (949)553-0371
www qaunc com
INSPECTION REPORT
INSPECTORCODE JOB NUMBER DATE W
V
K Si
BUILDING / OSHPD PERMIT # / DSA APPS DSA FILE*
GENERAL COIKBACTORIfKBA
U*
(IMlV
JURISDICTION
3"ARCHITECT SUBCONTRACTOR (IMny)
REQUIREMENTS Limit of one job number one permit number per sheet Identify all work by type and SPECIFIC location Non compliant work must be
specifically identified Communication (RFI Sketch, etc ) voiding previous non compliant items must be listed record conversations and communications
with project designers, building and permit granting authority officials
HOURS
REGULAR
Q
1 5X 2X TIME IN
/voo
TIME OUT
^.<3o
MEAL PERIOD
3 Mileage ^ | | Expenses
| Reinforcement | \ Concrete Placement j | Masonry j [ Prestress Post Ten | | Batch Plant.
| Fireproofmg | | Quality Control [""] Administration [~| Other
DESCRIPTION OF WORK INSPECTED
\J^Uvt/ CllVA
VwiUi-»c %3
/3S £>*i.C oit_-
&\c/S+*.\r I
A^itJliol pl*C-
f>pl~ tr^M^. ^
Ui uJ F / "N t<v
r Sk -5 tVcl
J
L^K A£0<L
^Wr',JC GH°
C
£ Do^r/ f*
>a7
r r\ ' / C i f•\ (4? 0 s / o^st.^*^ p I 'bc<.rt'i.<o 4- oV ri\o VftfciOt
i ^1 /^ /^ ^ j ^> t i t . •*? C/ i -^ O <"J 1*^,
• 4 OL ^.C^TN^ e\ o v-^J *-^ v^ | / ^^ \, ^^- 4* t j o ^"o «^ 7 ' / * ^ ^.
&l£ 1 dilC^ v^*i t>*U> ^oleorJ &f c^\J-U C &' j M r
io^rOiJc I ^:l( eKuX <^Ws 7oc*K..J J<«^arrao
J *
^f^i*-/ M g CoO »TVt\J «u{ ^
MIX USED DESIGN SLUMP
Certification of Comphanc
I declare under penalty of perjury that all of the abov
and that of my own personal knowledge the work dur
by ttus report has been performed and Installed in
(. a/U V>»ac| appro\
(approving authority e g DSA O
and all applicable codes ex
Exception(s) noted in report
(Initial at Yes / No as applicable)
Inspector's Name
Inspector's Signature
Inspector's ID / Lie #
ADMIXTURE
e
e statements are true
ng the period covered
compliance with the
/ed plans specifications
SHPD City ol LA etc)
sept as noted below
Yes No V^O^
/vr'fc. &KXV
i A^^ i/ksv
lj
•>^
V*
DESIGN PSI CUBIC YARDS SPECIMENS
[ | Additional Page (Paae #) CM
All inspections based on minimum of 4 hours and over 4 hours 8 hours minimum
In addition any inspection extending past noon will be an 8 hour minimum
It inspector is called to a project and no work is performed a 2 hour minimum
charge will be applied
Approved/ Authorized by
(Project Superintendent)
Submitted by
Quality Assurance Inspections
17942 Sky Park Circle Ste J Irvine California 92614
Phone (949) 553-0370
Fax (949) 553-0371
www qannc com
INSPECTION REPORT
INSPECTOR CODE JOB NUMBER DATE Ty w
JQ&MAME ("-*••). \uaofc>>BUILDING / OSHPD PERMIT #/ DSA APP#
f
DSA FILE*
ADDRESS
QCbO
*7 1rl /~k / 1 I
LuM-l&bac/
GENERAL CONIBACTOR
ARCHIT ECT EIJI6WEER
Ka&fcvJ
SUBCONTRACTOR (If Arly
REQUIREMENTS Limit of one job number one permit number per sheet Identify all work by type and SPECIFIC location Non compliant work must be
specifically identified Communication (RFI, Sketch, etc ) voiding previous non compliant items must be listed record conversations and communications
with project designers, building and permit granting authority officials
HOURS
REGULAR 1 5X 2X TIME IN
/ /ia o
r TIME OUT
/•SO />«*-\
MEAL PERIOD
I Mileage *-/ o I I Expenses.
[y|. Reinforcement.
| | Fireproofmg
. [""] Concrete Placement | | Masonry | | Prestress Post Ten_
. Q Quality Control |"~] Administration | | Other
Batch Plant.
DESCRIPTION OF WORK INSPECTED
'
3^ toffte" 3*7
MIX USED DESIGN SLUMP ADMIXTURE DESIGN PSI CUBIC YARDS SPECIMENS
Certification of Compliance
I declare under penalty of perjury that all of the above statements are true
and that of my own personal knowledge the work during the period covered
by thjs report has been performed and installed in compliance with the
C^Af \&fa (ft-<Ji approved plans specifications
(approving authority e g DSA OSHPD City of LA etc)
and all applicable codes except as noted below
Exception(s) noted in report Yes
(Initial at Yes / No as applicable)
Inspector's Name
Inspector's Signature.
Inspector's ID / Lie #
| | Additional Page (Page #) CM.
No ^X
All inspections based on minimum of 4 hours and over 4 hours 8 hours minimum
In addition any inspection extending past noon will be an 8 hour minimum
If inspector is called to a project and no work is performed a 2 hour minimum
charge will be applied
Approved/Authorized by _
Submitted by.
(Project Superintendent)
Quality Assurance Inspections
SUBMIT TO QAS
Geotechnical and Environmental Science Consultants
San Diego Irvine Ontario Los Angeles
Oakland Las Vegas Phoenix
www nmyoandmoore com
FOUNDATION EXCAVATION
OBSERVATION MEMORANDUM
Project No
Project Name "Dp
Address
CJbbCr Cst \S\Q6l
Plan File No Permit/Appl No Other Reference
SUBJECT Foundation Excavation Observation For , x,
(structure)
The undersigned has observed the footing excavations listed below for the subject structure(s) The materials exposed in
/-• ,- / S. W-, 5«- -i> \the bottom of the footing excavations were comprised of Co'^pcc^--') ki' .y./'^ .ym^ff-a-agi s,., \ (ci<-.t^ S^.JA;
that probed firm, and appeared generally consistent with the conditions anticipated in the project geotechnical report prepared by
. o+ a *> T'^jf dated D*.c 2.2* riook> Based on our observations,t-_ g-' ft
measurements and review of the approved project documents, we noted that the footing excavations generally conform to the
depths and widths indicated on the project foundation plans dated i & / o U op^?. ^/ip/vi , and prepared by
vcv U. ft rc.U fe.£.-K. » ) <^ r ut/ p Accordingly, it is our opinion that the footing excavations
observed are suitable for support of foundations designed in accordance with the recommendations of the project geotechnical
report The following footings excavations were observed
X to-re/"- of fr.-O f,-&\es or fo*jt >~*\,ot*s ^aj'h>J<=.A "TDr
I,*)*- BZ >»> r< , •.
Recommendations Prior to placement of steel reinforcement and concrete, the footings should be cleaned of loose soils,
standing water or debris Soil exposed in the footings should be maintained m a moist condition by light sprinkling as ap-
propriate We understand that inspection of reinforcing steel and cleanliness of foundation excavations will be performed
by the Building Agency's inspector prior to placement of concrete In the event the footing excavations are disturbed by
construction activities, rainfall, or other environmental conditions, our office should be notified and the footing excava-
tions should be re-evaluated
The following footings were checked and found to need further work to conform to the Project Plans
BY
For Nmyo & Moore
Foundttion Exovuion Observation Memo v2 21 doc
White Copy - Project File, Yellow Copy Client Pink Copy - Field File
Geotechnical and Environmental Science Consultants
San Diego Irvine • Ontario • Los Angeles
Oakland • Las Vegas Phoenix
www ninyoandmoore com
FOUNDATION EXCAVATION
OBSERVATION MEMORANDUM
Date ProjectNo
Project Name
Address
Plan File No Perrmt/Appl No Other Reference
SUBJECT Foundation Excavation Observation For
(structure)
The undersigned has observed the footing excavations listed below for the subject structure(s) The materials exposed in
the bottom of the footing excavations were comprised of Ce,n OAC T* o Ft n.
that probed firm, and appeared generally consistent with the conditions anticipated in the project geotechmcal report prepared by
» rc-5 dated JZ/TZ/?^*; Based on our observations,
measurements and review of the approved project documents, we noted that the footing excavations generally conform to the
depths and widths indicated on the project foundation plans dated v />lf /'2^7 , and prepared by
/g/^sfc//^ CF/vA/A/c^/g/ A/^ Accordingly, it is our opinion that the footing excavations
observed are suitable for support of foundations designed in accordance with the recommendations of the project geotechmcal
report. The following footings excavations were observed
71="2S 32
'<* ^.
r
Recommendations: Pnor to placement of steel reinforcement and concrete, the footings should be cleaned of loose soils,
standing water or debns Soil exposed in the footings should be maintained in a moist condition by light sprinkling as ap-
propriate We understand that inspection of reinforcing steel and cleanliness of foundation excavations will be performed
by the Building Agency's inspector prior to placement of concrete In the event the footing excavations are disturbed by
construction activities, rainfall, or other environmental conditions, our office should be notified and the footing excava-
tions should be re-evaluated Lac,^t' A^^T^J>A<~ *>H&ttt.t) fff .gfA'ot cv? //g/g/g r*
Q P £vuc a F TP . .
The following footings were checked and found to need further work to conform to the Project Plans
BY
For Ninyo & Moore
Foundation Excavation Obwrvatioo Memo v2 21 doc
White Copy - Project File, Yellow Copy Client, Pink Copy - Field File
Geotechnical and Environmental Science Consultants
San Diego Irvine Ontario Los Angeles
Oakland Las Vegas Phoenix
www ninyoandmoore com
Plan File No Permit/Appl No C tf O(> 3 V3 /
SUBJECT Foundation Excavation Observation For f?<
FOUNDATION EXCAVATION
OBSERVATION MEMORANDUM
Date I// jAwag Project No /£>£ / 2 y^ /
Project Name . , / _ -
Address ,
Z^^r^' C^t^if&ft-L ri^di:: CA/l t.'5i}t*t?j d/*
Other Reference
js i 0 ///<•> ^3
(structure)
The undersigned has observed the footing excavations list
the bottom of the footing excavations were comprised
that probed firm, and appeared generally consistent with the c
measurements and review of the approved project document
depths and widths indicated on the project foundation
1? A 5 fc. / // t?A/£f i */ (c (:K. M£)
observed are suitable for support of foundations designed m
report The following footings excavations were observed
/?// I <: Z?/A/(/-i ft^Z /--/«?«?/H fif/>ttoj( • i^A-'Tf:
F*i l~~ T l/v t^ EW y^ A H O V<? . / "Sc. L- A ~r &D r~c.
3 S B f *T iwz *& jJ (~t ft- i f) L. f +*f L~ 7 *~f A-^O 3o
ed below for the subject structure(s) The matenals exposed in
of <!"« t*p A c rev) Ft *- <~
onditions anticipated in the project geotechnical report prepared by
dated ' 2 /^ 1 / 2ss- £ Based on our observations,
ts, we noted that the footing excavations generally conform to the
plans dated ^ / 1 1> 1 ? w? , and prepared by
Accordingly, it is our opinion that the footing excavations
accordance with the recommendations of the project geotechnical
*r/^ AL,^,£ Appeov Ai*T*--tw (-.WL^e
iufc-^r ^»-r 0^$ *~v -rH e*€-f=°*.< ^^,'
Recommendations. Prior to placement of steel reinforcen
standing water or debns Soil exposed in the footings shoi
propnate We understand that inspection of reinforcing ste
by the Building Agency's inspector pnor to placement of
construction activities, rainfall, or other environmental co
lent and concrete, the footings should be cleaned of loose soils,
ild be maintained in a moist condition by light sprinkling as ap-
:el and cleanliness of foundation excavations will be performed
concrete In the event the footing excavations are disturbed by
ndltions. our office shoujd he.nqtified and the footing pxcava-
tions should be re-evaluated. Lot^i- M*+ T >s ,j. > /i ^ a u/s D L &/? / ^ AHZ s t=*^ t- c j /* •?/•*<? A«. &-r'-*s<.j
(z? jf £ /Q i, /•) 7'//>yv *5 5 A^'<'-> C/ t_ /2 $ C"~" f£ €~ fi''ft &(' £? iJ ^ti.^ re 7/yt- *<A<&itt=A,r <^/^ Ct*'f/ft n-r
The following footings were checked and found to need further work to conform to the Project Plans
BY 72-K-i. ~--&2— \ /^Cc 7<i5r^y
For Nmyo & Moore
Foundation Exovation OtnervMion Memo v2.21 doc
White Copy - Project File, Yellow Copy - Client, Pink Copy - Field File
Geotechnical and Environmental Science Consultants
San Diego Irvine Ontario Los Angeles
Oakland Las Vegas Phoenix
www nmyoandmoore com
Plan File No /•— - Permit/ Appl No r ,£ r f~Z~> /-/_
FOUNDATION EXCAVATION
OBSERVATION MEMORANDUM
Date .„_ ___ ^ Pro|ect No /,,* f \~) li s\s\ 1
Project Name „ _ / /jfceS^I fa,<.^(_U % p !-f
^\ V } C t ^> 1 -^1-^,0 \ i vj i / ^S /Ci~<x< -f
Address ^ i C^-iPrv. ' o j&ff £
r y
Other Reference
SUBJECT Foundation Excavation Observation For P)LA\v 0 l H V. /J"""^5 C. Z. C. 6^ iX /<3 <>• "%
* (structure)
The undersigned has observed the footing excavations list
the bottom of the footing excavations were comprised
that probed firm, and appeared generally consistent with the c
l^e. \C/|V\ \OVsi £\AI<A ^C,S r ' C. l rYi -p> S> i'V C
measurements and review ofjhe approved project document
depths and widths indicated on the project foundation
observed are suitable for support of foundations designed in
report The following footings excavations were observed
ed below for the subject structure(s) The materials exposed in
of (L/S (AA.^'C'vf ie/J -T~~l 1— .1
onditions anticipated in the project geotechmcal report prepared by
dated )^— "££.- coo ^ Based on our observations.
s, we noted that the footing excavations generally conform to the
plans dated H ~ f£? """ ^,^C>"7' > , and prepared by
Accordingly, it is our opinion that the footing excavations
accordance with the recommendations ofthe project geotc'chmcal
t
t~ / ti LA*- M v C A,pai/-oY_»VA-/s-A )-G>~> / Pe>o \ i-ik LwO <• f^.7V < i^j 5 / C /'' — !}£>
p'M^/i -^ 9o'/' <^<>r <^1 -?g'
A>u.vJ rts*7/MN UrvTvojAA^ M^^
v<>J?L -q^o'^^r;i \ ' is t A-AA M LAAH V i •?///* ^ • i
i - L
;
">
Recommendations Pnor to placement of steel reinforcement and concrete, the footings should be cleaned of loose soils,
standing water or debris Soil exposed in the footings should be maintained in a moist condition by light sprinkling as ap-
propriate We understand that inspection of reinforcing steel and cleanliness of foundation excavations will be performed
by the Building Agency's inspector prior to placement of concrete in the event the footing excavations are disturbed by
construction activities, rainfall, or other environmental conditions. our.office should be notified and the footing excava-
A '-v. 4 ' l!V
tions should be re-evaluated * • X.
> ^ "1. " N
y"" ••: "\
\; -
The following footings were checked and found to need further work to conform to the Project Plans
, X\
- -
W i (/,, r ,
BY / ry/r"* n V / / / s*\s}\ i^^k / <^/ \s v/\y •> // ^ " f V
For Nmya& IVloore^/ "•--
C
1
Fnundaiioii F.xciualion Observation Memo v2 21 doc
'"'White Copy Project File Yellow Copy Client Pink Copy Field File*-
V /
V 0(0
DAILY REPORT OF
FIELD OBSERVATIONS
DATE
NAME
AUTHOR
PROJ NO
CLIENT ^Cotxv. H/NX f
NO
EQUIPMENT \CONTRACTOR
FOREMAN
WEATHER
PERMIT NO
CODE DESCRIPTION OF WORK PERFORMED
AC f x .» C /
6
< /r~e
HOURS OT VISITORS
CLIENT REP
White File Copy Yellow Client Copy Pink Field Copy Page .. of
i .