HomeMy WebLinkAbout2501 EL CAMINO REAL; 230; CB150934; Permit (2)City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
06-05-2015 Commercial/Industrial Permit Permit No: CB150934
Building Inspection Request Line (760) 602-2725
Job Address: 2501 EL CAMINO REAL CBADSt: 230
Permit Type: Tl Sub Type: COMM Status: ISSUED
Applied: 03/30/2015
Entered By: RMA
Parcel No: 1563020800 Lot#: 0
Valuation: $120,942.00 Construction Type: 58
Occupancy Group: Reference#
Project Title: PEETS COFFEE-2006 SF WARM
SHELL TO COFFEE SHOP
Applicant:
REM ARCHITECTS
STE 8
16917 VENTURA BLVD
ENCINO CA 91316
818 788-9498
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Building Permit Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'! Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Fire Expedidted Plan Review
Total Fees:
Inspector:
$700.19
$0.00
$490.13
$0.00
$0.00
$33.86
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5.00
$295.00
yments To Date:
Date:
Owner:
CMF PCR L L C
Plan Approved: 06/04/2015
Issued: 06/04/2015
Inspect Area
Plan Check #:
C/0 WESTFIELD PROPERTY TAX DEPT
PO BOX 130940 DEPTWFLD
CARLSBAD,CA 92013
Meter Size
Add'l Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (31 04193)
License Tax (4304193}
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
Redev Parking Fee
Additional Fees
HMP Fee
Green Bldg Standards Plan Chk
TOTAL PERMIT FEES
$6,099.39 Balance Due:
Clearance:
$0.00
$0.00
$0.00
$0.00
$2,201.14
$2,031.83
$0.00
$0.00
$0.00
$0.00
$159.00
$115.20
$68.04
$0.00
$0.00
$0.00
$0.00
??
??
$6,099.39
$0.00
NOTICE: Please take NO pproval of your project includes the "lmpositio 'of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactio s." Yo have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which ou have reviousl been iven a NOTICE similar to this. or as to which the statute of limitations has reviousl otherwise ex ired.