HomeMy WebLinkAbout2501 EL CAMINO REAL; 204; CBC2017-0103; RecycleNONRESIDENTIAL GREEN
BUILDING CODE STANDARDS
MANDATORY MEASURES
CERTIFICATION CHECKLIST
B-52
""'"~
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
This form, signed and completed, and all receipts for the recycled materials shall be
submitted to the Building Inspector prior to Final Inspection •
..,,w.
Site ll>evelopment Mandatory
5.106.1 Storm water pollution prevention plan. For projects of one acre or less, develop a Storm
Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to (X)
the State Storm water NPDES Construction Permit or local ordinance, whichever is stricter, as is G-210 required for projects over one acre. The plan should cover prevention of soil loss by storm water SWPCNOTES run-off and/or wind erosion, of sedimentation and/or of dustlearticulate f"tlatter air oollution.
5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or (X) NIA
meet local ordinance, whichever is stricter. NO NEW PARKING
5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic, provide
permanently anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to (X)N/A
passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two-NO NEW PARKING
bike capacity rack.
5.106.4.2 Long Term bicycle parking. For buildings with over 10 tenant-occupants, provide secure
bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum (X) N/A
of one space. NO NEW PARKING
5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting,
~,n •1c,i~A!J~~'" fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.3.1.
5.106.8 Light pollution reduction. Comply with lighting power requirements in the California
Energy Code and design interior lighting such that zero direct-beam illumination leaves the building (X) N/A
site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 1-4 as defined in
Chapter 10 of the California Administrative Code, using the following strategies:
1. Shield all exterior luminaries or use cutoff luminaries (X) N/A
2. Contain interior lighting within each source (X) N/A
3. Allow no more than .01 horizontal foot candle 15ft. beyond the site (X) N/A
4. Contain all exterior lighting within property boundaries (X) NIA
Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking
facilities and walkways.
5.106.10 Grading and paving. The site shall be planned and developed to keep surface water -
away from buildings. Construction plans shall indicate how site grading or drainage system will (X) N/A
manaae all surface water.~pws.
Water Efficiency and Conservation
Indoor Water Use
5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503.1.1 (X)
through 503.1.3. P3.0 5303.1.1 Buildings in excess of 50,000 square feet Separate sub-meters shall be installed as
follows: (X) 1. For each individual leased, rented, or other tenant space within the building projected to
consume
more than 100 gal/day.
2. For spaces used for laundry or cleaners, restaurant or food service, medical or dental office,
laboratorv or beauty salon or barber shoo p_!:Qj_~_~ted to consume more than 100 gal/day.
B-52 Page 1 of 5 Rev_ 5/17
5.303.1.2 Excess consumption. Any building within a project or space within a building that is
projected to consume more than 1,000 gal/day.
5.303 Percent savings. A schedule of plumbing fixtures and fixture fittings that will reduce the
overall use of potable water within the building by 20 percent shall be provided (Calculate
savings by Water Use Worksheets or utilize Table 5.303.2.3).
5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are
served by more than one showerhead, the combined flow rate of all the showerheads shall not
exceed the maximum flow rates specified in the 20 percent reduction column contained in
Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in
ooeration at a time.
5.303.6 Plumbing fixtures and fittings. Plumbing fixtures (water closets
and urinals) and fittings (faucets and showerheads) shall comply with the requirements listed
for each type in items listed in Table 5.303.6.
1. Water closets (toilets) -flushometer type
2. Water closets (toilets)-tank type
3. Urinals
4. Public lavatory faucets
5. Public metering self-closing faucets
6. Residential bathroom lavatory sink faucets
7. Residential bathroom lavatory sinks
8. Residential showerheads
P3.0
(X)
(X)
P1.0
{X)
N/A
. ..
As applicable
{X) P1.0
(X) NIA
(X) P1.0
(X) P1.0
(X) N/A
(X) N/A
(X) NIA
(X) NIA
9. Sinole shower fixtures served by more than one showerhead !---"--'---'...._--------~-----------·······---------1---"-'-'-'-'-''----l (X) NIA
Outdoor Water Use
5.304.1 Water Budget. A water budget shall be developed for landscaping irrigation use.
5.304.2 Outdoor potable water use. For new water service, separate meters or submeters
shall be installed for indoor and outdoor potable water use for landscaped areas between
1,000 and 5,000 square feet.
5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500
square feet of landscaped area (the level at which the MLO applies), install irrigation controllers
and sensors which include the following criteria and meet manufacturer's recommendations.
5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of
final inspection shall comply with the following:
1. Controllers shall be weather-or soil moistureMbased controllers that automatically adjust
irrigation in response to changes in plant's needs as weather conditions change.
2. Weather based controllers without integral rain sensors or communication systems that
account for local rainfall shall have separate wired or wireless rain sensors which connects or
communicates with the controller(s}. Soil moisture-based controllers are not required to have
rain sensor input.
Construction Waste Management Plan
5.408.1 Construction waste diversion. Establish a construction waste management plan or
meet local ordinance, whichever is more stringent
5.408.2 Construction waste management plan. Submit plan per this section to enforcement
authority within the city.
5.408.1.4 Documentation. Provide documentation of the waste management plan (see form
B-59) that meets the requirements listed in Section 5.408.1.1 thru 5.408.1.3 and the plan is
accessible to the enforcement authority.
5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of
nonhazardous construction and demolition debris or meet local ordinance, whichever is more
stringent.
Exceptions:
1. Excavated soil and land-clearing debris
2. Alternate waste reduction methods, developed by working with local agencies if
diversion or recycle facilities capable of compliance with this item do not exist.
.!:~08.3 Excavated soil and land clearing debris. 100 percent of trees. Stumps, rocks and
B-52 Page 2 of 5
(X) N/A
(X) N/A
(X) NIA
As applicable
(X) NIA
(><)
{X)
(X) N/A
(X)
Rev. 5/17
associated vegetation and soils resulting primarily from land clearing shall be reused or
recycled.
Building Maintenance and Operation
5.410.1 Recycling by occu_p_a--n-ts-.-P-ro-v-id-e-re_a_d-ily-ac_c_e_s-si_b_le_a_r-ea_s_t_h_a_t s_e_rv_e-the entire
building and are identified for the depositing, storage and collection of nonhazardous materials
for recycling.
5.410.2 Commissioning. For new buildings 10,000 square feet and over, building
commissioning for all building systems covered by T24, Part 6, process systems and
renewable energy systems shall be included in the design and construction processes of the
building project. Commissioning requirements shall include items listed in Section 5.410.2. -
5.410.2.6
5.410.2.1 owner's Project Requirements (OPR). Documented before the design phase of
the project begins the OPR shall include items listed in Section 5.410.4.
5.410.2.2 Basis of Design (BOD). A written explanation of how the design of the building
systems meets the OPR shall be completed at the design phase of the building project and
updated periodically to cover the systems listed in Section 5.410 .2.2.
5.410.2.3 Commissioning plan. A commissioning plan describing how the project will be
commissioned shall be started during the design phase of the building project and shall include
items listed in Section 5.410.2.3.
5.410.2.4 Functional performance testing shall demonstrate the correct installation and
operation of each component, system and system-to-system interface in accordance with the
approved plans and specifications.
5.410.2.5 Documentation and training. A Systems manual and systems operations training
are required.
5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or
representative and facilities operator and shall include the items listed in Section 5.410.2.5.1.
5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff
for each equipment type and/or system shall include items listed in Section 5.410.2.5.2.
5.410.2.6 Commissioning report. A complete report of commissioning process activities
undertaken through the design, construction and reporting recommendations for post
construction phases of the building project shall be completed and provided to the owner or
representative.
5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for
buildings less
than 10,000 square feet.
5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems.
Systems to be included for testing and adjusting shall include, as applicable to the project, the
systems listed in Section 5.410.3.2.
5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry
best practices and applicable national standards on each system.
5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or
space is operated for normal use, the system should be balanced in accordance with the
procedures defined by national standards listed in Section 5.410.3.3.1.
5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report
of testing signed by the individual responsible for performing those services.
maintenance instructions and copies of guaranties/warranties for each system prior to final
inspection.
5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed
operating and maintenance manual
5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports
required bv the enforcinq ;:;c.::.;-;;;,.
B-52 Page 3 of 5
(X) NIA
(X) N/A
(X)
(X) M1.0
(X) M1.0
(X) M1.0
(X)M1.0
(X) M1.0
(X) M1.0
(X) M1.0
(X) M1.0
(X) M1.0
(X) M1.0
(X) M1.0
(X) M1.0
(X) M1.0
M1.0
M1.0
Rev. 5/17
Environmental Quality
fireplaces
5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a
sealed woodstove and refer to residential requirements in the California Energy Code, Title 24,
Part 6, Subchapter 7, Section 150.
5.503.1.1 Woodstoves. Woodstoves.shaH comply with US EPA Phase II emission limits.
Weather Resistance and Moisture Management
(X)
N/A
As Applicable
(X) NIA
·--···-------------------------;.-------! 5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope
as required by California Building Code Section 1403.2 and California Energy Code Section 150,
manufacturer's installation instruction instructions or local ordinance, whichever is more stringent.
5.407.2 Moisture control. Employ moisture control measured by the following methods:
5.407.2.1 Sprinklers. Prevent irrigation spray on structures.
5.407.2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion
into buildinas.
Pollution Control
(X)
(X)N/A
(X)
5.504.3 Covering of duct openings and protection of mechani-ca_l_e_q_u-ip-m-en_t_d_u_r-in-g-----i----------<
construction. At the time of rough installation or during storage on the construction site and until
final start up of the heating and cooling equipment, all duct and other related air distribution
component openings shall be covered with tape, plastic, sheet metal or other methods to reduce
(X)M1.0
the amount of debris or duct which may collect in the sys!~m-·------------...... --+-------i
5.504.5.3 FIiters. In mechanically ventilated buildings, provide regularly occupied areas of the
bui!dino with outside and return air prior to oc~a_ncy that provides §!!lea_~_t7 :-:-a-:M::-E_R-:V,--o_f 8"":c.--:----+----------l
5.504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1
through 5.504.4.6
5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet
the requirements of the following standards:
1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and
caulks shall comply with local or regional air pollution control or air quality management
district rules where applicable or SCAQMD Rule 1168 VOC limits as shown in Tables
5.504.4.1 and 5.504.4.2.
2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking
compounds (in units of product, less packaging, which do not weigh more than one pound
and do not consist of more than 16 fluid ounces) shall comply with statewide voe
standards and other requirements, including prohibitions on use of certain toxic
compounds, of California Code of Regulations, Title 17, commencing with Section 94507.
5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3
5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product-
Weighted MIR limits for ROC in Section 94522 (a)(3) and other requirements, including prohibition
on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520
et seq.).
5.504.4 Carpet systems. AH carpet installed in the building interior shall meet the testing and
product requirements of one of the standards listed in Section 5.504.4.4.
50504.4.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the
requirements of the Carpet and Rug Institute Green label Program.
5.504.4.4.2 Carpet adhesive. AH carpet adhesive shall meet the requirements of Table 804.4.1.
5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density
fiberboard composite wood products used on the interior or exterior of the building shall meet the
requirements for formaldehyde as specified in Table 5.504.4.
5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as
requested by the enforcing agency. Documentation shall include at least one of the following:
1. Product certification and specifications
2. Chain of custody certifications
3. Other methods acceptable to the enforcing agency
(X) NIA
5.504.4.6 Resilient flooring systems. Comply with the voe emission limits defined in the 2009 ( x)
CHPS criteria and listed on its low-emitting Materials list (or product registry) or certified under
the FloorScore orooram of the Resilient Floor Covering Institute. c...;c..c.::.....;....c.;;...c....... __ __..~~----------~~-----·····""·----..... -. ___ _.,,_ ______ __.
B-52 Page 4 of 5 Rev. 5/17
Indoor Moisture and Radon Control
5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California M1.0 BuildinQ Code, Title 24 Part 2, Sections 1203 (Ventilation) Chapter 14.1. (X)
Air quality and Exhaust
5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the (X)
minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and M1.0
Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent.
5.506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation,
CO2 sensors and ventilation controls shall be specified and installed in accordance with the (X)
requirements of the latest edition of the California Enerqv Code, Title 24, Part 6, Section 120.1.(C} (4). M1.0
Outdoor Air Quality
5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and
frre suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. As
5.508.1 CFCs. Install HVAC and refrigeration equipment that does not contain CFCs. applicable
5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. (X) M1
"·"··· (X) M1.
I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items
listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016
California Green Building Standards. AU receipts for recycled materials have been attached to this form.
2501 El Camino Real, Suite 204
Project Address: Carlsbad, CA 92008 Pz:mOOr CBC2017-0103
DOUGLAS H. LEE . -.--Print Name: Signed:
/
License Number: C-6430 Date: 10/25/17
•..• """"""'·-
8-52 Page 5of 5 Rev. 5/17
0
0
( City of
Carlsbad
WASTE MANAGEMENT
PLAN
8-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Owner: C!lp.£5,E -~c...fOR'( REsTAllAAN rontractor: G, lz !<\AHllltJ(7J I AIC ,
JobAddress: ~,s:;,.,.5 f=t..CAMl/{0 8EA1. .... ft/l}!5 Phone Number: ~-43) 45't-8qu
Permit#: C BC.). C, //a -0 0 76 Estimated Cost of Project: $ _____________ _
D New Construction ~model or T.I. D Residential lla"tommercial D Demolition Type of Project:
(check all that apply) OOther _____________________________ _
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. = lbs. of allowable waste.
D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
I Table 1 -Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash I Garbai:>:e
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled ______ %
I certify that the information provided herein, to the best of my knowledge, is true and correct.
Contractor or Owner (print name)
Contractor or Owner (signature) Date
Official Use Only
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: _________________ _
Page 1 of 2 REV.01-2017
Table 2 -Actual Waste (To be completed after construction.)
'
MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method
LANDFILL RE-USED or RECYCLED (complete only if different than Table 1)
Asphalt/ Concrete 0 I t-. D .-,., I\/ <i IIA "'"' Dtf 1s 'CL Co~ A7 {j/Y
Brick/ Masonry R Fr' LIN\ ATI (":')/V
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste 3(),. 84' 5D, ~q Wtl,c;Tr= M .A di,( /)i /':-, E /Y\. I:= /V T
Trash I Garba!!:e
Other:
TOTAL lbs.: 30.84LT 2/tJ, B'1 T
Actual Percentage Re-Used or Recycled. ____ g_7,____ .. ~A-__ %
Official Use Only
D 65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _
Reviewed/ Approved by:. __________________ _
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED
Asphalt I Concrete 0 3000
Brick I Masorny 1.00 050
Cardboard 0 1.50
Drywall 0 50
Landscape Debris 0 1.20
Lumber I Wood 500 0
Metals 300 ::2.00
Mixed Waste 1.500 0
Trash I Garbage 300 0
Other: :Pool c;L{V\,tte 0 900
TOTAL lbs.: 2700 5,3J-O
Percentage to be Re-Used or Recycled 6 7 %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
Waste Hauling Company or Re-Use Method
ABC f-tG L{LLV\,a Co.
WM I Re-v\.secl Bv-Le,ix, OV\,-SLte
ABC f-tGL{LLV\,a Co.
A BC f-tG L{LLV\, Co.
ML{Ld1ecl .c; Re-L{.secl Ol!\.,-sLte
WG.ste MG VI,{,] cieVvLeV\,t
WM I ABC /-tGL{LLvi,g
WM
WM
v\.secl Gs CnA..sviecl BG.se oV\,-sLte
5370 X 100 = 67% Re-Used or Recycled
(2700 + 5370)
Since 67% exceeds the minimum requirement of 65%, this plan complies.
Page 2 of 2
/i ~c VCLF-D !ltJN R Ea(C.L ~I) ToTAL L4Q ~.;,4 I 03 J ;z.55
(_:;t l) /, 8t, .~5 :? . I /
(3) ;), 5 , 3L/-J.M
(,4) ~. "??2 (32 :2. . t,4
(5) ;?,84 , 39 31 :.Z:J
(C::>) :2 I :33 ,JZ 2.-&,_5
(7) 51 8~ 5,. sc1
( 8) 0 ft> f {,J_ 1 o , 1oz
(CJ) 4,5 t 58 5 I{) 8
{/tJ) L/1 0B ,6,4-5,3,,?
{! I) 5. ·7 0 ? "7
(!J) 0 41'53 1, ?3
(!3) 0 ftB 4,9
('14) 3. /4 ,43 3,57
(26) !i; t,3 0 5,b3
(!&) :J, 71 0 A,7C/
(17) 4f /4 , 57 4 ,7/
(18) 6 I ~2-,85 7. o 7
!
5'() · 8q 30,84-81 , ·73
.(
1
/Vo !'I
j (}
~oN
t--{' 5J
I
7
'7
11,, ·'7:) .,y,, \
<l.~~ ,* ~:,o~ ~~ ·-1:, ,~
IA / . i'\.~v
"'( (!)
~. >J
I
MOODY'S1
EL CORAZON RECL MATION
P0B0X96;
BONSALL, CA 2003
(760) 433-3316 • FAX (7, 0) 433-6691
P.O.
NA
IT FOAIGIN
JOB LOCATION
PU TRAILER
L ADCOUNT
1 2
J ,r ,f
#LOADS
SIGNATURE
31 4 5
X PRICE
All bills due upon presentatid,n unless. otherwise
arranged in advance. Open accounts .subject to
1 1 /2% month, charge after, 30\ days unpaid
balance.
\
6
MOODY'S
. vehicle
· yard.
\ JQB•COPV
Torvs
DATE
7 -8 9 10
not responsible for darpage to
being loaded or unloaded in
\
15 N\AEL,.
/~~\ ~ ... 1
P.O.
AME
CITY OF ORIGIN
JOB LOCATION
PU TRAILER
LOAD COUNT
1 2
/ /
#LOADS
SIGNATURE
MOODY'S\
EL CORAZON RECL '. MATION
POBOX96'
BONSALL, CA 2003
(760):433-3316 • FAX (7 0) 433-6691
JOB# DATE.
CHARGE TIME
:FLATBED ENDDUMP T&T
4 5 6 7 8 9
X OTHER CHARGES
$
TOTAL
10
All bills due upon presentatioh unless;otherwise
arranged in advance. Operi accounts subject to
1 1/2% month, charge aftei:3P'days unpaid
MOODY'S , not responsible for damage to
vehicle whil being loaded or unloaded:in
yard. ! ' balance. \ l
·,;I J. 3 .
,JOBCOPV
r,-
P.O.
CASH CHECK
NAME
CITY OF ORIGIN
JOB LOCATION
PU TRAILER
LOAD COUNT
1 2
#LOADS
SIGNATURE
MOODY'S I
EL CORAZON RECL~ ATION
PO BOX 9691
BONSALL, CA 9; 003
(760) 433-3316 • FAX (76: ) 433-6691
!
DATE
T1ME ,£t:: ,',
FLAWED -· . END DUMP T& T
3 4 5 6 7 8 9
PRICE OTH,El:L?HARGES
,,.,.;,"' ,,..,•
,,,,.!"' -•~'
$'
TOTAL
TRUCK#
10
All bills due upon prese~tation unless otherwise
arranged in advance. OP,E'n accounts subject to
1 1/2% month, charge att
1
. er 30 days unpaid
balono, .
1
MOOD
vehicle
yard.
is not responsible for damage to
hi!e being loaded or u1foaded in
I ,lOl:lCOPV
I '~i .,,,_ ' ,::: I ,
P.O.
CHECK
CITY OF ORIGIN
JOB LOCATION
PU TRAILER
LOAD COUNT
1 2
i ,/
#LOADS
SIGNATURE
MOODY'S
EL CORAZON RECL . MATION
POB0X96
BONSALL, CA 2003
: (760) 433-3316 • FAX (7 0) 433-6691
JOB# DATE
TIME
ENOOUMP T& T
,'
M1~T~A~:;-/" ..
. ,/ ,; ,,<·' f':1"._,..,_,.,.,,1
{ .
3 4 5 6 7 8 9
X. PRICE OTHER CHARGES
,,,-,,•~-
$
TOTAL
10
All bHls due upon preserttlltion unless otherwise
arranged In advance. Opeh accounts subject to
1 1/2% month, charge aft~r 30 days unpaid
MOODYj is not resPonsible for 1amage to
vehicle ile being loaded or unloaded in
balance. 1
yard. I
:JOBCOPY'·
P.O.
'l CASH,.., CHECK :.~,~··
NAME
CITY OF ORIGIN
JOB LOCATION
PU TRAILER
LOAD COUNT
1 2
#LOADS
SIGNATURE
MOODY'S
EL CORAZON RECL , MATION
POBOX96 '.
BONSALL, CA ;2003
(760) 433-3316 • FAX (7
1
0) 433-6691
DATE
TIME
,.--., ....
l
END DUMP T & T
MAT!fRI \ • "-. __ .!. _ . ..,r/J tr
3 4 5 6 7 8
X PRICE OTHER CHARGES
$
10
AU bills due upon prestjntation unless otherwise
arrange<! in advance.',pen actj:)unts subject to
1 1/2%.month, charge tier 30 (jays unpaid
MOO 'S is not responsible tbr ds1mage to
vehicl ' while being loaded or ~nloetdecl in.
yard. I
balance. • .
I i JOB-COPY
I 2
P.O.
,~ff'• CHECK
/'· r
NAME
·· CITY OF ORIGIN
JOB LOCATION
PU TRAILER
LOAD COUNT
1, 2
#LOADS
SIGNATURE
MOODY'S
EL CORAZON RECL MA TION
POB0X969I
. BONSALL, CA 9'. 003
. [(760) 433-3316 • FAX (7. ) 433-6691
DATE
ENDDUMP T&T
6 7 8 9
X OTHER CHARGES
$ ,,;:J (/
TOTAL
10
All bills due upon pres,entation unles. s otherwise
arranged in advance-' pen accounts subject to
1 1/2% month; charge fter 30 days unpaid
balance.
MOOD 'S is not responsible fbr damage to
vehicle hile being loaded or ~nloaded in
yard. I
I
I JO/ilCOPV
I
' I
P.
G(-~ CHECK
)-<
NAM
CITYOF R!GIN
JOB LOCATION
. ~., I
I
MOODY'S
ATION EL CORAZON RECL
POBOX969
BONSALL, CA 9: 003
'(760) 433-3316 • FAX (76:) 433-6691
I I
'
DATE
COMMEF\,GtAL RE I DENCE TIME _., .. ,/ ~"'--···--~·'
'; /·-........ .,,.-··
...,..~,~··,,..
'::.', ,,,,
t>t·" ;1,t ~ ...
PU TRAILER END DUMP T&T
MATE~~L ~ ,<"'
LOAD COUNT i//(~~-,·:~1;l~~
1 2 3! 4 5 6
#LOADS X PRICE
7
$
8 9
OTHEry Chl~R~J::S
J/./ ,// }
TOTAL.
11
""} ~~~::~~:;~~t
n ~ 1
10
SIGNATURE : \
All bills due UPon presentation unless ;otherwise
arranged in advance. Open apcounts i,ubject to
1 1~% month, charge after13(> days u~paid
balat;ice. ! '
\ TRUCK#\
MOODY'S i' not responsible for daiage to
vehicle whil being loaded or unloadr in
yard.
·1 r~ ~]""' l;:;~b
U~-
MOODY'S
EL CORAZON RECL . MATION
POB0X96.
BONSALL, CA . 2003
1 (760) 433-3316 • FAX (7 0) 433-6691
P ..
CA5it' / CHECK
t
NAME
CITY OF ORI IN
JOB LOCATION
PU TRAILER
LOAD COUNT
1 2 3
#LOADS X
SIGNATURE 1
./
4
M~~IAL--; .. ·. / ,.>~y ;/' ~{~
5
PRICE
6
DATE
TIME
... :'NHEJ:;L ENO DUMP T & T ...• ) _.,.,,..,::, ,_,.,~·
7 8 9
OTHER CHARGES
10
All bills due upon presehtation unless otherwise
arranged in advance. :dpen accounts subject to
11/2% month, charge after 30 days unpaid
MOO Y'S is not responsible f$r damage to
vehicl · while being loaded or \jnloaded in ·
balance. J
i
I
yard. I
I_
2lt1 0 i •
I .JOBCOPY
ITY OF ORIGIN
.108 LOCATION
PU TRAILER
LOAD COUNT
1 2
l i
#LOADS
SIGNATURE
i MOODY'S\
EL' CORAZON RECL MATION
PO BOX 969:
BONSALL, CA 9 003
(760)433-3316 • FAX (7 · ) 433-6691
DATE
CHARGE COMMli6CIAL
__ ,'
FLATBED
3
l I I
4
MATERIAL
5
TIME
6 I 7 8 9
X PRICE OTHER CHARGES
$
10
Alf bills due upon presentation unless otherwise
arranged in advance. Open ac;counts subject to
1 1/2% morith, charge after 30 days unpaid
balance. \
MOODY'S i . not responsible for damage to
vehicle whif ' being loaded or unloaded in
yard.
1 ~:)
\ I
P ..
CASH CHECK
NAME
lTY OF ORIGIN
JOB LOCATION
'PU TRAILER
LOAD COUNT
1 2
#LOADS
SIGNATURE
MOODY'S
EL CORAZON RECL I ATION
POBOX969i
BONSALL, CA 9, 003
1(760) 433-3316 • FAX (76 ) 433-6691
I !
JOB# DATE
TIME
}
FLATBED BOBTAIL
MATERIAL,.~ i 1
I t f v ~, \ l, 'I
4 5 6 7 8
T&T
9
X OTHER CHARGES -)
$(,;;>""
i TRUCK# I
10
All bills due· upon presenta'iion ·unless otherwise
arranged ln advance. Ope~ accounts subject to
1 1 /2"/o montfl, charge after 30 days unpaid
MOODY' is not responsible for damage to
vehicle w ile being loaded or un19aded in
balance. ·
! . I
yard. 1
JOB COPY
;
~ 1~.7 t I · ..... i,
P.O.
CASH,,...;d .. , .. SHECK
NAME
CITY OF ORIGIN
JOB LOCATION
PU I TRAILER
LOAD COUNT
1
~.~::~
l ' i
#LOADS
SIGNATURE
2
MOODY'S\
EL CORAZON RECL: ATION
POBOX96
BONSALL, CA '2003
(760)433-3316 •FAX (7 0) 433-6691
JOB# DATE
COMMER~!{. TIME
'\~ \ ( ; . '
~''
'
rLATB~D BOBTAIL [ ·~.:~)L.. I END DUMP IT & T
' MATERIAL !
! i'-/\ ~ :./ / ) -':', ,,..{,
3 4 5 6 ! 7 8 9
X OTHER CHARGES
$
TOTAL
~;r
I \RUClK#
10
All bills due upon presentation unless otherwise
arranged in advance. Op~n accoqnts subject to
1 1/2% month, charge a~er 30 days unpaid
MOOD) is not reswnsible tori damage to
vehicle · ile being loaded or uriloaded in
yard. i
balance. i !
' ,,,1
~"""" "'"'Ill'
JOB COPY I i
P.O.
•'NAME
CITY OF O IGIN
JOB LOCATION
PU TRAILER
LOAD COUNT
2
/ / /'
#LOADS
MOODY'S 1
EL CORAZON RECLA. ATION
PO BOX 969.
BONSALL; CA 9. 003
(760) 433-3316 • FAX (76') 433-6691
DATE
TIME
FLATBED ENO DUMP T& T
7 8 9
X OTHER CHARGES
$
TOTAL
/ .' J l-(>:/
10
SIGNATURE ' ' .
All bills due upon prese .. ~uition un_ 'less otherwise
TRUCK.;#' ... ,,:· , •. . ~--~'""·· .. ,.··,.L·''_,/
· arranged in advance. O e'n accounts subject to
1 1/2% month, charge a: er 30 days unpaid
balance. ·
MOOD: 'S is not responsible for dl:)mage to
vehicle/ hile being loaded or u~IQl\lded in
yard. I . I_
21
JOBCOPV I
P,O.
JOB LOCATION
PU TRAILER
LOAD COUNT
1 2
!
#LOADS
... ;!,./
SIGNATURE
MOODY'S
EL CORAZON RECL , MA TION
POBOX96
BONSALL, CA , 2003
(760) 433-3316 • FAX (7 0) 433-6691
I
JOB# DATE ,.,. ' -'
COMMEf),GIAL TIME
,.
I \
FLATBED
3 4
X
1
BOBTAIL
MATERIAL
5
PRICE
6 i 1
$'
' {
8 9
OTHER CHARGES
TOTAL
11, ! ,_,
TRUCK#
10
All bills due upon presen1ation unless otherwise
arranged in advance. O~en accounts subject to
1 1/2% month, charge after 30 days unpaid
balance.
MOOD, 'S is not responsible tot damage to
vehicle, hile being loaded or u~loadecl in
yard. !
P.O.
, NAME
CITY OF ORIGIN
JOB LOCATION
PU TRAILER
LOAD COUNT
1 2
I /
#LOADS
SIGNATURE
I MOODY'S 1
EL CORAZON RECL~ ATION
POBOX9691
BONSALL, CA 9 003
(760) 433-3316 • FAX (7tj ) 433-6691
DATE
END DUMP T& T
G ! 4 5 6 7 8 9
OTHER CHARGES
TOTAL
/ !.,-'
10
All bills due upon preser;itation unless otherwise
arranged in advance. open accqunts subject to
1 1/2% month, charge a~er 30 days unpaid
MOO
vehicl
yard.
•i> e"
'S is not responsible fqr damage to
while being loaded or uhloaded in I .
balance. , I
-JOS COPY
I I MOODY'S I
EL CORAZON RECLA! ATION
POB0X969I
_ BONSALL, CA 9: 003
(760) 433-3316 • FAX (7~ ) 433-6691
P.O. JOB# DATE
CASl:i CHECK ,:;;:;~,
;"
l'/AME
CITY OF ORIG N
JOB LOCATION
PU TRAILER
LOAD COUNT
1 2
J
./ /
#LOADS
SIGNATURE
TIME
ENDDUMP T&T
4 5 6 7 8 9
X PRICE OTHER CHARGES
$
10
All bills due upon prese~tation unless otherwise
arranged in advance. or· en accounts subject to 1 1/2% month, charge fter 30 days unpaid
MOO 'S Is not responsible for damage to
vehicl while being loaded or Jr,loaded in yard. ·
balance. ·
JOB COPY·
I
I
I~ r~
CITY OF ORIGIN
JOB LOCATION
PU TRAILER
LOAD COUNT
l i
1 2
#LOADS
SIGNATURE
MOODY'S I
EL CORAZON RECLA! A TION
' POBOX969i
BONSALL, CA 9 003
(760) 433-3316 • FAX (7 : ) 433-6691
FLAT81;D
!3 4
X
\/
COMMERCIAL .,/ \ \
5
PRICE
DATE
R SIDENCE TIME
END DUMP T& T
6 ! 7 8 9
OTHER CHARGES
TRUCK#
10
All bills due upon preset• tatio_ n un. less otherwise_ arranged in advance. O en accounts subject to·
1 1/2% month, charg9r, er 30 days unpaid
balance.
·· MOO 'S is not responsible ftjr damage to
vehicl · while being loaded or urloaded in
yard. !
JOB COP't
®
WASTE MANAGEMENT
DUMPSITE/LANDFILL
Palomar Landfill (PAL)
5960 El Camino Real
Carlsbad CA 92008 I I
DATE OF SERVICE SVC TICKET#
10/16/2017 902606
10/10/2017 900538
10/4/2017 899174
9/27/2017 895928
9/20/2017 894159
9/14/2017 892087
9/5/2017 888795
8/25/2017 885182
8/11/2017 880760
Total Tons
Total Tons Diverted
Total Tons Landfilled
Total Diversion
GENERAL CONTRACTOR:
TERRANOVA
2501 EL CAMINO REAL STE 204
CARLSBAD, CA. 92008
Construction & Recycling Services
5701 S. Eastern Ave., STE 300, Commerce, CA 90040
714-480-2317 (Direct) 866-459-3985 (Fax)
C&D SORT & TRANSFER FACILITY
EDCO CDI Recycling & Buy Back Center
224 S Las Posas Rd
Acct: 350-72150
Sales Rep: Nicolas Berthier
christinan@terranova-ind.com
Prepared Date· 10/23/2017 San Marcos, CA 92078
Total Tons RECY
BIN SIZE MATERIAL TYPE Tons RCY RATE% FACILITY
40YD MIXEDC&D 2.80 2.52 90.00% EDCO SAN MARCO (EDD)
40YD MIXEDC&D 2.85 2.57 90.00% EDCO SAN MARCO (EDD)
40YD MSW /TRASH 1.34 0.00 0.00% PALOMAR LANDFILL (PAL)
40YD MSW /TRASH 2.33 0.00 0.00% PALOMAR LANDFILL (PAL)
40YD MIXEDC&D 4.42 3.89 88.00% EDCO SAN MARCO (EDD)
40YD MSW /TRASH 3.06 0.00 0.00% PALOMAR LANDFILL (PAL)
40YD MIXEDC&D 3.85 3.39 88.00% EDCO SAN MARCO (EDD)
40YD MSW /TRASH 3.13 0.00 0.00% PALOMAR LANDFILL (PAL)
40YD MSW /TRASH 7.10 0.00 0.00% PALOMAR LANDFILL (PAL)
30.88
12.37
18.51
40.06%
MANAGEMENT
PLAN
Development ~-ervices
Building Division
1635 Faraday Avenue
760--602-2719
www.carlsbadca.gov
Owner: Islands Burgers Contractor: Terra Nova Industries -------
Jon Address: __ ~501 ~I Camino Real, Suite 2?4__ Phone 934-6133
Permit#: CBC2017-0103 Estimated Cost of Project: ___ 1_,6_1_7 .... ' .. 5 ..•. 8_9_.0_0 ____ ··---·
Type of Project O New Construction t& Remodel or TJ. O Residential O Commercial D DemolitiOn
. (check all that apply} O Other ---.... --........ __ .. -----.... -.......... ______ .
Non-hazardous construction waste generated during the course of t!1is project shall be recycled and/ or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of btJilding area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department
ALTERNATIVE FORMS OF COMPLIANCE: (If do not complete Tables 1 & 2 below)
0 Construction waste shall not exceed 2 lbs. per sf. of area. AH receipts shall be provided to the Building Official prior to
final. {This option not applicable for most construction projects.)
Square feet of construction area ··-·---__ X 2 lbs. "' lbs. of allowable waste.
plan on using a WASTE MANAGEMENT roll-off bin. Atl receipts shall be provided to the Building Official prior to final.
Table 1 -Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.) --
MATERIALS lbs. of waste to be ta ken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete ~----
Brick/ Masonry
Cardboard
Drywall -Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash J Garbage
Other:
TOTAi.lbs:
Estimated Percentage to be 0Re-Used or Recycled __ , _____ %
Official Use Only
D Plan Approved O Pfan Denied O Project Valuation Approved
Reviewed J Approved
Page :t of 2
'
REV.O:t-2017
Table 2 -Actua I Waste (To be completed after construction.)
MATERIALS
Asphaft/ Concrete
Brick/ Masoniy
Debris
Lumber/ Wood
Metals
Mixed Waste
Trash Garba e
Other:
lbs. of waste taken to
LAN DALL
lbs. of waste
REUSED or RECYCLED
Actual Percentage Re-Used or Recycled ,4: G .D~ %
Officiat Use Only /
Waste Hauling Company or Re-Use Method
(complete only if different than Table 1)
vJ :5113
\\ '' ,, II ,, \I
,I \I
(I \I
\ \ ;\
I\
II t,
\\ I\ =N••-'"••---
D 65~-Goal Achieve0 65% Goal Not Achieved O Alternative Compliance Achieved Penalty Paid $ ______ _
Reviewed/.,.1!1!1111::rby:_lli.· U,~~-----
EXAMPLE: Use the following example as a guide to completing this form.
·--T
MATERIALS lbs. of woste to be taken to lbs. of waste to be Waste Hauling Compony or Re-Use Mothod LANDFILL RE-USED or RECYCLED
Asphalt I Concrete 0 3000 A:T'.">C HCluLLtt.CI Cb.
Brick I Masonry 1.00 050 Vv'M I Rt-IA.std :srfrJ;.: OVv-sLte
Cardboard 0 150 A"!sC, 1-+cruHV!.,tJ Go.
Drywall D 50 Al>C H·ciu.LLVl,C\ Co.
Lan~--cape Debris 0 t:::.w Mw.Le,hed _£; Rt-used OtA-.£tte
LumberiWood 500 ,~ ,.,I waste Ma!l\,cii.::1eV1M:~'1,,t
"'"
Metals 300 200 WM I A"&C f-tC!uLi.11',g
Mixed Waste ~.csoo 0 0/M -
Trash J C'.rarbagc 300 0 WM
Other: 'PDDL <; 0 ')00 !A.sea C!S C.ruslrled l>Cl.se Ov,,-s~te
TOTAL lbs.; :2:700 ,,370
Percentage to be Re-Used or Recycled 6 7 %
Fom1ula:
X 100 = % Re-Used or Recycled
(Total Combined Waste)
X 100 ;; 67% Re-Used or Recycled
(2700 + 5370)
Since 67% exceeds the minimum requirement of 65%, this plan compiles.
Page 2 of 2
Ticket: 880760 Driver: MARTIN ORDONEZ-
Opened by: MELMANGE
Customer: 350-72150 TERRA NOVA
2501 EL CAMINO REAL STE 204
CARLSBAD CA 92008-1202
Contact: CHRISTINA NELSON
925-934-6133
Requested by: CRISTINA
Profile:
Load Type: EMPTY&RETURN
Date Requested: 08/09/2017
Date Dispatched: 08/11/2017
Dump Site: PALOMAR TRANSFER STATION Swappable? Y Mandate Disposal Site? N
Service
DISPOSAL PER TON
T Waste
Quantity P Yds ~ Weight Job
7.10 T
Special Description
PLEASE DEL BEFORE 9 AM IT'S A MALL AND AFTER 9 THERE WILL BE TOO MANY CA
RS POC MIKE VOSSLER 925 708 1546 ROLON FILE-pls service before 12, too
much traffic after 12
Signature: Date:
Ticket: 885182 Driver: EDEN JACOBO
Opened by: MARREOLl
Customer:
Contact:
350-72150 TERRA NOVA
2501 EL CAMINO REAL STE 204
CARLSBAD CA 92008-1202
CHRISTINA NELSON
925-934-6133
Requested by: CHRISTINA
Profile:
Load Type: SWITCH OUT
Date Requested: 08/23/2017
Date Dispatched: 08/25/2017
Dump Site: PALOMAR TRANSFER STATION Swappable? Y Mandate Disposal Site? N
T Waste
Service Quantity P Yds ~ Weight Job Special Description
DISPOSAL PER TON 3.13 T MSW
PLEASE DEL BEFORE 9 AM IT'S A MALL AND AFTER 9 THERE WILL BE TOO MANY CA
RS POC MIKE VOSSLER 925 708 1546 ROLON FILE
********if possible before noon************
Signature: Date:
Ticket: 888795 Driver: MARTIN ORDONEZ-
Opened by: SNAJAM
Date Requested: 09/01/2017
Date Dispatched: 09/05/2017
Customer:
Contact:
350-72150 TERRA NOVA
2501 EL CAMINO REAL STE 204
CARLSBAD CA 92008-1202
CHRISTINA NELSON
925-934-6133
Requested by: CHRISTINA
Profile:
Load Type:
Dump Site:
SWITCH OUT
EDCO C&D LOADS Swappable? Y Mandate Disposal Site? N
Service
DISPOSAL PER TON DEMOLITION
T Waste
Quantity P Yds ~ Weight Job
3.85 T
Special Description
PLEASE DEL BEFORE 9 AM IT'S A MALL AND AFTER 9 THERE WILL BE TOO MANY CA
RS POC MIKE VOSSLER 925 708 1546 ROLON FILE
Signature: Date:
Ticket: 892087 Driver: MARTIN ORDONEZ-
Opened by: RMASTAND
Customer:
Contact:
350-72150 TERRA NOVA
2501 EL CAMINO REAL STE 204
CARLSBAD CA 92008-1202
CHRISTINA NELSON
925-934-6133
Requested by: CHRISTINA
Profile:
Load Type: SWITCH OUT
Date Requested: 09/13/2017
Date Dispatched: 09/14/2017
Dump Site: PALOMAR TRANSFER STATION Swappable? Y Mandate Disposal Site? N
T Waste
Service Quantity P Yds ~ Weight Job Special Description
DISPOSAL PER TON 3.06 T MSW
PLEASE DEL BEFORE 9 AM IT'S A MALL AND AFTER 9 THERE WILL BE TOO MANY CA
RS POC MIKE VOSSLER 925 708 1546 ROLON FILE
Signature: Date:
Ticket: 894159 Driver: MARTIN ORDONEZ-
Opened by: RWORKMAl
Customer:
Contact:
350-72150 TERRA NOVA
2501 EL CAMINO REAL STE 204
CARLSBAD CA 92008-1202
CHRISTINA NELSON
925-934-6133
Requested by: CHRISTINA
Profile:
Load Type:
Date Requested: 09/19/2017
Date Dispatched: 09/20/2017
Dump Site:
SWITCH OUT
EDCO C&D LOADS Swappable? Y Mandate Disposal Site? N
Service
DISPOSAL PER TON DEMOLITION
T Waste
Quantity P Yds ~ Weight Job
4.42 T
AT A MALL PLEASE 8/0 9AM IF POSSIBLE
Signature:
Special Description
Date:
Ticket: 895928 Driver: MARTIN ORDONEZ-
Opened by: RWORKMAl
Customer:
Contact:
350-72150 TERRA NOVA
2501 EL CAMINO REAL STE 204
CARLSBAD CA 92008-1202
CHRISTINA NELSON
925-934-6133
Requested by: CHRISTINA
Profile:
Load Type: SWITCH OUT
Date Requested: 09/25/2017
Date Dispatched: 09/27/2017
Dump Site: PALOMAR TRANSFER STATION Swappable? Y Mandate Disposal Site? N
T Waste
Service Quantity P Yds ~ Weight Job Special Description
DISPOSAL PER TON 2.33 T MSW
PLEASES/I BEFORE 9 AM IT'S A MALL AND AFTER 9 THERE WILL BE TOO MANY CA
RS POC MIKE VOSSLER 925 708 1546 . AS EARLY AS POSSIBLE IF FINE
Signature: Date:
Ticket: 899174 Driver: MARTIN ORDONEZ-
Opened by: ALUNA5
Customer:
Contact:
350-72150 TERRA NOVA
2501 EL CAMINO REAL STE 204
CARLSBAD CA 92008-1202
CHRISTINA NELSON
925-934-6133
Requested by: CHRISTINA
Profile:
Load Type: SWITCH OUT
Date Requested: 10/03/2017
Date Dispatched: 10/04/2017
Dump Site: PALOMAR TRANSFER STATION Swappable? Y Mandate Disposal Site? N
Service
DISPOSAL PER TON
40 YD DEMOLITION
T Waste
Quantity P Yds ~ Weight Job
1.34 T
1.00 T 40 MSW
Special Description
PLEASE DEL BEFORE 9 AM IT'S A MALL AND AFTER 9 THERE WILL BE TOO MANY CA
RS POC MIKE VOSSLER 925 708 1546 ROLON FILE
Signature: Date:
Ticket: 900538
Opened by: JBENEFil
Driver: MARTIN ORDONEZ-Date Requested: 10/09/2017
Date Dispatched: 10/10/2017
Customer: 350-72150 TERRA NOVA
2501 EL CAMINO REAL STE 204
CARLSBAD CA 92008-1202
Contact: CHRISTINA NELSON
925-934-6133
Requested by: CHRISTINA
Profile:
Load Type: EMPTY&RETURN
Dump Site: EDCO C&D LOADS Swappable? Y Mandate Disposal Site? N
T Waste
Service Quantity R Yds ~ Weight Job
2.85 T DEMO
Special Description
DISPOSAL PER TON DEMOLITION
40 YD DEMOLITION 1.00 T 40 DEMO
PLEASE DEL BEFORE 9 AM IT'S A MALL AND AFTER 9 THERE WILL BE TOO MANY CA
RS POC MIKE VOSSLER 925 708 1546 ROLON FILE
bin on site already but container should be taken to C & D and needs
reporting
Signature: Date:
Ticket: 902606 Driver: MARTIN ORDONEZ-
Opened by: NBERTHIE
Customer: 350-72150 TERRA NOVA
2501 EL CAMINO REAL STE 204
CARLSBAD CA 92008-1202
Contact: CHRISTINA NELSON
925-934-6133
Requested by: CHRISTINA
Profile:
Load Type:
Date Requested: 10/13/2017
Date Dispatched: 10/16/2017
Dump Site:
SWITCH OUT
EDCO C&D LOADS Swappable? Y Mandate Disposal Site? N
Service
DISPOSAL PER TON DEMOLITION
40 YD DEMOLITION
T waste
Quantity P Yds ~ Weight Job
2.80 T DEMO
1. 00 T 40 DEMO
requesting service before 10 am
Signature:
Special Description
Date:
Building Division Staff Meetings
Planning Library 8:00-9:00
11/2/2017
Pass Downs, Announcements -Mike
Staffing
Part Time Employee
Follow up
SDG&E
Reports
Counter -Shay, Hollie, Allison & Sandra
Administrative Support-Christina, Emily f~,,. MAll'll"· ~t::.AIZ.., tJ1!1~~ a 'lrtNflL,..,
Inspections -Paul, Mike, Andy & Chris 1.,-tVC