HomeMy WebLinkAbout2501 El Camino Real; 200; CBC2018-0246; Permit{city of
Carlsbad
Commercial Permit
Print Date: 04/26/2019 Permit No: CBC2018-0246
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
2501 El Camino Real, 200
BLDG-Commercial
1563023500
$150,000.00
Work Class:
Lot#:
Reference#:
Construction Type:
Bathrooms:
Orig, Plan Check#:
Tenant Improvement Status:
Applied:
Issued:
Permit
Finaled:
Inspector:
Closed -Finaled
05/04/2018
06/19/2018
03/29/2019
MColl
Ptan Check#:
Final
Inspection: 4/26/2019 11:59:31AM
Project Title:
Description: REGAL CINEMA: MALL ENTRY T.I.
Applicant: Owner: Contractor:
LDA DESIGN GROUP
NIVERT MANSI
R PI CARLSBAD LP CULP CONSTRUCTION COMPANY
3500 W Burbank Blvd
Burbank, CA 91505-2235
818-972-5080
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
1114 Avenue Of The Americas, Floor 45
New York, NY 10036-7700
214-660-S232 x215232
ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL
MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL
SB1473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-COMMERCIAL
Total Fees: $1,557.95 Total Payments To Date: $1,557.95
1 Technology Dr, 0411
Irvine, CA 92618-5331
801-486-2064
Balance Due:
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
$0.00
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
$803.50
$562.4S
$89.00
$55.00
$6.00
$42.00
TliE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: □PLANNING □ENGINEERING □BUILDING □FIRE □HEALTH □HAZMATIAPCD I
Ccityof Building Permit Application Plan Check No. Cil:90/ f-6J-tf.o
1635 Faraday Ave., Cartsbad, CA 92008 Est. Value 150,000.00
Carlsbad Ph: 760-602-2719 Fax: 760-602-8558 Plan Ck. Dt;po11lt email: building@cartsbadca.gov
www.carlsbadca.gov Date ,') /LJ / J X los.04.18 I
JOB ADDRESS ,;J~-o
SUITEf/$PACEt/UN1Tt
IAPN 156 -i525-EI Camino Real 4./:() -302 -08 -
CT/PROJECT# LOT# 1PHASE# # OF UNITS I # BEDROOMS #BATHROOMS TI;NANT BUSINESS NAME I CONSTR. TYPE I occ. GROUP
The Shoppes at Carlsbad 111-B M
DESCRIPTtON OF WORK: Include Square Ffft of Affected Area(sJ
TENANT IMPROVEMENT, ADDING ENTRY DOOR TO THE EXISTING REGAL THEATER FROM THE MALL SIDE. ADDING
NEW STAIRS AND RAMP TO CONNECT THE NEW ENTRY TO THE EXISTING THEATER RAISED FINISHED FLOOR WITHIN
THE THEATER BUILDING
EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) I DECKS (SF) FIREPLACE 1 IAIR CONDITIONING I FIRE SPRINKLERS
Retail Mall Retail Mall YES[)t NofZI YES □No 0 YESl:2] NO□
APPLICANT NAME Nivert Mansi, LDA Design Grouc PROPERTY OWNER NAME Kyle Godat, Rouse Properties 3'WA'Y·.&PED4ll:
ADDRESS ADDRESS
3500 W Burbank Blvd 555 Broadway Suite 1019
CITY STATE ZIP CITY STATE ZIP
Burbank CA 91505 Chula Vista CA 91910
PHONE IFAX PHONE IFAX 818-972-5080 619-427-6701
EMAIL EMAIL
nivertm@ldadesigngroup.com kyle.godat@rouseproperties.com
DESIGN PROFESSIONAL Richard Brett AIA coNTRAcro• eus. NAM• VEA.cop ccNS.-l • L...,L.,C..
ADDRESS ADDRESS\t~O "F\Tc...\"i 3500 W. Burbank Blvd
CITY STATE ZIP CITY l SCA ZIP
Burbank CA 91505 "i2.v Iµ Ii>. i?Z.b\ 4
PHONE IFAX PHONE IFAX
818-972-5080 818-848-3895 Cf'-l"t ~ 2.22 -'70~0 ~4"{ • 22.2 -C)S~ C
EMAIL richardhlillldadesianarou ).com
EMAIL
-::S&:l'\N1 !JC.., ft_, L~ e_ ~"'°IJ. C.o VI
STATE UC.# STATE LIC. # I CLASS I~ BUS. UC.#
C-31256 l o~2.33o A-'.:l 112.LO'c:, Oc>2'(79·0'-i -
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repatr any structure, prior to rts LSSuance, also requires the applicant for such permit to file a siitned statement tllat he is licensed pursuant to the provisions of the Contractor's License Law {Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or fhat he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicanffor a permit subjects the applicant to a
civil penalty of not more than five hundred dollars ($500}).
WORKERS" COMPENSATION
Workers' Compensation Declaratlon: / hereby affirm under penalty of perjury one of the following declarations:
□ I have and wlll maintain a certificate of consent to self-Insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit Is issued.
~ I Mvt and wlll maintain worker9' ~utlon. as reQuired bv Section 3700 of the Labor Code, for the performance of the work f«v.tiich this permit is issued. My workers' compensation in ra carrier and policy
nomberne,lm,uranceCo. :;?,~1CH fvn&e..,cAw P•;cyNo. '1AC. 3$01..{5"91{? E,q;rationDate / / 0
"PJj§. section need not be completed if the permit is for one hundred dollars ($100) or less. LJ Certfflcalt of Exemption: I certify that in the performance of the work for'Mlich this permit Is Issued, J shall not employ any person In any manner so as to D8COl1le subject to the Workers' Compensatlon Laws of
California. WARNING: Failure to secure workers' compensation coverage Is unlawful, and shall sub}ect an employer to criminal penalties and clvll fines up to one hundred thousand dollars (&100,000), In
addition to IN cost of compensation, dam,.. .J"'°"'ded for In Section 3708 of the Labor code, Interest and attorney's
~ CONTRACTOR SIGNATURE ~
I hereby atfinn that I am exempt from Contractor's l...icense Law for the following reason: O I, as owner of the property or my employees with wages as their sole compensation, 'MIi do the work and the structure Is not Intended« offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of ~ who builds « improves thereon, and who does such work himself« through his own employees, provided that such Improvements are not intended « offered for
sale. If, however, the blinding or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build CM' improve for the purpose of sale).
□
□
I, as owner of the property, am exdusively contracting with Qcensed conlractors to construct the project (Sec. 7044, Buskless and Professions Code: The Contractor's License Law does nol apply to an owner of
property who builds« improves thereon, and contracts for such projects with contrador(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section ____ ,Business and Professions Code for this reason:
1. I personally plan to provide lhe major labor and materials for construction of the proposed property improvemenl 0Yes Oo
2. I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction Onclude name address/ phone/ contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to ooordinate, supe,vise and provide the major work Onclude name I address/ phone I contractors' license number):
5. I 'MIi provide some of the work, but 1 have contracted (hired) the following persons to provide the work indicated (indude name / address / phone I type of work):
~ PROPERTY OWNER SIGNATURE □AGENT DATE
PERMIT INSPECTION HISTORY REPORT (CBC2018-0246)
Permit Type: BLDG-Commercial Application Date: 05/04/2018 Owner: R P I CARLSBAD LP
Work Class: Tenant Improvement Issue Date: 06/19/2018 Subdivision: CARLSBAD TCT#76-18
Status: Closed -Finaled Expiration Date: 10/21/2019 Address: 2501 El Camino Real , 200
Carlsbad, CA 92008-1215
IVR Number: 11152
Scheduled Actual Inspection Status Primary Inspector Complete Date Start Date Inspection Type Inspection No. Reinspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready. See card for pick up including No
Fire Dept. Sign off.
BLDG-Electrical Final No
04/19/2019 04/19/2019 BLOG-Final 089452-2019 Failed Paul Burnette Reinspectlon Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready. See card for pick up including No
Fire Dept. Sign off.
BLDG-Electrical Final No
04/23/2019 04/23/2019 BLDG-Final 089624-2019 Failed Michael Collins Reinspection Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready. See card for pick up including No
Fire Dept. Sign off.
BLDG-Building Deficiency 4/23/19, contractor not on site, need final No
Fire Dept sign off.
BLDG-Electrical Final No
04/2612019 04/26/2019 BLDG-Final 090072-2019 Passed Michael Collins Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 4/26/2019, EM & Exit signage, ISA signage Yes
ok. Stair/ramp rail ok.
BLDG-Building Deficiency Not ready. See card for pick up including No
Fire Dept. Sign off.
BLDG-Building Deficiency 4/23/19, contractor not on site, need final No
Fire Dept sign off.
BLDG-Electrical Final No
BLDG-Electrical Final Yes
BLDG-Fire Final 089790-2019 Scheduled Cindy Wong Incomplete
Checklist Item COMMENTS Passed
FIRE-Building Final No
April 26, 2019 Page 2 of 2
PERMIT INSPECTION HISTORY REPORT (CBC2018-0246)
Permit Type: BLDG-Commercial Application Date: 05/04/2018 Owner: R P I CARLSBAD LP
Work Class: Tenant Improvement Issue Date: 06/19/2018 Subdivision: CARLSBAD TCT#76-18
Status: Closed -Finaled Expiration Date; 10/21/2019 Address: 2501 El Camino Real , 200
Carlsbad, CA 92008-1215
IVR Number: 11152
Scheduled Actual Complete
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection
08/16/2018 08/16/2018 BLDG-14 067224-2018 Failed Michael Collins Relnspection Complete
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Wrong permit number No
BLOG-15 067238-2018 Failed Michael Collins Relnspection Complete
Roof/ReRoof (Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Wrong permit number No
01/23/2019 01/23/2019 BLOG-14 081949-2019 Falled Michael C:ollins Relnspection Complete
Frame/Steel/Boltlng/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No approved plans on site. No
BLDG-Building Deficiency \Nrong permit number No
02105/2019 02/05/2019 BLDG-14 083092-2019 Partial Pass Michael Collins Reinspection Incomplete
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Partial, mall side poster wall with columns & Yes
wall electrical only
BLDG-Building Deficiency Wrong permit number No
BLDG-Building Deficiency No approved plans on site. No
02/13/2019 02/13/2019 BLDG-14 083771-2019 Passed Paul Burnette Complete
Frame/Steel/Baiting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No approved plans on site. No
BLDG-Building Deficiency Partial, mall side poster wall with columns & Yes
wall electrical only
BLDG-Building Deficiency Wrong permit number No
03/28/2019 03/28/2019 BLDG-Final 087212-2019 Falled Paul Burnette Reinspectlon Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final No
04/01/2019 04/01/2019 BLDG-Final 087526-2019 Failed Michael Collins Reinspectlon Complete
Inspection
April 26, 2019 Page 1 of 2
j~R "' ••vr ~ CITY OF
CARts81\l1
Building Division INSPECTION RECORD
CBC2018-0246
.~01 EL CAMINO REAL
REGAL CINEMA MALL ENTRY H
0 INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE .JOB
0 CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTIO~ [~: (-:; [ i
0 FOR BUILDING INSPECTION CALL: 760-602-2725
-#200
1563023500
1/24/2019
OR GO TO: www.Carlsbadca.gov/Building AND CLICK ON
"Request Inspection"
APR 2 5 2019 CBC2018-0246
DATE:
If "YES" is checked below that Division·s approval is required rior to re uestin a Final Building Inspection. If you have any questions
please call the applicable divisions at the phone numbers provided below. After all required approvals are signed off-fax to
760-602-8560, email to bJ__d ins ections@carlsbadca. ov or bring in a COPY of this card to: 1635 Faraday Ave,, Carlsbad.
IF MARKED 'YES", IT IS REQUIRED PRIOR TO ANY CONSTRUCTION
STORM WATER PRECON MEETING REQUIRED 760-602-2725 Allow 24 hours
IF MARKED "YES", APPROVAL REQUIRED PRIOR TO REQUESTING BUILDING
Fire Prevention 760-602-4660 Allow 48 hours
Planning/Landscape 7 60-944-8463 Allow 48 hours
CM&! /Engineering Inspections) 760-438-3891 Call before 2 pm
Type of Inspection Type of Inspection
CODE# BUILDING Date Inspector COOE # ELECTRICAL
#11 FOUNDATION #31 □ ELECTRIC UNDERGROUND □ UFER
#12 REINFORCED STEEL #34 ROUGH ELECTRIC/ EV CHARGER
#66 MASONRY PRE GROUT #33 □ ELEC SERVICE #32OTEMP0RARY
□ GROUT □ WALL DRAINS #35 PHOTO VOLTAIC
#10 TILT PANELS #38 SIGNS
#11 POUR STRIPS ===--------f-----f-----------1 BLDG-FINAL
#11 COLUMN FOOTINGS CODE# MECHANICAL
#14 SUBFRAME □ FLOOR □ CEILING #41 UNDERGROUND DUCTS & PIPING
#15 ROOF SHEATHING #44 □ DUCT & PLENUM □ REF. PIPING
#13 EXT, SHEAR PANELS #43 HEAT-AIR C0ND, SYSTEMS
#16 INSULATION =='-'-----~----f-----f-----------1 BLDG-FINAL
#18 EXTERIOR LATH COOE# COMBO INSPECTION
#81 UNDERGROUND 111,12,21,31)
#82 DRYWALL,EXT LATH, GAS TES (17,18,23)
Date Ins ector #83 ROOF SHEATING, EXT SHEAR (13,15)
#22 □ SEWER & BL/CO □ PL/CO #84 FRAME ROUGH COMBO (14,24,34,44)
#21 UNDERGROUND □WASTE □ WTR #85 T-Bar(14,24,34,44)
#24 TOP OUT □ WASTE □WTR BLDG-FINAL OCCUPANCY
#27 TUB & SHOWER PAN FIRE
#23 □GAS TEST □ GAS PIPING A/5 UNDERGROUND VISUAL
#25 WATER HEATER A/S UNDERGROUND HYDRO
A/S UNDERGROUND FLUSH
Date Ins ector
#51 POOL EXCAV / STEEL A/S FINAL
#52 PLUMBING F/ A ROUGH-IN
#53 ELEC CONDUIT/ WIRING F/AFINAL
#54 EQUIPOTENTIAL BOND FIXED EXrlNGUISHING SYSTEM ROUGH-IN
#55 PREPLASTER / FENCE/ ALARMS FIXED EXrlNG SYSTEM HYDROSTATIC TEST
#57 GUNITE FIXED EXrlNGUISHING SYSTEM FINAL
BLDG-FINAL MEDICAL GAS PRESSURE TEST
MEDICAL GAS FINAL
REV 6/18
Date
Date
Date
Date
Notes
COPY OF CARD
REQUIRED
Inspector
Ins ector
Ins ector
Ins ector
SEE BACK FOR SPECIAL NOTES
DICK NIGRA INSPECTIONS, INC. Phone (818) 957-2759
Fax (818) 957-2885
Cell (818) 326-4291 4735 Oakado Place
La Canada, CA 91011
REGISTERED INSPECTOR'S DAILY REPORT
TYPeOF INSPECTION
REO\JIRED
lnepoctor(1)
0 RNIIOICOd CC>nCNte
0 POil TONloned ConoNllo 0 RoinlOICOd Mooonry
0 Ounllo
0 Epo"Y
O Other
ADDIT10NAL REMARKS ON SAMPLES
c,.
..
Rt:CORD COPY
DICK NIGRA INSPECTIONS, INC.
4 735 Oakado Place
La Canada, CA 91011
REGISTERED INSPECTOR'S DAILY REPORT
T'YPEOF 11'4SPECTION
REOUIRED
QUANTITY II HI'
Phone (818) 957-2759
Fax (818) 957-2885
Cell (818) 326-4291
Doi• "Z.
Thornton Tomasetti Field Report 13
PROJECT NO S16012.50 DATE March 29, 2019
Andres Gutierrez
Engineer
PROJECT
NAME FROM
PROJECT
LOCATION
The Shoppes at Carlsbad
Carlsbad, CA TITLE
The !oliowmg comments and observanons are bc.sed upon a cursozy /'eV!eW of the work only, '.md are not mrended robe al/-inclus1ve.
Project Site Contacts:
Steven Ruiz
Bradley Wernli
Site Conditions:
(Architect, LDA Design Group)
(Project Superintendent, Culp Construction)
Friday, March 22, 2019, 9:30 AM
Weather: 60 F and Partly Sunny
ActiVities:
1) Onsite inspection of the final as-built conditions for the structural components within
the scope of ASR-50: RP1804.00 -Regal Cinema Lobby.
Observations:
1) At the time of the site visit, architectural finishes had already been installed at the
staircase. Therefore, it was not possible to observe that the structural connections
and detailing follow the contract documents (Figure 1 & 2).
2) Could not verify that handrail post at base of staircase did not core drill into existing
slab during installation. Per TT's conversation with the general contractor, they
installed a base plate anchored to the existing deck. Subsequently the handrail post
was welded to the plate followed by a 3" thick topping slab. TT could not observe
this as-built condition (Figure 3).
3) Architectural finishes had already been installed at the access ramp between grids
C and B. TT could not observe anchoring details (Figure 4).
4) TT could not observe whether header beam along grid 13 was installed per contract
documents. Architectural finishes obstructed any access or view to verify structural
connections and members (Figures 5 & 6).
Discussions:
1) All structural components and connections designed by Thornton Tomasetti were no
longer visible during the site visit and hence could not be observed.
2) Without damaging completed architectural finishes, Thornton Tomasetti must rely on
the reports and photographs from the general contractor and inspector.
3) The inspection reports and supporting photographs should be submitted by the
contractor for review.
END OF REPORT
22~ Broadway, Suite 1250 I San Diego CA 92l0l IT 619.550.5900 F 619.269.4465 I www.T'.1o11m.:nTomast::ttu;om
Thornton Tomasetti
TT Project: S16012.50
The Shoppes at Carlsbad
March 29, 2019, Page 2
Fig 1: Top of lobby entrance stairs between grids E and F.
Field Report 13
Fig 2: Lobby stairs looking from the 1968 Shoppes at Carlsbad building entrance.
225 B1oadway, Suite 1250 I San Diego CA 92101 IT 6\ 9.550 5900 F 619.269.4465 I www.T:iorntonTomasetti.com
Thornton Tomasetti
TT Project: S16012.50
The Shoppes at Carlsbad
March 29, 2019, Page 3
Field Repo rt 13
Fig 3: Installed condition of handrail post; cannot verify what lies beneath tile surface.
Fig 4: Ramp handrails and carpet installed; could not confirm base connections.
225 81oadway, Suite 1250 I San Diego CA 92101 IT 619.550.5900 F 619.269.4465 I www.T:iorntonTomaseni.com
Thornton Tomasetti
TT Project: S16012.50
The Shoppes at Carlsbad
March 29, 2019, Page 4
Field Report 13
Fig 5: Header beam at grid 13 already covered with plasterboard; could not verify structural members
Fig 6: Architectural finishes and entrance door being installed during site visit.
225 B1oactway, Suite 1250 I San Diego CA 92101 IT 6 I 9.550.5900 F 619.269.4465 1 www.T:iorntonTomasetticom
DATE: 5/15/2018
JURISDICTION: City of Carlsbad
PLAN CHECK#.: CBC2018-0246
✓• EsG1I
A SAFEbu1lt Cornpan•)'
SET: I
PROJECT ADDRESS: 2501 El Camino Real Suite 200
D APPLICANT
D JURIS.
PROJECT NAME: The Shoppers at Carlsbad Regal Cinemas Mall Entry
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
0 EsGil staff did not advise the applicant that the plan check has been completed.
D EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: /
Date contacted: ./
Mail Telephone Fax
0 REMARKS:
By: David Yao
EsGil
Telephone#:
(by:~ ) Email:
In Wrson
Enclosures:
5/7/18
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
City of Carlsbad CBC2018-0246
5/15/2018
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad
PREPARED BY: David Yao
PLAN CHECK#.: CBC2018-0246
DATE: 5/15/2018
BUILDING ADDRESS: 2501 El Camino Real Suite 200
BUILDING OCCUPANCY:
BUILDING AREA Valuation
PORTION ( Sq. Ft.) Multiplier
cinemas mall
entry
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
-----------------------l
Bld . Permit Fee b Ordinance g y ..,, I
Type of Review:
D Repetitive fee -~~-..,,7 Repeats
Comments:
Complete Review
D Other
D Hourly
EsGil Fee
Reg. VALUE
Mod.
per city
D Structural Only
1----------11 Hr. @ •
($)
150,000
150,000
$458,031
Sheet of
Thornton Tomasetti
Project
The Shoppes at Carlsbad
Regal Cinema
Structural Calculations
Project No. 516012.00
Prepared For
LDA Design Group
3500 West Burbank Blvd.
Burbank, CA 91505
T: 818.972.5080
Prepared By
Thornton Tomasetti Inc.
Building Solutions
925 Fort Stockton Drive, Suite 200
San Diego, CA 92103
T: 619.550.5900
February 2, 2018
Thornton Tomasetti
TABLE OF CONTENTS
Calculations
Basis of Design
Gravity Loading .................................................................................................................... A1-1
Miscellaneous
Stair Stringers ....................................................................................................................... 61-1
Header Beam ........................................................................................................................ 82-1
Ramp Studs .......................................................................................................................... 63-1
Regal Cinema Structural Calculations May 2. 2017 I Project#S16012.00
Thornton Tomasetti
Building Solutions
Section A
Basis of Design
Thornton Tomasetti
Building Solutions
Al -Gravity Loading
Thornton Tomasetti
PROJECT T '5, C. -T?..., .. I '
SUBJECT Lo"'~ Tc.L.... -Of+
?" co,,u:
'S.¼itA
0 .. ~1.
<;;.1.. .... ,1.1..:...,
F, ........ :"';
M, .. c
IZ I"!>"
-ZS
10
➔
l! .:: !rO r•.C t> L
100 "' .. ~ (.."
7. ,. •. ~
3 ,.,,. ~
5" p•.-t
c. gs:~
J!... = IS i" .,f DL.
I 00 t>~t'-l-'-
PR0JECTN0. :S,\'-O1-C DATE 4 /1:S /18
BY c;:,Apj, ______ SH_E_ET_~l __ ol~\_
CHECKED BY DRAWING NO.
Thornton Tomasetti
Building Solutions
Section B
Miscellaneous
Thornton Tomasetti
Building Solutions
Bl -Stair Stringers
Title· Block Line 1
You can change this area
using the "Settings" menu item
and then using the "Printing &
Title Block" selection.
Title Block Line 6
Steel Beam Ale= C:\Useis\SNORVl-11Desktop\Shoppes\REGAL0-1\TSC_RE-1.EC6
ENERCALC, INC. 1983-2017, Build:10.17.8.9, Ver:10.17.8.9
Description : Stair Stringer
CODE REFERENCES
Calculations per AISC 360-10, IBC 2012, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Pro rties
Analysis Method : Load Resistance Factor Design
Beam Bracing : Completely Unbraced
Bending Axis : Major Axis Bending
D 0 .3 L 0.6
HSS 14x4x3/8
Span = 7.0 rt
Fy : Steel Yield :
E: Modulus:
46.0 ksi
29,000.0 ksi
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.050, L = 0.10 ksf, Tributary Width= 6.0 ft, (Stalir Loading)
DESIGN SUMMARY
Maximum Bending Stress Ratio = o.cf5f .. :· 1
Section used for this span HSS14x4x3/8
Mu : Applied 8.400 k-ft
Mn* Phi : Allowable 164.910k-ft
Maximum Shear Stress Ratio =
Section used for this span
Vu: Applied
Vn • Phi : Allowable
Load Combination
Design OK
Load Combination +1.20D+0.50Lr+1.60L +1.60H
Location of maximum on span 3.500ft
Span # where maximum occurs Span # 1
Location of maximum on span
Span # where maximum occurs
.. 0.021 : 1
HSS14x4x3/8
4.80 k
224.583 k
+1 .20D+0.50Lr+1.60L +1.60H
0.000 ft
Span# 1
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.004 in Ratio=
0.000 in Ratio =
0.007 in Ratio=
0.000 in Ratio=
Maximum Forces & Stresses for Load Combinations
Load Combination Max Stress Ratios
Segment Length Span# M V max Mu+ max Mu -
+1.40D+1.60H
Dsgn. L = 7.00 ft 0.018 0.007 2.94
+1.20D+0.50Lr+1.60L +1.60H
Dsgn. L = 7.00 ft 0.051 0.021 8.40
+1.20D+1.60L +0.50S+1 .60H
Dsgn. L = 7.00 ft 0.051 0.021 8.40
+1.20D+1.60Lr+0.50L +1.60H
Dsgn. L = 7.00ft 0.026 0.011 4.36
+1.20D+1.60Lr+0.50W+1.60H
Dsgn. L = 7.00ft 0.015 0.006 2.52
+1.20D+0.50L +1.60S+1.60H
Dsgn. L = 7.00 ft 0.026 0.011 4.36
+1.20D+1.60S+0.50W+1.60H
Dsgn. L = 7.00 ft 0.015 0.006 2.52
+1.20D+0.50Lr+0.50L +W+1.60H
Dsgn. L = 7.00 ft 0.026 0.011 4.36
+1.20D+0.50L +0.50S+W+1.60H
Dsgn. L = 7.00 ft 0.026 0.011 4.36
+1.20D+0.50L +0.20S+E+1.60H
Dsgn. L = 7.00ft 0.026 0.011 4.36
+0.90D+W+0.90H
Dsgn. L = 7.00 ft 0.011 0.005 1.89
+0.90D+E+0.90H
Dsgn. L = 7.00 ft 0.011 0.005 1.89
18,852 >=360
0 <360
11998 >=180
0 <180
Summary of Moment Values
Mu Max Mnx
2.94 183.23
8.40 183.23
8.40 183.23
4.36 183.23
2.52 183.23
4.36 183.23
2.52 183.23
4.36 183.23
4.36 183.23
4.36 183.23
1.89 183.23
1.89 183.23
Phi*Mnx Cb Rm
164.91 1.14 1.00
164.91 1.14 1.00
164.91 1.14 1.00
164.91 1.14 1.00
164.91 1.14 1.00
164.91 1.14 1.00
164.91 1.14 1.00
164.91 1.14 1.00
164.91 1.14 1.00
164.91 1.14 1.00
164.91 1.14 1.00
164.91 1.14 1.00
Summary of Shear Values
VuMax Vnx Phi*Vnx
1.68 249.54 224.58
4.80 249.54 224.58
4.80 249.54 224.58
2.49 249.54 224.58
1.44 249.54 224.58
2.49 249.54 224.58
1.44 249.54 224.58
2.49 249.54 224.58
2.49 249.54 224.58
2.49 249.54 224.58
1.08 249.54 224.58
1.08 249.54 224.58
Title'Block Line 1
You can change this area
using the "Settings" menu item
and then using the "Printing &
Title Block" selection.
Description: Stair Stringer
Overall Maximum Deflections
Load Combination Span
+D+L+H 1
Vertical Reactions
Load Combination Support 1
Overall MAXimum 3.300
Overall MINimum 0.720
+D+H 1.200
+D+L+H 3.300
+D+Lr+H 1.200
+D+S+H 1.200
+D+0.750Lr-+0.750L +H 2.775
+D+0.750L +0.750S+H 2.775
+D+0.60W+H 1.200
+D+0.70E+H 1.200
+D+0.750Lr-+0.750L +0.450W+H 2.775
+D+0.750L +0.750S+0.450W+H 2.775
+D+0.750L +0. 750S+0.5250E+H 2.775
+0.60D+0.60W+0.60H 0.720
+0.60D+0.70E+0.60H 0.720
D Only 1.200
Lr Only
L Only 2.100
SOnly
WOnly
E Only
HOnly
Max.•.• Defl
0.0070
Support2
3.300
0.720
1.200
3.300
1.200
1.200
2.775
2.775
1.200
1.200
2.775
2.775
2.775
0.720
0.720
1.200
2.100
Location in Span
3.520
Ale= C:\Users\SNORVl-1\0esktop\Shoflpes\REGALC-1\TSC_RE~1.EC6
ENERCALC, INC. 1983-2017, Build:10.17.8.9, Ver:10.17.8.9
Load Combination Max. "+' Defl Location in Span
0.0000 0.000
Support notation : Far left is #1 Values in KIPS
Thornton Tomasetti
Building Solutions
B2 -Header Beam
Tiije Block Line 1
You can change this area
using the "Settings" menu item
and then using the "Printing &
Tiije Block" selection.
Tiije Block Line 6
Description : Door Header-SeW We~ht
Calculations per AISC 360-10, IBC 2012, ASCE 7-10
Load Combination Set : ASCE 7-10
Materlal!Ptoperttes•··.·
Analysis Method : Load Resistance Factor Design
Beam Bracing : Completely Unbraced
Bending Axis: Minor Axis Bending
Fy : Steel 'field :
E: Modulus:
Span= 26.0ft
46.0 ksi
29,000.0 ksi
APi>lled l;C1Bds .• · Service loads entered. Load Factors will be applied for calculations.
Beam sew weight calculated and added to loading
DESl~N SJ/./f6MA.RY. ..... .
Maximum Bending Stress Ratio =
Section used for this span
Mu: Applied
Mn • Phi : Al\oweble
Load Combination
Maxfmum Shear Stress Ratio =
Section used for this span
Vu :Applied
Vn • Phi : Alloweble
Load Combination
Location of maximum on span
Span # where maximum occurs
0.056: 1
HSS12x6x3/8
5.062 k-ft
90.143 k-ft
+1.40D+1.60H
13.000ft
Span# 1
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.000 in Ratio=
0.000 in Ratio=
0.209 in Ratio=
0.000 in Ratio=
Maidrnum Forces &StreP!l!lfdr 1.Pi!!d CotnblnaUoo•t•
Load Combination Max Stress Ratios
Segment Length Span# M V max Mu+ max Mu-
+1.40D+1.60H
Dsgn. L = 26.00 ft 0.056 0.009 5.06
+1.20D+0.50Lr+1.60L +1.60H
Dsgn. L = 26.00 ft 0.048 0.008 4.34
+1.20D+1.60L +0.50S+1.60H
Dsgn. L = 26.00 ft 0.048 0.008 4.34
+120D+1.60Lr+0.50L +1.60H
Dsgn. L = 26.00 ft 0.048 0.008 4.34
+1.200+1.60Lr+0.50W+1.60H
Dsgn. L = 26.00 ft 0.048 0.008 4.34
+1.20D+0.50L +1.60S+1.60H
Dsgn. L = 26.00 ft 0.048 0.008 4.34
+1.20D+1.60S+0.50W+1.60H
Dsgn. L = 26.00 ft 0.048 0.008 4.34
+1.20D+0.50Lr+0.50L +W+1.60H
Dsgn. L = 26.00 ft 0.048 0.008 4.34
+1.20D+O.SOL +0.50S+W+1.60H
Dsgn. L = 26.00 ft 0.048 0.008 4.34
+1.20D+0.50L +0.20S+E+1.60H
Dsgn. L = 26.00 ft 0.048 0.008 4.34
+0.90D+W+0.90H
Dsgn. L = 26.00 ft 0.036 0.006 3.25
+0.90D+E+0.90H
Dsgn. L = 26.00 ft 0.036 0.006 3.25
0<360
0 <360
1492 >=180
0 <180
Summary of Moment Values
Mu Max Mny
5.06 100.16
4.34 100.16
4.34 100.16
4.34 100.16
4.34 100.16
4.34 100.16
4.34 100.16
4.34 100.16
4.34 100.16
4.34 100.16
3.25 100.16
3.25 100.16
Phi*Mny Cb Rm
90.14 1.14 1.00
90.14 1.14 1.00
90.14 1.14 1.00
90.14 1.14 1.00
90.14 1.14 1.00
90.14 1.14 1.00
90.14 1.14 1.00
90.14 1.14 1.00
90.14 1.14 1.00
90.14 1.14 1.00
90.14 1.14 1.00
90.14 1.14 1.00
Design OK
0.009: 1
HSS12x6x3/8
0.7788 k
85.877 k
+1.40D+1.60H
0.000 ft
Span# 1
Summary of Shear Values
VuMax Vny Phi'Vny
0.78 95.42 85.88
0.67 95.42 85.88
0.67 95.42 85.88
0.67 95.42 85.88
0.67 95.42 85.88
0.67 95.42 85.88
0.67 95.42 85.88
0.67 95.42 85.88
0.67 95.42 85.88
0.67 95.42 85.88
0.50 95.42 85.88
0.50 95.42 85.88
Title· Block Line 1
You can change this area
using the "Settings" menu item
and then using the "Printing &
Title Block" selection.
Title Block Line 6
Description: Door Header -SeW Weight
Load Combination
DOnly
Vertl~l:Re11ct1ona
load Combination
overall MAXimum
OVerall MINimum
+D+H
+D+l+H
+D+Lr+H
+O+S+H
+D+0.750Lr+0.750L +H
+D+0.750L +0.750S+H
+D+0.60W+H
+D+0.70E+H
+D+0. 750Lr+0. 750L +0.450W+H
+D+0.750L+0.750S+0.450W+H
+D+0. 750L +0. 750S+0.5250E+H
+0.60D+0.60W+0.60H
+0.60D+0.70E+0.60H
DOnly
Lr Only
LOnly
S Only
WOnly
EOnly
HOnly
Span
Support 1
0.556
0.334
0.556
0.556
0.556
0.556
0.556
0.556
0.556
0.556
0.556
0.556
0.556
0.334
0.334
0.556
Max.•-• Defl
0.2091
Support2
0.556
0.334
0.556
0.556
0.556
0.556
0.556
0.556
0.556
0.556
0.556
0.556
0.556
0.334
0.334
0.556
Location in Span load Combination
13.074
Support notation : Far left is #1
Max. ·+·Defl
0.0000
Values In KIPS
location in Span
0.000
Title Block Line 1
You can change this area
using the "Settings" menu item
and then using the "Printing &
Title Block' selection.
Title Block Line 6
Description:
Calculations per AISC 360-10, IBC 2012, ASCE 7-10
Load Combination Set : ASCE 7-10
Material ProJl!ll:tlil$ --
Analysis Method : Load Resistance Factor Design
Beam Bracing : Completely Unbraced
Bending Axis : Minor Axis Bending
Load Combination ASCE 7-10
Fy : Steel Yield :
E: Modulus:
46.0 ksi
29,000.0 ksi
Applied Loa~ Service loads entered. Load Factors will be applied for calculations.
Unifonn Load : W = 0.0050 ksf, Tributary Width= 7.625 ft, (Lateral Wind (Interior))
Unifonn Load : E = 0.150 k/ft, Tributary Width= 1.0 ft, (Seismic Fp for Storefront)
DESlGNSt,M~Y _ _ _ ____ .-•· "'··MaxifTlt.inl'B8ndiriQ""SfreSS 'R8fi0 ;_" , ... ~.. . ...... i:L141···:·· 1
Section used for this span HSS12x6x3/8
Mu: Applied 12.675 k-ft
Mn• Phi: Allowable 90.143 k-ft
Maximum Shear stress Ratio =
Section used for this span
Vu: Applied
Vn * Phi : Allowable
Load Combination
Design OK
ii:023: 1
HSS12x6x3/8
1.950 k
85.877 k
Load Combination +1.20D+0.50L +0.20S+E+1.60H
Location of maximum on span 13.000ft
Span # where maximum occurs Span # 1
Location of maximum on span
Span # where maximum occurs
+1.20D+0.50L +0.20S+E+1.60H
26.000 ft
Span# 1
Maximum Deflection
Max Downward L +Lr+S Deflection 0.000 in Ratio= 0<360
Max Upward L +Lr+S Deflection 0.000 in Ratio= 0 <360
Max Downward Total Deflection 0.735 in Ratio= 424
Max Upward Total Deflection 0.000 in Ratio= 0 <180
Maximum Forcei & Si,nsesforl;;Plldt.oml>inlltlo111
load Combination Max Stress Ratios Summary of Moment Values Summary of Shear Values
Segment Length Span# M V max Mu+ max Mu-Mu Max Mny Phi*Mny Cb Rm VuMax Vny Phii\lny
+I .40D+1.60H
Dsgn. L = 26.00 ft 0.000 100.16 90.14 1.00 1.00 -0.00 95.42 85.88
+120D+0.50Lr+1.60L +I .60H
Dsgn. L = 26.00 ft 0.000 100.16 90.14 1.00 1.00 -0.00 95.42 85.88
+1.20D+1.60L +0.50S+l .60H
Dsgn. L = 26.00 ft 0.000 100.16 90.14 1.00 1.00 -0.00 95.42 85.88
+I .20D+1.60Lr+0.50L +1.60H
Dsgn. L = 26.00 ft 0.000 100.16 90.14 1.00 1.00 -0.00 95.42 85.88
+120D+1.60Lr+0.50W+l .60H
Dsgn. L = 26.00 ft 0.018 0.003 1.61 1.61 100.16 90.14 1.14 1.00 0.25 95.42 85.88
+1.20D+0.50L +1.60S+l .60H
Dsgn. L = 26.00 ft 0.000 100.16 90.14 1.00 1.00 -0.00 95.42 85.88
+I .20D+1.60S+0.50W+1.60H
Dsgn. L = 26.00 ft 0.018 0.003 1.61 1.61 100.16 90.14 1.14 1.00 0.25 95.42 85.88
+1.20D+0.50Lr+0.50L +W+1.60H
Dsgn. L = 26.00 ft 1 0.036 0.006 3.22 3.22 100.16 90.14 1.14 1.00 0.50 95.42 85.88
+1.20D+0.50L +0.50S+W+t .60H
Dsgn. L = 26.00 ft 0.036 0.006 3.22 3.22 100.16 90.14 1.14 1.00 0.50 95.42 85.88
+1.20D+0.50L +020S+E+1.60H
Dsgn. L = 26.00 ft 0.141 0.023 12.68 12.68 100.16 90.14 1.14 1.00 1.95 95.42 85.88
+0.90D+W+0.90H
Dsgn. L = 26.00 ft 0.036 0.006 3.22 3.22 100.16 90.14 1.14 1.00 0.50 95.42 85.88
+0.90D+E+0.90H
Dsgn. L = 26.00 ft 0.141 0.023 12.68 12.68 100.16 90.14 1.14 1.00 1.95 95.42 85.88
nue Block Line 1
You can change this area
using the "Settings" menu item
and then using the "Printing &
Title Block" selection.
Title Block Line 6
Desaiption :
load Combination Span
E Only 1
Vertical Reac:tlon, • U"'8cto1Wr ,
Load Combination
overall MAXimum
Overall MlNimum
+D+H
+D+L+H
+D+Lr+H
+O+S+H
+D+0.750Lr+O. 750L +H
+D+0.750L +0.750S+H
+D+o.60W+H
+D+0.70E+H
+D+0. 750Lr+0. 750L +0.450W+H
+D+0.750L +0. 750S+0.450W+H
+D+0.750L +0. 750S+0.5250E+H
+0.60D+o.60W+0.60H
+0.60D+0.70E+0.60H
DOnly
Lr Only
LOnly
sonly
WOnly
EOnly
HOnly
Support 1
1.950
0.223
0.297
1.365
0.223
0.223
1.024
0.297
1.365
0.496
1.950
Max.•-• Defl
0.7354
Support 2
1.950
0.223
0.297
1.365
0.223
0.223
1.024
0.297
1.365
0.496
1.950
Location in Span load Combination
13.130
Support notation : Far left is #1
Max.•+• Defl
0.0000
Values in KIPS
Location in Span
0.000
Thornton Tomasetti
Building Solutions
B3 -Ramp Studs
Thornton Tomasetti
Project: Regal Cinema Project#: S16012
By: SAN
Checked By:. _____ _
METAL STUDS AXIAL CAPACITY: SINGLE STUD
!Stud
l!J Units
Input
KI-x== 2-ft
Kry== 2-ft
I<Li== 2-ft
!362S137-33 33 !
E := 29500• ksi
G := 11300-ksi
l!J Effective Area
Slenderness Check
.....
. _,
Date: 4/25/2018
Sheet ____ of ___ _
Drawing#: _____ _
(Effective length about x-axis)
(Effective length about y-axis)
(Effective length for twisting)
(Elastic modulus)
(Shear modulus)
(Nominal uniform compression stress)
if max Kl-x, Kry 1 > 200, "Upsize stud" , "Slenderness OK" l = "Slenderness OK"
~ ~) )
Elastic flexural buckling stress for bending about x-axis
2 1T ·E a ·= ---= 1025-ksi
ex. (Kl-x 12
rx )
Elastic flexural buckling stress for bending about y-axis
1?E "ey := = 126.9-ksi
(
Kry'/
ry )
(Eqn C3.1.2-8)
(Eqn C3.1.2-9)
C:\Users\SNorville\Desktop\Shoppes\Regal Cinema\AISI Steel\Concentric Compression Single Stud.xmcd Page:1
9:30AM
Thornton Tomasetti
Project: Regal Cinema Project#: S16012
By: SAN
Checked By: _____ _
Polar radius of gyration about shear center
r0 :=Jr/+ r./ + "O 2 = 1.8-in
Elastic torsional buckling stress
I [ ~1 crt := ---G-J + ,.,. ~J = 109-ksi
Ag·ro2 (KLi)2 J
~ := I -(: ~
2
= 0.7
Elastic lateral torsional buckling stress
Date: 4/25/2018
Sheet ____ of ___ _
Drawing#: _____ _
(Eqn C3.1.2-13)
(Eqn C3.1.2-10)
(Eqn C4.2-3)
(Eqn C4.2-1)
The critical elastic buckling stress will be the minimum stress of buckling about x or y axis,
torsional buckling, and lateral-torslnal buckling
Fe:= min(( <Tex crey cr1 Feit))= 105.3-ksi
\, := ]f. = 0.6
Fn := (o.658 >-/)FY if >-c ,;; 1.5
--·Fy otheiw,se
(
0.877') .
>-/ )
Compression Strength for
!le:= 1.80
~ ~
(ASD)
Compression Strength for
LRFD:
<l>c := 0.85
l<i>c·Pn = 4.7·ki~
(LRFD)
= 28.9-ksi
(Eqn C4-4)
(Eqn C4-2)
(Eqn C4-3)
(Eqn C4-1)
C:\Users\SNorville\Desktop\Shoppes\Regal Cinema\AISI SteenConcentric Compression Single Stud.xmcd Page:2
9:30AM
Thornton Tomasetti
Project: Regal Cinema Project#: S16012
By: SAN Checked By: _____ _
METAL STUDS AXIAL CAPACITY: SINGLE STUD
t""'I
!Stud
I!] Units
Input
KL,.:= 2-ft
Kry== 2-ft
KLi== 2-ft
!600S162-43 33 !
E := 29500-ksi
G:= 11300-ksi
I!] Effective Area
Slenderness Check
.. ---
Date: 4/24/2018 Sheet ____ of ___ _
Drawing#: _____ _
(Effective length about x-axis)
(Effective length about y-axis)
(Effective length for twisting)
(Elastic modulus)
(Shear modulus)
(Nominal uniform compression stress)
if max KL,., Kry 1 > 200, "Upsize stud" , "Slenderness OK" 1 = "Slenderness OK"
~ ~) )
Elastlc flexural buckling stress for bending about x-axis
2
1T -E "ex:= ---= 2618.4-ksi
(
KL,.'/
rx )
Elastic flexural buckling stress for bending about y-axis
,r2-E
"ey := = 167.7-ksi
(
Kry 12
ry )
(Eqn C3.1.2-8)
(Eqn C3.1.2-9)
C:\Users\SNorville\Desktop\Shoppes\Regal Cinema\AISI Steel\Concentric Compression Single Stud_Large.xmcd Page:1
9:28AM
Thornton Tomasetti
Project: Regal Cinema Project#: S16012
By: SAN Checked By: _____ _
Polar radius of gyration about shear center
r0 := J,/ + r/ + "O 2 = 2.6-in
Elastlc torslonal buckling stress
1 [ 1-?E-c~l
cr1 := Ag·r/ • G·J + (KLiJ2 J = 187.6-ksi
~ := I -(: ~
2
= 0.8
Elastlc lateral torsional buckling stress
Date: 4/24/2018 Sheet ___ of ___ _
Drawing#: ______ _
(Eqn C3.1.2-13)
(Eqn C3.1.2-10)
(Eqn C4.2-3)
(Eqn C4.2-1)
The critical elastic buckling stress will be the minimum stress of buckling about x or y axis,
torsional buckling, and lateral-torsinal buckling
Fe:= min(( crex crey cr1 Feit})= 167.7-ksi
>-e:= ~=0.4
Fn := (o.65//)FY if >-e S 1.5
--· o erwise
(
0.877 \ F th .
x/) Y
Compression Strength for
fie:= 1.80
~ ~
(ASD)
Compression Strength for
LRFD:
<lie:= 0.85 (LRFD)
l<i:>e· p n = 8.2· lci~
= 30.4-ksi
(Eqn C4-4)
(Eqn C4-2)
(Eqn C4-3)
(Eqn C4-1)
C:\Users\SNorville\Desktop\Shoppes\Regal Cinema\AISI SteenConeentrie Compression Single Stud_Large.xmcd Page:2
9:28AM