Loading...
HomeMy WebLinkAbout2501 EL CAMINO REAL; ; PCR14195; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 ' 01-13-2015 Plan Check Revision Permit No:PCR14195 Job Address: Permit Type: Parcel No, Valuation: Reference #: PC#: Project Title: Applicant: Building Inspection Request Line (?60) 602-2725 2501 EL CAMINO REAL CBAD PCR Lot#: 0 1563020800 $0.00 CB132181 . Construction Type: 1A WESTFIELD MODIFICATIONS TO Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: DOCK, DOOR, WALL, EQUIPMENT, CEILING CLEARANCES, Owner: CMF PCRL LC ISSUED 11/24/2014 SKS 01/13/2015 01/13/2015 EVEN SHAY STE 1 3156 LIONSHEAD AVE CARLSBAD CA 92010-4703 760-692-4019 C/0 WESTFIELD PROPERTY TAX DEPT PO BOX 130940 DEPT WFLD CARLSBAD, CA 92013 Plan Check Revision Fee Fire Expedited Plan Review Additional Fees $870.00 $362.50 $0.00 Total Fees: $1,23,2.50 Total Payments To Date: $1,232.50 Balance Due: Inspector:------ FINAL APPROVAL Date: ------Clearance: _____ _ $0.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You.have 90 days from the date this permit was issued to prolest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactiof!S D9ES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees·in connection with this project. NCJR DOES IT APPLY to any fees/exactions of which vou have oreviouslv been oiven a NOTICE similar to this or as to which the statute of limitations has oreviouslv-otherwise exoired. Ccityof Carlsbad PLAN CHECK REVISION APPLICATION 8-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No. -;pC-62.-{ L.{ { q .S-- Project Address 2501 El Camino Real Original Plan Check No. CB13-2181 Date 11-24-14 Contact Shay Even Ph 760-692-4019 Fax 760-692-4105 Email severi@hofmanplanning.com Contact Address 3156 Lionshead Avenue, Suite 1 City Carlsbad Zip 92010 General Scope of Work Modifications to the Building shell in support of Retail space No.1-Tesla Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: [{].Plans D Calculations D Soils D Energy D Other 2. 3. 4. Describe revisions in detail List page(s) where List revised sheets each revision is that replace shown existing sheets 1. Modified Truck dock area in support of the build-out for Retail space AD5.{New),A2.1 A2.1,A3.1,A4.1 No.1(Tesla). Revised footprint, removed dock equipment, revised slab A3.1, A4.1,A5.2, AS.2, M3.01, on grade, modified duct work, removed and relocated floor drains and A5.9{New), P3.01 relocated hose bibs. M3.01 ,P3.01 2. Added door No. 119 A2.1,A5.9,A 10.1 A2.1, A10.1 3. Added wall type to partitions A2.1,A5.9,A10.6 A2.1, A10.6 4. Added equipment fig. 's, details and defined floor areas to receive A2.1,A5.9 A2.1 cone. leveling compound. 5. Re-routed condenser supply, Electrical conduits, vent piping,{3) 3" FP0.01, M3.01, FP0.01 ,M3.01, cold water pipes, and fire sprinkler mains to assure ceiling clearances. P3.01 ,E2.01 P3.01 ,E2.01 6. Electrical: revised switchboard MMDS1, Added (2) 3" conduit from E4.00, E4.01, E4.00, E4.01, TELBB1, relocated WSHP-1.1, added power fot new FSD and revised E4.02 E4.02 lighting, power, signal and fire alarm at corridor. Does this revision, in any way, alter the exterior of the project? D Yes [ZI No 5. 6. 7. 8. Does this revision add ANY new floor area(s}? D Yes [ZI No Does this revision affect any fire related issues? 0 Yes D No RECElllED NOV 2 4 2014 CITY OF CARLSBAD ,.@'.$'Signature-+---11'-\,,,,~~,:...-f-.,C.......,._...'---~--~--------~L'd-1.1t1 _+,..,Hi:,i'.1-,r \;JFJ,.,·Hu"'t-lifh"v"-i~...,, =o=N-,---- 1635 Faraday Ave fh: 7 60-602-2719 fax: 7 60-602-8558 fmait. building@carlsbadca.gov www.carlsbadca.gov EsGil Corporation In <Partnersli.ip witli. government for (}Jui(aing Safety DATE; DEC.08,2014 CJ APPLICANT CJ JURIS. JURISDICTION: CARLSBAD CJ PLAN REVIEWER CJ FILE PLAN CHECK NO.: 13-2181 (REV. #7) -NEW i>CR #14-195 _ SET: I PROJECT ADDRESS: 2501 EL CAMINO REAL PROJECT NAME: 3 STORY MALL ADD & REMODEL) [2s] The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: Michael Sheller 2049 Century Park East 41 st floor, Century City, CA 90067 ~ EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Mike Telephone#: 310-575-5909 Date contacted: (by: ) Email: msheller@westfield.com Fax #: Mail Telephone Fax In Person l:8J. REMARKS: Misc. Revisions to accommodate the new T.I. for Tesla Dealership. Selected sheets are impacted and resubmitted. By: ALI SADRE, S.E. EsGil Corporation D GA D EJ D PC Enclosures: 11/24 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 < ' [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD (REV. #7) -NEW PCR #14-195 PREPARED BY: ALI SADRE, S.E. PLAN CHECK NO.: 13-2181 DATE: DEC.08,2014 BUILDING ADDRESS: 2501 EL CAMINO REAL BUILDING OCCUPANCY: M/ A2/B BUILDING PORTION misc. revisions to accommodate the new Tesla · dealership Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: D Repetitive Fee [3 Repeats • Based· on hourly rate Comments: D AREA Valuation ( Sq. Ft.) Multiplier By Ordinance Complete Review o Other Hourly 0 EsGil Fee TYPE OF CONSTRUCTION: 11-B/SPR. Reg. VALUE ($) Mod. $a10.001 o Structural Only 61 Hrs.@* =====$=1=1=6·=0:0 $696.001 Sheet 1 of 1 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 & . ~<. PLAN CHECK . ~o Community&Economic REVIEW · :() Development Department ~· CITY OF CARLSBAD · ~,A 1635 Faraday Avenue TRANS MITT AL "')', Carlsbad CA 92008 00 www.car1sbadca.gov . ~Ls DATE: 1/13/15 PROJECT NAME: shell (tesla) PROJECT ID: PLAN CHECK NO: pcr14195/cb132181 SET#: I · ADDRESS: 2501 ecr APN: 1ZJ This plan check review is complete and has been APPROVED by the fire Division. By: cwong A Final Inspection by the Division is required ~ Yes D No D This plan check review is. NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: .. .. PLANNING ENGINEl;RING a .. FIR·E PREVt:NTION . . 760-602-4610 760-602-2750 .. · 760,602-46~5. · . . D Chris Sexton D Kathleen Lawrence D Greg Ryan 760-602-4624 760-602-27 41 760-602-4663 Chris.Sexton®carlsbad~a.gov Kathleen.Lawrence@carlsbadca.gov Grego!'.)'..Ryan@carlsbadca.gov D Gina Ruiz D Linda Ontiveros ~ Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@c~rlsb,1!:l~~-gov Linda.Ontiveros@carlsbadca.gov. C)'.nthia.Wong@carlsbadca.gov D D D Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov . Remarks: * * * For Approval to be valid, make. additions to final set. This will note that all fire protection systems are for reference ONLY**. **APPROVED: Page 1 of2 . THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Page2 of2 " El Carlsbad Ffre Department .. ' . . Plan Review Da,te ofR,epor.t: 01~06,.2015 Name: Address: Perm.it#: P.CR14}95 EVEN SHAY STE 1 : ·3156 LlONSHEAP A Vi ' . CA.RLSBADC.A ,920lQ .. 470J Job Nam~: WESTFIELD MODIFICATION~ TO Job Address: 2501 EL CAMI_NO REAL: CSA!;> INCOMPLETE The i.tem you have $Ubmitted for review is iJ1complete. At t.his time, this office cannot adequately conduct a review to determin~ c.Qmpliance with the applica~le codes a,nd/or standards. Please review carefully all comments attached. Please re$ubmit the necessary plans and/or specifiqations, with changes "clouded", to this office for review fUld apprQval. · Conditions: Cond: CON0Q07967 [MET]. *** For Approval to be valid, make additions to final set. This will note that a,11 fire protection systems .are for reference-ONLY**. ** APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR, THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, · CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS-APPROVAL SHALL NOT BE HELD TO 'PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Entry: Q 1/06/2015 l3y: cwong Action: AP Page 1 of 1 '• . Bl -DG. DEPT COPY Recommendation for Approvat" Daryl K. James & Associates, Inc. 205 Colina Terrace VJsta, CA 92084 T. (760) 724-7001 Email: kitfire@sbcglobal.net APPLICANT: Shay Even PROJECT NAME: Retail Expansion PROJECT DESCRIPTION: PCR14t95 / CB132181 Checked by: Daryl K..James Date: 12/24/2014 JURISDICTION: Carlsbad Fire Department PROJECT ADDRESS: 2501 ECR 1. vModified truck dock area in support of the build-out for Retail space No, 1 (Tesla). Revised footprint, removed dock equipment, revised slab on grade, modified ductwork, removed and relocated floor drain$ and relocated hose bibs. · 2. vAdded door No. 119 3.. v Added wall type to partitions. A 10.6 All rated wall details to include ICC evaluation report#, UL Listing ·or reference to Item number iri 2013 CBC Table 721.1(2) 4.-v Added equipment ftg's, details and defined floor areas to receive cone. leveling compound. 5. vRe-routed condenser supply, Electrical conduits, vent piping, (3) 3" cold water pipes, and the fire sprinkler mains to assure ceiling clearances. vD1-1': List Fire Sprinkier System, designed in accordance with 2013 CFC 903 and 2013 NFPA 13, signed ~md submitted by a C-16 CA Licensed Fire Protection Contractor, as a deferred submi_ttal. 6. vE:lecttical: revised switchboard MMbS1, Added (2) 3" cor:,duit from TEL881, relocated WSHP-1.1, added power for new FSD and revised lighting, power, sign~I and fire alarm at corridor. D1-1: List Fire Alarm System, designed in accordance with 2013 CFC 907 including CFC 907.2 sections specific to occupancy groups and 2013 NFPA 72, signed and submitted by a C10 CA Licensed Electrical Contractor or Electrical Engineer, as a deferred submittal. 1= JPRA ARCHITECTS planning architecture interiors environmental graphics November 20, 2014 REFERENCE: PROJECT NO: BULLETIN NO. 11 INTENT Westfield Carlsbad Phase 1 -May Building Repurpose Carlsbad, CA 1739 This Bulletin has been issued to modify and/or clarify the Contract Documents, including the drawings and specifications. Unless otherwise instructed, the information contained within this Bulletin shall take precedence over the original Contract Documents as well as previous Bulletins and Addenda, and shall be hereinafter a part of the Contract Documents. CONTENTS: Content of Bulletin #11 provides selective demolition and construction modifications to the base building in support of the Tenant modifications to retail space No. 1.(Tesla) The scope of the modifications are described below by sheet no. and have been bubbled on the issued drawings. CONTENTS: ARCHITECTURAL: 1. SHEET DI ,..1: a. Added 2 new Architectural sheets. 2. SHEET AD-5.1: a. Removed full height C.M.U. wall at truck dock. b. Removed dock leveler equipment. C. Removed concrete slab on grade in preparation locations of pad footings. RECE~\lED d. Removed 8" curb adjacent to truck dock. e. Removed guard posts w/ ftg. 3. SHEET A2.1: a. Provided reference to new enlarged plan sht. A5.9. b. Revised wall type references. C. Indicated equipment pad fig's. d. Removed truck dock area. NOV 2 4 2014 CITY OF CARLSBAD BUILDING DIVISION 39300 West Twelve Mile Road. Suite 180 Farmington Hills Ml 48331 phone 248.737.0180 fax 248.737.9161 www.jpra.com gg JPRA ARCHITECTS Westfield Carlsbad Phase 1 -May Building Repurpose JPRA Project #1739 November 20, 2014 Bulletin No. 11 4. SHEET A3.1: a. Revised the Tenant improvement floor plan to include Tesla layout. This sheet is issued for reference only. Tenant build-out is documented and permitted by other. 5. SHEET A4.1: a. Revised the reflected ceiling plan 6. SHEET A5.2: a. Indicates revised scope of the truck dock/ compactor area and provided reference to new sheetA5.9 7. SHEET A5.9: a. Added enlarged plan sheet defining modifications to the shell building in support of the retail Tenant no.1 space. (Tesla) 8. SHEET A10.1: a. Added door No. 119 to door schedule. 9. SHEET A10.6: a. Added wall type C1 FIRE PROTECTION: 1. SHEET FP 0.01: a. Re-routed the fire sprinkler main pipes to provide high ceiling arrangement in the front show room area. b. Directed to move an existing fire sprinkler at gridline 10 westward to provide high ceiling arrangement in that area. MECHANICAL: 1. SHEET M-3.01: PLUMBING: a. Modified the supply duct and registers for WSHP-1.1 serving trash compactor area and corridors with transfer grilles and relief lou_ver , and relocated thermostat. b. Re-routed condenser water supply and return lines to provide high ceiling arrangement in the front show room area. 1. SHEET P-3.01: a. Re-routed vent pipe to provide high ceiling arrangement in the front show room area. b. Re-routed three 3" cold water pipes to provide high ceiling in the front show room area. c. Removed existing floor drain at grid 8K (where new wall placed), and included a new floor drains in trash compactor bay. d. Relocated two hose bibs. Page 2 of 3 • 88 JPRA ARCHITECTS ELECTRICAL: 1. SHEET E-2.01: Westfield Carlsbad Phase 1 -May Building Repurpose JPRA Project #1739 November 20, 2014 Bulletin No. 11 a. Added notes to raise conduits in the Tesla Service Area to 14'-6" clearance. 2. SHEET E-4.00: a. Revised main switchboard MMDS1 for Tesla. b. Added (2) 3" C. from TEL881 to Tesla IT Room. 3. SHEET E-4.01: a. Revised Lighting, Power, and Signal for new extended corridor. b. Relocated WSHP-1.1. c. Added power for new FSD. 4. SHEET E-4.02: a. Revised Fire Alarm for new extended corridor. NEW DRAWINGS ISSUED: (All dated 11/20/14) AD5.1, A5.9 DRAWINGS ISSUED: (All dated 11/20/14) DI-1, A2.1, A3.1, A4.1, A5.2, A10.1, A10.6, FP0.01, M3.01, P3.01, E-2.01, E-4.00, E-4.01, E-4.02 END OF BULLETIN NO. 11 Westfield Carlsbad -Phase 1 -May Building Repurpose Submitted by Gregg R. Stouder, AIA on behalf of William J. Beitz. Principal, JPRA Architects Page 3 of 3 Raenette Abbey From: Sent: Kevin Beideman <kbeideman@us.westfield.com> Tuesday, January 06, 2015 11:47 AM To: Cynthia Wong; Bill Heitman Cc: Subject: Paul York; Raenette Abbey; Mike Peterson; Janet Altar RE: Outstanding PCRs Cindy, . On the permit for the seating change you are correct as a ball was dropped here at Westfield but I will get it resolved quickly. As an update to a couple of issues that you and I have spoken on; the internal ansul in the Auto-Fry appliances will be hooked ·up later this week a_nd ready for inspection soon. The UL Report request has been made back to the M EP- Engineers and they responded earlier today that it is forth coming, I will forward once received. I also appreciate the document you sent with regards to the pull station cover; can you approve its for use at the front door pull station? If so I will get it ordered and possibly in this week as well. ' I will communicate back when the pretesting for the Auto-Fry appliances has been completed. Kevin Beideman Construction Westfield Design / Construction. Westfield Carlsbad 2525 El Camino Real / Suite 100 / Construction Offices Carlsbad, CA 92007 Off. 760. 434.2450 / Cell 619. 869.0106 kbeideman@westfield.com From: Cynthia Wong [mailto:Cynthia.Wong@carlsbadca.gov] Sent: Tuesday, January 06, 2015 9:55 AM To: Bill Heitman; Kevin Beideman Cc: Paul Yqrk; Raenette Abbey; Mike Peterson; Janet Altar Subject: Outstanding PCRs I have sent a few emails over the holidays-I hope that both of you received these. I have copied all individuals that have been involved and building personnel that will be coordinating the final archived sets. . ' Bill as my primary POC, an issue of PCRs (plan check revisions) have come to light as we attempt to ties up loose ends. -Both Regal and Shell have permits that' need to be pulled. This in itself is going require some coordination. If you are unaware, we have the first set of shell drawings and multiple rolls of PCR sheets that have never been slip sheeted together. This needs to be done, by appointment, by an individual familiar with the changes, submittals, etc. of this job. I am surprised_to see a PCR (Tesla) for work on the shell that I thought was completed . . Please provide two (2) copies in PDF form of the final sets of drawings. for, all that has been submitted for this project. The drawings will be for the final set (inclusive of all PCRs). 1 ~ ~ Kevin, Same for you. The permit for changes to the seating was never pulled. I believe that slip sheeting needs to be done as well. In addition, we are waiting for the Ansul tie in, sheets on grease laden vapors (UL or similar) and I have qn assembly permit application that needs to be forwarded to Regal representatives for their annual fire assembly permit. I believe I sent an email to Bill about this. This would be best handled between you and I because I think that the permit can be as one and more cost effective if done this way. Thank you, Cindy 2